Content Copy Of Original Ministry of the Environment Ministère de l’Environnement ENVIRONMENTAL COMPLIANCE APPROVAL NUMBER 1963-9CBNES Issue Date: October 23, 2013 2354084 Ontario Limited 127 Earl Thompson Pl North Dumfries, Ontario, N0B 1E0 Site Location: Mammoet Maintenance Yard Lot 25, Concession 8 Puslinch Township, County of Wellington N0B 2J0 You have applied under section 20.2 of Part II.1 of the Environmental Protection Act , R.S.O. 1990, c. E. 19 (Environmental Protection Act) for approval of: Sewage works with a subsurface sewage disposal system designed and operated at a maximum capacity of 11,250 L/d to service a new maintenance facility, to be used by approximately 150 employees per day, in the Township of Puslinch, located at the above noted site location and consisting of the following: SEWAGE TREATMENT SYSTEM Septic Tanks Proposed one (1) two (2)-compartment tank, with total capacity of approximately 36,000 L, fitted with effluent filter to remove particles. Dosing Tank Proposed one (1) tank with total capacity of approximately 17,600 L, to be installed between the septic tank and the Waterloo Biofilter. Waterloo Biofilter Closed Loop Nitrifier Proposed one (1) HDPE tank aerobic nitrifying trickling filter with total capacity approximately 4455 L complete with filter media capable of treating a maximum of 3500 L/day with 100% recirculation back to the dosing tank Waterloo Biofilter Nitrifier Proposed one (1) tank aerobic nitrifying trickling filter, with total capacity of approximately 27,000 L complete with filter media Recirculation Proposed recirculation from the Waterloo Biofilter nitrifier to the inlet of the Dosing Tank and the inlet of the Septic Tank to dilute the incoming raw sewage. WaterNOx Biofilter

Content Copy Of Original Ministry of the Environment ......Site Location:Mammoet Maintenance Yard Lot 25, Concession 8 Puslinch Township, County of Wellington N0B 2J0 You have applied

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • Content Copy Of Original

    Ministry of the Environment Ministère de l’Environnement

    ENVIRONMENTAL COMPLIANCE APPROVAL NUMBER 1963-9CBNES 

    Issue Date: October 23, 2013

    2354084 Ontario Limited 127 Earl Thompson Pl North Dumfries, Ontario, N0B 1E0

    Site Location: Mammoet Maintenance Yard Lot 25, Concession 8 Puslinch Township, County of Wellington N0B 2J0

    You have applied under section 20.2 of Part II.1 of the Environmental Protection Act , R.S.O. 1990, c.E. 19 (Environmental Protection Act) for approval of: Sewage works with a subsurface sewage disposal system designed and operated at a maximumcapacity of 11,250 L/d to service a new maintenance facility, to be used by approximately 150employees per day, in the Township of Puslinch, located at the above noted site location andconsisting of the following:

      SEWAGE TREATMENT SYSTEM  Septic Tanks Proposed one (1) two (2)-compartment tank, with total capacity of approximately 36,000 L, fitted witheffluent filter to remove particles.   Dosing Tank Proposed one (1) tank with total capacity of approximately 17,600 L, to be installed between the septictank and the Waterloo Biofilter.  Waterloo Biofilter Closed Loop Nitrifier  Proposed one (1) HDPE tank aerobic nitrifying trickling filter with total capacity approximately 4455 Lcomplete with filter media capable of treating a maximum of 3500 L/day with 100% recirculation backto the dosing tank  Waterloo Biofilter Nitrifier  Proposed one (1) tank aerobic nitrifying trickling filter, with total capacity of approximately 27,000 Lcomplete with filter media  Recirculation Proposed recirculation from the Waterloo Biofilter nitrifier to the inlet of the Dosing Tank and the inletof the Septic Tank to dilute the incoming raw sewage.   WaterNOx Biofilter 

  • Proposed one (1) tank anoxic trickling filter, with total capacity of approximately 22,000 L, completewith filter media for denitrification. A portion of treated effluent is recirculated to the inlet of the SepticTank.      Polisher Biofilter Proposed one (1) tank, with total capacity of approximately 12,500 L, for final removal of BOD afterdenitrification process. A portion of treated effl uent is recirculated to the inlet of the Septic Tank.      SUBSURFACE DISPOSAL SYSTEM  Filter Bed (Area Bed)  One (1) proposed area bed, having a total contact area of 1440 m 2  and consisting of four (4) rows of75 mm diameter perforated pipes approximately 36 m long (144 m total) spaced at 1.2 m centre tocentre, all installed in a 300 mm deep continuous stone layer over the surface of a minimum of 750mm deep approved filter medium as per OBC requirements and complete with a 250 mm thick sandmantle having a percolation time of 6 to 10 min/cm and extending a minimum of 15 m beyond theoutermost distribution pipes in a direction which the effluent will move laterally in the soil away from thearea beds.  STORM WATER MANAGEMENT SYSTEM  Catchbasin A total of five (5) catchbasin (CB) including CB1, CBMH5, CB4, CBMH6 and CB5 all draining toCBMH3 prior to a Stormceptor Oil and Grit Separator (OGS); and   Stormceptor Oil and Grit Separator   One (1) Stormceptor Oil and Grit separator OGS (SWQ-100 or approved equal) to provide "EnhancedProtection Level of 80% Suspended Solids removal for run-off rate up to 225 L/s, having a sedimentstorage capacity of 32.98 cu.m., oil storage capacity of  10,555 L and a total volume of 44.355 cu.m,discharging to Mill Creek Wetland.   and other controls, piping, valves, drains, and appurtenances essential for the proper operation of theaforementioned sewage works,  all in accordance with supporting documents listed in Schedule B . For the purpose of this environmental compliance approval, the following definitions apply: "Annual Average Concentration" means the arithmetic mean of the   monthly concentration s  of acontaminant in the effluent calculated for any particular calendar year;   "Approval"  means this entire document and any schedules attached to it, and the application;  " BOD5 " (also known as TBOD 5 ) means five day biochemical oxygen demand measured in anunfiltered sample and includes carbonaceous and nitrogenous oxygen demand;   " CBOD5 " means five day carbonaceous (nitrification inhibited) biochemical oxygen demandmeasured in an unfiltered sample;   "Director"  means a person appointed by the Minister pursuant to section 5 of the EPA for thepurposes of Part II.1 of the EPA;  

  • "District Manager"  means the District Manager of the Guelph District Office of the Ministry;  "EPA"  means the Environmental Protection Act , R.S.O. 1990, c.E.19, as amended;  "Equivalent equipment"  means a substituted equipment that meets the required quality andperformance standards of a named equipment;  " Grab sample "  is defined in Section 3.1.1 of the Ministry publication, "Protocol For the Sampling andAnalysis of Industrial/Municipal Waste Water" dated January 1999, and as amended;  "Licensed installer" means a person who holds a licence under Article 2.12.3.1 of the Ontario BuildingCode;  "Limited Operational Flexibility"  (LOF) means the Modifications  that the Owner  is permitted to maketo the Works  under this Approval ;  "Ministry"  means the   ministry of the government of Ontario responsible for the EPA and  OWRA  and  includes all officials, employees or other persons   acting on its behalf;  "Modifications"  means any addition, replacement, alteration, expansion or optimization for the Worksas specified under Limited Operational Flexibility;  "Notice of Modifications"  means the form entitled “Notice of Modifications to Sewage Works”;   "OWRA"  means the Ontario Water Resources Act , R.S.O. 1990, c. O.40, as amended;  "Owner"  means Hydro One Networks Inc.and its successors and assignees;  " Professional Engineer "   means a person entitled to practise as a Professional Engineer in theProvince of Ontario under a licence issued under the Professional Engineers Act;  " Quarterly " means once every three months, with a minimum 2 months separation between eachsample; and  " Works" means the sewage works described in the Owner's application, this Approval  and in thesupporting documentation referred to herein, to the extent approved by this Approval  including theLimited Operational Flexibility . You are hereby notified that this environmental compliance approval is issued to you subject to theterms and conditions outlined below: TERMS AND CONDITIONS 1. GENERAL PROVISIONS  (1) The Owner shall ensure that any person authorized to carry out work on or operate any aspect ofthe Works is notified of this Approval and the conditions herein and shall take all reasonable measuresto ensure any such person complies with the same.  (2) Except as otherwise provided by these conditions, the Owner shall design, build, install, operateand maintain the Works in accordance with the description given in this Approval , and the applicationfor approval of the W orks.  

  • (3) Where there is a conflict between a provision of any document in the schedule referred to in thisApproval and the conditions of this Approval , the Conditions in this Approval shall take precedence,and where there is a conflict between the documents in the schedule, the document bearing the mostrecent date shall prevail.  (4) Where there is a conflict between the documents listed in the Schedule submitted documents, andthe application, the application shall take precedence unless it is clear that the purpose of thedocument was to amend the application.  (5) The Conditions of this Approval are severable. If any Condition of this Approval , or the applicationof any requirement of this Approval to any circumstance, is held invalid or unenforceable, theapplication of such condition to other circumstances and the remainder of this Approval  shall not beaffected thereby.  2. EXPIRY OF APPROVAL    The approval issued by this Approval  will cease to apply to those parts of the Works  which have notbeen constructed within five (5) years  of the date of this Approval.  3. CHANGE OF OWNER    (1) The Owner  shall notify the District Manager  and the Director, in writing, of any of the followingchanges within thirty (30) days  of the change occurring:  (a) change of Owner; 

    (b) change of address of the Owner;  

       

    (c) change of partners where the  Owner  is or at any time becomes a partnership, and a copy ofthe most recent declaration filed under the Business Names Act , R.S.O. 1990, c.B17 shall beincluded in the notification to the District Manager;

    (d) change of name of the corporation where the Owner  is or at any time becomes a corporation,and a copy of the most current information filed under the Corporations Informations Act , R.S.O.1990, c. C39 shall be included in the notification to the District Manager;

     (2) In the event of any change in ownership of the Works, other than a change to a successormunicipality, the Owner  shall notify in writing the succeeding owner of the existence of this Approval,and a copy of such notice shall be forwarded to the District Manager  and the Director.  4. CONSTRUCTION  (1) The Owner  shall ensure that the construction of the works is supervised by a licensed installer or aProfessional Engineer, as defined in the Professional Engineers Act .  (2) Upon construction of the works, the Owner  shall prepare a statement, certified by a licensedinstaller or a Professional Engineer, that the Works  are constructed in accordance with this Approval,and upon request, shall make the written statement available for inspection by Ministry  staff and staff

  • of the local municipality.  5. OPERATION AND MAINTENANCE    (1) The Owner  shall exercise due diligence in ensuring that, at all times, the Works  and the relatedequipment and appurtenances used to achieve compliance with this Approval are properly operatedand maintained. Proper operation and maintenance shall include effective performance, adequatefunding, adequate operator staffing and training, including training in all procedures and otherrequirements of this Approval and the Act  and regulations, adequate laboratory facilities, processcontrols and alarms and the use of process chemicals and other substances used in the Works .  (2) The Owner  shall prepare an operations manual within six (6) months of   the   introduction ofsewage to the Works, that includes, but not necessarily limited to, the following information:  (a) operating procedures for routine operation of the Works ;

     (b) inspection programs, including frequency of inspection, for the Works  and the methods ortests employed to detect when maintenance is necessary;   (c) repair and maintenance programs, including the frequency of repair and maintenance for theWorks ; copies of maintenance contracts for any routine inspections & pump-outs should beincluded for all the tanks and treatment units;  (d) procedures for the inspection and calibration of monitoring equipment;  (e) a spill prevention control and countermeasures plan, consisting of contingency plans andprocedures for dealing with equipment breakdowns, potential spills and any other abnormalsituations,  including notification of the District Manager ; and  (f) procedures for receiving, responding and recording public complaints, including recording anyfollow-up actions taken.

     (3) The Owner  shall maintain the operations manual current and retain a copy at the location of theWorks for the operational life of the  Works .  Upon request, the Owner  shall make the manualavailable to Ministry  staff.  (4) The Owner shall, for an on-going basis, enter into the Servicing & Maintenance Agreement with thelocal authorized Service Agent for the proposed Waterloo Biofilter sewage treatment unit to have theWorks  inspected at a minimum of every month. Bi-annual inspection of the leaching beds for evidenceof effluent breakout, and monitoring of effluent mounding below the beds shall also be conducted.  6. EFFLUENT OBJECTIVES    (1) The Owner  shall use best efforts to operate the Works  with the objective that the concentrationsof the materials named below as effluent parameters are not exceeded in the effluent from the sewagetreatment plant prior to discharging to a subsurface sewage disposal system.  

    Table 1 - Effluent ObjectivesEffluent Parameter Concentration Objective 

    (milligrams per litre unless otherwiseindicated)

    CBOD5

  • Total Suspended Solids (TSS)

  • edition), as amended from time to time by more recently published editions;

    (d) for any parameters not mentioned in the documents referenced in (a) and (b), the writtenapproval of the District Manager  shall be obtained prior to sampling.

     (4) The Owner  shall measure and record on a daily basis the Average Daily Flow  of effluent beingdisposed of through the subsurface disposal system.  (5) The measurement frequencies specified in subsection (2) in respect to any parameter are minimumrequirements which may, be modified by the District Manager  in writing from time to time.  (6) The Owner  shall retain for a minimum of five (5) years from the date of their creation, all recordsand information related to or resulting from the monitoring activities required by this Approval .     8. EFFLUENT LIMITS  (1) The Owner  shall design and construct the Works , operate and maintain the Works such that theAnnual Average Concentration  of nitrate in the effluent of the Waterloo Biofilter/WaterNox system unitdoes not exceed 10.0 mgN/L.  9. CONTINGENCY PLAN  (1) If the expected effluent quality, as stated in Condition 8(1), is not achieved the Owner shallinvestigate new  strategies to assist the nitrogen reduction process.   The Owner  shall submit to theDirector  for approval (i) recommendations for additional treatment, (ii) the detailed design of theproposed works and (iii) the timeline for the implementation of the proposed works.  10. REPORTING  (1) One (1) week  prior to the start up of the operation of the Works , the Owner  shall notify theDistrict Manager (in writing) of the pending start up date.  (1) In addition to the obligations under Part X of the Environmental Protection Act , the Owner  shall,within 10 working days of the occurrence of any reportable spill as defined in Ontario Regulation675/98, bypass or loss of any product, by-product, intermediate product, oil, solvent, waste material orany other polluting substance into the environment, submit a full written report of the occurrence to theDistrict Manager  describing the cause and discovery of the spill or loss, clean-up and recoverymeasures taken, preventative measures to be taken and schedule of implementation.  (2) The Owner  shall prepare and submit to the District Manager  performance reports for the Works every two (2) years , starting from the commencement of operation of the works. The reports shall beprepared within ninety (90) days  following the completion of the period being reported upon. Thereports shall contain the following information in a format acceptable to the District Manager :

     (a) A summary of all monitoring data including an overview of the success and adequacy of thesewage treatment program;   

  • (b) A comprehensive interpretation of all monitoring and analytical data obtained during thereporting period, and a comparison to the effluent quality and quantity criteria;   (c) A summary of all maintenance carried out on any major structure, equipment, apparatus,mechanism or thing forming part of the Works ; and  (d) An account of any environmental and operating problems encountered at the site of thesewage treatment plant and the mitigative measures taken during the reporting period.

     (3) After a minimum of three (3)  reporting periods, the Owner  may request to increase the reportingperiod. Such request shall be prepared and submitted (in writing) to the District Manager  for approval.  11. LIMITED OPERATIONAL FLEXIBILITY    (1) The Owner  may make Modifications  to the Works  in accordance with the terms and conditions ofthis Approval  and subject to the Ministry’s “Limited Operational Flexibility Criteria for Modifications toSewage Works ”, as amended, included under Schedule A of this Approval.  (2) Sewage works under Limited Operational Flexibility  shall adhere to the design guidelinescontained within the Ministry’s publication “Design Guidelines for Sewage Works 2008”, as amended.  (3) The Owner  shall ensure at all times, the Works  and related equipment and appurtenances whichare installed or used to achieve compliance are operated in accordance with all terms and conditionsof this Approval .  (4) For greater certainty, the following are not  permitted as part of Limited Operational Flexibility:  (a) Modifications  to the Works  that result in an increase of the Rated Capacity of the Works; (b) Modifications  to the Works  that adversely affect the approved effluent quality criteria or thelocation of the discharge/outfall; (c) Modifications  to the Works  approved under s.9 of the EPA, and (d) Modifications  to the Works   pursuant to an order issued by the Ministry.  (5) Implementation of Limited Operational Flexibility  is not intended to be used for piecemealmeasures that result in major alterations or expansions.  (6) If the implementation of Limited Operational Flexibility  requires changes to be made to theEmergency Response, Spill Reporting and Contingency Plan, the Owner  shall provide a revised copyof this plan for approval to the local fire services authority prior to implementing Limited OperationalFlexibility .  (7) For greater certainty, any alteration made under the Limited Operational Flexibility  may only becarried out after other legal obligations have been complied with including those arising from theEnvironmental Protection Act , Niagara Escarpment Planning and Development Act , Oak RidgesMoraine Conservation Act , Lake Simcoe Protection Act  and Greenbelt Act.   (8) At least  thirty (30) days  prior to implementing Limited Operational Flexibility,  the Owner shallcomplete a Notice of Modifications  describing any proposed Modifications  to the Works  and submit itto the  District Manager.  (9) The Owner  shall not proceed with implementation of Limited Operational Flexibility , until a

  • minimum of thirty (30) days  after the day the District Manager  has acknowledged receipt of theNotice of Modifications  in writing or after receiving a written acceptance from the District Manager .

         

    Schedule A Limited Operational Flexibility Criteria for Modifications to Sewage Works  The Modifications  to sewage works approved under an Environmental Compliance Approval (ECA)that are permitted under the Limited Operational Flexibility (LOF),   are outlined below and are subjectto the LOF conditions in the ECA . For clarity proposes, Modifications  of equipment does not  includeprocess equipment where treatment unit operations occur, including but not limited to: screens, gritseparators, blowers, oxygen diffusers, sludge thickeners and dewatering equipment, UV systems,chlorine contact tanks, bio-disks, digester gas handling systems, and process reactors.  Modifications  of sewage works that are exempt from section 53 of the OWRA by O. Reg. 525/98continue to be exempt and are not required to follow the notification process under this LimitedOperational Flexibility. If there is a conflict between the list of sewage works listed below and theconditions in the ECA, the conditions in the ECA shall take precedence .  The following sewage works are permitted under Limited Operational Flexibility,  and as per theconditions in the Approval:  1.0 Sewage Pumping Stations 

    1.1 Alter pumping capacity by adding or replacing equipment where new equipment is locatedwithin an existing sewage treatment plant site or an existing sewage pumping station site, wherethe facility rated capacity is not exceeded and while maintaining the existing flow process and/ortreatment train, if applicable.  1.2 Replacing existing minor equipment with Equivalent equipment  of different make and model,provided that there are no treatment process changes as a result of the replacement.

     2.0 Inlet Works

     2.1 Replacing existing minor equipment with Equivalent equipment  of different make and model.

     3.0 Sewage Treatment Process

     

    3.1 Install or replace instrumentation or chemical dosage equipment for operational ormaintenance purposes including replacing chemicals for pH adjustment or coagulants (non-toxicpolymers) provided that there are no Modifications  of treatment processes or other Modifications that may alter the intent of operations and may have negative impacts on Works'  effluent quantityand quality.   

  • 3.2 Expansion of buffer zone between a sanitary sewage lagoon facility or land treatment area andadjacent uses where the buffer zone is entirely on the proponent’s land.   3.3 Optimize existing sanitary sewage lagoons with the purpose to increase efficiency of treatmentoperations provided that existing sewage treatment plant rated capacity is not exceeded andwhere no land acquisition is required.  3.4 Replacing existing minor equipment with Equivalent equipment  of different make and model,provided that there are no treatment process changes as a result of the replacement.  

    4.0 Sewage Treatment Process Outfall

     4.1 Replacement of discharge pipe with similar pipe size provided that the outfall location is notchanged.

     5.0 Sanitary Sewers

     5.1 Pipe relining and replacement with similar pipe size to the approved site location’s existingsanitary sewers  and forcemains sewage collection system. The sewer main Modifications  shallnot  include combined sewers .  5.2 Sanitary gravity sewers and forcemains within the approved site location, except those with anominal diameter greater than 1,200 mm.

     6.0 Stormwater Management System 

    6.1 Modifications  of stormwater management works to service the existing approved drainagearea located within the site, provided that there is no increase in the average impervious areaestablished in the original design and the discharges from the site will not exceed the attenuatedflows established in the original design.   6.2 Installation of new oil grit separators.

     7.0 Pilot Systems

     7.1 Installation of pilot systems for new or existing technologies provided that:   (a) any effluent from the pilot system is discharged  to the inlet of the main sewage treatment plantor hauled off-site for proper disposal,   (b) any effluent from the pilot system discharged  to the inlet of the main sewage treatment plantdoes not significantly alter the composition/concentration of the influent sewage to be treated inthe downstream process; and that it does not add any inhibiting substances to the downstreamprocess, and   

  • (c) the pilot system’s duration be of up to a maximum of two years ; and a report with results issubmitted to the Director  and District Manager   three months  after completion of the pilotproject.

       

    Schedule B

    Environmental Compliance Approval (ECA) supporting documents:  1. Environmental Compliance Approval Application  for Sewage Works dated December 12, 2012signed by Jonh Ham;  2. A Document entitled “Mammoet Maintenance Shop and Office – Wastewater Treatment SystemDesign Brief” dated December 14, 2012 and prepared by K. Smart Associates Limited;  3. Certificate of Incorporation dated December 17, 2012;   4. A letter dated May 15, 2013 from Sandra Swanton, P.Eng. of K. Smart Associates Limited YoussoufKalogo, P.Eng of the Ontario Ministry of the Environment (MOE); and  5. Email dated September 16, 2013 from Sandra Swanton, P.Eng. of K. Smart Associates LimitedYoussouf Kalogo, P.Eng of the MOE.                          

    The reasons for the imposition of these terms and conditions are as follows:

     

  • 1. Condition 1 is imposed to ensure that the Works  are built and operated in the manner in which theywere described for review and upon which approval was granted. This condition is also included toemphasize the precedence of Conditions in the Approval  and the practice that the Approval is basedon the most current document, if several conflicting documents are submitted for review. The conditionalso advises the Owners their responsibility to notify any person they authorized to carry out workpursuant to this Approval  the existence of this Approval.  2. Condition 2 is included to ensure that, when the Works  are constructed, the Works  will meet thestandards that apply at the time of construction to ensure the ongoing protection of the environment.   3. Condition 3 is included to ensure that the Ministry  records are kept accurate and current withrespect to the approved works and to ensure that subsequent owners of the Works  are made awareof the Approval  and continue to operate the Works  in compliance with it.  4. Condition 4 is included to ensure that the Works  are constructed, and may be operated andmaintained such that the environment is protected and deterioration, loss, injury or damage to anyperson or property is prevented.  5. Condition 5 is included to require that the Works  be properly operated, maintained, funded, staffedand equipped such that the environment is protected and deterioration, loss, injury or damage to anyperson or property is prevented. As well, the inclusion of a comprehensive operations manualgoverning all significant areas of operation, maintenance and repair is prepared, implemented andkept up-to-date by the owner and made available to the Ministry . Such a manual is an integral part ofthe operation of the Works . Its compilation and use should assist the Owner  in staff training, in properplant operation and in identifying and planning for contingencies during possible abnormal conditions.The manual will also act as a benchmark for Ministry  staff when reviewing the Owner' s operation ofthe work.  6. Condition 6 is imposed to establish non-enforceable effluent quality objectives which the Owner  isobligated to use best efforts to strive towards on an ongoing basis. These objectives are to be used asa mechanism to trigger corrective action proactively and voluntarily before environmental impairmentoccurs.  7. Condition 7 is included to enable the Owner  to evaluate and demonstrate the performance of theWorks ,  on a continual basis, so that the Works  are properly operated and maintained at a levelwhich is consistent with the design objectives specified in the Approval  and that the Works  does notcause any impairment to the receiving watercourse.  8. Condition 8 is imposed to ensure that the effluent discharged from the Proposed Works  to theground meets the Ministry 's effluent quality requirements thus minimizing environmental impact on thereceiver and to protect groundwater quality.    9. Condition 9 is included to make the Owner  aware that he must install a back up system if theeffluent from the Waterloo Biofilter/WaterNox system does not achieve a nitrate level of 5.0 mg/L.  10. Condition 10 is included to ensure that the Ministry  is made aware of problems as they arise.  11. Condition 11 is included to ensure that the Works  are operated in accordance with the applicationand supporting documentation submitted by the Owner, and not in a manner which the Director  hasnot been asked to consider. These conditions are also included to ensure that a Professional Engineerhas reviewed the proposed Modifications  and attests that the Modifications  are in line with that ofLimited Operational Flexibility, and provide assurance that the proposed Modifications  comply with the

  • Ministry's requirements stipulated in the terms and conditions of this Approval,  MOE policies,guidelines, and industry engineering standards and best management practices.  In accordance with Section 139 of the Environmental Protection Act, you may by written Notice servedupon me, the Environmental Review Tribunal and in accordance with Section 47 of the EnvironmentalBill of Rights, 1993 , S.O. 1993, c. 28 (Environmental Bill of Rights), the Environmental Commissioner,within 15 days after receipt of this Notice, require a hearing by the Tribunal. The EnvironmentalCommissioner will place notice of your appeal on the Environmental Registry. Section 142 of theEnvironmental Protection Act provides that the Notice requiring the hearing shall state:  1. The portions of the environmental compliance approval or each term or condition in theenvironmental compliance approval in respect of which the hearing is required, and; 2. The grounds on which you intend to rely at the hearing in relation to each portion appealed.  The Notice should also include:  3. The name of the appellant; 4. The address of the appellant; 5. The environmental compliance approval number; 6. The date of the environmental compliance approval; 7. The name of the Director, and; 8. The municipality or municipalities within which the project is to be engaged in.  And the Notice should be signed and dated by the appellant.  This Notice must be served upon:  The Secretary* Environmental ReviewTribunal 655 Bay Street, Suite1500 Toronto, Ontario M5G 1E5

    AND

    The EnvironmentalCommissioner 1075 Bay Street, Suite605 Toronto, Ontario M5S 2B1

    AND

    The Director appointed for thepurposes of Part II.1 of theEnvironmental Protection Act Ministry of the Environment 2 St. Clair Avenue West, Floor12A Toronto, Ontario M4V 1L5

     * Further information on the Environmental Review Tribunal ’s requirements for an appeal canbe obtained directly from the Tribunal at: Tel: (416) 212-6349, Fax: (416) 314-3717 orwww.ert.gov.on.ca  This instrument is subject to Section 38 of the Environmental Bill of Rights, 1993, that allows residentsof Ontario to seek leave to appeal the decision on this instrument. Residents of Ontario may seekleave to appeal within 15 days from the date this decision is placed on the Environmental Registry. Byaccessing the Environmental Registry at www.ebr.gov.on.ca , you can determine when the leave toappeal period ends.  The above noted activity is approved under s.20.3 of Part II.1 of the Environmental Protection Act.   

    DATED AT TORONTO this 23rd day of October, 2013Edgardo Tovilla Director 

  • appointed for the purposes of Part II.1 ofthe Environmental Protection Act

    YK/ c: District Manager, MOE Guelph Sandra Swanton, K. Smart Associates Limited