20
Contents 02 At a Glance 04 History 06 Yard and Facilities 10 our Products 11 • FPSO 12 • FLNG 13 • Semisubmersible Unit 14 • Platform 15 • Land-Based Module 16 • Jack-Up Production Drilling and Quarter 17 • Substructure 18 • Marine Terminal and Jetty 19 our services 20 • Offshore Installation 21 • Hook-Up and Commissioning 22 Research and Development 24 Quality Management 25 Hse Management 26 Lifestyle services 28 Performance Record 38 Global network oFFsHoRe & enGIneeRInG Contact Point HEAD OFFICE 1000 Bangeojinsunhwando-ro, Dong-gu, Ulsan, South Korea TEL : 82-52-202-1121, 203-4992 FAX : 82-52-202-1976, 1977 E-mail : [email protected] HOE-2015 09 210 mm x 297 mm (Merit)

Contact Point oFFsHoRe & TEL : 82-52-202-1121, 203 … · for mounting the 12,112 ton topside on the hull of the FPU by lifting it 53 m above the ground. Transocean, Sedco 714 Norsk

  • Upload
    vudang

  • View
    217

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Contact Point oFFsHoRe & TEL : 82-52-202-1121, 203 … · for mounting the 12,112 ton topside on the hull of the FPU by lifting it 53 m above the ground. Transocean, Sedco 714 Norsk

Contents

02 AtaGlance

04 History

06 YardandFacilities

10 ourProducts

11 •FPSO

12 •FLNG

13 •SemisubmersibleUnit

14 •Platform

15 •Land-BasedModule

16 •Jack-UpProductionDrillingandQuarter

17 •Substructure

18 •MarineTerminalandJetty

19 ourservices

20 •OffshoreInstallation

21 •Hook-UpandCommissioning

22 ResearchandDevelopment

24 QualityManagement

25 HseManagement

26 Lifestyleservices

28 PerformanceRecord

38 Globalnetwork

oFFsHoRe&enGIneeRInG

ContactPoint

HEADOFFICE

1000 Bangeojinsunhwando-ro, Dong-gu, Ulsan, South Korea

TEL : 82-52-202-1121, 203-4992 FAX : 82-52-202-1976, 1977

E-mail : [email protected]

HOE-201509210mmx297mm(Merit)

Page 2: Contact Point oFFsHoRe & TEL : 82-52-202-1121, 203 … · for mounting the 12,112 ton topside on the hull of the FPU by lifting it 53 m above the ground. Transocean, Sedco 714 Norsk

HHI OFFSHORE & ENGINEERING 02/03

HHI’s Offshore & Engineering Division is the best partner to execute and implement EPIC projects in the fields of the oil and gas

industry, combining the world’s largest production capabilities in yards and facilities with our people’s proven technology and ex-

periences.

The Division gears up itself for any challenges of the offshore energy development by building up our competencies in all phases

of projects, which encompasses engineering, procurement, construction, offshore installation and project management for all types

of offshore oil and gas facilities.

BestePICContractorforoffshoreoilandGasProjects

offshore

&engineering

D

ivision

Design&Engineering

ProjectManagement

(andControl)

BusinessDevelopment

&Marketing

Hook-up&

Commissioning

Fabrication&

Construction

OffshoreInstallation

Procurement

•FixedPlatform

-Topside / Module / Quarter /

Jacket/Pile

•Floater

-FPSO/FSO/FPU/FLNG

-Production/DrillingUnit

(Semisubmersible / Jack-up /

TLP/SPAR/Others)

•Land-BasedModule(PAU/PAR)

•OffshorePipeline

AtaGlance

HHI’sstrongValueChainforenergyIndustry

Hyundai Heavy Industries (HHI) has been in the shipbuilding industry since

1972, committed to delivering high quality ships through well-equipped

large production yards and facilities, state-of-the-art engineering solu-

tions and advanced shipbuilding technologies.

HHI has now merged as a leading integrated heavy industry company

specializing in shipbuilding, offshore and engineering, industrial plant

and engineering, marine engines and machinery, electro electric systems,

green energy and construction equipment.

HHI’s unique business portfolio creates strong value chains for the energy

industry to provide optimal solutions, leveraging the expertise and experi-

ence from HHI’s business divisions to adapt to a wide range of our clients’

needs around the world.

HHI’s wealth of capabilities and experiences as a reliable contractor in the

heavy industry fields ensure that a high level of customer satisfaction can

be achieved, while maintaining competitive advantage in product, value

and price.

HHIBusinessDivisions

LNG/LPG Carriers, Containerships, Tankers, VLOO Car-

riers, Product Carriers, Pure Car Carriers, Bulk / OBO

Carriers, Drillships, LNG FSRU, Naval & Special Ships

shipbuilding

Floater, FLNG, Platform, Land-based Module, Semi-

submersible, Jack-up Production Drilling & Quarter,

Substructure, Marine Terminal & Jetty

offshore&engineering

Thermal Power Plants, Combined Cycle Power Plants,

Co-generation Plants, Oil & Gas Plants, LNG Liquefac-

tion, Refineries, Petrochemical Plants

IndustrialPlant&engineering

Marine Engines & Machinery, Engine Power Plants,

Industrial Machinery, Robot & Automation

engine&Machinery

Transformers, Gas Insulated Switchgear, Switchgear,

Power Automation, Low & Medium Voltage Circuit

Breakers, Rotating Machinery, Power Electronics, Auto-

mation Systems

electroelectricsystems

Hydraulic Excavators, Wheel Loaders, Backhoe Loaders,

Skid Steer Loaders, Forklift Trucks, Rollers, Hydraulic

Machinery

Constructionequipment

Solar Module, Solar Inverter, Total PV Solution

Greenenergy

Page 3: Contact Point oFFsHoRe & TEL : 82-52-202-1121, 203 … · for mounting the 12,112 ton topside on the hull of the FPU by lifting it 53 m above the ground. Transocean, Sedco 714 Norsk

HHI OFFSHORE & ENGINEERING 04/05

History

traditionofGrowthtowardsBestPartnerforoffshoreenergyBusiness

Since1976,HHI’sOffshore&EngineeringDivisionstartedthefabricationofsmall-sizedoffshorefixedplatformsand

subseapipe-layingprojects,andgrewtobeaworld-classfabricatorequippedwithadvancedyardfacilities,skillfullabor

andefficientconstructionmanagementsystems.

Duringtheperiodoftheseearlyyears,theDivisionlaidthefoundationforHHItogrowasanEPICcontractorbyacquir-

ingthecorecapabilitiesfortheexecutionofoffshoreprojects.

Past(1976-1990)

TheOffshore&EngineeringDivisionhasevolvedtobecomeanEPICcontractorprovidingfullyintegratedengineering,

procurement,construction,installationandprojectmanagementservices.

Duringtheperiod,theDivisionhasdramaticallyexpandedtherangeofservicestoallkindsofoffshoreprojects:FPSO,

FPU,semisubmersible,jack-up,TLP,andland-basedprocessfacilitiesandhascompletedmorethan170projectsinclud-

ing100EPICprojectsfortheoilandgasindustry.

Present(1991-2015)

HHI’sOffshore&EngineeringDivisionpursuesfurthergrowthasareliablepartnerintheoilandgasindustry,backedbyrich

experiencesandtechnologyaccumulatedthroughthesuccessfulexecutionofvariousEPICprojects.

Ourgoalistoprovideclientswithacost-effectivetotalsolutionthatcanmeettheirintegratedfielddevelopmentplans.

Beyond

1976Construction contract for

OSTT from Saudi Arabia

1989Delivered the world’s biggest

Jacket (40,000 tons) to Exxon

2002Set Guinness World Record for

the assembly of an on-ground

‘super lift’ of 12,112 tons for

Na Kika FPU

2004Delivered the world’s

largest FPSO (Kizomba-

A FPSO 343,000 DWT /

ExxonMobil)

The Offshore & Engineering Division of HHI has a long history of supporting the offshore oil and gas industry by providing engineer-

ing, procurement, construction, offshore installation and project management services.

Starting as a fabricator of offshore structures, the Division has continuously repositioned itself as an integrated solution provider for

the oil and gas industry. HHI’s commitment to innovation and experience turned the challenges into opportunities, allowing us to

renew our goals and continuously push the boundaries of offshore projects.2009Completed H-Dock

specializing in FPSO

construction

2011Lifted the world’s largest

offshore platform

(North Rankin B

/ 23,178 tons)

2015Delivered the world’s

largest cylindrical FPSO

(Goliat FPSO)

Page 4: Contact Point oFFsHoRe & TEL : 82-52-202-1121, 203 … · for mounting the 12,112 ton topside on the hull of the FPU by lifting it 53 m above the ground. Transocean, Sedco 714 Norsk

HHI OFFSHORE & ENGINEERING 06/07

YardandFacilities

Well-equippedtoDeliverReliableandVersatilesolutions

HHI’s main offshore yard is located at Ulsan Port, which is 5 km away from its headquarter office in Ulsan, Korea. The yard spreads

over 1,180,757 ㎡ of paved area with world-class construction facilities.

HHI built a new drydock in its offshore yard in February 2009. The drydock specializes in building large size offshore floating facilities

including FPSO, FPU, semisubmersible and even large size FLNGs. It measures 490 m in length, 115 m in width, and 13.5 m in depth

with a capacity of 1 million DWT. The dock covers the same area as seven soccer fields and it is equipped with two 1,600 ton goliath

cranes. This allows HHI to simultaneously build both the hull and topside in the same dock.

HHI also added a 10,000 ton heavy lift vessel (HLV), Hyundai 10000, to its offshore facility in March 2015. The vessel equipped with

eight double truss jib cranes measures 182 m in length, 70 m in width and 11 m in depth. With the addition of HLV, HHI’s maximum

lifting capacity per module increased more than six-fold from 1,200 tons to 8,000 tons.

MainoffshoreYard

780,915m2

198,092m2

Assembly Areas

Shop and others979,007m2 201,750m2 1,180,757m2

onsanYard

102,470m2

99,280m2

total

883,385m2

297,372m2

HyundainewForeigners’Apartment13

Pre-fabrication&sub-assemblyshop14

Paintingshop#2/#315

officeBuilding#516

officeBuilding#41

Assemblyshop#22

officeBuilding#13

Paintingshop#14

1,600tonGoliathCrane5

H-Dock6

Assemblyshop#19

officeBuilding#210

Mainoffice11

officeBuilding#312

technicalBuilding7

engineeringoffice8

1 2

3

4

5

7

6

8 9

10 11

13

12

14

1516

5

oFFsHoReYARDLAYoUt

Page 5: Contact Point oFFsHoRe & TEL : 82-52-202-1121, 203 … · for mounting the 12,112 ton topside on the hull of the FPU by lifting it 53 m above the ground. Transocean, Sedco 714 Norsk

HHI OFFSHORE & ENGINEERING 08/09

HHIoffshoreMarineConstructionFleets

Crane Barge

Derrick / Pipelay Barge

Pipelay Barge

Derrick Barge

Launch Barge

Transportation Barge

Cargo Barge

Submersible Barge (Double Barge Unit)

Tug / Anchor Boat

Hyundai 10000

Hyundai 2500

Hyundai 423

Hyundai 60

Hyundai 289

Hyundai 1000

Hyundai B 1006

Hyundai B 1003

Hyundai B 1008

Hyundai B 1011 / 1012

He Yang O Ho

182 x 70 x 11

130 x 36 x 10.5

122 x 39 x 17

187 x 35 x 15

107 x 22 x 7

120 x 32 x 10

168 x 40 x 9.5

114.7 x 29.4 x 6.6

75 x 18 x 3.8

140 x 37 x 12

41 x 11 x 4.8

10,000 ton

500 kips, Max. 60 inch, 2,500 ton

450 kips, Max. 66 inch

540 kips, Max. 60 inch, 1,800 ton

140 kips, Max. 48 inch

1,000 ton

Max. Deck Load 12.7 ton / m2

Max. Deck Load 13.6 ton / m2

Max. Deck Load 25 ton / m2

Max. Deck Load 25 ton / m2

Cargo Dead Weight 560 ton

Name Dimension (m) CapacityType

Load-outequipment

- Air Pads System (APS-M250D) : 140 ea

- Hydraulic Jack (300 ton) : 16 ea

- Hydraulic Jack (250 ton) : 400 ea

- Push Pull System (Kenmark) : 3,000 ton

- Winches (75 ~ 10 ton) : 78 ea

- Submersible Barge : 2 ea

Load-outexperience

- 39,700 ton (Harmony Jacket, Exxon)

- 24,000 ton (Harding PDQ Jack-up, BP)

- 29,000 ton (Deepwater Nautilus, R&BF)

- 53,000 ton (Amenam FSO, Total)

- 17,000 ton (Bayu-Undan Topside, ConocoPhillips)

- 13,500 ton (Umm Shaif Topside, ADMA-OPCO)

- 23,500 ton (North Rankin ‘B’ Topside, Woodside)

- 29,500 ton (Bongkot Topside, PTTEP)

- 21,400 ton (Shwe Topside, Daewoo International)

- 13,400 ton (Ofon Phase 2, Topside, Total)

Yard and Facilities

Hyundai2500 Hyundai60 Hyundai423

Hyundai10000

1,650

1,600

1,290

900

450

800

550

450 ~ 45

1,000 ~ 800

600

500

300

200 ~ 150

Super-Gantry

Cranes

Crawler Cranes

Hydraulic

Transporters

1

2

2

2

4

4

4

30

8

4

11

24

7

2

2

1

14

1

7

1

2

2

4

2

3

16

8

4

10

17

7

Capacity (ton) HHI Offshore Yard ShipyardEquipment

HHIMajorConstructionequipment

Shell,NaKikaFPULoadoutTotal,AmenamFSOLoadout

Page 6: Contact Point oFFsHoRe & TEL : 82-52-202-1121, 203 … · for mounting the 12,112 ton topside on the hull of the FPU by lifting it 53 m above the ground. Transocean, Sedco 714 Norsk

Since 1996 with two EPC contracts from Petrobras for the conversion of P-33 and P-35 FPSO, HHI has delivered 10 world class FPSOs

to clients including the recent ENI’s Goliat FPSO and BP’s Quad 204 FPSO which can be stored up to 1.0 million barrels of oil.

HHI’s track record of FPSOs not only demonstrates HHI’s construction capabilities for floating production systems, but also shows our

record for fostering continuous working relationships with our clients.

The recent emphasis on offshore deepwater projects has led to an increased demand for floating production systems such as FPSOs,

FSOs, FPUs, semisubmersible units and so on.

FPsoFloatingProductionstorageandoff-Loading

Petrobras,P33&P35FPSO

Total,UsanFPSO

ENI,GoliatFPSO

BP,Quad204FPSO

ExxonMobil,KizombaFPSO

BP,PlutonioFPSO

Total,AkpoFPSO

HHI OFFSHORE & ENGINEERING 10/11

ourProducts

Page 7: Contact Point oFFsHoRe & TEL : 82-52-202-1121, 203 … · for mounting the 12,112 ton topside on the hull of the FPU by lifting it 53 m above the ground. Transocean, Sedco 714 Norsk

FLNG facilities can produce, liquefy, store and transfer LNG across the ocean.

HHI delivers state-of-the-art FLNG facilities using the expertise gained from providing front-end engineering and design (FEED)

services to clients in the shipbuilding industry. Through FEED, HHI ensures all the clients’ specific requirements are reflected in the

design.

HyundaiFLNG(Design)

HHI OFFSHORE & ENGINEERING 12/13ourProducts

FLnGFloatingLiquefiednaturalGas semisubmersibleUnit

Since 1982, HHI has delivered 10 semisubmersibles, to various oil companies.

HHI executes a construction plan that allows semisubmersible rigs to be fabricated on ground at HHI’s offshore fabrication yard

instead of the traditional construction in drydocks.

HHI successfully completed the semisubmersible drilling vessel, ‘‘Deepwater Nautilus’’ for R&B Falcon in 2000. In 2002, HHI completed

Shell’s Na Kika Floating Production Unit. It is 92 m in length 81 m in width and 70 m in height. The unit has a total weight of 31,609

tons with 12,580 ton topside and an 19,029 ton hull. During the construction process, HHI was certified by Guinness World Records

for mounting the 12,112 ton topside on the hull of the FPU by lifting it 53 m above the ground.

NorskHydro,Troll-CFPUHullTransocean,Sedco714

Shell,NaKikaFPUTransocean(FormallyR&BFalcon),DeepwaterNautilus

PrincipalCharacteristic

Hull Particulars

Storage Capacity

LNG Production Capacity

Mooring Type

Offloading Type

Length

Breadth

Depth

Design draft

LNG (Membrane Mark III Type)

LPG

Condensate

355 m

70 m

35 m

14.5 m

2.5 MTPA

(LIMUMTR Liquefaction Process by LINDE AG)

193,800 m3

57,900 m3

29,700 m3

Internal Permanent Turret

LNG & LPG - Side by Side Condensate - Tandem

Page 8: Contact Point oFFsHoRe & TEL : 82-52-202-1121, 203 … · for mounting the 12,112 ton topside on the hull of the FPU by lifting it 53 m above the ground. Transocean, Sedco 714 Norsk

Since the first Champion-7 gas compression module was fabricated for Brunei Shell Petroleum in 1980, more than 400 topside mod-

ules and living quarters have been fabricated at the HHI offshore yard for various clients around the world.

Developing the largest intergrated mega-decks to the smallest wellhead platforms, our extensive experience and know-how secure

us to deliver the best solutions our customers need.

HHI OFFSHORE & ENGINEERING 14/15ourProducts

Phillips,BayuUndanDPP/CUQTopside

PTTEP,Bongkot4A

DaewooInternational,Shwe

Total,OfonPhase2Topside

ADMAOPCO,UmmShaifPlatform

Woodside,NorthRankinB

Platform Land-BasedModule

Demand for natural gas is steadily increasing in line with the global trend for clean energy policies, which is opening up opportunities

for HHI to expand in the area of land-based module.

With qualified experts and well-equipped fabrication facilities, HHI successfully completed and delivered the Sakhalin-1 OPF (Onshore

Processing Facility) for Exxon Neftegas Limited, in which the contract was awarded in March 2005. More recently, HHI was awarded

the contract to fabricate Chevron’s Gorgon LNG plant module in Australia weighing over 198,675 tons.

FluorIntercontinental,Sakhalin-1OPFModule ExxonMobil,HebronUPM Chevron,GorgonModule

Chevron,GorgonModuleonSite

Page 9: Contact Point oFFsHoRe & TEL : 82-52-202-1121, 203 … · for mounting the 12,112 ton topside on the hull of the FPU by lifting it 53 m above the ground. Transocean, Sedco 714 Norsk

The innovative fabrication programs for the semisubmersible drilling rigs built on the ground also enabled HHI to fabricate jack-up

drilling rigs on the ground.

Traditionally, moving these hull-type structures outside the marine environment would cause the hulls to be over-stressed during the

operations. HHI overcame this limitation by supporting the hull on hydraulically activated skid shoes during the load out operation,

thereby allowing the deflections and deformations of the foundations and transport vessel to be accommodated by movements in

the hydraulic supports, as opposed to otherwise creating overstress conditions in the structure.

BP,HardingPDQJack-upPlatform HMDC,HiberniaProcess&QuartersModules

ENL,Sakhalin-1,DC-1 APM,Jack-upMaerskInnovator Conoco,WestNatunaHangTauh

HHI OFFSHORE & ENGINEERING 16/17ourProducts

Jack-UpProductionDrillingandQuarter substructure

HHI has fabricated more than 655,000 tons of offshore jackets, steel gravity base structure (GBS) and other subsea structures at the

offshore yard since 1976. Based on its accumulated experience and capability, HHI has been well recognized as the most reliable

contractor for providing a quality product, especially for super-size substructures.

ExxonMobil,HarmonyJacket

BP,LanTayJacket VevaOil,HanzeGBS

Page 10: Contact Point oFFsHoRe & TEL : 82-52-202-1121, 203 … · for mounting the 12,112 ton topside on the hull of the FPU by lifting it 53 m above the ground. Transocean, Sedco 714 Norsk

Since the construction of the Open Sea Tanker Terminal for the Port Authority of Saudi Arabia in 1976, HHI has successfully com-

pleted a number of major marine terminals and jetties in India, Thailand, the Middle East and Korea.

In 1999, HHI completed a 200,000 DWT class coal unloading terminal in Israel for the Israel Electrical Corporation on a turnkey basis.

The project was effectively completed using HHI’s own marine fleet and equipment.

300,000DWTClassOpenSeaTankerTerminalofJubailIndustrialHarborProjectinSaudiArabia

300,000DWTClassIraqCrudeOilTransSaudiArabiaProjectPhase-2inSaudiArabia

200,000DWTClassCoalUnloadingTerminalProjectinIsrael

30,000DWTClassPetchburiTerminalProjectinThailand

150,000DWTClassHaldia2ndOilJettyProjectinIndia

HHI OFFSHORE & ENGINEERING 18/19ourProducts

MarineterminalandJettyourservices

Page 11: Contact Point oFFsHoRe & TEL : 82-52-202-1121, 203 … · for mounting the 12,112 ton topside on the hull of the FPU by lifting it 53 m above the ground. Transocean, Sedco 714 Norsk

Since 1976, with its own marine construction fleet, HHI has installed various offshore structures including jackets, topside decks and

modules, living quarters, submarine pipeline and cables.

HHI operates three large size derrick pipelay vessels and one shallow water pipelay barge. All its marine crews are well experienced

and are led by qualified engineers and supervisors. With accumulated experience and technology in various fields, HHI has installed

heavy integrated decks, GBS, FSU, MOgPU, SPM, PLEM, etc., while working together with a number of specialized installation and

marine subcontractors as part of an EPIC scope of work.

HHI has completed the installation of a GBS weighing up to 14,900 tons with concreting and the installation of the integrated pro-

duction deck (IPD) weighing up to 7,000 tons on top of the GBS at F2A Hanze Field, the North Sea, involving various marine and

installation contractors. Currently HHI’s capacity extends to the installation of floating units in deep water such as FPSO, FSO, TLP,

SPAR, etc.

HHI has a dedicated commissioning group to cover an EPIC scope of work.

HHI has developed and applied its own Project Completion System, a computerized database system compiling all disciplinary unit

work, to all commissioning activities. HHI also owns and operates marine spreads to perform offshore hook-up and commissioning

activities throughout the world.

The accumulated experience and know-how from previous and ongoing commissioning activities for different types of facilities will

ensure that HHI delivers offshore projects that satisfies clients’ needs.

HHI OFFSHORE & ENGINEERING 20/21ourservices

CraneLiftInstallation-Total,YadanaProjectinMyanmar VebaOil,HanzeF2APlatformintheNetherlands

JacketInstallation-ONGC,NQPProjectinIndia ONGC,NQProcessPlatforminIndia

SPMInstallation Conoco,WestNatunaMOgPUinIndonesia

MOgPU Installation - Conoco, West NatunaProjectinIndonesia

SSB,ENG55/83F-6APlatforminMalaysiaFloatOverInstallation-BP,LanTayProjectinVietnam

AGIP,NC-41B-4ModuleinLibya

offshoreInstallation Hook-UpandCommissioning

Page 12: Contact Point oFFsHoRe & TEL : 82-52-202-1121, 203 … · for mounting the 12,112 ton topside on the hull of the FPU by lifting it 53 m above the ground. Transocean, Sedco 714 Norsk

HHI’s research and development (R&D) comprises of a corporate technology institute, five business division research institutes, and

a technology administration office. The institutes have played a crucial role in HHI’s growth since 1983 when the Hyundai Welding

Research Institute was first established.

Technological innovation is the engine that drives growth. It is also a key component in market leadership. HHI’s R&D creates new

business by focusing on the development of market-driven technologies.

ResearchandDevelopment

CorporateResearchCenter

AdvancedResearch Institute

IndustrialResearch Institute

TechnologyAdministration

Office

ConvergenceResearchInstitute

BusinessDivisionResearchInstitute

Maritime Research Institute

GreenEnergy

ResearchInstitute

Engine & Machinery Research Institute

ElectroElectric Systems

Research Institute

Construction Equipment Research Institute

HHI

AdvancedResearchInstitute

• Process/Safety Engineering for Oil and Gas Plant

• Global Performance and Structural Safety Assessment for

Offshore Structures

• Gas Management System Design with LNG Fuel Supply System

• Development of Marine Engine Emission Control System

• CFD Analysis and Performance Design for Thermal Fluid System

• Low Noise and Vibration Design for Ships and Offshore

StructuresConvergenceResearchInstitute

• Development of Smart Products : Smart Ship / Smart Engine /

Smart Electro Electric Systems

• Development of Smart Manufacturing and HSE (Health, Safety

and Environment) System based on IoT / ICT

• Development of Core Technologies for Medical Robots and De-

vices

• Enhanced Smart Design for Industrial Products

IndustrialResearchInstitute

• Development of Welding Process and Equipment

• Material Process Design and Corrosion Management

• Structure Design and Analysis for Steel and Concrete Structures

• Computer Aided Design for Manufacturing Process

• Automation of Production and Control System

• Development of Coating Technologies and Automatic Painting

Systems

technologyAdministrationoffice

• Technology Planning

• IP Management

CorporateResearchCenter

shipbuildingDivision

MaritimeResearchInstitute

• Ship Powering Performance

• Hull Form and Propulsor

• Seakeeping and Maneuverability

• Ship and Offshore Hydrodynamics

• Navigation Performance

• New Types of LNG Cargo Containment Systems

• Model Ship and Model Propeller

• Telemetry System

• CFD

engine&MachineryDivision

engine&MachineryResearchInstitute

• Combustion Engine

• Fluid/Turbo Machinery

• Ballast Water Treatment Systems

• Industrial Robots

• Product Reliability

• Intelligent Control System

GreenenergyDivision

GreenenergyResearchInstitute

• Silicon Solar Cell Manufacturing Process

• PV Module Reliability and Field Performance

• Solar Cell Interconnection and Module Integration

electroelectricsystemsDivision

electroelectricsystemsResearchInstitute

• Electric Power Machinery

• Quality & Reliability

• Rotating Machinery

• Power Distribution Equipment

ConstructionequipmentDivision

ConstructionequipmentResearchInstitute

• Structural Durability & Safety

• Reliability of Main Components

• Productivity & Comfort

• Energy Saving

• System Control and IT Convergence

• New Product and System

BusinessDivisionResearchInstitute

HHI OFFSHORE & ENGINEERING 22/23

GeneratorofValue-AddedProductsandInnovativesolutions

Process/SafetyEngineeringforOil&GasPlant GlobalPerformance&StructuralSafetyAssessmentforOffshoreStructures

LowNoise&VibrationDesignforShipsandOff-shoreStructures

AutomaticWeldingSystemforOffshorePipeline

Page 13: Contact Point oFFsHoRe & TEL : 82-52-202-1121, 203 … · for mounting the 12,112 ton topside on the hull of the FPU by lifting it 53 m above the ground. Transocean, Sedco 714 Norsk

CommittedtoHealth,safetyandenvironmentalexcellence

Health, Safety and Environment (HSE) Management is HHI’s top priority among its business activi-

ties. To this effect, HHI has established a company policy under which HHI is fully committed to

comply with the governing HSE standards and regulations.

All business activities are performed strictly in accordance with ISO 14001 and OHSAS 18001, which

are internationally certified HSE management systems that provide safe, low risk and environmen-

tally friendly working conditions.

Furthermore, HHI has organized and held special HSE joint workshops in which most oil majors and

clients participate to share HSE awareness on a quarterly basis, to promote better implementation

of safety first (S1) programs. Through such continuous and substantial effort, HHI has gained a

high reputation in HSE management.

HHI’s quality assurance systems are designed, organized, and implemented to ensure HHI’s strict

standards for quality. These systems are acknowledged worldwide by scores of national and in-

ternational design and manufacturing organizations. All of HHI’s Divisions have received ISO9001

Quality Management System Certificates.

HHI’s commitment to training enable us to continue to provide clients with high quality, reliable

products, and better services. We will continue to implement and further develop our QM systems

to achieve higher levels of product quality.

HighQualityProductsthatexceedsAllProfessionalstandards

Certifi cates Certifi cates

QualityManagement

HseManagement

HHI OFFSHORE & ENGINEERING 24/25

Page 14: Contact Point oFFsHoRe & TEL : 82-52-202-1121, 203 … · for mounting the 12,112 ton topside on the hull of the FPU by lifting it 53 m above the ground. Transocean, Sedco 714 Norsk

Lifestyleservices

Ulsan, where HHI is located, is the top industrial city in Korea. The city is surrounded by beautiful nature and scattered with various

sports, cultural and commercial facilities, making it one of the best places to live in Korea.

HHI provides housing at the Foreigners’ Compounds for long-term foreign residents and for short-term residents and business

visitors we offer accommodation at the five-star Hotel Hyundai, Ulsan. We also operate 10 schools, including Ulsan University and

Hyundai Foreign School, in order to create a positive educational envrironment for the people in Ulsan.

HHI has built six recreational centers which include a concert hall, cinema, six soccer fields, and various sports facilities. These facilities

play an important role in developing the surrounding community and enriching the quality of life of the community.

The company also operates the Ulsan University Hospital, which is one of Korea’s top eight hospitals. It is equipped with state-of-

the-art medical equipment and specialists to provide high quality medical services.

Dedicated to helping its international supervisors and their families, HHI runs a FLiK Service Center located on the second floor of

the Hyundai Foreigners’ Compound Clubhouse. The center supports interpretation, tickets reservation, and provides cultural experi-

ence programs.

HomeAwayfromHome

HHI OFFSHORE & ENGINEERING 26/27

HyundaiForeigners’Compound&Apartment

- 473 Housing Units and Bungalows (1 to 4 Bedrooms)

- Gym- Outdoor Swimming Pool (Summer Only)- Golf Driving Range

HanmaeumCulturalCenter

- Swimming Pool- Gym- Basketball Court- Tennis Court- Futsal (Mini Soccer) Court

HyundaiForeignSchoolAsanSportsCenter

- Ice Rink- Indoor Tennis Courts- Outdoor Sledding Slope (Winter Only)

HyundaiArtsCenter

- Concert Hall- Cinema- Bowling Alley- Racquetball Courts- Table Tennis Courts- Artificial Rock Climbing

UlsanUniversityHospital

HHI’sshipyard

Yardforoffshore&engineering

HyundaiMipoDockyard

HomeplusshoppingMall15

AsansportsCenter14

UlsanCollegeDongbuCampus13

MiposoccerFields12

DaewangamPark16

HyundainewForeigners’Apartment11

1

2

3 4

56

78

10

9

15

1413

12

1611

seobusoccerFields1

HanmaeumCulturalCenter9

UlsanDongbuLibrary2

MyeongduckLakePark10

HyundaiForeignschool3

HyundaiForeigners’Compound4

HyundaiArtsCenter5

HyundaiDepartmentstore6

HyundaiHotel7

UlsanUniversityHospital8

Page 15: Contact Point oFFsHoRe & TEL : 82-52-202-1121, 203 … · for mounting the 12,112 ton topside on the hull of the FPU by lifting it 53 m above the ground. Transocean, Sedco 714 Norsk

PerformanceRecord

HHI OFFSHORE & ENGINEERING 28/29

Facility Type Project Units Weight (M/Ton)

Total 173 3,205,382

Offshore & Engineering Division

Remarks

Floaters

22 1,131,837 FPSO, FSO, FPU, etc.

Drilling Facilities

5 118,586

Platforms

93 1,426,729

Onshore Facilities & Others

18 528,230

Subsea Pipelines

35 Length : 5,821 km

Ships

84 9,369,620 DWT

Page 16: Contact Point oFFsHoRe & TEL : 82-52-202-1121, 203 … · for mounting the 12,112 ton topside on the hull of the FPU by lifting it 53 m above the ground. Transocean, Sedco 714 Norsk

HHI OFFSHORE & ENGINEERING 30/31

Ser. Ser.Project Name Project NameClient ClientDescription DescriptionScope ofServices

Scope ofServices

Project Period Project PeriodWeight Weight

Conversion of V.L.C.C. ‘Henrique Dias’ into FPSO (P-33)

Petrobras Brazil FPSO : 320 m x 54.5 m x 27.8 m EPIC Apr. 1996 ~ Jun. 1998 30,0001 North Rankin ‘A’ Platform - Pile Tubular Woodside Offshore Petroleum Pty., Ltd.

Australia Pile : 15.4 m (H), 53” (OD) PC May. 1980 ~ May. 1982 8,5651

Bekok ‘C’/Tapis ‘D’ Platform Jacket & Cap Facilities

Esso Production Malaysia Inc. Malaysia Jacket (2ea) & Pile PC Jun. 1980 ~ Jun. 1981 10,7802

Development of the Champion-7 Field Complex

Brunei Shell Petroleum Co., Ltd.

Brunei Platform (6ea) & Bridge (9ea) & Pile PC Oct. 1980 ~ Mar. 1982 14,2273

Central Luconia F23 - Substructure Sarawak Shell Berhad Malaysia Jacket (3ea) & Pile PCT Apr. 1981 ~ Oct. 1982 11,2064

Tcot Pumping Platform, Tiong ‘A’, Tinggi ‘A’ Jacket Structure

Esso Production Malaysia Inc. Malaysia Jacket (3ea) & Pile PC May. 1981 ~ May. 1982 14,3205

SSB ENG 79/83 Marine Platform (SIWA Jacket)

Sarawak Shell Berhad Malaysia Platform & Pile PC Oct. 1983 ~ Jun. 1984 1,50918

South Bassein Platform Complex Oil & Natural Gas Corporation Limited

India Platform (4ea) & Bridge & Pile EPIC Nov. 1984 ~ Mar. 1987 20,98926

Exxon Santa Ynez Unit Development(Harmony & Heritage)

Exxon Co. USA Platform (2ea) PC Jul. 1985 ~ Apr. 1988 72,10029

Lombo East Development Texaco Angola Prospeccao

E Producao S.A.R.L.

Angola Platform & Pile

Pipeline : 105 km

EPIC Dec. 1985 ~ Mar. 1987 4,77030

Phase II of ‘NQ’ Complex Oil & Natural Gas Corporation Limited

India Platform (3ea) & Bridge (3ea) & PilePipeline : 68.3 km

EPIC Dec. 1983 ~ Apr. 1985 12,24820

Phase III of ‘SH’ Complex Oil & Natural Gas Corporation Limited

India Platform (2ea) & Bridge & PilePipeline : 62.8 km

EPIC Dec. 1983 ~ May. 1985 17,15721

Semankok ‘A’ & ‘B’, Irong Barat ‘A’ and Pulai ‘B’ Jacket Structures

Esso Production Malaysia Inc. Malaysia Jacket (4ea) & Pile PC Apr. 1982 ~ May. 1983 17,74010

Water Injection Well Platform (WI-2,3,4,5)for Bombay High Project

Oil & Natural Gas Corporation Limited

India Platform (4ea) & Pile EPIC May. 1982 ~ Apr. 1983 10,43211

WIN Process Platform Facilities for Bombay High Project

Oil & Natural Gas Corporation Limited

India Platform EPIC Jun. 1982 ~ Mar. 1984 10,00012

Peninsular Malaysia Offshore Gas Project Petronas Caligali Sdn., Bhd. Malaysia Jacket (4ea) & Pile PC Sep. 1982 ~ May. 1983 5,58813

Marjan (GOSP #2 & #3) Offshore Facilities Arabian American Oil Co. Saudi Arabia Platform (11ea) & Bridge (6ea) & Pile EPIC Oct. 1982 ~ Nov. 1985 40,48114

SSB ENG 83/84 Marine Platform Sarawak Shell Berhad Malaysia Platform (3ea) & Pile PC Jan. 1983 ~ Dec. 1984 2,93615

Satun and Platong Fields Facilities Union Oil Company Thailand Topside, L/Q & Bridge (2ea) EPC Jul. 1983 ~ Jan. 1985 8,93016

Texaco Harvest ‘A’ Platform Topside Texaco Co., Inc. USA Topside (8ea) PCT Sep. 1983 ~ Jun. 1985 7,28217

SSB ENG 208/82 Mini Production Platform Sarawak Shell Berhad Malaysia Topside (2ea) PC Oct. 1983 ~ Dec. 1984 1,50019

SSB Marine Platform (ENG 79/82) Sarawak Shell Berhad Malaysia Platform (2ea) PC Feb. 1984 ~ Mar. 1985 6,63122

Esso east Zeit Platform Esso Suez Inc. Egypt Platform PCT Apr. 1984 ~ Feb. 1985 5,87323

24 SSB ENG 55/83 F6-A Module Sarawak Shell Berhad Malaysia Topside (4ea) & Bridge (2ea) EPIC Aug. 1984 ~ Dec. 1986 7,124

25 SSB (ENG 55/83 F6-A) Jacket & Pile Sarawak Shell Berhad Malaysia Jacket (2ea) & Pile EPIC Aug. 1984 ~ Jun. 1985 6,756

27 San Miguel ‘JULIUS’ Platform Cities Service Oil & Gas Co. USA Platform (9ea) & Pile PCT Dec. 1984 ~ Nov. 1986 41,123

28 NC-41B Bouri Field Development(Phase-I) AGIP (N.A.M.E.) Co., Ltd. Libya Topside (9ea) EPIC Feb. 1985 ~ Jun. 1987 10,230

Central Luconia F23 - Module Sarawak Shell Berhad Malaysia Module (3ea) PC Oct. 1981 ~ Oct. 1982 3,2796

Kepong ‘A’/ Tiong ‘B’ Platform Facilities Esso Production Malaysia Inc. Malaysia Jacket (2ea) & Pile PC Nov. 1981 ~ Sep. 1982 6,0007

Zuluf Offshore Facilities (GOSP #3 & #4) Arabian American Oil Co., Ltd. Saudi Arabia Platform (22ea) & Bridge (8ea) & Pile EPIC Dec. 1981 ~ Jul. 1985 28,4168

Conductor Pile for Iwaki Project Esso Production Japan Conductor (15ea) PC Feb. 1982 ~ Apr. 1983 1,2009

Conversion of V.L.O.O. ‘Jose Bonifacio’

into FPSO (P-35)

Petrobras Brazil FPSO : 320 m x 54.5 m x 28 m EPIC Jun. 1996 ~ Dec. 1998 30,0002

Troll-C FPU Hull Construction

(GVA 8000)

- Operator : Norsk Hydro- Contractor : Umoe Haugesung

Norway FPU (Pontoon & Column) EPCT Apr. 1997 ~ Nov. 1998 14,1003

Amenam / Kpono FSO Elf Petroleum Nigeria Ltd. Nigeria FSO : 298 m x 62 m x 32 m EPC(T & I : SBM)

Sep. 2000 ~ Dec. 2002 43,5005

Na Kika Semi-submersible FPU Shell Exploration & ProductionCompany

USA FPU PCT Feb. 2001 ~ Jan. 2003 31,6096

Kizomba ‘A’ FPSO Esso Exploration Angola (EEA) Angola FPSO : 285 m x 63 m x 32.2 m EPC Jul. 2001 ~ Jun. 2004 80,6617

Kizomba ‘B’ FPSO Esso Exploration Angola (EEA) Angola FPSO : 285 m x 63 m x 32.2 m EPC Dec. 2002 ~ Oct. 2005 80,6619

Greater Plutonio FPSO BP Angola (Block 18) B.V. Angola FPSO : 310 m x 58 m x 32 m Hull : EPCTopsides : IC

Jan. 2004 ~ Apr. 2007 72,70010

AKPO FPSO TOTAL Upstream NigeriaLimited

Nigeria FPSO : 310 m x 61 m x 31 m EPIC May. 2005 ~ Nov. 2008 98,45011

Moho Bilondo FPU TOTAL E & P Congo Congo FPU : 188.5 m x 34 m x 12.5 m EPIC Jun. 2005 ~ Feb. 2008 28,43312

Usan FPSO TOTAL Nigeria FPSO : 320 m x 61 m x 32 m EPC Feb. 2008 ~ Nov. 2012 114,09213

Goliat FPSO Eni Norge AS Norway FPSO : 90 m x 75 m (Cylindrical Type)

EPC Feb. 2010 ~ Apr. 2015 51,38414

Quad 204 FPSO BP North Sea FPSO : 270 m x 52 m x 30 m EPC Feb. 2011 ~ Dec. 2015 84,42415

Moho Nord FPU Total E&P Congo Congo FPU : 250 m x 44 m x 18 m EPC Mar. 2013 ~ Jun. 2016 62,20020

Rosebank FPSO Chevron UK FPSO : 292 m x 57.4 m x 30 m EPC Apr. 2013 ~ Dec. 2019 99,75421

Jangkrik FPU Hull / LQ Eni Indonesia Hull :200 m x 46 m x 15 m EPC Feb. 2014 ~ Mar. 2016 28,74522

Delta House FPS Hull LLOG GoM Semisub FPS : 81.6 m x 81.6 m x 51.6m

ePC Aug. 2012 ~ Feb. 2014 11,37216

Aasta Hansteen Spar Hull Statoil Norway Spar Hull : 196 m (H), 50 m (D) EPC Aug. 2012 ~ Mar. 2016 45,33217

Aasta Hansteen Topside Statoil Norway Topside : 60 m x 50 m x 18 m EPC Jan. 2013 ~ Apr. 2017 21,50018

Moho Nord TLP EPSCC (Ph.3) Total E&P Congo Congo Tension Leg Platform : 61.5 m x 61.5 m

EPC Feb. 2013 ~ Nov. 2015 14,57019

West Seno FPU / TLP Unocal Indonesia FPU :152 m x 38 m x 10 mTLP : 50 m x 50 m x 40 mPipeline (2 Lines) : 12” x 62 km

EPIC Aug. 2001 ~ Jul. 2003 28,3508

Girassol FPSO - Operator : Elf Exploration,Angola

- Contractor : Mar ProfundoGirasol

Angola FPSO : 300 m x 59.6 m x 30.5 m EPIC Jun. 1997 ~ Nov. 1999 60,0004

Floaters Platforms

Performance Record

Page 17: Contact Point oFFsHoRe & TEL : 82-52-202-1121, 203 … · for mounting the 12,112 ton topside on the hull of the FPU by lifting it 53 m above the ground. Transocean, Sedco 714 Norsk

HHI OFFSHORE & ENGINEERING 32/33

Ser.Ser. Project NameProject Name ClientClient DescriptionDescription Scope ofServices

Scope ofServices

Project PeriodProject Period WeightWeight

Infill Well Platform (IA, IB, ID & ICD) Oil & Natural Gas Corporation Limited

India Platform (4ea) & Pile EPIC Nov. 1986 ~ Dec. 1987 15,00031

BHN Revamp Platform - Operator : ONGC - Contractor : MDL

India Living Quarter Module(104 Person)

EPIC Oct. 1998 ~ Apr. 2000 90059

West Natuna Block B Facilities Conoco Indonesia, Inc. Indonesia Platform

Pipelines : 42 km

EPIC Feb. 1999 ~ May. 2001 23,15060

Soroosh-Nowrooz EPIC-1 Shell Exploration B.V Iran Platform (4ea) Pipeline : 12 km

EPIC Sep. 2000 ~ Mar. 2002 4,12465

DongHae-1 Gas Development Korea National Oil Corporation S. Korea Platform Pipeline : 72 km

EPIC Mar. 2001 ~ Nov. 2003 10,10068

Bongkot Phase-3B Wellhead Platform PTTEP Thailand Platform (2ea) & Modification (2ea) Pipeline : 23 km

EPIC Aug. 1999 ~ Jun. 2001 3,23563

Bayu-Undan DPP / CUQ Topsides Fabrication

Phillips Petroleum Pty. Ltd. Austalia Topside (2ea) EC Oct. 2000 ~ Jul. 2003 24,30066

Huizhou 19-3/2/1 Platform CACT-OG China Platform (2ea) & Pipeline (2 Lines) : 41.1 km

EPIC Aug. 2002 ~ Jun. 2004 24,00072

MSP Platform Oil & Natural Gas Corporation Limited

India Platform EPIC Jun. 2003 ~ Apr. 2005 13,56073

Gauri-A Field Project Cairn Energy India Pty Ltd. India Topside Pipeline : 5.4 km

T & I Dec. 2003 ~ Mar. 2004 55074

Rong Doi Platform Korea National Oil Corporation Vietnam Platform (2ea) & BridgePipeline : 58 km

EPIC Sep. 2004 ~ Sep. 2006 17,20075

East Area EPC-1B Mobil Producing Nigeria

Unlimited

Nigeria Platform (3ea) & Bridge (3ea) EPIC Dec. 2004 ~ Jul. 2007 13,54076

Escravos Gas Project Phase 3A

Offshore Platform

Chevron Nigeria Limited Nigeria Platform (2ea) EPIC Mar. 2005 ~ Mar. 2007 4,39277

Yadana MP Compression Platform

Development

Total E&P Myanmar Myanmar Platform & Bridge & Pile EPIC Oct. 2005 ~ Mar. 2008 8,72378

Umm Shaif Gas Injection Facilities ADMA-OPCO UAE Platform (3ea) Pipeline : 23 km

EPIC Sep. 2006 ~ Jun. 2010 39,00079

SHWE Platform Daewoo International

(Myanmar E&P)

Myanmar Platform Pipeline : 126.5 km

EPIC Oct. 2009 ~ Apr. 2013 50,75083

Barzan Offshore RasGas Qatar Topside (3ea) & L/Q Pipelines : 178.5 km

EPIC Jan. 2011 ~ Nov. 2014 8,75084

Infill ‘ICP’ Process Platform Complex Oil & Natural Gas Corporation Limited

India Platform (5ea) & Bridge (4ea) & PilePipelines (13Lines) : 100.45 km

EPIC Nov. 1986 ~ Feb. 1989 20,91332

Neelam Process Complex Oil & Natural Gas Corporation Limited

India Platform (5ea) & Bridge (3ea) & PilePipeline (9 Lines) : 132 km

EPIC Feb. 1992 ~ Apr. 1994 49,50044

L-ABCD&E Well Platform Complex Oil & Natural Gas Corporation Limited

India Platform (5ea)Pipeline (6 Lines) : 66 km

EPIC Mar. 1992 ~ May. 1993 18,70045

NQP Process Complex Oil & Natural Gas Corporation Limited

India Platform (4ea) & PilePipeline (8 Lines) : 102 km

EPIC Mar. 1992 ~ Apr. 1994 14,96146

HX/HY Wellhead Platform Oil & Natural Gas Corporation Limited

India Platform (4ea) Pipeline : 39.1 km

EPIC May. 1996 ~ Dec. 1997 2,90051

B-121/119 Wellhead Platform Oil & Natural Gas Corporation Limited

India Platform Pipeline : 36.7 km

EPIC Jun. 1996 ~ Jan. 1997 1,00053

Development of Facilities for AMDP-30 Brunei Shell Petroleum Co. Sdn. Bhd.

Brunei Platform & PilePipeline : 3 km

EPIC Jul. 1996 ~ Jun. 1997 1,67054

Booster Compressor Platform - A & B, Bombay High Field

- Operator : ONGC, India- Contractor : MDL

India Jacket (2ea) & Module (10ea) & Bridge (4ea) & Pile

EPIC May. 1997 ~ May. 1999 14,16555

Weizhou 12-1 Platform Topside Construction

China National Offshore Oil Corp.

China Topside & Living Quarter EPIC Jul. 1997 ~ Mar. 1999 5,63056

Ping Hu Offshore Platform China National Offshore Oil Corp.

China Platform EPIC Jun. 1996 ~ Jul. 1998 12,80052

EDOP Gas Injection Platform Mobil Producing Nigeria Ultd. Nigeria Platform & Bridge & PilePipeline : 3.6 km

EPIC Jun. 1994 ~ Jun. 1996 6,00050

Hibernia Field Development Hibernia Management & Development Company

Canada Module (2ea) PC Mar. 1993 ~ Mar. 1995 12,42047

Infill ‘ICW’ Process Platform Complex Oil & Natural Gas Corporation Limited

India Platform & Bridge (2ea) & Pile Pipeline : 4.1 km

EPIC Dec. 1986 ~ Feb. 1989 11,70033

Heera Process Platform Complex Oil & Natural Gas Corporation Limited

India Platform (10ea) & Bridge (2ea) & PilePipeline (10Lines) : 20 km

EPIC May 1988 ~ May. 1990 26,80537

Iwafune-oki Platform Japex Offshore Ltd. Japan Module (4ea) EPCT Mar. 1989 ~ May. 1990 5,52038

Goodwyn ‘A’ Process Platform Woodside Offshore Petroleum Pty. Ltd.

Austalia Topside (4ea) & Flare Tower PC Apr. 1990 ~ Jun. 1992 10,78439

Iraq Crude Oil Trans Saudi Arabia project (Offshore Marine Terminal)

State Company of Oil Project Iraq Jacket (40ea) & Bridge (20ea) & Pile EPIC Sep. 1987 ~ Sep. 1989 50,75434

57 Benchamas Field Development POGO Producing Co. USA Platform (2ea) & Bridge (2ea) EPIC Sep. 1997 ~ May. 1999 8,350

58 Redoubt Unit Exploratory Drilling Platform Forcenergy, Inc. USA Jacket PCT May. 1998 ~ Mar. 1999 2,970

61 Suizhong 36-1 CEP Topside China National Offshore Oil Corp. China Topside EPIC Jun. 1999 ~ Oct. 2000 5,880

62 Hanze F2A Steel GBS Platform Veba Oil Nederland B.V. Netherlands Steel GBS & Deck EPIC Jul. 1999 ~ Jun. 2001 21,000

64 Eardo Project Korea Offshore Research S. Korea Platform & Pile EPIC Sep. 2000 ~ Mar. 2003 3,030

67 Lan Tay Platform British Petroleum Vietnam Platform EPIC Dec. 2000 ~ Jun. 2002 16,700

69 PM-3 CPP Field Development (Phase 2) Lundin Oil Company Sweden Topside EPIC Jul. 2001 ~ Sep. 2003 7,673

70 Block 5 Field Development Maersk Oil Qatar AS Qatar Platform (10ea) EPIC Sep. 2001 ~ Jun. 2003 37,005

71 Sabratha Platform AGIP Gas BV Libya Jacket EPIC Jan. 2002 ~ Sep. 2004 30,832

80 Ofon Phase 2 – OFP2 Topside Elf Petroleum Nigeria Limited Nigeria Topside EPC Jun. 2007 ~ Nov. 2014 13,400

81 North Rankin ‘B’ Gas Comp. P/F Woodside Australia Topside & DSF epC Dec. 2007 ~ Dec. 2011 23,752

82 Bongkot 4A P/F PTTEP Thailand Platform & Bridge (3ea) EPIC Sep. 2008 ~ Sep. 2011 29,501

35 Takula Water Injection Platform CABGOC Angola Jacket (5ea) & Pile PCT Nov. 1987 ~ Jul. 1988 4,869

36 Exxon ‘SYU’ Topside Structures Fabrication Exxon Co. USA Topside (22ea) PC Jan. 1988 ~ Jan. 1989 8,936

40 BP Riser Jacket British Petroleum UK Jacket PC May. 1991 ~ May. 1992 6,500

41 Safaniya GOSP-4 Living Quarters Platform Saudi Arabian oil Company Saudi Arabia Living Quarter Module (140 Person) EPCT Jun. 1991 ~ Jun. 1993 1,460

42 Brage Jacket Components Norsk Hydro / Ake Verdal A.S. Norway Jacket Components (91ea) PCT Dec. 1991 ~ May. 1992 11,458

48 Yacheng 13-1 Wellhead Platform Arco China Platform & Pile CTI Mar. 1993 ~ Apr. 1994 6,276

49 BP Harding Jack-up PDQ Platform BP Exploration Operating Co., Ltd UK Jack-up EPC Mar. 1993 ~ Jul. 1995 24,300

43 JHN Julius Platform Modification JHN Oil Operating Co., China Modification of Platform (9ea) PCT Jan. 1992 ~ Jul. 1992 2,592

PlatformsPlatforms

Performance Record

Page 18: Contact Point oFFsHoRe & TEL : 82-52-202-1121, 203 … · for mounting the 12,112 ton topside on the hull of the FPU by lifting it 53 m above the ground. Transocean, Sedco 714 Norsk

HHI OFFSHORE & ENGINEERING 34/35

Platforms

92 Badamyar Development Project Total Myanmar Platform (2ea) & Bridge & Pile EPC Sep. 2014 ~ Apr. 2017 13,913

93 Baronia CPP-B P/F Petronas Carigali Malaysia Platform EPIC Nov. 2014 ~ Nov. 2017 22,749

Ser. Project Name Client Description Scope ofServices

Project Period Weight

85 Clair Ridge Platform BP North Sea Platform (2ea) EPC Mar. 2011 ~ Feb. 2016 43,100

86 DSO Platform Chevron Nigeria Platform (2ea) EPC Jan. 2011 ~ Aug. 2014 14,881

87 Booster Compression Platform Carigali-Hess Malaysia Platform EPC Sep. 2012 ~ Sep. 2015 24,237

88 Hebron Topside DES (Derrick Equipment Set) Worley Parsons (ExxonMobil) Canada DES : 25 m x 20 m x 80 m epC Feb. 2013 ~ Feb. 2015 3,200

89 Su Tu Nau (T&I) PTSC M&C (CLJOC) Vietnam Jacket Installation T & I Jul. 2013 ~ Oct. 2013 5,938

90 Bergading CPP & WHP Hess E&P Malaysia Platform (2ea) & Bridge EPIC May. 2014 ~ Nov. 2016 32,536

91 NASR Full Field Development – PKG2 ADMA-OPCO UAE Platform (3ea) & Bridge (11ea) EPIC Jul. 2014 ~ May. 2019 63,064

DrillingFacilities

Ser. Project Name Client Description Scope ofServices

Project Period Remarks Weight

Semi-Submersible Drilling Rig‘Deepwater Nautilus’

R & B Falcon USA. Drilling Rig : 114 m x 78 m x 40 m

EPIC Nov. 1997 ~ Dec. 1999 Accommodation : 130 PersonPositioning : Anchor & DP

25,5001

Semi-Submersible Drilling Rig‘Deepwater Horizon’

R & B Falcon USA. Drilling Rig : 114 m x 78 m x 40 m

EPIC Dec. 1998 ~ Dec. 2000 Accommodation : 130 PersonPositioning : Full DP System

27,0002

Semi-Submersible Drilling Rig‘Sakhalin DC-1’

Exxon Neftegas Ltd. Russia Drilling Rig EPC May. 2002 ~ Jun. 2005 8,3465

Semi-Submersible Drilling Rig‘MSC, CJ70-MC150’

A. P. Moller Denmark Drilling Rig : 88.8 m x 102.5 m x 11.5 mLeg Length (3ea) : 205 m

EPCT Apr. 2000 ~ Jun. 2002 Accommodation : 120 PersonDrilling Water Depth : 150 mDrilling Depth : 9,140 m

28,8703

Semi-Submersible Drilling Rig‘MSC, CJ70-MC150’

A. P. Moller Denmark Drilling Rig : 88.8 m x 102.5 m x 11.5 mLeg Length (3ea) : 205 m

EPCT Jan. 2001 ~ Mar. 2004 Accommodation : 120 PersonDrilling Water Depth : 150 mDrilling Depth : 9,140 m

28,8704

onshoreFacilities&others

Ser. Project Name Client Description Scope ofServices

Project Period Remarks Weight

Open Sea Tanker Terminal of Jubail Industrial Harbor

Ports Authority Saudi Arabia

Jacket (89ea), Module (24ea) Pile (651ea) x OD24”~38”

PCI Jun. 1976 ~ Dec. 1980 92,0001

Replacement of North Breasting Dolphin

Kung In Energy Co., Ltd. S. Korea Jacket & Pile PC Jul. 1976 ~ Oct. 1976 4502

Yanbu NGL Tanker Terminal

Arabian American Oil Co., Ltd.

Saudi Arabia

Jacket & Module PCI Jan. 1979 ∼ Mar. 1982 24,0003

Yeosu LNG Tanker Terminal

Honam Oil Refinery Co., Ltd.

S. Korea Jacket & Pile PCTI Nov. 1979 ~ Dec. 1980 4,7604

Haldia 2nd Oil Jetty Off-shore Marine Terminal

Calcutta Port Trust India Deck (11ea), Pile (18ea), Bridge (10ea)

EPIC Aug. 1988 ~ Apr. 1990 3,1115

De-Kastri Terminal SPM Bluewater, the Netherlands Russia Single Point Mooring (1ea) PC Apr. 2004 ~ Apr. 2005 3,57010

OPF Onshore Modules Fabrication

Fluor / ENL Russia Module (63ea), Piperack (7ea)

pC Jun. 2004 ~ May. 2006 39,00011

Sakhalin-1 OPF Pipe Spool Fabrication

Fluor / ENL Russia Pipe Spool : 32,126 m EPIC Feb. 2005 ~ Jan. 2006

8,43612

Gorgon LNG Plant

Chevron Australia LNG Plant Module epC Oct. 2009 ~ Sep. 2015 198,67513

Semi Submersible HeavyTransportation Vessel

Dockwise Netherlands Vessel : 275 m x 70 m x 15.5 m

EPC Jan. 2011 ~ Feb. 2013 60,89714

Hebron Topside

WorleyParsons Canada Utilities & Process Module 100 m x 65 m x 40 m

epC May. 2012 ~ Oct. 2015 34,95015

Point Thomson Module Fabrication

ExxonMobil Alaska Onshore Module epC Jul. 2012 ~ Jun. 2015 Processing : 10,000 bpd 9,26816

Odoptu Gas Injection Compression Unit

Fluor (ExxonMobil) Russia(Sakhalin)

GIU Steel Frame pC Jan. 2013 ~ Apr. 2014 97017

Odoptu Stage 2 - Module Fabrication

Exxon Neftegas Limited Russia(Sakhalin)

Onshore Module epC Jun. 2014 ~ Jun. 2017 24,45418

Ravva Oil & Gas Development

Cairn Energy India Pty Ltd.(Command Petroleum)

India Wellhead Platform (5ea)SPM : 120,000 DWTPipeline (8 Lines, 4”~20”) : 113 km

EPIC Apr. 1995 ~ Jul. 1996 Crude Unit : 2 Trains x 20,000 BOPDStorage : 3 Tanks x 250,000BOPDGas Processing Facilities : 55 MMCFD

2,0006

Hazira Phase-III ‘A’Project - Construction of Onshore Gas Plant

Oil & Natural Gas Corporation Limited

India Gas Treatment EPIC Sep. 1995 ~ Oct. 1997 Gas Sweetening Unit :2 Trains x 6.3 MMSCMDGas Dehydration Unit :2 Trains x 6.3 MMSCMD

5,4837

Rutenberg Offshore Coal Unloading Terminal

Israel Electric Co. Ltd., Israel Jetty : 1.8 km x 12m, Pile (226ea)Dolphin / Others

EPIC Apr. 1997 ~ Sep. 1999 Unloading Pier : 200,000 DWTConcrete Work : 21,883 m3

24,6429

Petchburi Terminal Petchburi Terminal Co., Ltd.

Thailand Mooring Dolphin (4ea)Berthing Dolphin (4ea)Service Platform & Fire Monitoring TowerOffshore Pipeline : 16” x 6.5 km (3Lines)

EPIC Feb. 1996 ~ Nov. 19968

Performance Record

Page 19: Contact Point oFFsHoRe & TEL : 82-52-202-1121, 203 … · for mounting the 12,112 ton topside on the hull of the FPU by lifting it 53 m above the ground. Transocean, Sedco 714 Norsk

HHI OFFSHORE & ENGINEERING 36/37

Pipelines Pipelines

Ser. Project Name Client Description Scope ofServices

Project Period

Ser. Project Name Client Description Scope ofServices

Project Period

Weizhou 11 - 4 Pipelines NANHAI West Oil Co., China Pipeline : 4”~10” x 37.1 km EPIC Jan. 1993 ~ May. 19941

South Bassein Hazira Trunkline Oil & Natural Gas Corporation Limited India Pipeline : 30”~42” x 251.6 km EPIC Oct. 1993 ~ Feb. 19962

Petrovietnam Gas Utilization Petechim Vietnam Pipeline : 16” x 124 km EPIC Dec. 1993 ~ Apr. 19953

Second Offshore Oil Terminal Indian Oil Corp. Ltd. India Pipeline : 42” x 8.8 km EPIC May 1996 ~ Mar. 19974

B-55 Wellhead Platform Installation Oil & Natural Gas CorporationLimited India Pipeline : 16” x 77 km EPIC Oct. 1996 ~ Mar. 19985

Weizhou Oil Fields Development China National Offshore Oil Corp. China Pipeline : 8’’ ~ 24’’ x 132.5 km EPIC Jun. 1997 ~ Aug. 19986

Yung-An Tung Hsiao Offshore Pipeline Chinese Petroleum Corp. Taiwan Pipelines : 36” x 273.7 km EPIC Feb. 1999 ~ Aug. 20008

CRMP-I Pipeline Oil & Natural Gas Corporation Limited India Pipelines : 4”~12” x 23 km EPIC Jun. 1999 ~ Apr. 20009

Young-Jong-Do Pipeline Korea Gas Corporation S. Korea Pipeline : 36” x 24.4 km EPIC Mar. 2000 ~ Feb. 200111

Water Injection Pipelines Replacement Oil & Natural Gas Corporation Limited India Pipeline (11 Lines) : 4”~12” x 52 km EPIC Aug. 2000 ~ May. 200112

Lakshimi Field Development Cairn Energy India Pty. Ltd. India Pipeline : 24”+ 12” x 36 km EPIC Jul. 2001 ~ Apr. 200213

HV Wellhead Platform Oil & Natural Gas Corporation Limited India Pipeline (4 Lines) : 8”~12” x 29.7 km EPIC Aug. 2001 ~ Nov. 200214

East HP Gas Expansion Pipeline Brunei Shell Petroleum Company Brunei Pipeline : 28” x 68.29 km EPIC Oct. 2001 ~ Jul. 200215

Gas Transmission and Distribution PT Perusahaan Gas Negara (PESERO) Indonesia Pipeline : 28” x 215 km EPIC May. 2002 ~ Oct. 200317

MHB Pipeline Oil & Natural Gas Corporation Limited India Pipeline : 8”~12” ×59.41 km EPIC Mar. 2003 ~ Feb. 200419

Chunxiao Gas Complex Development CNOOC China Limited China Pipeline : 8”~28” × 471.2 km EPIC Sep. 2003 ~ Apr. 200520

MUT Pipeline Oil & Natural Gas Corporation Limited India Pipeline : 12”~30” x 506.65 km EPIC Jan. 2004 ~ May. 200521

Third Transmission Pipeline PTT Public Company Limited Thailand Pipeline : 24”~42” × 607.2 km EPIC Feb. 2005 ~ Jun. 200622

Sisi Nubi Field Development (Phase I) TOTAL E&P Indonesia Indonesia Pipeline : 16”~26” x 54.4 km EPIC Jul. 2005 ~ Jul. 200723

Crude Export Facilities (NTF, STF, MAA) Kuwait Oil Company Kuwait Pipeline : 24”+56” x 88.3 km EPIC Oct. 2005 ~ Jun. 200824

Shanghai LNG Pipeline Shanghai LNG Co. China Pipeline : 36” x 35.6 km EPIC Dec. 2007 ~ Nov. 200827

Dragon & Tortoise Gas Utilization Vietsopetro Vietnam Pipeline : 8” ~ 10” x 24.8 kmRiser (6ea)

EPC Apr. 2010 ~ Jul. 201028

Bach Ho Gas Pipeline PVGAS Vietnam Rigid Pipeline : 12” x25.7 kmValve Skid (1ea)

EPC Oct. 2010 ~ May. 201129

Paradip SPM Pipeline IOCL India Subsea & Onshore Pipeline : 45”~48” x 71.55 km SPM (2ea)

EPC Oct. 2010 ~ Jun. 201230

Offshore Gas Spur Line PTT PCL Thailand Pipeline : 24”~ 28” x 86.0 kmPLEM (2ea)

EPC Oct. 2010 ~ Aug. 201131

Thang Long - Dong Do Installation PTSC M&C Vietnam Pipeline : 6”~12” x 17.81 km I Apr. 2013 ~ Sep. 201332

Flow Assurance Offshore RasGas Qatar Pipeline : 6” x 185 kmWHP Modification (11ea)

EPC Aug. 2013 ~ Nov. 201533

Yetagun Phase 5 (T&I) Larsen & Toubro Limited(PCML, Hong Kong)

India WHP (Yet-D) Pipeline : 10’’ x 11.2 km

T & I Jul. 2013 ~ Sep. 201434

Nghi Son Refinery & Petrochemical Complex

SK E & C Vietnam Pipeline : 48” x 69 km (2 Lines)CALM Buoy & PLEM (1ea)

T & I Mar. 2014 ~ Aug. 201535

Mumbai Port Submarine Pipeline Replacement

Mumbai Harbor, West of coast India Pipeline : 8” ~ 42” x 31.2 km EPIC Feb. 1999 ~ Jun. 20007

South Pars Field Development(Phase 2 & 3)

National Iranian Oil Company Iran Pipeline : 32” x 218.6 km EPIC Sep. 1999 ~ Jun. 200110

Bonny Terminal Integrated Pipeline

Shell Nigeria Development Company Nigeria Pipeline : 48”+ 32” x 54 km EPIC Feb. 2002 ~ Apr. 200516

Hangzhou Bay Offshore Pipeline Chinese Petroleum and Chemical Corporation (SINOPEC)

China Pipeline : 10”~30” × 160.5 km EPIC Feb. 2003 ~ Apr. 200418

South Sumatra to West Java Gas Pipeline

PT Perusahaan Gas Negara Indonesia Pipeline : 32” x 160 km I Aug. 2006 ~ Dec. 200625

SK Crude Oil Unloading SystemRelocation Project

SK Energy S. Korea Pipeline : 42” x 10.43 km EPC Nov. 2007 ~ Jul. 200826

ships

Ser. Project Name Client Description Scope ofServices

Project Period Remarks

103K Tanker Primorsk Russia 244 m x 42 m x 21 m EPC Nov. 2006 ~ Jun. 2009 2 Ships1

105K Crude Oil Carrier Novoship Russia 244 m x 42 m x 21 m EPC Mar. 2003 ~ Jul. 2007 10 Ships2

105K Product & Chemical Tanker

Teekay Canada 244 m x 42 m x 21 m EPC Jul. 2003 ~ Apr. 2009 27 Ships3

105K Tanker Kristen / Maran Greece 244 m x 42 m x 21 m EPC Oct. 2006 ~ Sep. 2009 2 Ships4

112K Product & Chemical Tanker

Novoship Russia 250 m x 44 m x 21 m EPC Sep. 2006 ~ Sep. 2009 4 Ships5

115K Crude Oil Carrier SCI India 250 m x 44 m x 21.5 m EPC Aug. 2007 ~ Mar. 2011 4 Ships6

151K Crude Oil Carrier Gungen Turkey 269 m x 46 m x 25.4 m EPC Jul. 2008 ~ Nov. 2011 1 Ships7

158K Crude Oil Carrier GESCO India 274 m x 48 m x 23.1 m EPC Jul. 2008 ~ Jan. 2012 2 Ships8

180K Bulk Carrier Chang Myung Shipping S. Korea 292 m x 45 m x 24.7 m EPC May. 2007 ~ Feb. 2012 12 Ships9

22.5K Liquefied Petroleum Gas Carrier

AP Moller Singapore 154 m x 25.5 m x 16 m EPC Jul. 2008 ~ Oct. 2011 6 Ships10

300K Very Large Ore Carrier Han Jin Shipping S. Korea 340 m x 55 m x 30 m EPC Jan. 2008 ~ May. 2011 2 Ships11

35K Liquefied Petroleum Gas Carrier

Hyproc Algeria 174.2 m x 28 m x 17.8 m EPC Sep. 2008 ~ Nov. 2010 2 Ships12

82K Liquefied Petroleum Gas Carrier

Bergesen Norway 225 m x 36.6 m x 22 m EPC Apr. 2005 ~ Oct. 2008 8 Ships13

97K Tanker FAL Shipping UAE 237 m x 42 m x 20.3 m EPC Dec. 2006 ~ Feb. 2010 2 Ships14

Performance Record

Page 20: Contact Point oFFsHoRe & TEL : 82-52-202-1121, 203 … · for mounting the 12,112 ton topside on the hull of the FPU by lifting it 53 m above the ground. Transocean, Sedco 714 Norsk

overseasBranchoffice

tHeUnIteDKInGDoM

2ND FLOOR, THE TRIANGLE, 5-17 HAMMERSMITHGROVE,LONDON,W60LG,UK

Tel:44-20-8600-7132Fax:44-20-8741-5620

noRWAY

HYUNDAIOSLO(LIAISON)OFFICERAADHUSGATEN20,0151OSLO,NORWAY

Tel:47-2310-0890Fax:47-2310-0899

GReeCe

73,POSEIDONOSAVENUE,17562,PALEOFALIRO,ATHENS,GREECE

Tel:30-210-428-2992~3Fax:30-210-428-2144

RUssIA

WORLDTRADECENTER,ENT.3,#703,KRASNOPRESNENSKAYANAB.12,MOSCOW,123610,RUSSIA

Tel:7-495-258-1381Fax:7-495-258-1382

tHenetHeRLAnDs

SCHORPIOENSTRAAT69,3067GG,ROTTERDAM,THENETHERLANDS

Tel:31-10-212-1567Fax:31-10-212-5134

sInGAPoRe

7TEMASEKBOULEVARD,#41-02SUNTECTOWERONE038987,SINGAPORE

Tel:65-6337-2366Fax:65-6333-4680

JAPAn

8THFLOORNORTHTOWERYURAKUCHODENKIBLDG.,1-7-1YURAKU-CHO,CHIYODA-KU,TOKYO100-0006,JAPAN

Tel:81-03-3211-4792Fax:81-03-3216-0728

1-ROOM5THFLOORNAGAHORIPLAZABLDG.2-4-8MINAMISENBA,CHUO-KU,OSAKA542-0081,JAPAN

Tel:81-06-6261-5766~7Fax:81-06-6261-5818

UsA

300SYLVANAVENUEENGLEWOODCLIFFS,NJ07632,USA

Tel:1-201-816-4080~2Fax:1-201-816-4083

15990NORTHBARKERSLANDING,SUITE175,HOUSTON,TEXAS77079,USA

Tel:1-281-578-7097,7802Fax:1-281-578-7330

6100ATLANTICBOULEVARD,2NDFL.,NORCROSS,GA30071,U.S.A.

Tel:1-678-823-7839Fax:1-678-823-7553

noRtHAMeRICA eURoPe AsIA

AFRICA

AnGoLA

RUAREIKATYAVALA,EDIFICIOREIKATYAVALABLOCOB,(8THFLOOR)PISO,SALA8-B,INGOMBOTA,LUANDA,ANGOLA

Tel:244-923-585-130

tHe MIDDLE EAST

sAUDIARABIA

OFFICE404,4THFLOOR,AKARIA-3BUILDING,P.O.BOX8072,RIYADH11482,KINGDOMOFSAUDIARABIA

Tel:966-11-464-4696,9366Fax:966-11-462-2352

7THFLOOR,ALKHOBARBUSINESSGATEBUILDINGP.O.BOX20753,ALKHOBAR-31952KINGDOMOFSAUDIARABIA

Tel:966-013-849-3876~7

UAe

UNIT205,BUILDING4,EMAARSQUARE,SHEIKHZAYEDROAD,P.O.BOX252458,DUBAI,UAE

Tel:971-4-425-7995Fax:971-4-425-7996

JEBELALIFREEZONELOB18,FLATNO.301&302,3RDFLOOR,P.O.BOX261733,DUBAI,U.A.E

Tel:971-4-884-0566Fax:971-4-884-0567

Globalnetwork

HHI OFFSHORE & ENGINEERING38/39

overseassubsidiaries

BeLGIUM

HYUnDAIHeAVYInDUstRIeseURoPen.V.VOSSENDAAL11,2440GEEL,BELGIUM

Tel:32-14-56-2211,2214Fax:32-14-59-3405,3406

CHInA

BeIJInG HYUnDAI JInGCHenG ConstRUCtIonMACHIneRYCo.,LtD.)NO.2,NANLI,LUGUOQIAO,FENGTAIDISTRICT,BEIJING100165,CHINA

Tel:86-10-8321-8347~8Fax:86-10-8321-1353

HYUnDAI(JIAnGsU)ConstRUCtIonMACHIneRYCo.,LtD.288,HEHAIWESTROAD,XINBEIDISTRICT,CHANGZHOU,JIANGSU213125,CHINA

Tel:86-519-8519-1002,1020Fax:86-519-8519-1385

CHAnGZHoUHYUnDAIHYDRAULICMACHIneRYCo.,LtD.326,HUANGHEWESTROAD,CHANGZHOU,JIANGSU213125,CHINA

Tel:86-519-8302-1710Fax:86-519-8302-1726

HYUnDAI(sHAnDonG) HeAVY InDUstRIes MA-CHIneRY.Co.,LtD.YITIANMEN AVENUE MIDDLE, TAIANHIGH-TECH-ZONE,SHANDONG271000,CHINA

Tel:86-538-349-0110Fax:86-538-349-0098

HYUnDAI HeAVY InDUstRIes(CHInA) eLeCtRICCo.,LtD.NO.9,XIANDAIROAD,XINBASCIENTIFICANDTECHNOLOGICZONE,YANGZHONG,JIANGSU,P.R.C.ZIP:212212,CHINA

Tel:86-511-8842-0666,0500Fax:86-511-8842-0668,0231

YAntAIHYUnDAIHeAVYInDUstRIesCo.,LtD.NO.333CHANGJIANGROAD,YANTAIETDA,SHANDONG264006,CHINA

Tel:86-535-216-5800~1Fax:86-535-216-5810,5830

WeIHAI HYUnDAI WInD PoWeR teCHnoLoGYCo.,LtD.MIDDLESECTIONOFHYUNDAIROAD,WENDENG,SHANDONG264006,CHINA

Tel:86-631-896-6000Fax:86-631-896-6799

HHICHInAInVestMentCo.,LtD.801, SHENHONG INTERNATIONAL PLAZA(SOUTHAREA), HONGQIAO AIRPORT TERMINAL 2, #1500SHENKUNROAD,SHANGHAI,CHINA(200335)

Tel:86-21-3357-5888Fax:86-21-3357-5808

HHIHYUnDAIFInAnCIALLeAsInGCo.,LtD.ROOM3301,CHINAMERCHANTSTOWER,#161EASTLUJIAZUIROAD,SHANGHAI,CHINA(200120)

Tel:86-21-2033-2000Fax:86-21-2033-2033

HYUnDAI HeAVY InDUstRIes (sHAnGHAI) R&DCo.,LtD.ROOM10102,BUILDING10,NO.498,GUOSHOUJINGROAD,SHANGHAI,CHINA(201203)

Tel:86-21-5013-3393Fax:86-21-5013-3393#105

BULGARIA

HYUnDAIHeAVYInDUstRIesCo.-BULGARIA41,ROJENBLVD.,1271SOFIA,BULGARIA

Tel:359-2-803-3200,3210,3220Fax:359-2-803-3203,3242

GeRMAnY

JAHneL-KesteRMAnnGetRIeBeWeRKeGMBHHUNSCHEIDTSTR.116,44789BOCHUM,GERMANY

Tel:49-234-339-0Fax:49-234-339-253,346

HUnGARY

HYUnDAIteCHnoLoGIesCenteRHUnGARYLtD.1146,BUDAPEST,HERMINAUT22,HUNGARY

Tel:36-1-273-3733Fax:36-1-220-6708

RUssIA

HYUnDAIeLeCtRosYsteMsCo.,LtD.692760, RUSSIA, PRIMORSKIY KRAI, ARTEM, STR.,POTEMKINA15

Tel:7-423-201-0110Fax:7-423-201-0110

FRAnCe

HYUnDAIHeAVYInDUstRIesFRAnCesAs17,RUEBEFFROY,92200NEUILLY-SUR-SEINE,FRANCE

Tel:33-1-4637-1761Fax:33-1-4637-1295

eURoPe

InDIA

HYUnDAI ConstRUCtIon eQUIPMent InDIAPVt.,LtD.PLOTNO.A-2,MIDCCHAKANPHASE-II,VILL.-KHALUMBRE.PUNE410501,INDIA

Tel:91-21-3530-1700Fax:91-21-3530-1712

InDonesIA

Pt.HYUnDAIMACHIneRYInDonesIAKAWASAN INDUSTRI SENTUL, JL. OLYMPIC RAYABLOKB18,SENTUL,INDONESIA

Tel:62-21-2945-5019Fax:62-21-2945-5020

AsIA

KUWAIt

HYUnDAIGReenInDUstRIesCo.,W.L.L.P.O.BOX5107,SAFAT-13052KUWAIT,PLOT#B36,SHUWAIKHFREETRADEZONE,STATEOFKUWAIT

Tel:96560966639Fax:96522413963

sAUDIARABIA

HYUnDAIARABIACo.,LtD.2NDFLOOR.,AL-NOORBLDGNO.2,PRINCESULTANBIN ABDULLAZIZ ROAD, AL-JAWHRAH DISTRICT,P.O.BOX32140,ALKHOBAR31952, KINGDOMOFSAUDIARABIA

Tel:966-13-898-4925

tHeMIDDLeeAst

nIGeRIA

HYUnDAIHeAVYInDUstRIesCo.,nIGeRIALtD.PLOTB, BLOCK12E,ADMIRALTYWAY, LEKKI, LA-GOS,NIGERIA

Tel:234-1-342-7729

AFRICA

BRAZIL

HYUnDAIHeAVYInDUstRIesBRAsILRODOVIAPRESIDENTEDUTRA,S/N,KM315-PARTE,CEP:27.580-000ITATIAIA,RIODEJANEIRO,BRAZIL

Tel:55-24-3352-2338

UsA

HYUnDAIConstRUCtIoneQUIPMentAMeRICAs,InC.6100ATLANTICBOULEVARD,NORCROSS,GA30071,USA.

Tel:1-678-823-7777Fax:1-678-823-7778

HYUnDAIIDeALeLeCtRICCoMPAnY330EASTFIRSTSTREETMANSFIELD,OH44902,USA.

Tel:1-419-522-3611Fax:1-419-522-9386

HYUnDAIPoWeRtRAnsFoRMeRsUsA,InC.215FOLMARPARKWAY,MONTGOMERY,AL36105,USA.

Tel:1-334-481-2000Fax:1-334-481-2098

noRtHAMeRICA