20
1 Consultant Selection & Contract Administration Amy Schmidt, District 7 Consultant Contract Manager

Consultant Selection & Contract Administration · Contract Administration Amy Schmidt, District 7 Consultant Contract Manager. 2 Consultant Selection Process Required Pre-qualifications

  • Upload
    others

  • View
    6

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Consultant Selection & Contract Administration · Contract Administration Amy Schmidt, District 7 Consultant Contract Manager. 2 Consultant Selection Process Required Pre-qualifications

1

Consultant Selection &

Contract Administration

Amy Schmidt,

District 7 Consultant Contract Manager

Page 2: Consultant Selection & Contract Administration · Contract Administration Amy Schmidt, District 7 Consultant Contract Manager. 2 Consultant Selection Process Required Pre-qualifications

2

Consultant Selection Process

Required Pre-qualifications

Negotiating a Consultant Contract Fee

Who Writes the Contract?

Local-Let Consultant Agreements

ODOT-Let Consultant Agreements

Consultant Selection and Contract Administration Topics

Page 3: Consultant Selection & Contract Administration · Contract Administration Amy Schmidt, District 7 Consultant Contract Manager. 2 Consultant Selection Process Required Pre-qualifications

3

Consultant Selection Process(PE, RW SERV, CO CE)

1. 1) Direct Select.

Ohio Revised Code Section 5526.06 permits direct selection of

consultants when the entire contract is less than $50,000. You may

post a project announcement (request letters of interest) on

ODOT’s website.

• 2) Quality-Based Selection

• Required for all contracts over $50,000. You must post a project

announcement on ODOT’s website.

Consultant Selection Process

Page 4: Consultant Selection & Contract Administration · Contract Administration Amy Schmidt, District 7 Consultant Contract Manager. 2 Consultant Selection Process Required Pre-qualifications

4http://www.dot.state.oh.us/Divisions/Engineering/Consultant/Consultant/prequal.doc

• Required pre-qualifications must be listed in the contract

scope of services.

• The firm must be pre-qualified for every category relative

to the project, or supplement their team with a pre-

qualified sub-consultant.

• The document “Consultant Prequalification Requirements

and Procedures” is located on the Office of Consultant

Services web page.

Consultant Prequalification Requirements

and Procedures

Page 5: Consultant Selection & Contract Administration · Contract Administration Amy Schmidt, District 7 Consultant Contract Manager. 2 Consultant Selection Process Required Pre-qualifications

5http://www.dot.state.oh.us/divisions/Engineering/consultant/Pages/default.aspx

ODOT Home Page Divisions Engineering

Consultant Services Prequalification Information

Scroll down the ribbon on the left of this page:

• Pre-qualified Engineering Consultants• http://www.dot.state.oh.us/Divisions/Engineering/Consultant/Consultant/prequal-engineering.pdf

• Pre-qualified Environmental Consultants• http://www.dot.state.oh.us/Divisions/Engineering/Consultant/Consultant/prequal-environ.pdf

• Pre-qualified Right of Way Acquisition Individuals• http://www.dot.state.oh.us/Divisions/Engineering/Consultant/Consultant/prequal-row.pdf

• Pre-qualifications for Construction Inspection are not yet

required, but may be used as a selection factor.

Page 6: Consultant Selection & Contract Administration · Contract Administration Amy Schmidt, District 7 Consultant Contract Manager. 2 Consultant Selection Process Required Pre-qualifications

6

Procedures for Posting Announcements on

ODOT’s Website

After you have developed the scope document, you will need to

request that ODOT post your “Announcement” on the Local

Government Project Notifications web page. Abbreviated

instructions are on the next slide, and more details (and instructions)

for this process are located on Consultant Services website.

ODOT Home Page Divisions Engineering Consultant

Services Local Government Project Notifications

Scroll down the ribbon on the left of this page.

http://www.dot.state.oh.us/Divisions/Engineering/Consultant/Consultant/LPA%20Procedures.pdf

Page 7: Consultant Selection & Contract Administration · Contract Administration Amy Schmidt, District 7 Consultant Contract Manager. 2 Consultant Selection Process Required Pre-qualifications

7

Procedures for Posting Announcements on

ODOT’s Website

1. Prepare the announcement in a word processing format using the sample

documents provided in the web page, or other format that complies with the

requirements of the Manual.

2. Send the document as an E-mail attachment along with any specific instructions

for posting to the following E-mail address: [email protected]

3. ODOT will post the announcement under the heading “Local Government

Project Notifications” on the Consultant Services page of ODOT’s Website.

Project announcements are posted each Monday and remain posted until the due

date. Documents should be received by the previous Wednesday for a Monday

posting. A minimum of two weeks response time is required.

http://www.dot.state.oh.us/Divisions/Engineering/Consultant/RFPLOILPA/Forms/RFP-LOI-LPA.aspx

Page 8: Consultant Selection & Contract Administration · Contract Administration Amy Schmidt, District 7 Consultant Contract Manager. 2 Consultant Selection Process Required Pre-qualifications

8

Quality-Based Scoring and Selection

Each letter of interest needs to be rated using the LPA’s own documented QBS

process or ODOT’s QBS matrix shown on the next slide.

You may ask the District Consultant Contract Manager for the past performance

scores for engineering firms and Project Managers. They will provide you with

data from the last 3 years, if available.

Once a consultant is selected, the LPA will send letters to each consultant

informing them whether they were selected or not.

The LPA will work with the District LPA Coordinator to schedule a Scope of

Services meeting with the selected consultant.

Consultant Selection Process

Page 9: Consultant Selection & Contract Administration · Contract Administration Amy Schmidt, District 7 Consultant Contract Manager. 2 Consultant Selection Process Required Pre-qualifications

9

• Quality-Based Selection Matrix:

Consultant Selection Process

Category Total Value Scoring Criteria Score

Management & Team

Project Manager 20 See Note 1, Exhibit 1

Strength/Experience of Assigned

Staff including Subconsultants15 See Note 2, Exhibit 1

Firm's Current Workload/

Availability of Personnel10 See Note 4, Exhibit 1

Consultant's Past Performance 25 See Note 3, Exhibit 1

Project Approach 30

Total 100

Page 10: Consultant Selection & Contract Administration · Contract Administration Amy Schmidt, District 7 Consultant Contract Manager. 2 Consultant Selection Process Required Pre-qualifications

10http://www.dot.state.oh.us/Divisions/Engineering/Consultant/ConsultDocs/Cons_Fee_Est_Guide_April2015.docx

Subject matter experts from ODOT worked with the

American Council of Engineering Companies of Ohio

(ACEC) to create the “Consultant Fee Estimation

Guidelines”.

These guidelines shall be used on all contracts when federal

money is used in the contract.

They are just guidelines to be followed and not taken as a

hard rule. They are not applicable to every task on every

project.

The District will review the fee proposal when there are

federal funds in the contract.

Negotiating a Consultant Contract Fee

Page 11: Consultant Selection & Contract Administration · Contract Administration Amy Schmidt, District 7 Consultant Contract Manager. 2 Consultant Selection Process Required Pre-qualifications

11

Who Writes the Consultant Contract?

1. The district writes the contract whenever you are using any

amount of federal funds to hire a consultant. This contract

cannot be altered by the LPA.

Engineering

Environmental

Right of Way Acquisition Services

Construction Engineering

Page 12: Consultant Selection & Contract Administration · Contract Administration Amy Schmidt, District 7 Consultant Contract Manager. 2 Consultant Selection Process Required Pre-qualifications

12

Page 13: Consultant Selection & Contract Administration · Contract Administration Amy Schmidt, District 7 Consultant Contract Manager. 2 Consultant Selection Process Required Pre-qualifications

13

Send a scanned image of all letters of interest and the

attachments listed below to the District Consultant Contract

Manager.

Page 14: Consultant Selection & Contract Administration · Contract Administration Amy Schmidt, District 7 Consultant Contract Manager. 2 Consultant Selection Process Required Pre-qualifications

14

Local-Let Consultant Agreements

1. 1) Consultant agreement (between LPA and consultant)

follows the LPA agreement (between LPA and ODOT);

• 2) Consultant contract modifications must be approved by

the fund manager.

Page 15: Consultant Selection & Contract Administration · Contract Administration Amy Schmidt, District 7 Consultant Contract Manager. 2 Consultant Selection Process Required Pre-qualifications

15

ODOT-Let Consultant Agreements

1. 1) Preliminary legislation is processed first. This is returned

to ODOT as an ordinance or resolution passed by the LPA.

2. - includes a section for “Authority to Sign”

3. 2) District prepares the Consultant agreement (between

LPA and consultant) and sends to LPA with a “letter form

agreement” (between LPA and ODOT);

• 3) Consultant contract modifications must be approved by

the fund manager.

Page 16: Consultant Selection & Contract Administration · Contract Administration Amy Schmidt, District 7 Consultant Contract Manager. 2 Consultant Selection Process Required Pre-qualifications

16

Consultant Invoicing / Direct Pay

1. Your agreement will be set up to pay the federal/state

portion directly to the consultant. The LPA pays only their

portion with each invoice.

• No paper, please.

• Email a clean, legible pdf file of the complete LPA

certification and consultant invoice to the District

Consultant Contract Administrator.

[email protected], D7; [email protected], D8; [email protected], D7&D8

Page 17: Consultant Selection & Contract Administration · Contract Administration Amy Schmidt, District 7 Consultant Contract Manager. 2 Consultant Selection Process Required Pre-qualifications

17

One Last Important Item

to Clear Up

Page 18: Consultant Selection & Contract Administration · Contract Administration Amy Schmidt, District 7 Consultant Contract Manager. 2 Consultant Selection Process Required Pre-qualifications

18

in the Construction Phase only

Page 19: Consultant Selection & Contract Administration · Contract Administration Amy Schmidt, District 7 Consultant Contract Manager. 2 Consultant Selection Process Required Pre-qualifications

19Federal Funds Used in Construction

• Even when there are no federal funds in these

phases, if there are federal funds in construction,

the LPA is required to select an ODOT pre-qualified

consultant.

Pre-Qualified Design Firms,

Environmental Firms, Right of

Way Acquisition Individuals

Page 20: Consultant Selection & Contract Administration · Contract Administration Amy Schmidt, District 7 Consultant Contract Manager. 2 Consultant Selection Process Required Pre-qualifications

20

Questions?