14
1 Annex no. 2 Tender documentation to the public contractprocurement ‘A device for thin layer chromatography with flame-ionization detector TLC/FID’ Contract on supply Concluded as perunder § 1746 clause 2 and Act No. 89/2012 Coll., Civil Code, as amended Contracting parties: Business company: Unipetrol Centre for Research and Education, a. s. Head office: Revoluční 84, 400 01 Ústí nad Labem CRN: Identification number: 62243136 VAT ID: Tax Identification number: CZ62243136 Bank account: Komerční banka Ústí nad Labem Account No.: 7009-411/0100 Record in Companies Register: District court in Ústí nad Labem, section B, insert 664 Represented by: Ing. František Svoboda, Chairman of the Board doc. Ing. Jaromír Lederer, CSc., Vice-Chairman of the Board Person authorized to act in technical affairs: Ing. Veronika Vavroušková – Manager of Infrastructure Projects, e-mail: [email protected], tel: 471 122 305 Person for implementation: Ing. Ladislav Kudrlička, Research Employee e-mail: [email protected], tel: 736 506 280 on one side, (Furtheras the first contracting party, (hereinafter referred to as “Client”) and Business company / name [TO BE ADDED BY THE applicantBIDDER] Identification number/ birth registration no.:[TO BE ADDED BY THE applicantBIDDER] Head office/ address: [TO BE ADDED BY THE applicantBIDDER] CRN: [to be added by the applicant] VAT ID: [to be added by the applicant] Identification number: [TO BE ADDED BY THE BIDDER] Tax Identification number: [TO BE ADDED BY THE BIDDER] Bank account: [TO BE ADDED BY THE applicantBIDDER]

Contract on supply Business company: Unipetrol Centre for ... · chromatography with flame-ionization detector – TLC/FID’ for payment, spare parts and consumables, and accessories

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Contract on supply Business company: Unipetrol Centre for ... · chromatography with flame-ionization detector – TLC/FID’ for payment, spare parts and consumables, and accessories

1

Annex no. 2 Tender documentation to the public contractprocurement ‘A device for thin

layer chromatography with flame-ionization detector – TLC/FID’

Contract on supply

Concluded as perunder § 1746 clause 2 and Act No. 89/2012 Coll., Civil Code, as

amended

Contracting parties:

Business company: Unipetrol Centre for Research and Education, a.

s. Head office: Revoluční 84, 400 01 Ústí nad Labem

CRN: Identification number: 62243136

VAT ID: Tax Identification number: CZ62243136

Bank account: Komerční banka Ústí nad Labem

Account No.: 7009-411/0100

Record in Companies Register: District court in Ústí nad Labem, section B, insert

664

Represented by: Ing. František Svoboda, Chairman of the Board

doc. Ing. Jaromír Lederer, CSc., Vice-Chairman of

the Board

Person authorized to act

in technical affairs: Ing. Veronika Vavroušková – Manager of

Infrastructure Projects, e-mail:

[email protected], tel: 471 122 305

Person for implementation: Ing. Ladislav Kudrlička, Research Employee

e-mail: [email protected],

tel: 736 506 280

on one side,

(Furtheras the first contracting party,

(hereinafter referred to as “Client”)

and

Business company / name [TO BE ADDED BY THE

applicantBIDDER]

Identification number/ birth registration no.: [TO BE ADDED BY THE

applicantBIDDER]

Head office/ address: [TO BE ADDED BY THE

applicantBIDDER]

CRN: [to be added by the applicant]

VAT ID: [to be added by the applicant]

Identification number: [TO BE ADDED BY THE BIDDER]

Tax Identification number: [TO BE ADDED BY THE BIDDER]

Bank account: [TO BE ADDED BY THE

applicantBIDDER]

Page 2: Contract on supply Business company: Unipetrol Centre for ... · chromatography with flame-ionization detector – TLC/FID’ for payment, spare parts and consumables, and accessories

2

Account No.: [TO BE ADDED BY THE

applicantBIDDER]

Record in Companies Register: [TO BE ADDED BY THE

applicantBIDDER]

Represented by:

onas the other sidesecond contracting party

(hereinafter referred to as „the Supplier“)

based on their true and free will, conclude this

Contract on supply

(hereinafter referred to as „AgreementContract“)

PREAMBLE

The contracting parties herewithhereby conclude this Contract in relation to the results

fromof the public contractprocurement proceedings of small scale titled ‘A device for

thin layer chromatography with flame-ionization detector – TLC/FID’ (hereinafter

referred to as ‚Public ContractProcurement‘) where the most beneficialsuitable bid of

Supplier was selected. This Contract defines the scope of fulfilmentconsideration, which

is subject tomatter of the Public ContractProcurement.

The Public ContractProcurement fulfilment as perunder this Contract forms a part of the

project implementation ‘The development of UniCRE centre‘, implemented within the

programprogramme ‘National Sustainability Program I‘ (NPU I) with financial support

from Ministry of Education, Youth, and Sports of the Czech Republic.

I. Subject matter and purpose of the Contract

1. Subject matter of the Contract is a transfer of device ‘A device for thin layer

chromatography with flame-ionization detector – TLC/FID’ for payment, spare parts

and consumables, and accessories which is further detailed in cataloguedata sheets in

annex no.1 hereof, which together forms annex no. 1 of the Contract (hereinafter

referred to as the „Supply“). The fulfilment as perconsideration provided under this

Contract moreover includes the transport of theinstrumentthe device to the placesite

of fulfilmentperformance, its installation, commissioning, servicing activity, and

training of the Client’s employees by the Supplier resulting in the

eligibilityqualification of the Client’s employees to appropriately enjoyuse and

operate the installed Supply. An integral part of thisthe Supply is the delivery of

accessories and consumption material defined in annex no. 2 hereof, completed2 of

the Contract, drafted by the bidderSupplier based on the specifications in the tender

documentation for the contractPublic Procurement, i.e. the Supplier’s bid.

2. The obligation of the Supplier to deliver the Supply also includes:

Issued initial overhaul report

Detailed manual for the instrumentdevice operation in English language.

Conformity declaration and other materials required for the inspection bodies of

the above mentioned device

Page 3: Contract on supply Business company: Unipetrol Centre for ... · chromatography with flame-ionization detector – TLC/FID’ for payment, spare parts and consumables, and accessories

3

Respective certificates with the authorisation to use the instrumentdevice in the

Czech Republic, i.e. common attests issued by the respective test laboratory in

some of the EU country in Czech language.

One day basic training of the operators immediately after the installation.

Subsequent operator one day training approximately 3-5 months after the Supply

delivery. Accurate deadlineterm will be agreed with the Client. The operators are

the employees of the purchaserClient; at least 2 persons per instrumentdevice.

Installation in UniCRE building in premises Chempark in Litvínov.

Spare parts and consumables additionallyadditional to the specified commonly

supplied material in the respective annex with the instrument device technical

specification.

24-month warranty for the instrument from the bidderdevice

In caseGuaranty of the instrumentSupplier repair in the warranty period, the

warranty period extends for the repair duration period, i.e. the period from the

defect reporting to its removal. If the warranty repair lasts longer than 3 months

or the total period of the instrument repairs in one year is longer than 3 months,

the client may require the supplier to supply a new device, its parts or the

defective unit.

Warranty of the bidder for the provision of spare parts and consumables for 10

years from the first instrumentdevice installation.

Post-warranty service for at least 10 years.

3. The purpose of the Contract is the adjustmentstipulation of rights and obligations of

the contracting parties related to the Supply and the provision of the below defined

services required for the project implementation ‘Development of UniCRE centre’

(see the Preamble hereof).

II. General conditions for the Supply completion

1. The Supplier undertakes to perform the Supply appropriatelyduly and in time, in

compliance with the Contract and the catalogue sheets forming an annex hereto.

2. The Client undertakes to pay the contractual price for the Supply as defined in article

V. hereofof the Contract, and provide the Supplier with required information and

appropriate cooperation for the purpose of the Contract fulfilment of obligations

under the Contract.

3. The Client is entitled to inform the Supplier about its reservations or give the

Supplier detailed instructions for the Supply completion. The Supplier is obligated to

considerfollow Client’s instructions. The Supplier’s duty to perform its contractual

obligations independently with due care and respect themto inform the Client on

ineligibility of its instructions will not be affected by this clause.

4. The Supplier undertakes that the Supply will not suffer from any legal and other

defects. The Supplier shall provide the Client with right to use any copyright

protected part of the Supply in the extent necessary for the purpose of the Contract.

5. The Supplier By signing thisof the Contract the Supplier confirms that all technical

and delivery conditions of the Supply are included in the price calculation, in

Page 4: Contract on supply Business company: Unipetrol Centre for ... · chromatography with flame-ionization detector – TLC/FID’ for payment, spare parts and consumables, and accessories

4

compliance with this Contract, and the defined matters are sufficient for concluding

this Contract. The Supplier also declares that it is fully acquainted with other

conditions for the fulfilment of obligations resulting from this Contract but, which

are not defined explicitly. The Supplier is entitled In relation with the fulfilment of

the Supply the Supplier is entitled to request instructions from the Client; the Client

is obligedobligated to provide the Supplier with the obligationsinstructions without

delay. The Supplier’s duty to perform its contractual obligations independently with

due care and to inform the Client on ineligibility of its instructions shall not be

affected by this clause.

6. In the performance hereof, The Supplier is obligedobligated to proceedperform its

obligation under the Conrtact with due diligencecare. The Supplier is obliged to

observe theabide by binding legal regulations, directives, and other regulations (in

particular in relation to the principles of cooperation of the companies in Chempark

Záluží.). The rules and regulationsconditions for the entry and movement

in Chempark Záluží are defined in annex no. 3 hereof. Therefore, the Supplier must

is obligated to conclude a separate contract with the Administrator of Chemopark

Záluží an adequate contract to be granted the entry to Chemopark premises . This

applies providing ifprovided that the fulfilment locationsite of performance is

Chempark, see article III. hereofof the Contract.

7. The SuppliersSupplier undertakes that the Supply will fulfil thecomply with

technical parameters defined in annex no. 2 hereofof the Contract.

8. The Supplier is obliged to provide all documents and documentsdocumentation

submitted to the Client as a part of the Supply in Czech language, or in translation to

Czech language.

9. The Supplier is obligedobligated to mark the correspondence and payment records to

be delivered to the Client with the Client’s Contract number and the name of the

Public ContractProcurement. The Client can return the unmarked correspondence

and payment records to the Supplier. Potential related delay is at the expense of The

Supplier shall be held liable for eventual delay related therewith.

10. After the Contract conclusion of the Contract, the SupplierSeller is further

obligedobligated to perform servicing activity in particular based on the

instrumentdevice adjustments upon the request of the purchaserClient and on the

removal of defects caused by the purchaser’s employeeswhich are not subject to the

warranty., including the defects caused by the Client’s employees. This service will

be provided ad hoc based on the requirements – therequests – orders of the

purchaserClient (hereinafter referred to as ‘the servicing activity’). Detailed

description of the servicing activity is specified in Annex no. 4 hereof. In order to

eliminate allof the Contract. For avoidance of any doubts, the contracting parties

herewithhereby declare that the servicing activities represent the activities not

performed by the sellerSupplier for the purchaserClient as warranty activity within

the warranty service for the warranty period free of charge (see article VIII clause 4

hereof).

III. Date and place of delivery

Page 5: Contract on supply Business company: Unipetrol Centre for ... · chromatography with flame-ionization detector – TLC/FID’ for payment, spare parts and consumables, and accessories

5

1. Binding and final deadlineterm for appropriate delivery and installation of the Supply

is within 90 days from the Contract conclusion.

2. Failure to observedeliver and install the deadline for appropriate Supply deliveryin

stipulated term will be considered a serious material breach of the Contract violation

which entitles the Client to immediate withdrawal from the Contract.

3. The fulfilment locationsite of performance of the Contract subject matter, i.e. the

location of supply and installation of the Supply is the existing building no. 2838,

located in the industrial premises Chempark Záluží - Záluží 1, 436 70 Litvínov

(hereinafter referred to only as „Chempark“). Chempark premises are managed by

UNIPETROL RPA s.r.o., IČ Identification number: 275 97 075, with head office in

Litvínov - Záluží 1, Post Code 436 70 (hereinafter referred to as the „Chempark

administrator“).

4. The Supplier will ensure all permissions at its costs, required for the entry of vehicles

and employees in the Chempark premises, including all related matters. at its own

costs. The Client undertakes to cooperate with the Supplier during theon provision of

the required permissions.

IV. HandoverDelivery and acceptancetakeover of the Supply and transfer of the

ownership title

1. The Supplier must handoveris obligated to deliver the Supply to the Client

appropriatelyduly and in time, in compliance with the instructions of the Client and

this Contract, in quality corresponding to the specification of the Supply as per

thisset forth under the Contract, all its annexes and purpose for which the Supply is

provided.

2. In order to eliminate allFor avoidance of any doubts, the contracting parties

statedeclare that the Supply is appropriately handed overdelivered at the moment of

adequatelyduly completed installation of perfectfaultless and complete Supply as per

theaccording to instructions of the Client in the designated location, and after

appropriate training of the Client's employees.

3. The handoverdelivery and acceptancetakeover of the Supply by the contracting

parties is subject to the handoverdelivery protocol in writing which will, amongst

other, contain the explicit confirmation of the Client on the acceptance of the Supply.

4. At the moment of acceptingtakeover of the Supply, the Client receivesacquires the

ownership titles to the Supply and all tangible and intangible outputs directly related

to the Supply.

5. If the Supply indicates any defects, the Client is entitled to refuse the

acceptancetakeover of the Supply.

V. Contractual price for the supply

1. Total price of the Supply, in relation to the fulfimentfulfilment as per art. I. hereof,of

the agreedContract, has been stipulated as maximum price is defined as limit priceat

[TO BE ADDED BY THE BIDDER IN COMPLIANCE WITH THE EVALUATED

Page 6: Contract on supply Business company: Unipetrol Centre for ... · chromatography with flame-ionization detector – TLC/FID’ for payment, spare parts and consumables, and accessories

6

LIST OF ITEMS] CZK, excluding VAT, or [TO BE ADDED BY THE BIDDER IN

COMPLIANCE WITH THE EVALUATED LIST OF ITEMS] CZK with VAT.

3.2. Detailed breakdown of the Supply price calculation of the Supply is defined in the

evaluated list of items (price sheet) forming annex no. 2 hereof, and it complies with

the evaluated list of items defined by the Supplier in its bid for the Public

ContractProcurement).

5.3. Unless explicitly defined otherwise in the Contract, the Supply price includes all

costs required for appropriatedue fulfilment of the Supplier’s obligation as per

thisunder the Contract, including all services related to the Supply.

VI. Payment Terms

1. The Client will not provide the Supplier with any advance payments.

2. The Supply price as per art. V clauseparagraph 1 hereofof the Contract will be paid

by the Client to the Supplier based on an invoice issued by the Supplier after

appropriatedue Supply acceptance withwithin 21 maturity days after the invoice

acceptancedelivery.

3. The invoice mustwill contain all matters of tax document as per part 5, Act No.

235/2004 Coll., on value added tax and with the Act no. č. 563/1991 Coll., on

Accountancy. It mustwill contain:

Registration number of the Contract

Maturity date

Identification of banking institution and account no. to which the payment is

to be transferred

Public ContractProcurement title

4. If the invoice does not contain the above specified mattersrequirements, the Client is

entitled to return it to the Supplier for correction or completion. In such case the

maturity period stops, and new maturity period as per this Contract starts by

deliveringthe day of delivery of the corrected invoice to the Client.

VII. Materials for the Supply completion

1. The Supplier declares it has all information and materials required for appropriate

completion of the Supply, and it is acquainted with local conditions at site of

performance of the Supply fulfilment location.

.

2. The Supplier undertakes to exercise due diligence to review all materials received

from the Client and/ or the prior to the received before delivery of the Supply in

order to specifyand/or received additionally for the purpose of specification of the

Supply installation with due care, and to notify the Client in writing without undue

Page 7: Contract on supply Business company: Unipetrol Centre for ... · chromatography with flame-ionization detector – TLC/FID’ for payment, spare parts and consumables, and accessories

7

delay of all potential defects.

3. All materials submitted materials from the Client to the Supplier remain in the

ownership of the Client. The Supplier can use it solely for the purpose of the Supply

performance. Immediately after appropriate provisiondue delivery of the Supply, the

Supplier undertakes to return all materials to the Client.

VIII. Liability for Defects

1. The Supplier undertakes that the Supply will be the 1stof premium quality, i.e. all

properties of the completed Supply will satisfycomply with the defined requirements,

i.e. the utilisation, operation safety, defect-free operation, sustainability, economic

operation, the provision ofmaintainability, cost-efficiency, compliance with

environmental protection, etc. The properties will comply with the valid legal

adjustmentlaws and regulations applicable in the CR,Czech Republic, and with Czech

technical standards acceptingimplementing the European standardsregulation.

3.2. The contracting parties have agreed that the Supplier will provide a

guaranteewarranty for the Supply quality, i.e. the Supplier undertakes and guarantees

that for the duration of the contractual warranty period, the supply will be eligible for

use according to its purpose, and it will maintain the agreed properties and quality as

perstipulated in the Contract and its annexes. The Supplier guarantees that the Supply

will have the properties defined in the technical standards (ČSN) and the regulations

related to the Supply completion (hereinafter only the ‘“quality guarantee’).

warranty”).

5.3. The Supply has defects, i.e. deviations in quality, content, scope, and parameters

incompliant with the conditions defined in the Contract, technical standards, and

generally binding regulations, if the Supply completion does not comply with the

requirements defined in the Contract and other documentation related to the design.

its completion. The Supplier is responsibleliable for the defects of the Supply at the

time of handing overdelivery, and the defects occurred during the warranty period.

During the warranty period, the Supplier is not responsibleliable for the defects

occurred due to incompliance or violation with the submitted regulations for the

operation and maintenance of the device by the Client. The Supplier shall be held

liable for defects that occur after the warranty period if those prove tothe defects have

been caused by breaching of the Supplier's obligations.

7.4.The Supplier provides 24 months warranty period for the Supply including all related

activities. All thethese activities are provided free of charge by the sellerSupplier for

the warranty period duration (hereinafter only the ‘warranty activities’). The scope

and description of the warranty activities is specified in annex no. 4 hereof – the

description of the servicing activities. The provision of warranty activities by the

sellerSupplier does not affect the right of the purchaserClient to providerequest

servicing activity as per article II. clause 10 of this Contract. The warranty period

commences on the date following the delivery and acceptance of the respective

Page 8: Contract on supply Business company: Unipetrol Centre for ... · chromatography with flame-ionization detector – TLC/FID’ for payment, spare parts and consumables, and accessories

8

consideration. In case of the device repair in the warranty period, the warranty period

extends for the repair duration period, i.e. the period from the defect reporting to its

removal. handover and acceptance. The warranty period is extended by the period

when the Client cannot use the Supply due to the defects. If the warranty repair lasts

longer than 3 months or the total period of the device repairs in one year is longer

than 3 months, the Client is entitled to demand from the Supplier to supply Client

with a new device, its parts or the defective unit.

9.5. The Client will announcenotify the Supplier of the defect by fax, email, by means of

data box or mail. The notification of the defect mustwill contain a brief description

of the defect, its effects, the place, and method causingdescription (if it is known to

the Client) how the defect, and its effects occured.

11.6. If a defect of the Supply occurs during the warranty period on the completed

Supply preventing theits use for common purpose, the Supplier is obliged to

commence works to remove the defects immediately after the notification in writing

from the Client as per article VIII. clause 5 hereof. Unless the contracting parties

agree otherwise, the Supplier is obligedobligated to remove the defect preventing the

use of the Supply for common purpose at the latest within 5 working days from

delivering the notice of a defect.

13.7. If a defect of the Supply occurs during the warranty period on the delivered

Supply not preventing theits use for common purpose, the Supplier is obliged to

commence works to remove the defects after receiving the notification in writing

from the Client as per article VIII. clause 5 hereof. The Supplier is obligedobligated

to remove the defect not preventing the use of the Supply for common purpose at the

latest within 10 working days from delivering the notice of a defect (article VIII

clause 6 hereof)..

15.8. The Client is obliged to enablegrant the Supplier the entry to the premises to

remove the defects, including and allow it to use the connection to the agents.utilities.

In case of any damages during the warranty defect removal, the Supplier is obliged to

fully replacecompensate it, within three days from the enforcement by the Client.

16.9. The Supplier will handoverdeliver the repaired defectdevice to the Supplier

including the recorddelivery protocol. The completed repair, within the contractual

warranty period, is subject to 24 months warranty provided by the Supplier from the

date of its removal and date of handoverdelivery.

18.10. If the Supplier does not commence the defect removal as per the provision of this

article VIII. Contract, the Client is entitled to order the defect removal from another

supplier. The Supplier is then obliged to pay the evidentverifiable costs for the defect

removal, within 14 days from the accounting submissiondelivery of invoice by the

Client.

Page 9: Contract on supply Business company: Unipetrol Centre for ... · chromatography with flame-ionization detector – TLC/FID’ for payment, spare parts and consumables, and accessories

9

IX. Insurance

1. The Supplier at its costs will ensure the property insurance and damage liability

insurance in relation to the completion of the Supply, and it must be agreed for the

whole fulfilment period until appropriate completion at its costs until the Supply is

duly completed.

2. The Supplier undertakes, prior to the Supply performance, to agreeensure and

maintain the validity of the respective insurance for the defined period; the maximum

insurance fulfilmentpayment limit will comply with the minimum amount of

2,000,000 CZK and the level of the Supplier’s deductibleinsurance participation will

not exceed 10 % of the insurance event value. Failure to fulfil this obligation shall be

considered a seriousmaterial breach of the Contract.

X. Contractual Penalties

1. If the Supplier fails to observemeet the periodterm as per article III, the Client is

entitled to enforce and the Supplier is obligedobligated to pay to the Client a

contractual penalty of 0.2% of the Supply price for each commenced day of the delay.

If the Supplier fails to handoverdeliver the respective Supply within 30 days after the

implementation deadlinecompletion term, the situation shallwill be evaluated as the

Supplier’s inability to provide the Supply in compliance withconsidered a material

breach of the Contract, and the Client is entitled to withdraw from the Contract.

ItThis does not apply in case of force majeure – see chapter XIII.

2. If the Supplier fails to observemeet the deadlineterm for the defect removal as per

article VIII clause 6 or article VIII clause 7, the Client is entitled to account the

penalty at 1000of 1.000 CZK for each commenced day of the delay.

3. The Client undertakes, that in case of delay with the invoice payment issued as

perunder this Contract, it will pay interest on late payment of 0.05 % from the owed

amount defined on the paymentinvoice for each day of the delay.

4. In case the Supplier's violation of regulations causes a penalty to the Client by

external administration or inspection bodies, the Supplier is obligedobligated to pay

the penalty to the Client. Such case shall be considered a seriousmaterial breach of

the Contract.

5. The enforcement of the entitlementSupplier’s claim for the contractual penalty or

payment of the contractual finepenalty does not affect the Client’s right for the

damage compensation of damages caused by the Supplier to the Client by failure to

fulfil the obligations of the Supplier accepted in this stipulated under the Contract or

is bound bythe obligations under applicable law. The Supplier mustundertakes to

pay for the damage compensation using a methodthe damages under terms and

deadline notifiedconditions stated by the Client in written notice in writing.

6. The Contractual penalties and damage compensations will be accounted by

independent payment records. The Supplier is obligedobligated to pay the

contractual penalty or pay the damage compensationdamages within 30 days from

receiving the payment record issued by the Client.

Page 10: Contract on supply Business company: Unipetrol Centre for ... · chromatography with flame-ionization detector – TLC/FID’ for payment, spare parts and consumables, and accessories

10

XI. Confidentiality

1. The Supplier and the Client are obligedobligated to maintain confidentiality on all

matters forming the business secret of the second party, and also other data related to

the second contracting party, which they received in relation with the fulfilment of

this Contract, and also other data the second party indicates as confidential. The

Supplier and the Client mustwill not provide or make the data accessible to other

entities or use it for their own requirements or for other entities (including the family

members and close persons). ItThis does not apply to generally known data.

2. The confidentiality obligation relates to the matters not commonly available in the

respective business circuits, in particular:

• The matters of business nature, in particular information on internal and

economical situation and contractual partners of the second contracting party,

information on services provided or used by the second contracting party,

information on business activities and business methods of the second contracting

party,

• The matters of production nature,

• The matters of technical nature.

3. If the obligation to maintainkeep the business secret and confidentiality is violated, it

includes significant violationconstitutes a material breach of the Contract and the

contractual party which violated the obligation mustwill pay to the second

contractual party a penalty of 50,000 CZK for everyeach case of individual violation

of the confidentiality obligation. The payment of the contractual fine does not affect

or limit the right of the second contracting party for the compensation of damages

occurredsuffered in relation with the definedconfidentiality obligation violation.

XII. Duration of Contract

1. The Contract becomes valid and effective on the day of signature by both contractual

parties.

2. It is possible to withdraw from the Contract due to legalfor the reasons stated by

applicable law and reasons stated by this Contract, in particular in cases of material

breach of the Contract.

3. The Client is also entitled to withdraw from the Contract if the costs defined by the

Contract are defined as ineligible by the Managing Body for the Program of National

Sustainability Program I, or another body, upon finding the matters below:

• The Supplier’s bid processing included the participation of the Client's employees

or the member of the project implementation team or a person who participated in

the preparation or assignment of the tender proceedings;

• The Supplier’s offer was processed in association with the Supplier and the

person employed by the Client or member of the implementation team or person

who contractually participated in the preparation or assignment of the respective

tender proceedings;

Page 11: Contract on supply Business company: Unipetrol Centre for ... · chromatography with flame-ionization detector – TLC/FID’ for payment, spare parts and consumables, and accessories

11

• Subcontractor for the Contract fulfilment is an employee of the Client, member of

the implementation team or a person who contractually participated in the

preparation or assignment of the respective tender proceedings.

4. The termination of the ClientClient’s or the SupplierSupplier’s existence with the

legal successor does not cause the Contract termination but it passes to the legal

successor.

5. In the case of withdrawal from the Contract, the entitlementsrights of the Client from

the Supply defects remain valid including the damagerights to damages

compensation and the right to payment of contractual finespenalties.

XIII. Force Majeure

1. No contractual party violates the contractual obligations resulting hereofunder the

Contract if such fulfilment is prevented by force majeure occurred after the signature

of the Contract by both contractual parties.

2. Force majeure represents unforeseen exceptional situations, strikes, lockouts, and

other interruptions of industry, acts of public enemy, wars, declared or not, blockades,

riots, demonstrations, epidemics, land slides, earthquakes, storms, lighting, floods,

natural disasters, civil unrests, explosions, and any other unforeseeable events, the

contracting parties cannot affect and which are not manageable despite all care.

3. The contractual party with the rights and obligations affected by force majeure

mustis obligated to take all measures required to remove the inability to fulfil the

obligations under the Contract with minimum delay as per this Contract.

4. The Supplier is not liable for the occurred damagedamages if the failure to fulfil the

obligations resulting hereof is caused by force majeure. . Similarly, the Client is not

responsibleliable for the moratorydefault interest payments if the failure to fulfil the

obligations resulting hereofunder the Contract is caused by force majeure

5. If any of the contracting parties assumes the circumstances of force majeure occurred,

which could affect the fulfilment of the obligations, it mustis obligated to

immediately inform the second contracting parties and define the details on the

nature, probable duration, and probable effect of the circumstances. If the Client

does not issue instructions in writing, the Supplier mustwill continue in the fulfilment

of its obligations in compliance with the Contract, if it can be justly required

considering all circumstances, and it mustis obligated to seek all

alternativesalternative measures for the fulfilment of obligations not prevented by

force majeure. The Supplier mustwill not use alternative toolsmeasures unless

instructed by the Client.

6. If the Contract fulfilment becomes impossible within 2 months fromdue to a force

majeure and it will not be possible to perform obligations under the Contract, the

party suffering the force majeure, will request the second party to adjustmodify the

Contract as regardsin respect with the subject matter, price, and fulfilment

periodperformance term. If the agreement is not reached, the party suffering the force

majeure is entitled to withdraw from the Contract. The effects of The withdrawal will

occurbe effective on the day of delivering the notice delivery.

Page 12: Contract on supply Business company: Unipetrol Centre for ... · chromatography with flame-ionization detector – TLC/FID’ for payment, spare parts and consumables, and accessories

12

XIV. Final Provisions

1. The Supplier is aware that the provider of the support within the program NPU I is

entitled to perform the inspection of the project goals‘ fulfilment within the project

‘Development of UniCRE Centre' including the inspection of the support use and the

purpose orientation of the project costs utilisation in compliance with the contract on

the support provision for the solution of the research and development project

no.: MSMT-43760/2015, and also financial inspection as perunder § 39 Act no.

218/2000 Coll., on the budget regulations, as amended, and Act no. 320/2001 Coll.,

on financial inspection in public administration, as amended. The Supplier is

obligedobligated to provide full cooperation during the inspection performance by

the support provider and observe all instructions of the provider or the Client in

relation with the inspection, particularly provide access to the workplace, to persons

participating in the Contract implementation, and to all documents, computer records,

and devices forming a part of the Contract fulfilment or related to the Contract. The

Supplier mustis obligated to maintain all documents, computer records, and other

information related to the Contract fulfilment for the period defined by the Czech

Republic legal code and by directly applicable regulations of European Union, at

least for the period of the project implementation and then five (5) years after the

project completion with the planned completion at the latest on 31.12.2020. The

Supplier mustis obligated to contractually ensure that the obligations as perunder this

Contract article mustwill be fulfilled by all potential subcontractors of the Supplier.

In the case of breach of abovementioned Supplier’s obligations the Supplier is

obligated to compensate any damages suffered by the Client as a result of the breach.

3.2. The Supplier During the supplydelivery and installation of the Supply mustthe

Supplier is obligated to observe all legal regulations related to the occupational

health and safety. The Supplier is further obligedobligated to observe all legal

standardsregulations, local regulations and rules related to the workplace, observing

the safety, hygienic, and fire regulations, including the construction site premises

(the supply locationsite of performance and the Supply installation). During the

supplydelivery and installation, the Supplier is obliged observe the regulations

related to work safety, in particular occupational health and safety and the

Government Decree of the Czech Republic no. 591/2006 Coll., on detailed minimum

requirements for occupational health and safety on the construction site. It is also

obligedobligated to observe the safety regulations (work safety, health protection,

fire safety, prevention of serious emergency, transport of hazardous items, security of

the premises), and environmental protection applicable for the premises of Chempark

(annex no. 3).

4.3. The negotiation language for the Contract duration is Czech (Slovak) language,

potentially English language. The language of a specific meeting (including in

writing or e-mail) will be decided by the Client.

4. The Contract and the relationships arising therein will be governed by the laws of the

Czech Republic.

Page 13: Contract on supply Business company: Unipetrol Centre for ... · chromatography with flame-ionization detector – TLC/FID’ for payment, spare parts and consumables, and accessories

13

5. All disputes arising from the Contract or in connection therewith will be finally

decided by Czech courts, in particular with the District Court of Prague 1 in cases

tried before district courts under applicable law or the Municipal Court in Prague in

cases tried before regional courts under applicable law.

6. This Contract can be amended and cancelled only in writing and based on mutual

consent of both the contracting parties. Electronic format is not considered as a form

in writing.

8.7. The presentThis Contract is draftedhas been executed in foureight counterparts

within the validityCzech and English language, out of the original, two forwhich

each contracting party will receive two counterparts in each language. In the event of

any inconsistencies between the provisions of the Czech and English version, the

provisions of the Czech version shall prevail.

9.8. Legal relations resulting hereof and not adjusted by this Contract are subject to Act

no. 89/2012 Coll., civil code, as amended, and Act no. 121/2000 Coll., Act on

copyright, rights related to the copyright, and on change of some acts and other

related legal regulations.

11.9. The following Annexes represent an integral part of the Contract:

Annex no. 1 – Documentation of the supply / Catalogue Sheets of the Supply – to be

added by the applicant- TO BE ADDED BY THE BIDDER

Annex No.2 - List of evaluated items – to be added by the applicant- TO BE

ADDED BY THE BIDDER

Annex no. 3 – OHS and FP regulations and services provided by the administrator in

Chempark

Annex No.4 – Description of the servicing activities provided – to be added by the

applicant- TO BE ADDED BY THE BIDDER

The contracting parties hereby expressly acknowledge that the Contract reflects their true

and free will, in witness whereof they attach their respective signatures hereunto.

In ……………on ……………. date …………… In Litvínov on

…………….…………… date ……………

………………………………

The Supplier The Client

……………………………… ………………………………

Page 14: Contract on supply Business company: Unipetrol Centre for ... · chromatography with flame-ionization detector – TLC/FID’ for payment, spare parts and consumables, and accessories

14

……………………………… ………………………………

[TO BE ADDED BY THE BIDDER] Ing. František Svoboda

Chairman of the Board of Directors

…………………………………

………………………………

………………………………

[TO BE ADDED BY THE BIDDER] doc. Ing. Jaromír Lederer, CSc.

[TO BE ADDED BY THE BIDDER]

Vice-Chairman of the Board of Directors