Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP) Results at Sik Sik Yuen Ho Fung College - Intake (ASR1) Sep-10 to Dec-10 100 200 300 400 500 TSP Level ( μ μ μ μg/m 3 ) 0 100 200 300 400 500 TSP Level ( μ μ μ μg/m 3 ) Date 1st 1-hr TSP 2nd 1-hr TSP 3rd 1-hr TSP Action Level Limit Level

Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Air Quality Monitoring (1-hr TSP) Results at Sik Sik Yuen Ho Fung College - Intake (ASR1)

Sep-10 to Dec-10

100

200

300

400

500

TS

P L

eve

l (

µµ µµg

/m3)

0

100

200

300

400

500

TS

P L

eve

l (

µµ µµg

/m3)

Date

1st 1-hr TSP 2nd 1-hr TSP 3rd 1-hr TSP Action Level Limit Level

Page 2: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Air Quality Monitoring (1-hr TSP) Results at Hong Hoi Chee Hong Temple - Intake (ASR3)

Sep-10 to Dec-10

100

200

300

400

500

TS

P L

eve

l (

µµ µµg

/m3)

0

100

200

300

400

500

TS

P L

eve

l (

µµ µµg

/m3)

Date

1st 1-hr TSP 2nd 1-hr TSP 3rd 1-hr TSP Action Level Limit Level

Page 3: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Air Quality Monitoring (1-hr TSP) Results at Long Beach Gardens - Outfall (ASR8)

Sep-10 to Dec-10

100

200

300

400

500

TS

P L

eve

l (

µµ µµg

/m3)

0

100

200

300

400

500

TS

P L

eve

l (

µµ µµg

/m3)

Date

1st 1-hr TSP 2nd 1-hr TSP 3rd 1-hr TSP Action Level Limit Level

Page 4: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Air Quality Monitoring (1-hr TSP) Results at Greenview Terrance - Outfall (ASR9)

Sep-10 to Dec-10

100

200

300

400

500

TS

P L

eve

l (

µµ µµg

/m3)

0

100

200

300

400

500

TS

P L

eve

l (

µµ µµg

/m3)

Date

1st 1-hr TSP 2nd 1-hr TSP 3rd 1-hr TSP Action Level Limit Level

Page 5: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Noise Monitoring Results at Sik Sik Yuen Ho Fung College (NSR 1)

Sep-10 to Dec-10

30/03/2010 Cloudy 19 0.8 N 15:03 15:33

30/03/2010 Cloudy 19 0.5 N 14:20 14:50

26-Jan-10* Fine 19 0.4 E 11:10 11:40

30/01/1900 Cloudy 19 0.5 N 10:10 10:40

30/03/2010 Cloudy 19 0.8 N 11:05 11:35

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Noise Monitoring Results at Hong Hoi Chee Hong Temple (NSR 3)

Sep-10 to Dec-10

55

60

65

70

75

80

09-S

ep-1

0

15-S

ep-1

0

22-S

ep-1

0

27-S

ep-1

0

06-O

ct-

10

12-O

ct-

10

18-O

ct-

10

28-O

ct-

10

03-N

ov-1

0

09-N

ov-1

0

15-N

ov-1

0

25-N

ov-1

0

01-D

ec-1

0

07-D

ec-1

0

13-D

ec-1

0

23-D

ec-1

0

29-D

ec-1

0

Le

q (

30

min

s)

dB

(A)

Limit Levels dB(A) Leq(30min) dB(A)

Sep-10 to Dec-10

26-Jan-10* Fine 19 0.5 E 12:58 13:28

55

60

65

70

75

80

09-S

ep-1

0

15-S

ep-1

0

22-S

ep-1

0

27-S

ep-1

0

06-O

ct-

10

12-O

ct-

10

18-O

ct-

10

28-O

ct-

10

03-N

ov-1

0

09-N

ov-1

0

15-N

ov-1

0

25-N

ov-1

0

01-D

ec-1

0

07-D

ec-1

0

13-D

ec-1

0

23-D

ec-1

0

29-D

ec-1

0

Le

q (

30

min

s)

dB

(A)

Limit Levels dB(A) Leq(30min) dB(A)

55

60

65

70

75

80

09-S

ep-1

0

15-S

ep-1

0

22-S

ep-1

0

27-S

ep-1

0

06-O

ct-

10

12-O

ct-

10

18-O

ct-

10

28-O

ct-

10

03-N

ov-1

0

09-N

ov-1

0

15-N

ov-1

0

25-N

ov-1

0

01-D

ec-1

0

07-D

ec-1

0

13-D

ec-1

0

23-D

ec-1

0

29-D

ec-1

0

Le

q (

30

min

s)

dB

(A)

Limit Levels dB(A) Leq(30min) dB(A)

Page 6: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Noise Monitoring Results at Squatters (NSR 6)

Sep-10 to Dec-10

30/03/2010 Cloudy 19 0.8 N 15:03 15:33

30/03/2010 Cloudy 19 0.5 N 14:20 14:50

26-Jan-10* Fine 19 0.4 E 11:10 11:40

30/01/1900 Cloudy 19 0.5 N 10:10 10:40

30/03/2010 Cloudy 19 0.8 N 11:05 11:35

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Noise Monitoring Results at Long Beach Gardens (NSR 8)

Sep-10 to Dec-10

40

45

50

55

60

65

70

75

80

09-S

ep-1

0

15-S

ep-1

0

21-S

ep-1

0

27-S

ep-1

0

06-O

ct-

10

12-O

ct-

10

18-O

ct-

10

28-O

ct-

10

03-N

ov-1

0

09-N

ov-1

0

15-N

ov-1

0

25-N

ov-1

0

01-D

ec-1

0

07-D

ec-1

0

13-D

ec-1

0

23-D

ec-1

0

29-D

ec-1

0

Le

q (

30

min

s)

dB

(A)

Limit Levels dB(A) Leq(30min) dB(A)

Sep-10 to Dec-10

26-Jan-10* Fine 19 0.5 E 12:58 13:28

* Additional Noise Monitoring

40

45

50

55

60

65

70

75

80

09-S

ep-1

0

15-S

ep-1

0

21-S

ep-1

0

27-S

ep-1

0

06-O

ct-

10

12-O

ct-

10

18-O

ct-

10

28-O

ct-

10

03-N

ov-1

0

09-N

ov-1

0

15-N

ov-1

0

25-N

ov-1

0

01-D

ec-1

0

07-D

ec-1

0

13-D

ec-1

0

23-D

ec-1

0

29-D

ec-1

0

Le

q (

30

min

s)

dB

(A)

Limit Levels dB(A) Leq(30min) dB(A)

55

60

65

70

75

80

09-S

ep-1

0

15-S

ep-1

0

21-S

ep-1

0

27-S

ep-1

0

06-O

ct-

10

12-O

ct-

10

18-O

ct-

10

28-O

ct-

10

03-N

ov-1

0

09-N

ov-1

0

15-N

ov-1

0

25-N

ov-1

0

01-D

ec-1

0

07-D

ec-1

0

13-D

ec-1

0

23-D

ec-1

0

29-D

ec-1

0

Le

q (

30

min

s)

dB

(A)

Limit Levels dB(A) Leq(30min) dB(A)

Page 7: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Noise Monitoring Results at Greenview Terrace (NSR 9)

Sep-10 to Dec-10

30/03/2010 Cloudy 19 0.8 N 15:03 15:33 63.4 65.9 59.4

30/03/2010 Cloudy 19 0.5 N 14:20 14:50 - 72.6 74.2 69.6

26-Jan-10* Fine 19 0.4 E 11:10 11:40 75 67.3 68.3 64.6

30/01/1900 Cloudy 19 0.5 N 10:10 10:40 66.2 68.5 61.9

-60

65

70

75

80

Le

q (

30

min

s)

dB

(A)

30/03/2010 Cloudy 19 0.8 N 11:05 11:35 64.5 65.9 62.6

Sunny 1.2

26-Jan-10* Fine 19 0.5 E 12:58 13:28 75 73 76.3 64.6

-

* Additional Noise Monitoring

50

55

60

65

70

75

8009-S

ep-1

0

15-S

ep-1

0

22-S

ep-1

0

27-S

ep-1

0

06-O

ct-

10

12-O

ct-

10

18-O

ct-

10

28-O

ct-

10

03-N

ov-1

0

09-N

ov-1

0

15-N

ov-1

0

25-N

ov-1

0

01-D

ec-1

0

07-D

ec-1

0

09-D

ec-1

0*

13-D

ec-1

0

15-D

ec-1

0*

23-D

ec-1

0

29-D

ec-1

0

Le

q (

30

min

s)

dB

(A)

Limit Levels dB(A) Leq(30min) dB(A)

Page 8: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Sik Sik Yuen Ho Fung College (I-1)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Sik Sik Yuen Ho Fung College (I-1-C)

Sep-10 to Dec-10

Sep-10 to Dec-10

0

5

10

15

20

25

30

35

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

Tem

pera

ture

oC

Date

I-1 Temperature

Sep-10 to Dec-10

0

5

10

15

20

25

30

35

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

Tem

pera

ture

oC

Date

I-1 Temperature

0

5

10

15

20

25

30

35

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

Tem

pera

ture

oC

Date

I-1-C Temperature

Page 9: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Hong Hoi Chee Hong Temple (I-2)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Hong Hoi Chee Hong Temple (I-2-C)

Sep-10 to Dec-10

Sep-10 to Dec-10

0

5

10

15

20

25

30

35

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

Tem

pera

ture

oC

Date

I-2 Temperature

Sep-10 to Dec-10

0

5

10

15

20

25

30

35

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

Tem

pera

ture

oC

Date

I-2-C Temperature

0

5

10

15

20

25

30

35

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

Tem

pera

ture

oC

Date

I-2 Temperature

Page 10: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Squatters (I-3)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Squatters (I-3-C)

Sep-10 to Dec-10

Sep-10 to Dec-10

0

5

10

15

20

25

30

35

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

Tem

pera

ture

oC

Date

I-3 Temperature

Sep-10 to Dec-10

0

5

10

15

20

25

30

35

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

Tem

pera

ture

oC

Date

I-3-C Temperature

0

5

10

15

20

25

30

35

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

Tem

pera

ture

oC

Date

I-3 Temperature

Page 11: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Sik Sik Yuen Ho Fung College (I-1)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Sik Sik Yuen Ho Fung College (I-1-C)

Sep-10 to Dec-10

Sep-10 to Dec-10

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.001-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

Turb

idity

NT

U

Date

I-1 Turbidity I-1 Action Level I-1 Limit Level

Sep-10 to Dec-10

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

Turb

idity

NT

U

Date

I-1-C Turbidity

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.001-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

Turb

idity

NT

U

Date

I-1 Turbidity I-1 Action Level I-1 Limit Level

Page 12: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Hong Hoi Chee Hong Temple (I-2)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Hong Hoi Chee Hong Temple (I-2-C)

Sep-10 to Dec-10

Sep-10 to Dec-10

0.0

5.0

10.0

15.001-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

Turb

idity

NT

U

Date

I-2 Turbidity I-2 Action Level I-2 Limit Level

Sep-10 to Dec-10

0.0

5.0

10.0

15.001-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

Turb

idity

NT

U

Date

I-2 Turbidity I-2 Action Level I-2 Limit Level

0.0

5.0

10.0

15.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

Turb

idity

NT

U

Date

I-2-C Turbidity

Page 13: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Squatters (I-3)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Squatters (I-3-C)

Sep-10 to Dec-10

Sep-10 to Dec-10

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

Turb

idity

NT

U

Date

I-3 Turbidity I-3 Action Level I-3 Limit Level

Sep-10 to Dec-10

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

Turb

idity

NT

U

Date

I-3 Turbidity I-3 Action Level I-3 Limit Level

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

Turb

idity

NT

U

Date

I-3-C Turbidity

Page 14: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Sik Sik Yuen Ho Fung College (I-1)

Note: Exceedances of Action / Limit Levels occur when the levels of DO are below the respective limit levels.

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Sik Sik Yuen Ho Fung College (I-1-C)

Sep-10 to Dec-10

Sep-10 to Dec-10

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

DO

mg/L

Date

I-1 DO I-1 Action Level I-1 Limit Level

Sep-10 to Dec-10

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

DO

mg/L

Date

I-1 DO I-1 Action Level I-1 Limit Level

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

DO

mg/L

Date

I-1-C DO

Page 15: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Hong Hoi Chee Hong Temple (I-2)

Note: Exceedances of Action / Limit Levels occur when the levels of DO are below the respective limit levels.

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Hong Hoi Chee Hong Temple (I-2-C)

Sep-10 to Dec-10

Sep-10 to Dec-10

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

DO

mg/L

Date

I-2 DO I-2 Action Level I-2 Limit Level

Sep-10 to Dec-10

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

DO

mg/L

Date

I-2-C DO

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

DO

mg/L

Date

I-2 DO I-2 Action Level I-2 Limit Level

Page 16: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Squatters (I-3)

Note: Exceedances of Action / Limit Levels occur when the levels of DO are below the respective limit levels.

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Squatters (I-3-C)

Sep-10 to Dec-10

Sep-10 to Dec-10

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

DO

mg/L

Date

I-3 DO I-3 Action Level I-3 Limit Level

Sep-10 to Dec-10

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

DO

mg/L

Date

I-3-C DO

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

DO

mg/L

Date

I-3 DO I-3 Action Level I-3 Limit Level

Page 17: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Sik Sik Yuen Ho Fung College (I-1)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Sik Sik Yuen Ho Fung College (I-1-C)

Sep-10 to Dec-10

Sep-10 to Dec-10

5.0

5.5

6.0

6.5

7.0

7.5

8.0

8.5

9.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

pH

Date

I-1 pH

Sep-10 to Dec-10

5.0

5.5

6.0

6.5

7.0

7.5

8.0

8.5

9.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

pH

Date

I-1-C pH

5.0

5.5

6.0

6.5

7.0

7.5

8.0

8.5

9.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

pH

Date

I-1 pH

Page 18: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Hong Hoi Chee Hong Temple (I-2)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Hong Hoi Chee Hong Temple (I-2-C)

Sep-10 to Dec-10

Sep-10 to Dec-10

5.0

5.5

6.0

6.5

7.0

7.5

8.0

8.5

9.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

pH

Date

I-2 pH

Sep-10 to Dec-10

5.0

5.5

6.0

6.5

7.0

7.5

8.0

8.5

9.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

pH

Date

I-2-C pH

5.0

5.5

6.0

6.5

7.0

7.5

8.0

8.5

9.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

pH

Date

I-2 pH

Page 19: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Squatters (I-3)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Squatters (I-3-C)

Sep-10 to Dec-10

Sep-10 to Dec-10

5.0

5.5

6.0

6.5

7.0

7.5

8.0

8.5

9.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

pH

Date

I-3 pH

Sep-10 to Dec-10

5.0

5.5

6.0

6.5

7.0

7.5

8.0

8.5

9.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

pH

Date

I-3-C pH

5.0

5.5

6.0

6.5

7.0

7.5

8.0

8.5

9.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

pH

Date

I-3 pH

Page 20: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Sik Sik Yuen Ho Fung College (I-1)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Sik Sik Yuen Ho Fung College (I-1-C)

Sep-10 to Dec-10

Sep-10 to Dec-10

0.0

5.0

10.0

15.001-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

SS

mg/L

Date

I-1 SS I-1 Action Level I-1 Limit Level

Sep-10 to Dec-10

0.0

5.0

10.0

15.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

SS

mg/L

Date

I-1-C SS

0.0

5.0

10.0

15.001-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

SS

mg/L

Date

I-1 SS I-1 Action Level I-1 Limit Level

Page 21: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Hong Hoi Chee Hong Temple (I-2)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Hong Hoi Chee Hong Temple (I-2-C)

Sep-10 to Dec-10

Sep-10 to Dec-10

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.001-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

SS

mg/L

Date

I-2 SS I-2 Action Level I-2 Limit Level

Sep-10 to Dec-10

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.001-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

SS

mg/L

Date

I-2 SS I-2 Action Level I-2 Limit Level

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

SS

mg/L

Date

I-2-C SS

Page 22: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Squatters (I-3)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Squatters (I-3-C)

Sep-10 to Dec-10

Sep-10 to Dec-10

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

SS

mg/L

Date

I-3 SS I-3 Action Level I-3 Limit Level

Sep-10 to Dec-10

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

SS

mg/L

Date

I-3-C SS

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

01-S

ep-1

003-S

ep-1

006-S

ep-1

008-S

ep-1

010-S

ep-1

013-S

ep-1

015-S

ep-1

017-S

ep-1

020-S

ep-1

022-S

ep-1

024-S

ep-1

027-S

ep-1

029-S

ep-1

0

02-O

ct-

10

04-O

ct-

10

06-O

ct-

10

08-O

ct-

10

11-O

ct-

10

13-O

ct-

10

15-O

ct-

10

18-O

ct-

10

20-O

ct-

10

22-O

ct-

10

25-O

ct-

10

27-O

ct-

10

29-O

ct-

10

01-N

ov-1

003-N

ov-1

005-N

ov-1

008-N

ov-1

010-N

ov-1

012-N

ov-1

015-N

ov-1

017-N

ov-1

019-N

ov-1

022-N

ov-1

024-N

ov-1

026-N

ov-1

029-N

ov-1

0

01-D

ec-1

003-D

ec-1

006-D

ec-1

008-D

ec-1

010-D

ec-1

013-D

ec-1

015-D

ec-1

017-D

ec-1

020-D

ec-1

022-D

ec-1

024-D

ec-1

029-D

ec-1

031-D

ec-1

0

SS

mg/L

Date

I-3 SS I-3 Action Level I-3 Limit Level

Page 23: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Outfall 1 During Flood Tide (O-1(FT))

Oct-10 to Dec-10

25.00

27.00

29.00

19.00

21.00

23.00

25.00

27.00

29.00

Te

mp

era

ture

(oC

)

15.00

17.00

19.00

21.00

23.00

25.00

27.00

29.00

Te

mp

era

ture

(oC

)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Control of Outfall 1 During Flood Tide (O-1-C(FT))

15.00

17.00

19.00

21.00

23.00

25.00

27.00

29.00

Te

mp

era

ture

(oC

)

Date

O-1(FT) Temperature

Water Quality Results at Control of Outfall 1 During Flood Tide (O-1-C(FT))

Oct-10 to Dec-10

15.00

17.00

19.00

21.00

23.00

25.00

27.00

29.00

Te

mp

era

ture

(oC

)

Date

O-1(FT) Temperature

25.00

27.00

29.00

15.00

17.00

19.00

21.00

23.00

25.00

27.00

29.00

Te

mp

era

ture

(oC

)

Date

O-1(FT) Temperature

19.00

21.00

23.00

25.00

27.00

29.00

Te

mp

era

ture

(oC

)

15.00

17.00

19.00

21.00

23.00

25.00

27.00

29.00

Te

mp

era

ture

(oC

)

Date

O-1(FT) Temperature

15.00

17.00

19.00

21.00

23.00

25.00

27.00

29.00

Te

mp

era

ture

(oC

)

15.00

17.00

19.00

21.00

23.00

25.00

27.00

29.00

Te

mp

era

ture

(oC

)

Date

O-1(FT) Temperature

15.00

17.00

19.00

21.00

23.00

25.00

27.00

29.00

Te

mp

era

ture

(oC

)

Date

O-1-C(FT) Temperature

Page 24: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Outfall 1 During Ebb Tide (O-1(ET))

Oct-10 to Dec-10

25.00

27.00

19.00

21.00

23.00

25.00

27.00

Te

mp

era

ture

(oC

)

15.00

17.00

19.00

21.00

23.00

25.00

27.00

Te

mp

era

ture

(oC

)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

15.00

17.00

19.00

21.00

23.00

25.00

27.00

Te

mp

era

ture

(oC

)

Date

O-1(ET) Temperature

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Control of Outfall 1 During Ebb Tide (O-1-C(ET))

Oct-10 to Dec-10

15.00

17.00

19.00

21.00

23.00

25.00

27.00

Te

mp

era

ture

(oC

)

Date

O-1(ET) Temperature

25.00

27.00

15.00

17.00

19.00

21.00

23.00

25.00

27.00

Te

mp

era

ture

(oC

)

Date

O-1(ET) Temperature

19.00

21.00

23.00

25.00

27.00

Te

mp

era

ture

(oC

)

15.00

17.00

19.00

21.00

23.00

25.00

27.00

Te

mp

era

ture

(oC

)

Date

O-1(ET) Temperature

15.00

17.00

19.00

21.00

23.00

25.00

27.00

Te

mp

era

ture

(oC

)

15.00

17.00

19.00

21.00

23.00

25.00

27.00

Te

mp

era

ture

(oC

)

Date

O-1(ET) Temperature

15.00

17.00

19.00

21.00

23.00

25.00

27.00

Te

mp

era

ture

(oC

)

Date

O-1-C(ET) Temperature

Page 25: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Outfall 1 During Flood Tide (O-1(FT))

Oct-10 to Dec-10

12.00

14.00

16.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

Tu

rbid

ity

(N

TU

)

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

Tu

rbid

ity

(N

TU

)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Control of Outfall 1 During Flood Tide (O-1-C(FT))

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

Tu

rbid

ity

(N

TU

)

Date

O-1(FT) Turbidity O-1(FT) Action Level O-1(FT) Limit Level

Water Quality Results at Control of Outfall 1 During Flood Tide (O-1-C(FT))

Oct-10 to Dec-10

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

Tu

rbid

ity

(N

TU

)

Date

O-1(FT) Turbidity O-1(FT) Action Level O-1(FT) Limit Level

12.00

14.00

16.00

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

Tu

rbid

ity

(N

TU

)

Date

O-1(FT) Turbidity O-1(FT) Action Level O-1(FT) Limit Level

4.00

6.00

8.00

10.00

12.00

14.00

16.00

Tu

rbid

ity

(N

TU

)

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

Tu

rbid

ity

(N

TU

)

Date

O-1(FT) Turbidity O-1(FT) Action Level O-1(FT) Limit Level

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

Tu

rbid

ity

(N

TU

)

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

Tu

rbid

ity

(N

TU

)

Date

O-1(FT) Turbidity O-1(FT) Action Level O-1(FT) Limit Level

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

Tu

rbid

ity

(N

TU

)

Date

O-1-C(FT) Turbidity

Page 26: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Outfall 1 During Ebb Tide (O-1(ET))

Oct-10 to Dec-10

12.00

14.00

16.00

6.00

8.00

10.00

12.00

14.00

16.00

Tu

rbid

ity

(N

TU

)

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

Tu

rbid

ity

(N

TU

)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

Tu

rbid

ity

(N

TU

)

Date

O-1(ET) Turbidity O-1(ET) Action Level O-1(ET) Limit Level

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Control of Outfall 1 During Ebb Tide (O-1-C(ET))

Oct-10 to Dec-10

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

Tu

rbid

ity

(N

TU

)

Date

O-1(ET) Turbidity O-1(ET) Action Level O-1(ET) Limit Level

12.00

14.00

16.00

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

Tu

rbid

ity

(N

TU

)

Date

O-1(ET) Turbidity O-1(ET) Action Level O-1(ET) Limit Level

6.00

8.00

10.00

12.00

14.00

16.00

Tu

rbid

ity

(N

TU

)

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

Tu

rbid

ity

(N

TU

)

Date

O-1(ET) Turbidity O-1(ET) Action Level O-1(ET) Limit Level

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

Tu

rbid

ity

(N

TU

)

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

Tu

rbid

ity

(N

TU

)

Date

O-1(ET) Turbidity O-1(ET) Action Level O-1(ET) Limit Level

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

Tu

rbid

ity

(N

TU

)

Date

O-1-C(ET) Turbidity

Page 27: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Outfall 1 During Flood Tide (O-1(FT))

Oct-10 to Dec-10

7.00

7.50

8.00

DO

(m

g/L

)

5.00

5.50

6.00

6.50

7.00

7.50

8.00

DO

(m

g/L

)

5.00

5.50

6.00

6.50

7.00

7.50

8.00

DO

(m

g/L

)

Date

O-1(FT) Surface DO O-1(FT) Middle DO

O-1(FT) Bottom DO O-1(FT) Surface/Middle Action Level

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Control of Outfall 1 During Flood Tide (O-1-C(FT))

5.00

5.50

6.00

6.50

7.00

7.50

8.00

DO

(m

g/L

)

Date

O-1(FT) Surface DO O-1(FT) Middle DO

O-1(FT) Bottom DO O-1(FT) Surface/Middle Action Level

O-1(FT) Surface/Middle Limit Level O-1(FT) Bottom Action Level

O-1(FT) Bottom Limit Level

Water Quality Results at Control of Outfall 1 During Flood Tide (O-1-C(FT))

Oct-10 to Dec-10

5.00

5.50

6.00

6.50

7.00

7.50

8.00

DO

(m

g/L

)

Date

O-1(FT) Surface DO O-1(FT) Middle DO

O-1(FT) Bottom DO O-1(FT) Surface/Middle Action Level

O-1(FT) Surface/Middle Limit Level O-1(FT) Bottom Action Level

O-1(FT) Bottom Limit Level

7.00

7.50

8.00

5.00

5.50

6.00

6.50

7.00

7.50

8.00

DO

(m

g/L

)

Date

O-1(FT) Surface DO O-1(FT) Middle DO

O-1(FT) Bottom DO O-1(FT) Surface/Middle Action Level

O-1(FT) Surface/Middle Limit Level O-1(FT) Bottom Action Level

O-1(FT) Bottom Limit Level

6.00

6.50

7.00

7.50

8.00

DO

(m

g/L

)

5.00

5.50

6.00

6.50

7.00

7.50

8.00

DO

(m

g/L

)

Date

O-1(FT) Surface DO O-1(FT) Middle DO

O-1(FT) Bottom DO O-1(FT) Surface/Middle Action Level

O-1(FT) Surface/Middle Limit Level O-1(FT) Bottom Action Level

O-1(FT) Bottom Limit Level

5.00

5.50

6.00

6.50

7.00

7.50

8.00

DO

(m

g/L

)

5.00

5.50

6.00

6.50

7.00

7.50

8.00

DO

(m

g/L

)

Date

O-1(FT) Surface DO O-1(FT) Middle DO

O-1(FT) Bottom DO O-1(FT) Surface/Middle Action Level

O-1(FT) Surface/Middle Limit Level O-1(FT) Bottom Action Level

O-1(FT) Bottom Limit Level

5.00

5.50

6.00

6.50

7.00

7.50

8.00

DO

(m

g/L

)

Date

O-1-C(FT) Surface DO O-1-C(FT) Middle DO O-1-C(FT) Bottom DO

Page 28: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Outfall 1 During Ebb Tide (O-1(ET))

Oct-10 to Dec-10

7.00

7.50

8.00

5.50

6.00

6.50

7.00

7.50

8.00

DO

(m

g/L

)

5.00

5.50

6.00

6.50

7.00

7.50

8.00

DO

(m

g/L

)

Date

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

5.00

5.50

6.00

6.50

7.00

7.50

8.00

DO

(m

g/L

)

Date

O-1(ET) Surface DO O-1(ET) Middle DO

O-1(ET) Bottom DO O-1(ET) Surface/Middle Action Level

O-1(ET) Surface/Middle Limit Level O-1(ET) Bottom Action Level

O-1(ET) Bottom Limit Level

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Control of Outfall 1 During Ebb Tide (O-1-C(ET))

Oct-10 to Dec-10

5.00

5.50

6.00

6.50

7.00

7.50

8.00

DO

(m

g/L

)

Date

O-1(ET) Surface DO O-1(ET) Middle DO

O-1(ET) Bottom DO O-1(ET) Surface/Middle Action Level

O-1(ET) Surface/Middle Limit Level O-1(ET) Bottom Action Level

O-1(ET) Bottom Limit Level

7.50

8.00

5.00

5.50

6.00

6.50

7.00

7.50

8.00

DO

(m

g/L

)

Date

O-1(ET) Surface DO O-1(ET) Middle DO

O-1(ET) Bottom DO O-1(ET) Surface/Middle Action Level

O-1(ET) Surface/Middle Limit Level O-1(ET) Bottom Action Level

O-1(ET) Bottom Limit Level

6.00

6.50

7.00

7.50

8.00

DO

(m

g/L

)

5.00

5.50

6.00

6.50

7.00

7.50

8.00

DO

(m

g/L

)

Date

O-1(ET) Surface DO O-1(ET) Middle DO

O-1(ET) Bottom DO O-1(ET) Surface/Middle Action Level

O-1(ET) Surface/Middle Limit Level O-1(ET) Bottom Action Level

O-1(ET) Bottom Limit Level

5.00

5.50

6.00

6.50

7.00

7.50

8.00

DO

(m

g/L

)

5.00

5.50

6.00

6.50

7.00

7.50

8.00

DO

(m

g/L

)

Date

O-1(ET) Surface DO O-1(ET) Middle DO

O-1(ET) Bottom DO O-1(ET) Surface/Middle Action Level

O-1(ET) Surface/Middle Limit Level O-1(ET) Bottom Action Level

O-1(ET) Bottom Limit Level

5.00

5.50

6.00

6.50

7.00

7.50

8.00

DO

(m

g/L

)

Date

O-1-C(ET) Surface DO O-1-C(ET) Middle DO O-1-C(ET) Bottom DO

Page 29: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Outfall 1 During Flood Tide (O-1(FT))

Oct-10 to Dec-10

8.20

8.30

8.40

8.50

7.80

7.90

8.00

8.10

8.20

8.30

8.40

8.50

pH

7.50

7.60

7.70

7.80

7.90

8.00

8.10

8.20

8.30

8.40

8.50

pH

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Control of Outfall 1 During Flood Tide (O-1-C(FT))

7.50

7.60

7.70

7.80

7.90

8.00

8.10

8.20

8.30

8.40

8.50

pH

Date

O-1(FT) pH

Water Quality Results at Control of Outfall 1 During Flood Tide (O-1-C(FT))

Oct-10 to Dec-10

7.50

7.60

7.70

7.80

7.90

8.00

8.10

8.20

8.30

8.40

8.50

pH

Date

O-1(FT) pH

8.20

8.30

8.40

8.50

7.50

7.60

7.70

7.80

7.90

8.00

8.10

8.20

8.30

8.40

8.50

pH

Date

O-1(FT) pH

7.80

7.90

8.00

8.10

8.20

8.30

8.40

8.50

pH

7.50

7.60

7.70

7.80

7.90

8.00

8.10

8.20

8.30

8.40

8.50

pH

Date

O-1(FT) pH

7.50

7.60

7.70

7.80

7.90

8.00

8.10

8.20

8.30

8.40

8.50

pH

7.50

7.60

7.70

7.80

7.90

8.00

8.10

8.20

8.30

8.40

8.50

pH

Date

O-1(FT) pH

7.50

7.60

7.70

7.80

7.90

8.00

8.10

8.20

8.30

8.40

8.50

pH

Date

O-1-C(FT) pH

Page 30: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Outfall 1 During Ebb Tide (O-1(ET))

Oct-10 to Dec-10

8.30

8.40

8.50

7.90

8.00

8.10

8.20

8.30

8.40

8.50

pH

7.50

7.60

7.70

7.80

7.90

8.00

8.10

8.20

8.30

8.40

8.50

pH

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

7.50

7.60

7.70

7.80

7.90

8.00

8.10

8.20

8.30

8.40

8.50

pH

Date

O-1(ET) pH

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Control of Outfall 1 During Ebb Tide (O-1-C(ET))

Oct-10 to Dec-10

7.50

7.60

7.70

7.80

7.90

8.00

8.10

8.20

8.30

8.40

8.50

pH

Date

O-1(ET) pH

8.30

8.40

8.50

7.50

7.60

7.70

7.80

7.90

8.00

8.10

8.20

8.30

8.40

8.50

pH

Date

O-1(ET) pH

7.80

7.90

8.00

8.10

8.20

8.30

8.40

8.50

pH

7.50

7.60

7.70

7.80

7.90

8.00

8.10

8.20

8.30

8.40

8.50

pH

Date

O-1(ET) pH

7.50

7.60

7.70

7.80

7.90

8.00

8.10

8.20

8.30

8.40

8.50

pH

7.50

7.60

7.70

7.80

7.90

8.00

8.10

8.20

8.30

8.40

8.50

pH

Date

O-1(ET) pH

7.50

7.60

7.70

7.80

7.90

8.00

8.10

8.20

8.30

8.40

8.50

pH

Date

O-1-C(ET) pH

Page 31: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Outfall 1 During Flood Tide (O-1(FT))

Oct-10 to Dec-10

20.00

25.00

10.00

15.00

20.00

25.00

SS

(m

g/L

)

0.00

5.00

10.00

15.00

20.00

25.00

SS

(m

g/L

)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Control of Outfall 1 During Flood Tide (O-1-C(FT))

0.00

5.00

10.00

15.00

20.00

25.00

SS

(m

g/L

)

Date

O-1(FT) SS O-1(FT) Action Level O-1(FT) Limit Level

Water Quality Results at Control of Outfall 1 During Flood Tide (O-1-C(FT))

Oct-10 to Dec-10

0.00

5.00

10.00

15.00

20.00

25.00

SS

(m

g/L

)

Date

O-1(FT) SS O-1(FT) Action Level O-1(FT) Limit Level

20.00

25.00

0.00

5.00

10.00

15.00

20.00

25.00

SS

(m

g/L

)

Date

O-1(FT) SS O-1(FT) Action Level O-1(FT) Limit Level

10.00

15.00

20.00

25.00

SS

(m

g/L

)

0.00

5.00

10.00

15.00

20.00

25.00

SS

(m

g/L

)

Date

O-1(FT) SS O-1(FT) Action Level O-1(FT) Limit Level

0.00

5.00

10.00

15.00

20.00

25.00

SS

(m

g/L

)

0.00

5.00

10.00

15.00

20.00

25.00

SS

(m

g/L

)

Date

O-1(FT) SS O-1(FT) Action Level O-1(FT) Limit Level

0.00

5.00

10.00

15.00

20.00

25.00

SS

(m

g/L

)

Date

O-1-C(FT) SS

Page 32: Contract No. DC/2007/12 - Design and Construction of Tsuen ... · Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel Air Quality Monitoring (1-hr TSP)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Outfall 1 During Ebb Tide (O-1(ET))

Oct-10 to Dec-10

22.00

27.00

12.00

17.00

22.00

27.00

SS

(m

g/L

)

2.00

7.00

12.00

17.00

22.00

27.00

SS

(m

g/L

)

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

2.00

7.00

12.00

17.00

22.00

27.00

SS

(m

g/L

)

Date

O-1(ET) SS O-1(ET) Action Level O-1(ET) Limit Level

Contract No. DC/2007/12 - Design and Construction of Tsuen Wan Drainage Tunnel

Water Quality Results at Control of Outfall 1 During Ebb Tide (O-1-C(ET))

Oct-10 to Dec-10

2.00

7.00

12.00

17.00

22.00

27.00

SS

(m

g/L

)

Date

O-1(ET) SS O-1(ET) Action Level O-1(ET) Limit Level

22.00

27.00

2.00

7.00

12.00

17.00

22.00

27.00

SS

(m

g/L

)

Date

O-1(ET) SS O-1(ET) Action Level O-1(ET) Limit Level

12.00

17.00

22.00

27.00

SS

(m

g/L

)

2.00

7.00

12.00

17.00

22.00

27.00

SS

(m

g/L

)

Date

O-1(ET) SS O-1(ET) Action Level O-1(ET) Limit Level

2.00

7.00

12.00

17.00

22.00

27.00

SS

(m

g/L

)

2.00

7.00

12.00

17.00

22.00

27.00

SS

(m

g/L

)

Date

O-1(ET) SS O-1(ET) Action Level O-1(ET) Limit Level

2.00

7.00

12.00

17.00

22.00

27.00

SS

(m

g/L

)

Date

O-1-C(ET) SS