45
1205.01 1 2 P AV E M E N T M A R K I NG S R A LE I GH , N . C . D I V I S I ON O F H I GH WAY S D E P T . O F T R AN SP O R T A T I ON NO R T H C A R O L I NA S T A TE O F SHEET OF E NG L I S H S T ANDA R D D R A WI NG F O R 10’ 30’ YELLOW OR WHITE 2’ YELLOW OR WHITE WHITE 1 - 12 3’ 3’ 12" WHITE 6’ 9’ 3’ L I N E T Y P E S AND O FFS ET S 10’-30’/SP SKIP LINE 3’-3’/SP MINI-SKIP LINE 2’-6’/SP MINI-SKIP LINE 3’-9’/SP MINI-SKIP LINE THE WHITE EDGE LINE ENTENSIONS AT ROUNDABOUTS. UNLESS OTHERWISED SHOWN, USE 3’-3’/SP MINI-SKIPS FOR USED FOR BICYCLE LANE LINES. EXTENSIONS THROUGH INTERSECTIONS AND MINI-SKIPS LANE LINE EXTENSIONS THROUGH INTERSECTIONS, EDGE LINE UNLESS OTHERWISED SHOWN, USE 2’-6’/SP MINI-SKIPS FOR SKIP LANE LINES AND SKIP CENTER LINES. UNLESS OTHERWISED SHOWN, USE 10’-30’/SP SKIPS FOR MINI-SKIP LANE LINES AND LINE EXTENSIONS THROUGH TAPERS. UNLESS OTHERWISED SHOWN, USE 3’-9’/SP MINI-SKIPS FOR 3- GORE LINES SHALL BE TWICE THE WIDTH OF THE NORMAL LINE. OF THE NORMAL LINE. 2- LANE LINES INDICATED AS "WIDE" ON THE ROADWAY STANDARD DRAWINGS SHALL BE AT LEAST TWICE THE WIDTH AS DIRECTED BY THE ENGINEER. 1- USE 6" LANE, EDGE, AND CENTER LINES ON ALL FULL CONTROL OF ACCESS FACILITIES AND OTHER ROUTES GENERAL NOTES: 4"/6" 4"/6" 4"/6"

CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

Embed Size (px)

Citation preview

Page 1: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

1205.0

11205.0

1

1 2

1 2

CO

NT

INU

OU

S L

INE

S

GO

RE

LIN

E

CE

NT

ER

LIN

E

ST

OP

OR

TR

AN

SV

ER

SE

BA

R

DIA

GO

NA

L L

INE

PAVEMENT MARKINGS

PAVEMENT MARKINGS

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

10’

30’

YE

LL

OW

OR

WH

ITE

2’

YE

LL

OW

OR

WH

ITE

YE

LL

OW

OR

WH

ITE

WH

ITE

YE

LL

OW

WH

ITE

YE

LL

OW

OR

WH

ITE

WH

ITE

WH

ITE

24’’

WH

ITE

16"

RxR

LIN

E

WH

IT

E

1-12

1-12

3’

3’

12"

WH

IT

E

24

" L

ON

GIT

UD

INA

L

8" T

RA

NS

VE

RS

E

CR

OS

SW

AL

K L

INE

6’

LA

NE

LIN

E

ED

GE

LIN

E

9’

3’

LINE TYPES AND OFFSETS

LINE TYPES AND OFFSETS

8

"/1

2"

12

’’ 45

MP

H O

R H

IGH

ER

8’’ L

ES

S T

HA

N 4

5 M

PH

10’-30’/S

P S

KIP

LIN

E

3’-3

’/S

P M

IN

I-S

KIP

LIN

E

2’-6

’/S

P M

IN

I-S

KIP

LIN

E

3’-9

’/S

P M

IN

I-S

KIP

LIN

E

TH

E W

HIT

E E

DG

E L

INE

EN

TE

NS

ION

S A

T R

OU

ND

AB

OU

TS

.

UN

LE

SS

OT

HE

RW

ISE

D S

HO

WN

, US

E 3

’-3’/S

P M

INI-S

KIP

S F

OR

US

ED

FO

R B

ICY

CL

E L

AN

E L

INE

S.

EX

TE

NS

ION

S T

HR

OU

GH

INT

ER

SE

CT

ION

S A

ND

MIN

I-SK

IPS

LA

NE

LIN

E E

XT

EN

SIO

NS

TH

RO

UG

H IN

TE

RS

EC

TIO

NS

, ED

GE

LIN

E

UN

LE

SS

OT

HE

RW

ISE

D S

HO

WN

, US

E 2

’-6’/S

P M

INI-S

KIP

S F

OR

SK

IP L

AN

E L

INE

S A

ND

SK

IP C

EN

TE

R L

INE

S.

UN

LE

SS

OT

HE

RW

ISE

D S

HO

WN

, US

E 1

0’-3

0’/S

P S

KIP

S F

OR

MIN

I-SK

IP L

AN

E L

INE

S A

ND

LIN

E E

XT

EN

SIO

NS

TH

RO

UG

H T

AP

ER

S.

UN

LE

SS

OT

HE

RW

ISE

D S

HO

WN

, US

E 3

’-9’/S

P M

INI-S

KIP

S F

OR

3- G

OR

E L

INE

S S

HA

LL

BE

TW

ICE

TH

E W

IDT

H O

F T

HE

NO

RM

AL

LIN

E.

OF

TH

E N

OR

MA

L L

IN

E.

2- L

AN

E L

INE

S IN

DIC

AT

ED

AS

"W

IDE

" O

N T

HE

RO

AD

WA

Y S

TA

ND

AR

D D

RA

WIN

GS

SH

AL

L B

E A

T L

EA

ST

TW

ICE

TH

E W

IDT

H

AS

DIR

EC

TE

D B

Y T

HE

EN

GIN

EE

R.

1- U

SE

6" L

AN

E, E

DG

E, A

ND

CE

NT

ER

LIN

ES

ON

AL

L F

UL

L C

ON

TR

OL

OF

AC

CE

SS

FA

CIL

ITIE

S A

ND

OT

HE

R R

OU

TE

S

GE

NE

RA

L N

OT

ES

:

4"/6"

4"/6"

4"/6"

4"/6"

4"/6"

4"/6"

Page 2: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

1205.0

11205.0

1

2 2

2 2

TA

BL

E 1

LE

GE

ND

TW

O-W

AY

UN

DIV

IDE

D R

OA

DW

AY

TW

O-W

AY

UN

DIV

IDE

D R

OA

DW

AY

WIT

H T

WO

-WA

Y L

EF

T T

UR

N L

AN

E

MU

LT

I-LA

NE

RO

AD

WA

Y

ED

GE

LIN

E O

FF

SE

T D

ET

AIL

LA

NE

LIN

E O

FF

SE

T D

ET

AIL

CE

NT

ER

LIN

E O

FF

SE

T D

ET

AIL

PAVEMENT MARKINGS

PAVEMENT MARKINGS

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

YE

LL

OW

CE

NT

ER

LIN

E

YE

LL

OW

CE

NT

ER

LIN

E

CL3

’’

3’’

6’’

CL

WH

ITE

LA

NE

LIN

EO

F T

RA

VE

LW

AY

2’’ T

OW

AR

DS

LE

FT

SID

E

WH

ITE

OR

YE

LL

OW

ED

GE

LIN

E

SH

OU

LD

ER

E.O

.T.

19’

20’

21’

22’

23’

24’

26’

28’

30’

32’

16

’ -

18

’2

’’

4’’

6’’

8’’

10’’

10’’

1’

2’

2’

3’

4’

8’ - 9’

9’

9.5

10’

10’

10.5

11’

11’

12’

12’

12’

FR

OM

E.O

.T.

MA

X. E

DG

E L

INE

OF

FS

ET

TR

AV

EL

PA

VE

ME

NT

WID

TH

(W

) O

F

ED

GE

LIN

E O

FF

SE

TS

FO

R 2

-LA

NE

, 2-W

AY

RO

AD

WA

YS

WIT

H U

N-P

AV

ED

SH

OU

LD

ER

S

W =

WID

TH

OF

TR

AV

EL

LA

NE

TR

AF

FIC

FL

OW

DIR

EC

TIO

N O

F

OF

FS

ET

DE

TA

IL

SE

E E

DG

E L

INE

W W

L C

SE

E C

EN

TE

R L

INE

OF

FS

ET

DE

TA

IL

OF

FS

ET

DE

TA

IL

SE

E E

DG

E L

INE

OF

FS

ET

DE

TA

IL

SE

E E

DG

E L

INE

OF

FS

ET

DE

TA

IL

SE

E E

DG

E L

INE

SE

E C

EN

TE

R L

INE

OF

FS

ET

DE

TA

IL

WWW

OF

FS

ET

DE

TA

IL

SE

E L

AN

E L

INE

W W

OF

FS

ET

DE

TA

IL

SE

E E

DG

E L

INE

OF

FS

ET

DE

TA

IL

SE

E E

DG

E L

INE

L CL CL C

1-12

1-12

LINE TYPES AND OFFSETS

LINE TYPES AND OFFSETS

2’’ M

AX

., RE

FE

R A

LS

O T

O T

AB

LE

1

WID

TH

(W

)

MIN

IMU

M L

AN

E

E.O

.T.=

ED

GE

OF

TR

AV

EL

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

Page 3: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

PAVEMENT MARKINGS

PAVEMENT MARKINGS

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1205.0

21205.0

2

WW

SH

OU

LD

ER

WH

ITE

ED

GE

LIN

ES

YE

LL

OW

SK

IP

CE

NT

ER

LIN

ES

E.O

.T.

SH

OU

LD

ER

E.O

.T.

SH

OU

LD

ER

SH

OU

LD

ER

WWW10’

32

0’ T

YP

IC

AL

SP

AC

IN

G

BE

TW

EE

N S

ET

S O

F A

RR

OW

SY

MB

OL

S

SP

AC

ING

CA

N B

E IN

CR

EA

SE

D O

R D

EC

RE

AS

ED

AS

DE

TE

RM

INE

D B

Y T

HE

EN

GIN

EE

R

10’

YE

LL

OW

SK

IP

CE

NT

ER

LIN

ES

YE

LL

OW

CE

NT

ER

LIN

ES

WH

ITE

ED

GE

LIN

ES

E.O

.T.

E.O

.T.

1-12

1-12

LE

GE

ND

W =

WID

TH

OF

TR

AV

EL

LA

NE

SY

MB

OL

S

PA

VE

ME

NT

MA

RK

ING

PA

SS

ING

SID

E

YE

LL

OW

SK

IP C

EN

TE

R L

INE

S,

NO

PA

SS

ING

SID

E

YE

LL

OW

CE

NT

ER

LIN

E,

TWO-LANE AND MULTI-LANE ROADWAYS

TWO-LANE AND MULTI-LANE ROADWAYS(T

WO

YE

LL

OW

CE

NT

ER

LIN

ES

)

DO

UB

LE

YE

LL

OW

CE

NT

ER

LIN

E

TR

AF

FIC

FL

OW

DIR

EC

TIO

N O

F

E.O

.T.=

ED

GE

OF

TR

AV

EL

1 2

1 2

PA

SS

ING

ZO

NE

- BO

TH

DIR

EC

TIO

NS

PA

SS

ING

ZO

NE

- SIG

NA

L D

IRE

CT

ION

NO

-PA

SS

ING

ZO

NE

- BO

TH

DIR

EC

TIO

NS

3- R

EF

ER

TO

RO

AD

WA

Y S

TA

ND

AR

D D

RA

WIN

GS

12

05

.01

AN

D 1

20

5.0

8 F

OR

AD

DIT

ION

AL

PA

VE

ME

NT

MA

RK

ING

GU

IDA

NC

E.

INT

ER

SE

CT

ION

S A

ND

MA

JO

R D

RIV

EW

AY

S, S

EE

RO

AD

WA

Y S

TA

ND

AR

D D

RA

WIN

G 1

205.0

5 F

OR

AD

DIT

ION

AL

GU

IDA

NC

E.

2- C

ON

TIN

UE

ED

GE

LIN

ES

TH

RO

UG

H M

INO

R D

RIV

EW

AY

S. D

O N

OT

CO

NT

INU

E E

DG

E L

INE

S A

T

1- E

DG

E L

INE

S A

RE

NO

T R

EQ

UIR

ED

AL

ON

G C

UR

B A

ND

GU

TT

ER

LO

CA

TIO

NS

.

GE

NE

RA

L N

OT

ES

:

PA

SS

ING

/NO

PA

SS

ING

ZO

NE

S W

ILL

BE

DE

TE

RM

INE

D B

Y T

HE

EN

GIN

EE

R.

TW

O-L

AN

E, T

WO

-WA

Y R

OA

DW

AY

TW

O-L

AN

E, T

WO

-WA

Y R

OA

DW

AY

WIT

H T

WO

-WA

Y L

EF

T T

UR

N L

AN

E

Page 4: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

PAVEMENT MARKINGS

PAVEMENT MARKINGS

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1205.0

21205.0

2

SH

OU

LD

ER

W W W W W

10

’ 320’ T

YP

IC

AL

SP

AC

IN

G

BE

TW

EE

N S

ET

S O

F L

EF

T T

UR

N A

RR

OW

SY

MB

OL

S

SP

AC

ING

MA

Y B

E IN

CR

EA

SE

D O

R D

EC

RE

AS

ED

AS

DE

TE

RM

INE

D B

Y T

HE

EN

GIN

EE

R

WH

ITE

ED

GE

LIN

EE

.O.T

.S

HO

UL

DE

R

10

WH

ITE

ED

GE

LIN

EE

.O.T

.

1-12

1-12

WIT

H T

WO

-WA

Y L

EF

T T

UR

N L

AN

E

UN

DIV

IDE

D M

UL

TI-L

AN

E R

OA

DW

AY

TWO-LANE AND MULTI-LANE ROADWAYS

TWO-LANE AND MULTI-LANE ROADWAYS

LA

NE

LIN

ES

WH

IT

E S

KIP

WH

ITE

ED

GE

LIN

E

W

SH

OU

LD

ER

YE

LL

OW

ED

GE

LIN

ES

IN

SID

E E

.O.T

.M

ED

IAN

OU

TS

ID

E E

.O.T

.

SH

OU

LD

ER

SH

OU

LD

ER

WH

ITE

ED

GE

LIN

EO

UT

SID

E E

.O.T

.

W WW

WH

ITE

SK

IP L

INE

S

DIV

IDE

D F

OU

R-L

AN

E R

OA

DW

AY

3- R

EF

ER

TO

RO

AD

WA

Y S

TA

ND

AR

D D

RA

WIN

GS

1205.0

1 A

ND

1205.0

8 F

OR

AD

DIT

ION

AL

PA

VE

ME

NT

MA

RK

ING

GU

IDA

NC

E.

INT

ER

SE

CT

ION

S A

ND

MA

JO

R D

RIV

EW

AY

S, S

EE

RO

AD

WA

Y S

TA

ND

AR

D D

RA

WIN

G 1

205.0

5 F

OR

AD

DIT

ION

AL

GU

IDA

NC

E.

2- C

ON

TIN

UE

ED

GE

LIN

ES

TH

RO

UG

H M

INO

R D

RIV

EW

AY

S. D

O N

OT

CO

NT

INU

E E

DG

E L

INE

S A

T

1- E

DG

E L

INE

S A

RE

NO

T R

EQ

UIR

ED

AL

ON

G C

UR

B A

ND

GU

TT

ER

LO

CA

TIO

NS

.

GE

NE

RA

L N

OT

ES

:L

EG

EN

D

W =

WID

TH

OF

TR

AV

EL

LA

NE

SY

MB

OL

S

PA

VE

ME

NT

MA

RK

ING

TR

AF

FIC

FL

OW

DIR

EC

TIO

N O

F

E.O

.T.=

ED

GE

OF

TR

AV

EL

CE

NT

ER

LIN

ES

YE

LL

OW

SK

IP

LIN

ES

YE

LL

OW

CE

NT

ER

2 2

2 2

Page 5: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

PAVEMENT MARKINGS

PAVEMENT MARKINGS

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1205.0

31205.0

3

SH

OU

LD

ER

WH

ITE

GO

RE

LIN

ES

WH

ITE

ED

GE

LIN

E

YE

LL

OW

ED

GE

LIN

E

W W

WH

ITE

ED

GE

LIN

E

SH

OU

LD

ER

DIR

EC

TIO

N O

F

TR

AF

FIC

FL

OW

W

W =

WID

TH

OF

TR

AV

EL

LA

NE

1-12

1-12

E.O

.T.

E.O

.T.

E.O

.T.

LA

NE

LIN

E

WH

ITE

SK

IP

PH

YS

ICA

L G

OR

E

TH

EO

RE

TIC

AL

GO

RE

1 3

1 3

TA

PE

RE

D D

EC

EL

ER

AT

ION

LA

NE

YE

LL

OW

ED

GE

LIN

E

EXIT AND ENTRANCE RAMPS

EXIT AND ENTRANCE RAMPS

MIN

I-S

KIP

LIN

E

WH

IT

E 3

’-9

’/S

P

LE

GE

ND

E.O

.T.=

ED

GE

OF

TR

AV

EL

4- R

EF

ER

TO

RO

AD

WA

Y S

TA

ND

AR

D D

RA

WIN

G 1

20

5.0

1 F

OR

AD

DIT

ION

AL

PA

VE

ME

NT

MA

RK

ING

GU

IDA

NC

E.

3- G

OR

E L

INE

S S

HA

LL

BE

TW

ICE

TH

E W

IDT

H O

F T

HE

NO

RM

AL

LIN

E.

2- G

OR

E L

INE

MA

RK

ING

S T

ER

MIN

AT

E A

T T

HE

PH

YS

ICA

L G

OR

E.

1- U

SE

TH

E S

AM

E L

INE

WID

TH

ON

EN

TR

AN

CE

AN

D E

XIT

RA

MP

S.

GE

NE

RA

L N

OT

ES

:

Page 6: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

1205.0

31205.0

3

2 3

2 3

YE

LL

OW

ED

GE

LIN

E

WH

ITE

ED

GE

LIN

E

W W

E.O

.T.

E.O

.T.

WH

ITE

ED

GE

LIN

ES

HO

UL

DE

RE

.O.T

.W

HIT

E G

OR

E L

INE

S

LA

NE

LIN

ES

WH

IT

E S

KIP

LA

NE

LIN

E

WH

IT

E S

KIP

WW

PH

YS

ICA

L G

OR

E

PAVEMENT MARKINGS

PAVEMENT MARKINGS

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

WH

ITE

ED

GE

LIN

E YE

LL

OW

ED

GE

LIN

E

WH

ITE

ED

GE

LIN

E

W

SH

OU

LD

ER

W W

1-12

1-12

E.O

.T.

E.O

.T.

E.O

.T.

PH

YS

ICA

L G

OR

E

LIN

ES

WH

ITE

GO

RE

PA

RA

LL

EL

DE

CE

LE

RA

TIO

N L

AN

E A

T A

MU

LT

I-LA

NE

EX

IT

PA

RA

LL

EL

DE

CE

LE

RA

TIO

N L

AN

E

YE

LL

OW

ED

GE

LIN

E

YE

LL

OW

ED

GE

LIN

E

LA

NE

LIN

E

WH

IT

E S

KIP

LA

NE

LIN

E

WH

ITE

"W

IDE

"

TE

RM

INA

TE

AT

PH

YS

ICA

L G

OR

E

WH

ITE

LA

NE

LIN

E,

MIN

I-S

KIP

LIN

E

WH

IT

E 3

’-9

’/S

P

LIN

E

WH

IT

E 3

’-9

’/S

P M

IN

I-S

KIP

MIN

I-S

KIP

LIN

E

WH

IT

E 3

’-9

’/S

P

25

’ M

IN

.

25

’ M

IN

.

TH

EO

RE

TIC

AL

GO

RE

TH

EO

RE

TIC

AL

GO

RE

RA

MP

INT

ER

SE

CT

ION

EXIT AND ENTRANCE RAMPS

EXIT AND ENTRANCE RAMPS

DIR

EC

TIO

N O

F

TR

AF

FIC

FL

OW

W =

WID

TH

OF

TR

AV

EL

LA

NE

LE

GE

ND

E.O

.T.=

ED

GE

OF

TR

AV

EL

5- R

EF

ER

TO

RO

AD

WA

Y S

TA

ND

AR

D D

RA

WIN

G 1

20

5.0

1 F

OR

AD

DIT

ION

AL

PA

VE

ME

NT

MA

RK

ING

GU

IDA

NC

E.

4- G

OR

E L

INE

S S

HA

LL

BE

TW

ICE

TH

E W

IDT

H O

F T

HE

NO

RM

AL

LIN

E.

3- L

AN

E L

INE

S IN

DIC

AT

ED

AS

"W

IDE

" S

HA

LL

BE

AT

LE

AS

T T

WIC

E T

HE

WID

TH

OF

TH

E N

OR

MA

L L

INE

.

2- G

OR

E L

INE

MA

RK

ING

S T

ER

MIN

AT

E A

T T

HE

PH

YS

ICA

L G

OR

E.

1- U

SE

TH

E S

AM

E L

INE

WID

TH

ON

EN

TR

AN

CE

AN

D E

XIT

RA

MP

S.

GE

NE

RA

L N

OT

ES

:

Page 7: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

1205.0

31205.0

3

3 3

3 3

TA

PE

RE

D A

CC

EL

ER

AT

ION

LA

NE

PAVEMENT MARKINGS

PAVEMENT MARKINGS

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

F

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

100’

WH

ITE

ED

GE

LIN

E

E.O

.T.

WH

ITE

ED

GE

LIN

E

WH

ITE

GO

RE

LIN

ES

W W

E.O

.T.

SH

OU

LD

ER

E.O

.T.

SH

OU

LD

ER

10

0’

10

0’

WH

ITE

GO

RE

LIN

ES

SH

OU

LD

ER

WH

ITE

ED

GE

LIN

E

YE

LL

OW

ED

GE

LIN

E

WH

ITE

ED

GE

LIN

E

SH

OU

LD

ER

TH

EO

RE

TIC

AL

GO

RE

W W W

W

PH

YS

ICA

L G

OR

E

LIN

E

YE

LL

OW

ED

GE

A =

LE

NG

TH

FR

OM

PH

YS

ICA

L G

OR

E T

O T

HE

OR

ET

ICA

L G

OR

E

� A

M

IN

.

TH

EO

RE

TIC

AL

GO

RE

PH

YS

ICA

L G

OR

E

E.O

.T.

E.O

.T.

E.O

.T.

LA

NE

LIN

E

WH

ITE

SK

IP

YE

LL

OW

ED

GE

LIN

E

YE

LL

OW

ED

GE

LIN

E

LA

NE

LIN

E

WH

ITE

"W

IDE

"

MIN

I-S

KIP

LIN

ES

WH

IT

E 3

’-9

’/S

P

MIN

I-S

KIP

LIN

E

WH

IT

E 3

’-9

’/S

P

PA

RA

LL

EL

AC

CE

LE

RA

TIO

N L

AN

E

25’ M

IN

.

20

°

ME

RG

E A

RR

OW

LA

NE

LIN

E

WH

IT

E S

KIP

ME

RG

E A

RR

OW

20

°

1-12

1-12

SH

EE

T O

FEXIT AND ENTRANCE RAMPS

EXIT AND ENTRANCE RAMPS

DIR

EC

TIO

N O

F

TR

AF

FIC

FL

OW

W =

WID

TH

OF

TR

AV

EL

LA

NE

PA

VE

ME

NT

MA

RK

ING

SY

MB

OL

S

LE

GE

ND

E.O

.T.=

ED

GE

OF

TR

AV

EL

5- R

EF

ER

TO

RO

AD

WA

Y S

TA

ND

AR

D D

RA

WIN

GS

12

05

.01

AN

D 1

20

5.0

8 F

OR

AD

DIT

ION

AL

PA

VE

ME

NT

MA

RK

ING

GU

IDA

NC

E.

4- G

OR

E L

INE

S S

HA

LL

BE

TW

ICE

TH

E W

IDT

H O

F T

HE

NO

RM

AL

LIN

E.

3- L

AN

E L

INE

S IN

DIC

AT

ED

AS

"W

IDE

" S

HA

LL

BE

AT

LE

AS

T T

WIC

E T

HE

WID

TH

OF

TH

E N

OR

MA

L L

INE

.

2- G

OR

E L

INE

MA

RK

ING

S T

ER

MIN

AT

E A

T T

HE

PH

YS

ICA

L G

OR

E.

1- U

SE

TH

E S

AM

E L

INE

WID

TH

ON

EN

TR

AN

CE

AN

D E

XIT

RA

MP

S.

GE

NE

RA

L N

OT

ES

:

Page 8: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

1205.0

41205.0

4

1 2

1 2

PAVEMENT MARKINGS

PAVEMENT MARKINGS

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

15

0’ T

HR

U L

AN

E

AR

RO

W S

PA

CIN

G

1-12

1-12

LE

GE

ND

TR

AF

FIC

FL

OW

DIR

EC

TIO

N O

F

*

INTERSECTIONS

PA

VE

ME

NT

MA

RK

ING

SY

MB

OL

S

OP

TIO

NA

L

SIG

NA

LIZ

ED

MU

LT

I-L

AN

E R

OA

DW

AY

WIT

H T

UR

N B

AY

S

60’

ST

OP

BA

R

INTERSECTIONS

SE

E N

OT

E 1

FO

R T

UR

N L

AN

E M

AR

KIN

GS

GU

IDA

NC

E

RE

FE

R T

O S

TD

. 1205.0

5

FO

R P

AIN

TE

D IS

LA

ND

S G

UID

AN

CE

RE

FE

R T

O S

TD

. 1205.0

9

SE

E N

OT

E 3

WH

IT

E 2

’-6’/S

P M

IN

I-S

KIP

LIN

ES

,

*S

EE

NO

TE

2

WH

IT

E 2

’-6’/S

P M

IN

I-S

KIP

LIN

ES

,

SE

E N

OT

E 1

PA

VE

ME

NT

MA

RK

ING

GU

IDA

NC

E.

4- R

EF

ER

TO

RO

AD

WA

Y S

TA

ND

AR

D D

RA

WIN

GS

12

05

.01

, 12

05

.02

, 12

05

.05

, 12

05

.08

AN

D 1

20

5.0

9 F

OR

AD

DIT

IO

NA

L

3- M

INI-S

KIP

LA

NE

LIN

E E

XT

EN

SIO

NS

SH

AL

L B

E U

SE

D W

HE

RE

MU

LT

IPL

E T

UR

N L

AN

ES

AR

E U

SE

D.

VIS

IBIL

ITY

CO

ND

ITIO

NS

SU

CH

AS

OF

FS

ET

, SK

EW

ED

, OR

CU

RV

ED

RO

AD

WA

YS

.

2- M

INI-S

KIP

LA

NE

LIN

E E

XT

EN

SIO

NS

SH

OU

LD

BE

US

ED

AT

INT

ER

SE

CT

ION

S T

HA

T H

AV

E R

ED

UC

ED

ST

OP

BA

R L

OC

AT

ION

S O

R A

S D

IRE

CT

ED

BY

TH

E E

NG

INE

ER

.

IF A

PA

VE

ME

NT

MA

RK

ING

PL

AN

IS N

OT

PR

OV

IDE

D, C

ON

TA

CT

TH

E S

IGN

AL

DE

SIG

N S

EC

TIO

N F

OR

TH

E

1- R

EF

ER

TO

TH

E P

AV

EM

EN

T M

AR

KIN

G P

LA

N F

OR

ST

OP

BA

R L

OC

AT

ION

S F

OR

SIG

NA

LIZ

ED

INT

ER

SE

CT

ION

S.

GE

NE

RA

L N

OT

ES

:

Page 9: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

1205.0

41205.0

4

2 2

2 2

ME

DIA

N

60’

150’

**

PAVEMENT MARKINGS

PAVEMENT MARKINGS

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

*

60’

150’

1-12

1-12

INTERSECTIONS

OT

HE

RW

ISE

TH

EY

AR

E N

OT

RE

QU

IRE

D.

IN M

ED

IAN

CR

OS

SO

VE

R W

HE

N W

IDT

H O

F M

ED

IAN

EX

CE

ED

S 3

0 F

T,

US

E D

OU

BL

E Y

EL

LO

W C

EN

TE

R L

INE

AN

D A

RR

OW

SY

MB

OL

S

10’ T

YP

.

*

*

ST

OP

BA

R, S

EE

NO

TE

1S

TO

P B

AR

, SE

E N

OT

E 1

SE

E N

OT

E 1

ST

OP

BA

R,

10’ T

YP

.

*

*

>3

0’ R

EF

.

10’ T

YP

.

TW

O-L

AN

E, T

W0

-WA

Y R

OA

DW

AY

TW

O-L

AN

E, T

WO

-WA

Y R

OA

DW

AY

WIT

H T

WO

-WA

Y L

EF

T T

UR

N L

AN

E

DIV

IDE

D M

UL

TI-L

AN

E R

OA

DW

AY

WIT

H T

UR

N B

AY

DIV

IDE

D M

UL

TI-L

AN

E R

OA

DW

AY

WIT

H W

IDE

ME

DIA

N C

RO

SS

OV

ER

UN

DIV

IDE

D M

UL

TI-L

AN

E R

OA

DW

AY

ME

DIA

N

150’

60’

* ST

OP

BA

R, S

EE

NO

TE

1*

SE

E N

OT

E 1

ST

OP

BA

R,

*

INTERSECTIONS

160’

FO

R T

UR

N L

AN

E M

AR

KIN

G G

UID

AN

CE

RE

FE

R T

O S

TD

. 1205.0

5

LIN

E, S

EE

NO

TE

3

WH

IT

E 2

’-6

’/S

P M

IN

I-S

KIP

LIN

E, S

EE

NO

TE

3

WH

IT

E 2

’-6

’/S

P M

IN

I-S

KIP

LIN

ES

, SE

E N

OT

E 2

WH

IT

E 2

’-6

’/S

P M

IN

I-S

KIP

LIN

E, S

EE

NO

TE

3

WH

IT

E 2

’-6’/S

P M

IN

I-S

KIP

LIN

E, S

EE

NO

TE

3

WH

IT

E 2

’-6’/S

P M

IN

I-S

KIP

LIN

E

YE

LL

OW

2’-6’/S

P M

IN

I-S

KIP

LIN

E

WH

IT

E 2

’-6’/S

P M

IN

I-S

KIP

LIN

E, S

EE

NO

TE

3

WH

IT

E 2

’-6

’/S

P M

IN

I-S

KIP

LIN

ES

YE

LL

OW

2’-6

’/S

P M

IN

I-S

KIP

OU

TL

INE

D W

ITH

ED

GE

LIN

ES

MO

NO

LIT

HIC

ISL

AN

DS

MA

Y B

E

AR

OU

ND

ME

DIA

N

CO

NT

INU

E E

DG

E L

INE

AR

OU

ND

ME

DIA

N

CO

NT

INU

E E

DG

E L

INE

*

ST

OP

SIG

N

LE

GE

ND

TR

AF

FIC

FL

OW

DIR

EC

TIO

N O

F

ST

AT

ION

AR

Y S

IGN

*

PA

VE

ME

NT

MA

RK

ING

SY

MB

OL

S

OP

TIO

NA

L

AD

DIT

ION

AL

PA

VE

ME

NT

MA

RK

ING

GU

IDA

NC

E.

4- R

EF

ER

TO

RO

AD

WA

Y S

TA

ND

AR

D D

RA

WIN

GS

12

05

.01

, 12

05

.02

, 12

05

.05

, 12

05

.08

AN

D 1

20

5.0

9 F

OR

3- M

INI-S

KIP

ED

GE

LIN

E E

XT

EN

SIO

NS

MA

Y B

E P

LA

CE

D T

HR

OU

GH

INT

ER

SE

CT

ION

S A

ND

MA

JO

R D

RIV

EW

AY

S.

VIS

IBIL

ITY

CO

ND

ITIO

NS

SU

CH

AS

OF

FS

ET

, SK

EW

ED

, OR

CU

RV

ED

RO

AD

WA

YS

.

2- M

INI-S

KIP

LA

NE

LIN

E E

XT

EN

SIO

NS

SH

OU

LD

BE

US

ED

AT

INT

ER

SE

CT

ION

S T

HA

T H

AV

E R

ED

UC

ED

TH

E E

NG

IN

EE

R.

INT

ER

SE

CT

ING

RO

AD

WA

Y. U

SE

10 F

EE

T A

S T

HE

TY

PIC

AL

SE

TB

AC

K D

IST

AN

CE

OR

AS

DIR

EC

TE

D B

Y

ST

OP

BA

RS

NO

LE

SS

TH

AN

4 F

EE

T A

ND

NO

MO

RE

TH

AN

30

FE

ET

FR

OM

TH

E N

EA

RE

ST

ED

GE

OF

TH

E

IS IM

PO

RT

AN

T T

O IN

DIC

AT

E T

HE

PO

INT

WH

ICH

VE

HIC

LE

S A

RE

RE

QU

IRE

D T

O S

TO

P. P

LA

CE

1- P

LA

CE

ME

NT

OF

ST

OP

BA

RS

AT

NO

N-S

IGN

AL

IZE

D IN

TE

RS

EC

TIO

NS

IS O

PT

ION

AL

AN

D U

SE

D W

HE

RE

IT

GE

NE

RA

L N

OT

ES

:

Page 10: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

1205.0

51205.0

5

1 1

1 1

TU

RN

LA

NE

BA

Y

60’

TA

PE

R

TU

RN

LA

NE

BA

Y

60’

SY

MB

OL

PA

VE

ME

NT

MA

RK

ING

160’

� LE

NG

TH

OF

BA

Y

WH

ITE

LA

NE

LIN

E,

TW

O-W

AY

LE

FT

TU

RN

LA

NE

UP

TO

25

0’ M

AX

.

WH

ITE

LA

NE

LIN

E, L

EN

GH

T O

F B

AY

UP

TO

12

5’ M

AX

.

WH

IT

E L

AN

E L

IN

E, � L

EN

GH

T O

F B

AY

TU

RN

LA

NE

BA

Y L

EN

GT

HS

SH

OW

N A

BO

VE

AN

D A

RR

OW

SP

AC

ING

AP

PL

Y A

S F

OR

TH

E V

AR

IOU

S

SA

ME

PA

VE

ME

NT

MA

RK

ING

LIN

ES

, NU

MB

ER

OF

AR

RO

WS

,

PAVEMENT MARKINGS

PAVEMENT MARKINGS

TURN LANES

TURN LANES

DIR

EC

T T

AP

ER

TU

RN

LA

NE

TU

RN

LA

NE

BA

YS

125 -

250 F

T.

DO

UB

LE

TU

RN

LA

NE

S

TU

RN

LA

NE

BA

YS

< 1

25 F

T.

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

10’

TU

RN

LA

NE

BA

Y

60’

TU

RN

LA

NE

BA

Y

TA

PE

R

TA

PE

R

60’

250’

TU

RN

LA

NE

BA

Y

TA

PE

R

CE

NT

ER

BE

TW

EE

N F

IRS

T A

ND

LA

ST

AR

RO

WS

TA

PE

R

LE

GE

ND

EN

D O

F T

AP

ER

1-12

1-12

LIN

E

WH

ITE

LA

NE

WH

ITE

LA

NE

LIN

E

TU

RN

LA

NE

BA

YS

25

0 F

T. O

R G

RE

AT

ER

TU

RN

LA

NE

BA

Y

AR

RO

W C

EN

TE

RE

D IN

WH

ITE

LA

NE

LIN

E

AN

D L

AS

T A

RR

OW

S

CE

NT

ER

BE

TW

EE

N F

IRS

T

AN

D L

AS

T A

RR

OW

S

CE

NT

ER

BE

TW

EE

N F

IRS

T

LE

FT

TU

RN

LA

NE

DE

VE

LO

PE

D F

RO

M T

WO

-WA

Y T

UR

N L

AN

E

2- T

HE

NU

MB

ER

OF

AR

RO

WS

SH

OW

N IS

TH

E M

INIM

UM

RE

QU

IRE

D. U

SE

AD

DIT

ION

AL

AR

RO

WS

AS

DIR

EC

TE

D B

Y T

HE

EN

GIN

EE

R.

1- U

SE

TH

E G

UID

AN

CE

SH

OW

N A

BO

VE

IN C

ON

JU

NC

TIO

N W

ITH

TH

E IN

TE

RS

EC

TIO

N G

UID

AN

CE

SH

OW

N O

N R

OA

DW

AY

ST

AN

DA

RD

DR

AW

ING

12

05

.04

.

GE

NE

RA

L N

OT

ES

:

WH

IT

E 3

’-9

’/S

P M

IN

I-S

KIP

LIN

E

WH

IT

E 3

’-9

’/S

P M

IN

I-S

KIP

LIN

E

WH

IT

E 3

’-9

’/S

P M

IN

I-S

KIP

LIN

E

WH

IT

E 3

’-9

’/S

P M

IN

I-S

KIP

LIN

E

LIN

E

WH

IT

E 2

’-6

’/S

P M

IN

I-S

KIP

WH

IT

E 3

’-9

’/S

P M

IN

I-S

KIP

LIN

E

WH

IT

E 3

’-9

’/S

P M

IN

I-S

KIP

LIN

E

WH

IT

E S

KIP

LA

NE

LIN

E

Page 11: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

PAVEMENT MARKINGS

PAVEMENT MARKINGS

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1-12

1-12

1205.0

61205.0

6

1 3

1 3

ONLY

ONLY

ONLY

ONLY

10

’ T

YP

.

1 M

IL

E O

R L

ES

SM

OR

E T

HA

N 1

MIL

E

60’

60’

LA

NE

LIN

E

WH

ITE

SK

IP

LA

NE

LIN

E

WH

ITE

SK

IPL

AN

E L

INE

WH

ITE

"W

IDE

"

TH

RU

-LA

NE

DR

OP

AT

AN

INT

ER

SE

CT

ION

LA

NE

LIN

E

WH

ITE

"W

IDE

"

MIN

I-S

KIP

LIN

E

WH

IT

E "

WID

E" 3

’-9’/S

P

MIN

I-S

KIP

LIN

E

WH

IT

E "

WID

E" 3

’-9’/S

P

W =

WID

TH

OF

TR

AV

EL

LA

NE

SY

MB

OL

S &

CH

AR

AC

TE

RS

PA

VE

ME

NT

MA

RK

ING

LE

GE

ND

75’

75’

TY

P.

TY

P.

55

MP

H =

45

0’

=

40

-5

0 M

PH

= 2

00

35

MP

H =

15

0’

=

75’

75’

TY

P.

TY

P.

55

MP

H =

45

0’

=

40

-5

0 M

PH

= 2

00

35

MP

H =

15

0’

=

LANE DROPS

LANE DROPS

UP

ST

RE

AM

RE

GU

LA

TO

RY

OR

WA

RN

ING

SIG

N A

SS

OC

IAT

ED

WIT

H T

HE

LA

NE

DR

OP

.

DR

OP

SH

OU

LD

BE

GIN

NO

CL

OS

ER

TO

TH

E IN

TE

RS

EC

TIO

N T

HA

N T

HE

MO

ST

US

E E

NG

INE

ER

ING

JU

DG

EM

EN

T T

O D

ET

ER

MIN

G L

AN

E D

RO

P L

EN

GT

H. T

HE

LA

NE

ONLY

TR

AF

FIC

FL

OW

DIR

EC

TIO

N O

F2

- LA

NE

LIN

ES

IND

ICA

TE

D A

S "

WID

E" S

HA

LL

BE

AT

LE

AS

T T

WIC

E T

HE

WID

TH

OF

TH

E N

OR

MA

L L

INE

.

RO

AD

WA

Y S

TA

ND

AR

D D

RA

WIN

G 1

205.0

4.

1- U

SE

TH

E G

UID

AN

CE

SH

OW

N O

N T

HE

AB

OV

E D

ET

AIL

IN C

ON

JU

NC

TIO

N W

ITH

INT

ER

SE

CT

ION

GU

IDA

NC

E S

HO

WN

ON

GE

NE

RA

L N

OT

ES

:

Page 12: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

PAVEMENT MARKINGS

PAVEMENT MARKINGS

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

F

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

ONLY

1-12

1-12

WWW

PH

YIS

ICA

L G

OR

E300’

� MIL

E M

IN

.

W WWW

LA

NE

LIN

ES

WH

IT

E S

KIP

PH

YS

ICA

L G

OR

E

300’

� MIL

E M

IN

.

LIN

ES

WH

ITE

GO

RE

LA

NE

LIN

ES

WH

ITE

SK

IP

LIN

ES

WH

ITE

GO

RE

LA

NE

DR

OP

AT

A S

ING

LE

LA

NE

EX

IT R

AM

P

LA

NE

DR

OP

AT

A M

UL

TI-L

AN

E E

XIT

RA

MP

LA

NE

LIN

E

WH

ITE

"W

IDE

"

ONLY

TE

RM

INA

TE

AT

PH

YS

ICA

L G

OR

E

WH

ITE

"W

IDE

" L

AN

E L

INE

,

MIN

I-S

KIP

LIN

E

WH

IT

E "

WID

E" 3

’-9’/S

P M

IN

I-S

KIP

LIN

E

WH

IT

E "

WID

E" 3

’-9’/S

P

MIN

I-S

KIP

LIN

E

WH

IT

E "

WID

E" 3

’- 9

’/S

P

TH

EO

RE

TIC

AL

GO

RE

500’

500’

75’

75’

75’

75’

TH

EO

RE

TIC

AL

GO

RE

RA

MP

INT

ER

SE

CT

ION

1205.0

61205.0

6

2 3

2 3

SH

EE

T O

FLANE DROPS

LANE DROPS

W =

WID

TH

OF

TR

AV

EL

LA

NE

SY

MB

OL

S &

CH

AR

AC

TE

RS

PA

VE

ME

NT

MA

RK

ING

LE

GE

ND

ONLY

TR

AF

FIC

FL

OW

DIR

EC

TIO

N O

F

3- G

OR

E L

INE

S S

HA

LL

BE

TW

ICE

TH

E W

IDT

H O

F T

HE

NO

RM

AL

LIN

E.

2- L

AN

E L

INE

S IN

DIC

AT

ED

AS

"W

IDE

" S

HA

LL

BE

AT

LE

AS

T T

WIC

E T

HE

WID

TH

OF

TH

E N

OR

MA

L L

INE

.

SH

OW

N O

N R

OA

DW

AY

ST

AN

DA

RD

DR

AW

ING

1205.0

3.

1- U

SE

TH

E G

UID

AN

CE

SH

OW

N O

N T

HE

FO

LL

OW

ING

DE

TA

ILS

IN C

ON

JU

NC

TIO

N W

ITH

TH

E E

XIT

RA

MP

GU

IDA

NC

E

GE

NE

RA

L N

OT

ES

:

Page 13: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

PAVEMENT MARKINGS

PAVEMENT MARKINGS

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

F

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

W W W

W W W W

1-12

1-12

GO

RE

PH

YS

ICA

L

LIN

E

WH

ITE

GO

RE

GO

RE

PH

YS

ICA

L

LIN

E

WH

ITE

GO

RE

AU

XIL

IAR

Y L

AN

E 2

MIL

ES

OR

LE

SS

IN L

EN

GT

H B

ET

WE

EN

RA

MP

S

LA

NE

LIN

ES

WH

ITE

SK

IP

3 3

SH

EE

T O

F3

3

LA

NE

LIN

E

WH

ITE

"W

IDE

"

LA

NE

LIN

E

WH

ITE

"W

IDE

"

LANE DROPS

LANE DROPS

1205.0

61205.0

6

� MIL

E M

IN

.G

OR

E

PH

YS

ICA

L

LIN

ES

WH

ITE

GO

RE

W W W

LA

NE

LIN

E

WH

ITE

"W

IDE

"

LA

NE

LIN

ES

WH

ITE

SK

IP

W

RO

UT

E S

PL

IT W

ITH

DE

DIC

AT

ED

LA

NE

S

W

MIN

I-S

KIP

LIN

E

WH

IT

E "

WID

E" 3

’-9

’/S

P

MIN

I-S

KIP

LIN

E

WH

IT

E "

WID

E" 3

’-9

’/S

P

25

’ M

IN

.

25

’ M

IN

.

25

’ M

IN

.

TH

EO

RE

TIC

AL

GO

RE

TH

EO

RE

TIC

AL

GO

RE

TH

EO

RE

TIC

AL

GO

RE

W =

WID

TH

OF

TR

AV

EL

LA

NE

SY

MB

OL

S &

CH

AR

AC

TE

RS

PA

VE

ME

NT

MA

RK

ING

LE

GE

ND

ONLY

TR

AF

FIC

FL

OW

DIR

EC

TIO

N O

F

3- G

OR

E L

INE

S S

HA

LL

BE

TW

ICE

TH

E W

IDT

H O

F T

HE

NO

RM

AL

LIN

E.

2- L

AN

E L

INE

S IN

DIC

AT

ED

AS

"W

IDE

" S

HA

LL

BE

AT

LE

AS

T T

WIC

E T

HE

WID

TH

OF

TH

E N

OR

MA

L L

INE

.

SH

OW

N O

N R

OA

DW

AY

ST

AN

DA

RD

DR

AW

ING

12

05

.03

.

1- U

SE

TH

E G

UID

AN

CE

SH

OW

N O

N T

HE

FO

LL

OW

ING

DE

TA

ILS

IN C

ON

JU

NC

TIO

N W

ITH

TH

E E

XIT

RA

MP

GU

IDA

NC

E

GE

NE

RA

L N

OT

ES

:

Page 14: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

PEDESTRIAN CROSSWALKS

HI-V

ISIB

ILIT

Y C

RO

SS

WA

LK

ST

AN

DA

RD

CR

OS

SW

AL

K

PAVEMENT MARKINGS

PAVEMENT MARKINGS

PEDESTRIAN CROSSWALKS

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1205.0

71205.0

7

1 1

1 1

ST

OP

BA

R

4’ M

IN

.

TO

CR

OS

SW

AL

K

6’ M

IN

.

CR

OS

SW

AL

K

PE

DE

ST

RIA

N

8" W

HIT

E

CR

OS

SW

AL

K L

INE

S

1-12

1-12

CU

RB

RA

MP

S

4’ M

IN

.

TO

CR

OS

SW

AL

K L

INE

ED

GE

OF

TR

AV

EL

CL

EA

R S

PA

CE

4’ X

4’

SID

EW

AL

K

CU

RB

RA

MP

24’’ W

HIT

E

CR

OS

SW

AL

K L

INE

24

’’ GA

P

10

’ MIN

. WID

TH

5- C

UR

B R

AM

PS

SH

AL

L B

E C

ON

ST

RU

CT

ED

IN A

CC

OR

DA

NC

E T

O T

HE

LA

TE

ST

NC

DO

T R

OA

DW

AY

ST

AN

DA

RD

DR

AW

ING

S.

BE

CO

OR

DIN

AT

ED

WIT

H T

HE

SIG

NA

L D

ES

IGN

SE

CT

ION

OR

AS

DIR

EC

TE

D B

Y T

HE

EN

GIN

EE

R.

4- P

LA

CE

ST

OP

BA

RS

A M

INIM

UM

OF

4 F

EE

T F

RO

M N

EA

RE

ST

CR

OS

SW

AL

K L

INE

. ST

OP

BA

RS

AT

SIG

NA

LIZ

ED

INT

ER

SE

CT

ION

S S

HO

UL

D

3- B

EY

ON

D T

HE

CU

RB

FA

CE

, A C

LE

AR

SP

AC

E O

F 4

’ X 4

’ FE

ET

MIN

IMU

M S

HA

LL

BE

PR

OV

IDE

D W

ITH

IN T

HE

WID

TH

OF

TH

E C

RO

SS

WA

LK

.

2- S

ET

BA

CK

DIS

TA

NC

E F

RO

M IN

SID

E C

RO

SS

WA

LK

MA

RK

ING

TO

NE

AR

ES

T E

DG

E O

F T

RA

VE

L IS

4’ M

IN.

1- T

HE

MIN

IMU

M W

IDT

H O

F S

TA

ND

AR

D C

RO

SS

WA

LK

S IS

6 F

EE

T. T

HE

MIN

IMU

M W

IDT

H O

F H

I-VIS

IBIL

ITY

CR

OS

SW

AL

KS

IS 1

0 F

EE

T.

DO

ME

S

DE

TE

CT

AB

LE

WA

RN

ING

SID

EW

AL

K

LE

GE

ND

TR

AF

FIC

FL

OW

DIR

EC

TIO

N O

F

WA

RN

IN

G D

OM

ES

DE

TE

CT

AB

LE

CU

RB

RA

MP

WIT

H

CL

EA

R S

PA

CE

4’ X

4’

Page 15: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

RA

MP

AR

RO

W

PAVEMENT MARKINGS

PAVEMENT MARKINGS

1205.0

81205.0

8

1 7

ME

RG

E A

RR

OW

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

2’-10"

4’-4�"

14’-10� "

12’-3’’

18’-0’’

5’-9’’

2’-

10�

"

12’’

20’’

4’-6"

14’’

12’’

6’-4’’

36’’

8’’

28’’24’’

R=

28’’

R=

40’’

32’’

4’’

28’’

48’’ 32’’

12’’

5’-4’’

12’’

14’’

R=

40’’

R=

28’’

12’’

24’’

6’-4’’ 3

2’’

4’’

28’’

44’’ 32’’

28’’

8’’

36’’

20’’

SA

ME

DIM

EN

SIO

NS

AP

PL

Y A

S F

OR

TH

E L

EF

T/R

IGH

T T

UR

N A

RR

OW

SA

ME

DIM

EN

SIO

NS

AP

PL

Y A

S

FO

R T

HE

CO

MB

INA

TIO

N S

TR

AIG

HT

AN

D L

EF

T/R

IGH

T T

UR

N A

RR

OW

FO

R W

RO

NG

-WA

Y M

OV

EM

EN

TS

ON

FR

EE

WA

Y A

ND

EX

PR

ES

SW

AY

RA

MP

S

CR

YS

TA

L/R

ED

PA

VE

ME

NT

MA

RK

ER

8’’

2’-6’’ 8’’

10’-0’’

L C O

F R

AM

P

7’-1’’

2’-6’’

8’’

16

’-8

’’

2’-6’’

5’-0’’

TY

P.

TYP.

5’-0"

RA

MP

AR

RO

W

AT

EX

IT R

AM

P

100’–

AT

EX

IT R

AM

P

RA

MP

AR

RO

W

100’–

1-12

1-12

1 8

9’-6" MIN.

5’

8’ MIN.

12.75’ MIN.

SY

MB

OL

S A

RE

RE

QU

IRE

D T

O B

E A

PP

RO

VE

D B

Y T

HE

DE

PA

RT

ME

NT

.

TH

ER

EF

OR

E S

LIG

HT

VA

RIA

NC

ES

AR

E A

CC

EP

TA

BL

E, H

OW

EV

ER

, AL

L

TH

RU

8). S

YM

BO

L D

IME

NS

ION

S C

AN

VA

RY

AM

ON

G M

AN

UF

AC

TU

RE

RS

,

HIG

HW

AY

SIG

NS

AN

D P

AV

EM

EN

T M

AR

KIN

GS

", (R

EF

ER

TO

SH

EE

TS

5

4- C

ON

FO

RM

AL

L S

YM

BO

LS

TO

TH

E F

HW

A "

ST

AN

DA

RD

AL

PH

AB

ET

S F

OR

UN

LE

SS

AP

PR

OV

ED

BY

TH

E E

NG

INE

ER

.

EX

PA

NS

ION

JO

INT

S O

N P

OR

TL

AN

D C

EM

EN

T C

ON

CR

ET

E P

AV

EM

EN

TS

,

3- D

O N

OT

PL

AC

E P

AV

EM

EN

T M

AR

KIN

G S

YM

BO

LS

AC

RO

SS

TR

AN

SV

ER

SE

IN

TO

IN

TE

RS

EC

TIO

N A

RE

AS

.

2- D

O N

OT

LO

CA

TE

PA

VE

ME

NT

MA

RK

ING

SY

MB

OL

S A

S T

O E

NC

RO

AC

H

1- U

SE

TH

E C

OL

OR

WH

ITE

FO

R A

LL

PA

VE

ME

NT

MA

RK

ING

SY

MB

OL

S.

GE

NE

RA

L N

OT

ES

:

TU

RN

AR

RO

W

RIG

HT

OR

LE

FT

LE

FT

OR

RIG

HT

TU

RN

AR

RO

W

CO

MB

INA

TIO

N S

TR

AIG

HT

AN

DC

OM

BIN

AT

ION

LE

FT

AN

D

RIG

HT

TU

RN

AR

RO

W

CO

MB

INA

TIO

N L

EF

T A

ND

ST

RA

IGH

T

AN

D R

IGH

T T

UR

N A

RR

OW

ST

RA

IGH

T A

RR

OW

SYMBOLS AND WORD MESSAGES

SYMBOLS AND WORD MESSAGES

Page 16: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

F

ENGLISH STANDARD DRAWING FOR

3"-12"

24

"

36"

3"-12"

12

"

18"

24

" Y

IEL

D L

INE

SY

MB

OL

12

" Y

IEL

D L

INE

SY

MB

OL

10’-2"

3’-4

"

7’-9

"

12

"

3’-4

"

6’-0

"

6’-0

"

6’-0

"6

’-0

"

4’-0

"

BIC

YC

LE

LA

NE

SY

MB

OL

S

10

"

24"

2"

5"

2"

6"

ENGLISH STANDARD DRAWING FOR

BIC

YC

LE

DE

TE

CT

OR

SY

MB

OL

U-T

UR

N A

RR

OW

LE

FT

3’-4

"

9’-4

"

6’-0

"

SH

AR

ED

LA

NE

SY

MB

OL

1-12

1-12

1205.0

81205.0

8

SH

EE

T O

F2

8

2 8

US

E O

N 1

2’ A

ND

AB

OV

E L

AN

ES

US

E O

N U

ND

ER

12’ L

AN

ES

SY

MB

OL

S A

RE

RE

QU

IRE

D T

O B

E A

PP

RO

VE

D B

Y T

HE

DE

PA

RT

ME

NT

.

TH

ER

EF

OR

E S

LIG

HT

VA

RIA

NC

ES

AR

E A

CC

EP

TA

BL

E, H

OW

EV

ER

, AL

L

TH

RU

8). S

YM

BO

L D

IME

NS

ION

S C

AN

VA

RY

AM

ON

G M

AN

UF

AC

TU

RE

RS

,

HIG

HW

AY

SIG

NS

AN

D P

AV

EM

EN

T M

AR

KIN

GS

", (R

EF

ER

TO

SH

EE

TS

5

4- C

ON

FO

RM

AL

L S

YM

BO

LS

TO

TH

E F

HW

A "

ST

AN

DA

RD

AL

PH

AB

ET

S F

OR

UN

LE

SS

AP

PR

OV

ED

BY

TH

E E

NG

INE

ER

.

EX

PA

NS

ION

JO

INT

S O

N P

OR

TL

AN

D C

EM

EN

T C

ON

CR

ET

E P

AV

EM

EN

TS

,

3- D

O N

OT

PL

AC

E P

AV

EM

EN

T M

AR

KIN

G S

YM

BO

LS

AC

RO

SS

TR

AN

SV

ER

SE

IN

TO

IN

TE

RS

EC

TIO

N A

RE

AS

.

2- D

O N

OT

LO

CA

TE

PA

VE

ME

NT

MA

RK

ING

SY

MB

OL

S A

S T

O E

NC

RO

AC

H

1- U

SE

TH

E C

OL

OR

WH

ITE

FO

R A

LL

PA

VE

ME

NT

MA

RK

ING

SY

MB

OL

S.

GE

NE

RA

L N

OT

ES

:

SYMBOLS AND WORD MESSAGES

SYMBOLS AND WORD MESSAGES

PAVEMENT MARKINGS

PAVEMENT MARKINGS

Page 17: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

MU

LT

I-LA

NE

WID

TH

"S

CH

OO

L"

O.C

.

O.C

.

PAVEMENT MARKINGS

PAVEMENT MARKINGS

SYMBOLS AND WORD MESSAGES

SYMBOLS AND WORD MESSAGES

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1205.0

81205.0

8

1-12

1-12

3 8

3 8

LE

TT

ER

HE

IG

HT

= 1

0’ M

IN

.

LE

TT

ER

WID

TH

= 2

0’’

24’’ W

HIT

E T

RA

NS

VE

RS

E B

AN

D

10’ MIN. 7’-6’’

24’’ W

HIT

E T

RA

NS

VE

RS

E B

AN

D

14

’-2

’’ M

IN

. TO

22

’-6

" M

AX

.

7’-6’’

CE

NT

ER

TE

XT

IN L

AN

ES

SP

AC

ING

= 1

0’’ M

IN./3

0’’ M

AX

. (US

E E

QU

AL

SP

AC

ING

BE

TW

EE

N L

ET

TE

RS

)

SIN

GL

E L

AN

E W

IDT

H "

SC

HO

OL

"

14

’-2

’’ M

IN

. TO

22

’-6

" M

AX

.

(F

EE

T)

WID

TH

OF

"X

" (

FE

ET

)

LA

NE

WID

TH

8’-4’’

4’’

12’’

6’’

6’’

16’’

4’’ 16’’

7’-0

’’

16’’

16’’

8’’

8’’

TY

P.

6’-0’’

11�’’

2�’’

TR

AN

SV

ER

SE

BA

ND

24’’ W

HIT

E

8’<

W<

9’

9’<

W<

12

W>

12

’1

0’

8’

7’

50’

24’’ W

HIT

E

TR

AN

SV

ER

SE

BA

ND

LA

NE

WID

TH

O.C

.

LA

NE

CL

16’’

7’

48’

20’

6’ 7’

14’

O.C

.

WH

ITEALIGN "R" WITH "X"

14’

WID

TH

OF

"X

"

CE

NT

ER

TE

XT

IN L

AN

E

8’-4"8’-4"

LE

TT

ER

WID

TH

= 1

6’’

LE

TT

ER

HE

IG

HT

= 8

’-4

’’

SP

AC

ING

= 4

’’ MIN

./8’’ M

AX

. (US

E E

QU

AL

SP

AC

ING

BE

TW

EE

N L

ET

TE

RS

)

27’

27’

24’’ W

HIT

E T

RA

NS

VE

RS

E B

AN

D

24’’ W

HIT

E T

RA

NS

VE

RS

E B

AN

D

O.C

.

O.C

.

8’-4"

RA

ILR

OA

D R

XR

SY

MB

OL

PA

RT

7 O

F T

HE

MU

TC

D M

AY

AL

SO

BE

US

ED

.

NO

TE

: TH

E T

WO

-LA

NE

PA

VE

ME

NT

MA

RK

ING

DIM

EN

SIO

NS

OF

"S

CH

OO

L" S

HO

WN

IN

Page 18: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

PAVEMENT MARKINGS

PAVEMENT MARKINGS

SP

EE

D L

IM

IT

WO

RD

SY

MB

OL

S

BE

TW

EE

N

DIS

TA

NC

E "

D"

(M

PH

)

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1205.0

81205.0

8

10

’-4

’’

4’’

16’’

16’’

16’’

12’’

16’’

16’’

8’-4’’

8’’

8’’

8’’

4’’

9’-4’’

16’’

16’’

16’’

16’’

16’’

8’-4’’

4’’

12’’

8’’

8’’

LE

TT

ER

HE

IGH

T=

8’-4

’’

LE

TT

ER

WID

TH

=1

6’’

LE

TT

ER

SP

AC

ING

=8’’

7’-4’’

8’-4’’

8’-4’’

16’’

16’’

16’’

16’’

16’’

8’-1

0’’

6’’

6’’

8’’

6’’

LE

TT

ER

HE

IGH

T=

8’-4

’’

LE

TT

ER

WID

TH

=1

6’’

LE

TT

ER

SP

AC

ING

=8’’

7’-4’’

8’-4’’

LE

TT

ER

HE

IGH

T=

8’-4

’’

LE

TT

ER

WID

TH

=1

6’’

LE

TT

ER

SP

AC

ING

=8’’

7’-4’’

8’-4’’

LA

NE

WID

TH

LA

NE

WID

TH

’’D’’’’D’’

’’D’’

DIR

EC

TIO

N O

F T

RA

VE

L

WO

RD

S A

RE

CE

NT

ER

ED

IN T

RA

VE

L L

AN

E

NE

CE

SS

AR

Y F

OR

OP

TIC

AL

SP

AC

ING

DIS

TA

NC

E "

D" M

AY

BE

AD

JU

ST

ED

AS

35 O

R L

ES

S

40

- 5

0

55

- 6

0

65

OR

GR

EA

TE

R100’

80’

60’

40’

1-12

1-12

4 8

4 8

SYMBOLS AND WORD MESSAGES

SYMBOLS AND WORD MESSAGES

Page 19: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

PAVEMENT MARKINGS

PAVEMENT MARKINGS

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1205.0

81205.0

8

1-12

1-12

5 8

5 8

SYMBOLS AND WORD MESSAGES

SYMBOLS AND WORD MESSAGES

7- F

OR

6’ H

IG

H C

HA

RA

CT

ER

S, T

HE

WID

TH

IS

11

�" (

US

E 2

�" F

OR

EA

CH

GR

ID

SQ

UA

RE

).

6- F

OR

10’ H

IG

H C

HA

RA

CT

ER

S, T

HE

WID

TH

IS

20" (

US

E 5

" F

OR

EA

CH

GR

ID

SQ

UA

RE

).

5- F

OR

8’-4" H

IG

H C

HA

RA

CT

ER

S, T

HE

WID

TH

IS

16" (

US

E 4

" F

OR

EA

CH

GR

ID

SQ

UA

RE

).

’R’ S

YM

BO

L A

ND

TH

E T

WO

-LA

NE

10’ S

CH

OO

L S

YM

BO

L.

4- S

TA

ND

AR

D C

HA

RA

CT

ER

HE

IGH

TS

AR

E 8

’-4". E

XC

EP

T F

OR

TH

E 6

’ RA

ILR

OA

D

(O

PT

IC

AL

SP

AC

IN

G M

AY

BE

US

ED

).

3- S

PA

CE

1 U

NIT

(MIN

.) BE

TW

EE

N C

HA

RA

CT

ER

S O

R A

S O

TH

ER

WIS

E S

HO

WN

2- V

ER

TIC

AL

ST

RO

KE

S A

RE

1 U

NIT

WID

E, H

OR

IZO

NT

AL

ST

RO

KE

S A

RE

4 U

NIT

S H

IGH

.

LE

TT

ER

"I" A

ND

TH

E N

UM

BE

R "

1" W

HIC

H A

RE

1 U

NIT

WID

E).

1- S

TA

ND

AR

D C

HA

RA

CT

ER

S A

RE

25 G

RID

UN

ITS

HIG

H A

ND

4 U

NIT

S W

IDE

(EX

CE

PT

GE

NE

RA

L N

OT

ES

:

Page 20: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

PAVEMENT MARKINGS

PAVEMENT MARKINGS

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1205.0

81205.0

8

1-12

1-12

6 8

6 8

SYMBOLS AND WORD MESSAGES

SYMBOLS AND WORD MESSAGES

7- F

OR

6’ H

IG

H C

HA

RA

CT

ER

S, T

HE

WID

TH

IS

11

�" (

US

E 2

�" F

OR

EA

CH

GR

ID

SQ

UA

RE

).

6- F

OR

10’ H

IG

H C

HA

RA

CT

ER

S, T

HE

WID

TH

IS

20" (

US

E 5

" F

OR

EA

CH

GR

ID

SQ

UA

RE

).

5- F

OR

8’-4" H

IG

H C

HA

RA

CT

ER

S, T

HE

WID

TH

IS

16" (

US

E 4

" F

OR

EA

CH

GR

ID

SQ

UA

RE

).

’R’ S

YM

BO

L A

ND

TH

E T

WO

-LA

NE

10’ S

CH

OO

L S

YM

BO

L.

4- S

TA

ND

AR

D C

HA

RA

CT

ER

HE

IGH

TS

AR

E 8

’-4". E

XC

EP

T F

OR

TH

E 6

’ RA

ILR

OA

D

(O

PT

IC

AL

SP

AC

IN

G M

AY

BE

US

ED

).

3- S

PA

CE

1 U

NIT

(MIN

.) BE

TW

EE

N C

HA

RA

CT

ER

S O

R A

S O

TH

ER

WIS

E S

HO

WN

2- V

ER

TIC

AL

ST

RO

KE

S A

RE

1 U

NIT

WID

E, H

OR

IZO

NT

AL

ST

RO

KE

S A

RE

4 U

NIT

S H

IGH

.

LE

TT

ER

"I" A

ND

TH

E N

UM

BE

R "

1" W

HIC

H A

RE

1 U

NIT

WID

E).

1- S

TA

ND

AR

D C

HA

RA

CT

ER

S A

RE

25 G

RID

UN

ITS

HIG

H A

ND

4 U

NIT

S W

IDE

(EX

CE

PT

GE

NE

RA

L N

OT

ES

:

Page 21: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

PAVEMENT MARKINGS

HIGHWAY PAVEMENT MARKING (USDOT-FHWA)

STANDARD ALPHABET AND SYMBOLS FOR

PAVEMENT MARKINGS

HIGHWAY PAVEMENT MARKING (USDOT-FHWA)

STANDARD ALPHABET AND SYMBOLS FOR

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1205.0

81205.0

8

1-12

1-12

7 8

7 8

7- F

OR

6’ H

IG

H C

HA

RA

CT

ER

S, T

HE

WID

TH

IS

11

�" (

US

E 2

�" F

OR

EA

CH

GR

ID

SQ

UA

RE

).

6- F

OR

10’ H

IG

H C

HA

RA

CT

ER

S, T

HE

WID

TH

IS

20" (

US

E 5

" F

OR

EA

CH

GR

ID

SQ

UA

RE

).

5- F

OR

8’-4" H

IG

H C

HA

RA

CT

ER

S, T

HE

WID

TH

IS

16" (

US

E 4

" F

OR

EA

CH

GR

ID

SQ

UA

RE

).

’R’ S

YM

BO

L A

ND

TH

E T

WO

-LA

NE

10’ S

CH

OO

L S

YM

BO

L.

4- S

TA

ND

AR

D C

HA

RA

CT

ER

HE

IGH

TS

AR

E 8

’-4". E

XC

EP

T F

OR

TH

E 6

’ RA

ILR

OA

D

(O

PT

IC

AL

SP

AC

IN

G M

AY

BE

US

ED

).

3- S

PA

CE

1 U

NIT

(MIN

.) BE

TW

EE

N C

HA

RA

CT

ER

S O

R A

S O

TH

ER

WIS

E S

HO

WN

2- V

ER

TIC

AL

ST

RO

KE

S A

RE

1 U

NIT

WID

E, H

OR

IZO

NT

AL

ST

RO

KE

S A

RE

4 U

NIT

S H

IGH

.

LE

TT

ER

"I" A

ND

TH

E N

UM

BE

R "

1" W

HIC

H A

RE

1 U

NIT

WID

E).

1- S

TA

ND

AR

D C

HA

RA

CT

ER

S A

RE

25 G

RID

UN

ITS

HIG

H A

ND

4 U

NIT

S W

IDE

(EX

CE

PT

GE

NE

RA

L N

OT

ES

:

Page 22: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

PAVEMENT MARKINGS

PAVEMENT MARKINGS

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1205.0

81205.0

8

1-12

1-12

8 8

8 8

SYMBOLS AND WORD MESSAGES

SYMBOLS AND WORD MESSAGES

7- F

OR

6’ H

IG

H C

HA

RA

CT

ER

S, T

HE

WID

TH

IS

11

�" (

US

E 2

�" F

OR

EA

CH

GR

ID

SQ

UA

RE

).

6- F

OR

10’ H

IG

H C

HA

RA

CT

ER

S, T

HE

WID

TH

IS

20" (

US

E 5

" F

OR

EA

CH

GR

ID

SQ

UA

RE

).

5- F

OR

8’-4" H

IG

H C

HA

RA

CT

ER

S, T

HE

WID

TH

IS

16" (

US

E 4

" F

OR

EA

CH

GR

ID

SQ

UA

RE

).

’R’ S

YM

BO

L A

ND

TH

E T

WO

-LA

NE

10’ S

CH

OO

L S

YM

BO

L.

4- S

TA

ND

AR

D C

HA

RA

CT

ER

HE

IGH

TS

AR

E 8

’-4". E

XC

EP

T F

OR

TH

E 6

’ RA

ILR

OA

D

(O

PT

IC

AL

SP

AC

IN

G M

AY

BE

US

ED

).

3- S

PA

CE

1 U

NIT

(MIN

.) BE

TW

EE

N C

HA

RA

CT

ER

S O

R A

S O

TH

ER

WIS

E S

HO

WN

2- V

ER

TIC

AL

ST

RO

KE

S A

RE

1 U

NIT

WID

E, H

OR

IZO

NT

AL

ST

RO

KE

S A

RE

4 U

NIT

S H

IGH

.

LE

TT

ER

"I" A

ND

TH

E N

UM

BE

R "

1" W

HIC

H A

RE

1 U

NIT

WID

E).

1- S

TA

ND

AR

D C

HA

RA

CT

ER

S A

RE

25 G

RID

UN

ITS

HIG

H A

ND

4 U

NIT

S W

IDE

(EX

CE

PT

GE

NE

RA

L N

OT

ES

:

Page 23: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

LE

GE

ND

PAINTED ISLANDS

PAVEMENT MARKINGS

PAVEMENT MARKINGS

PAINTED ISLANDS

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1205.0

91205.0

9

1 1

1 1

WH

ITE

DIA

GO

NA

L L

INE

S

(CH

EV

RO

N)

WH

ITE

GO

RE

LIN

ES

1

2

1

2

(2:1

SL

OP

E)

DIA

GO

NA

L L

INE

S

YE

LL

OW

CE

NT

ER

LIN

ES

DO

UB

LE

YE

LL

OW

ME

DIA

N S

ID

E E

.O.T

.

OR

SH

OU

LD

ER

OU

TS

ID

E E

.O.T

.

OR

SH

OU

LD

ER

2

1

(2:1

SL

OP

E)

DIA

GO

NA

L L

INE

WH

ITE

ED

GE

LIN

E

WH

ITE

ED

GE

LIN

E

YE

LL

OW

(2:1

SL

OP

E)

DIA

GO

NA

L L

INE

S

YE

LL

OW

2

1

CL

1-12

1-12

TR

AF

FIC

FL

OW

DIR

EC

TIO

N O

F

E.O

.T.=

ED

GE

OF

TR

AV

EL

ME

DIA

N IS

LA

ND

SE

PA

RA

TIN

G T

RA

FF

IC IN

OP

PO

SIN

G D

IRE

CT

ION

S

CH

AN

NE

LIZ

ING

ISL

AN

D S

EP

AR

AT

ING

TR

AF

FIC

IN S

AM

E D

IRE

CT

ION

ED

GE

OF

PA

VE

ME

NT

OR

SH

OU

LD

ER

ISL

AN

D

"D"

"D

"

"D

"

MA

Y B

E A

DJU

ST

ED

AS

DE

TE

RM

INE

D B

Y T

HE

EN

GIN

EE

R.

3- A

DJU

ST

SP

AC

ING

OF

DIA

GO

NA

LS

DE

PE

ND

ING

ON

TH

E L

EN

GT

H O

F T

HE

ISL

AN

D. S

PA

CIN

G

2- IN

CR

EA

SE

SP

AC

ING

OF

DIA

GO

NA

LS

TO

200’ O

R M

OR

E O

N IN

TE

RS

TA

TE

RO

AD

WA

YS

.

1- "

D" =

SP

AC

IN

G O

F D

IA

GO

NA

L L

IN

ES

(T

YP

IC

AL

LY

EQ

UA

L I

N F

EE

T T

O T

HE

PO

ST

ED

SP

EE

D L

IM

IT

).

GE

NE

RA

L N

OT

ES

:

Page 24: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

SCHOOL

SCHOOL

SCHOOL

SCHOOL

SCHOOL SCHOOL

SCHOOLSCHOOL

SCHOOL

SCHOOL

PAVEMENT MARKINGS

PAVEMENT MARKINGS

SCHOOL AREAS

SCHOOLSCHOOL

SCHOOLSCHOOL

SCHOOLSCHOOL

SCHOOLSCHOOL

SCHOOL

SCHOOL

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1205.1

01205.1

0

1 1

1 1

SC

HO

OL

BU

ILD

ING

SC

HO

OL

BU

ILD

ING

SC

HO

OL

BU

ILD

ING

SC

HO

OL

BU

ILD

ING

SC

HO

OL

BU

ILD

ING

SC

HO

OL

BU

ILD

ING

SC

HO

OL

BU

ILD

ING

VIS

IBIL

ITY

CR

OS

SW

AL

KS

MA

Y B

E U

SE

D.

RE

QU

IRE

D IN

SC

HO

OL

AR

EA

S, H

IGH

WH

ER

E P

ED

ES

TR

IAN

CR

OS

SW

AL

KS

AR

E

PLPL

1-12

1-12

SCHOOL AREAS

TW

O-L

AN

E, T

WO

-WA

Y R

OA

DW

AY

(DIV

IDE

D A

ND

UN

DIV

IDE

D)

SIX

-LA

NE

RO

AD

WA

Y

WIT

H T

WO

-WA

Y L

EF

T T

UR

N L

AN

E

TW

O-L

AN

E, T

WO

-WA

Y R

OA

DW

AY

TW

O-W

AY

LE

FT

TU

RN

LA

NE

FO

UR

-LA

NE

RO

AD

WA

Y W

ITH

(DIV

IDE

D A

ND

UN

DIV

IDE

D)

FO

UR

-LA

NE

RO

AD

WA

Y

TW

O-W

AY

LE

FT

TU

RN

LA

NE

SIX

-LA

NE

RO

AD

WA

Y W

ITH

100’ M

IN

.

50

0’ M

AX

.5

00

’ MA

X.

100’ M

IN

.

TY

PIC

AL

MA

RK

ING

PL

AC

EM

EN

T

SY

MB

OL

S &

CH

AR

AC

TE

RS

PA

VE

ME

NT

MA

RK

ING

LE

GE

ND

TR

AF

FIC

FL

OW

DIR

EC

TIO

N O

F

SCHOOL

PLP

RO

PE

RT

Y L

INE

3- R

EF

ER

TO

RO

AD

WA

Y S

TA

ND

AR

D D

RA

WIN

G 1

20

5.0

8 F

OR

AD

DIT

ION

AL

PA

VE

ME

NT

MA

RK

ING

GU

IDA

NC

E.

WH

EN

TW

O-L

AN

E W

IDT

H M

ES

SA

GE

S A

RE

US

ED

ON

TW

O-L

AN

E, T

WO

WA

Y R

OA

DW

AY

S.

SC

HO

OL

AR

EA

. EX

TE

ND

24" W

HIT

E T

RA

NS

VE

RS

E L

INE

S A

CR

OS

S E

NT

IRE

RO

AD

2- E

XT

EN

D 2

4" W

HIT

E T

RA

NS

VE

RS

E L

INE

S A

CR

OS

S A

LL

AP

PR

OA

CH

LA

NE

S T

O T

HE

1- S

ING

LE

LA

NE

WID

TH

"S

CH

OO

L" W

OR

D M

ES

SA

GE

S C

AN

BE

US

ED

IN E

AC

H A

PP

RO

AC

H L

AN

E.

GE

NE

RA

L N

OT

ES

:

Page 25: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

RR

RR

RR

PAVEMENT MARKINGS

PAVEMENT MARKINGS

ST

OP

BA

R L

OC

AT

ION

RAILROAD CROSSINGS

RAILROAD CROSSINGS

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1205.1

11205.1

1

1 4

1 4

(F

EE

T)

PL

AC

EM

EN

T D

IST

AN

CE

AD

VA

NC

E W

AR

NIN

G S

IGN

PO

ST

ED

OR

85 P

ER

CE

NT

IL

E

SP

EE

D (M

PH

)

"D

"

4

5

5

0

5

5

6

0

6

5

RR

RR

OR OR

15

FE

ET

IN A

DV

AN

CE

OF

TH

E N

EA

RE

ST

RA

IL

8 F

EE

T IN

AD

VA

NC

E O

F S

IGN

AL

S W

ITH

OU

T G

AT

ES

, BU

T N

O

CL

OS

ER

TH

AN

15

FE

ET

TO

TH

E N

EA

RE

ST

RA

IL.

8 F

EE

T IN

AD

VA

NC

E O

F G

AT

ES

, BU

T N

O C

LO

SE

R

TH

AN

15 F

EE

T T

O T

HE

NE

AR

ES

T R

AIL

.

12

5*

*

17

5*

*

25

0*

*

32

5*

*

40

0*

*

35

10

’ M

IN

.5

0’ M

IN

.

W1

0-1

ME

ET

SIG

HT

DIS

TA

NC

E R

EQ

UIR

EM

EN

TS

).

SY

MB

OL

(OR

LO

NG

ER

AS

RE

QU

IRE

D T

O

LE

AS

T 1

0 F

T. P

AS

T T

HE

RA

ILR

OA

D

EX

TE

ND

YE

LL

OW

CE

NT

ER

LIN

E A

T

TR

AF

FIC

FL

OW

DIR

EC

TIO

N O

F

PA

VE

ME

NT

MA

RK

ING

SY

MB

OL

S

RA

ILR

OA

D T

RA

CK

S

ST

OP

BA

R

24’’ W

HIT

E

50

’ M

IN

.

W1

0-1

BE

AD

JU

ST

ED

FO

R A

SIG

N L

EG

IB

IL

IT

Y D

IS

TA

NC

E O

F 2

50

FT

.

AN

AD

EQ

UA

TE

AD

VA

NC

E W

AR

NIN

G F

OR

TH

E D

RIV

ER

. PL

AC

EM

EN

T M

AY

NE

ED

TO

** T

HE

PL

AC

EM

EN

T L

OC

AT

ION

IS D

EP

EN

DE

NT

ON

SIT

E C

ON

DIT

ION

S T

O P

RO

VID

E

ST

AT

ION

AR

Y S

IGN

1-12

1-12

"D

"

"D

"

LE

GE

ND

4

0

47

5*

*

24’’ W

HIT

E

ST

OP

BA

R

WA

RN

IN

G S

IG

N (

W1

0-1

).

DIR

EC

TL

Y O

PP

OS

ITE

TH

E A

DV

AN

CE

RA

ILR

OA

D

A P

OR

TIO

N O

F T

HE

"X

" S

YM

BO

L S

HO

UL

D B

E

TH

E M

UT

CD

FO

R A

DD

ITIO

NA

L G

UID

AN

CE

.

OT

HE

R IN

ST

AL

LE

D D

EV

ICE

S P

RO

VID

E S

UIT

AB

LE

WA

RN

ING

AN

D C

ON

TR

OL

. RE

FE

R T

O P

AR

T 8

OF

SP

EE

D IS

LE

SS

TH

AN

40 M

PH

OR

IN U

RB

AN

AR

EA

S IF

AN

EN

GIN

EE

RIN

G S

TU

DY

IND

ICA

TE

S T

HA

T

* A

DV

AN

CE

PA

VE

ME

NT

MA

RK

ING

S S

HA

LL

NO

T R

EQ

UIR

ED

WH

EN

TH

E P

OS

TE

D O

R S

TA

TU

TO

RY

HIG

HW

AY

**

*100

7- R

EF

ER

TO

"M

AN

UA

L O

N U

NIF

OR

M T

RA

FF

IC C

ON

TR

OL

DE

VIC

ES

" O

R S

IGN

ING

PL

AN

S F

OR

AD

DIT

ION

AL

WA

RN

ING

SIG

NS

.

6- R

EF

ER

TO

RO

AD

WA

Y S

TA

ND

AR

D D

RA

WIN

G 1

20

5.0

8 F

OR

AD

DIT

ION

AL

PA

VE

ME

NT

MA

RK

ING

GU

IDA

NC

E.

5- E

XT

EN

D C

EN

TE

R L

INE

S B

EY

ON

D T

HE

ST

OP

BA

RS

AT

"R

XR

" C

RO

SS

ING

WIT

H S

IGN

IFIC

AN

T R

OA

DW

AY

CU

RB

AP

PR

OA

CH

.

4- C

EN

TE

R T

HE

"R

XR

" S

YM

BO

L A

CR

OS

S T

HE

EN

TIR

E R

OA

DW

AY

FO

R R

OA

DW

AY

S T

HA

T A

RE

LE

SS

TH

AN

16

FE

ET

IN W

IDT

H.

3- P

OS

ITIO

N A

LL

TR

AN

SV

ER

SE

BA

ND

S A

ND

ST

OP

BA

RS

PE

RP

EN

DIC

UL

AR

TO

TH

E C

EN

TE

RL

INE

OF

TH

E R

OA

DW

AY

.

CE

NT

ER

LIN

ES

OR

ED

GE

LIN

ES

DO

NO

T E

XIS

T.

OR

PO

SIT

ION

TH

E M

AR

KIN

GS

TO

AC

CO

MM

OD

AT

E F

UT

UR

E P

LA

CE

ME

NT

OF

ED

GE

LIN

E A

ND

CE

NT

ER

LIN

E P

AV

EM

EN

T M

AR

KIN

GS

WH

ER

E

2- E

XT

EN

D "

RX

R" S

YM

BO

L M

AR

KIN

GS

6 IN

CH

ES

FR

OM

TH

E E

DG

E O

F P

AV

EM

EN

T T

O 8

INC

HE

S F

RO

M T

HE

CE

NT

ER

LIN

E O

F T

HE

RO

AD

WA

Y

HIG

HW

AY

SP

EE

D IS

40

MP

H O

R G

RE

AT

ER

.

SIG

NA

LS

OR

AU

TO

MA

TIC

GA

TE

S A

RE

LO

CA

TE

D, A

ND

AT

AL

L O

TH

ER

GR

AD

E C

RO

SS

ING

S W

HE

RE

TH

E P

OS

TE

D O

R S

TA

TU

TO

RY

1- ID

EN

TIC

AL

MA

RK

ING

S S

HA

LL

BE

PL

AC

ED

IN E

AC

H A

PP

RO

AC

H L

AN

E O

N A

LL

PA

VE

D A

PP

RO

AC

HE

S T

O G

RA

DE

CR

OS

SIN

GS

WH

ER

E

GE

NE

RA

L N

OT

ES

:

Page 26: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

R

R

SIG

N C

ON

TR

OL

LE

D.

TH

IS A

PP

RO

AC

H IS

ST

OP

SY

MB

OL

IS N

OT

RE

QU

IRE

D IF

ON

SP

EE

D L

IMIT

OF

AP

PR

OA

CH

.

MA

Y B

E R

EQ

UIR

ED

DE

PE

ND

ING

TH

IS A

DD

ITIO

NA

L S

YM

BO

L

RR

RR

RR

RR

RR

RA

ILR

OA

D L

ES

S T

HA

N 4

0 F

T. F

RO

M IN

TE

RS

EC

TIO

NR

AIL

RO

AD

LE

SS

TH

AN

40

FT

. FR

OM

INT

ER

SE

CT

ION

RA

ILR

OA

D M

OR

E T

HA

N 7

5 F

T. F

RO

M IN

TE

RS

EC

TIO

NR

AIL

RO

AD

MO

RE

TH

AN

75 F

T. F

RO

M IN

TE

RS

EC

TIO

N

PAVEMENT MARKINGS

PAVEMENT MARKINGS

RAILROAD CROSSINGS

RAILROAD CROSSINGS

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1205.1

11205.1

1

2 4

2 4

UN

DE

R

40’

UN

DE

R

4

0’

R

RR

R

OV

ER

75

OV

ER

75

1-12

1-12

Page 27: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

RR

RR

RR

RR

RR

RRRR

RRRR

RR

RR

RA

ILR

OA

D 4

0 T

O 7

5 F

T. F

RO

M IN

TE

RS

EC

TIO

NR

AIL

RO

AD

40

TO

75

FT

. FR

OM

INT

ER

SE

CT

ION

PAVEMENT MARKINGS

PAVEMENT MARKINGS

RAILROAD CROSSINGS

RAILROAD CROSSINGS

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1205.1

11205.1

1

3 4

3 4

DIS

TA

NC

E

OM

IT

TR

AN

SV

ER

SE

BA

RS

LE

SS

TH

AN

75’

MO

RE

TH

AN

40’

OM

IT S

TO

PB

AR

IF

IN

SU

FF

IC

IE

NT

ST

OP

SIG

N C

ON

TR

OL

LE

D.

IF

TH

IS

AP

PR

OA

CH

IS

SY

MB

OL

NO

T R

EQ

UIR

ED

MO

RE

TH

AN

40’

LE

SS

TH

AN

75’

DIS

TA

NC

E

OM

IT S

TO

PB

AR

IF

IN

SU

FF

IC

IE

NT

OM

IT

TR

AN

SV

ER

SE

BA

RS

75’ T

YP

.

12

05

.09

FO

R Y

EL

LO

W P

AIN

TE

D IS

LA

ND

S

RE

FE

R T

O R

OA

DW

AY

ST

AN

DA

RD

DR

AW

ING

75’ T

YP

.1-12

1-12

TU

RN

LA

NE

DIS

CO

NT

INU

ED

AC

RO

SS

TR

AC

KS

TW

O-L

AN

E, T

WO

-WA

Y R

OA

DW

AY

WIT

H C

EN

TE

R

TU

RN

LA

NE

CO

NT

INU

ED

AC

RO

SS

TR

AC

KS

TW

O-L

AN

E, T

WO

-WA

Y R

OA

DW

AY

WIT

H C

EN

TE

R

Page 28: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

RR

RR

RRRR

RR

RR

RR RR

RR

RR RRRRRR

RRRRRRRR

RRRR

(NO

CE

NT

ER

TU

RN

-LA

NE

)

TU

RN

LA

NE

S A

T R

AIL

RO

AD

CR

OS

SIN

G

PAVEMENT MARKINGS

PAVEMENT MARKINGS

RAILROAD CROSSINGS

RAILROAD CROSSINGS

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1205.1

11205.1

1

4 4

4 4

12

05

.09

FO

R Y

EL

LO

W P

AIN

TE

D IS

LA

ND

S

RE

FE

R T

O R

OA

DW

AY

ST

AN

DA

RD

DR

AW

ING

75’ T

YP

.

75’ T

YP

.

TA

PE

R.

FA

LL

S W

ITH

IN A

TU

RN

LA

NE

TU

RN

LA

NE

IF "

R X

R" S

YM

BO

L

OM

IT T

HE

SY

MB

OL

IN T

HE

1-12

1-12

3-L

AN

E, 2

-WA

Y R

OA

DW

AY

LA

NE

DIS

CO

NT

INU

ED

AC

RO

SS

TR

AC

KS

MU

LT

I-LA

NE

RO

AD

WA

Y W

ITH

CE

NT

ER

TU

RN

LA

NE

CO

NT

INU

ED

AC

RO

SS

TR

AC

KS

MU

LT

I-LA

NE

RO

AD

WA

Y W

ITH

CE

NT

ER

TU

RN

Page 29: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

1 1

1 1

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1205.1

21205.1

2

CL

EA

R R

OA

DW

AY

WID

TH

> 2

5 F

T.

18 F

T. <

CL

EA

R R

OA

DW

AY

WID

TH

< 2

5 F

T.

CL

EA

R R

OA

DW

AY

WID

TH

< 1

8 F

T.

48

’’ X 4

8’’

W5

-2

NA

RR

OW

BR

IDG

EW

5-2

A

48

’’ X 4

8’’

48

’’ X 4

8’’

W5

-3

BR

IDG

E

ON

E L

AN

E

NA

RR

OW

BR

IDG

E

W5

-2A

48

’’ X 4

8’’

BR

IDG

E

ON

E L

AN

E48

’’ X 4

8’’

W5

-3

NO

PA

SS

ING

ZO

NE

S)

RE

QU

IRE

D F

OR

PA

SS

ING

&

(DO

UB

LE

OR

SIN

GL

E A

S

YE

LL

OW

CE

NT

ER

LIN

ES

WH

ITE

ED

GE

LIN

ES

NO

PA

SS

ING

ZO

NE

AT

BR

IDG

E A

PP

RO

AC

H

TY

PIC

AL

FO

R B

OT

H S

IDE

S

30

0’ M

IN

.

50

0’ +

/-

DO

UB

LE

YE

LL

OW

CE

NT

ER

LIN

ES

ON

BR

IDG

E

AL

ON

G E

DG

E L

INE

S @

20

’ SP

AC

ING

CR

YS

TA

L/C

RY

ST

AL

PA

VE

ME

NT

MA

RK

ER

S

AL

ON

G C

EN

TE

R L

INE

@ 4

0’ S

PA

CIN

G

YE

LL

OW

/YE

LL

OW

PA

VE

ME

NT

MA

RK

ER

S

50

0’ +

/-

48

’’ X 4

8’’

W5

-2

500’ +

/-

30

0’ T

AP

ER

NO

PA

SS

ING

ZO

NE

30

0’ M

IN

.

30

0’ M

IN

.

NO

PA

SS

ING

ZO

NE

50

0’ +

/-

RE

FE

R T

O R

OA

DW

AY

ST

AN

DA

RD

1205.0

9

FO

R W

HIT

E P

AIN

TE

D IS

LA

ND

S

@ 2

0’ S

PA

CIN

G

AL

ON

G E

DG

E L

INE

S

PA

VE

ME

NT

MA

RK

ER

S

CR

YS

TA

L/C

RY

ST

AL

NO

CE

NT

ER

LIN

E M

AR

KIN

G

WH

ITE

ED

GE

LIN

ES

WH

IT

E

DIA

GO

NA

L L

INE

S

(DO

UB

LE

OR

SIN

GL

E A

S

RE

QU

IRE

D F

OR

PA

SS

ING

&

NO

PA

SS

ING

ZO

NE

S) ED

GE

LIN

ES

WH

ITE

YE

LL

OW

CE

NT

ER

LIN

ES

300’ T

AP

ER

LE

GE

ND

TR

AF

FIC

FL

OW

DIR

EC

TIO

N O

F

ST

AT

ION

AR

Y S

IGN

YE

LL

OW

/YE

LL

OW

PA

VE

ME

NT

MA

RK

ER

CR

YS

TA

L/C

RY

ST

AL

PA

VE

ME

NT

MA

RK

ER

SE

E G

EN

ER

AL

NO

TE

2

--O

R

--O

R

2

SE

E G

EN

ER

AL

NO

TE

PAVEMENT MARKINGS

BRIDGES

PAVEMENT MARKINGS

BRIDGES

1-12

1-12

WID

TH

IS L

ES

S T

HA

N T

HE

WID

TH

OF

TH

E A

PP

RO

AC

H P

AV

EM

EN

T P

LU

S 2

FE

ET

.

2- F

OR

BR

IDG

ES

18 T

O 2

5 F

EE

T W

IDE

, SIG

NS

MU

ST

BE

US

ED

WH

EN

TH

E C

LE

AR

RO

AD

WA

Y

SIG

HT

DIS

TA

NC

ES

AS

DE

TE

RM

INE

D B

Y T

HE

EN

GIN

EE

R.

1- N

O P

AS

SIN

G Z

ON

ES

SH

OW

N A

RE

MIN

IMU

MS

. AP

PL

Y M

INIM

UM

PA

SS

ING

AN

D S

TO

PP

ING

GE

NE

RA

L N

OT

ES

:

NA

RR

OW

BR

IDG

E

ST

AN

DA

RD

BR

IDG

E

ON

E-L

AN

E B

RID

GE

Page 30: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

PAVEMENT MARKINGS

PAVEMENT MARKINGS

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

F

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1-12

1-12

LA

NE

EN

DS

RIG

HT

LA

NE

EN

DS

W

ME

DIA

N

30

W

10

0’

10

0’

W

30

0’

30

0’

W W

W

W

WW W W

W

LE

FT

12

21

TA

PE

R (V

AR

IES

)

LA

NE

AD

DIT

ION

TR

AN

SIT

ION

(VA

RIE

S)

LA

NE

RE

DU

CT

ION

TR

AN

SIT

ION

(VA

RIE

S)

(48"X

48")

W4-2

L/W

4-2

R

(48"X

48")

W9-1

L/W

9-1

R

(48"X

48")

W4-2

R/W

4-2

L

(48"X

48")

W9-1

R/W

9-1

L

10

0’

10

0’

"D

"

SE

E N

OT

E 1

"D

"

SE

E N

OT

E 1

"D

"

SE

E N

OT

E 1

"D

"/4

30

0’

LA

NE

LIN

E

EN

D W

HIT

E S

KIP

"D

"

"D

"/4

LA

NE

LIN

ES

WH

ITE

SK

IP

SE

E N

OT

E 1

LIN

E

YE

LL

OW

ED

GE

LIN

E

WH

ITE

ED

GE

E.O

.T.

E.O

.T.

SH

OU

LD

ER

LIN

E

WH

ITE

ED

GE

DIA

GO

NA

LS

YE

LL

OW

CE

NT

ER

LIN

ES

DO

UB

LE

YE

LL

OW

ST

AR

T O

F T

AP

ER

BE

GIN

YE

LL

OW

ED

GE

LIN

E

EN

D D

OU

BL

E Y

EL

LO

W C

EN

TE

R L

INE

,

E.O

.T.

E.O

.T.

ST

AR

T O

F T

AP

ER

LA

NE

LIN

ES

WH

ITE

SK

IPS

HO

UL

DE

R

E.O

.T.

LIN

E

WH

ITE

ED

GE

BE

GIN

WH

ITE

SK

IP L

AN

E L

INE

LIN

ES

YE

LL

OW

ED

GE

SH

OU

LD

ER

LANE REDUCTIONS

(F

EE

T)

"D

"

SP

EE

D (M

PH

)

85

PE

RC

EN

TIL

E

PO

ST

ED

OR

LANE REDUCTIONS RO

AD

WA

Y T

O T

WO

-LA

NE

RO

AD

WA

Y

LE

FT

LA

NE

RE

DU

CT

IO

N, F

OU

R-L

AN

E

1205.1

3

SH

EE

T O

F1

1

1205.1

3

1 1

W =

WID

TH

OF

TR

AV

EL

LA

NE

S

TA

TIO

NA

RY

SIG

N

PA

VE

ME

NT

MA

RK

ING

SY

MB

OL

S

DIR

EC

TIO

N O

F T

RA

FF

IC F

LO

W

LE

GE

ND

35

40

45

50

60

5570

65

99

0

88

5

77

5

67

0

56

5

MU

LT

I-LA

NE

RO

AD

WA

Y W

ITH

RIG

HT

LA

NE

RE

DU

CT

ION

100’ T

YP

.

10

0’ T

YP

.

MIN

I-S

KIP

LIN

E

WH

IT

E 3

’-9

’/S

P

MIN

I-S

KIP

LIN

E

WH

IT

E 3

’-9

’/S

P

2- R

EF

ER

TO

RO

AD

WA

Y S

TA

ND

AR

D D

RA

WIN

GS

1205.0

1 A

ND

1205.0

8 F

OR

AD

DIT

ION

AL

PA

VE

ME

NT

MA

RK

ING

GU

IDA

NC

E.

1- R

EF

ER

TO

SIG

NIN

G P

LA

NS

OR

TA

BL

E "

A" F

OR

AD

VA

NC

E W

AR

NIN

G S

IGN

PL

AC

EM

EN

T D

IST

AN

CE

.

GE

NE

RA

L N

OT

ES

:

YE

LL

OW

FL

EX

IBL

E D

EL

INE

AT

OR

CR

YS

TA

L F

LE

XIB

LE

DE

LIN

EA

TO

R

PL

AC

EM

EN

T D

IST

AN

CE

AD

VA

NC

E W

AR

NIN

G S

IGN

20°

ME

RG

E A

RR

OW

1,1

00

1,2

00

1,2

50

20°

ME

RG

E A

RR

OW

30

0’

LA

NE

LIN

E

EN

D W

HIT

E S

KIP

75

1,3

50

TA

BL

E "

A"

GR

AD

ES

.

RO

AD

WA

YS

, MA

KE

CO

RR

EC

TIO

NS

FO

R

- DIS

TA

NC

ES

SH

OW

N A

RE

FO

R L

EV

EL

Page 31: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1250.0

11250.0

1

1 3

1 3

1-12

1-12

TY

PE

OF

PA

VE

ME

NT

MA

RK

ING

40

40

20

205

GO

RE

LIN

ES

TA

PE

RS

PA

VE

ME

NT

MA

RK

ER

SP

AC

ING

CH

AR

T

TW

O-W

AY

RA

MP

CE

NT

ER

LIN

ES

RA

ISE

D M

ED

IAN

ISL

AN

DS

WR

ON

G W

AY

RA

MP

AR

RO

W

40

20

40

TY

PIC

AL

SP

AC

ING

(FT

)

ED

GE

LIN

E

CE

NT

ER

LIN

E

20

20

40

CE

NT

ER

LIN

ES

SK

IP

LIN

ES

SO

LID

LIN

ES

40

WH

ITE

YE

LL

OW

20

FT

. FO

R C

EN

TE

R L

IN

E

� NO

RM

AL

SP

AC

ING

WO

RK

ZO

NE

AP

PL

ICA

TIO

NS

AL

L O

TH

ER

DIV

ER

SIO

NS

40

LA

NE

DR

OP

AP

PR

OA

CH

ES

MIN

I-SK

IP L

INE

S A

T

TU

RN

LA

NE

S-

HO

RIZ

ON

TA

L C

UR

VE

S L

ES

S T

HA

N 6

°

AL

ON

G T

AN

GE

NT

SE

CT

ION

S A

ND

MIN

I-S

KIP

LIN

ES

80

40

HO

RIZ

ON

TA

L C

UR

VE

S >

ED

GE

LIN

E

ON

E L

AN

E B

RID

GE

S-

NA

RR

OW

BR

IDG

ES

-

PA

INT

ED

ISL

AN

DS

-

2-L

AN

E, 2

-WA

Y O

N-S

ITE

DIV

ER

SIO

N

AL

ON

G T

HR

U L

AN

ES

-

SK

IP L

INE

S A

ND

CE

NT

ER

LIN

ES

24

24

RAISED PAVEMENT MARKERS

RAISED PAVEMENT MARKERS

6- M

AR

KE

RS

AR

E N

OT

RE

QU

IRE

D A

LO

NG

MIN

I-SK

IP L

INE

S IN

TA

PE

RS

.

MA

RK

ER

DU

RIN

G R

EP

AIN

TIN

G O

PE

RA

TIO

NS

.

BE

TW

EE

N T

HE

LIN

ES

AN

D T

HE

MA

RK

ER

TO

RE

DU

CE

OV

ER

SP

RA

YIN

G T

HE

CE

NT

ER

LIN

ES

MID

-WA

Y B

ET

WE

EN

TH

E L

INE

S. P

RO

VID

E A

GA

P

5- P

LA

CE

PA

VE

ME

NT

MA

RK

ER

S U

SE

D IN

CO

NJU

NC

TIO

N W

ITH

DO

UB

LE

YE

LL

OW

MA

RK

IN

G L

IN

ES

.

4- D

O N

OT

PL

AC

E P

AV

EM

EN

T M

AR

KE

RS

DIR

EC

TL

Y O

N P

AV

EM

EN

T

AL

LO

WE

D IN

BO

TH

DIR

EC

TIO

NS

.

LIN

ES

ON

TW

O-L

AN

E, T

WO

-WA

Y R

OA

DW

AY

S W

HE

RE

PA

SS

ING

IS

BE

TW

EE

N D

OU

BL

E Y

EL

LO

W C

EN

TE

R L

INE

S, A

ND

AL

ON

G Y

EL

LO

W S

KIP

PA

VE

ME

NT

CO

NS

TR

UC

TIO

N J

OIN

T (A

S F

EA

SIB

LE

), EX

CE

PT

WH

EN

PL

AC

ED

3- D

O N

OT

PL

AC

E P

AV

EM

EN

T M

AR

KE

RS

CL

OS

ER

TH

AN

3 IN

CH

ES

TO

A

CR

YS

TA

L/R

ED

MA

RK

ER

S A

LO

NG

TH

E E

NT

IRE

LE

NG

TH

OF

TH

E P

RO

JE

CT

.

OF

TH

E M

AR

KE

R T

O F

AC

E "

WR

ON

G-W

AY

" T

RA

FF

IC. W

HE

N U

SE

D, P

LA

CE

WH

ER

E W

RO

NG

-WA

Y M

OV

EM

EN

TS

AR

E P

OS

SIB

LE

. PO

SIT

ION

TH

E R

ED

SID

E

2- P

LA

CE

CR

YS

TA

L/R

ED

MA

RK

ER

S A

T IN

TE

RS

EC

TIO

NS

AN

D IN

TE

RC

HA

NG

ES

2 I

NC

HE

S F

RO

M T

HE

ED

GE

LIN

E O

N T

HE

TR

AF

FIC

SID

E.

TH

EY

AR

E R

EQ

UIR

ED

, SP

AC

E T

HE

M O

N 2

0 F

T. C

EN

TE

RS

, AN

D O

FF

SE

T

IF D

ES

IGN

AT

ED

IN T

HE

PL

AN

S O

R D

IRE

CT

ED

BY

TH

E E

NG

INE

ER

. WH

EN

1- M

AR

KE

RS

AR

E G

EN

ER

AL

LY

NO

T R

EQ

UIR

ED

AL

ON

G E

DG

E L

INE

S E

XC

EP

T

GE

NE

RA

L N

OT

ES

:

INTSTALLATION SPACING

INSTALLATION SPACING

Page 32: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

LE

GE

ND

CR

YS

TA

L/R

ED

PA

VE

ME

NT

MA

RK

ER

YE

LL

OW

/YE

LL

OW

PA

VE

ME

NT

MA

RK

ER

SN

OW

PL

OW

AB

LE

RA

ISE

D P

AV

EM

EN

T M

AR

KE

RS

RA

ISE

D R

EF

LE

CT

IVE

PA

VE

ME

NT

MA

RK

ER

S

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1250.0

11250.0

1

2 3

2 3

FO

R S

PA

CIN

G R

ED

UC

TIO

NS

RE

FE

R T

O S

PA

CIN

G C

HA

RT

80’

15’

10’

WH

ITE

SK

IP

15’

20’

FR

OM

GO

RE

LIN

ES

MA

RK

ER

S O

FF

SE

T 2

’’

24’

MA

RK

ER

CE

NT

ER

ED

BE

TW

EE

N M

IN

I-S

KIP

LIN

ES

DIR

EC

TIO

N O

F T

RA

FF

IC

FL

OW

L CCL

MA

RK

ER

S C

EN

TE

RE

D

BE

TW

EE

N S

KIP

LIN

ES

6"

MA

RK

ER

S C

EN

TE

RE

D B

ET

WE

EN

DO

UB

LE

CE

NT

ER

LIN

ES

6"

80

FO

R S

PA

CIN

G R

ED

UC

TIO

NS

RE

FE

R T

O S

PA

CIN

G C

HA

RT

15’

BE

TW

EE

N D

OU

BL

E C

EN

TE

R L

INE

S

MA

RK

ER

S C

EN

TE

RE

D

TW

O-W

AY

LE

FT

TU

RN

LA

NE

S

UN

DIV

IDE

D R

OA

DW

AY

S

TW

O-L

AN

E, T

WO

-WA

Y R

OA

DW

AY

S

15’

80’

15’

15’

15’

1-12

1-12

10’-30’/S

P S

KIP

LIN

E

3’-9’/S

P M

IN

I-S

KIP

LIN

E

GO

RE

LIN

ES

YE

LL

OW

CE

NT

ER

LIN

ES

DE

TA

IL O

F P

AV

EM

EN

T M

AR

KE

R P

LA

CE

ME

NT

RAISED PAVEMENT MARKERS

RAISED PAVEMENT MARKERS

INSTALLATION SPACING

INSTALLATION SPACING

CE

NT

ER

LIN

ES

FO

R-

Page 33: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

LE

GE

ND

AU

XIL

IAR

Y T

UR

N L

AN

ES

YE

LL

OW

PA

INT

ED

ISL

AN

DS

WH

IT

E P

AIN

TE

D I

SL

AN

DS

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1250.0

11250.0

1

3 3

3 3

1-12

1-12

40

’ SP

AC

ING

AL

ON

G

DO

UB

LE

YE

LL

OW

CE

NT

ER

LIN

ES

TH

E T

UR

N-L

AN

E.

PL

AC

ED

INS

IDE

OF

AL

ON

G L

AN

E L

INE

S

20’ S

PA

CIN

G

AL

ON

G W

HIT

E L

INE

S

20’ S

PA

CIN

G

CR

YS

TA

L/R

ED

PA

VE

ME

NT

MA

RK

ER

YE

LL

OW

/YE

LL

OW

PA

VE

ME

NT

MA

RK

ER

DIR

EC

TIO

N O

F T

RA

FF

IC F

LO

W

PA

VE

ME

NT

MA

RK

ING

SY

MB

OL

RAISED PAVEMENT MARKERS

RAISED PAVEMENT MARKERS

INSTALLATION SPACING

INSTALLATION SPACING

Page 34: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

SID

E V

IEW

TO

P V

IEW

FR

ON

T V

IEW

RAISED PAVEMENT MARKERS

RAISED PAVEMENT MARKERS

PERMANENT AND TEMPORARY

PERMANENT AND TEMPORARY

PA

VE

ME

NT

SU

RF

AC

EP

AV

EM

EN

T S

UR

FA

CE

AP

PR

OV

ED

AD

HE

SIV

E

TY

PIC

AL

PA

VE

ME

NT

MA

RK

ER

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1251.0

11251.0

1

1 1

1 1

LE

NS

A L

EN

S B

YE

LL

OW

YE

LL

OW

CR

YS

TA

L R

ED

CR

YS

TA

L C

RY

ST

AL

4" M

IN

. - 5

" M

AX

.

2" MIN. - 4" MAX.

0.5" - 0.75"

25

° - 3

LE

NS

B

LE

NS

A

1-12

1-12

TR

AF

FIC

FL

OW

DIR

EC

TIO

N O

F

LE

GE

ND

US

E I

N N

OR

TH

CA

RO

LIN

A C

ON

TA

CT

TH

E N

CD

OT

SIG

NIN

G A

ND

DE

LIN

EA

TIO

N U

NIT

.

2- F

OR

A C

OM

PL

ET

E L

IS

TIN

G O

F P

AV

EM

EN

T M

AR

KE

RS

AN

D A

DH

ES

IV

ES

AC

CE

PT

AB

LE

FO

R

1- U

SE

A M

IN

IM

UM

OF

2 S

QU

AR

E I

NC

HE

S F

OR

TH

E A

RE

A O

F E

AC

H R

EF

LE

CT

IV

E L

EN

S.

GE

NE

RA

L N

OT

ES

:

Page 35: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

TO

P V

IEW

SID

E V

IEW

FR

ON

T V

IEW

TO

P V

IEW

FR

ON

T V

IEW

SID

E V

IEW

LE

NS

"A

"

LE

NS

"B

"

1 1

1 1

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1253.0

11253.0

1

TY

PIC

AL

PA

VE

ME

NT

MA

RK

ER

RE

FL

EC

TO

R

1-12

1-12W

EB

KE

EL

SU

RF

AC

E

AB

OV

E P

AV

EM

EN

T

�" M

AX

. PR

OJE

CT

IO

N

RE

FL

EC

TO

R

CA

ST

ING

WE

BK

EE

LK

EE

L

WE

B

CA

ST

ING

LE

VE

LIN

G L

UG

RE

FL

EC

TO

R

CR

YS

TA

L

YE

LL

OW

LE

NS

"A

"

RE

D

YE

LL

OW

LE

NS

"B

"

5�"

MA

X.

10

" M

AX

.A

PP

RO

VE

D B

Y T

HE

EN

GIN

EE

R.

MA

NU

FA

CT

UR

E O

F T

HE

MA

RK

ER

S A

ND

AN

D M

ET

HO

DS

RE

CO

MM

EN

DE

D B

Y T

HE

MO

UN

TE

D T

O C

AS

TIN

G W

ITH

AD

HE

SIV

E

WIT

H E

PO

XY

AD

HE

SIV

E

MO

UN

TE

D IN

SA

WC

UT

GR

OO

VE

TR

AF

FIC

FL

OW

DIR

EC

TIO

N O

F

AN

D P

RO

VID

E T

HE

RE

QU

IRE

D R

EF

LE

CT

IVIT

Y.

4- R

EF

LE

CT

OR

DIM

EN

SIO

NS

CA

N V

AR

Y, B

UT

DE

SIG

NE

D T

O F

IT IN

TH

E C

AS

TIN

G

3- C

ON

TA

CT

AL

L L

EV

EL

ING

LU

GS

TO

TH

E P

AV

EM

EN

T S

UR

FA

CE

.

2- S

AW

CU

T G

RO

OV

ES

TO

DIM

EN

SIO

NS

PR

OV

IDE

D B

Y T

HE

MA

NU

FA

CT

UR

ER

.

1- U

SE

A M

IN

IM

UM

OF

1.4

4+

/- S

Q. I

NC

H A

RE

A F

OR

EA

CH

RE

FL

EC

TIV

E L

EN

S.

GE

NE

RA

L N

OT

ES

:

LE

GE

ND

RAISED PAVEMENT MARKERS

SNOWPLOWABLE

RAISED PAVEMENT MARKERS

SNOWPLOWABLE

Page 36: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

DE

LIN

EA

TO

R S

PA

CIN

G R

EQ

UIR

EM

EN

TS

FO

R P

ER

MA

NE

NT

AN

D C

ON

ST

RU

CT

ION

SP

AC

IN

G (

FT

.)R

AIL

LO

CA

TIO

NS

100’

50’

25’

25’

RO

AD

WA

Y C

UR

VA

TU

RE

< 3

°

RA

IL P

AR

AL

LE

L T

O R

OA

DW

AY

RO

AD

WA

Y C

UR

VA

TU

RE

> 3

°

RA

IL P

AR

AL

LE

L T

O R

OA

DW

AY

BR

IDG

E R

AIL

S A

ND

RA

ILS

AT

BR

IDG

E A

PP

RO

AC

HE

S

GU

AR

DR

AIL

/BA

RR

IER

AL

ON

G R

OA

DW

AY

GU

AR

DR

AIL

/BA

RR

IER

AT

BR

IDG

ES

GU

AR

DR

AIL

OR

BA

RR

IER

YE

LL

OW

DE

LIN

EA

TO

R

CR

YS

TA

L D

EL

INE

AT

OR

DIV

IDE

D R

OA

DW

AY

SG

UA

RD

RA

IL/B

AR

RIE

R

AT

BR

IDG

ES

GU

AR

DR

AIL

/BA

RR

IER

25

’2

5’

25’

VA

RIE

S

SE

E C

HA

RT

BE

LO

W

BR

IDG

E

BR

IDG

E

25

25

’2

5’

25’

VA

RIE

S

SE

E C

HA

RT

BE

LO

W

ME

DIA

N

TW

O-L

AN

E A

ND

MU

LT

I-LA

NE

ZO

NE

GU

AR

DR

AIL

,BA

RR

IER

,AN

D B

RID

GE

RA

IL

TR

AF

FIC

FL

OW

DIR

EC

TIO

N O

F

SE

CT

ION

S L

ES

S T

HA

N 2

00’ L

ON

G

TR

AN

SIT

IO

NS

,TA

PE

RS

,&

1261.0

11261.0

1

1 1

1 1

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

STATE OF

NORTH CAROLINA

DEPT. OF TRANSPORTATION

DIVISION OF HIGHWAYS

RALEIGH, N.C.

AL

ON

G R

OA

DW

AY

1-12

1-12

WIT

H T

HE

BA

RR

IER

DE

LIN

EA

TO

RS

WH

ER

E G

UA

RD

RA

IL T

IES

TO

CO

NC

RE

TE

BA

RR

IER

.

7- P

OS

ITIO

N T

HE

GU

AR

DR

AIL

AN

D/O

R B

AR

RIE

R D

EL

INE

AT

OR

S T

O A

CH

IEV

E A

UN

IFO

RM

HE

IGH

T

ON

EIT

HE

R S

ID

E O

F T

HE

JO

IN

T.

6- B

AR

RIE

R D

EL

INE

AT

OR

S T

HA

T F

AL

L O

N J

OIN

TS

OR

MO

VE

CO

NN

EC

TIO

NS

(UP

TO

12 IN

CH

ES

),

GU

AR

DR

AIL

AP

PR

OA

CH

EN

DS

.

5- B

EG

IN D

EL

INE

AT

OR

PL

AC

EM

EN

T 5

FE

ET

FR

OM

BA

RR

IER

AP

PR

OA

CH

EN

DS

AN

D 2

5 F

EE

T F

RO

M

RO

AD

WA

Y.

4- P

OS

ITIO

N D

EL

INE

AT

OR

S S

UC

H T

HA

T T

HE

RE

FL

EC

TIV

E S

HE

ET

ING

IS P

ER

PE

ND

ICU

LA

R T

O T

HE

3- C

ON

FO

RM

CO

LO

R O

F D

EL

INE

AT

OR

S T

O T

HE

CO

LO

R O

F T

HE

AD

JA

CE

NT

ED

GE

LIN

ES

.

BA

RR

IER

OR

GU

AR

DR

AIL

INS

TA

LL

AT

ION

S (T

EM

PO

RA

RY

AN

D P

RO

PO

SE

D).

2- IN

ST

AL

L D

EL

INE

AT

OR

S P

RIO

R T

O A

LL

OW

ING

TR

AF

FIC

TO

PR

OC

EE

D IN

AN

AR

EA

WIT

H N

EW

CO

NC

RE

TE

BA

RR

IER

S, A

ND

BR

IDG

E R

AIL

S.

1- IN

ST

AL

L D

EL

INE

AT

OR

S A

T A

LL

LO

CA

TIO

NS

OF

PE

RM

AN

EN

T A

ND

TE

MP

OR

AR

Y G

UA

RD

RA

ILS

,

GE

NE

RA

L N

OT

ES

:

LE

GE

ND

BR

IDG

E

GUARDRAIL AND BARRIER DELINEATORS

INSTALLATION SPACING

GUARDRAIL AND BARRIER DELINEATORS

INSTALLATION SPACING

UN

DIV

IDE

D R

OA

DW

AY

S,

Page 37: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

IN

ST

AL

LA

TIO

N F

OR

BA

RR

IE

R

TY

PIC

AL

PO

WE

R D

RIV

EN

FA

ST

EN

ER

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1261.0

21261.0

2

1 1

1 1

US

E E

IT

HE

R M

OU

NT

IN

G

LO

CA

TIO

N F

OR

PE

RM

AN

EN

T

AP

PL

IC

AT

IO

NS

FO

R W

OR

KZ

ON

E A

PP

LIC

AT

ION

SA

LT

ER

NA

TIV

E

MO

UN

TIN

G

LO

CA

TIO

NU

NL

ES

S A

GL

AR

E S

CR

EE

N

IS

UT

IL

IZ

ED

EN

GIN

EE

R’S

AP

PR

OV

AL

AF

TE

R IN

ST

AL

LA

TIO

N O

F T

HE

AS

SE

MB

LY

.

PO

WE

R D

RIV

EN

FA

ST

EN

ER

S W

ITH

ZIN

C-R

ICH

PA

INT

TO

ME

ET

TH

E

PA

INT

TH

E E

XP

OS

ED

PO

RT

ION

S O

F T

HE

NU

T, L

OC

K W

AS

HE

R, A

ND

CE

NT

ER

ED

ON

BA

SE

AN

D A

DH

ES

IVE

BU

TY

L P

RIM

ER

DE

LIN

EA

TO

R B

AS

E

�" E

XT

RA

DU

TY

LO

CK

WA

SH

ER

�" H

EA

VY

HE

X N

UT

�" T

HR

EA

D L

EN

GT

H

�" D

IA

. ST

UD

PO

WE

R D

RIV

EN

FA

ST

EN

ER

9/3

2" M

OU

NT

ING

HO

LE

LE

NG

TH

SH

AN

K

0.1

52’’ D

IA

.-1�"

24

"

1-12

1-12

TY

PIC

AL

DE

LIN

EA

TO

RS

MO

UN

TIN

G D

ET

AIL

S

ME

TH

OD

S R

EC

OM

ME

ND

ED

BY

TH

E M

AN

UF

AC

TU

RE

R A

S A

PP

RO

VE

D B

Y T

HE

EN

GIN

EE

R.

4- U

SE

AD

HE

SIV

E, C

LIP

ON

GU

AR

DR

AIL

PO

ST

, GU

AR

DR

AIL

BO

LT

S, P

OW

ER

DR

IVE

N F

AS

TE

NE

RS

, OR

OT

HE

R M

OU

NT

ING

3- U

SE

A M

INIM

UM

7 S

Q. IN

. RE

FL

EC

TIV

E A

RE

A F

OR

TO

P M

OU

NT

ED

GU

AR

DR

AIL

DE

LIN

EA

TO

RS

.

2- U

SE

A M

INIM

UM

28 S

Q. IN

. RE

FL

EC

TIV

E A

RE

A F

OR

TO

P M

OU

NT

ED

BA

RR

IER

DE

LIN

EA

TO

RS

.

1- U

SE

A M

INIM

UM

7 S

Q. IN

. RE

FL

EC

TIV

E A

RE

A F

OR

SID

E M

OU

NT

ED

DE

LIN

EA

TO

RS

.

GE

NE

RA

L N

OT

ES

:

GUARDRAIL & BARRIER DELINEATORS

TYPES AND MOUNTING

TYPES AND MOUNTING

GUARDRAIL & BARRIER DELINEATORS

Page 38: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

FR

ON

T V

IEW

SID

E V

IEW

TO

P V

IEW

GUARDRAIL END DELINEATION

GUARDRAIL END DELINEATION

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1262.0

11262.0

1

1 1

1 1

EN

D S

EC

TIO

N

GU

AR

DR

AIL

BU

FF

ER

GU

AR

DR

AIL

BU

FF

ER

EN

D S

EC

TIO

N

8’’

GU

AR

DR

AIL

BU

FF

ER

EN

D S

EC

TIO

N

8’’

WIT

H A

PR

ES

SU

RE

SE

NS

IT

IV

E A

DH

ES

IV

E B

AC

KIN

G

AD

HE

SIV

E C

OA

TE

D Y

EL

LO

W R

EF

LE

CT

IVE

SH

EE

TIN

G

(8

’’ X

3’)

YE

LL

OW

RE

TR

OR

EF

LE

CT

IVE

SH

EE

TIN

G

TY

PE

III O

R I

V H

IG

H I

NT

EN

SIT

Y

(8

’’ X

3’)

YE

LL

OW

RE

TR

OR

EF

LE

CT

IVE

SH

EE

TIN

G

TY

PE

III O

R I

V H

IG

H I

NT

EN

SIT

Y

(8

’’ X

3’)

YE

LL

OW

RE

TR

OR

EF

LE

CT

IVE

SH

EE

TIN

G

TY

PE

III O

R I

V H

IG

H I

NT

EN

SIT

Y

1-12

1-12

1- G

UA

RD

RA

IL E

ND

DE

LIN

EA

TIO

N IS

RE

QU

IRE

D O

N A

LL

AP

PR

OA

CH

AN

D T

RA

ILIN

G

GE

NE

RA

L N

OT

ES

:

Page 39: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

AL

TE

RN

AT

E 2

AL

TE

RN

AT

E 1

AL

TE

RN

AT

E 1

AL

TE

RN

AT

E 2

OBJECT MARKERS

OBJECT MARKERS

TY

PE

2 O

BJE

CT

MA

RK

ER

ST

YP

E I

OB

JE

CT

MA

RK

ER

S

TY

PE

3 O

BJE

CT

MA

RK

ER

S

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1264.0

11264.0

1

1 1

1 1

1-12

1-12

OM

-3L

12

’’ X

36

’’

OM

-3R

12

’’ X

36

’’

4"

6’’ X

12

’’

18

’’ X

18

’’

18

’’ X

18

’’

3’’

6’’

6’’

3’’

3’’

6’’

6’’

3’’

NIN

E 3

’’ D

IA

. RE

D

AL

TE

RN

AT

E 1

AL

TE

RN

AT

E 2

18

’’ X

18

’’

18

’’ X

18

’’

3’’

6’’

6’’

3’’

3’’

6’’

6’’

3’’

TH

RE

E 3

’’ DIA

. YE

LL

OW

4"

WH

ICH

TR

AF

FIC

IS T

O P

AS

S

TO

WA

RD

TH

E S

IDE

OF

OB

ST

RU

CT

ION

ST

RIP

ES

SL

OP

E D

OW

NW

AR

D A

T 4

RE

FL

EC

TO

RS

PR

ISM

AT

IC P

LA

ST

IC

RE

FL

EC

TO

RS

PR

ISM

AT

IC P

LA

ST

IC

RE

FL

EC

TO

RS

PR

ISM

AT

IC P

LA

ST

IC

NIN

E 3

’’ DIA

. YE

LL

OW

MO

UN

TE

D O

N .1

25" A

LU

MIN

UM

PA

NE

L

YE

LL

OW

RE

TR

OR

EF

LE

CT

IVE

SH

EE

TIN

G

TY

PE

III O

R I

V H

IG

H I

NT

EN

SIT

Y

MO

UN

TE

D O

N .1

25

" A

LU

MIN

UM

PA

NE

L

YE

LL

OW

RE

TR

OR

EF

LE

CT

IVE

SH

EE

TIN

G

TY

PE

III O

R I

V H

IG

H I

NT

EN

SIT

Y

MO

UN

TE

D O

N .1

25

" A

LU

MIN

UM

PA

NE

L

RE

D R

ET

RO

RE

FL

EC

TIV

E S

HE

ET

ING

TY

PE

III O

R I

V H

IG

H I

NT

EN

SIT

Y

MO

UN

TE

D O

N .1

25" A

LU

MIN

UM

PA

NE

L

RE

TR

OR

EF

LE

CT

IVE

SH

EE

TIN

G

AL

TE

RN

AT

E B

LA

CK

AN

D Y

EL

LO

W S

TR

IPE

S

TY

PE

III O

R I

V H

IG

H I

NT

EN

SIT

Y

TY

PE

4 O

BJE

CT

MA

RK

ER

S

TYPES

TYPES

Page 40: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

BR

IDG

E

CU

LV

ER

T

OV

ER

HE

AD

BR

IDG

E

TW

O L

AN

E R

OA

DW

AY

TY

PE

3 O

BJE

CT

MA

RK

ER

LE

GE

ND

TY

PE

2 O

BJE

CT

MA

RK

ER

S

TY

PE

3 O

BJE

CT

MA

RK

ER

S

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1264.0

21264.0

2

1 1

1 1

TR

AF

FIC

FL

OW

DIR

EC

TIO

N O

F

SIG

N

RO

AD

WA

Y, S

UC

H A

S S

IGN

SU

PP

OR

TS

OR

RA

ISE

D IS

LA

ND

S.

INC

LU

DE

MA

RK

ING

OF

OB

ST

RU

CT

ION

S W

ITH

IN T

HE

TY

PIC

AL

AP

PL

ICA

TIO

N O

F T

YP

E 1

OB

JE

CT

MA

RK

ER

S

TY

PE

1 O

BJE

CT

MA

RK

ER

RA

ISE

D IS

LA

ND

TR

AV

EL

WA

Y

4’ M

IN

.

ME

DIA

N

TR

AV

EL

WA

Y

4’ M

IN

.

BO

LT

ED

OR

EP

OX

IED

TO

SIG

N P

OS

T

TY

PE

2 O

BJE

CT

MA

RK

ER

RE

AR

OF

SIG

N IN

ME

DIA

N

TR

AV

EL

WA

Y

TY

PIC

AL

AP

PL

ICA

TIO

N A

T E

ND

OF

RO

AD

WA

Y (D

EA

D E

ND

)

RE

GA

RD

LE

SS

OF

WH

ET

HE

R G

UA

RD

RA

IL IS

INS

TA

LL

ED

3 M

AR

KE

RS

MIN

IMU

M

6’ T

YP

.

7’ U

-C

HA

NN

EL

PO

ST

S (

1.1

2 L

B/F

T)

PA

VE

ME

NT

4’ M

IN

.

6’ T

YP

.

TY

PE

3 O

BJE

CT

MA

RK

ER

MO

UN

TE

D O

N U

-PO

ST

E.O

.T.

TR

AV

EL

WA

Y

4’ M

IN

.

HA

ZA

RD

AR

EA

TY

PIC

AL

AP

PL

ICA

TIO

NS

OF

TY

PE

3 O

BJE

CT

MA

RK

ER

S IN

CL

UD

E D

EL

INE

AT

ION

OF

BR

IDG

E P

IER

S,

AB

UT

ME

NT

S A

ND

RA

ILS

, CU

LV

ER

T H

EA

D W

AL

LS

,

NA

RR

OW

SH

OU

LD

ER

DR

OP

-OF

FS

, OR

OT

HE

R

HA

ZA

RD

OU

S R

OA

DS

IDE

CO

ND

ITIO

NS

1-12

1-12

TY

PE

1 O

BJE

CT

MA

RK

ER

S

TY

PE

4 O

BJE

CT

MA

RK

ER

S

OBJECT MARKERS

OBJECT MARKERSINSTALLATION

INSTALLATION

Page 41: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

FL

EX

IBL

E D

EL

INE

AT

OR

AS

SE

MB

LY

W =

WID

TH

OF

TR

AV

EL

LA

NE

LE

GE

ND

E.O

.T.=

ED

GE

OF

TR

AV

EL

LA

TE

RA

L O

FF

SE

TS

DIR

EC

TIO

N O

F T

RA

FF

IC F

LO

W

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1267.0

11267.0

1

1 1

1 1

1-12

1-12

SIDE SLOPE

SH

OU

LD

ER

PO

INT

PA

VE

D

SH

LD

.

SH

OU

LD

ER

RA

MP

FL

EX

IBL

E D

EL

INE

AT

OR

SE

CT

ION

VIE

W A

-A

PO

ST

RE

FL

EC

TIV

E S

HE

ET

ING

16 s

q. i

n. M

IN

.

RE

FL

EC

TIV

E A

RE

A

FL

EX

IBL

E D

EL

INE

AT

OR

PO

ST

3�" T

O 4�"

TR

AF

FIC

OF

DIR

EC

TIO

N

BA

SE

SU

PP

OR

T D

RIV

EN

TO

GR

OU

ND

LIN

E

�" D

IA

. HO

LE

S

U-C

HA

NN

EL

BA

SE

SU

PP

OR

T

18

"

HE

X B

OL

TS

AA

CU

RB

AN

D G

UT

TE

R

BE

RM

6’-0

’’ RE

CO

MM

EN

DE

DO

F S

HE

ET

ING

4’-0

’’ T

O T

OP

RA

MP

FA

CE

OF

CU

RB

SH

OU

LD

ER

PO

INT

E.O

.T.

FL

EX

IBL

E D

EL

INE

AT

OR

E.O

.T.

OF

SH

EE

TIN

G

4’-0

’’ T

O T

OP

3" M

IN

. WID

TH

1- P

LA

CE

DE

LIN

EA

TO

RS

AT

CO

NS

TA

NT

DIS

TA

NC

E F

RO

M T

RA

VE

LW

AY

.

GE

NE

RA

L N

OT

ES

:

FLEXIBLE DELINEATORS

INSTALLATION

FLEXIBLE DELINEATORS

INSTALLATION

Page 42: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1267.0

21267.0

2

1 1

1 1

TA

BL

E A

TA

BL

E B

4°0

0’ O

R L

ES

S

HO

RIZ

ON

TA

L

CU

RV

AT

UR

E

DE

LIN

EA

TO

R

SP

AC

IN

G (

FT

)

TO

0°3

0’

TO

4°0

0’

CU

RV

E R

AD

IUS

(R)

DE

LIN

EA

TO

R S

PA

CIN

G (S

)

(F

T)

(F

T)

50

150

200

250

300

400

500

600

700

800

900

10

00

11

00

12

00

13

00

14

00

20

30

35

40

50

55

65

70

75

80

85

90

95

100

105

110

- SP

AC

ING

RO

UN

DE

D T

O N

EA

RE

ST

5 F

T.

- M

IN

. SP

AC

IN

G =

20

FT

.

- S

PA

CIN

G F

OR

SP

EC

IF

IC

RA

DII M

AY

BE

TA

NG

EN

T

RA

MP

AC

CE

LE

RA

TIO

N

DE

CE

LE

RA

TIO

N L

AN

ES

200’

50’

RA

MP

GO

RE

S

INT

ER

PO

LA

TE

D F

RO

M T

AB

LE

B O

R

GR

EA

TE

R T

HA

N 0

°30’

GR

EA

TE

R T

HA

N 4

°00’

NE

AR

ES

T T

O T

HE

EN

DS

OF

TH

E C

UR

VE

.

TH

E F

IRS

T D

EL

INE

AT

OR

S A

RE

CO

NS

IDE

RE

D T

HE

ON

ES

AN

D T

HE

TH

IRD

6S

BU

T N

OT

TO

EX

CE

ED

30

0 F

EE

T.

OF

TH

E F

IR

ST

DE

LIN

EA

TO

R I

S 2

S, T

HE

SE

CO

ND

3S

,

IN A

DV

AN

CE

OF

AN

D B

EY

ON

D A

CU

RV

E, T

HE

SP

AC

ING

CO

MP

UT

ED

FR

OM

TH

E F

OR

MU

LA

S =

(3) R

-50

WH

ER

E S

= S

PA

CIN

G, R

= R

AD

IU

S, I

N F

EE

T.

CU

RV

AT

UR

ES

CU

RV

AT

UR

ES

200’

150’

1-12

1-12

GU

AR

DR

AIL

, OR

WH

ER

E A

DE

QU

AT

E F

IX

ED

SO

UR

CE

LIG

HT

IN

G I

S P

RO

VID

ED

.

2-F

LE

XIB

LE

DE

LIN

EA

TO

RS

AR

E N

OT

RE

QU

IR

ED

WH

ER

E T

HE

Y F

AL

L B

EH

IN

D

1-F

LE

XIB

LE

DE

LIN

EA

TO

RS

AR

E R

EQ

UIR

ED

ON

LY

AT

IN

TE

RC

HA

NG

ES

.

GE

NE

RA

L N

OT

ES

:

FLEXIBLE DELINEATORS

SPACING TABLES

FLEXIBLE DELINEATORS

SPACING TABLES

Page 43: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1267.0

31267.0

3

1 3

1 3

DIR

EC

TIO

N O

F T

RA

FF

IC F

LO

W

200’ S

PA

CIN

G

EX

IT R

AM

PS

TH

RU

-LA

NE

DR

OP

AT

EX

IT R

AM

P

SEE NOTES

SEE NOTES

SE

E N

OT

ES

EN

D O

F W

HIT

E G

OR

E L

INE

BE

GIN

DE

LIN

EA

TIO

N A

T

DECELERATION LANE - TAPERED

200’

SPACING

DE

CE

LE

RA

TIO

N L

AN

E - P

AR

AL

LE

L F

UL

L W

IDT

H

IF L

ON

GE

R T

HA

N 1

000’ U

SE

500’ S

PA

CIN

G

OT

HE

RW

ISE

US

E 2

00

’ SP

AC

ING

TA

PE

R

10

0’ S

PA

CIN

G

EN

D O

F W

HIT

E

GO

RE

LIN

E

SH

OU

LD

ER

SHOULDER

FR

OM

MA

INL

INE

E.O

.T. F

OR

CR

YS

TA

L D

EL

INE

AT

OR

S

RA

MP

E.O

.T. F

OR

YE

LL

OW

DE

LIN

EA

TO

RS

AN

D

MO

UN

TIN

G H

EIG

HT

SH

AL

L B

E M

EA

SU

RE

D F

RO

M

PO

INT

SH

OU

LD

ER

50’

50

’50’

E.O

.T.

RA

MP

MA

IN L

INE

BA

CK

OF

GO

RE

CR

YS

TA

L D

EL

INE

AT

OR

YE

LL

OW

DE

LIN

EA

TO

R

LE

GE

ND

1-12

1-12

FLEXIBLE DELINEATORS

SID

E O

F T

HE

CU

RV

E W

HE

N T

HE

GA

P B

ET

WE

EN

CR

YS

TA

L D

EL

INE

AT

OR

S IS

LE

SS

TH

AN

50

0 F

T.

OV

ER

LA

P O

F 2

DE

LIN

EA

TO

RS

WIT

HIN

TH

E C

UR

VE

. CO

NT

INU

E T

HE

CR

YS

TA

L D

EL

INE

AT

OR

S T

HR

OU

GH

TH

E R

IGH

T

RA

DII L

ES

S T

HA

N 1

00

0 F

T. C

ON

TIN

UE

WIT

H C

RY

ST

AL

DE

LIN

EA

TO

RS

ON

TH

E R

IGH

T S

IDE

WIT

H A

MIN

IMU

M

TH

E P

.T. O

R C

.S. IN

AD

VA

NC

E O

F A

ND

BE

YO

ND

TH

E C

UR

VE

FO

R R

AM

PS

AN

D L

OO

PS

WIT

H R

IGH

T H

AN

D C

UR

VE

PL

AC

E Y

EL

LO

W D

EL

IN

EA

TO

RS

ON

LE

FT

SID

E O

F C

UR

VE

(C

ON

VE

X S

ID

E) R

AN

GIN

G F

RO

M T

HE

P.C

. OR

S.C

. TO

WIT

H C

UR

VE

RA

DII 1

00

0 F

T. O

R G

RE

AT

ER

.

PL

AC

E C

RY

ST

AL

DE

LIN

EA

TO

RS

ON

RIG

HT

SID

E O

F R

AM

P F

OR

AL

L R

IGH

T A

ND

LE

FT

HA

ND

CU

RV

ES

FO

R R

AM

PS

FO

LL

OW

ING

RE

QU

IRE

ME

NT

S:

1- C

ON

TIN

UE

DE

LIN

EA

TO

RS

ON

RA

MP

S A

ND

LO

OP

S, U

SIN

G T

AB

LE

S A

OR

B O

N S

TD

. DW

G. 1

267.0

2 A

ND

TH

E

GE

NE

RA

L N

OT

ES

:

E.O

.T.=

ED

GE

OF

TR

AV

EL

GO

RE

AR

EA

S

FLEXIBLE DELINEATORS

SE

E G

OR

E A

RE

A T

YP

ICA

L

SE

E G

OR

E A

RE

A T

YP

ICA

L

SE

E G

OR

E A

RE

A T

YP

ICA

L

INTERCHANGE PLACEMENT

INTERCHANGE PLACEMENT

PH

YS

ICA

L G

OR

E

PH

YS

ICA

L G

OR

E

Page 44: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1267.0

31267.0

3

2 3

2 3

20

0’ S

PA

CIN

G

EN

D O

F W

HIT

E G

OR

E L

INE

EN

TR

AN

CE

RA

MP

S

SEE NOTES

SEE NOTES

TA

PE

R

100’ S

PA

CIN

G

ACCELERATION LANE - TAPERED

200’

SPACING

AC

CE

LE

RA

TIO

N L

AN

E - P

AR

AL

LE

L F

UL

L W

IDT

H

IF L

ON

GE

R T

HA

N 1

00

0’ U

SE

50

0’ S

PA

CIN

G

OT

HE

RW

ISE

US

E 2

00

’ SP

AC

ING

EN

D D

EL

INE

AT

ION

AT

EN

D O

F W

HIT

E G

OR

E L

INE

SE

E N

OT

ES

RA

MP

FR

OM

MA

INL

INE

E.O

.T. F

OR

CR

YS

TA

L D

EL

INE

AT

OR

S

RA

MP

E.O

.T. F

OR

YE

LL

OW

DE

LIN

EA

TO

RS

AN

D

MO

UN

TIN

G H

EIG

HT

SH

AL

L B

E M

EA

SU

RE

D F

RO

M

E.O

.T.

MA

IN L

INE

BA

CK

OF

GO

RE

50

’5

0’

50

SH

OU

LD

ER

PO

INT

SHOULDER

SH

OU

LD

ER

1-12

1-12

FLEXIBLE DELINEATORS

FLEXIBLE DELINEATORS

DIR

EC

TIO

N O

F T

RA

FF

IC F

LO

W

CR

YS

TA

L D

EL

INE

AT

OR

YE

LL

OW

DE

LIN

EA

TO

R

LE

GE

ND

E.O

.T.=

ED

GE

OF

TR

AV

EL

GO

RE

AR

EA

S

SE

E G

OR

E A

RE

A T

YP

ICA

L

SE

E G

OR

E A

RE

A T

YP

ICA

L

SE

E G

OR

E A

RE

A T

YP

ICA

L

TH

E R

IGH

T S

IDE

OF

TH

E C

UR

VE

WH

EN

TH

E G

AP

BE

TW

EE

N C

RY

ST

AL

DE

LIN

EA

TO

RS

IS L

ES

S T

HA

N 5

00

FT

.

MIN

IMU

M O

VE

RL

AP

OF

2 D

EL

INE

AT

OR

S W

ITH

IN T

HE

CU

RV

E. C

ON

TIN

UE

TH

E C

RY

ST

AL

DE

LIN

EA

TO

RS

TH

RO

UG

H

CU

RV

E R

AD

II L

ES

S T

HA

N 1

000 F

T. C

ON

TIN

UE

WIT

H C

RY

ST

AL

DE

LIN

EA

TO

RS

ON

TH

E R

IG

HT

SID

E W

IT

H A

TO

TH

E P

.T. O

R C

.S. IN

AD

VA

NC

E O

F A

ND

BE

YO

ND

TH

E C

UR

VE

FO

R R

AM

PS

AN

D L

OO

PS

WIT

H R

IGH

T H

AN

D

PL

AC

E Y

EL

LO

W D

EL

IN

EA

TO

RS

ON

LE

FT

SID

E O

F C

UR

VE

(C

ON

VE

X S

ID

E) R

AN

GIN

G F

RO

M T

HE

P.C

. OR

S.C

.

RA

MP

S W

IT

H C

UR

VE

RA

DII 1

000 F

T. O

R G

RE

AT

ER

.

PL

AC

E C

RY

ST

AL

DE

LIN

EA

TO

RS

ON

RIG

HT

SID

E O

F R

AM

P F

OR

AL

L R

IGH

T A

ND

LE

FT

HA

ND

CU

RV

ES

FO

R

FO

LL

OW

ING

RE

QU

IRE

ME

NT

S:

1- C

ON

TIN

UE

DE

LIN

EA

TO

RS

ON

RA

MP

S A

ND

LO

OP

S, U

SIN

G T

AB

LE

S A

OR

B O

N S

TD

. DW

G. 1

267.0

2 A

ND

TH

E

GE

NE

RA

L N

OT

ES

:

INTERCHANGE PLACEMENT

INTERCHANGE PLACEMENT

LA

NE

AD

DIT

ION

FR

OM

EN

TR

AN

CE

RA

MP

PH

YS

ICA

L G

OR

E

PH

YS

ICA

L G

OR

E

Page 45: CONTINUOUS LINES - Connect NCDOT Roadway... · continuous lines gore line center line stop or transverse bar diagonal line pavement markings p av e m e n t m a r k i ng s r a le i

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

RALEIGH, N.C.

DIVISION OF HIGHWAYS

DEPT. OF TRANSPORTATION

NORTH CAROLINA

STATE OF

SH

EE

T O

FS

HE

ET

OF

ENGLISH STANDARD DRAWING FOR

ENGLISH STANDARD DRAWING FOR

1267.0

31267.0

3

3 3

3 3

CL

OV

ER

LE

AF

INT

ER

CH

AN

GE

200’ S

PA

CIN

G20

0’ S

PA

CIN

G

SEE NOTES

SEE NOTES

AU

XIL

IAR

Y L

AN

E - P

AR

AL

LE

L F

UL

L W

IDT

H

IF L

ON

GE

R T

HA

N 1

00

0’ U

SE

50

0’ S

PA

CIN

G

OT

HE

RW

ISE

US

E 2

00

’ SP

AC

ING

EN

D O

F W

HIT

E

GO

RE

LIN

E

EN

D O

F W

HIT

E

GO

RE

LIN

E

5 IN

ST

AL

LA

TIO

NS

BO

TH

SID

ES

OF

LO

OP

50’ S

PA

CIN

G

SE

E N

OT

ES

50’ S

PA

CIN

G

3 C

RY

ST

AL S

EE

NO

TE

S

EN

TR

AN

CE

LO

OP

EX

IT L

OO

P

AS

RE

Q’D

.

OP

TIO

NA

LS

EE

NO

TE

S

3 Y

EL

LO

W

50’ S

PA

CIN

G

50’ S

PA

CIN

G

BO

TH

SID

ES

OF

RA

MP

5 IN

ST

AL

LA

TIO

NS

EN

TR

AN

CE

RA

MP

EX

IT R

AM

P

CR

YS

TA

L D

EL

INE

AT

OR

YE

LL

OW

DE

LIN

EA

TO

R

LE

GE

ND

1-12

1-12

GO

RE

AR

EA

- S

EE

TY

PIC

AL

ON

SH

EE

T 1

OF

3 G

OR

E A

RE

A -

SE

E T

YP

IC

AL

ON

SH

EE

T 2

OF

3

FLEXIBLE DELINEATORS

FLEXIBLE DELINEATORS

BA

CK

WIT

H R

ED

DE

LIN

EA

TO

R

CR

YS

TA

L D

EL

INE

AT

OR

BA

CK

TO

BA

CK

WIT

H R

ED

DE

LIN

EA

TO

R

YE

LL

OW

DE

LIN

EA

TO

R B

AC

K T

O

DE

LIN

EA

TO

RS

TH

RO

UG

H T

HE

RIG

HT

SID

E O

F T

HE

CU

RV

E W

HE

N T

HE

GA

P B

ET

WE

EN

CR

YS

TA

L D

EL

INE

AT

OR

S IS

LE

SS

TH

AN

500 F

T.

CR

YS

TA

L D

EL

INE

AT

OR

S O

N T

HE

RIG

HT

SID

E W

ITH

A M

INIM

UM

OV

ER

LA

P O

F 2

DE

LIN

EA

TO

RS

WIT

HIN

TH

E C

UR

VE

. CO

NT

INU

E T

HE

CR

YS

TA

L

AD

VA

NC

E O

F A

ND

BE

YO

ND

TH

E C

UR

VE

FO

R R

AM

PS

AN

D L

OO

PS

WIT

H R

IGH

T H

AN

D C

UR

VE

RA

DII L

ES

S T

HA

N 1

000 F

T. C

ON

TIN

UE

WIT

H

PL

AC

E Y

EL

LO

W D

EL

IN

EA

TO

RS

ON

LE

FT

SID

E O

F C

UR

VE

(C

ON

VE

X S

ID

E) R

AN

GIN

G F

RO

M T

HE

P.C

. OR

S.C

. TO

TH

E P

.T. O

R C

.S. I

N

RA

DII 1

000 F

T. O

R G

RE

AT

ER

.

PL

AC

E C

RY

ST

AL

DE

LIN

EA

TO

RS

ON

RIG

HT

SID

E O

F R

AM

P F

OR

AL

L R

IGH

T A

ND

LE

FT

HA

ND

CU

RV

ES

FO

R R

AM

PS

WIT

H C

UR

VE

1- C

ON

TIN

UE

DE

LIN

EA

TO

RS

ON

RA

MP

S A

ND

LO

OP

S, U

SIN

G T

AB

LE

S A

OR

B O

N S

TD

. DW

G. 1

267.0

2 A

ND

TH

E F

OL

LO

WIN

G R

EQ

UIR

EM

EN

TS

:

GE

NE

RA

L N

OT

ES

:

TE

RM

INA

LS

RA

MP

LO

OP

TY

PIC

AL

INT

ER

CH

AN

GE

PL

AC

EM

EN

T

CL

OV

ER

LE

AF

INT

ER

CH

AN

GE

FL

Y-O

VE

R IN

TE

RC

HA

NG

E

DIA

MO

ND

INT

ER

CH

AN

GE

INTERCHANGE PLACEMENT

INTERCHANGE PLACEMENT

PH

YS

ICA

L G

OR

E

PH

YS

ICA

L G

OR

E