Content Copy Of Original Ministry of the Environment Ministère de l’Environnement AMENDED ENVIRONMENTAL COMPLIANCE APPROVAL NUMBER 5313-9AHQDD Issue Date: December 12, 2013 Glencore Canada Corporation 10050 Highway 101 E Post Office Box, No. 2002 Timmins, Ontario P4N 7K1 Site Location: Kidd Concentrator Site 10050 Highway 101 E Timmins City, District of Cochrane P4N 7K1 You have applied under section 20.2 of Part II.1 of the Environmental Protection Act, R.S.O. 1990, c. E. 19 (Environmental Protection Act) for approval of: - One (1) Wheelabrator Model 1616 No. 112 dust collector having an air to cloth ratio of 3.25:1, discharging to the air at a volumetric flow rate of 4.8 cubic metres per second through a stack having a diameter of 63.5 centimetres and extending 14.3 metres above grade; - One (1) Wheelabrator #1224S Model 168 dust collector having an air to cloth ratio of 3.13:1, discharging to the air at a volumetric flow rate of 23.6 cubic metres per second through a stack having a diameter of 162.6 centimetres and extending 23.2 metres above grade; - One (1) dust collector equipped with an automatic shaker, having an air to cloth ratio of 2.65:1, discharging to the air at a volumetric flow rate of 19.3 cubic metres per second through a stack having a diameter of 162.6 centimetres and extending 23.2 metres above grade; - One (1) Wheelabrator 1218-S Model 168 dust collector having an air to cloth ratio of 6.75:1, discharging to the air at a volumetric flow rate of 12.7 cubic metres per second through a stack having an exit diameter of 91 centimetres and extending 17.6 metres above grade; - One (1) Concentrate Dryer designated as "Copper 1" discharging to the air at a volumetric flow rate of 6.5 actual cubic metres per second through a stack having an exit diameter of 0.56 metres and extending 50 metres above grade and equipped with a continuous concentration monitoring system for sulphur dioxide; - One (1) Concentrate Dryer designated as "Copper 2" discharging to the air at a volumetric flow rate of 6.8 actual cubic metres per second through a stack having an exit diameter of 0.56 metres and extending 50 metres above grade and equipped with a continuous concentration monitoring system for sulphur dioxide; - One (1) Concentrate Dryer designated as "Zinc 1" discharging to the air at a volumetric flow rate of 7.5 actual cubic metres per second through a stack having an exit diameter of 0.56 metres and extending 50 metres above grade; - One (1) Concentrate Dryer designated as "Zinc 2" discharging to the air at a volumetric flow rate of

Content Copy Of Original Ministry of the Environment · 2017. 3. 18. · a side mounted rectangular exit, measuring 0.46 metre by 0.51 metre, at a height of 25 metres above grade;

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Content Copy Of Original Ministry of the Environment · 2017. 3. 18. · a side mounted rectangular exit, measuring 0.46 metre by 0.51 metre, at a height of 25 metres above grade;

Content Copy Of Original

Ministry of the Environment Ministère de l’Environnement

AMENDED ENVIRONMENTAL COMPLIANCE APPROVAL NUMBER 5313-9AHQDD 

Issue Date: December 12, 2013

Glencore Canada Corporation 10050 Highway 101 E Post Office Box, No. 2002 Timmins, Ontario P4N 7K1  

Site Location: Kidd Concentrator Site 10050 Highway 101 E Timmins City, District of Cochrane P4N 7K1

You have applied under section 20.2 of Part II.1 of the Environmental Protection Act, R.S.O. 1990, c.E. 19 (Environmental Protection Act) for approval of:

 - One (1) Wheelabrator Model 1616 No. 112 dust collector having an air to cloth ratio of 3.25:1,discharging to the air at a volumetric flow rate of 4.8 cubic metres per second through a stack having adiameter of 63.5 centimetres and extending 14.3 metres above grade;  - One (1) Wheelabrator #1224S Model 168 dust collector having an air to cloth ratio of 3.13:1,discharging to the air at a volumetric flow rate of 23.6 cubic metres per second through a stack havinga diameter of 162.6 centimetres and extending 23.2 metres above grade;  - One (1) dust collector equipped with an automatic shaker, having an air to cloth ratio of 2.65:1,discharging to the air at a volumetric flow rate of 19.3 cubic metres per second through a stack havinga diameter of 162.6 centimetres and extending 23.2 metres above grade;  - One (1) Wheelabrator 1218-S Model 168 dust collector having an air to cloth ratio of 6.75:1,discharging to the air at a volumetric flow rate of 12.7 cubic metres per second through a stack havingan exit diameter of 91 centimetres and extending 17.6 metres above grade;  - One (1) Concentrate Dryer designated as "Copper 1" discharging to the air at a volumetric flow rateof 6.5 actual cubic metres per second through a stack having an exit diameter of 0.56 metres andextending 50 metres above grade and equipped with a continuous concentration monitoring system forsulphur dioxide;  - One (1) Concentrate Dryer designated as "Copper 2" discharging to the air at a volumetric flow rateof 6.8 actual cubic metres per second through a stack having an exit diameter of   0.56 metres andextending 50 metres above grade and equipped with a continuous concentration monitoring system forsulphur dioxide;  - One (1) Concentrate Dryer designated as "Zinc 1" discharging to the air at a volumetric flow rate of7.5 actual cubic metres per second through a stack having an exit diameter of 0.56 metres andextending 50 metres above grade;  - One (1) Concentrate Dryer designated as "Zinc 2" discharging to the air at a volumetric flow rate of

Page 2: Content Copy Of Original Ministry of the Environment · 2017. 3. 18. · a side mounted rectangular exit, measuring 0.46 metre by 0.51 metre, at a height of 25 metres above grade;

7.5 actual cubic metres per second through a stack having an exit diameter of 0.56 metre andextending 50 metres above grade;  - One (1) wet type, counter current, multivane centrifugal scrubber equipped with a mist eliminator,located in the transfer tower area of the Concentrator Building, operating at a pressure drop of 12.7centimetres of Water Column, using water as a scrubbing solution at a liquid flow rate of 1.3 litres persecond, discharging into the air at a volumetric flow rate of 4.2 actual cubic metres per second througha side mounted rectangular exit, measuring 0.46 metre by 0.51 metre, at a height of 25 metres abovegrade;  - One (1) standby diesel generator set, having a rating of 200 kilowatts, to provide power for theTailings #2 Thickener Building during emergency situations;  - One (1) standby diesel generator set, having a rating of 20.9 kilowatts, to provide power for theAdministration Building during emergency situations;   - One (1) standby diesel generator set, having a rating of 100 kilowatts, to provide power for theTailings Management Area Pond E Building during emergency situations;   - One (1) standby diesel generator set, having a rating of 1,750 kilowatts, to provide power for theConcentrator Building during emergency situations;  - One (1) standby diesel generator set, having a rating of 200 kilowatts, to provide power for theTailings No. 2 Lime Station Building during emergency situations;   - One (1) standby diesel generator set, having a rating of 400 kilowatts, to provide power for theFrederick House River Pumphouse;  - One (1) multivane type wet scrubber, designated as Ore Receiving Wet Scrubber and located in theMontcalm Ore Receiving Building, used to treat dust created from trucks dumping crushed ore in to aloading pocket within the Montcalm Ore Receiving Building, having a water flow rate of 68 litres perminute and equipped with a mist eliminator, discharging to the air at a volumetric flow rate of 2.8 cubicmetres per second through a stack having an exit diameter of 0.64 metre and extending 11.6 metresabove grade;  - One (1) multivane type wet scrubber, designated as Montcalm Fine Ore Bin Scrubber - Top, andlocated in the Concentrator Building, used to treat dust from transferring and loading of crushed oreinto a fine ore bin silo, having a water flow rate of 115 litres per minute and equipped with a misteliminator, discharging to the air at a volumetric flow rate of 4.7 cubic metres per second through astack having an exit diameter of 0.69 metre and extending 45.9 metres above grade;  - One (1) multivane type west scrubber, designated as Montcalm Fine Ore Bin Scrubber - Bottom andlocated in the Concentrator Building, used to treat dust from unloading and transferring of crushed orefrom a fine ore bin silo to the grinding circuit, having a water flow rate of 72 litres per minute andequipped with a mist eliminator, discharging to the air at a volumetric flow rate of 4.2 cubic metres persecond through a stack having an exit diameter of 0.45 metre by 0.31 metre and extending 7.4 metresabove grade;  - One (1) baghouse type dust collector, located in the Concentrator Building and serving the soda ashsilo, used to treat emissions from loading of soda ash into the soda ash silo, having 284 square metresof cloth filter bags, equipped with a shaker cleaning mechanism, discharging to the air at a volumetricflow rate of 0.83 cubic metre per second through a stack having an exit diameter of 0.30 metre andextending 23.2 metres above grade;  

Page 3: Content Copy Of Original Ministry of the Environment · 2017. 3. 18. · a side mounted rectangular exit, measuring 0.46 metre by 0.51 metre, at a height of 25 metres above grade;

- One (1) lime storage and slaking system, located at the Tailings Management Area No. 2 LimeStation, complete with a lime storage silo with a capacity of 316 tonnes and equipped with a bin ventfilter with 22.6 square metres of  polyester filter bags and with a shaker cleaning mechanism,discharging into the air at a volumetric flow rate of 0.3 cubic metre per second through a rectangularair outlet, having an equivalent exit diameter of 0.28 metre, extending 1.2 metres above the roof and23.7 metres above grade;  - Exhausts from the Analytical Lab, discharging into the air as outlined in Schedule "A";  - Exhausts from the Maintenance Building, discharging into the air as outlined in Schedule "B";  - Natural gas fired comfort heating equipment as outlined in Schedule "C";  - One (1) natural gas fired boiler, having a maximum combined thermal input of 2.2 Gigajoules perhour, serving the Concentrator Building.  All in accordance with the Application for Environmental Compliance Approval submitted by GlencoreCanada Corporation (formerly Xstrata Canada Corporation) dated April 25, 2013 and signed by DavidYaschyshyn, the Emission Summary and Dispersion Modelling Report dated April 29, 2013 submittedby Hatch, the Acoustic Assessment Report dated November 8, 2013 and prepared by Tim Kelsall ofHatch, and all other supporting information and documentation submitted in support of the application. For the purpose of this environmental compliance approval, the following definitions apply: 1. "Air Quality Monitoring Manual" means the Ministry publication entitled "Operations Manual for AirQuality Monitoring in Ontario", dated March 2008, as amended;2. "Approval" means this Environmental Compliance Approval, including the application andsupporting documentation listed above;

3. "Company" means Glencore Canada Corporation, that is responsible for the construction oroperation of the Facility and includes any successors and assigns;

4. "Director" means a person appointed by the Minister pursuant to section 5 of the EPA;

5. "District Manager" means the District Manager of the appropriate local district office of the Ministry,where the Facility is geographically located;

6. "EPA" means the Environmental Protection Act, R.S.O. 1990, c.E.19, as amended;

7. "Equipment" means the dust collectors, boilers, heaters, generators, exhausts, scrubbers,concentrate dryers, and lime storage and slaking system described in the Company's applications, thisApproval and in the supporting documentation submitted with the applications, to the extent approvedby this Approval;

8. "Facility" means the entire operation located on the property where the Equipment is located;

9. "Manual" means a document or a set of documents that provide written instructions to staff of theCompany;

10. "Ministry" means the ministry of the government of Ontario responsible for the EPA and includesall officials, employees or other persons acting on its behalf;

11. "Montcalm Ore" means custom ore from the Montcalm Mine facility located at Malette Road Northin the Unorganized Township of Montcalm, District of Cochrane, Ontario;

12. "Publication NPC-205" means the Ministry Publication NPC-205, "Sound Level Limits for

Page 4: Content Copy Of Original Ministry of the Environment · 2017. 3. 18. · a side mounted rectangular exit, measuring 0.46 metre by 0.51 metre, at a height of 25 metres above grade;

Stationary Sources in Class 1 & Class 2 Areas (Urban)", October, 1995 as amended; and

13. "Publication NPC-232" means the Ministry Publication NPC-232, "Sound Level Limits forStationary Sources in Class 3 Areas (Rural)", October, 1995 as amended.

 You are hereby notified that this environmental compliance approval is issued to you subject to theterms and conditions outlined below: TERMS AND CONDITIONS OPERATION AND MAINTENANCE1. The Company shall ensure that the Equipment is properly operated and maintained at all times. The Company shall:

(1) prepare, not later than three (3) months after the date of this Approval, and update, as necessary, aManual outlining the operating procedures and a maintenance program for the Equipment, including:

(a) routine operating and maintenance procedures in accordance with good engineering practicesand as recommended by the Equipment suppliers;

(b) emergency procedures, including spill clean-up procedures;

(c) procedures for any record keeping activities relating to operation and maintenance of theEquipment;

(d) all appropriate measures to minimize noise and odorous emissions from all potentialsources; and

(e) the frequency of inspection and replacement of the filter material in the Equipment;

(2) implement the recommendations of the Manual.2. The Company shall ensure that a maximum of one (1) copper dryer and one (1) zinc dryer areoperated at any given time.

3. The Company shall operate the Facility at a production limit of up to a combined 3 million tonnes peryear of copper ore and zinc ore, and up to a combined 1 million tonnes per year of Montcalm Ore andcustom ore.

FUGITIVE DUST CONTROL

  3. The Company shall develop in consultation with the District Manager and acceptable to the Director,a Best Management Practices Plan for the control of fugitive dust emissions. This Best ManagementPractices Plan shall include, but not be limited to:  (1) identification of the main sources of fugitive dust emissions such as: 

(a) on-site traffic; (b) paved roads/areas; (c) unpaved roads/areas; (d) material stock piles; (e) loading/unloading areas and loading/unloading techniques; 

Page 5: Content Copy Of Original Ministry of the Environment · 2017. 3. 18. · a side mounted rectangular exit, measuring 0.46 metre by 0.51 metre, at a height of 25 metres above grade;

(f) material spills; (g) material conveyance systems; (h) exposed openings in process and storage buildings; (i) general work areas; and (j) tailings management areas. 

(2) potential causes for high dust emissions and opacity resulting from these sources;  (3) preventative and control measures in place or under development to minimize the likelihood of highdust emissions and opacity from the sources of fugitive dust emissions identified above.  Details of thepreventative and control measures shall include: 

(a) a description of the control equipment to be installed; (b) a description of the preventative procedures to be implemented; and/or (c) the frequency of occurrence of periodic preventative activities, including material applicationrates, as applicable. 

(4) an environmental training program for all personnel (including contractors) on Best ManagementPractices related to fugitive dust emission identifying the topics and methods of training and therequired frequency;   (5) an environmental Facility inspection plan, including but not limited to: 

(a) documented inspection procedures for the Facility and air emission control equipment,including procedures to address deficiencies identified as a result of inspections;

(b) documented procedures for the reporting of the inspection results;

(c) documented schedule for inspections, including time and responsibilities for inspecting andcorrecting deficiencies identified; and

(d) procedures for detecting fugitive emissions;  (6) an implementation schedule for the Best Management Practices Plan, including the training offacility personnel;  (7) inspection and maintenance procedures and monitoring initiatives to ensure effectiveimplementation of the preventative and control measures; and  (8) a list of all Ministry comments received, if any, on the development of the Best ManagementPractices Plan, and a description of how each Ministry comment was addressed in the BestManagement Practices Plan.  4. The Company shall submit the Best Management Practices Plan to the Director and the DistrictManager not later than three months after the date of this Certificate.  (1) the Director may not accept the Best Management Practices Plan if the minimum requirementsdescribed in Condition No. 3 were not included in the Best Management Practices Plan.  (2) if the Best Management Practices Plan is not accepted by the Director, the Company shall submit aBest Management Practices Plan acceptable to the Director not later than nine months after the dateof this Certificate;  

Page 6: Content Copy Of Original Ministry of the Environment · 2017. 3. 18. · a side mounted rectangular exit, measuring 0.46 metre by 0.51 metre, at a height of 25 metres above grade;

5. Upon acceptance of the Best Management Practices Plan by the Director, the Company shallimmediately implement the Best Management Practices Plan for the control of fugitive dust emissionsto provide effective dust suppression measures to any potential sources of fugitive dust emissionsresulting from the operation of the Facility.  DOCUMENTATION REQUIREMENTS  6. The Company shall record, in a log book, each time a specific preventative and control measuredescribed in the Best Management Practices Plan is implemented. The Company shall record, as aminimum:  (1) the date when each emission control measure is installed, including a description of the controlmeasure;  (2) the date when each new preventative measure or operating procedure to minimize emissions isimplemented, including a description of the preventative measure or operating procedure; and  (3) the date, time of commencement, and time of completion of each periodic activity conducted tominimize emissions, including a description of the preventative measure/procedure and the name ofthe individual performing the periodic activity.  RECORD RETENTION7. The Company shall retain, for a minimum of two (2) years from the date of their creation, all recordsand information related to or resulting from the recording activities required by this Approval, and makethese records available for review by staff of the Ministry upon request. The Company shall retain:

  (1) all records on the maintenance, repair and inspection of the Equipment;   (2) the log book which contains all records on the preventative and control measures implemented foreach source of fugitive dust emission identified in the Best Management Practices Plan;  (3) all records on the environmental complaints; including: 

(a) a description, time, date and location of each incident;  (b) wind direction and other weather conditions at the time of the incident;  (c) the name(s) of Company personnel responsible for handling the incident;  (d) the cause of the incident;  (e) the Company response to the incident; and  (f) a description of the measures taken to address the cause of the incident and to prevent asimilar occurrence in the future, and the outcome of the measures taken.  

8 . REPORTING REQUIREMENTS  8.1 The Company shall provide the District Manager no later than March 31 of each year, an annualreport that shall include, as a minimum, the following:  

Page 7: Content Copy Of Original Ministry of the Environment · 2017. 3. 18. · a side mounted rectangular exit, measuring 0.46 metre by 0.51 metre, at a height of 25 metres above grade;

(1) A summary of the records produced by the continuous concentration monitoring systems on theCopper 1 dryer stack and Copper 2 dryer stack, and an evaluation of the performance of thecontinuous concentration monitoring systems including malfunctions;  (2) A record of any upset events including time, date, reason for upset, any remedial actions taken,and any measures to prevent such upsets in future.  9. AMBIENT AIR MONITORING  9.1 The Company shall carry out and maintain an ambient air monitoring program in accordance withthe Air Quality Monitoring Manual at locations agreed to by the District Manager and the Company, forthe measurement of test contaminants accepted by the District Manager, and by methods andequipment accepted by the District Manager.  The Company shall:   (a) submit a detailed plan of the ambient air monitoring program in accordance with the Air QualityMonitoring Manual to the District Manager within a time period acceptable to the District Manager, andfinalize the monitoring program in consultation with the District Manager;(b) implement the ambient air monitoring program within a time period acceptable to the DistrictManager, after the program has been accepted by the District Manager; and

(c) submit the ambient air monitoring data and summary reports on the ambient air quality monitoringprogram as per the requirements of the Air Quality Monitoring Manual to the District Manager, or on analternative frequency acceptable to the District Manager.

NOTIFICATION

10. The Company shall notify the District Manager of each environmental complaint verbally within two(2) business days of the complaint, and in writing within five (5) business days of the complaint.  Thewritten notification shall include:

(1) a description of the nature of the complaint;

(2) the time and date of the incident to which the complaint relates.

  (3) the wind direction and other weather conditions at the time of the incident; and  (4) the name(s) of Company personnel responsible for handling the incident.  11. The Company shall notify the District Manager in writing at least ninety (90) days prior to theprocessing of any custom ore at the Facility, except for Montcalm ore. The written notification shallinclude:  (1) The composition of the custom ore to be processed, including metal contents;(2) Dispersion modelling results and an assessment of compliance with the standards under O. Reg.419/05 during processing of the custom ore referred to in Condition 11(1).

NOISE PERFORMANCE

12. The Company shall, at all times, ensure that the noise emissions from the Facility comply with thelimits set out in Ministry Publication NPC-205 or Publication NPC-232, as applicable.

  

SCHEDULE "A" 

Page 8: Content Copy Of Original Ministry of the Environment · 2017. 3. 18. · a side mounted rectangular exit, measuring 0.46 metre by 0.51 metre, at a height of 25 metres above grade;

Exhausts from Analytical Lab   

 Exhaust Volumetric Flow

Rate (actual cubicmetres per

second)

Stack ExitDiameter (metres)

Stack HeightAbove Roof

(metres)

Stack HeightAbove Grade

(metres)

Analytical Lab BH 13.0 0.51 x 1.17 1.0 9.7Analytical Lab

Central Bank FumeExhaust

13.8 0.92 9.0 17.5

Perchloric AcidStack

1.13 1.31 x 0.64 5.6 14.3

Balance RoomFume HoodExhaust

0.52 0.18 x 0.22 0.9 9.6

Standards RoomFume HoodExhaust (2)

0.47 0.16 3.0 11.7

Fire Assay MainFume Exhaust

2.74 0.35 x 0.42 0.9 3.6

Fire AssaySlagging Exhaust

0.94 0.20 x 0.25 0.9 3.6

Fire Assay PartingExhaust Fan #26

1.20 0.20 x 0.25 0.9 3.6

Atomic AbsorptionExhaust Fan #9

0.87 - 0.9 9.6

Atomic AbsorptionExhaust Fan #8

0.38 - 0.9 9.6

Main Claisse FluxerExhaust

0.05 - 0.9 9.6

ICP Exhaust Fan#14

0.24 0.15 x 0.18 0.9 9.6

Chem Lab ClaisseFluxer Exhaust Fan

#16

0.51 0.20 0.7 9.4

Heating Boilers - 0.76 8.0 17.0 

SCHEDULE "B" Exhausts from Maintenance Building 

  

Exhaust Stack VolumetricFlow Rate (actualcubic metres per

second)

Stack ExitDiameter (metres)

Stack HeightAbove Roof

(metres)

Stack HeightAbove Grade

(metres)

Central FumeExtracting System

#1

8.09 0.45 x 0.50 1.2 11.9

Heating Boilers - 0.9 6.1 17.2SCHEDULE "C" 

Comfort Heating Sources  

Page 9: Content Copy Of Original Ministry of the Environment · 2017. 3. 18. · a side mounted rectangular exit, measuring 0.46 metre by 0.51 metre, at a height of 25 metres above grade;

Building Source Area Location Firing Rate(kilojoules per

hour)

Vent Size(centimetres)

ConcentratorBuilding

SPACE HEATER26007 EAST WALL D-DIV FLOT-MONTCALM

MET CONC.MONTCALMGENERAL

1,318,820 30

ConcentratorBuilding

DOOR HEATER 26-011 - EAST DOORREAGENT

MET CONC.GENERAL

1,529,831 30

ConcentratorBuilding

SPACE HEATER 26-018 LOAD OUTBOTTOM EAST

MET CONC.GENERAL

3,297,050 36

ConcentratorBuilding

SPACE HEATER 26-019 LOAD OUTBOTTOM WEST

MET CONC.GENERAL

1,645,887 30

ConcentratorBuilding

SPACE HEATERCONC. DRY AREA

MET CONC.GENERAL

1,978,230 30

ConcentratorBuilding

DOOR HEATERREAGENT EASTWALL

MET CONC.GENERAL

923,174 30

ConcentratorBuilding

SPACE HEATERMILL PUMPROOM

MET CONC.GENERAL

1,318,820 30

ConcentratorBuilding

SPACE HEATERMILL PUMPROOM

MET CONC.GENERAL

1,318,820 30

ConcentratorBuilding

SPACE HEATERABOVE CENTRALCONTROL

MET CONC.GENERAL

329,705 30

ConcentratorBuilding

DOOR HEATERREAGENT S0. WALLCENTRE

MET CONC.GENERAL

923,174 30

ConcentratorBuilding

DOOR HEATERREAGENT SOUTHWALL

MET CONC.GENERAL

1,318,820 30

ConcentratorBuilding

SPACE HEATERDRYERS NORTHEAST CORNER

MET CONC.GENERAL

1,120,997 30

ConcentratorBuilding

SPACE HEATER "A"GRIND WEST WALL

MET CONC.GENERAL

1,318,820 30

ConcentratorBuilding

SPACE HEATERDRYERS WEST END

MET CONC.GENERAL

1,123,634 30

ConcentratorBuilding

DOOR HEATER "D"GRIND DOOR 115 -MONTCALM

MET CONC.MONTCALMGENERAL

1,846,348 30

ConcentratorBuilding

DOOR HEATER 26-064 "D" GRIND S.E.CORNER-MONTCALM

MET CONC.MONTCALMGENERAL

1,529,831 30

ConcentratorBuilding

NO.1 GAS FIREDUNIT HEATERLOCATED AT TAILEND OF NP-16CONVEYOR

MET COPPERUNLOADINGBUILDING

63,303 10

Concentrator NO.2 NATURAL GAS MET COPPER 211,011 15

Page 10: Content Copy Of Original Ministry of the Environment · 2017. 3. 18. · a side mounted rectangular exit, measuring 0.46 metre by 0.51 metre, at a height of 25 metres above grade;

Building UNLOADINGBUILDING TAIL ENDOF NB-49TRANSFER TOWERHEATER

UNLOADINGBUILDING

ConcentratorBuilding

HEATER ABOVECRUSHER SHOP

MET CONC.GRINDING

1,846,348 30

ConcentratorBuilding

#6 CONVEYORTAKE-UP TOWERSPACE HEATER -MONTCALM

MET CONC.MONTCALMLOAD IN

232,112 15

ConcentratorBuilding

MAKE-UP HEATERDRYERS BOTTOMFLOOR

MET CONC.GENERAL

3,745,448 NO VENT

ConcentratorBuilding

MAKE-UP HEATER26008-ABOVE MILLOFFICE

MET CONC.GENERAL

5,275,279 NO VENT

ConcentratorBuilding

MAKE-UP HEATER26-010: REAGENTEAST WALL

MET CONC.GENERAL

5,803 NO VENT

ConcentratorBuilding

MAKE-UP HEATEREAST END LOAD IN

MET CONC.GENERAL

1,371,573 NO VENT

ConcentratorBuilding

MAKE-UP HEATERTOP C HI-VOLTROOM

MET CONC.GENERAL

3,692,695 NO VENT

ConcentratorBuilding

PINION FLOORMAKE-UP HEATER

MET CONC.GENERAL

696,337 NO VENT

ConcentratorBuilding

MAKE-UP HEATERCRUSHER NORTHWALL

MET CONC.GENERAL

4,009,212 NO VENT

ConcentratorBuilding

GAS MAKE-UPHEATER - TOPFLOOR DRY AREA

MET CONC.GENERAL

6,330,335 NO VENT

ConcentratorBuilding

MAKE-UP HEATERTRIPPER WEST END

MET CONC.GENERAL

152,983 NO VENT

ConcentratorBuilding

MAKE-UP HEATERABOVE "A" HI-VOLTRM

MET CONC.GENERAL

8,440,447 NO VENT

ConcentratorBuilding

MAKE-UP HEATERUNDER "A" LO-VOLTRM

MET CONC.GENERAL

3,745,448 NO VENT

ConcentratorBuilding

MAKE-UP HEATER"A" FLOC WESTWALL

MET CONC.GENERAL

5,275,279 NO VENT

ConcentratorBuilding

MAKE-UP HEATERCOMPRESSORROOM

MET CONC.GENERAL

3,692,695 NO VENT

ConcentratorBuilding

MAKE-UP HEATER26-065 TRANSFERTOWER

MET CONC.GENERAL

2,637,640 NO VENT

ConcentratorBuilding

MAKE-UP HEATER26-066 TRIPPEREAST END

MET CONC.GENERAL

4,220,223 NO VENT

Concentrator MAKE-UP HEATER MET CONC. 6,330,335 NO VENT

Page 11: Content Copy Of Original Ministry of the Environment · 2017. 3. 18. · a side mounted rectangular exit, measuring 0.46 metre by 0.51 metre, at a height of 25 metres above grade;

Building 26-067 CRUSHERNO. WALL

GENERAL

ConcentratorBuilding

MAKE-UP HEATER26-068 CRUSHERCOLD STORAGE

MET CONC.GENERAL

6,330,335 NO VENT

ConcentratorBuilding

MAKE-UP HEATER26-070 TRIPPERWEST END

MET CONC.GENERAL

4,220,223 NO VENT

ConcentratorBuilding

GAS MAKE-UPHEATER - WESTEND CRUSHERCOLD STORAGE

MET CONC.GENERAL

2,637,640 NO VENT

ConcentratorBuilding

MAKE-UP HEATER26-116 TOP OF LOADOUT

MET CONC.GENERAL

2,089,011 NO VENT

ConcentratorBuilding

NO.1 MAKE-UPHEATER 26-163PILOT PLANT

MET CONC.GENERAL

928,449 NO VENT

ConcentratorBuilding

NO.2 DOOR HEATER26-182 PILOT PLANT(MAKE UP HEATER)

MET CONC.GENERAL

1,846,348 NO VENT

ConcentratorBuilding

MAKE-UP HEATER26-208 LOAD INWEST ENTRY

MET CONC.GENERAL

1,371,573 NO VENT

ConcentratorBuilding

MAKE-UP HEATER26-217 ABOVE "D"H.V. RM -MONTCALM

MET CONC.MONTCALMGENERAL

4,589,493 NO VENT

ConcentratorBuilding

MAKE-UP HEATERFOR SEWAGEPLANT

MET CONC.GENERAL

263,764 NO VENT

ConcentratorBuilding

MAKE-UP HEATER26-237 LOAD OUTSECOND FL

MET CONC.GENERAL

2,637,640 NO VENT

ConcentratorBuilding

CUSTOM ORETRANSFER HOUSEEAST (MAKE UP AIRUNIT)

MET CONC.LOAD IN

791,292 NO VENT

MaintentanceBuilding 

NO. 3 GAS MAKE-UPHEATER WHSE

MET SHOPS(OTHER)

1,886,967 NO VENT

MaintentanceBuilding

NO. 4 GAS MAKE-UPHEATER

MAINWAREHOUSE

1,886,967 NO VENT

MaintentanceBuilding

NO. 8 GAS MAKE-UPHEATER

MET SHOPS(OTHER)

1,886,967 NO VENT

MaintentanceBuilding

NO. 10 GAS MAKE-UP HEATER

MET SHOPS(OTHER)

1,886,967 NO VENT

MaintentanceBuilding

NO. 12 GAS MAKE-UP HEATER

MET SHOPS(OTHER)

628,814 NO VENT

MaintentanceBuilding

NO. 13 GAS MAKE-UP HEATER

MET SHOPS(OTHER)

1,257,627 NO VENT

Analytical Lab GAS MAKE-UPHEATER

MET CENTRALLAB (OTHER)

8,366,593 NO VENT

The reasons for the imposition of these terms and conditions are as follows:

Page 12: Content Copy Of Original Ministry of the Environment · 2017. 3. 18. · a side mounted rectangular exit, measuring 0.46 metre by 0.51 metre, at a height of 25 metres above grade;

 1. Condition Nos. 1, 2, 3, 4 and 5 are included to emphasize that the Equipment must be maintainedand operated according to a procedure that will result in compliance with the EPA, the Regulations andthis Approval.2. Condition Nos. 6, 7 and 8 are included to require the Company to keep records and to provideinformation to staff of the Ministry so that compliance with the EPA, the Regulations and this Approvalcan be verified.

3. Condition No. 9 is included to require the Company to gather accurate information so that theenvironmental impact and subsequent compliance with the EPA, the Regulations and this Approvalcan be verified.

4. Condition Nos. 10 and 11 are included to require the Company to notify staff of the Ministry so as toassist the Ministry with the review of the site's compliance with the EPA, the Regulations and thisApproval.

  5. Condition No. 12 is included to provide the minimum performance requirements considerednecessary to prevent an adverse effect resulting from the operation of the Facility. Upon issuance of the environmental compliance approval, I hereby revoke Approval No(s). 8-5016-76-006, 8-5035-76-006, 8-5012-77-917, 8-6005-96-006, 3839-62AJ7K, 9437-7BMK39, 5879-7EUPGU, 7358-86RJK5, 2395-87TPW8  issued on May 26, 1976, August 13, 1976, June 14, 1991,April 15, 1996, June 28, 2004, February 28, 2008, May 22, 2008, July 5, 2010, September 30,2010.

 In accordance with Section 139 of the Environmental Protection Act, you may by written Notice servedupon me, the Environmental Review Tribunal and in accordance with Section 47 of the EnvironmentalBill of Rights, 1993 , S.O. 1993, c. 28 (Environmental Bill of Rights), the Environmental Commissioner,within 15 days after receipt of this Notice, require a hearing by the Tribunal. The EnvironmentalCommissioner will place notice of your appeal on the Environmental Registry. Section 142 of theEnvironmental Protection Act provides that the Notice requiring the hearing shall state:  1. The portions of the environmental compliance approval or each term or condition in theenvironmental compliance approval in respect of which the hearing is required, and; 2. The grounds on which you intend to rely at the hearing in relation to each portion appealed.  Pursuant to subsection 139(3) of the Environmental Protection Act, a hearing may not be required withrespect to any terms and conditions in   this environmental compliance approval, if the terms andconditions are substantially the same as those contained in an approval that is amended or revoked bythis environmental compliance approval.    The Notice should also include:  3. The name of the appellant; 4. The address of the appellant; 5. The environmental compliance approval number; 6. The date of the environmental compliance approval; 7. The name of the Director, and; 8. The municipality or municipalities within which the project is to be engaged in.  And the Notice should be signed and dated by the appellant. 

Page 13: Content Copy Of Original Ministry of the Environment · 2017. 3. 18. · a side mounted rectangular exit, measuring 0.46 metre by 0.51 metre, at a height of 25 metres above grade;

 This Notice must be served upon:  The Secretary* Environmental ReviewTribunal 655 Bay Street, Suite1500 Toronto, Ontario M5G 1E5

AND

The EnvironmentalCommissioner 1075 Bay Street, Suite605 Toronto, Ontario M5S 2B1

AND

The Director appointed for thepurposes of Part II.1 of theEnvironmental Protection Act Ministry of the Environment 2 St. Clair Avenue West, Floor12A Toronto, Ontario M4V 1L5

 * Further information on the Environmental Review Tribunal ’s requirements for an appeal canbe obtained directly from the Tribunal at: Tel: (416) 212-6349, Fax: (416) 314-4506 orwww.ert.gov.on.ca  This instrument is subject to Section 38 of the Environmental Bill of Rights, 1993, that allows residentsof Ontario to seek leave to appeal the decision on this instrument. Residents of Ontario may seekleave to appeal within 15 days from the date this decision is placed on the Environmental Registry. Byaccessing the Environmental Registry at www.ebr.gov.on.ca , you can determine when the leave toappeal period ends.  The above noted activity is approved under s.20.3 of Part II.1 of the Environmental Protection Act. 

DATED AT TORONTO this 12th day of December,2013

Rudolf Wan, P.Eng. Director appointed for the purposes of Part II.1 ofthe Environmental Protection Act

NR/ c: District Manager, MOE Timmins Roki Fukuzawa, P.Eng., Hatch Ltd.