Upload
hoangduong
View
233
Download
1
Embed Size (px)
Citation preview
www. .compep.pemex
Overview of Needs for Main E&P Projects
(Infrastructure, Drilling & Completion Services)
1
www. .compep.pemex
• Pemex at a glance
– O&G Production benchmark
– Annual Budget Overview
Agenda
• Contracting Prospective by Objective of Goods/Services
• PEP contracting needs by Specialty
• Summary of contracts programmed to be assigned in 2013
www. .compep.pemex
Pemex is the 8th largest global petroleum producer
Top crude oil production companies Million equivalent barrels/day
3
3.23.53.63.94.14.45.3
6.4
9.7
12.5
Saudi Aramco
Chevron NIOC Petro China
Top exporting countries to the USA Million barrels/day
0.70.8
1.11.2
2.2
Nigeria Saudi Arabia
Venezuela Canada Mexico (Pemex)
Pemex ranks 13th in crude oil reserves
Source: Volumes calculated by Wood Mackenzie; oil plus the energy equivalent in gas natural.
Source: U.S. Energy Information Administration, U.S. Crude Oil Imports by Country 2011.
Gazprom Exxon
Shell
BP PEMEX KPC
(Kuwait)
www. .compep.pemex
Pemex: Annual Budget Overview
Billion USD
13.8
15.6 14.9
18.6
20.8 19.1
23.9 25.3
30.4 30.0
27.3
2006 2007 2008 2009 2010 2011 2012 2013 E 2014 E 2015 E 2016 E
19.9
4.4 2.0%
Pemex-
Petrochemicals
Pemex-Gas & Basic
Petrochemicals
Pemex-Refining
Pemex-Exploration
& Production
2.0%
17%
79%
Subsidiary
www. .compep.pemex 5
Speciality TOTAL
Billion USD
Infrastructure and well services business unit 7.5
Drilling business unit 6.9
Logistics and maintenance business unit 3.1
Others 6.4
TOTAL 23.9
7.5 6.9
3.1
6.4
Infrastructure and wellservices business unit
Drilling business unit Logistics and maintenancebusiness unit
Others
Pemex Exploration and Production Annual Budget
Infrastructure
&
Well Services
(SSAP)
Drilling
(UNP)
Maintenance &
Logistics
(SML)
Others*
*Assets, Distribution & Commercialization Unit (SDC), Fields Development Unit (SDCA), Etc.
By Business Unit, 2012
Billion USD
www. .compep.pemex 6
Speciality TOTAL
Billion USD
Infrastructure and well services business unit 7.5
Drilling business unit 6.9
Logistics and maintenance business unit 3.1
Others 6.4
TOTAL 23.9
7.5 6.9
3.1
6.4
Infrastructure and wellservices business unit
Drilling business unit Logistics and maintenancebusiness unit
Others
Pemex Exploration and Production Annual Budget
Infrastructure
&
Well Services
(SSAP)
Drilling
(UNP)
Maintenance &
Logistics
(SML)
Others
*Assets, Distribution & Commercialization Unit (SDC), Fields Development Unit (SDCA), Etc.
By Business Unit, 2012
Billion USD
www. .compep.pemex
Region Type TOTAL
Billion USD
Offshore Construction 5.2
Wells 4.8
Onshore Construction 2.2
Wells 13.6
TOTAL 25.8
Contracting Prospective by Objective; 2013
Infrastructure and well services business unit (SSAP)
Offshore
Onshore
Wells 48%
Construction 52%
Wells 86%
Construction 14%
www. .compep.pemex
8
PEP Contract Needs by Specialty 2013
10.5
7.4
0.5
1.9 1.8
1.1 1.4
0.3 0.3 0.3 0.1 0.1
IntegratedDrillingServices
WellIntervention
Services
StrategicMaterials for
WellInterventions
SubseaPipelines
Platformconstruction
Work onOffshoreplatforms
Onshorefacilities
Onshorepipelines
PlatformTransport &Installation
Technicalconsulting
EngineeringServices
Processequipment
Specialty TOTAL
Billion USD
Integrated Drilling Services 10.5
Well Intervention Services 7.4
Strategic Materials for Well
Interventions 0.5
Subsea Pipelines 1.9
Platform construction 1.8
Works on Offshore platforms 1.1
Onshore facilities 1.4
Onshore pipelines 0.3
Platforms Transport & Installation 0.3
Technical consulting 0.3
Engineering Services 0.1
Process equipment 0.1
TOTAL 25.8
www. .compep.pemex
Integrated Drilling Services
9
Contract Assignment in 2013: USD $10.5 Billion
• Ten contracts in three sets. Contracts to be individually assigned.
• Bidding process to start by July 2013.
• Integrated Drilling Services include drilling rigs and their operation, drilling and
completion materials (drill bits, fluids, etc.) and services (logging, cementing, perforating,
installation of artificial lift systems, etc.), all well components, except tubing.
• All of these goods and services will be bundled together in an integrated contract.
www. .compep.pemex 10
Well intervention Services
Well intervention services include: rigs and their operation, drilling fluids, coiled
tubing operations, stimulation and hydraulic fracturing, and perforations, among
other services.
Specialties
• Workovers, well cleaning
• Nitrogen operations
• Coiled Tubing intervention services
• Stimulation/fracturing vessels & services
(offshore)
• Well logging
• Perforation services and special operations
• O & G measurement services
• Production packers
• Radioactive and chemical tracer services
• Other services
Contract Assignment in 2013: USD $7.4 Billion
www. .compep.pemex
Estimated Nitrogen Needs in the Southern Region
*Source: Preliminary estimates for 2013 contracting processes; SSAP/ A.T. Kearney
Nitrogen Needs by Asset for PEP South Region
696
468
355
501
814
49%
42%
8% 1%
2017
789
49%
42%
8% 1%
2016
764
49%
42%
8% 1%
2015
740
49%
42%
8% 1%
2014
715
49%
42%
8%
2018
2013
690
49%
42%
8%
1%
2012
2011
2010
2009
1%
Bellota-Jujo
Samaria-luna
Muspac
5 Presidentes
Historical consumption
• Growing needs for nitrogen in the Southern Region 2013-18*
• There is the intention to promote competition and diversify sources.
• A new long term contracting strategy is in process.
• Contracting processes in Q3 2013.
900
350
Historical Minimal demand
(2010)
Historical Maximal Demand
(2013)
www. .compep.pemex 12
This segment includes the procurement of specialized materials and
equipment needed for well interventions (trees, mud line suspension,
accessories, etc.; onshore & offshore)
Strategic materials for well interventions
Contract Assignment in 2013: USD $0.5 Billion
www. .compep.pemex
Subsea pipelines
13
• Subsea pipelines include pipe procurement, transport, pipeline laying,
connections, and hydrostatic tests.
• Contracting strategy in process.
• Bidding process by Q3, 2013.
Contract Assignment in 2013: USD $1.9 Billion
www. .compep.pemex
9 18
22
TS-XUX
48
30
18
APKMZ
38
5
27
6
22
0
APAPCH AYATSIL
140
52
88
56
37
APLT
79
31
39
APC
Planned Subsea Pipelines Projects by Production Asset and pipe diameter (2013 – 2015, KM)
< 16 inches
16 – 30 inches
> 30 inches
# pipeline 11 22 10 7 2 14
Subsea Pipelines to Contract in 2013
Most of the pipelines
needed are 16” in
diameter or more.
These pipelines will be
grouped into 24 contracts
with a total estimated
value of USD $1.9 Bn from
2013-2015
www. .compep.pemex
Tsimin Xux Scheme
Luna
N
Costero
TMDB
PB-Litoral-T
HA-Tsimin-
A
E-Tsimin-A/1
PB-Tsimin-
A
HA-Xux-A
E-Xux-A
PB-Xux-A/1
PB-Xux-A/2
CA-Xux-A
May-A
Tsimin-A
Tsimin-B
Xux-A Xux-B
Ogd 24” X 2.25 Km
Ogd 24” X 2.1 km
Ogd
24” x 2.0 km
Xux-C
Kinbe
Ogd 24” X 2.3 km
Ogd
24” x 4.5 km
Tsimin-D
Tsimin-C E-Litoral-A
Oil to RMNE via Pol-A Oil to TMDB L-4
Gas to Atasta via Pol-A L-5
L-263
www. .compep.pemex
Platforms Construction
16
The platforms construction contracting strategy will include: material and
equipment procurement, structure manufacturing, transporting and
installing, and systems connection and testing. Strategy on design phase;
and contracting process by Q4, 2013.
Contract Assignment in 2013: USD $1.8 Billion
www. .compep.pemex 17
Hook Up and Modernization Works;
offshore platforms
These contracts will include procurement of pipeline connection materials and
platform modernization, including safety, instrumentation, and control systems,
among others.
Contract Assignment in 2013: USD $1.1 Billion
www. .compep.pemex
Onshore facilities
18
These segment includes the modernization of separation, gas compression and
other onshore facilities (infrastructure, processing equipment and accessories;
electrical, safety, instrumentation and control systems), pipelines, and
connections, among others.
Contract Assignment in 2013: USD $1.4 Billion
www. .compep.pemex
Onshore pipelines
• Onshore pipelines include procurement of the required pipe, trenching, pipe
laying, special crossings, hydrostatic tests, connections, and start-up of the
built lines.
Contract Assignment in 2013: USD $0.3 Billion
www. .compep.pemex
Platform transport and installation
• It includes the transportation of Jacket and Deck structures, and their
hoisting and installation, using crane barges or by float-over method.
• Contracts for transporting and installing structures currently under
construction. Contracting process already started; execution Q3 & Q4, 2013.
Contract Assignment: USD $0.3 Billion
www. .compep.pemexJacket ready for loading and mooring
PLATFORM W. DEPTH
(metros)
STRUCTURE
WEIGHT (ton)
2012 2013
2014 / 2015 MAY JUN JUL AGO SEP OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
PP-KU-B 74 JACK: 2300
DECK: 2270
PP-ZAAP-E 66 JACK: 2266
DECK: 1679
PP-AYATSIL-A 122 JACK: 7300
DECK: 2650
PP-AYATSIL-B 115 JACK: 7000
DECK: 3000
PP-AYATSIL-C 123 JACK: 6381
DECK: 2337
PP-AYATSIL-D 116 JACK: 6100
DECK: 3000
PP-EK-A2 60 JACK: 1900
DECK: 1950
AKAL-H2 41 JACK: 1606
DECK: 1668
BALAM-A 49 JACK: 2068
DECK: 2540
AKAL-GS 42 JACK: 1606
DECK: 1668
HA-RE-01
Mod y Pte. 32 MOD: 3800
KAB-C 27 JACK: 1018
DECK: 1601
TSIMIN-D 16 JACK: 1255
DECK: 2193
8-JUL
20-NOV
9-JUL
22-NOV
24-ABR/15
1-MAR
25-DIC
24-ENE
25-MAR
29-JUN 19-AGO
12-AGO
12-AGO
5-JUN 3-JUL
23-JUN 7-JUL
15-SEP 21-SEP
15-SEP 21-SEP
22-AGO 16-SEP
29-AGO 15-SEP
12-SEP
25-OCT
Fabrication
22-FEB
20-SEP
13-OCT
12-SEP
12-SEP
12-SEP
24-DIC
3-ENE
29-OCT
19-MAR
Platforms Transport & Installation
Deck ready for loading and mooring Rig arrival
www. .compep.pemex
Tsimin Xux Scheme
Luna
N
Costero
TMDB
PB-Litoral-T
HA-Tsimin-
A
E-Tsimin-A/1
PB-Tsimin-
A
HA-Xux-A
E-Xux-A
PB-Xux-A/1
PB-Xux-A/2
CA-Xux-A
May-A
Tsimin-A
Tsimin-B
Xux-A Xux-B
Ogd 24” X 2.25 Km
Ogd 24” X 2.1 km
Ogd
24” x 2.0 km
Xux-C
Kinbe
Ogd 24” X 2.3 km
Ogd
24” x 4.5 km
Tsimin-D
Tsimin-C E-Litoral-A
Oil to RMNE via Pol-A Oil to TMDB L-4
Gas to Atasta via Pol-A L-5
L-263
www. .compep.pemex
Key
Tripod
Tetrapod
Octapod
New Octapod Sea horse
Living quarter
platform
Attached Structure
New Injector
Existing Injector New Gas Lift Pipeline
AKAL-C
PB-AC-1
BALAM-TE
BALAM-TB
BALAM-1
BALAM-TD
EK-TA
EK-TB
EK-A
BALAM-A
AKAL-B
PP-AB-1
BALAM-TA
Gas
Fuel Gas
Gas F/O
- All currents goes thru Ek-A, to be
sent through a 24" pipeline to Akal-
B.
PAQ 8
8” x 0.5 km
Diameter
(inch)
Length
(km)
6 0.5
8 1.5
14 1.6
14 1.5
16 1.4
16 1.4
18 1.4
24 8.0
PAQ. 8
12” Ø x 1.4 km
Cantarell Scheme (EK-A y Balam) New Pipeline network
EK-A2
www. .compep.pemex
Ayatsil - Tekel Scheme
www. .compep.pemex
Technical consulting & Engineering service
• These contracts include technical, operational and administrative support by
specialized firms, who provide designed services for structures, pipes and
facilities, technical advice, and on-site support in specific projects.
• Short term contracting at this point. New integrated contracting strategy will
be implemented by Q4, 2013 and Q1, 2014.
Contract Assignment in 2013: USD $0.4 Billion
www. .compep.pemex
Process equipment
These contracts will include the procurement of specialized process equipment,
such as burners, measurement equipment, and separators, among others.
Contract Assignment in 2013: USD $0.1 Billion
www. .compep.pemex
15,818 62%
1,869
7%
4,452 17%
3,679 14%
Contract type: A: > 200 MMUSD B: > 100 MMUSD y < 200 MMUSD C: : > 50 MMUSD and < 100 MMUSD D: < 50 MMUSD
340 Contracts
Estimated Amount USD $25.8 Billion
PEP contracts, 2013
Contract
Type
#Contracts
A 31
B 13
C 59
D 237
www. .compep.pemex
Contracts > 200 MMUSD
No. Description Specialty Type of procurement
process
1 Integrated Drilling and Completion Services for Pemex Exploration and Production North and South Regions
Integrated Drilling Services
International Public Tender with Trade
Agreements
2 Procurement and construction of a 38 km of 36’’ oil and gas pipeline connecting Xanab-C to TMDB
Subsea pipelines National Public
Tender
3 Integrated Drilling, Completion and Well Repair Services for Offshore Wells (Ayatsil-Tekel y Tsimin-Xux).
Integrated Drilling Services
International Public Tender with Trade
Agreements
4 Supply of nitrogen gas with cryogenic equipment for Oil Wells in the South Region Well intervention
services
International Public Tender with Trade
Agreements
5 CA-Ku-A1 Compression Platform Offshore Platforms International Public Tender with Trade
Agreements
6 PB-Ku-H2 Production Platform Offshore Platforms International Public Tender with Trade
Agreements
7 Well repair services for the North Region Well intervention
services
International Public Tender with Trade
Agreements
8 Well stimulation vessels service s(7 vessels) Well intervention
services
International Public Tender
9 Living quarter platform HA-TSIMIN-A Offshore Platforms International Public Tender with Trade
Agreements
www. .compep.pemex
No. Description Specialty
Type of
procurement
process
1 Coiled tubing services for the injection of nitrogen gas in offshore oil wells in the Gulf of Mexico
Well intervention services Direct award
2 Electromechanic work on deck of offshore Platforms of the Litoral de Tabasco Asset Work on Offshore Platforms International Public
Tender
3 Drilling Octapod Tekel-A. Offshore Platforms International Public Tender with Trade
Agreements
4 Installation of coiled tubing tools and cold tubing services in onshore oil wells of PEP’s North Region
Well Intervention Services International Public Tender with Trade
Agreements
5 Transport and Instalation of Drilling Platforms Ku-B, Zaap-E, PP-Ek-A2, PP-Balam-A, Akal-H2, Akal-GS, KAb-C y Tsimin-D
Transport and Installation International Public
Tender
6 Electromecanic work and conections for gas compression systems on the Enlace Litoral platform
Work on Offshore Platforms International Public
Tender
7 Electromechanical work and connections for the Northeast Offshore Region platforms Work on Offshore Platforms International Public Tender with Trade
Agreements
Contracts between 100 MMUSD and 200 MMUSD
www. .compep.pemex
No. Description Specialty Type of procurement
process
1 Oil and gas pipeline - 20’’ x 1.1 KM, from AKAL-H2 octapod to AKAL-TH, Gas pipeline- 10’’ x 1.7 KM from the BN ring to AKAL-H2, and Gas pipeline – 10’’ x 2.6 km to AKAL –H2
Subsea pipelines International Public Tender
with Trade Agreements
2 Geophysical logging for oilwells in the Gulf of Mexico and South Regions Well Intervention Services International Public Tender
with Trade Agreements
3 Procurement of high capacity underwater wellheads, including their installation and start- up for oilwells in the Gulf of Mexico
Well Intervention Services International Public Tender
with Trade Agreements
4 Integrated drilling and completion services in the South Mesozoic region Integrated Drilling Services Direct award
5 24’’ x 19.5 KM Oil Pipeline from PE-Tsimin-A to PB-Litoral-T. Subsea pipelines International Public Tender
with Trade Agreements
6 Stimulations, fracturing and pumping services for active oil wells in Samaria Luna, Macuspana Muspac, Bellota Jujo and Cinco Presidentes
Well Intervention Services International Public Tender
with Trade Agreements
7
Construction of an oil and gas pipeline – 16’’ x 28 KM, from Bagre “A” Platform to Punta de Piedra, and construction of an oil and gas pipeline – 8’’x24KM, from Bagre “B” Platform to Bagre “A” Platform
Subsea pipelines International Public Tender
with Trade Agreements
8 20’’x1.3 KM oil and gas pipeline from AKAL-GS to AKAL-GP, 10’’x1.0KM gas pipeline from L-240 gas pipeline to AKAL-GS gas pipeline.
Subsea pipelines International Public Tender
with Trade Agreements
9 Well workover and maintenance services for the North Region Assets Well Intervention Services Direct award
10
L-1 Oil pipeline, PP-Ayatsil-C to PLEM-2 from UFP L-10, Oil pipeline connection from Sub L-7 to PP- Ayatsil-C L-3, Oil and gas pipeline fromPP-Ayatsil-D toPLEM-1 fromUFP L-11, Oil pipeline from PP-Ayatsil-A to PP-Ayatsil-D.
Subsea pipelines International Public Tender
with Trade Agreements
11 Well stimulation vessels services (4 vessels) Well Intervention Services Direct award
12 Conventional operations with coiled tubing for oilwells in the North and South Regions Well Intervention Services International Public Tender
with Trade Agreements
Contracts between 50 MMUSD and 100 MMUSD
www. .compep.pemex 32
No. Description Specialty Type of procurement
process
13 Nitrogen gas injection services with chryogenic equipment in PEP North Region installations
Well Intervention Services International Public Tender
/Trade Agmnt
14 Electromechanical work, connection of service lines and start up of Tsimin, Xux and Ayatsil offshore platforms
Work on offshore platforms International Public Tender
/Trade Agmnt
15 Procurement of valve trees, wellheads and offshore valve shafts, for offshore oilwells Well Intervention Services International Public Tender
/Trade Agmnt
16 Procurement and installation of burners in South Region installations Process equipment International Public Tender
/Trade Agmnt
17 Oil and Gas pipeline, 24’’x2.3KM, from Tsimin-D to PE-Tsimin-A and 24’’ x 10 KM oil and gas pipline from Kab-C to PE-Tsimin-A
Subsea pipelines International Public Tender
/Trade Agmnt
18 Production Testing Services for Southwest Offshore Region Well Intervention Services International Public Tender
/Trade Agmnt
19 Replacement fiberglass firefighting system to carbonated steel in CP-Zaap,C and KU-S Work on offshore platforms International Public Tender
/Trade Agmnt
20 20’’x3.5KM Oil and Gas pipeline from Kuil-B to Kuil-A and 16’’x3.05KM oil and gas pipeline from Homol-A to Kuil-A.
Subsea pipelines International Public Tender
/Trade Agmnt
21 Engineering and electromechanical work for the optimization of the heating oil system of the gas proeccsing centers Akal-C7 and Akal-C8
Work on offshore platforms International Public Tender
/Trade Agmnt
22
Engineering, procurement, construction, installation, conection and start-up of a 24’’x2.8 KM oil and gas duct from PP-ZAAP-E to E-KU-A1, (KMZ-68) and 12’’X3.2 KM gas duct from PP-KU-M to PP-ZAAP-E
Subsea pipelines International Public Tender
/Trade Agmnt
23 Production perforations and special operations with explosives for oil wells in the North Region Terciary
Well Intervention Services International Public Tender
/Trade Agmnt
24 TMDB treatment plant (Phase E ). Work on onshore sites International Public Tender
/Trade Agmnt
25 SCADA project “D” system Onshore facilities International Public Tender
/Trade Agmnt
26 Replacement of firefighting system in the TMDB, Stage 2 Onshore facilities International Public Tender
/Trade Agmnt
27 Electromechanical work and connection of dehydration equipment on the Nohoch platforms
Work on offshore platforms International Public Tender
/Trade Agmnt
Contracts between 50 MMUSD and100 MMUSD