126
© ESRI Rwanda Ltd., RURA Mapping of Petrol Service Stations CountrywideFinal Report 1 Final Report for Consultancy Services to Conduct a Mapping Exercise for Petrol Service Stations Countrywide Client: Rwanda Utilities Regulatory Authority (RURA) P.O Box 7289 Kigali Tel: + (250) 252584562 E-mail: [email protected] Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda i[email protected] www.esri.rw Date 16 th January 2017 Contact Jean Pierre Gatera Technical Team Leader Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda Office +250 788 38 19 00 Phone: +250 788 914 091 [email protected] Sandra Wairimu Ndungu Project Manager Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda Office +250 788 38 19 00 Phone: +250 785 914 836 [email protected]

Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: [email protected] Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda [email protected] Date

  • Upload
    others

  • View
    2

  • Download
    4

Embed Size (px)

Citation preview

Page 1: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

1

Final Report for

Consultancy Services to Conduct a Mapping Exercise for Petrol Service Stations Countrywide

Client: Rwanda Utilities Regulatory Authority (RURA)

P.O Box 7289

Kigali

Tel: + (250) 252584562

E-mail: [email protected]

Consultant: Esri Rwanda Ltd.

P.O. Box 6867

Kigali, Rwanda

[email protected]

www.esri.rw

Date 16th January 2017

Contact Jean Pierre Gatera

Technical Team Leader

Esri Rwanda Ltd.

P.O. Box 6867

Kigali, Rwanda

Office +250 788 38 19 00

Phone: +250 788 914 091

[email protected]

Sandra Wairimu Ndungu

Project Manager

Esri Rwanda Ltd.

P.O. Box 6867

Kigali, Rwanda

Office +250 788 38 19 00

Phone: +250 785 914 836

[email protected]

Page 2: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

2

Contents

1. Table of Figures 4

2. List of Tables 5

Abbreviations and Definitions 7

3. Management Summary 9

4. Objective of the Project 11

5. General Requirements for Construction and Installation of a Petrol Service Station 12

5.1 Petrol Service Station Land 12

5.2 Location, Design and installation of Petrol Storage Tanks 12

5.3 Location and Design of Pipelines and Vent Pipes 12

5.4 Dispenser and Pumping Facilities 12

5.5 Position of Road Tanker 13

5.6 Minimum Distance of a property Line of Petrol Service Stations and Neighboring infrastructures 13

5.7 Forecourt Construction 13

5.8 Surface Drainage 13

5.9 Construction Material Selection 13

5.10 Electrical Installations 13

5.11 Facilities Identification 14

5.12 Fire and Emergency Equipment 14

6. Data Collection for Petrol Service Stations 15

6.1 Routes taken for PSS data collection 16

6.2 Overview of PSS found during data collection 17

6.2.1 Distribution of PSS collected per District 18 6.2.1.1 PSS collected in Kigali City 18 6.2.1.2 PSS collected in Eastern Province: 22 6.2.1.3 PSS collected in Northern Province 26 6.2.1.4 PSS collected in Southern Province 28 6.2.1.5 PSS collected in Western Province 32

6.2.2 Comparison of PSS given by RURA and PSS collected by Esri 35

6.3 Maps of the distribution of PSS found during data collection 41

7. Data Analysis for Petrol Service Stations 43

7.1 Geographic location-based (Spatial) Analysis 43

7.1.1 Geographic Location Analysis Scores Over 100% of Operating PSS 44

7.1.2 Average Score of Operating PSS per Operator on Geographic Location Analysis 57

7.2 Technical and risk analysis 58

Page 3: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

3

7.2.1 Technical and Risk Analysis Scores over 100 % of Operating PSS 58

7.2.2 Average score of operating PSS per operator on technical and risk analysis 81

7.3 Operating PSS Average Score for Compliance to Regulations per Operator 82

7.4 List on Non-Operating PSS 83

8. Categorizing Petrol Service Stations 84

8.1 Third Category: PSS that cannot comply with regulations even after doing any type of upgrade 84

8.2 Second Category: PSS that do not comply with most important regulations but can do significant upgrade to comply with regulations 86

8.3 First Category: PSS that comply with important regulations but need to do some technical upgrade and risk mitigation 94

9. Computer Application for Monitoring Petrol Service Stations 96

9.1 ArcGIS Desktop Software 96

9.2 ArcGIS Geodatabase 97

9.3 RURA geodatabase structure 100

10. GIS Training for RURA Staff 103

10.1 Objectives of the GIS Training 103

10.2 Content of the Training 103

10.3 Training schedule and Facilities: 103

10.4 Software Versions 103

11. Stakeholders validation workshop 104

12. TV Spot Content 111

13. Conclusion and Recommendations 113

13.1 From Stakeholders Validation workshop 113

13.2 On GIS Training to RURA staff 113

13.3 On PSS Data analysis 114

14. Annexes 116

14.1 PSS Mapping Questionnaire 116

Page 4: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

4

1. Table of Figures

Figure 1: Distribution of Petrol Service Stations in Rwanda....................................... 41

Figure 2: Total number of Petrol Service Stations per District ................................... 42

Figure 3: Operating PSS Total Average Score per Operator over 100% ................... 82

Figure 4: ArcGIS Desktop Interface .......................................................................... 97

Figure 5: Primary datasets that can be stored in a Geodatabase .............................. 99

Figure 6: RURA geodatabase structure .................................................................. 100

Figure 7: Stakeholders Validation Workshop .......................................................... 104

Page 5: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

5

2. List of Tables

Table 1: PSS in Nyarugenge District ......................................................................... 19

Table 2: PSS in Gasabo District ................................................................................ 20

Table 3: PSS in Kicukiro District ............................................................................... 22

Table 4: PSS in Bugesera District ............................................................................. 23

Table 5:PSS in Gatsibo District ................................................................................. 23

Table 6:PSS in Kayonza District ............................................................................... 24

Table 7:PSS in Kirehe District ................................................................................... 24

Table 8:PSS in Ngoma District .................................................................................. 24

Table 9:PSS in Nyagatare District ............................................................................. 25

Table 10:PSS in Rwamagana District ....................................................................... 26

Table 11:PSS in Burera District ................................................................................ 26

Table 12:PSS in Gakenke District ............................................................................. 26

Table 13:PSS in Gicumbi District .............................................................................. 27

Table 14:PSS in Musanze District ............................................................................. 27

Table 15:PSS in Rulindo District ............................................................................... 28

Table 16: PSS in Gisagara District ............................................................................ 28

Table 17:PSS in Huye District ................................................................................... 29

Table 18:PSS in Kamonyi District ............................................................................. 29

Table 19:PSS in Muhanga District ............................................................................ 30

Table 20:PSS in Nyamagabe District ........................................................................ 30

Table 21:PSS in Nyanza District ............................................................................... 30

Table 22:PSS in Nyaruguru District ........................................................................... 31

Table 23:PSS in Ruhango District ............................................................................. 31

Table 24:PSS in Karongi District ............................................................................... 32

Table 25:PSS in Ngororero District ........................................................................... 32

Table 26:PSS in Nyabihu District .............................................................................. 32

Table 27:PSS in Nyamasheke District ...................................................................... 33

Table 28:PSS in Rubavu District ............................................................................... 33

Table 29:PSS in Rusizi District ................................................................................. 34

Table 30: Licensed PSS given by RURA and not found by Esri ................................ 35

Table 31: List of PSS visited by RURA and not found by Esri ................................... 37

Table 32: PSS given by RURA but Operating under a different name ....................... 37

Page 6: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

6

Table 33:PSS collected by Esri and not provided in the list given by RURA .............. 40

Table 34: Geographic Location Analysis Scores Over 100% of Operating PSS ........ 56

Table 35: Average Score of Operating PSS per Operator on Geographic Location

Analysis .................................................................................................................... 57

Table 36:Technical and Risk Analysis Scores over 100 % of Operating PSS ........... 80

Table 37: Average score of operating PSS per operator on technical and risk

analysis..................................................................................................................... 81

Table 38: List on Non-Operating PSS ....................................................................... 83

Table 39: PSS falling in the third category ................................................................ 86

Table 40: PSS falling in the second category ............................................................ 92

Table 41: PSS falling in the second category ............................................................ 94

Table 42: PSS falling in the first category .................................................................. 95

Table 43: List of participants for the stakeholders’ validation workshop .................. 105

Table 44: Agenda for the Stakeholders Validation workshop .................................. 105

Page 7: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

7

Abbreviations and Definitions

CoK City of Kigali

Esri Environmental System Research Institute

GIS Geographic Information System

NISR National Institute of Statistics Rwanda

OSC One Stop center

PSS Petrol Service Station

RDB Rwanda Development Board

RHA Rwanda Housing Authority

RNRA Rwanda Natural Resource Authority

RTDA Rwanda Transport Development Agency

RURA Rwanda Utilities Regulatory Authority

Engineering Control

Method of reduction of risk by designing and constructing barriers to contain the hazard. Reduction of risk by this method is the most effective way of ensuring people’s and property safety because these measures are always present and less likely to go wrong.

Groundwater Water that is below the surface of the ground in the saturation zone, i.e. below the water table.

Hazard A potential source of serious harm to people, property or the environment

Hazardous Area

an area where flammable or explosive gas or vapor-air mixtures (often referred to as explosive gas-air mixtures) are, or may be expected to be, present in quantities which require special precautions to be taken against the risk of ignition

Interceptor a unit installed in a surface water drainage system to separate out any petrol and thus prevent it reaching public drains, sewers or water courses

Management control This is a method of reduction risk using instruction for example following a standard operation procedure. It is bound to human error and compliance.

Petrol Service Station(PSS)

Premises at which petrol is dispensed into the fuel tanks of motor vehicle

Petroleum/Petrol

"Petroleum" includes petroleum crude natural gas and any liquid or gas made from petroleum crude, natural gas, coal, schist, shale, peat or any other bituminous substance or from any product of petroleum crude, natural gas and includes condensate

Recommendations Potential solutions to findings or observations

Page 8: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

8

Regulatory Authority

Rwanda Utilities Regulatory Authority (RURA) as established by the law n°09/2013 of 01/03/2013

Risk Is the likelihood that a person, persons or environment can be harmed by the hazard

Risk Assessment

Will involve the careful examination of how petrol and petrol station activities can cause fire or explosion. This in turn will help to determine whether the station has enough measures on the ground to guarantee people and people’s property safety or whether the stations needs to include more measures. While the main idea is to eliminate the risks, this is often not the case and as such the assessment will try to make them as low as they can be done.

Standard Operating Procedures

Standard Operating Procedures are documented series of steps to be carried out in a logical order for a defined operation or in a given situation.

Upgrade

Relocation of existing storage tanks, installation of additional storage tanks, replacement of storage tanks where there is an increase in total storage capacity, total demolition and rebuilt of service station where there’s either increase in capacity or change of location of a service station

Vent Pipe

A pipe provided for the underground storage tank venting system. Necessary to prevent tank distortion due to variations in internal pressure resulting from the normal operational filling and emptying

Page 9: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

9

3. Management Summary

Rwanda Utilities Regulatory Authority (RURA) – a public institution mandated to regulate certain public utilities among which are the renewable and non-renewable energy, industrial gases, pipelines and storage facilities.

In exercising its mandate, RURA has developed a number of legal and regulatory instruments required to undertake its responsibilities. It is in the same context that, the regulations governing construction, installation, upgrade and operation of Petrol Service Stations (PSS) have been developed and eventually approved by RURA Regulatory Board initially in September 2013 and subsequently reviewed in April 2014.

In the framework of ensuring that the PSS are adhering to the regulations, RURA has recognized the valuable advantage of using Geographic Information Systems (GIS) to efficiently monitor PSS and their geographic locations for compliance enforcement on stipulated regulations. It is in this context that Esri Rwanda has been awarded by RURA the contract for “Consultancy Services to Conduct a Mapping Exercise for Petrol Service Stations Countrywide”.

Esri Rwanda has conducted the mapping exercise by physically visiting each PSS and collecting required data using tablet devices and a cloud-based mobile data collection application called iformbuilder. The application allowed to collect geographic coordinates of the petrol service stations, relevant pictures as well as required technical data that permitted to evaluate the compliance of PSS to RURA regulations.

After the data collection at each PSS, Esri Rwanda conducted a deep compliance analysis based on the RURA regulations; the analysis was divided into the following types of analyses:

Geographic location-based (spatial) analysis: using ArcGIS Desktop spatial analysis tools, the locations and parcels of PSS have been analyzed to check if they comply with RURA regulations about the size of PSS parcels, distance to sensitive areas (e.g. infrastructure, schools, hospitals, Memorial sites, etc.) and if they comply with districts land use master plans.

Technical and risk analysis: using data collected on site, PSS have been analyzed from different perspectives such as hazard and risk, safety and security, environment, available services, staff knowledge, compliance to RURA regulations of different parts (e.g. canopy, storage tanks, dispensing pumps, filling points, forecourt, building, etc.) of PSS, etc.

The results of the two types of analysis allowed to categorize the PSS into three categories:

Third category: PSS that cannot comply with regulations even if they do any type of upgrade. It is impossible for PSS in this category to comply with the regulations because their current location and parcel boundaries are completely inside prohibited areas.

Second category: PSS that do not comply with the most important regulations, but can do significant upgrades and comply. It is possible for PSS in this category to comply with the regulations after a significant investment like acquiring a neighbor plot to adapt their plot size or relocate its installations intersecting with protected areas.

Page 10: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

10

First category: PSS that comply with most of the important regulations but need to do some technical upgrade and risk mitigation. It is reasonably possible for the PSS in this category, to do necessary technical adjustments and comply with the regulations.

As RURA has to regularly inspect and monitor the PSS itself after this project, a computer based system has been developed to store information about existing and new PSS in a comprehensive and structured geodatabase, and to enable RURA staff to easily access information about any PSS in the country and evaluate its compliance to regulations and spatial regulations such as district land use master plans.

In summary, the following activities have been carried out during the project:

• Countrywide visit and mapping of all petrol service stations

• Analysis of their compliance with RURA regulations

• Analysis of their compliance with district land use master plans

• Analysis of their locations compared to sensitive areas

• Categorizing the PSS into three categories: PSS complying, PSS to be upgraded, PSS to be phased out

• Development of a computer based system for monitoring the location of the existing and new PSS

Page 11: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

11

4. Objective of the Project

The project intended to identify the existing and under construction PSS by gathering relevant information in order to evaluate their compliances to RURA regulations and categorize them in three categories:

PSS complying with regulations

PSS to be upgraded to comply with regulations

PSS that have to be phased out

During this project, a computer based system has also been developed to offer the following services to RURA:

Hosting, managing and accessing a well-structured geodatabase containing required information about PSS and their geographic coordinates.

Monitoring and evaluating the location of existing and proposed PSS based on RURA regulations, and vis-à-vis neighboring environment (residential houses, apartments, hotels, road junctions and sensitive areas, etc.) and the districts land use master plans.

Ensure a well-informed process for issuing PSS installation licenses by providing accurate and location-based information.

Support in any decision making process related to PSS and in “what-if scenarios” whenever needed.

Page 12: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

12

5. General Requirements for Construction and Installation of a Petrol Service Station

The design and construction of a petrol service station should consider potential environmental risks of operating a petrol station, and introduce enough engineering controls to ensure containment integrity of hazardous material (petrol) from the delivery truck, to the underground storage tank and into the customer’s vehicle.

Factors which should be considered during the design to minimize the potential loss of product and pollution include:

Environmental sustainability of the site and measures to be incorporated

Siting of the site

Storage tanks (tank design, tank contents, materials used to construct tanks and secondary containment)

Pipework and pipe trenches

Corrosion prevention systems

Fuel delivery and dispensing systems

Delivery facilities (e.g. overfill prevention, drainage of tanker standing area)

Site drainage systems (including interceptors)

Leak detection and environmental monitoring systems

5.1 Petrol Service Station Land

Existing petrol station land location should comply with requirements of environment law, national building regulations, and other relevant rules, regulations and standards, In addition to a minimum plot size of 900m2 for a petrol service station without a service bay and 1200m2 with a service bay.

5.2 Location, Design and installation of Petrol Storage Tanks

The petrol storage tanks shall be located underground, clear of the foundations of buildings and not within sensitive areas and they shall be separated from forecourts. They shall be as minimum requirements; single walled of rolled carbon or mild steel plate or fibre reinforced plastic material and shall comply with relevant international standards on petroleum equipment.

5.3 Location and Design of Pipelines and Vent Pipes

The pipelines from tanks to off-set filling points, metering pumps, dispensers and vent pipes shall be routed below the ground surface not under buildings or other obstructions at a depth of 300mm. The vent pipes shall extend to a height greater than 3.5m aboveground level and shall be in an open air to allow dispersion of vapour.

5.4 Dispenser and Pumping Facilities

All dispensers shall be of digital type and shall be calibrated by the national Body having standards in his attributions twice a year. They shall also be certified and installed in accordance with approved relevant standard on petrol products; their installation procedures must respect the manufacturer’s instructions. Dispensers shall be located at 6 m from the adjacent pump island.

Page 13: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

13

5.5 Position of Road Tanker

The road tanker stand for delivering petrol into storage tanks shall be in the open, away from buildings, dispensing activities and emergency escape routes. It shall be large enough to allow a road tanker to be positioned wholly within it during delivery.

5.6 Minimum Distance of a property Line of Petrol Service Stations and

Neighboring infrastructures

A minimum distance property line shall be as follows:

The distance of a property line of a petrol service station from the center line of the major arterial road (National Road) shall be not less than 22m;

The distance of a property line of a petrol service station from the center line of the minor (District) arterial road shall be not less than 12m;

The distance of a property line of a new petrol service station from sensitive areas shall be not less than 300m;

Any structure related with the petrol station shall be located a minimum of 50m from any residential building;

Petrol Service stations shall be sited at distance of not less than 1000m from each other on the same section of the single carriage road; this applies to either side of the dual carriage road;

NB: The distances measured from the property line of the PSS to the center line of the major/minor arterial e.t.c is taken from the parcel boundary lines.

5.7 Forecourt Construction

The forecourt area subject to vehicular traffic shall be of macadam material type or reinforced concrete and designed in a way capable of supporting the anticipated weight and intensity of traffic area under the canopy shall be concrete

5.8 Surface Drainage

Surface drainage of any area surrounding dispensers and road tanker delivery points shall be arranged to carry any spills or leaks of petrol, through trapped gullies or by channels, to petrol interceptors / oil-water separators before draining from the service station.

5.9 Construction Material Selection

Buildings shall be constructed generally of non-combustible materials and shall conform to the Rwanda Building Regulations. The Canopy shall have a minimum height of 5m.

5.10 Electrical Installations

The vent pipes and road tanker delivery stands shall be located away from the area beneath the overhead lines

The site shall be arranged so that there are no overhead power lines medium and high voltage or telephone lines. All electrical and electronic installations shall comply with the requirements of the RS 565-1 & RS 474

Page 14: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

14

5.11 Facilities Identification

Each tank shall be marked with an identifying number to distinguish it from any other tank. In the case of multi-compartment tanks, each compartment shall be marked with a separate number and type of fuel with specific color. The Dark color shall be for Kerosene, Yellow for Diesel and Blue for Gasoline.

There shall be identification on dispensers’ panels and dispenser pumps, clearly marked the words to indicate the type of product dispensed as following:

a) Gasoline; b) Diesel; c) Kerosene

5.12 Fire and Emergency Equipment

At all petrol service stations, a supply of dry sand, foam or similar absorbent material shall be kept in a container with a close fitting lid and shall be installed in an accessible place within canopy area

The PSS shall have an Emergency Management Plan for fire and spills.

Have functioning and duly serviced fire and emergency equipment, including but not limited to fire extinguishers, fire alarms which shall be available and accessible at the service station in an open space.

Page 15: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

15

6. Data Collection for Petrol Service Stations

Esri Rwanda has identified, visited and inspected 276 PSS countrywide. During the field visits, Esri field staff have collected required information using a digital and intelligent questionnaire that was agreed on with RURA prior starting the field visit and developed using iformbuilder and accessible via tablets devices.

The overall questionnaire for data collection about PSS was containing the following 19 specific sub-questionnaires:

1. Sub-questionnaire about general information 2. Sub-questionnaire about services and facilities 3. Sub-questionnaire about forecourt 4. Sub-questionnaire about parking 5. Sub-questionnaire about canopy 6. Sub-questionnaire about buildings 7. Sub-questionnaire about storage tanks 8. Sub-questionnaire about vent pipes 9. Sub-questionnaire about filling points 10. Sub-questionnaire about dispensing pumps 11. Sub-questionnaire about islands 12. Sub-questionnaire about road tanker stand 13. Sub-questionnaire about stock reconciliation and leak management 14. Sub-questionnaire about surface drainage, oil and water separators 15. Sub-questionnaire about electrical installations 16. Sub-questionnaire about fire, safety and security 17. Sub-questionnaire about staff knowledge and training 18. Sub-questionnaire about maintenance activities 19. Sub-questionnaire about disposal of waste

Each of the above questionnaire was having several questions requesting information about specific requirements as stipulated by the RURA regulations. For the purpose of evaluating the compliance of PSS with the regulations, a grading scheme was established and agreed on with RURA which assigned marks over 100% for meeting all the requirements.

Some requirements were considered to be very critical than others and they were given high grades (e.g. compliance to master plans, compliance to fire, safety and security regulations, etc.); this is mainly due to their severity from the hazard and risk points of view, based on how they represent a likelihood or a serious potential source for harming people, properties or environment.

More details about the list of questions for the above sub-questionnaires and the grade related to each question can be found in the project inception report submitted to RURA on 11 August 2016.

Page 16: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

16

6.1 Routes taken for PSS data collection

During the PSS data collection, routes have been defined to be followed by field staff based on roads and on the number of field staff (10 field staff) that conducted this exercise on field.

The following 19 routes have been defined and followed to map PSS in Kigali:

1. Field staff No 1:

- Route 1: from city main roundabout to Giticyinyoni (KN1RD)

- Route 2: from Nyabugogo taxi park to Gatsata – Karuruma (Akagera

Motor)

2. Field staff No 2:

- Route 3: from city main roundabout - Prison 1930 – Nyamirambo

Stadium (kuryanyuma)

- Route 4: Nyamirambo Stadium – Nyakabanda – Kimisagara –

Nyabugogo (not included)

3. Field staff No 3:

- Route 5: City center round about - pension plaza and mille collines

hotel – station at Radio – station at mosque –sation close to T2000 –

Station between city plaza and centenary gouse

- Route 6: Station Rugunga – Gikondo SEGEMU - to Rebero

4. Field staff No 4:

- Route 7: from Kanogo roundabout - Poids lourds (KN7Rd) –

Nyabugogo (Station Milimo included)

- Route 8: from Yamaha Muhima – to Kacyiru Police – USA embassy

– Conventional Center round about

5. Field staff No 5:

- Route 9: Gisozi bus station – Gisozi memorial – ULK – Kagugu – K

club – Utexrwa – Gisozi memorial

- Route 10: Gisozi agakinjiro – Gaposho estate

6. Field staff No 6:

- Route 11: from roundabout Kanogo – sonatubes - prince house

Remera

7. Field staff No 7:

- Route 12: - From SOPETRADE to Kimihurura - Gisimenti –

Mushimire - AZAM;

- Route 13: Kimironko – Kibagabaga – Kinyinya Centre

8. Field staff No 8:

- Route 14: From Giporoso (KN5Rd) to Kanombe Military Hospital –

Masaka (east main road)

- Route 15: Gare Remera to Rubirizi

9. Field staff No 9:

- Route 16: From CYA MITZIG (KK3Rd) to Kabuga Center

Page 17: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

17

10. Field staff No 10:

- Route 17: From Sonatubes (KK15Rd) to Gahanga Center

- Route 18: Kicukiro centre – Gitwaza - Rwandex

- Route 19: Gatenga - magerwa

The following 14 routes have been defined and followed to map PSS upcountry:

Field staff No 1:

- Route 1: Kabuga – Rwamagana – Kayonza

Field staff No 2:

- Route 2: Kayonza – Gahini – Kabarore – Ryabega - Nyagatare / - Route 3: Ryabega – Rwimiyaga – Matimba - Kagitumba

Field staff No 3:

- Route 4: Kayonza - Kabarondo – Kibungo – Rusumo

Field staff No 4:

- Route 5: Gahanga – Nyamata – Gashora - Gasenyi (umupaka Rwanda - Burundi)

Field staff No 5:

- Route 6: Rusizi – Bugarama Centre - Bugarama CIMERWA – Rusizi / - Route 7: Rusizi - Nyamasheke - Karongi - Muhanga

Field staff No 6:

- Route 8: Giticyinyoni - Musanze - Cyanika - Musanze - Route 9: Musanze - Rubavu - Route 10: Mukamira - Ngororero

Field staff No 7:

- Route 11: Giticyinyoni – Nyabarongo – Muhanga – Kabgayi - Ruhango

Field staff No 8:

- Route 12: Ruhango (MEREZ) - Nyanza (TOWN) – Huye – Kanyaru

Field staff No 9:

- Route 13: Huye (Musée) – Nyamagabe – Rusizi (intersection route rusizi-karongi)

Field staff No 10:

- Route 14: Karuruma (Akagera) – Byumba (TOWN) – Gatuna

6.2 Overview of PSS found during data collection

During the inception phase, Esri Rwanda got some information (mainly name of owner, operator, dealer, contact details, etc.) from RURA about 254 PSS. During this project, Esri Rwanda was able to collect 276 PSS. These have been categorized per District in the table below.

Page 18: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

18

6.2.1 Distribution of PSS collected per District

6.2.1.1 PSS collected in Kigali City

The following are PSS collected in Nyarugenge district:

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 46 Aziz Energy Poids Lourd 496 Operating Kigali city Nyarugenge Muhima Rugenge Ubumanzi

2 580 Black Star Shyorongi 2631 Operating Kigali city Nyarugenge Kanyinya Taba Ngendo

3 109 Discentre Nyabugogo 2327 Operating Kigali city Nyarugenge Kimisagara Kimisagara Gakaraza

4 148 Discentre Nyamirambo 214 Operating Kigali city Nyarugenge Rwezamenyo Rwezamenyo ii Umucyo

5 100 Engen Giticyinyoni 1666 Operating Kigali city Nyarugenge Kigali Nyabugogo Kamenge

6 1005 Engen Kanogo 503 Operating Kigali city Nyarugenge Nyarugenge Kiyovu Ganza

7 133 Engen Nyabugogo 1047 Operating Kigali city Nyarugenge Kimisagara Kimisagara Gakaraza

8 34 Engen Poids Lourd 502 Operating Kigali city Nyarugenge Muhima Rugenge Impala

9 37 Engen Sopetrad 27 Operating Kigali city Nyarugenge Muhima Ubumwe Isangano

10 85 Gas Oil Poids Lourd 562 Operating Kigali city Nyarugenge Muhima Amahoro Kabirizi

11 577 Gas Oil Shyorongi 3345 Operating Kigali city Nyarugenge Kanyinya Nyamweru Ruhengeri

12 103 Gemeca Giticyinyoni 1677 Operating Kigali city Nyarugenge Kigali Nyabugogo Giticyinyoni

13 82 Hass Petroleum Nyabugogo 1 352 Operating Kigali city Nyarugenge Kimisagara Kimisagara Gakaraza

14 112 Hass Petroleum Nyabugogo 2 2464 Operating Kigali city Nyarugenge Kimisagara Kimisagara Nyabugogo

15 97 Kobil Giticyinyoni 2300 Operating Kigali city Nyarugenge Kigali Nyabugogo Kamenge

16 151 Kobil Muhima 366 Operating Kigali city Nyarugenge Muhima Tetero Iwacu

17 172 Kobil Nyabugogo 1 459 Operating Kigali city Nyarugenge Muhima Nyabugogo Icyerekezo

18 121 Kobil Nyabugogo 2 1046 Operating Kigali city Nyarugenge Kimisagara Kimisagara Gakaraza

19 154 Kobil Nyakabanda 102 Operating Kigali city Nyarugenge Rwezamenyo Kabuguru ii Gasabo

20 136 Kobil Nyamirambo 996 Operating Kigali city Nyarugenge Nyamirambo Mumena Irembo

21 1045 Kobil Town T2000 1019 Operating Kigali city Nyarugenge Nyarugenge Kiyovu Inyarurembo

22 31 Maxi Station Kigali 36 Operating Kigali city Nyarugenge Muhima Ubumwe Isangano

23 28 Merez Muhima 256 Operating Kigali city Nyarugenge Muhima Amahoro Inyarurembo

Page 19: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

19

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

24 139 Merez Nyamirambo 224 Operating Kigali city Nyarugenge Rwezamenyo Rwezamenyo ii Amahoro

25 175 Mount Meru Kimisagara 85 Operating Kigali city Nyarugenge Kimisagara Kamuhoza Buhoro

26 40 Source Oil Poids Lourd 1 Operating Kigali city Nyarugenge Muhima Rugenge Ubumanzi

27 145 SP Nyabugogo 1 9 Operating Kigali city Nyarugenge Muhima Nyabugogo Ubucuruzi

28 157 SP Nyabugogo 2 2465 Operating Kigali city Nyarugenge Kimisagara Kimisagara Nyabugogo

29 142 SP Nyamirambo 159 Operating Kigali city Nyarugenge Nyamirambo Mumena Mumena

30 1083 SP Rugunga 1418 Operating Kigali city Nyarugenge Nyarugenge Kiyovu Cercle sportif

31 1082 SP Town City Tower 1036 Operating Kigali city Nyarugenge Nyarugenge Kiyovu Inyarurembo

32 1034 SP Town Mosque 1159 Operating Kigali city Nyarugenge Nyarugenge Kiyovu Inyarurembo

33 1065 SP Town Radio 1290 Operating Kigali city Nyarugenge Nyarugenge Kiyovu Inyarurembo

34 1056 SP Town Zinc Hotel 685 Operating Kigali city Nyarugenge Nyarugenge Kiyovu Ishema

35 184 Station Kimisagara Maison des Jeunes 2422

Stopped Construction Kigali city Nyarugenge Kimisagara Kimisagara Buhoro

Table 1: PSS in Nyarugenge District

The following are PSS collected in Gasabo district:

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 295 Delta Petroleum Kabuye 4745 Operating Kigali city Gasabo Jabana Kabuye Rebero

2 7 Engen Kacyiru 1592 Operating Kigali city Gasabo Kacyiru Kibaza Umutako

3 25 Engen Kimironko 601 Operating Kigali city Gasabo Kimironko Nyagatovu Ijabiro

4 160 Gas Oil Gatsata 1885 Operating Kigali city Gasabo Gatsata Nyamabuye Musango

5 289 Gas Oil Kabuye 4916 Operating Kigali city Gasabo Jabana Ngiryi Rubona

6 91 Gas Oil Masaka 138 Operating Kigali city Gasabo Rusororo Nyagahinga Runyonza

7 1077 Gulf Energy Sonatubes 256 Operating Kigali city Gasabo Remera Rukiri i Ubumwe

8 1067 Hashi Energy Gisozi 675 Operating Kigali city Gasabo Kacyiru Kamutwa Urwibutso

9 106 Hashi Energy Kabuga 503 Operating Kigali city Gasabo Rusororo Kabuga i Kabeza

10 16 Hashi Energy Kinamba 213 Operating Kigali city Gasabo Kacyiru Kamutwa Inkingi

11 1071 Kobil Gacuriro KClub 1500 Not Operating Kigali city Gasabo Kinyinya Gacuriro Akaruvusha

Page 20: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

20

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

12 79 Kobil Kabuga 57 Operating Kigali city Gasabo Rusororo Nyagahinga Runyonza

13 67 Kobil Kanombe Cyamitsingi 316 Operating Kigali city Gasabo Remera Rukiri ii Ubumwe

15 166 Kobil Karuruma 3980 Operating Kigali city Gasabo Jabana Kabuye Rebero

16 13 Kobil Kinamba 1816 Operating Kigali city Gasabo Kacyiru Kamutwa Inkingi

17 1088 Kobil Remera Grand Legacy Hotel 108 Operating Kigali city Gasabo Remera Rukiri i Gisimenti

18 19 Kobil Remera Kisimenti 422 Operating Kigali city Gasabo Remera Rukiri i Gisimenti

19 208 Lake Petroleum Rugende 1631 Operating Kigali city Gasabo Rusororo Ruhanga Mirama

20 169 M.Line Gatsata 248 Operating Kigali city Gasabo Gatsata Nyamabuye Musango

21 1070 Merez Kagugu 6923 Under Construction Kigali city Gasabo Kinyinya Kagugu Rukingu

22 43 Mogas Remera Giporoso 307 Operating Kigali city Gasabo Remera Rukiri ii Ubumwe

23 1069 Mount Meru Kagugu 5539 Operating Kigali city Gasabo Kinyinya Kagugu Kabuhunde

24 52 Mount Meru Kimironko 497 Operating Kigali city Gasabo Kimironko Bibare Imitari

25 58 Source Oil Kibagabaga 3682 Operating Kigali city Gasabo Kimironko Kibagabaga Nyirabwana

26 10 Source Oil Kacyiru 229 Operating Kigali city Gasabo Kacyiru Kamatamu Kabare

27 1066 Source Oil Kinamba 338 Operating Kigali city Gasabo Kacyiru Kibaza Iriba

28 22 Source Oil Remera 255 Operating Kigali city Gasabo Remera Rukiri ii Amahoro

29 1068 Source Oil Utexrwa 902 Operating Kigali city Gasabo Kacyiru Kibaza Umutako

30 163 SP Gatsata 226 Operating Kigali city Gasabo Gatsata Nyamugari Akamwunguzi

31 550 SP Kabuga 1277 Operating Kigali city Gasabo Rusororo Nyagahinga Nyarucundura

32 1090 SP Nyarutarama 108 Stopped Construction Kigali city Gasabo Remera Nyarutarama Gishushu

33 118 SP Remera Giporoso 269 Operating Kigali city Gasabo Remera Rukiri ii Amahoro

34 130 SP Remera Prince House 1 101 Operating Kigali city Gasabo Remera Rukiri i Gisimenti

35 55 Station Kimironko Zindiro 200 Stopped Construction Kigali city Gasabo Kimironko Bibare Abatuje

Table 2: PSS in Gasabo District

Page 21: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

21

The following are PSS collected in Kicukiro district:

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 70 Delta Petroleum Kicukiro 1865 Operating Kigali city Kicukiro Gatenga Nyanza Bwiza

2 1075 Discentre Gikondo 150 Operating Kigali city Kicukiro Kicukiro Ngoma Ahitegeye

3 1078 Enes Sonatubes 10 Operating Kigali city Kicukiro Niboye Nyakabanda Amarembo

4 4 Engen Free zone 838 Operating Kigali city Kicukiro Nyarugunga Nonko Kavumu

5 1001 Engen Gikondo 145 Operating Kigali city Kicukiro Gikondo Kinunga Kigugu i

6 1076 Engen Kicukiro 8 Operating Kigali city Kicukiro Kicukiro Gasharu Amajyambere

7 115 Engen Ndera 3357 Operating Kigali city Kicukiro Nyarugunga Kamashashi Kabagendwa

8 1073 Gas Oil Kicukiro 18 Operating Kigali city Kicukiro Kicukiro Kagina Umuremure

9 1079 Hashi Energy Gikondo 150 Operating Kigali city Kicukiro Gikondo Kinunga Kigugu i

10 1084 Hass Petroleum Gikondo 1 Operating Kigali city Kicukiro Gikondo Kanserege Kanserege iii

11 127 IRST Biodiesel Mulindi 413 Not Operating Kigali city Kicukiro Nyarugunga Kamashashi Mukoni

12 49 Kobil Gikondo Magerwa 1257 Operating Kigali city Kicukiro Gatenga Karambo Ihuriro

13 94 Kobil Kicukiro Nyanza 2602 Operating Kigali city Kicukiro Gatenga Nyanza Juru

14 76 Kobil Mulindi 1192 Operating Kigali city Kicukiro Nyarugunga Kamashashi Kabagendwa

15 1023 Kobil Sonatube 19 Operating Kigali city Kicukiro Kicukiro Kagina Umuremure

16 88 Merez Gahanga 1652 Operating Kigali city Kicukiro Gahanga Gahanga Rinini

17 319 Merez Gatenga 101 Under Construction Kigali city Kicukiro Kicukiro Ngoma Iriba

18 1004 Merez Gikondo 1 Operating Kigali city Kicukiro Kigarama Karugira Umurimo

19 1012 Mogas Gikondo 152 Operating Kigali city Kicukiro Gikondo Kinunga Kigugu i

20 178 Mount Meru Kicukiro 217 Operating Kigali city Kicukiro Kicukiro Kicukiro Gasave

21 1080 Mount Meru Remera 546 Operating Kigali city Kicukiro Niboye Nyakabanda Amahoro

22 181 Oil City Remera 668 Operating Kigali city Kicukiro Niboye Nyakabanda Kinyana

23 1072 SP Gikondo 416 Operating Kigali city Kicukiro Kicukiro Kagina Gashiha

24 124 SP Kabeza 201 Operating Kigali city Kicukiro Kanombe Kabeza Karisimbi

Page 22: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

22

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

25 1 SP Kanombe 12 615 Operating Kigali city Kicukiro Nyarugunga Rwimbogo Urwibutso

26 61 SP Kanombe Sector 1639 Operating Kigali city Kicukiro Nyarugunga Nonko Gitara

27 73 SP Remera Prince House 2 3 Operating Kigali city Kicukiro Kanombe Kabeza Giporoso i

28 1050 Station Gahanga 2289 Under Construction Kigali city Kicukiro Gahanga Gahanga Rwinanka

29 64 Station Kabeza Samuduha 807

Under Construction Kigali city Kicukiro Kanombe Rubirizi Intwari

30 1074 Ukod Oil Kicukiro 20 Operating Kigali city Kicukiro Kicukiro Gasharu Amajyambere

Table 3: PSS in Kicukiro District

6.2.1.2 PSS collected in Eastern Province:

The following are PSS collected in Bugesera district:

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 1026 Delta Petroleum

Nyamata 305 Operating Eastern Bugesera Nyamata Nyamata y' umujyi Nyamata I

2 1011 Enes Nyamata 1131 Operating Eastern Bugesera Nyamata Kayumba Gatare

3 1027 Excel Energy Nyamata 343 Operating Eastern Bugesera Nyamata Nyamata y' umujyi Nyamata II

4 1031 Gas Oil Ruhuha 945 Operating Eastern Bugesera Ruhuha Ruhuha Ruhuha II

5 1002 Kobil Nyamata 885 Operating Eastern Bugesera Ntarama Kanzenze Cyeru

6 1003 Mount Meru Nyamata 1003 Operating Eastern Bugesera Nyamata Kayumba Kayenzi

7 1047 Petroil Gashora 1226 Operating Eastern Bugesera Gashora Kagomasi Kuruganda

8 1025 Source Oil Nyamata 179 Operating Eastern Bugesera Nyamata Nyamata y' umujyi Nyabivumu

9 1049 SP Gako 1567 Operating Eastern Bugesera Mayange Mbyo Rwimikoni I

10 1089 SP Kanzenze 2278 Operating Eastern Bugesera Ntarama Kanzenze Kabeza

11 1013 SP Nyamata 1 180 Operating Eastern Bugesera Nyamata Nyamata y' umujyi Nyabivumu

12 1014 SP Nyamata 2 500 Operating Eastern Bugesera Nyamata Kanazi Musagara

Page 23: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

23

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

13 1032 Station Ruhuha 1 Destroyed Eastern Bugesera Ruhuha Gikundamvura Kazabagarura

Table 4: PSS in Bugesera District

The following are PSS collected in Gatsibo district

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 1057 Addax Petroleum Muhura 316 Operating Eastern Gatsibo Muhura Taba Kanyinya

2 1054 Delta Petroleum Ngarama 500 Operating Eastern Gatsibo Ngarama Ngarama Kiyovu

3 1018 Enes Kabarore 930 Operating Eastern Gatsibo Kabarore Kabarore Kabarore i

4 1009 Excel Energy Rwagitima 2445 Operating Eastern Gatsibo Rugarama Gihuta Gashenyi i

5 1016 Kobil Kabarore 307 Operating Eastern Gatsibo Kabarore Karenge Mutarama

6 1008 Kobil Kiramuruzi 2776 Operating Eastern Gatsibo Kiramuruzi Gakenke Akurusizi

7 1017 Source Oil Kabarore 1660 Operating Eastern Gatsibo Kabarore Kabarore Kabarore i

8 1010 Source Oil Kiziguro 3552 Operating Eastern Gatsibo Kiziguro Rubona Nyagasambu

Table 5:PSS in Gatsibo District

The following are PSS collected in Kayonza district

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 403 Discentre Kabarondo 448 Operating Eastern Kayonza Kabarondo Cyabajwa Rutagara

2 1006 Discentre Kayonza 1674 Operating Eastern Kayonza Mukarange Bwiza Abisunganye

3 475 Enes Kayonza 4449 Operating Eastern Kayonza Mukarange Nyagatovu Akanyinya

4 1085 Hashi Energy Kayonza 2628 Operating Eastern Kayonza Mukarange Kayonza Kayonza centre

5 469 Kobil Mukarange 4255 Operating Eastern Kayonza Mukarange Nyagatovu Iragwe

6 1019 Lake Petroleum Kayonza 163 Operating Eastern Kayonza Mukarange Bwiza Abemeramahoro

7 406 M.Line Kabarondo 4545 Operating Eastern Kayonza Kabarondo Cyabajwa Rutagara

8 472 Mount Meru Kayonza 3324 Operating Eastern Kayonza Mukarange Nyagatovu Akamayange

9 409 Source Oil Kabarondo 7182 Operating Eastern Kayonza Kabarondo Cyinzovu Munini

10 187 Source Oil Kayonza 4035 Operating Eastern Kayonza Mukarange Nyagatovu Irebero

11 1007 SP Kayonza 2635 Operating Eastern Kayonza Mukarange Kayonza Kayonza centre

Page 24: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

24

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

12 370 Station Kayonza Mukabuga 3590 Under Construction Eastern Kayonza Mukarange Mburabuturo Akabuga

Table 6:PSS in Kayonza District

The following are PSS collected in Kirehe district

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 439 Kobil Gatore 3244 Operating Eastern Kirehe Gatore Muganza Rwabigaro

2 433 Kobil Kirehe 1 4427 Operating Eastern Kirehe Kirehe Nyabikokora Rugero

3 424 Kobil Kirehe 2 3568 Operating Eastern Kirehe Kigina Rwanteru Rwanteru i

4 427 Lake Petroleum Kirehe 3484 Operating Eastern Kirehe Kigina Ruhanga Ku murenge

5 430 SP Kirehe 2300 Operating Eastern Kirehe Kirehe Nyabikokora Bwiza

6 421 SP Rusumo 4401 Operating Eastern Kirehe Nyamugari Kiyanzi Kabuye

7 418 Station Rusumo 4403 Under Construction Eastern Kirehe Nyamugari Kiyanzi Rusumo

Table 7:PSS in Kirehe District The following are PSS collected in Ngoma district

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 541 Engen Ngoma 2383 Operating Eastern Ngoma Kibungo Karenge Amahoro

2 415 Hashi Energy Ngoma 920 Operating Eastern Ngoma Kibungo Cyasemakamba Rubimba

3 400 Kobil Ngoma 1 918 Operating Eastern Ngoma Kibungo Cyasemakamba Rubimba

4 544 Kobil Ngoma 2 3511 Operating Eastern Ngoma Kibungo Cyasemakamba Bwiza

5 547 Merez Ngoma 1003 Operating Eastern Ngoma Kibungo Cyasemakamba Kabeza

6 412 SP Ngoma 940 Operating Eastern Ngoma Kibungo Cyasemakamba Rubimba

Table 8:PSS in Ngoma District

Page 25: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

25

The following are PSS collected in Nyagatare district

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 1055 Delta Petroleum Rukomo 3541 Operating Eastern Nyagatare Rukomo Gashenyi Rurembo

2 1051 Engen Nyagatare 1433 Operating Eastern Nyagatare Nyagatare Nyagatare Nyagatare ii

3 1028 Hashi Energy Karangazi 923 Operating Eastern Nyagatare Karangazi Rwisirabo Rukundo

4 1033 Kobil Matimba 20 Operating Eastern Nyagatare Matimba Matimba Umudugudu iii

5 1044 Kobil Nyagatare 1746 Operating Eastern Nyagatare Nyagatare Nyagatare Nyagatare ii

6 1036 Kobil Rwimiyaga 1 3053 Operating Eastern Nyagatare Rwimiyaga Nyarupfubire Rwimiyaga i

7 1037 Kobil Rwimiyaga 2 3247 Operating Eastern Nyagatare Rwimiyaga Rwimiyaga Mahoro

8 1052 Merez Nyagatare 2576 Under Construction Eastern Nyagatare Nyagatare Nyagatare Nyagatare ii

9 1029 Mogas Kagitumba 1314 Operating Eastern Nyagatare Matimba Kagitumba Munini

10 1048 Mount Meru Nyagatare 2631 Operating Eastern Nyagatare Nyagatare Nyagatare Nyagatare ii

11 1046 Source Oil Nyagatare 1747 Operating Eastern Nyagatare Nyagatare Nyagatare Nyagatare ii

12 1030 SP Matimba 79 Operating Eastern Nyagatare Matimba Matimba Umudugudu iii

13 1053 SP Nyagatare 1971 Operating Eastern Nyagatare Nyagatare Nyagatare Nyagatare ii

14 1035 SP Ryabega 771 Operating Eastern Nyagatare Nyagatare Rutaraka Ryabega

Table 9:PSS in Nyagatare District

The following are PSS collected in Rwamagana district

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 205 Buranga Petroleum Musha 2394 Operating Eastern Rwamagana Musha Musha Gatika

2 241 Hass Petroleum Mwulire 1 Operating Eastern Rwamagana Mwulire Bushenyi Kabahima

3 1058 Kobil Karenge 748 Operating Eastern Rwamagana Karenge Karenge Rebero

4 238 Kobil Mwulire 2371 Operating Eastern Rwamagana Mwulire Bushenyi Byange

5 211 Kobil Nyagasambu 921 Operating Eastern Rwamagana Fumbwe Nyakagunga Akabeza

6 463 Kobil Rwamagana 1729 Operating Eastern Rwamagana Muhazi Nyarusange Plage

Page 26: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

26

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

7 466 Kobil Rwamagana Tsinda 353 Operating Eastern Rwamagana Muhazi Nsinda Kibare

8 457 Lake Petroleum Rwamagana 297 Operating Eastern Rwamagana Kigabiro Cyanya Rurembo

9 460 Merez Rwamagana 100 Operating Eastern Rwamagana Kigabiro Cyanya Busanza

10 235 Mount Meru Gishari 604 Operating Eastern Rwamagana Mwulire Bushenyi Kabahima

11 244 SP Rwamagana 1778 Operating Eastern Rwamagana Muhazi Nyarusange Plage

Table 10:PSS in Rwamagana District

6.2.1.3 PSS collected in Northern Province

The following are PSS collected in Burera district

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 517 Delta Petroleum Butaro 11931 Operating Northern Burera Butaro Rusumo Butaro

2 520 Merez Cyanika 5852 Operating Northern Burera Cyanika Kamanyana Gasovu

3 523 OM Kidaho 4949 Operating Northern Burera Cyanika Gisovu Rutango

Table 11:PSS in Burera District

The following are PSS collected in Gakenke district

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 556 Gulf Energy Gakenke 3235 Operating Northern Gakenke Gakenke Rusagara Umujyi wa gakenke

Table 12:PSS in Gakenke District

Page 27: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

27

The following are PSS collected in Gicumbi district

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 313 Engen Byumba 331 Operating Northern Gicumbi Byumba Gacurabwenge Gacurabwenge

2 232 Gemeca Gicumbi 6100 Operating Northern Gicumbi Byumba Gacurabwenge Gashirwe

3 280 Kobil Gaseke 5304 Operating Northern Gicumbi Mutete Gaseke Irasaniro

4 316 Kobil Rukomo 702 Operating Northern Gicumbi Kageyo Horezo Nyirangoga

5 214 Source Oil Gicumbi 577 Operating Northern Gicumbi Cyumba Rwankonjo Rukizi

Table 13:PSS in Gicumbi District

The following are PSS collected in Musanze district

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 508 Discentre Musanze 1385 Operating Northern Musanze Muhoza Kigombe Nyamuremure

2 514 Kobil Musanze 1 84 Operating Northern Musanze Muhoza Mpenge Rukoro

3 376 Kobil Musanze 2 2040 Operating Northern Musanze Cyuve Rwebeya Mubuga

4 367 Lake Petroleum Musanze 513 Operating Northern Musanze Musanze Cyabagarura Bukane

5 379 Merez Musanze 2445 Operating Northern Musanze Cyuve Rwebeya Mubuga

6 502 OM Musanze 444 Operating Northern Musanze Muhoza Kigombe Nduruma

7 511 SP Musanze 1 19 Operating Northern Musanze Muhoza Cyabararika Bwuzuri

8 505 SP Musanze 2 15 Operating Northern Musanze Muhoza Mpenge Gikwege

9 364 Station Musanze Byangabo 2604

Under Construction Northern Musanze Busogo Gisesero Gahanga

10 373 Ukod Oil Musanze 836 Operating Northern Musanze Muhoza Ruhengeri Muhe

Table 14:PSS in Musanze District

Page 28: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

28

The following are PSS collected in Rulindo district

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 565 Delta Petroleum Shyorongi 760 Operating Northern Rulindo Shyorongi Bugaragara Gatimba

2 562 Kobil Rulindo 3518 Operating Northern Rulindo Rusiga Kirenge Rebero

3 559 Source Oil Base 3664 Operating Northern Rulindo Base Gitare Nyamugali

Table 15:PSS in Rulindo District

6.2.1.4 PSS collected in Southern Province

The following are PSS collected in Gisagara district

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 451 M.Line Ndora Gisagara 4808 Operating Southern Gisagara Ndora Gisagara Nyabitare

Table 16: PSS in Gisagara District

The following are PSS collected in Huye district

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 310 Engen Huye 662 Operating Southern Huye Ngoma Butare Taba

2 337 Gemeca Huye 227 Operating Southern Huye Ngoma Butare Bukinanyana

3 286 Kobil Huye Bus Station 456 Operating Southern Huye Ngoma Butare Akabuye

4 448 Kobil Huye Market 165 Operating Southern Huye Ngoma Butare Bukinanyana

5 334 Kobil Huye Town 222 Operating Southern Huye Ngoma Butare Bukinanyana

6 385 Kobil Tumba Mukoni 1 Operating Southern Huye Tumba Cyarwa Mukoni

7 292 Merez Huye 350 Operating Southern Huye Ngoma Butare Akabuye

Page 29: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

29

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

8 283 SP Huye Bus Station 953 Operating Southern Huye Ngoma Butare Karubanda

9 340 SP Huye Town 209 Operating Southern Huye Ngoma Butare Bukinanyana

10 526 Station Huye Hotel Credo 515 Destroyed Southern Huye Ngoma Butare Busenyi

Table 17:PSS in Huye District

The following are PSS collected in Kamonyi district

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 250 Aziz Energy Rugobagoba 1102 Operating Southern Kamonyi Gacurabwenge Kigembe Mushimba

2 583 Black Star Ruyenzi 2682 Operating Southern Kamonyi Runda Ruyenzi Nyagacaca

3 196 Hashi Energy Bishenyi 501 Operating Southern Kamonyi Runda Muganza Nyagacyamu

4 247 Kobil Rugobagoba 4582 Operating Southern Kamonyi Gacurabwenge Kigembe Mushimba

5 202 Lake Petroleum Kamonyi 5080 Operating Southern Kamonyi Gacurabwenge Nkingo Kamonyi

6 253 Station Bishenyi 1 118 Destroyed Southern Kamonyi Runda Muganza Nyagacyamu

7 199 Station Bishenyi 2 2354 Under Construction Southern Kamonyi Rugarika Sheli Ntebe

Table 18:PSS in Kamonyi District

The following are PSS collected in Muhanga district:

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 331 Diettha Petroleum Muhanga 2760 Operating Southern Muhanga Nyamabuye Gitarama Kagitarama

2 394 Engen Muhanga 1059 Operating Southern Muhanga Nyamabuye Gitarama Kagitarama

3 307 Gemeca Muhanga 3974 Operating Southern Muhanga Nyamabuye Gahogo Kamazuru

4 301 Hashi Muhanga 1245 Operating Southern Muhanga Nyamabuye Gitarama Kagitarama

Page 30: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

30

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

5 220 Kobil Muhanga 3121 Operating Southern Muhanga Nyamabuye Gahogo Nyarucyamu iii

6 322 Kobil Muhanga Mucyakabiri 4508 Operating Southern Muhanga Shyogwe Ruli Murambi

7 382 Kobil Nyabisindu 1817 Operating Southern Muhanga Nyamabuye Gitarama Kagitarama

8 226 M.Line Muhanga 1454 Operating Southern Muhanga Nyamabuye Gahogo Rutenga

9 304 Maxi Station Muhanga 1307 Operating Southern Muhanga Nyamabuye Gahogo Rutenga

10 223 Mount Meru Muhanga 1687 Operating Southern Muhanga Nyamabuye Gahogo Nyarucyamu i

11 325 SP Muhanga 1371 Operating Southern Muhanga Nyamabuye Gitarama Kagitarama

12 397 Station Muhanga Bus Station 1140 Under Construction Southern Muhanga Nyamabuye Gitarama Kagitarama

Table 19:PSS in Muhanga District

The following are PSS collected in Nyamagabe district

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 388 Kobil Nyamagabe 5012 Operating Southern Nyamagabe Gasaka Nyamugari Kabajogo

2 391 SP Nyamagabe 3541 Operating Southern Nyamagabe Gasaka Nyamugari Kabacuzi

3 529 Station Gasarenda 807 Destroyed Southern Nyamagabe Tare Gasarenda Murangara

Table 20:PSS in Nyamagabe District

The following are PSS collected in Nyanza district

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 442 Delta Petroleum Nyanza 3330 Operating Southern Nyanza Busasamana Nyanza Nyanza

2 259 Hashi Energy Nyanza 3357 Operating Southern Nyanza Busasamana Gahondo Bigega

3 256 Kobil Nyanza Kubigega 1526 Operating Southern Nyanza Busasamana Kavumu Mukoni

4 445 Kobil Nyanza Town 3232 Operating Southern Nyanza Busasamana Nyanza Nyanza

Table 21:PSS in Nyanza District

Page 31: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

31

The following are PSS collected in Nyaruguru district

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 478 Station Kibeho Munini 79 Not Operating Southern Nyaruguru Kibeho Mubuga Mubuga

2 499 Station Kibeho Sinayi 1 328 Under Construction Southern Nyaruguru Kibeho Kibeho Sinayi

3 496 Station Kibeho Sinayi 2 346 Destroyed Southern Nyaruguru Kibeho Kibeho Sinayi

Table 22:PSS in Nyaruguru District

The following are PSS collected in Ruhango district

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 568 Addax Petroleum Kinazi 2317 Operating Southern Ruhango Kinazi Burima Burima

2 490 Enes Ruhango 681 Operating Southern Ruhango Ruhango Nyamagana Mujyejuru i

3 481 Kobil Kirengeri 2524 Operating Southern Ruhango Byimana Kirengeri Kirengeri

4 553 M.Line Gitwe 6822 Operating Southern Ruhango Bweramana Murama Rusororo

5 571 M.Line Kinazi 1505 Under Construction Southern Ruhango Kinazi Burima Mirambi

6 493 Merez Ruhango 581 Operating Southern Ruhango Ruhango Nyamagana Mujyejuru i

7 484 Mogas Ruhango 5622 Operating Southern Ruhango Ruhango Munini Gataka

8 574 Station Kigoma 6205 Destroyed Southern Ruhango Ruhango Rwoga Mwezi

9 487 Station Ruhango Yezu Nyirimpuhwe 5831 Not Operating Southern Ruhango Ruhango Munini Gataka

Table 23:PSS in Ruhango District

Page 32: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

32

6.2.1.5 PSS collected in Western Province

The following are PSS collected in Karongi district

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 1041 Engen Rubengera 693 Operating Western Karongi Rubengera Gacaca Kamuvunyi

2 1038 Kobil Karongi 916 Operating Western Karongi Bwishyura Kiniha Ruganda

3 1040 Merez Karongi 18 Operating Western Karongi Bwishyura Kibuye Gatwaro

4 1039 Source Oil Karongi 316 Operating Western Karongi Bwishyura Kiniha Nyarurembo

5 1042 Source Oil Rubengera 409 Under Rehabilitation Western Karongi Rubengera Gacaca Kamuvunyi

6 1043 SP Rubengera 159 Operating Western Karongi Rubengera Gacaca Gasharu

Table 24:PSS in Karongi District

The following are PSS collected in Ngororero district

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 538 Hashi Energy Ngororero 15 Operating Western Ngororero Ngororero Kazabe Ngororero

2 532 OM Kabaya 2421 Operating Western Ngororero Kabaya Kabaya Kimisagara

3 535 OM Ngororero 4014 Operating Western Ngororero Ngororero Rususa Kabagari

Table 25:PSS in Ngororero District

The following are PSS collected in Nyabihu district

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 355 Kobil Nyabihu Shaba 3160 Operating Western Nyabihu Bigogwe Kijote Shaba

2 361 Lake Petroleum Mukamira 1455 Operating Western Nyabihu Mukamira Jaba Rwanyirangeni

3 358 OM Mukamira 4146 Operating Western Nyabihu Mukamira Rugeshi Kazibake

Table 26:PSS in Nyabihu District

Page 33: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

33

The following are PSS collected in Nyamasheke district

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 1024 Delta Petroleum Nyamasheke 4709 Operating Western Nyamasheke Kanjongo Kibogora Nyagacaca

Table 27:PSS in Nyamasheke District

The following are PSS collected in Rubavu district

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 268 Delta Petroleum Rubavu 297 Operating Western Rubavu Gisenyi Bugoyi Bugoyi

2 262 Discentre Rubavu 609 Operating Western Rubavu Gisenyi Mbugangari Amajyambere

3 274 Engen Rubavu 1070 Operating Western Rubavu Gisenyi Nengo Ubucuruzi

4 346 Gas Oil Rubavu 274 Operating Western Rubavu Gisenyi Nengo Nyaburanga

5 349 Gemeca Rubavu 277 Operating Western Rubavu Gisenyi Nengo Nyaburanga

6 271 Kobil Rubavu 1078 Operating Western Rubavu Gisenyi Nengo Ubucuruzi

7 277 Merez Rubavu 1224 Operating Western Rubavu Gisenyi Nengo Gikarani

8 352 OM Mahoko 4907 Operating Western Rubavu Kanama Mahoko Mahoko

9 265 OM Rubavu 1188 Operating Western Rubavu Gisenyi Kivumu Giponda

10 343 SP Rubavu 275 Operating Western Rubavu Gisenyi Nengo Nyaburanga

Table 28:PSS in Rubavu District

The following are PSS collected in Rusizi district:

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

1 1061 Engen Kamembe 397 Operating Western Rusizi Kamembe Kamashangi Kadasomwa

2 1087 Excel Energy Bugarama 2601 Operating Western Rusizi Bugarama Nyange Gatebe

3 1064 Gas Oil Kamembe 402 Operating Western Rusizi Kamembe Gihundwe Nkurunziza

4 1021 Hashi Energy Rusizi 1004 Operating Western Rusizi Kamembe Ruganda Murindi

Page 34: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

34

No PSS_ID PSS_Name Parcel_ID Status Province District Sector Cell Village

5 1022 Hashi Enery Kamembe 1758 Operating Western Rusizi Kamembe Ruganda Kadashya

6 1015 Kobil Kamembe 36 Operating Western Rusizi Kamembe Kamurera Cyapa

7 1060 Kobil Rusizi 1 10 Operating Western Rusizi Mururu Gahinga Birogo

8 1063 Maxi Station Kamembe 404 Operating Western Rusizi Kamembe Gihundwe Nkurunziza

9 1020 Merez Rusizi 1444 Under Construction Western Rusizi Kamembe Kamurera Gikombe

10 1086 SP Bugarama 1 Operating Western Rusizi Bugarama Pera Mwaro

11 1059 SP Rusizi 1 9 Operating Western Rusizi Mururu Gahinga Birogo

12 1062 SP Rusizi 2 2493 Operating Western Rusizi Gihundwe Kamatita Gahwazi

Table 29:PSS in Rusizi District

Page 35: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

35

6.2.2 Comparison of PSS given by RURA and PSS collected by Esri

A comparison was made with the data given by RURA so as to establish if all the PSS were captured by Esri Rwanda during this project. The following tables indicates PSS given by RURA but not found by Esri during the data collection.

The following table shows PSS that have been licensed by RURA which were not foundduring the data collection:

Table 30: Licensed PSS given by RURA and not found by Esri

NB: There could be may reasons of not finding the above PSS on field (e.g. PSS not yet constructed; PSS now operating under a different name; PSS licensed to an individual but rented to a different operator).

No Name of Licensed PSS Location License Number Expiry Date

1 Loyal Trust Company Ltd Huye 024/PSS/RURA/2015 30/06/2015

2 Buranga Petroleum Ruhango 002/PSS/RURA/2014 03/12/2017

3 Trans Time Ltd Ruhango 006/PSS/RURA/2015 21/01/2018

4 Gaz Energy Muhanga 005/PSS/RURA/2014 17/12/2018

5 Mr. KABAGEMA Jean Muhanga 023/PSS/RURA/2015 26/06/2018

6 Kinehe Ngosha Ltd. Muhanga 014/PSS/RURA/2015 02/04/2018

7 Mr.RURANGANGABO Paulin Kicukiro 031/PSS/LIC/GP-EWS/RURA/2015

31/08/2018

8 Mr. NDAGIMANA Francois Kabeza 033/PSS/LIC/GP-EWS/RURA/2015

02/10/2018

9 La Japonaise Ltd Nyamata 022/PSS/RURA/2015 22/05/2018

10 Mr. NDAGIJIMANA Emmanuel Nyamata 027/PSS/LIC/GP-EWS/RURA/2015

13/08/2018

11 Entreprise KAMANA Olivier Nyamata 011/PSS/RURA/2015 27/02/2018

12 Mr. KABALISA Gaspard Kayonza 026/PSS/RURA/2015 28/07/2018

13 Escale Group Ltd

Kayonza 030/PSS/LIC/GP-EWS/RURA/2015

31/08/2018

14 Mr. GASHUMBA Emmanuel Kirehe 020/PSS/RURA/2015 28/04/2018

15 Escale Group Ltd Kirehe 021/PSS/RURA/2015 15/05/2018

16 Nsinda Station Service Rwamagana 010/PSS/RURA/2015 27/02/2018

17 Home Station Rwamagana 036/PSS/LIC/GP-EWS/RURA/2015

13/10/2018

18 Petroil Ltd Ruhuha 015/PSS/RURA/2015 28/04/2018

19 Home Station Kibeho 038/PSS/LIC/GP-EWS/RURA/2015

12/10/2018

20 GF. Petroleum & Service Ltd 012/PSS/RURA/2015 26/02/2018

Page 36: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

36

The following table shows PSS previously collected by RURA, which were not found during the data collection:

No Name of PSS Province District Sector

1 Enes -Ruyenzi Southern Kamonyi Runda

2 Hass Petroleum Southern Ruhango Ruhango

3 Station Gitwe Southern Ruhango Gitwe

4 Job Petroleum Southern Nyamagabe Gasaka

5 Petro Ouset Southern Nyaruguru Kibeho

6 Job Petroleum Southern Nyanza Busasamana

7 Petro Ouset Southern Gisagara Ndora

8 Station Nyagasambu Eastern Rwamanagana Nyagasambu

9 Station Lion Ltd Eastern Kirehe

10 Station Muhazi Kibaru Eastern Rwamanagana Nyagasambu

11 Station Accession Eastern Rwamanagana Karenge

12 I.P.S (International Petroleum Suppliers Ltd)

Eastern Kayonza Mukarange

13 Station Accession Eastern Ngoma Sake

14 I.P.S (International Petroleum Suppliers Ltd)

Eastern Ngoma Kibungo

15 I.P.S (International Petroleum Suppliers Ltd)

Eastern Nyagatare Nyagatare

16 I.P.S Kirehe Eastern Kirehe

17 Job Petroleum Shyorongi Northern Rulindo Rusiga

18 Station –Bushoki, Nyirangarama Northern Rulindo Tare

19 Lion Station Shaba Western Nyabihu Mukamira

20 Accession Ltd Bugarama Western Rusizi Bugarama

21 Station Unknown Bugarama Western Rusizi Bugarama

22 Station Blue Moon- Kanyinya Kigali City Nyarugenge Kanyinya

23 Olympic Energy Sonatube Kigali City Kicukiro Kicukiro

24 I.P.S (International Petroleum Suppliers Ltd) Kabuga

Kigali City Kicukiro Masaka

25 I.P.S (International Petroleum Suppliers Ltd) Kanombe

Kigali City Kicukiro

Nyarugunga

26 Gemeca Sonatube Kigali City Kicukiro Niboye

Page 37: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

37

Table 31: List of PSS visited by RURA and not found by Esri

NB: one of the reason is caused by the change made with respect to operators that are managing the stations. (Eg. Station that were under JOB Petroleum are now under different operators; stations that were under Petro-ouest or Gapco are now under various companies such as Lake Petroleum, HASH Energy; Stations that were under Buranga Petroleum are now managed by SP, MT Meru, etc.).

The following table shows PSS given by RURA but found on field to be operating with a different name:

Table 32: PSS given by RURA but Operating under a different name

27 Engen Kabuye Kigali City Gasabo Jabana

28 Job Petroleum Kigali City Gasabo Gatsata

No Name of PSS Province District Sector Currently Operating As

1 Gapco Southern Muhanga Nyamabuye Hashi Energy

2 Delta Southern Muhanga Nyamabuye M.Line

3 Gapco Southern Kamonyi Lake Oil Petroleum

4 Gapco Eastern Rwamagana Kigabiro Lake Oil Petroleum

5 Delta Eastern Kayonza Kabarondo M.Line

6 Petro Ouest Eastern Gatsibo Kabarore Enes

7 Abbax Eastern Gatsibo Ngarama Delta

8 Zita Petroleum Eastern Nyagatare Nyagatare Delta

9 Gapco Eastern Kirehe Kigina Lake Oil Petroleum

10 Buranga Eastern Bugesera Nyamata Mount Meru

11 Station Sopeya Northern Rulindo Rusiga Kobil

12 Sopeya Northern Musanze Cyuve Kobil

13 Abbax Petrol Northern Gicumbi Mutete Kobil Gaseke

14 Job Petroleum Western Rubavu Gisenyi Delta

15 Engen Centre Ville

Kigali Nyarugenge Nyarugenge SP

17 Kobil City Centre Kigali Nyarugenge Nyarugenge SP Town Zinc Hotel

18 Job Petroleum Kigali Kicukiro Gikondo Mogas

19 Gas Oil Kigali Gasabo Kacyru Hashi Energy

Page 38: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

38

The following table shows PSS found by Esri which were not in the list provided by RURA:

No PSS_ID PSS_Name Province District Sector Village

1 211 Kobil Nyagasambu Eastern Rwamagana Fumbwe Akabeza

2 244 SP Rwamagana Eastern Rwamagana Muhazi Plage

3 370 Station Kayonza Mukabuga Eastern Kayonza Mukarange Akabuga

4 415 Hashi Energy Ngoma Eastern Ngoma Kibungo Rubimba

5 418 Station Rusumo Eastern Kirehe Nyamugari Rusumo

6 421 SP Rusumo Eastern Kirehe Nyamugari Kabuye

7 427 Lake Petroleum Kirehe Eastern Kirehe Kigina Ku murenge

8 430 SP Kirehe Eastern Kirehe Kirehe Bwiza

9 439 Kobil Gatore Eastern Kirehe Gatore Rwabigaro

10 463 Kobil Rwamagana Eastern Rwamagana Muhazi Plage

11 466 Kobil Rwamagana Tsinda Eastern Rwamagana Muhazi Kibare

12 469 Kobil Mukarange Eastern Kayonza Mukarange Iragwe

13 472 Mount Meru Kayonza Eastern Kayonza Mukarange Akamayange

14 475 Enes Kayonza Eastern Kayonza Mukarange Akanyinya

15 541 Engen Ngoma Eastern Ngoma Kibungo Amahoro

16 1007 SP Kayonza Eastern Kayonza Mukarange Kayonza centre

17 1008 Kobil Kiramuruzi Eastern Gatsibo Kiramuruzi Akurusizi

18 1009 Excel Energy Rwagitima Eastern Gatsibo Rugarama Gashenyi i

19 1016 Kobil Kabarore Eastern Gatsibo Kabarore Mutarama

20 1019 Lake Petroleum Kayonza Eastern Kayonza Mukarange Abemeramahoro

21 1025 Source Oil Kibagabaga Eastern Bugesera Nyamata Nyabivumu

22 1027 Excel Energy Nyamata Eastern Bugesera Nyamata Nyamata II

23 1029 Mogas Kagitumba Eastern Nyagatare Matimba Munini

24 1030 SP Matimba Eastern Nyagatare Matimba Umudugudu iii

25 1032 Station Ruhuha Eastern Bugesera Ruhuha Kazabagarura

26 1035 SP Ryabega Eastern Nyagatare Nyagatare Ryabega

27 1037 Kobil Rwimiyaga 2 Eastern Nyagatare Rwimiyaga Mahoro

28 1047 Petroil Gashora Eastern Bugesera Gashora Kuruganda

29 1048 Mount Meru Nyagatare Eastern Nyagatare Nyagatare Nyagatare ii

30 1049 SP Gako Eastern Bugesera Mayange Rwimikoni I

31 1052 Merez Nyagatare Eastern Nyagatare Nyagatare Nyagatare ii

32 1055 Delta Petroleum Rukomo Eastern Nyagatare Rukomo Rurembo

33 1057 Addax Petroleum Muhura Eastern Gatsibo Muhura Kanyinya

34 1085 Hashi Energy Kayonza Eastern Kayonza Mukarange Kayonza centre

35 1089 SP Kanzenze Eastern Bugesera Ntarama Kabeza

36 4 Engen Free zone Kigali city Kicukiro Nyarugunga Kavumu

37 7 Engen Kacyiru Kigali city Gasabo Kacyiru Umutako

38 13 Kobil Kinamba Kigali city Gasabo Kacyiru Inkingi

39 22 Source Oil Remera Kigali city Gasabo Remera Amahoro

Page 39: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

39

No PSS_ID PSS_Name Province District Sector Village

40 43 Mogas Remera Giporoso Kigali city Gasabo Remera Ubumwe

41 49 Kobil Gikondo Magerwa Kigali city Kicukiro Gatenga Ihuriro

42 55 Station Kimironko Zindiro Kigali city Gasabo Kimironko Abatuje

43 61 SP Kanombe Sector Kigali city Kicukiro Nyarugunga Gitara

44 64 Station Kabeza Samuduha Kigali city Kicukiro Kanombe Intwari

45 67 Kobil Kanombe Cyamitsingi Kigali city Gasabo Remera Ubumwe

46 73 SP Remera Prince House 2 Kigali city Kicukiro Kanombe Giporoso i

47 97 Kobil Giticyinyoni Kigali city Nyarugenge Kigali Kamenge

48 121 Kobil Nyabugogo 2 Kigali city Nyarugenge Kimisagara Gakaraza

49 124 SP Kabeza Kigali city Kicukiro Kanombe Karisimbi

50 130 SP Remera Prince House 1 Kigali city Gasabo Remera Gisimenti

51 148 Discentre Nyamirambo Kigali city Nyarugenge Rwezamenyo Umucyo

52 169 M.Line Gatsata Kigali city Gasabo Gatsata Musango

53 172 Kobil Nyabugogo 1 Kigali city Nyarugenge Muhima Icyerekezo

54 184 Station Kimisagara Maison des Jeunes Kigali city Nyarugenge Kimisagara Buhoro

55 295 Delta Petroleum Kabuye Kigali city Gasabo Jabana Rebero

56 550 SP Kabuga Kigali city Gasabo Rusororo Nyarucundura

57 580 Black Star Shyorongi Kigali city Nyarugenge Kanyinya Ngendo

58 1050 Station Gahanga Kigali city Kicukiro Gahanga Rwinanka

59 1067 Hashi Energy Gisozi Kigali city Gasabo Kacyiru Urwibutso

60 1068 Source Oil Utexrwa Kigali city Gasabo Kacyiru Umutako

61 1071 Kobil Gacuriro KClub Kigali city Gasabo Kinyinya Akaruvusha

62 1074 Ukod Oil Kicukiro Kigali city Kicukiro Kicukiro Amajyambere

63 1080 Mount Meru Remera Kigali city Kicukiro Niboye Amahoro

64 1082 SP Town City Tower Kigali city Nyarugenge Nyarugenge Inyarurembo

65 1083 SP Rugunga Kigali city Nyarugenge Nyarugenge Cercle sportif

66 214 Source Oil Nyamata Northern Gicumbi Cyumba Rukizi

67 313 Engen Byumba Northern Gicumbi Byumba Gacurabwenge

68 373 Ukod Oil Musanze Northern Musanze Muhoza Muhe

69 376 Kobil Musanze 2 Northern Musanze Cyuve Mubuga

70 517 Delta Petroleum Butaro Northern Burera Butaro Butaro

71 523 OM Kidaho Northern Burera Cyanika Rutango

72 562 Kobil Rulindo Northern Rulindo Rusiga Rebero

73 565 Delta Petroleum Shyorongi Northern Rulindo Shyorongi Gatimba

74 199 Station Bishenyi 2 Southern Kamonyi Rugarika Ntebe

75 220 Kobil Muhanga Southern Muhanga Nyamabuye Nyarucyamu iii

76 223 Mount Meru Muhanga Southern Muhanga Nyamabuye Nyarucyamu i

77 250 Aziz Energy Rugobagoba Southern Kamonyi Gacurabwenge Mushimba

78 253 Station Bishenyi 1 Southern Kamonyi Runda Nyagacyamu

79 283 SP Huye Bus Station Southern Huye Ngoma Karubanda

80 304 Maxi Station Muhanga Southern Muhanga Nyamabuye Rutenga

Page 40: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

40

No PSS_ID PSS_Name Province District Sector Village

81 322 Kobil Muhanga Mucyakabiri Southern Muhanga Shyogwe Murambi

82 331 Diettha Petroleum Muhanga Southern Muhanga Nyamabuye Kagitarama

83 391 SP Nyamagabe Southern Nyamagabe Gasaka Kabacuzi

84 397 Station Muhanga Bus Station Southern Muhanga Nyamabuye Kagitarama

85 442 Delta Petroleum Nyanza Southern Nyanza Busasamana Nyanza

86 451 M.Line Ndora Gisagara Southern Gisagara Ndora Nyabitare

87 478 Station Kibeho Munini Southern Nyaruguru Kibeho Mubuga

88 487 Station Ruhango Yezu Nyirimpuhwe Southern Ruhango Ruhango Gataka

89 490 Enes Ruhango Southern Ruhango Ruhango Mujyejuru i

90 496 Station Kibeho Sinayi 2 Southern Nyaruguru Kibeho Sinayi

91 499 Station Kibeho Sinayi 1 Southern Nyaruguru Kibeho Sinayi

92 526 Station Huye Hotel Credo Southern Huye Ngoma Busenyi

93 529 Station Gasarenda Southern Nyamagabe Tare Murangara

94 553 M.Line Gitwe Southern Ruhango Bweramana Rusororo

95 571 M.Line Kinazi Southern Ruhango Kinazi Mirambi

96 574 Station Kigoma Southern Ruhango Ruhango Mwezi

97 583 Black Star Ruyenzi Southern Kamonyi Runda Nyagacaca

98 262 Discentre Rubavu Western Rubavu Gisenyi Amajyambere

99 355 Kobil Nyabihu Shaba Western Nyabihu Bigogwe Shaba

100 538 Hashi Energy Ngororero Western Ngororero Ngororero Ngororero

101 1020 Merez Rusizi Western Rusizi Kamembe Gikombe

102 1041 Engen Rubengera Western Karongi Rubengera Kamuvunyi

103 1043 SP Rubengera Western Karongi Rubengera Gasharu

104 1086 SP Bugarama Western Rusizi Bugarama Mwaro

105 1087 Excel Energy Bugarama Western Rusizi Bugarama Gatebe

Table 33:PSS collected by Esri and not provided in the list given by RURA

Page 41: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

41

6.3 Maps of the distribution of PSS found during data collection

Figure 1: Distribution of Petrol Service Stations in Rwanda

The above map shows the distribution of PSS within the districts as well as how close they are to the national paved roads.

Page 42: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

42

Figure 2: Total number of Petrol Service Stations per District

The above map shows how PSS are distributed in terms of their numbers per district.

Page 43: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

43

7. Data Analysis for Petrol Service Stations

During the data analysis, Esri Rwanda conducted a deep compliance analysis based on the RURA regulations with two types of analysis: Geographic location-based (spatial) analysis plus technical and risk analysis

7.1 Geographic location-based (Spatial) Analysis

Using Spatial Analyst tools provided in ArcGIS for Desktop software, Esri Rwanda performed location-based analysis on the collected data that allowed to reveal the spatial relationship between PSS with parcels data, infrastructure data, social economic data, environmental data, sensitive areas data, etc.

The spatial analysis has allowed also to compare the geographic locations of the PSS with the local district land use master and development plans to check if they are in line with those master plans.

Based on the spatial requirements from RURA regulations, Esri Rwanda has checked the PSS locations to answer the following questions and has given grades based on the grading scheme defined and agreed on with RURA.

Is the plot size complying with RURA regulations?

Is the plot location complying with the Master Plan?

Is the PSS near (<300m) a sensitive area?

What is the distance from PSS property line to centre of the major road?

What is the distance from PSS property line centre of the minor road?

What is the distance from PSS property line to cross cutting road junction?

What is the distance from PSS property line to nearest residential area?

What is the distance from nearest petrol station?

Page 44: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

44

7.1.1 Geographic Location Analysis Scores Over 100% of Operating PSS

The following is a table showin the geographic location analysis scores of each PSS over 100%.PSS highilighted in green have scored over 50% and the ones highlighted in orange have scored less than 50%.

PSS_ID PSS_Name PSS Distance to Major Road Score Over 1 %

PSS Distance to Minor Road Score Over 1 %

PSS Distance to Nearby PSS Score Over 1 %

PSS Plot Size Score Over 10%

PSS Distance to Road Junction Score Over 1 %

PSS Distance to Residential House Score Over 3 %

PSS Distance to Sensitive Area Score Over 3%

PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

1009 Excel Energy Rwagitima 0 N/A 1 10 1 0 3 10 86

10 Source Oil Kacyiru N/A 1 1 10 1 3 3 5 83

1065 SP Town Radio N/A 1 0 10 0 3 0 10 83

1029 Mogas Kagitumba 1 N/A 1 10 0 3 3 5 79

1003 Mount Meru Nyamata 0 N/A 1 10 0 3 3 5 76

1075 Discentre Gikondo 0 N/A 0 10 1 3 3 5 76

145 SP Nyabugogo 1 0 N/A 0 10 0 3 3 5 72

172 Kobil Nyabugogo 1 0 N/A 0 10 0 3 3 5 72

181 Oil City Remera 0 N/A 0 10 1 0 0 10 72

412 SP Ngoma 0 N/A 0 10 1 0 0 10 72

1016 Kobil Kabarore 0 N/A 0 10 1 0 0 10 72

1033 Kobil Matimba 0 N/A 0 10 1 0 0 10 72

1039 Source Oil Karongi 0 N/A 0 10 1 0 0 10 72

1040 Merez Karongi 0 N/A 0 10 1 0 0 10 72

1041 Engen Rubengera 0 N/A 0 10 1 0 0 10 72

1057 Addax Petroleum Muhura N/A 1 1 10 1 0 3 5 72

Page 45: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

45

PSS_ID PSS_Name PSS Distance to Major Road Score Over 1 %

PSS Distance to Minor Road Score Over 1 %

PSS Distance to Nearby PSS Score Over 1 %

PSS Plot Size Score Over 10%

PSS Distance to Road Junction Score Over 1 %

PSS Distance to Residential House Score Over 3 %

PSS Distance to Sensitive Area Score Over 3%

PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

1063 Maxi Station Kamembe 1 N/A 0 10 0 0 0 10 72

82 Hass Petroleum Gikondo 0 0 0 10 0 3 3 5 70

49 Kobil Gikondo Magerwa 1 N/A 0 10 1 0 3 5 69

88 Merez Gahanga 0 N/A 1 10 1 0 3 5 69

202 Lake Petroleum Kamonyi 1 N/A 1 10 0 0 3 5 69

214 Source Oil Nyamata 0 N/A 1 10 1 0 3 5 69

235 Mount Meru Gishari 0 N/A 1 10 1 0 3 5 69

238 Kobil Mwulire 0 N/A 1 10 1 0 3 5 69

241 Hass Petroleum Mwulire 0 N/A 1 10 1 0 3 5 69

262 Discentre Rubavu 0 N/A 1 10 1 0 3 5 69

316 Kobil Rukomo 0 N/A 1 10 1 0 3 5 69

325 SP Muhanga 0 N/A 1 10 1 0 3 5 69

355 Kobil Nyabihu Shaba 0 N/A 1 10 1 0 3 5 69

367 Lake Petroleum Musanze 0 N/A 0 10 0 0 0 10 69

421 SP Rusumo 0 N/A 1 10 1 0 3 5 69

439 Kobil Gatore 0 N/A 1 10 1 0 3 5 69

466 Kobil Rwamagana Tsinda 0 N/A 1 10 1 0 3 5 69

469 Kobil Mukarange 0 N/A 1 10 1 0 3 5 69

472 Mount Meru Kayonza 0 N/A 1 10 1 0 3 5 69

520 Merez Cyanika 0 N/A 1 10 1 0 3 5 69

Page 46: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

46

PSS_ID PSS_Name PSS Distance to Major Road Score Over 1 %

PSS Distance to Minor Road Score Over 1 %

PSS Distance to Nearby PSS Score Over 1 %

PSS Plot Size Score Over 10%

PSS Distance to Road Junction Score Over 1 %

PSS Distance to Residential House Score Over 3 %

PSS Distance to Sensitive Area Score Over 3%

PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

553 M.Line Gitwe 0 N/A 1 10 1 0 3 5 69

565 Delta Petroleum Shyorongi 0 N/A 1 10 1 0 3 5 69

577 Gas Oil Shyorongi 0 N/A 1 10 1 0 3 5 69

1002 Kobil Nyamata 0 N/A 1 10 1 0 3 5 69

1011 Enes Nyamata 0 N/A 1 10 1 0 3 5 69

1019 Lake Petroleum Kayonza 0 N/A 1 10 1 0 3 5 69

1031 Gas Oil Ruhuha 0 N/A 1 10 1 0 3 5 69

1047 Petroil Gashora 0 N/A 1 10 1 0 3 5 69

1089 SP Kanzenze 0 N/A 1 10 1 0 3 5 69

94 Kobil Kicukiro Nyanza 0 N/A 1 10 0 0 3 5 66

166 Kobil Karuruma 0 N/A 1 10 0 0 3 5 66

220 Kobil Muhanga 0 N/A 0 10 1 0 3 5 66

223 Mount Meru Muhanga 0 N/A 0 10 1 0 3 5 66

226 M.Line Muhanga 0 N/A 0 10 1 0 3 5 66

247 Kobil Rugobagoba 0 N/A 0 10 1 0 3 5 66

250 Aziz Energy Rugobagoba 0 N/A 0 10 1 0 3 5 66

256 Kobil Nyanza Kubigega 0 N/A 0 10 1 0 3 5 66

259 Hashi Energy Nyanza 0 N/A 0 10 1 0 3 5 66

304 Maxi Station Muhanga 0 N/A 0 10 1 0 3 5 66

322 Kobil Muhanga Mucyakabiri 0 N/A 1 10 0 0 3 5 66

Page 47: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

47

PSS_ID PSS_Name PSS Distance to Major Road Score Over 1 %

PSS Distance to Minor Road Score Over 1 %

PSS Distance to Nearby PSS Score Over 1 %

PSS Plot Size Score Over 10%

PSS Distance to Road Junction Score Over 1 %

PSS Distance to Residential House Score Over 3 %

PSS Distance to Sensitive Area Score Over 3%

PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

376 Kobil Musanze 2 0 N/A 0 10 1 0 3 5 66

379 Merez Musanze 0 N/A 0 10 1 0 3 5 66

382 Kobil Nyabisindu 0 N/A 0 10 1 0 3 5 66

409 Source Oil Kabarondo 0 N/A 0 10 1 0 3 5 66

424 Kobil Kirehe 2 0 N/A 1 10 0 0 3 5 66

427 Lake Petroleum Kirehe 0 N/A 0 10 1 0 3 5 66

481 Kobil Kirengeri 0 N/A 1 10 0 0 3 5 66

493 Merez Ruhango 0 N/A 0 10 1 0 3 5 66

550 SP Kabuga 0 N/A 0 10 1 0 3 5 66

556 Gulf Energy Gakenke 0 N/A 1 10 0 0 3 5 66

559 Source Oil Base 0 N/A 1 10 0 0 3 5 66

1001 Engen Gikondo 0 N/A 0 10 1 0 3 5 66

1010 Source Oil Kiziguro 0 N/A 0 10 1 0 3 5 66

1028 Hashi Energy Karangazi 0 N/A 1 10 0 0 3 5 66

1036 Kobil Rwimiyaga 1 0 N/A 0 10 1 0 3 5 66

1045 Kobil Town T2000 N/A 1 0 10 0 3 0 5 66

1053 SP Nyagatare 0 N/A 0 10 1 0 3 5 66

289 Gas Oil Kabuye 0 0 1 10 0 0 3 5 63

583 Black Star Ruyenzi 0 0 1 10 0 0 3 5 63

1014 SP Nyamata 2 0 0 1 10 0 0 3 5 63

Page 48: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

48

PSS_ID PSS_Name PSS Distance to Major Road Score Over 1 %

PSS Distance to Minor Road Score Over 1 %

PSS Distance to Nearby PSS Score Over 1 %

PSS Plot Size Score Over 10%

PSS Distance to Road Junction Score Over 1 %

PSS Distance to Residential House Score Over 3 %

PSS Distance to Sensitive Area Score Over 3%

PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

79 Kobil Kabuga 0 N/A 0 10 0 0 3 5 62

91 Gas Oil Masaka 0 N/A 0 10 0 0 3 5 62

100 Engen Giticyinyoni 0 N/A 0 10 0 0 3 5 62

130 SP Remera Prince House 1 0 N/A 0 10 0 0 3 5 62

160 Gas Oil Gatsata 0 N/A 0 10 0 0 3 5 62

169 M.Line Gatsata 0 N/A 0 10 0 0 3 5 62

196 Hashi Energy Bishenyi 0 N/A 0 10 0 0 3 5 62

388 Kobil Nyamagabe 0 N/A 0 10 0 0 3 5 62

391 SP Nyamagabe 0 N/A 0 10 0 0 3 5 62

535 OM Ngororero 0 N/A 0 10 0 0 3 5 62

538 Hashi Energy Ngororero 0 N/A 0 10 0 0 3 5 62

1005 Engen Kanogo 0 N/A 0 10 0 3 0 5 62

1013 SP Nyamata 1 0 N/A 0 10 0 3 0 5 62

1022 Hashi Enery Kamembe 0 N/A 0 10 0 0 3 5 62

1058 Kobil Karenge N/A 1 1 10 1 0 0 5 62

1080 Mount Meru Remera 0 N/A 0 10 0 0 3 5 62

133 Engen Nyabugogo 0 0 0 10 0 3 0 5 60

7 Engen Kacyiru N/A 1 0 10 1 0 0 5 59

211 Kobil Nyagasambu 0 N/A 1 10 1 0 0 5 59

295 Delta Petroleum Kabuye 0 N/A 1 10 1 0 0 5 59

Page 49: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

49

PSS_ID PSS_Name PSS Distance to Major Road Score Over 1 %

PSS Distance to Minor Road Score Over 1 %

PSS Distance to Nearby PSS Score Over 1 %

PSS Plot Size Score Over 10%

PSS Distance to Road Junction Score Over 1 %

PSS Distance to Residential House Score Over 3 %

PSS Distance to Sensitive Area Score Over 3%

PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

394 Engen Muhanga 1 N/A 0 10 1 0 0 5 59

523 OM Kidaho 0 N/A 1 10 1 0 0 5 59

541 Engen Ngoma 0 N/A 1 10 1 0 0 5 59

580 Black Star Shyorongi 0 N/A 1 10 1 0 0 5 59

1004 Merez Gikondo N/A 1 0 10 1 0 0 5 59

1049 SP Gako 0 N/A 1 10 1 0 0 5 59

1069 Mount Meru Kagugu N/A 1 0 10 1 0 0 5 59

1072 SP Gikondo 0 N/A 0 10 1 3 3 0 59

1082 SP Town City Tower 1 N/A 0 10 0 3 3 0 59

19 Kobil Remera Kisimenti N/A 0 0 10 1 0 0 5 55

25 Engen Kimironko N/A 0 0 10 1 0 0 5 55

40 Source Oil Poids Lourd N/A 0 0 10 1 0 0 5 55

43 Mogas Remera Giporoso 1 N/A 0 10 0 0 0 5 55

52 Mount Meru Kimironko N/A 0 0 10 1 0 0 5 55

61 SP Kanombe Sector N/A 1 0 10 0 0 0 5 55

85 Gas Oil Poids Lourd N/A 1 0 10 0 0 0 5 55

118 SP Remera Giporoso 1 N/A 0 10 0 0 0 5 55

139 Merez Nyamirambo N/A 0 0 10 1 0 0 5 55

157 SP Nyabugogo 2 0 N/A 0 10 0 3 3 0 55

175 Mount Meru Kimisagara N/A 0 0 10 1 0 0 5 55

Page 50: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

50

PSS_ID PSS_Name PSS Distance to Major Road Score Over 1 %

PSS Distance to Minor Road Score Over 1 %

PSS Distance to Nearby PSS Score Over 1 %

PSS Plot Size Score Over 10%

PSS Distance to Road Junction Score Over 1 %

PSS Distance to Residential House Score Over 3 %

PSS Distance to Sensitive Area Score Over 3%

PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

232 Gemeca Gicumbi 0 N/A 0 10 1 0 0 5 55

244 SP Rwamagana 0 N/A 0 10 1 0 0 5 55

280 Kobil Gaseke 0 N/A 1 10 0 0 0 5 55

283 SP Huye Bus Station 0 N/A 0 10 1 0 0 5 55

286 Kobil Huye Bus Station 0 N/A 0 10 1 0 0 5 55

292 Merez Huye 0 N/A 0 10 1 0 0 5 55

301 Hashi Muhanga 0 N/A 0 10 1 0 0 5 55

307 Gemeca Muhanga 0 N/A 0 10 1 0 0 5 55

310 Engen Huye 0 N/A 0 10 1 0 0 5 55

352 OM Mahoko 0 N/A 1 10 0 0 0 5 55

361 Lake Petroleum Mukamira 0 N/A 0 10 1 0 0 5 55

373 Ukod Oil Musanze 0 N/A 0 10 1 0 0 5 55

400 Kobil Ngoma 1 0 N/A 0 10 1 0 0 5 55

433 Kobil Kirehe 1 0 N/A 0 10 1 0 0 5 55

463 Kobil Rwamagana 0 N/A 0 10 1 0 0 5 55

484 Mogas Ruhango 0 N/A 0 10 1 0 0 5 55

490 Enes Ruhango 0 N/A 0 10 1 0 0 5 55

502 OM Musanze 0 N/A 0 10 1 0 0 5 55

505 SP Musanze 2 0 N/A 0 10 1 0 0 5 55

508 Discentre Musanze 0 N/A 0 10 1 0 0 5 55

Page 51: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

51

PSS_ID PSS_Name PSS Distance to Major Road Score Over 1 %

PSS Distance to Minor Road Score Over 1 %

PSS Distance to Nearby PSS Score Over 1 %

PSS Plot Size Score Over 10%

PSS Distance to Road Junction Score Over 1 %

PSS Distance to Residential House Score Over 3 %

PSS Distance to Sensitive Area Score Over 3%

PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

511 SP Musanze 1 0 N/A 0 10 1 0 0 5 55

514 Kobil Musanze 1 0 N/A 0 10 1 0 0 5 55

544 Kobil Ngoma 2 0 N/A 0 10 1 0 0 5 55

547 Merez Ngoma 0 N/A 0 10 1 0 0 5 55

1008 Kobil Kiramuruzi 0 N/A 0 10 1 0 0 5 55

1012 Mogas Gikondo 0 N/A 0 10 1 0 0 5 55

1017 Source Oil Kabarore 0 N/A 0 10 1 0 0 5 55

1018 Enes Kabarore 0 N/A 0 10 1 0 0 5 55

1023 Kobil Sonatube 0 N/A 0 10 1 0 0 5 55

1024 Delta Petroleum Nyamasheke 0 N/A 1 10 0 0 0 5 55

1035 SP Ryabega 0 N/A 1 10 0 0 0 5 55

1054 Delta Petroleum Ngarama 0 N/A 1 10 0 0 0 5 55

1059 SP Rusizi 1 0 N/A 0 10 1 0 0 5 55

1060 Kobil Rusizi 1 0 N/A 0 10 1 0 0 5 55

1061 Engen Kamembe 1 N/A 0 10 0 0 0 5 55

1079 Hashi Energy Gikondo 0 N/A 0 10 1 0 0 5 55

1084 Hass Petroleum Nyabugogo 1 N/A 0 0 10 1 0 0 5 55

385 Kobil Tumba Mukoni 0 0 1 10 0 0 0 5 53

457 Lake Petroleum Rwamagana 0 0 0 10 1 0 0 5 53

1027 Excel Energy Nyamata 0 N/A 1 10 0 0 0 5 53

Page 52: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

52

PSS_ID PSS_Name PSS Distance to Major Road Score Over 1 %

PSS Distance to Minor Road Score Over 1 %

PSS Distance to Nearby PSS Score Over 1 %

PSS Plot Size Score Over 10%

PSS Distance to Road Junction Score Over 1 %

PSS Distance to Residential House Score Over 3 %

PSS Distance to Sensitive Area Score Over 3%

PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

4 Engen Free zone 0 N/A 0 10 0 0 0 5 52

37 Engen Sopetrad 0 0 0 10 0 0 0 5 52

46 Aziz Energy Poids Lourd N/A 0 0 10 0 0 0 5 52

67 Kobil Kanombe Cyamitsingi 0 N/A 0 10 0 0 0 5 52

151 Kobil Muhima 0 N/A 0 10 0 0 0 5 52

187 Source Oil Kayonza 0 N/A 0 10 0 0 0 5 52

274 Engen Rubavu 0 N/A 0 10 0 0 0 5 52

334 Kobil Huye Town 0 N/A 0 10 0 0 0 5 52

343 SP Rubavu 0 N/A 0 10 0 0 0 5 52

346 Gas Oil Rubavu 0 N/A 0 10 0 0 0 5 52

349 Gemeca Rubavu 0 N/A 0 10 0 0 0 5 52

403 Discentre Kabarondo 0 N/A 0 10 0 0 0 5 52

406 M.Line Kabarondo 0 N/A 0 10 0 0 0 5 52

475 Enes Kayonza 0 N/A 0 10 0 0 0 5 52

568 Addax Petroleum Kinazi 0 N/A 0 10 0 0 0 5 52

1006 Discentre Kayonza 0 N/A 0 10 0 0 0 5 52

1015 Kobil Kamembe 0 N/A 0 10 0 0 0 5 52

1025 Source Oil Kibagabaga 0 N/A 0 10 0 0 0 5 52

1044 Kobil Nyagatare 0 N/A 0 10 0 0 0 5 52

1048 Mount Meru Nyagatare N/A 0 0 10 0 0 0 5 52

Page 53: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

53

PSS_ID PSS_Name PSS Distance to Major Road Score Over 1 %

PSS Distance to Minor Road Score Over 1 %

PSS Distance to Nearby PSS Score Over 1 %

PSS Plot Size Score Over 10%

PSS Distance to Road Junction Score Over 1 %

PSS Distance to Residential House Score Over 3 %

PSS Distance to Sensitive Area Score Over 3%

PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

1051 Engen Nyagatare N/A 0 0 10 0 0 0 5 52

1062 SP Rusizi 2 N/A 0 0 10 0 0 0 5 52

1068 Source Oil Utexrwa N/A 1 0 10 1 0 3 0 52

1085 Hashi Energy Kayonza 0 N/A 0 10 0 0 0 5 52

1086 SP Bugarama N/A 0 0 10 0 0 0 5 52

97 Kobil Giticyinyoni 0 0 0 10 0 0 0 5 50

277 Merez Rubavu 0 0 0 10 0 0 0 5 50

445 Kobil Nyanza Town 0 0 0 10 0 0 0 5 50

1007 SP Kayonza 0 0 0 10 0 0 0 5 50

1087 Excel Energy Bugarama 0 0 0 10 0 0 0 5 50

178 Mount Meru Kicukiro 0 N/A 0 10 1 0 3 0 48

1034 SP Town Mosque N/A 1 0 0 0 3 0 10 48

1056 SP Town Zinc Hotel 1 N/A 0 10 0 3 0 0 48

31 Maxi Station Kigali N/A 0 0 10 0 3 0 0 45

103 Gemeca Giticyinyoni 0 N/A 0 10 0 0 3 0 45

112 Hass Petroleum Nyabugogo 2 0 N/A 0 0 0 0 3 10 45

121 Kobil Nyabugogo 2 0 N/A 0 10 0 3 0 0 45

1088 Kobil Remera Grand Legacy Hotel 0 N/A 0 10 0 0 3 0 45

1 SP Kanombe 12 0 N/A 1 10 1 0 0 0 41

34 Engen Poids Lourd N/A 1 0 10 1 0 0 0 41

Page 54: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

54

PSS_ID PSS_Name PSS Distance to Major Road Score Over 1 %

PSS Distance to Minor Road Score Over 1 %

PSS Distance to Nearby PSS Score Over 1 %

PSS Plot Size Score Over 10%

PSS Distance to Road Junction Score Over 1 %

PSS Distance to Residential House Score Over 3 %

PSS Distance to Sensitive Area Score Over 3%

PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

1066 Source Oil Kinamba N/A 1 0 10 1 0 0 0 41

1077 Gulf Energy Sonatubes 1 N/A 0 10 1 0 0 0 41

13 Kobil Kinamba N/A 1 0 10 0 0 0 0 38

16 Hashi Energy Kinamba N/A 1 0 10 0 0 0 0 38

28 Merez Muhima 1 N/A 0 10 0 0 0 0 38

124 SP Kabeza N/A 0 0 10 1 0 0 0 38

142 SP Nyamirambo N/A 0 0 10 1 0 0 0 38

154 Kobil Nyakabanda N/A 0 0 10 1 0 0 0 38

163 SP Gatsata 0 N/A 0 10 1 0 0 0 38

265 OM Rubavu 0 N/A 0 10 1 0 0 0 38

415 Hashi Energy Ngoma 0 N/A 0 10 1 0 0 0 38

1030 SP Matimba 0 N/A 0 10 1 0 0 0 38

1037 Kobil Rwimiyaga 2 0 N/A 0 0 1 0 0 10 38

1064 Gas Oil Kamembe 1 N/A 0 0 0 0 0 10 38

1073 Gas Oil Kicukiro 0 N/A 0 10 1 0 0 0 38

1076 Engen Kicukiro 0 N/A 0 10 1 0 0 0 38

1078 Enes Sonatubes 0 N/A 0 10 1 0 0 0 38

1083 SP Rugunga 1 N/A 0 10 0 0 0 0 38

73 SP Remera Prince House 2 0 N/A 0 10 0 0 0 0 34

76 Kobil Mulindi 0 N/A 0 10 0 0 0 0 34

Page 55: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

55

PSS_ID PSS_Name PSS Distance to Major Road Score Over 1 %

PSS Distance to Minor Road Score Over 1 %

PSS Distance to Nearby PSS Score Over 1 %

PSS Plot Size Score Over 10%

PSS Distance to Road Junction Score Over 1 %

PSS Distance to Residential House Score Over 3 %

PSS Distance to Sensitive Area Score Over 3%

PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

106 Hashi Energy Kabuga 0 N/A 0 10 0 0 0 0 34

337 Gemeca Huye 0 N/A 0 10 0 0 0 0 34

358 OM Mukamira 1 N/A 0 0 1 0 3 5 34

451 M.Line Ndora Gisagara N/A 0 1 0 1 0 3 5 34

1046 Source Oil Nyagatare 0 N/A 0 10 0 0 0 0 34

1055 Delta Petroleum Rukomo N/A 0 1 0 1 0 3 5 34

109 Discentre Nyabugogo 0 0 0 10 0 0 0 0 33

268 Delta Petroleum Rubavu 0 N/A 0 0 1 0 3 5 31

430 SP Kirehe 0 N/A 0 0 1 0 3 5 31

517 Delta Petroleum Butaro 0 N/A 1 0 0 0 3 5 31

1021 Hashi Energy Rusizi 0 N/A 0 0 1 0 3 5 31

208 Lake Petroleum Rugende 0 0 1 0 0 0 3 5 30

562 Kobil Rulindo 0 0 1 0 0 0 3 5 30

58 Source Oil Gicumbi N/A 1 1 0 1 0 0 5 28

271 Kobil Rubavu 1 N/A 0 0 0 0 0 5 21

313 Engen Byumba 0 N/A 0 0 1 0 0 5 21

331 Diettha Petroleum Muhanga 0 N/A 0 0 1 0 0 5 21

448 Kobil Huye Market 1 N/A 0 0 0 0 0 5 21

460 Merez Rwamagana N/A 0 0 0 1 0 0 5 21

532 OM Kabaya 0 N/A 1 0 0 0 0 5 21

Page 56: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

56

PSS_ID PSS_Name PSS Distance to Major Road Score Over 1 %

PSS Distance to Minor Road Score Over 1 %

PSS Distance to Nearby PSS Score Over 1 %

PSS Plot Size Score Over 10%

PSS Distance to Road Junction Score Over 1 %

PSS Distance to Residential House Score Over 3 %

PSS Distance to Sensitive Area Score Over 3%

PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

1038 Kobil Karongi 0 N/A 0 0 1 0 0 5 21

205 Buranga Petroleum Musha 0 0 1 0 0 0 0 5 20

22 Source Oil Remera N/A 0 0 0 0 0 0 5 17

70 Delta Petroleum Kicukiro 0 N/A 0 0 0 0 0 5 17

340 SP Huye Town 0 N/A 0 0 0 0 0 5 17

442 Delta Petroleum Nyanza 0 N/A 0 0 0 0 0 5 17

1026 Delta Petroleum Nyamata 0 N/A 0 0 0 0 0 5 17

1067 Hashi Energy Gisozi N/A 1 0 0 1 3 0 0 17

1043 SP Rubengera 0 N/A 0 0 1 0 3 0 14

136 Kobil Nyamirambo N/A 1 0 0 1 0 0 0 7

148 Discentre Nyamirambo N/A 1 0 0 1 0 0 0 7

1074 Ukod Oil Kicukiro 0 N/A 0 0 1 0 0 0 3

115 Engen Ndera 0 0 0 0 0 0 0 0 0

Table 34: Geographic Location Analysis Scores Over 100% of Operating PSS

NB: N/A implies PSS not evaluated against indicated parameter

Page 57: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

57

7.1.2 Average Score of Operating PSS per Operator on Geographic Location

Analysis

The following table recapitulates the average score over 100% per operator as analysis results on PSS compliance to geographic locations and master plans regulations.

Table 35: Average Score of Operating PSS per Operator on Geographic Location Analysis

NB: The average score is based on number of PSS that are currently operating; PSS under construction, rehabilitation or not operating are not considered here.

No Operator Number of Operating PSS per Operator

Average Score Over 30% for Spatial

Location

1 Excel Energy 3 63

2 Addax 2 62

3 Mogas 4 61

4 Mount Meru 10 61

5 Black Star 2 61

6 Maxi 3 61

7 Hass 4 60

8 Lake Petroleum 7 59

9 Aziz 2 59

10 M.Line 5 57

11 Gas Oil 9 56

12 Merez 12 56

13 Kobil 57 55

14 Source Oil 15 54

15 Enes 5 54

16 Gulf Energy 2 53

17 SP 40 53

18 Engen 19 51

19 Discentre 7 49

20 Hashi 13 49

21 Gemeca 5 48

22 OM 7 46

23 Other 4 46

24 Delta 10 39

25 Ukod 2 29

Page 58: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

58

7.2 Technical and risk analysis

Using technical data collected on site, PSS have been analysed from different perspectives such as hazard and risk, safety and security, environment, available services, staff knowledge, compliance to RURA regulations of different parts (e.g. canopy, storage tanks, dispensing pumps, filling points, forecourt, building, etc.) of PSS, etc.

7.2.1 Technical and Risk Analysis Scores over 100 % of Operating PSS

PSS_ID PSS_Name

Fire, Safety, Security Score over 10%

Storage Tanks Score over 9%

Filling Point Score over 7%

Electrical Installation Score over 5%

Forecourt Score over 5%

Dispensing Pumps Score over 4%

Disposal of Waste Score over 4%

Staff Knowledge and Training Score over 4%

Available Services Score over 3%

Wet Stock Reconcilitaion Score over 3%

Parking Score over 2%

Canopy Score over 2%

Vent Pipes Score over 2%

Road Tanker Score over 2%

Surface Drainage Score over 2%

Maintenance Activities Score over 2%

Building Score over 1%

Island Score over 1%

Total Technical and Risk Analysis Score over 100%

100 Engen Giticyinyoni 6.5 8 5.5 4 3 3 4 3 2.5 2.5 1.5 1 2 1.5 2 2 1 1 77

172 Kobil Nyabugogo 1 6.5 7 6 4.5 2.5 4 4 3 2 3 2 1 2 1.5 1 2 1 1 77

1005 Engen Kanogo 7 8 6 3 3.5 2 3.5 2 2 2.5 1.5 2 2 2 1.5 2 1 1 75

43 Mogas Remera Giporoso 6 9 5.5 4.5 3.5 3 3.5 3 2.5 1 2 1 2 2 0 2 1 1 75

145 SP Nyabugogo 1 5.5 10 6 3 2.5 3.5 4 3 2.5 1.5 2 1 1 1 2 2 1 1 75

133 Engen Nyabugogo 5.5 10 4.5 4 4 3 4 3 1.5 2.5 0.5 1 1 1.5 2 2 1 1 74

Page 59: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

59

PSS_ID PSS_Name

Fire, Safety, Security Score over 10%

Storage Tanks Score over 9%

Filling Point Score over 7%

Electrical Installation Score over 5%

Forecourt Score over 5%

Dispensing Pumps Score over 4%

Disposal of Waste Score over 4%

Staff Knowledge and Training Score over 4%

Available Services Score over 3%

Wet Stock Reconcilitaion Score over 3%

Parking Score over 2%

Canopy Score over 2%

Vent Pipes Score over 2%

Road Tanker Score over 2%

Surface Drainage Score over 2%

Maintenance Activities Score over 2%

Building Score over 1%

Island Score over 1%

Total Technical and Risk Analysis Score over 100%

151 Kobil Muhima 5.5 9 6 3.5 2.5 4 4 3 1.5 2.5 2 1 1 1.5 1 2 1 1 74

121 Kobil Nyabugogo 2 5.5 9 4.5 4.5 2 3.5 4 3 2.5 3 0 1 1 1.5 2 2 1 1 73

283 SP Huye Bus Station 6.5 9 5 4.5 3.5 4 2 3 3 1.5 0 2 2 1.5 1.5 2 0 0 73

310 Engen Huye 6 7 4 3.5 4 4 2 3 2.5 2 0 2 2 2 2 2 1 1 71

4 Engen Free zone 7.5 8 5.5 3 3 3.5 3.5 3 2.5 1.5 1 2 1 2 0.5 2 0 0 71

223 Mount Meru Muhanga 5.5 9 5 4.5 2.5 3.5 2 3 1 2.5 1.5 1 2 1.5 1 2 1 1 71

1 SP Kanombe 12 7 6 6 4.5 4 3 2.5 3.5 2 1.5 0 2 1 1.5 1 2 1 1 71

52 Mount Meru Kimironko 5 10 5 4.5 3.5 3 3 3 2 0.5 1 2 2 1.5 1 1 0 1 70

1082 SP Town City Tower 6 10 5.5 3.5 2 4 3.5 1.5 2 0.5 2 1 2 1.5 1 2 1 0 70

1076 Engen Kicukiro 6.5 8 6.5 4 1.5 4 3.5 1.5 1.5 0.5 2 2 2 2 1 0 1 1 69

37 Engen Sopetrad 7 10 5 3 3.5 3 3.5 3.5 0.5 0.5 0 2 2 1.5 1.5 1 0 1 69

1065 SP Town Radio 7.5 8 5.5 3.5 1.5 2.5 3.5 3 2.5 0.5 1.5 2 2 1 0 2 1 1 69

Page 60: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

60

PSS_ID PSS_Name

Fire, Safety, Security Score over 10%

Storage Tanks Score over 9%

Filling Point Score over 7%

Electrical Installation Score over 5%

Forecourt Score over 5%

Dispensing Pumps Score over 4%

Disposal of Waste Score over 4%

Staff Knowledge and Training Score over 4%

Available Services Score over 3%

Wet Stock Reconcilitaion Score over 3%

Parking Score over 2%

Canopy Score over 2%

Vent Pipes Score over 2%

Road Tanker Score over 2%

Surface Drainage Score over 2%

Maintenance Activities Score over 2%

Building Score over 1%

Island Score over 1%

Total Technical and Risk Analysis Score over 100%

34 Engen Poids Lourd 6.5 9 5 3.5 3 4 3 3 0 1 1 2 2 1 2 1 0 1 69

178 Mount Meru Kicukiro 8 8 6.5 3.5 3 4 3 1 1.5 1 2 0.5 2 1.5 0.5 1 0 1 69

7 Engen Kacyiru 5.5 8 5 3.5 3 3 3.5 3 1.5 0.5 1.5 2 1 1.5 2 2 0 1 68

541 Engen Ngoma 3 8 7 4 1 4 3.5 3.5 2 1 1.5 2 2 1.5 1.5 2 0 0 68

25 Engen Kimironko 8 7 5 4 2.5 3 3.5 2.5 1 0.5 0 2 2 1.5 1.5 1 1 1 67

484 Mogas Ruhango 3.5 8 5.5 4 4 3.5 2 3 3 3 2 1 1 1.5 0 1 1 0 67

1003 Mount Meru Nyamata 7 9 6 2.5 3.5 4 2.5 2.5 0.5 0.5 0 2 2 1.5 0.5 2 1 0 67

583 Black Star Ruyenzi 3.5 10 5.5 4 1.5 3.5 2.5 3 1 3 2 1 1 1 1 1 1 1 66

427

Lake Petroleum Kirehe 4.5 6 5.5 4 4 3 4 3 1.5 1 1 2 1 1.5 1.5 1 1 1 66

493 Merez Ruhango 2.5 9 5.5 4 4 2 2 3 1.5 2.5 1.5 1 2 1.5 1 1 1 1 66

235 Mount Meru Gishari 6 6 6 3 4.5 4 1 3 2 0.5 0 2 2 1.5 0.5 2 1 1 66

Page 61: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

61

PSS_ID PSS_Name

Fire, Safety, Security Score over 10%

Storage Tanks Score over 9%

Filling Point Score over 7%

Electrical Installation Score over 5%

Forecourt Score over 5%

Dispensing Pumps Score over 4%

Disposal of Waste Score over 4%

Staff Knowledge and Training Score over 4%

Available Services Score over 3%

Wet Stock Reconcilitaion Score over 3%

Parking Score over 2%

Canopy Score over 2%

Vent Pipes Score over 2%

Road Tanker Score over 2%

Surface Drainage Score over 2%

Maintenance Activities Score over 2%

Building Score over 1%

Island Score over 1%

Total Technical and Risk Analysis Score over 100%

1004 Merez Gikondo 7 9 3.5 3 3.5 3 3.5 3 3 0.5 0 2 1 1.5 0 1 1 0 65

157 SP Nyabugogo 2 5.5 7 4 3 2 3.5 4 3 1.5 2.5 1.5 1 1 1 1 2 1 1 65

568

Addax Petroleum Kinazi 2.5 9 5.5 4 1.5 3 2 3 1.5 3 1.5 1 2 1.5 1 1 1 1 64

46 Aziz Energy Poids Lourd 5.5 9 5.5 4.5 3 4 2 0 2.5 0.5 1.5 2 1 1 0 2 0 1 64

250 Aziz Energy Rugobagoba 2.5 8 5 3.5 4 3.5 4 3 1 2 0 1 2 1.5 1 1 1 1 64

97 Kobil Giticyinyoni 3 10 6 4 2 3.5 2.5 2.5 0.5 2.5 2 1 1 1.5 1 1 0 1 64

1088

Kobil Remera Grand Legacy Hotel 5 8 4.5 3.5 2 3 3.5 3.5 2.5 0.5 2 2 1 1 0 2 1 0 64

325 SP Muhanga 4.5 9 5 3 2.5 3.5 3.5 3 1.5 2 0 1 1 1.5 1 1 1 1 64

1075 Discentre Gikondo 5.5 9 5 3 2 3.5 3.5 1.5 2 0.5 1.5 2 1 2 1.5 0 1 0 64

220 Kobil Muhanga 4 7 5 3.5 2.5 4 4 3 1.5 1.5 1 1 1 1.5 1 1 1 1 64

61 SP Kanombe Sector 4.5 8 4.5 3.5 2.5 2.5 2 2.5 2.5 1 2 2 2 2 0 2 1 0 64

Page 62: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

62

PSS_ID PSS_Name

Fire, Safety, Security Score over 10%

Storage Tanks Score over 9%

Filling Point Score over 7%

Electrical Installation Score over 5%

Forecourt Score over 5%

Dispensing Pumps Score over 4%

Disposal of Waste Score over 4%

Staff Knowledge and Training Score over 4%

Available Services Score over 3%

Wet Stock Reconcilitaion Score over 3%

Parking Score over 2%

Canopy Score over 2%

Vent Pipes Score over 2%

Road Tanker Score over 2%

Surface Drainage Score over 2%

Maintenance Activities Score over 2%

Building Score over 1%

Island Score over 1%

Total Technical and Risk Analysis Score over 100%

1021 Hashi Energy Rusizi 4.5 9 6 3.5 4 3 1 3 0 0.5 1.5 2 1 2 1 1 1 0 63

286 Kobil Huye Bus Station 3.5 6 5 4 3.5 3 2.5 3 1.5 1 0 2 1 2 2 2 1 1 63

247 Kobil Rugobagoba 4.5 7 6 4.5 2.5 4 2 3 1 2 1.5 1 1 1 1 1 1 0 63

58 Source Oil Gicumbi 6 10 5.5 4.5 1.5 1.5 3 2.5 1 0.5 1.5 1 2 1.5 0 1 0 1 63

1072 SP Gikondo 4.5 7 5.5 4.5 2 4 4 0 2 2 2 2 1 1 0.5 1 1 0 63

340 SP Huye Town 7 5.5 5 4 2.5 3 2 3 2.5 1.5 0 1 2 1 1 1 1 1 63

160 Gas Oil Gatsata 4.5 6 6 4 1.5 3.5 3 3 0.5 1.5 1.5 1 1 1.5 1 2 1 1 62

196 Hashi Energy Bishenyi 4.5 6 5 4.5 4 2.5 2.5 3 1 2 0 1 2 1.5 1 1 1 1 62

211 Kobil Nyagasambu 4.5 7 4.5 3 3.5 4 3.5 3 3 0.5 0 2 1 1.5 0.5 1 1 0 62

1045 Kobil Town T2000 6 8 4.5 3.5 2 2.5 3.5 3 1 0.5 1.5 2 1 1.5 0 2 1 0 62

202

Lake Petroleum Kamonyi 4.5 9 3 3.5 3.5 4 2.5 3 0.5 2.5 0 1 1 0.5 1 2 1 1 62

Page 63: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

63

PSS_ID PSS_Name

Fire, Safety, Security Score over 10%

Storage Tanks Score over 9%

Filling Point Score over 7%

Electrical Installation Score over 5%

Forecourt Score over 5%

Dispensing Pumps Score over 4%

Disposal of Waste Score over 4%

Staff Knowledge and Training Score over 4%

Available Services Score over 3%

Wet Stock Reconcilitaion Score over 3%

Parking Score over 2%

Canopy Score over 2%

Vent Pipes Score over 2%

Road Tanker Score over 2%

Surface Drainage Score over 2%

Maintenance Activities Score over 2%

Building Score over 1%

Island Score over 1%

Total Technical and Risk Analysis Score over 100%

31 Maxi Station Kigali 5 10 5.5 3.5 2 3.5 2 2 2 1 1.5 2 2 1.5 0 0 0 0 62

1069 Mount Meru Kagugu 5.5 8 7 3 1.5 2 2 2.5 2 0.5 1.5 2 2 1.5 0.5 1 0 1 62

1080 Mount Meru Remera 6.5 7 6 3 3.5 3 2 2.5 2 0.5 1 2 1 1 0.5 0 1 1 62

475 Enes Kayonza 6 7 5 3 1.5 3 1 3 2.5 0.5 1.5 2 2 1.5 0.5 1 1 1 61

274 Engen Rubavu 3.5 9 5.5 4.5 2.5 3 2.5 3 2.5 0.5 0 2 2 0.5 0 1 0 1 61

136 Kobil Nyamirambo 5.5 8 5.5 3 3.5 2 3.5 2 2 0.5 1 0.5 2 1.5 0.5 1 1 0 61

304 Maxi Station Muhanga 4.5 7 5 3.5 3 4 2.5 3 1 1.5 0 1 2 1.5 0.5 1 1 1 61

547 Merez Ngoma 3.5 7 5.5 3.5 3 2.5 3 2.5 2.5 1.5 1.5 2 1 1 1 1 1 0 61

472 Mount Meru Kayonza 5 7 6 4.5 3.5 3 1 0 2.5 0.5 1.5 2 2 1 0.5 1 1 1 61

142 SP Nyamirambo 4 7 5.5 2.5 2.5 3 2 3 3 1 1.5 2 1 1 1 1 1 1 61

70

Delta Petroleum Kicukiro 6 7 5 3 2.5 4 2 3.5 2 1 1.5 0.5 2 0.5 0 1 1 0 61

Page 64: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

64

PSS_ID PSS_Name

Fire, Safety, Security Score over 10%

Storage Tanks Score over 9%

Filling Point Score over 7%

Electrical Installation Score over 5%

Forecourt Score over 5%

Dispensing Pumps Score over 4%

Disposal of Waste Score over 4%

Staff Knowledge and Training Score over 4%

Available Services Score over 3%

Wet Stock Reconcilitaion Score over 3%

Parking Score over 2%

Canopy Score over 2%

Vent Pipes Score over 2%

Road Tanker Score over 2%

Surface Drainage Score over 2%

Maintenance Activities Score over 2%

Building Score over 1%

Island Score over 1%

Total Technical and Risk Analysis Score over 100%

91 Gas Oil Masaka 2.5 8 4.5 3.5 3.5 4 3 0.5 2.5 2 1 2 1 1.5 1 1 1 0 61

103 Gemeca Giticyinyoni 5.5 8 4.5 3.5 1.5 2 3.5 2 1.5 1.5 2 1 1 1 1 1 1 1 61

334 Kobil Huye Town 4 5 6.5 2.5 3.5 3.5 2 2 1.5 1.5 1.5 2 2 1 0 2 1 1 61

463 Kobil Rwamagana 5 7 6 3 2.5 0.5 3.5 3 2.5 0.5 0 2 2 1.5 0.5 1 1 1 61

367

Lake Petroleum Musanze 2.5 10 6 2.5 1.5 3 2.5 2.5 1.5 0.5 1.5 2 2 1 1.5 1 1 0 61

139 Merez Nyamirambo 3 8 4.5 2.5 4 2.5 3.5 3 3 1 0 2 1 1.5 1 1 1 0 61

265 OM Rubavu 3.5 10 5 3.5 1.5 2.5 2 3 2 0.5 2 2 1 1 0 1 1 1 61

124 SP Kabeza 4.5 9 5 3.5 2.5 3 2 3 1.5 1 0 2 2 1 0.5 1 1 0 61

1007 SP Kayonza 4 8 5.5 3.5 1.5 4 2 2 1.5 0.5 1.5 1 1 1.5 1 2 1 1 61

118 SP Remera Giporoso 5 9 5.5 4 3.5 0.5 2 3 1.5 1 0 1 2 2 0.5 1 0 1 61

1062 SP Rusizi 2 4.5 8 6 3 3.5 3 2.5 3 1.5 0.5 0 1 2 1.5 0.5 0 1 1 61

Page 65: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

65

PSS_ID PSS_Name

Fire, Safety, Security Score over 10%

Storage Tanks Score over 9%

Filling Point Score over 7%

Electrical Installation Score over 5%

Forecourt Score over 5%

Dispensing Pumps Score over 4%

Disposal of Waste Score over 4%

Staff Knowledge and Training Score over 4%

Available Services Score over 3%

Wet Stock Reconcilitaion Score over 3%

Parking Score over 2%

Canopy Score over 2%

Vent Pipes Score over 2%

Road Tanker Score over 2%

Surface Drainage Score over 2%

Maintenance Activities Score over 2%

Building Score over 1%

Island Score over 1%

Total Technical and Risk Analysis Score over 100%

241

Hass Petroleum Mwulire 5 7 5 3.5 3 3 2 3 1 0.5 0 2 2 1 1 2 1 0 60

112

Hass Petroleum Nyabugogo 2 5.5 7 2.5 4 3 3 4 3 0.5 2 0 1 1 0.5 1 2 1 1 60

469 Kobil Mukarange 4 7 6 3.5 4.5 1 2 3 2 0.5 1.5 2 2 1 0 1 1 0 60

466

Kobil Rwamagana Tsinda 5 8 5.5 4 2 3 1 3 1 0.5 2 2 2 0.5 0.5 1 1 0 60

88 Merez Gahanga 4.5 8.5 5 3.5 3.5 2 3.5 0.5 1.5 0.5 2 0.5 2 1.5 0 1 1 1 60

412 SP Ngoma 4 7 3.5 4 1.5 4 3.5 3 1 1 0 2 2 1 1.5 2 1 0 60

343 SP Rubavu 4.5 7.5 5.5 3.5 1.5 4 2 3 3 0.5 1.5 1 1 0.5 2 1 0 0 60

394 Engen Muhanga 2.5 7 4.5 4.5 3.5 3 2 3 1.5 2 0 1 2 1.5 0.5 1 1 1 59

307 Gemeca Muhanga 4.5 8 5 4 1.5 3 2 3 0.5 2 0 1 2 1.5 0.5 1 1 1 59

106 Hashi Energy Kabuga 4.5 7 3.5 2.5 4 2.5 3.5 3 3 1 0 2 2 0.5 0.5 1 1 0 59

Page 66: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

66

PSS_ID PSS_Name

Fire, Safety, Security Score over 10%

Storage Tanks Score over 9%

Filling Point Score over 7%

Electrical Installation Score over 5%

Forecourt Score over 5%

Dispensing Pumps Score over 4%

Disposal of Waste Score over 4%

Staff Knowledge and Training Score over 4%

Available Services Score over 3%

Wet Stock Reconcilitaion Score over 3%

Parking Score over 2%

Canopy Score over 2%

Vent Pipes Score over 2%

Road Tanker Score over 2%

Surface Drainage Score over 2%

Maintenance Activities Score over 2%

Building Score over 1%

Island Score over 1%

Total Technical and Risk Analysis Score over 100%

154 Kobil Nyakabanda 5.5 8 4 3.5 3 0.5 3.5 3 3 0.5 1.5 2 1 0.5 0 1 1 0 59

169 M.Line Gatsata 3.5 9 5 4 1.5 3 2.5 3 0.5 2 0 1 2 0.5 1 1 1 1 59

430 SP Kirehe 3 6 4 3 3.5 4 3.5 3.5 2.5 1 1.5 2 1 1 0 1 1 0 59

1013 SP Nyamata 1 4.5 8 5 2.5 4 3 3 2 1 0.5 0 2 2 1 0 2 1 0 59

295

Delta Petroleum Kabuye 4.5 9 4.5 3 1 4 3 3 0 0.5 1.5 0.5 2 1.5 0 2 1 0 59

1084

Hass Petroleum Nyabugogo 1 5 8 4.5 2.5 2 4 3.5 0 2 0.5 1.5 2 1 1 0.5 2 1 0 59

1015 Kobil Kamembe 4.5 7 5 4 2.5 3 2 3 0.5 0.5 0 2 2 1.5 0.5 1 1 1 59

382 Kobil Nyabisindu 2.5 7 5 4 4 3.5 2 3 1 1.5 0 1 1 1 0.5 2 1 1 59

256 Kobil Nyanza Kubigega 5 6 6 3.5 2.5 3 2 3 1.5 1 1 1 2 1.5 0 1 1 0 59

271 Kobil Rubavu 3.5 10 5.5 3 0.5 3.5 2 3 3 0.5 0 2 2 1.5 0 1 0 0 59

1012 Mogas Gikondo 4.5 6 5.5 3 2 4 2.5 1.5 2.5 0.5 1.5 2 2 1.5 0 1 1 0 59

Page 67: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

67

PSS_ID PSS_Name

Fire, Safety, Security Score over 10%

Storage Tanks Score over 9%

Filling Point Score over 7%

Electrical Installation Score over 5%

Forecourt Score over 5%

Dispensing Pumps Score over 4%

Disposal of Waste Score over 4%

Staff Knowledge and Training Score over 4%

Available Services Score over 3%

Wet Stock Reconcilitaion Score over 3%

Parking Score over 2%

Canopy Score over 2%

Vent Pipes Score over 2%

Road Tanker Score over 2%

Surface Drainage Score over 2%

Maintenance Activities Score over 2%

Building Score over 1%

Island Score over 1%

Total Technical and Risk Analysis Score over 100%

163 SP Gatsata 3.5 8 4 4 1.5 4 4 3 0.5 1.5 0 1 1 1 1 2 1 0 59

511 SP Musanze 1 5 10 4.5 3.5 0.5 3 1 2.5 1.5 0.5 0 2 2 1 2 1 1 0 59

1083 SP Rugunga 5 8 4.5 3 2.5 3.5 3.5 1.5 1 0.5 0 2 1 1.5 0.5 2 1 0 59

109 Discentre Nyabugogo 5.5 7 4.5 3.5 1.5 4 2 3 1 1.5 0 1 0 1.5 0.5 2 1 1 58

115 Engen Ndera 4 5 7 3 3.5 1 2 3 1.5 1 1 1 2 1 0.5 2 1 1 58

85 Gas Oil Poids Lourd 5.5 8 3.5 2.5 1.5 4 1.5 3 1.5 0.5 1.5 2 2 1.5 0 1 0 1 58

448 Kobil Huye Market 2.5 7 5 4 3 3.5 2 3 1.5 1 0 2 2 1 0 2 0 1 58

166 Kobil Karuruma 6 5 4 4.5 3 2 2.5 3 0.5 3 0 1 1 1 1 2 1 0 58

400 Kobil Ngoma 1 2 7 6.5 4 2.5 3.5 2.5 0.5 2 1 1 2 2 1 0 2 1 0 58

73 SP Remera Prince House 2 5 8 5 3 2.5 2.5 2.5 3 1.5 0.5 0 2 1 1.5 0.5 1 1 0 58

1034 SP Town Mosque 4.5 9 6 3 2.5 3.5 3 1 0.5 0.5 1 0 1 1 0 2 1 1 58

1011 Enes Nyamata 4.5 9 3.5 2 3 4 3 1.5 2 0.5 0 2 1 1 0 1 1 1 57

490 Enes Ruhango 2.5 8 3.5 4 1.5 3.5 2 3 0.5 3 1.5 1 1 1 1 1 1 1 57

Page 68: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

68

PSS_ID PSS_Name

Fire, Safety, Security Score over 10%

Storage Tanks Score over 9%

Filling Point Score over 7%

Electrical Installation Score over 5%

Forecourt Score over 5%

Dispensing Pumps Score over 4%

Disposal of Waste Score over 4%

Staff Knowledge and Training Score over 4%

Available Services Score over 3%

Wet Stock Reconcilitaion Score over 3%

Parking Score over 2%

Canopy Score over 2%

Vent Pipes Score over 2%

Road Tanker Score over 2%

Surface Drainage Score over 2%

Maintenance Activities Score over 2%

Building Score over 1%

Island Score over 1%

Total Technical and Risk Analysis Score over 100%

1041 Engen Rubengera 4.5 8 4 4.5 2 3 2 3 1 0.5 0 2 2 1.5 0 0 1 1 57

337 Gemeca Huye 3.5 4 5 4 1.5 4 2.5 3 3 0.5 0 2 2 1 1 2 1 0 57

16 Hashi Energy Kinamba 4.5 8 5 3.5 3 2.5 3.5 3 0.5 0.5 1.5 2 1 0.5 0 0 0 1 57

433 Kobil Kirehe 1 1.5 5 5.5 3.5 3.5 2.5 2.5 2.5 2.5 1 1.5 2 2 1.5 0 2 1 0 57

322 Kobil Muhanga Mucyakabiri 3.5 5 5.5 3 4 1.5 2 3 2 2 0 1 2 1.5 1 1 1 1 57

292 Merez Huye 2 8 4.5 4.5 2.5 2.5 2 3 1 1 0 2 2 1.5 0.5 1 1 1 57

262 Discentre Rubavu 4.5 9 6 3.5 0.5 2.5 2 2.5 2 0.5 1.5 1 2 0.5 0.5 1 0 0 56

1027 Excel Energy Nyamata 3.5 5 3.5 2.5 4 4 3.5 3 2 0.5 0 2 2 1 0 1 1 1 56

415 Hashi Energy Ngoma 3.5 7 4.5 2 1.5 3 2.5 2.5 3 1 1 2 2 1 0 2 1 0 56

481 Kobil Kirengeri 3.5 7 4.5 2 2.5 4 2 3 0.5 2 0 1 2 1.5 1 1 1 1 56

1029 Mogas Kagitumba 3.5 8 5.5 4 3 3.5 1 1.5 0.5 0.5 1.5 1 2 2 0 0 1 1 56

Page 69: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

69

PSS_ID PSS_Name

Fire, Safety, Security Score over 10%

Storage Tanks Score over 9%

Filling Point Score over 7%

Electrical Installation Score over 5%

Forecourt Score over 5%

Dispensing Pumps Score over 4%

Disposal of Waste Score over 4%

Staff Knowledge and Training Score over 4%

Available Services Score over 3%

Wet Stock Reconcilitaion Score over 3%

Parking Score over 2%

Canopy Score over 2%

Vent Pipes Score over 2%

Road Tanker Score over 2%

Surface Drainage Score over 2%

Maintenance Activities Score over 2%

Building Score over 1%

Island Score over 1%

Total Technical and Risk Analysis Score over 100%

82

Hass Petroleum Gikondo 4.5 9 7 3.5 2 0.5 1 0 2.5 0.5 2 2 2 1.5 0 1 0 0 56

280 Kobil Gaseke 4 7 4.5 2.5 3 3 2 3 1 0.5 1.5 0.5 2 1.5 0 1 1 1 56

19 Kobil Remera Kisimenti 6 5 5 3 2 2.5 3.5 1.5 1 0.5 0 2 1 1 2 1 1 1 56

550 SP Kabuga 4 9 3.5 3.5 3 3 2 3 1.5 1 0 2 1 0.5 0 1 1 0 56

244 SP Rwamagana 5 6 4 4 3.5 0.5 2 3 1 0.5 1.5 2 1 1 0 2 1 1 56

1051 Engen Nyagatare 2.5 8 6 2 1.5 3.5 2.5 1.5 1.5 0.5 0 2 2 1 2 1 1 0 55

1079 Hashi Energy Gikondo 5 5 4.5 4.5 0.5 3 2 1.5 2 0.5 2 2 1 1.5 1.5 1 1 0 55

1002 Kobil Nyamata 6 7 5.5 1 2 3 2.5 0.5 1 0.5 2 2 1 1.5 0 1 1 1 55

226 M.Line Muhanga 2.5 8 5 4 1.5 3.5 2 3 1 1 0 1 1 1.5 0.5 1 1 1 55

1048 Mount Meru Nyagatare 3.5 8 3.5 3.5 4 3.5 1 1 2 0.5 1.5 1 1 1.5 0 1 1 1 55

1068 Source Oil Utexrwa 3.5 6 4.5 3 2 1 2 3.5 1.5 1 2 1 2 2 0.5 1 1 1 55

1049 SP Gako 4.5 7 5 2 2 3 2 3 1 0.5 0 2 2 1.5 0 2 1 0 55

Page 70: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

70

PSS_ID PSS_Name

Fire, Safety, Security Score over 10%

Storage Tanks Score over 9%

Filling Point Score over 7%

Electrical Installation Score over 5%

Forecourt Score over 5%

Dispensing Pumps Score over 4%

Disposal of Waste Score over 4%

Staff Knowledge and Training Score over 4%

Available Services Score over 3%

Wet Stock Reconcilitaion Score over 3%

Parking Score over 2%

Canopy Score over 2%

Vent Pipes Score over 2%

Road Tanker Score over 2%

Surface Drainage Score over 2%

Maintenance Activities Score over 2%

Building Score over 1%

Island Score over 1%

Total Technical and Risk Analysis Score over 100%

580 Black Star Shyorongi 4.5 8.5 5 2 2.5 3 0 2.5 1.5 0.5 0 2 2 1.5 1.5 1 0 0 54

1024

Delta Petroleum Nyamasheke 3.5 7 5 4 2 3 2 3 1 0.5 0 2 1 2 0 1 1 0 54

1001 Engen Gikondo 3.5 8 6.5 4.5 2 1 1 0.5 0 0.5 1 2 2 1.5 1 2 1 0 54

556 Gulf Energy Gakenke 3.5 9 6 3 2.5 3.5 1 2 1.5 0.5 0 2 2 0.5 0 1 0 0 54

379 Merez Musanze 3.5 9 1.5 3.5 3 3 2 2.5 2.5 0.5 0 2 2 1 1 1 0 0 54

1014 SP Nyamata 2 6 8 5 2.5 1.5 4 2 1.5 0.5 0.5 0 1.5 1 1 0 2 1 0 54

313 Engen Byumba 6 5 4.5 3.5 2.5 4 1 3 1 0.5 0 0.5 2 0 0 2 1 1 54

1061 Engen Kamembe 3.5 8 5 4 1 3 2 3 1.5 0.5 0 1 2 1.5 0.5 0 1 0 54

1077 Gulf Energy Sonatubes 3.5 8 5 3.5 2.5 3 2 1.5 0.5 0.5 1 2 2 1 0.5 0 1 0 54

1022 Hashi Enery Kamembe 2.5 7 4.5 4 4.5 2 2 3 1.5 0.5 0 1 1 2 0 1 1 0 54

1038 Kobil Karongi 2.5 8 6 3.5 3 0 2 3 0.5 0.5 0 2 2 2 0.5 0 1 1 54

238 Kobil Mwulire 4 8 4.5 1.5 3 4 0 3 1 0.5 0 1.5 2 1.5 0 2 1 0 54

Page 71: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

71

PSS_ID PSS_Name

Fire, Safety, Security Score over 10%

Storage Tanks Score over 9%

Filling Point Score over 7%

Electrical Installation Score over 5%

Forecourt Score over 5%

Dispensing Pumps Score over 4%

Disposal of Waste Score over 4%

Staff Knowledge and Training Score over 4%

Available Services Score over 3%

Wet Stock Reconcilitaion Score over 3%

Parking Score over 2%

Canopy Score over 2%

Vent Pipes Score over 2%

Road Tanker Score over 2%

Surface Drainage Score over 2%

Maintenance Activities Score over 2%

Building Score over 1%

Island Score over 1%

Total Technical and Risk Analysis Score over 100%

277 Merez Rubavu 3 9 4.5 4 2 1.5 1 2 3 0.5 1.5 2 2 0.5 0 1 0 0 54

175 Mount Meru Kimisagara 6.5 7 5.5 2.5 2 2.5 2 2.5 0 0.5 1 1 1 1 0.5 1 1 0 54

502 OM Musanze 4.5 9 4.5 3 1 4 2 3 1.5 0.5 0 2 1 0.5 0 1 0 0 54

391 SP Nyamagabe 4 7 3.5 4 1.5 4 2 1.5 1 1.5 0 1 1 1 0.5 2 1 1 54

577 Gas Oil Shyorongi 2 10 4.5 4 1.5 2.5 1.5 0 2 0.5 1.5 2 2 0.5 0.5 1 0 1 53

301 Hashi Muhanga 4 9 3 3 0.5 3 2.5 3 2 1.5 0 1 1 0.5 1 1 1 0 53

388 Kobil Nyamagabe 2.5 7 6 3.5 2 3 2 2 1.5 0 0 2 0 2 0.5 1 1 1 53

1019

Lake Petroleum Kayonza 2.5 9 5.5 3 2.5 2.5 0 1.5 0.5 0 1.5 1 2 1.5 1 1 1 1 53

361

Lake Petroleum Mukamira 3.5 6 5 3 2.5 3.5 1.5 1 1 0.5 1.5 2 1 1 2 1 1 0 53

553 M.Line Gitwe 1.5 7 4.5 4 2.5 3.5 2 3 0.5 1 0 1 2 1.5 0 1 1 1 53

1089 SP Kanzenze 3.5 9 4.5 3 1 4 1 1.5 0.5 0.5 0 2 2 1.5 0 2 1 0 53

505 SP Musanze 2 4.5 8 4.5 2.5 1.5 3 2 3 0 0.5 0 2 1 1.5 0 2 1 0 53

Page 72: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

72

PSS_ID PSS_Name

Fire, Safety, Security Score over 10%

Storage Tanks Score over 9%

Filling Point Score over 7%

Electrical Installation Score over 5%

Forecourt Score over 5%

Dispensing Pumps Score over 4%

Disposal of Waste Score over 4%

Staff Knowledge and Training Score over 4%

Available Services Score over 3%

Wet Stock Reconcilitaion Score over 3%

Parking Score over 2%

Canopy Score over 2%

Vent Pipes Score over 2%

Road Tanker Score over 2%

Surface Drainage Score over 2%

Maintenance Activities Score over 2%

Building Score over 1%

Island Score over 1%

Total Technical and Risk Analysis Score over 100%

148 Discentre Nyamirambo 4.5 7 4 3.5 1.5 1.5 3.5 0.5 2 0.5 0 2 2 0.5 0.5 1 1 1 52

259 Hashi Energy Nyanza 4.5 8 5.5 3.5 1.5 1 2 3 1 1 0 1 1 0.5 0 1 1 1 52

562 Kobil Rulindo 3.5 9 1.5 3 2.5 3.5 2 2.5 1.5 0.5 0 2 2 1 0 2 0 0 52

1047 Petroil Gashora 3.5 8 3.5 3 1.5 2.5 3.5 2.5 1.5 0.5 0 2 1 1 0.5 1 1 0 52

1008 Kobil Kiramuruzi 4 9 4.5 3 1.5 3 1 0.5 0.5 0.5 1.5 2 2 2 0 1 0 0 51

385 Kobil Tumba Mukoni 2.5 8 4.5 4.5 1.5 3 2.5 0 1 1 0 2 1 1 0.5 2 1 0 51

457

Lake Petroleum Rwamagana 3.5 5 4.5 4 3 3.5 2 3 1 0.5 1.5 2 0 0.5 0 1 1 0 51

1043 SP Rubengera 4.5 7 5 3.5 0.5 1 2.5 3 1.5 0.5 0 1 2 2 0 0 1 1 51

421 SP Rusumo 3 7 4.5 2.5 1.5 1 2.5 3 0.5 1 1 2 2 1.5 0 2 1 0 51

1009 Excel Energy Rwagitima 2.5 10 5 2 2.5 2 0 0.5 0.5 0.5 1.5 2 2 1.5 1 1 1 0 51

94 Kobil Kicukiro Nyanza 5.5 6 5 2.5 3.5 2 2 2 0 1 1 0.5 2 0.5 0 1 1 0 51

Page 73: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

73

PSS_ID PSS_Name

Fire, Safety, Security Score over 10%

Storage Tanks Score over 9%

Filling Point Score over 7%

Electrical Installation Score over 5%

Forecourt Score over 5%

Dispensing Pumps Score over 4%

Disposal of Waste Score over 4%

Staff Knowledge and Training Score over 4%

Available Services Score over 3%

Wet Stock Reconcilitaion Score over 3%

Parking Score over 2%

Canopy Score over 2%

Vent Pipes Score over 2%

Road Tanker Score over 2%

Surface Drainage Score over 2%

Maintenance Activities Score over 2%

Building Score over 1%

Island Score over 1%

Total Technical and Risk Analysis Score over 100%

40 Source Oil Poids Lourd 2 8 3.5 3 2 4 2 0 1.5 3 1.5 2 2 1 0 0 0 0 51

1030 SP Matimba 5 7 4.5 2.5 2 3.5 1 2 0.5 0.5 0 2 1 2 0 1 1 0 51

331

Diettha Petroleum Muhanga 1 9 4.5 2.5 1.5 3.5 2 3 0.5 2 0 1 1 1 0.5 1 0 1 50

538 Hashi Energy Ngororero 4 7 4 2.5 0.5 4 2.5 2.5 1.5 0.5 0 2 2 1 0 1 0 0 50

1016 Kobil Kabarore 3.5 8 5 0.5 1.5 4 0 1.5 0.5 0.5 2 2 2 2 0 1 1 0 50

13 Kobil Kinamba 4 6 3.5 3.5 2.5 3 2 0 2 0.5 1 2 1 0 0 2 1 1 50

1023 Kobil Sonatube 2 6.5 3.5 3.5 1.5 3 2 0.5 1.5 0.5 1.5 2 2 2 0 2 1 0 50

451 M.Line Ndora Gisagara 2 7 5 3.5 1 2.5 2 3 0 1.5 0 2 1 2 0.5 1 1 0 50

1040 Merez Karongi 3 8 4.5 3 0.5 2 2.5 3 0 0.5 0 2 2 1.5 0.5 0 1 1 50

373 Ukod Oil Musanze 2.5 8 4.5 3 1.5 3 1 3 3 0.5 0 1 1 1 0 1 1 0 50

517

Delta Petroleum Butaro 3 9 4.5 3 1.5 2.5 2 2 1 0.5 0 2 2 0.5 0 1 0 0 49

Page 74: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

74

PSS_ID PSS_Name

Fire, Safety, Security Score over 10%

Storage Tanks Score over 9%

Filling Point Score over 7%

Electrical Installation Score over 5%

Forecourt Score over 5%

Dispensing Pumps Score over 4%

Disposal of Waste Score over 4%

Staff Knowledge and Training Score over 4%

Available Services Score over 3%

Wet Stock Reconcilitaion Score over 3%

Parking Score over 2%

Canopy Score over 2%

Vent Pipes Score over 2%

Road Tanker Score over 2%

Surface Drainage Score over 2%

Maintenance Activities Score over 2%

Building Score over 1%

Island Score over 1%

Total Technical and Risk Analysis Score over 100%

1006 Discentre Kayonza 4.5 9 4.5 3.5 1.5 2.5 1 0.5 1 0.5 0 1 1 1.5 0.5 1 1 0 49

67 Kobil Kanombe Cyamitsingi 2.5 4 4.5 4.5 2 1.5 2 1 2.5 1 0 2 2 1 0 2 1 1 49

514 Kobil Musanze 1 3.5 9 5 3.5 1.5 3 1 0 2.5 0.5 0 1 2 1 0 1 0 0 49

208

Lake Petroleum Rugende 2.5 4 4.5 3.5 2.5 3 2 3 2.5 0.5 0 2 1 1.5 0 1 1 0 49

1031 Gas Oil Ruhuha 2 8 4 2 2 3 3 2 2 0.5 0 1.5 1 1 0 1 1 0 49

1058 Kobil Karenge 2.5 10 5 0.5 2.5 3 0 1 3 0.5 0 2 1 1 0 1 1 0 49

445 Kobil Nyanza Town 4 7 2.5 4 1.5 2.5 2 1.5 1 0.5 0 1 1 1 0.5 2 1 1 49

1037 Kobil Rwimiyaga 2 1.5 7 4.5 2.5 3 4 0 1 1 0.5 1.5 2 2 1 0.5 1 1 0 49

28 Merez Muhima 4.5 6 2.5 3.5 2 4 2.5 0 1.5 0.5 1.5 2 1 0.5 0 0 1 1 49

409 Source Oil Kabarondo 1 7 5.5 4 1 2.5 1.5 3 0.5 1 1 2 1 1 0 1 1 0 49

1054

Delta Petroleum Ngarama 1.5 9 4.5 3 4 4 0 1 0.5 0.5 0 2 0 1.5 0 1 1 0 48

Page 75: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

75

PSS_ID PSS_Name

Fire, Safety, Security Score over 10%

Storage Tanks Score over 9%

Filling Point Score over 7%

Electrical Installation Score over 5%

Forecourt Score over 5%

Dispensing Pumps Score over 4%

Disposal of Waste Score over 4%

Staff Knowledge and Training Score over 4%

Available Services Score over 3%

Wet Stock Reconcilitaion Score over 3%

Parking Score over 2%

Canopy Score over 2%

Vent Pipes Score over 2%

Road Tanker Score over 2%

Surface Drainage Score over 2%

Maintenance Activities Score over 2%

Building Score over 1%

Island Score over 1%

Total Technical and Risk Analysis Score over 100%

442

Delta Petroleum Nyanza 3 7 4.5 4.5 0.5 2 2 1.5 1.5 0.5 0 1 1 1.5 0 1 1 1 48

1067 Hashi Energy Gisozi 4 6 4 2 1.5 2.5 2 3 1 0.5 0 1 1 1.5 0.5 1 1 1 48

1085 Hashi Energy Kayonza 3.5 7 4.5 3.5 0.5 3 1 0.5 1.5 0.5 1.5 2 0 1.5 1 1 1 0 48

1044 Kobil Nyagatare 2.5 9 5 2 1.5 2.5 0 1 1 0.5 1.5 2 1 1 0 1 1 1 48

181 Oil City Remera 6 6.5 0 2.5 3.5 3 3 1.5 1 0.5 1 0.5 2 0.5 0 1 1 0 48

358 OM Mukamira 4.5 8 3.5 3 0.5 3.5 1 2 0.5 0.5 1 2 1 0.5 0 1 0 1 48

1053 SP Nyagatare 3 10 4.5 4.5 0.5 3 0 1.5 0.5 0.5 0 2 1 1.5 0 0 1 0 48

403 Discentre Kabarondo 2 6 5 2.5 1.5 2 3.5 2 0.5 1 1 1 1 1 0 1 1 1 47

508 Discentre Musanze 3 10 3 3 0.5 2 1 0.5 2 0.5 0 2 2 0.5 0 1 1 1 47

232 Gemeca Gicumbi 5.5 7 5 3 1.5 2.5 1 0.5 0 0.5 0 0.5 2 1 0 1 1 1 47

1028 Hashi Energy Karangazi 3.5 7 5.5 3.5 3 0.5 0 1 0.5 0.5 1.5 2 1 1.5 0 1 1 0 47

Page 76: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

76

PSS_ID PSS_Name

Fire, Safety, Security Score over 10%

Storage Tanks Score over 9%

Filling Point Score over 7%

Electrical Installation Score over 5%

Forecourt Score over 5%

Dispensing Pumps Score over 4%

Disposal of Waste Score over 4%

Staff Knowledge and Training Score over 4%

Available Services Score over 3%

Wet Stock Reconcilitaion Score over 3%

Parking Score over 2%

Canopy Score over 2%

Vent Pipes Score over 2%

Road Tanker Score over 2%

Surface Drainage Score over 2%

Maintenance Activities Score over 2%

Building Score over 1%

Island Score over 1%

Total Technical and Risk Analysis Score over 100%

406 M.Line Kabarondo 2.5 8 4.5 2.5 1.5 1 1.5 2 1.5 1 0 2 1 1 0 1 1 1 47

1063 Maxi Station Kamembe 3.5 6 3 3 3 3 1.5 3 0.5 0.5 1 2 1 0.5 0.5 0 1 0 47

460 Merez Rwamagana 2 6 5.5 1.5 1.5 3 2.5 3 1.5 0.5 1 1 0 1 0 1 1 1 47

532 OM Kabaya 3.5 8 4 3 0.5 3.5 1 2.5 0.5 0.5 0 2 1 1 0 1 1 0 47

187 Source Oil Kayonza 4 5 3 4 1.5 3 1 3 2 1 1 1 1 0.5 0 1 1 0 47

1078 Enes Sonatubes 5 6.5 2 3 1.5 3 3 0 1.5 0.5 0 2 2 0.5 0 0 1 1 46

535 OM Ngororero 3.5 10 1.5 2.5 0.5 4 1 2.5 0.5 0.5 0 2 2 1 0 1 0 0 46

214 Source Oil Nyamata 2 7.5 6 3.5 1.5 2 1 0.5 0.5 0.5 1 0.5 2 1 0 1 1 1 46

130 SP Remera Prince House 1 5 4 7 3.5 2.5 3 1 0 0.5 0.5 0 1 1 1.5 0 1 0 1 46

1074 Ukod Oil Kicukiro 4 5 4 2.5 0.5 3 3 1.5 2 0.5 1.5 1 1 1 0 0 1 1 46

1057

Addax Petroleum Muhura 2.5 9 5 2 2 2.5 0 0 0.5 0.5 1.5 2 2 1 0.5 0 1 0 46

Page 77: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

77

PSS_ID PSS_Name

Fire, Safety, Security Score over 10%

Storage Tanks Score over 9%

Filling Point Score over 7%

Electrical Installation Score over 5%

Forecourt Score over 5%

Dispensing Pumps Score over 4%

Disposal of Waste Score over 4%

Staff Knowledge and Training Score over 4%

Available Services Score over 3%

Wet Stock Reconcilitaion Score over 3%

Parking Score over 2%

Canopy Score over 2%

Vent Pipes Score over 2%

Road Tanker Score over 2%

Surface Drainage Score over 2%

Maintenance Activities Score over 2%

Building Score over 1%

Island Score over 1%

Total Technical and Risk Analysis Score over 100%

1055

Delta Petroleum Rukomo 1 9 5 2 2.5 3.5 0 0 0.5 0.5 1.5 2 1 1.5 0 1 1 0 46

79 Kobil Kabuga 2 7 5.5 2 2.5 1 2 0.5 2 1 1 1 1 1.5 0 1 1 0 46

1010 Source Oil Kiziguro 1 9 4.5 2.5 1.5 2 1 0.5 1.5 0.5 0 1 2 2 0 1 1 1 46

22 Source Oil Remera 4.5 6 4.5 3 1 2 2 2.5 1 0.5 1.5 1 2 0.5 0 0 0 0 46

1086 SP Bugarama 3.5 6 4.5 3.5 1 2.5 2 3 0.5 0.5 0 0.5 1 1.5 0 1 1 0 46

565

Delta Petroleum Shyorongi 2 10 4 2.5 1.5 3 1 0 1.5 0.5 0 2 2 0.5 0 1 0 0 45

439 Kobil Gatore 1.5 8 3 2.5 2 2.5 2.5 2 0.5 1 0 2 1 1 0 1 1 0 45

376 Kobil Musanze 2 1 10 3 3 2.5 4 1 0 2.5 0.5 0 1 0 1 0 1 0 1 45

352 OM Mahoko 4.5 8 0 3 1 4 1 2.5 1.5 0.5 0 2 2 0.5 0 1 0 0 45

1087 Excel Energy Bugarama 1 7 4.5 2.5 0.5 2.5 2 0 1.5 0.5 1.5 2 2 1.5 0 1 1 0 44

76 Kobil Mulindi 0 5 3 4 3 3.5 1 2 0.5 1 1 1 2 1 0 2 1 0 44

1059 SP Rusizi 1 5 7 2.5 2.5 0 2 2 3 0.5 0.5 0 1 1 1 0 1 1 1 44

Page 78: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

78

PSS_ID PSS_Name

Fire, Safety, Security Score over 10%

Storage Tanks Score over 9%

Filling Point Score over 7%

Electrical Installation Score over 5%

Forecourt Score over 5%

Dispensing Pumps Score over 4%

Disposal of Waste Score over 4%

Staff Knowledge and Training Score over 4%

Available Services Score over 3%

Wet Stock Reconcilitaion Score over 3%

Parking Score over 2%

Canopy Score over 2%

Vent Pipes Score over 2%

Road Tanker Score over 2%

Surface Drainage Score over 2%

Maintenance Activities Score over 2%

Building Score over 1%

Island Score over 1%

Total Technical and Risk Analysis Score over 100%

1035 SP Ryabega 3 5 5 3.5 2 0.5 0 1 1.5 0.5 1.5 1 2 1.5 0 1 1 1 44

205

Buranga Petroleum Musha 3 5 5 2.5 1.5 3.5 1 1.5 1 0.5 0 2 1 1 0 1 1 0 44

268

Delta Petroleum Rubavu 1 8 5 4.5 1.5 3 2 0 1.5 0.5 0 1 1 0.5 0 1 0 0 44

355 Kobil Nyabihu Shaba 3 4 4.5 2.5 2.5 3 1 1 0.5 0.5 1.5 1.5 2 1 0 1 1 0 44

316 Kobil Rukomo 2.5 5 4.5 3 2 3 2 0.5 0.5 0.5 1 0 2 1 0 2 1 0 44

1066 Source Oil Kinamba 2.5 5 4.5 1.5 3.5 2 3.5 2.5 0.5 0 0 1 0 1 0 1 1 1 44

1056 SP Town Zinc Hotel 3.5 8 4 2.5 1 2 0 0 1 0 1.5 2 2 1 0 0 1 1 44

1018 Enes Kabarore 4.5 7 3 2.5 1.5 2.5 0 0.5 0.5 0.5 0 2 2 1.5 0 1 1 0 43

289 Gas Oil Kabuye 1 7 4.5 2.5 1.5 4 1 0 0 1 1 0.5 2 1 0 2 1 0 43

1064 Gas Oil Kamembe 3 5 3.5 3.5 3 2.5 1 3 1 0.5 0 2 0 1 0 0 1 0 43

349 Gemeca Rubavu 3 8 4.5 3 0.5 3 0 0.5 0.5 0.5 1.5 2 1 0.5 0 1 0 0 42

Page 79: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

79

PSS_ID PSS_Name

Fire, Safety, Security Score over 10%

Storage Tanks Score over 9%

Filling Point Score over 7%

Electrical Installation Score over 5%

Forecourt Score over 5%

Dispensing Pumps Score over 4%

Disposal of Waste Score over 4%

Staff Knowledge and Training Score over 4%

Available Services Score over 3%

Wet Stock Reconcilitaion Score over 3%

Parking Score over 2%

Canopy Score over 2%

Vent Pipes Score over 2%

Road Tanker Score over 2%

Surface Drainage Score over 2%

Maintenance Activities Score over 2%

Building Score over 1%

Island Score over 1%

Total Technical and Risk Analysis Score over 100%

424 Kobil Kirehe 2 0 4 5 1 1 3.5 2 2 0.5 1 1 2 2 1.5 0 2 1 0 42

1060 Kobil Rusizi 1 2 8 2.5 3 1.5 2 2 3 0.5 0.5 0 1 1 1.5 0 0 1 0 42

523 OM Kidaho 4.5 4 3 3 0.5 2 1 2.5 1 0.5 0 2 2 1 0 1 1 0 41

1017 Source Oil Kabarore 0 8 5 3.5 1 2.5 0 0 0.5 0.5 1 1 2 1.5 0 1 1 0 41

544 Kobil Ngoma 2 2 6 3.5 1.5 2.5 2.5 2 0.5 1 1 0 1 1 0.5 0 2 1 0 40

1036 Kobil Rwimiyaga 1 1 8 5.5 0.5 1 3.5 0 1 1.5 0.5 1 2 0 0.5 0 1 1 0 40

520 Merez Cyanika 2 6 4 2 1 2 1.5 1 0.5 0.5 0 2 2 0.5 2 1 0 0 40

10 Source Oil Kacyiru 1.5 5 3.5 0.5 3 2 2.5 0 2.5 0.5 2 1 2 1 0 0 0 1 40

1039 Source Oil Karongi 0 8 3.5 3 2.5 2 2.5 0 0.5 0 0 1 1 2 0 0 1 1 40

1026

Delta Petroleum Nyamata 4.5 7 2.5 1 0.5 3 1 0.5 1 0.5 0 2 1 0.5 0 1 1 0 39

346 Gas Oil Rubavu 1.5 8 3.5 3 1.5 3 0 0 0.5 0.5 1.5 1 1 0.5 0 1 0 0 38

1033 Kobil Matimba 1.5 8 5.5 2 0 0.5 0 1 0.5 0.5 0 1 2 2 0 0 1 1 38

Page 80: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

80

PSS_ID PSS_Name

Fire, Safety, Security Score over 10%

Storage Tanks Score over 9%

Filling Point Score over 7%

Electrical Installation Score over 5%

Forecourt Score over 5%

Dispensing Pumps Score over 4%

Disposal of Waste Score over 4%

Staff Knowledge and Training Score over 4%

Available Services Score over 3%

Wet Stock Reconcilitaion Score over 3%

Parking Score over 2%

Canopy Score over 2%

Vent Pipes Score over 2%

Road Tanker Score over 2%

Surface Drainage Score over 2%

Maintenance Activities Score over 2%

Building Score over 1%

Island Score over 1%

Total Technical and Risk Analysis Score over 100%

1046 Source Oil Nyagatare 2.5 7 4 2.5 2.5 2 0 0 0.5 0 0 2 0 1 0.5 0 1 0 36

1025 Source Oil Kibagabaga 2 7 4.5 1 0.5 1.5 1 0.5 1 0.5 0 1 1 0.5 0 1 1 1 36

1073 Gas Oil Kicukiro 2 6 3 2.5 1.5 3.5 0 0.5 0.5 0.5 0 2 0 0.5 0 0 1 0 34

49 Kobil Gikondo Magerwa 1.5 4 2.5 3 1.5 2.5 2 1.5 0 0.5 1 0 1 0.5 0 1 1 0 34

559 Source Oil Base 0 7 4.5 1 0 1 0 0 1 0.5 0 1.5 1 1 0 1 0 0 28

Table 36:Technical and Risk Analysis Scores over 100 % of Operating PSS

Page 81: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

81

7.2.2 Average score of operating PSS per operator on technical and risk

analysis

The following table recapitulates the average score over 100% per operator as analysis results on PSS compliance to technical requirements and risk analysis.

Table 37: Average score of operating PSS per operator on technical and risk analysis

NB: The average score is based on number of PSS that are currently operating; PSS under construction, rehabilitation or not operating are not considered here.

No Operator Number of Operating PSS per Operator Average score over 100%

1 Addax 2 55

2 Aziz 2 64

3 Black Star 2 60

4 Delta 10 49

5 Discentre 7 53

6 Enes 5 53

7 Engen 19 65

8 Excel Energy 3 50

9 Gas Oil 9 49

10 Gemeca 5 53

11 Gulf Energy 2 54

12 Hashi 13 54

13 Hass 4 59

14 Kobil 57 54

15 Lake Petroleum 7 57

16 M.Line 5 53

17 Maxi 3 57

18 Merez 12 55

19 Mogas 4 64

20 Mount Meru 10 64

21 OM 7 49

22 Other 4 48

23 Source Oil 15 44

24 SP 40 58

25 Ukod 2 48

Page 82: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

82

7.3 Operating PSS Average Score for Compliance to Regulations per Operator

Figure 3: Operating PSS Total Average Score per Operator over 100%

0

10

20

30

40

50

60

70

Addax

Aziz Black

Star

Delta

Discentr

e

Enes

Engen

Excel

Energy

GasOil

Gemec

a

GulfEnergy

Hashi

Hass

Kobil

Lake

Petroleu

m

M.Line

Maxi

Merez

Mogas

MountMer

u

OM Other

SourceOil

SP Ukod

Average Technical and RisKAnalysis Score Over 100%

55 64 60 49 53 53 65 50 49 53 54 54 59 54 57 53 57 55 64 64 49 48 44 58 48

Average Spatial LocationAnalysis Score Over 100%

62 59 61 39 49 54 51 63 56 48 53 49 60 55 59 57 61 56 61 61 46 46 54 53 29

Operator Average Score for Compliance to Regulations

AverageTechnical andRisKAnalysis ScoreOver 100%

AverageSpatialLocationAnalysis ScoreOver 100%

Page 83: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

83

7.4 List on Non-Operating PSS

PSS_ID PSS_Name Plot_Number Status

1042 Source Oil Rubengera 409 Under Rehabilitation

64 Station Kabeza Samuduha 807 Under Construction

199 Station Bishenyi 2 2354 Under Construction

319 Merez Gatenga 101 Under Construction

364 Station Musanze Byangabo 2604 Under Construction

370 Station Kayonza Mukabuga 3590 Under Construction

397 Station Muhanga Bus Station 1140 Under Construction

418 Station Rusumo 4403 Under Construction

499 Station Kibeho Sinayi 1 328 Under Construction

571 M.Line Kinazi 1505 Under Construction

1020 Merez Rusizi 1444 Under Construction

1050 Station Gahanga 2289 Under Construction

1052 Merez Nyagatare 2576 Under Construction

1070 Merez Kagugu 6923 Under Construction

55 Station Kimironko Zindiro 200 Stopped Construction

184 Station Kimisagara Maison des Jeunes 2422 Stopped Construction

1090 SP Nyarutarama 108 Stopped Construction

127 IRST Biodiesel Mulindi 413 Not Operating

478 Station Kibeho Munini 79 Not Operating

1071 Kobil Gacuriro KClub 1500 Not Operating

487 Station Ruhango Yezu Nyirimpuhwe 5831 Not Operating

253 Station Bishenyi 1 118 Destroyed

496 Station Kibeho Sinayi 2 346 Destroyed

526 Station Huye Hotel Credo 515 Destroyed

529 Station Gasarenda 807 Destroyed

574 Station Kigoma 6205 Destroyed

1032 Station Ruhuha 1 Destroyed

Table 38: List on Non-Operating PSS

Page 84: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

84

8. Categorizing Petrol Service Stations

After a deep analysis of PSS compliances to location-based and technical regulations, it was found that there is no PSS that has scored 100%. Therefore, there is a need to categorise PSS based on how much they scored and their possibility to comply with the regulations.

As RURA wants all PSS to respect the regulations, the categories proposed are based on the possibility of PSS to comply with regulations; it is in this context that the following three categories have been identified:

1. Third category: PSS that cannot comply with regulations even if they do any type of upgrade. It is impossible for PSS in this category to comply with the regulations because their current location and parcel boundaries are completely inside prohibited areas.

2. Second category: PSS that do not comply with the most important regulations, but can do significant upgrades and comply. It is possible for PSS in this category to comply with the regulations after a significant investment like acquiring a neighbor plot to adapt their plot size or relocate its installations intersecting with protected areas.

3. First category: PSS that comply with most of important regulations but need to do some technical upgrade and risk mitigation. It is reasonably possible for the PSS in this category, to do necessary technical adjustments and comply with the regulations.

More details about PSS falling in the above categories can be found in the next subchapters.

8.1 Third Category: PSS that cannot comply with regulations even after

doing any type of upgrade

In this category, we find PSS with at least any of the following characterstics:

PSS parcel is completely inside a reserved or prohibited land use zone (e.g. wetland, road reserve, environment reserve, etc.)

PSS parcel boundary lines are closer than 50 meters to residential buildings

PSS parcel boundary lines are closer than 300 meters to sensitive areas (e.g. schools, hospitals, trade markets, museums, etc.)

The following is a table listing 40 (Forty) PSS falling in the third category because they are completely inside a reserved or prohibited land use zone:

Page 85: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

85

PSS_ID PSS_Name Operator PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

PSS Technical and Risk Total Score over 100%

109 Discentre Nyabugogo Discentre 0 33 58

148 Discentre Nyamirambo Discentre 0 7 52

1078 Enes Sonatubes Enes 0 38 46

1076 Engen Kicukiro Engen 0 38 69

115 Engen Ndera Engen 0 0 58

34 Engen Poids Lourd Engen 0 41 69

1073 Gas Oil Kicukiro Gas Oil 0 38 34

103 Gemeca Giticyinyoni Gemeca 0 45 61

337 Gemeca Huye Gemeca 0 34 57

1077 Gulf Energy Sonatubes Gulf Energy 0 41 54

1067 Hashi Energy Gisozi Hashi 0 17 48

106 Hashi Energy Kabuga Hashi 0 34 59

16 Hashi Energy Kinamba Hashi 0 38 57

415 Hashi Energy Ngoma Hashi 0 38 56

13 Kobil Kinamba Kobil 0 38 50

76 Kobil Mulindi Kobil 0 34 44

121 Kobil Nyabugogo 2 Kobil 0 45 73

154 Kobil Nyakabanda Kobil 0 38 59

136 Kobil Nyamirambo Kobil 0 7 61

1088 Kobil Remera Grand Legacy Hotel Kobil 0 45 64

31 Maxi Station Kigali Maxi 0 45 62

28 Merez Muhima Merez 0 38 49

178 Mount Meru Kicukiro Mount Meru 0 48 69

265 OM Rubavu OM 0 38 61

1066 Source Oil Kinamba Source Oil 0 41 44

1046 Source Oil Nyagatare Source Oil 0 34 36

1068 Source Oil Utexrwa Source Oil 0 52 55

163 SP Gatsata SP 0 38 59

1072 SP Gikondo SP 0 59 63

124 SP Kabeza SP 0 38 61

1 SP Kanombe 12 SP 0 41 71

1030 SP Matimba SP 0 38 51

157 SP Nyabugogo 2 SP 0 55 65

142 SP Nyamirambo SP 0 38 61

73 SP Remera Prince House 2 SP 0 34 58

1043 SP Rubengera SP 0 14 51

Page 86: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

86

PSS_ID PSS_Name Operator PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

PSS Technical and Risk Total Score over 100%

1083 SP Rugunga SP 0 38 59

1082 SP Town City Tower SP 0 59 70

1056 SP Town Zinc Hotel SP 0 48 44

1074 Ukod Oil Kicukiro Ukod 0 3 46

Table 39: PSS falling in the third category

NB: The second and third possible conditions for a PSS to be in the third category, were not considered here because we believe that the required distances are not realistic and too strict. These would therefore make most of the PSS to fall in this last category. This is also in line with the new regulations that are yet to be approved which consider to reduce these distances. It is in this context that we have recommended (see chapter 10) to RURA to evaluate the feasibility of the regulations about required distances between PSS and residential houses as well as the sensitive areas because the current regulations will disqualify all of the operating PSS if the three criterias are used (Compliance to master plan, distances to residential houses and distance to sensitive areas).

8.2 Second Category: PSS that do not comply with most important

regulations but can do significant upgrade to comply with regulations

In this category, we find PSS that are not in the first category but with at least any of the following characterstics:

PSS parcel is partially inside a reserved or prohibited area (e.g. wetland, road reserve, etc.)

PSS parcel is smaller than the required size

The following is a table with 194 (One Hundred and Ninety-Four) PSS falling in the second category because of having part of their parcel intersecting a prohibited land use zone:

PSS_ID PSS_Name Operator

PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

Total Technical and Risk Analysis Score over 100%

568 Addax Petroleum Kinazi Addax 5 52 64

1057 Addax Petroleum Muhura Addax 5 72 46

Page 87: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

87

PSS_ID PSS_Name Operator

PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

Total Technical and Risk Analysis Score over 100%

46 Aziz Energy Poids Lourd Aziz 5 52 64

250 Aziz Energy Rugobagoba Aziz 5 66 64

583 Black Star Ruyenzi Black Star 5 63 66

580 Black Star Shyorongi Black Star 5 59 54

205 Buranga Petroleum Musha Other 5 20 44

517 Delta Petroleum Butaro Delta 5 31 49

295 Delta Petroleum Kabuye Delta 5 59 59

70 Delta Petroleum Kicukiro Delta 5 17 61

1054 Delta Petroleum Ngarama Delta 5 55 48

1024 Delta Petroleum Nyamasheke Delta 5 55 54

1026 Delta Petroleum Nyamata Delta 5 17 39

442 Delta Petroleum Nyanza Delta 5 17 48

268 Delta Petroleum Rubavu Delta 5 31 44

1055 Delta Petroleum Rukomo Delta 5 34 46

565 Delta Petroleum Shyorongi Delta 5 69 45

331 Diettha Petroleum Muhanga Other 5 21 50

1075 Discentre Gikondo Discentre 5 76 64

403 Discentre Kabarondo Discentre 5 52 47

1006 Discentre Kayonza Discentre 5 52 49

508 Discentre Musanze Discentre 5 55 47

262 Discentre Rubavu Discentre 5 69 56

1018 Enes Kabarore Enes 5 55 43

475 Enes Kayonza Enes 5 52 61

1011 Enes Nyamata Enes 5 69 57

490 Enes Ruhango Enes 5 55 57

313 Engen Byumba Engen 5 21 54

4 Engen Free zone Engen 5 52 71

1001 Engen Gikondo Engen 5 66 54

100 Engen Giticyinyoni Engen 5 62 77

310 Engen Huye Engen 5 55 71

7 Engen Kacyiru Engen 5 59 68

1061 Engen Kamembe Engen 5 55 54

1005 Engen Kanogo Engen 5 62 75

25 Engen Kimironko Engen 5 55 67

394 Engen Muhanga Engen 5 59 59

Page 88: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

88

PSS_ID PSS_Name Operator

PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

Total Technical and Risk Analysis Score over 100%

541 Engen Ngoma Engen 5 59 68

133 Engen Nyabugogo Engen 5 60 74

1051 Engen Nyagatare Engen 5 52 55

274 Engen Rubavu Engen 5 52 61

37 Engen Sopetrad Engen 5 52 69

1087 Excel Energy Bugarama Excel Energy 5 50 44

1027 Excel Energy Nyamata Excel Energy 5 53 56

160 Gas Oil Gatsata Gas Oil 5 62 62

289 Gas Oil Kabuye Gas Oil 5 63 43

91 Gas Oil Masaka Gas Oil 5 62 61

85 Gas Oil Poids Lourd Gas Oil 5 55 58

346 Gas Oil Rubavu Gas Oil 5 52 38

1031 Gas Oil Ruhuha Gas Oil 5 69 49

577 Gas Oil Shyorongi Gas Oil 5 69 53

232 Gemeca Gicumbi Gemeca 5 55 47

307 Gemeca Muhanga Gemeca 5 55 59

349 Gemeca Rubavu Gemeca 5 52 42

556 Gulf Energy Gakenke Gulf Energy 5 66 54

196 Hashi Energy Bishenyi Hashi 5 62 62

1079 Hashi Energy Gikondo Hashi 5 55 55

1028 Hashi Energy Karangazi Hashi 5 66 47

1085 Hashi Energy Kayonza Hashi 5 52 48

538 Hashi Energy Ngororero Hashi 5 62 50

259 Hashi Energy Nyanza Hashi 5 66 52

1021 Hashi Energy Rusizi Hashi 5 31 63

1022 Hashi Enery Kamembe Hashi 5 62 54

301 Hashi Muhanga Hashi 5 55 53

82 Hass Petroleum Gikondo Hass 5 70 56

241 Hass Petroleum Mwulire Hass 5 69 60

1084 Hass Petroleum Nyabugogo 1 Hass 5 55 59

280 Kobil Gaseke Kobil 5 55 56

439 Kobil Gatore Kobil 5 69 45

49 Kobil Gikondo Magerwa Kobil 5 69 34

97 Kobil Giticyinyoni Kobil 5 50 64

286 Kobil Huye Bus Station Kobil 5 55 63

Page 89: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

89

PSS_ID PSS_Name Operator

PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

Total Technical and Risk Analysis Score over 100%

448 Kobil Huye Market Kobil 5 21 58

334 Kobil Huye Town Kobil 5 52 61

79 Kobil Kabuga Kobil 5 62 46

1015 Kobil Kamembe Kobil 5 52 59

67 Kobil Kanombe Cyamitsingi Kobil 5 52 49

1058 Kobil Karenge Kobil 5 62 49

1038 Kobil Karongi Kobil 5 21 54

166 Kobil Karuruma Kobil 5 66 58

94 Kobil Kicukiro Nyanza Kobil 5 66 51

1008 Kobil Kiramuruzi Kobil 5 55 51

433 Kobil Kirehe 1 Kobil 5 55 57

424 Kobil Kirehe 2 Kobil 5 66 42

481 Kobil Kirengeri Kobil 5 66 56

220 Kobil Muhanga Kobil 5 66 64

322 Kobil Muhanga Mucyakabiri Kobil 5 66 57

151 Kobil Muhima Kobil 5 52 74

469 Kobil Mukarange Kobil 5 69 60

514 Kobil Musanze 1 Kobil 5 55 49

376 Kobil Musanze 2 Kobil 5 66 45

238 Kobil Mwulire Kobil 5 69 54

400 Kobil Ngoma 1 Kobil 5 55 58

544 Kobil Ngoma 2 Kobil 5 55 40

355 Kobil Nyabihu Shaba Kobil 5 69 44

382 Kobil Nyabisindu Kobil 5 66 59

172 Kobil Nyabugogo 1 Kobil 5 72 77

211 Kobil Nyagasambu Kobil 5 59 62

1044 Kobil Nyagatare Kobil 5 52 48

388 Kobil Nyamagabe Kobil 5 62 53

1002 Kobil Nyamata Kobil 5 69 55

256 Kobil Nyanza Kubigega Kobil 5 66 59

445 Kobil Nyanza Town Kobil 5 50 49

19 Kobil Remera Kisimenti Kobil 5 55 56

271 Kobil Rubavu Kobil 5 21 59

247 Kobil Rugobagoba Kobil 5 66 63

316 Kobil Rukomo Kobil 5 69 44

Page 90: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

90

PSS_ID PSS_Name Operator

PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

Total Technical and Risk Analysis Score over 100%

562 Kobil Rulindo Kobil 5 30 52

1060 Kobil Rusizi 1 Kobil 5 55 42

463 Kobil Rwamagana Kobil 5 55 61

466 Kobil Rwamagana Tsinda Kobil 5 69 60

1036 Kobil Rwimiyaga 1 Kobil 5 66 40

1023 Kobil Sonatube Kobil 5 55 50

1045 Kobil Town T2000 Kobil 5 66 62

385 Kobil Tumba Mukoni Kobil 5 53 51

202 Lake Petroleum Kamonyi Lake Petroleum

5 69 62

1019 Lake Petroleum Kayonza Lake Petroleum

5 69 53

427 Lake Petroleum Kirehe Lake Petroleum

5 66 66

361 Lake Petroleum Mukamira Lake Petroleum

5 55 53

208 Lake Petroleum Rugende Lake Petroleum

5 30 49

457 Lake Petroleum Rwamagana Lake Petroleum

5 53 51

169 M.Line Gatsata M.Line 5 62 59

553 M.Line Gitwe M.Line 5 69 53

406 M.Line Kabarondo M.Line 5 52 47

226 M.Line Muhanga M.Line 5 66 55

451 M.Line Ndora Gisagara M.Line 5 34 50

304 Maxi Station Muhanga Maxi 5 66 61

520 Merez Cyanika Merez 5 69 40

88 Merez Gahanga Merez 5 69 60

1004 Merez Gikondo Merez 5 59 65

292 Merez Huye Merez 5 55 57

379 Merez Musanze Merez 5 66 54

547 Merez Ngoma Merez 5 55 61

139 Merez Nyamirambo Merez 5 55 61

277 Merez Rubavu Merez 5 50 54

493 Merez Ruhango Merez 5 66 66

460 Merez Rwamagana Merez 5 21 47

1012 Mogas Gikondo Mogas 5 55 59

Page 91: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

91

PSS_ID PSS_Name Operator

PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

Total Technical and Risk Analysis Score over 100%

1029 Mogas Kagitumba Mogas 5 79 56

43 Mogas Remera Giporoso Mogas 5 55 75

484 Mogas Ruhango Mogas 5 55 67

235 Mount Meru Gishari Mount Meru 5 69 66

1069 Mount Meru Kagugu Mount Meru 5 59 62

472 Mount Meru Kayonza Mount Meru 5 69 61

52 Mount Meru Kimironko Mount Meru 5 55 70

175 Mount Meru Kimisagara Mount Meru 5 55 54

223 Mount Meru Muhanga Mount Meru 5 66 71

1048 Mount Meru Nyagatare Mount Meru 5 52 55

1003 Mount Meru Nyamata Mount Meru 5 76 67

1080 Mount Meru Remera Mount Meru 5 62 62

532 OM Kabaya OM 5 21 47

523 OM Kidaho OM 5 59 41

352 OM Mahoko OM 5 55 45

358 OM Mukamira OM 5 34 48

502 OM Musanze OM 5 55 54

535 OM Ngororero OM 5 62 46

1047 Petroil Gashora Other 5 69 52

559 Source Oil Base Source Oil 5 66 28

58 Source Oil Gicumbi Source Oil 5 28 63

409 Source Oil Kabarondo Source Oil 5 66 49

1017 Source Oil Kabarore Source Oil 5 55 41

10 Source Oil Kacyiru Source Oil 5 83 40

187 Source Oil Kayonza Source Oil 5 52 47

1025 Source Oil Kibagabaga Source Oil 5 52 36

1010 Source Oil Kiziguro Source Oil 5 66 46

214 Source Oil Nyamata Source Oil 5 69 46

40 Source Oil Poids Lourd Source Oil 5 55 51

22 Source Oil Remera Source Oil 5 17 46

1086 SP Bugarama SP 5 52 46

1049 SP Gako SP 5 59 55

283 SP Huye Bus Station SP 5 55 73

340 SP Huye Town SP 5 17 63

550 SP Kabuga SP 5 66 56

Page 92: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

92

PSS_ID PSS_Name Operator

PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

Total Technical and Risk Analysis Score over 100%

61 SP Kanombe Sector SP 5 55 64

1089 SP Kanzenze SP 5 69 53

1007 SP Kayonza SP 5 50 61

430 SP Kirehe SP 5 31 59

325 SP Muhanga SP 5 69 64

511 SP Musanze 1 SP 5 55 59

505 SP Musanze 2 SP 5 55 53

145 SP Nyabugogo 1 SP 5 72 75

1053 SP Nyagatare SP 5 66 48

391 SP Nyamagabe SP 5 62 54

1013 SP Nyamata 1 SP 5 62 59

1014 SP Nyamata 2 SP 5 63 54

118 SP Remera Giporoso SP 5 55 61

130 SP Remera Prince House 1 SP 5 62 46

343 SP Rubavu SP 5 52 60

1059 SP Rusizi 1 SP 5 55 44

1062 SP Rusizi 2 SP 5 52 61

421 SP Rusumo SP 5 69 51

244 SP Rwamagana SP 5 55 56

1035 SP Ryabega SP 5 55 44

373 Ukod Oil Musanze Ukod 5 55 50

Table 40: PSS falling in the second category

Page 93: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

93

The following is a table with 33 (Thirty-Three) PSS falling in the second category because of having their parcel size smaller than the size required by regulations:

PSS_ID PSS_Name Operator PSS Plot Size Score Over 10%

PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

PSS Technical and Risk Total Score over 100%

205 Buranga Petroleum Musha Other 0 5 20 44

517 Delta Petroleum Butaro Delta 0 5 31 49

70 Delta Petroleum Kicukiro Delta 0 5 17 61

1026 Delta Petroleum Nyamata Delta 0 5 17 39

442 Delta Petroleum Nyanza Delta 0 5 17 48

268 Delta Petroleum Rubavu Delta 0 5 31 44

1055 Delta Petroleum Rukomo Delta 0 5 34 46

331 Diettha Petroleum Muhanga Other 0 5 21 50

148 Discentre Nyamirambo Discentre 0 0 7 52

313 Engen Byumba Engen 0 5 21 54

115 Engen Ndera Engen 0 0 0 58

1064 Gas Oil Kamembe Gas Oil 0 10 38 43

1067 Hashi Energy Gisozi Hashi 0 0 17 48

1021 Hashi Energy Rusizi Hashi 0 5 31 63

112 Hass Petroleum Nyabugogo 2 Hass 0 10 45 60

448 Kobil Huye Market Kobil 0 5 21 58

1038 Kobil Karongi Kobil 0 5 21 54

136 Kobil Nyamirambo Kobil 0 0 7 61

271 Kobil Rubavu Kobil 0 5 21 59

562 Kobil Rulindo Kobil 0 5 30 52

1037 Kobil Rwimiyaga 2 Kobil 0 10 38 49

208 Lake Petroleum Rugende Lake Petroleum

0 5 30 49

451 M.Line Ndora Gisagara M.Line 0 5 34 50

460 Merez Rwamagana Merez 0 5 21 47

532 OM Kabaya OM 0 5 21 47

358 OM Mukamira OM 0 5 34 48

58 Source Oil Gicumbi Source Oil 0 5 28 63

22 Source Oil Remera Source Oil 0 5 17 46

340 SP Huye Town SP 0 5 17 63

Page 94: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

94

PSS_ID PSS_Name Operator PSS Plot Size Score Over 10%

PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

PSS Technical and Risk Total Score over 100%

430 SP Kirehe SP 0 5 31 59

1043 SP Rubengera SP 0 0 14 51

1034 SP Town Mosque SP 0 10 48 58

1074 Ukod Oil Kicukiro Ukod 0 0 3 46

Table 41: PSS falling in the second category

Becase there are some PSS violating both regulations and some violating only one of them, the total number of PSS that have to be upgraded is 198 (One Hundred and Nine Eight) PSS which is the unique number of PSS violating any of the two regulations.

8.3 First Category: PSS that comply with important regulations but need to

do some technical upgrade and risk mitigation

In this category, we find PSS that are not in the third or the second category. These PSS are complying with the location regulations but have todo some technical upgrades.

The following is a table with 11 (Eleven) PSS falling in the first category. These PSS have scored the maximum on the plot size and on the compliance with master plans.

PSS_ID PSS_Name Operator

PSS Plot Size Score Over 10%

PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

Total Technical and Risk Analysis Score over 100%

1041 Engen Rubengera Engen 10 10 72 57

1009 Excel Energy Rwagitima Excel Energy 10 10 86 51

1016 Kobil Kabarore Kobil 10 10 72 50

1033 Kobil Matimba Kobil 10 10 72 38

367 Lake Petroleum Musanze Lake Petroleum 10 10 69 61

1063 Maxi Station Kamembe Maxi 10 10 72 47

1040 Merez Karongi Merez 10 10 72 50

181 Oil City Remera Oil City 10 10 72 48

1039 Source Oil Karongi Source Oil 10 10 72 40

412 SP Ngoma SP 10 10 72 60

Page 95: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

95

PSS_ID PSS_Name Operator

PSS Plot Size Score Over 10%

PSS Compliance to Master Plan Score Over 10%

PSS Spatial Location Total Score Over 100%

Total Technical and Risk Analysis Score over 100%

1065 SP Town Radio SP 10 10 83 69

Table 42: PSS falling in the first category

Page 96: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

96

9. Computer Application for Monitoring Petrol Service Stations

As RURA will continue to regularly monitor and inspect existing and new PSS about their compliance to the regulations, a desktop and GIS based system has been developed and implemented to assist RURA in this respect.

The system contains the following components:

ArcGIS Desktop Software: ArcGIS Desktop is the software that allow to store, manage, analyse and map georeferenced data. The software will be used by RURA for mapping PSS and monitor their geographic locations. ArcGIS will be used to evaluate the spatial relationship between PSS and their neighbourhood environment (e.g. if PSS are inside the right land use zone, distance from PSS property boundaries to road or to sensitive areas, etc.) by analysing PSS data and turning them into valuable information for decision making.

ArcGIS Geodatabase: this is the physical store of geographic information, primarily using a database management system (DBMS) or file system. The geodatabase is the native data structure for ArcGIS and is the primary data format used for editing and data management. While ArcGIS works with geographic information in numerous geographic information system (GIS) file formats, it is designed to work with and leverage the capabilities of the geodatabase.

More information about the above components can be found in the following sub-chapters.

9.1 ArcGIS Desktop Software

ArcGIS Desktop is the software that allow authoring and editing maps and geospatial content. Beyond showing your data as points, lines, polygons or as rasters on a map, ArcGIS Desktop gives you the power to manage and integrate your data, perform advanced analysis, model and automate operational processes, and display your results on professional-quality maps.

ArcGIS Desktop is the traditional GIS authoring, editing, and geoprocessing application that allows you to create beautiful maps, edit and manage spatial data, and perform the full spectrum of analyses needed to turn your raw data into valuable information.

The picture below shows how the interface of ArcGIS desktop looks like and shows the PSS distributions in the country, their spatial relationship to national roads and district boundaries.

Page 97: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

97

Figure 4: ArcGIS Desktop Interface

9.2 ArcGIS Geodatabase

At its most basic level, an ArcGIS geodatabase is a collection of geographic datasets of various types held in a common file system folder, a Microsoft Access database, or a multiuser relational DBMS (such as Oracle, Microsoft SQL Server, PostgreSQL, Informix, or IBM DB2). Geodatabases come in many sizes, have varying numbers of users and can scale from small, single-user databases built on files up to larger workgroup, department, and enterprise geodatabases accessed by many users.

But a geodatabase is more than a collection of datasets; the term geodatabase has multiple meanings in ArcGIS:

The geodatabase is the native data structure for ArcGIS and is the primary data format used for editing and data management. While ArcGIS works with geographic information in numerous geographic information system (GIS) file formats, it is designed to work with and leverage the capabilities of the geodatabase.

It is the physical store of geographic information, primarily using a database management system (DBMS) or file system. You can access and work with this physical instance of your collection of datasets either through ArcGIS or through a database management system using SQL.

Geodatabases have a comprehensive information model for representing and managing geographic information. This comprehensive information model is implemented as a series of tables holding feature classes, raster datasets, and attributes. In addition, advanced GIS data objects add GIS behavior; rules for

Page 98: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

98

managing spatial integrity; and tools for working with numerous spatial relationships of the core features, rasters, and attributes.

Geodatabase software logic provides the common application logic used throughout ArcGIS for accessing and working with all geographic data in a variety of files and formats. This supports working with the geodatabase, and it includes working with shapefiles, computer-aided drafting (CAD) files, triangulated irregular networks (TINs), grids, CAD data, imagery, Geography Markup Language (GML) files, and numerous other GIS data sources.

Geodatabases have a transaction model for managing GIS data workflows.

The geodatabase storage model is based on a series of simple yet essential relational database concepts and leverages the strengths of the underlying database management system (DBMS). Simple tables and well-defined attribute types are used to store the schema, rule, base, and spatial attribute data for each geographic dataset. This approach provides a formal model for storing and working with your data. Through this approach, structured query language (SQL)—a series of relational functions and operators—can be used to create, modify, and query tables and their data elements.

You can see how this works by examining how a feature with polygon geometry is modeled in the geodatabase as shown by the above picture. A feature class is stored as a table, often referred to as the base or business table. Each row in the table represents one feature. The shape column stores the polygon geometry for each feature. The contents of this table, including the shape when stored as a SQL spatial type, can be accessed through SQL.

All GIS users will work with three fundamental dataset types regardless of the system they use. They'll have a set of feature classes (much like a folder full of Esri shapefiles); they'll have a number of attribute tables (dBASE files, Microsoft Access tables, Excel spreadsheets, DBMSs, and so forth); and most of the time, they'll also have a large set of imagery and raster datasets to work with.

Page 99: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

99

The following picture shows the three primary types of datasets (i.e. table, feature class, raster dataset) that can be stored in a geodatabase.

Figure 5: Primary datasets that can be stored in a Geodatabase

Fundamentally, all geodatabases will contain this same kind of content. This collection of datasets can be thought of as the universal starting point for your GIS database design.

With a geodatabase, all of an organization's GIS data can be stored in a central location and in a uniform format for easy access and management. Geodatabase models support virtually any type of geographic data, including image and raster data, vector features and their attributes, terrains, addresses, 3D objects, surveys, and maps.

RURA geodatabase will contain all PSS data plus other important data like roads, parcels, land use zones, sensitive areas, etc. and the ArcGIS software will access, map and analyse this data, and provide essential and accurate information to RURA about PSS compliance to regulations.

Page 100: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

100

9.3 RURA geodatabase structure

The following picture shows the overview of RURA PSS Geodatabase. It contains five feature datasets containing the following categories of data:

Figure 6: RURA geodatabase structure

Rwanda Administrative Boundaries from Rwanda Natural Resources Authority (RNRA) containing Provinces, Districts, Sectors, Cells and Villages as shown below:

Infrastructure geodata from Rwanda Transport Development Agency (RTDA) containing National and District roads as well as their reserved areas (buffers) as per the regulations:

Page 101: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

101

Land Use Master Plans from Rwanda Housing Authority (RHA) and City of Kigali (CoK) containing information about land use zones in some cities.

Page 102: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

102

Petrol Services Stations Geodata collected by Esri on field and their corresponding parcels from Rwanda Natural Resources Authority (RNRA):

Sensitive Areas Geodata containing Health Facilities, Markets and Schools from Ministry of Health, Ministry of Trade and Industry and Ministry of Education respectively.

Page 103: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

103

10. GIS Training for RURA Staff

According to the contract signed between RURA and Esri Rwanda on the 18th July 2016 to conduct a mapping exercise for petrol service stations countrywide, part of the work to be done was provision of training to RURA staff on using and maintaining the computer application for monitoring activities incorporating the District Master Plans and collection of data using tablets and iform application.

10.1 Objectives of the GIS Training

The training aimed to introduce RURA GIS staff to various processes conducted by Esri

Rwanda in collection, mapping and analysis of the Petrol Service Stations according to

RURAs regulations. The knowledge acquired allows RURA staff to be able to carry out

the data collection, operate, maintain and update the geospatial database and carry out

monitoring activities of the petrol service stations countrywide.

10.2 Content of the Training

The training on Data collection and analysis covered the following topics:

Introduction to GIS – The cornerstone of a GIS

Introduction to ArcGIS Desktop Interface

Introduction to the Geodatabase

Creating a Geodatabase in ArcGIS

Create Feature Datasets

Adding x,y coordinate data as a feature dataset

Performing Spatial Analysis

Designing questionnaire using iForm technology

Collecting data using tablets

Esri Rwanda provided a training manual together with data collected and used during the analysis. Participants were taken through all the steps that Esri used to arrive at the score based on different analysis conducted.

10.3 Training schedule and Facilities:

The training took place in the afternoons from Monday to Thursday while on Friday this was conducted in the morning so as to accommodate sports in the afternoon. For the next trainings Esri recommends RURA to allocated a whole day for such trainings and preferably the training to be conducted out of the office so as to allow maximum concentration on the participants.

10.4 Software Versions

Esri installed the permanent ArcGIS software versions 10.2 on one of the machines to be used by the administrator of the computer application. For purposes of training Esri installed trial software ArcGIS licenses and recommends that RURA factors in the purchase of additional software.

Page 104: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

104

11. Stakeholders validation workshop

The stakeholders’ validation workshop was conducted on 15th December at Classic hotel in Kicukiro District. The aim of the workshop was to convey the results of the analysis conducted from the mapping exercise of the petrol service stations countrywide and get the views on the same.

Figure 7: Stakeholders Validation Workshop

The attendees of the workshop included different representatives from different government institutions as indicated below.

Names Post Institution

Antoinette NIYITEGEKA Downstream Petroleum Policy Specialist MINEACOM

J Baptiste MUKARAGE Ag Director of Land Administration RNRA

Ali RUDAHUNGA Economist RURA

Gerard RUSINE Director of Gas and Downstream Petroleum Regulations

RURA

Emile SERUBUGA Incharge Petroleum Regulations RURA

Samuel NDABAMENYE Licensing and Compliance RURA

Theophile MUTAGANDA GIS Specialist RHA

Fabrice BARISANGA RRDM RTDA

Cyprien NDAYISABA Environmental Specialist RTDA

Page 105: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

105

Names Post Institution

Gaston GASORE Design Conformity and Construction Standards Engineer

RHA

Fred MUGISHA Director OSC City of Kigali

Aloys NSHIMIYIMANA Building Inspector City of Kigali

Jean Clement Manager of Peat, Methane and Oil REG/EACC

Olivier MUKESHIMANA Standards Officer RSB

Jacques KARANGWA MINALOC

Sandra WAIRIMU GIS Specialist ESRI

Maxime RWAKA GIS Specialist ESRI

Table 43: List of participants for the stakeholders’ validation workshop

Activities lined up for the stakeholders’ validation workshop is indicated in the table below.

Time Item Duty

10.00 – 10.15 am Arrival and Registration of participants ESRI

10.15 – 10.25 am Welcome note and Introduction to PSS mapping project

RURA

10.25 – 11.15 am Presentation outcome of the PSS project ESRI

11.15 – 12.00 pm Discussions, Q&A Session Participants

12.00 – 12.30 pm Presentation of Key provisions on New Regulations on Petrol Service Stations

RURA

12.30 – 12.45 pm Discussions on Key provisions on the New Regulations

Participants

12.45 – 13.00 pm Closing Remarks RURA

13.00 pm Lunch Break

Table 44: Agenda for the Stakeholders Validation workshop

The stakeholders’ validation workshop started by a welcome note from Mr Gerard Rusine, Director of Gas and downstream petroleum regulations at RURA. who also took the members through the objectives of the mapping exercise for the PSS and why it was necessary to conduct such an exercise.

This was followed by a presentation from Esri Rwanda who took the participants through the methodology adopted in carrying out the analysis on the data collected for the petrol service stations and the criteria used in categorizing PSS into the three categories namely;

Page 106: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

106

Third category: PSS that cannot comply with regulations even if they do any type of upgrade. It is impossible for PSS in this category to comply with the regulations because their current location and parcel boundaries are completely inside prohibited areas.

Second category: PSS that do not comply with the most important regulations, but can do significant upgrades and comply. It is possible for PSS in this category to comply with the regulations after a significant investment like acquiring a neighbor plot to adapt their plot size or relocate its installations intersecting with protected areas.

First category: PSS that comply with most of important regulations but need to do some technical upgrade and risk mitigation. It is reasonably possible for the PSS in this category, to do necessary technical adjustments and comply with the regulations.

A demonstration of the computer application was also given to indicate the location of the existing petrol service stations in relation to the different land use proposed in the District master plans, National and District, residential areas as well as other sensitive areas such as schools and hospitals. This was illustrated through a web application designed on ArcGIS Online with various datasets indicated above received from different institutions such as RHA, CoK, RTDA and RNRA.

After the presentation from Esri, the participants were invited to give their input on the work done and results displayed. The points below summarize the discussions and the question and answer session:

Participants wanted to find out if the Rwanda Building Codes and the Law on Roads were consulted in stablishing the PSS regulations.

Participants wanted to find out if the mapped PSS were available to the public as this was a very good initiative to make such data especially on the location of the PSS available and whether they could be accessed on different devices or availed to the public via a web platform (e.g: Google map)

Participants pointed out that careful evaluation of the PSS to be phased out needed to be looked at carefully as this would impact negatively on investors and also drive away potential investors who view the country as a great business and investment destination.

One of the participant insisted that PSS must comply with the international standards. He emphasized that as much as there was the wish to promote trade, safety issues also had to be taken care of and this led to the distances which were proposed and which were based on fire safety standards

Due to most of the PSS not adhering to the current regulations, participants inquired whether it would be appropriate to review and analyse the new PSS based on the current regulations since the old PSS are affected mostly by the regulations

Participants wanted to find out who or which institution will bear the cost of phasing out or relocation of the PSS. It was emphasized by participants that PSS construction dates needs to be considered when phasing out.

The City of Kigali representatives suggested that the PSS map should be open and accessible to everyone, like the Kigali city master plan. He pointed out that based on the existing PSS regulations, it is difficult to provide construction permit, since 2016, no new PSS was approved. A collaboration between CoK and RURA is needed for the new regulations.

Participants wanted to find out if there was room for the Master Plans to be amended to reflect the current situation on the ground. This was seen necessary based on the numerous stations which were found to be located in restricted land

Page 107: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

107

uses. The Director of One Stop Center reacted by saying that Master Plans could be amended if it was deemed necessary

After the discussions, participants were also taken through the some of the Key contents of revised provisions of Petrol Service Stations Regulations No 003/R/GP-EWS/RURA/2016.

Page 108: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

108

These included the following:

Provisions Existing Regulations No.003/ENERGY/PSS/RURA/2014

Draft Revised Regulations No.003/R/GP-EWS/RURA/2016

Remarks

Distance between two stations on same side of the road

1,000 m 1,000m in city of Kigali and secondary Towns and 2,000m in rural areas.

This distances to be applied on either side of the road (single or double carriage)

*minimization of proliferation of PSSs in the Country

* CoK to specify which road is to be mentioned in the PSS regulations. The distances can be applied on either side of the road , only if no structure separating the dual carriage

Distance from residential buildings (households & apartments)

50m (fuel tanks as reference)

15m buffer zone from the boundary of the nearest plot with or without a residential house or commercial building to the hazardous area of PSS (Tanks or Pumps location).

*Safety distance

Distance from sensitive areas

300m buffer zone from sensitive areas (national parks, rivers, stream, historical sites, areas of high ecological nature, major aquifers, schools and churches)

100m from Sensitive areas: (Hospitals, Health Centre, Schools, Memorial sites, Museum, public markets, church, mosques, Public Bus stations and other public areas that may be updated from time to time by the Regulatory Authority)

*ESRI recommendation

Distance from power lines

N/A

-9m was taken referred to Former EWSA guidelines

15m(30kv- 220kv, medium & higher power lines)

This distance is stipulated in RURA Guidelines on Right of Way in Electricity sector.

Road junction distance

100m (annex of Regulations)

100m from PSS to major roads junctions (cross-cutting junctions and roundabouts)

*consult RTDA & CoK. CoK and RTDA should provide specification of junctions to be included in the regulation.

Cathodic protection of the tanks and pipe

N/A *Safety purpose, as per standards

Page 109: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

109

works against corrosion

Observation wells on tanks for easy collection of samples

N/A *As per Standards

Protection and welfare of personnel

N/A Providing certificate of training for retail (to be included in administration requirements for a Retail License)

Time for off-loading Petroleum products at petrol stations

N/A In cities and congested areas off-loading to be performed between 10 pm and 5am

*to avoid malpractice of off-loading during dispensing activities (ESRI Recommendation). This required consultation with high authority

Faults and related sanctions

N/A Chapiter-IX: Articles, 56, 57,58,59,60,61,62 & 63

-Installation of a service station without an Installation License

(1,000,000 fw),demolition (check building code)

- Operating a service station without a Retail License (500,000frw)

-Installing a service station in contradiction with the design and approved plans (stop installation works until compliance with the approved design and drawings.) (check building code) Annex-3

-Upgrading a service station without an authorization (500,000frw)checking building code

- Retailing substandard petroleum products (5,000,000frw)

Page 110: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

110

- Failure to provide information (500,000frw – 2,000,000 frw)

- retailing fuel at a price higher than the approved one (5,000,000 frw)

-Failure to perform Calibration and verification of pumps

Page 111: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

111

12. TV Spot Content

Esri together with RURA agreed on the key contents to be incorporated in the TV spot which would incorporate pictures and videos where possible. The key contents will briefly highlight RURAs mandate in respect to downstream petroleum and serve to sensitize the public.

The TV spot message was based on the following RURAs mandate:

RURA regulates the implementation and operation of petroleum infrastructures (Fuel depots, Petrol Stations, Fuel transportation in Road tankers / trucks,).

Urwego Ngenzuramikorere (RURA) rufite mu nshingano zayo kugenzura ibikorwaremezo by’ibijyanye n’ubucuruzi bw’ibikomoka kuri peteroli (ibigega, amasitasiyo) ndetse n’imirimo itandukanye y’ubucuruzi bwa peteroli (ubwikorezi, ububiko, kuranguza no kudandaza petelori).

Based on applicable standards RURA has set a number of Regulations governing

the construction and installation of petroleum infrastructures including petroleum

storage depots and petrol service stations.

Hashingiwe ku bipimo biri mu mabwiriza y’ubuziranenge (standards)

RURA yashyizeho amabwiriza (Regulations) agenga imyubakire

y’inyubako z’ibikomoka kuri peteroli harimo ibigega bibika amavuta (fuel

depots) ndeste n’inyubako za sitasiyo zitanga amavuta ku binyabiziga.

RURA was given a mandate to regulate fuel pricing at retail sites, and a close

follow up of fluctuation of petroleum price at international market.

RURA ishinzwe kandi gushyiraho no kugenzura ibiciro by’ibikomoka kuri

peteroli no gukurikirana ihindagurika ry’ibiciro ku isoko mpuzamahanga.

Liquefied Petroleum Gas (LPG) is also a petroleum product that is entering the

Rwanda market as cooking means. Its related filling plants and retail sites in

cylinders are also regulated by RURA.

GAZI ikoreshwa mu guteka (LPG- Liquified Petroleum Gas) ni imwe mu

bikomoka kuri peteroli icuruzwa ku isoko ryo mu Rwanda. Inganda (filling

plants) ndetse n’aho gazi icururizwa mu macupa (LPG Cylinders) nabyo

biri mu bigenzurwa na RURA.

Monitoring the Transportation of petroleum products across the country with

safety issues

Kugenzura ko ubwikorezi bw’ibikomoka kuri peteroli mu gihugu bukorwa

mu buryo budateza umutekano muke.

Page 112: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

112

RURA in collaboration with other stakeholders (government institutions, local

authorities / districts) has the responsibility of issuing licenses related to the

installation and operation of fuel storage and distribution facilities

Ku bufatanye n’inzego zitandukanye za leta (ibigo by a leta, ubuyobozi

bw’uturere) RURA itanga impushya (licenses) ku nyubako zijyanye

n’ubucuruzi bw’ibikomoka kuripeteroli.

Consumers protection is key responsibility of RURA in petroleum service delivery. Hotline 3988 RURA ishinzwe kandi kurengera abafatabuguzi ku muntu wese wagira

ikibazo kijya na service zitangwa mu bucuruzi bw’ibikomoka kuri peteroli.

Umurongo wa RURA wo guhamagaraho ugize ikibazo ni 3988.

To ensure that a huge population is reached, the TV content would be in Kinyarwanda.

Page 113: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

113

13. Conclusion and Recommendations

13.1 From Stakeholders Validation workshop

The following recommendations were given by the participants from the different government institutions during the Stakeholders validation workshop conducted to relay the outcome of the mapping and analysis done on data collected for the PSS.

1. The computer application for PSS to be developed further and make necessary information such as location freely accessible by the public in terms of motorists finding which is the nearest PSS incase they needed to refuel.

2. Mapping and analysis of fuel depots and liquefied petroleum gas filling points to be conducted as these are also components of petroleum products which also affect the petrol service stations

3. RURA to conduct an exercise to establish the projected demand for PSS so as to ascertain how many PSS need to be put up and compare this to the existing number. This would be useful in indicating whether there was need to put up more PSS or the current number would be able to meet the projected demand

4. Careful assessment of the identified PSS to be phased out to be done so as to not impact negatively on the investors

5. Need to revise the current regulations on PSS to also reflect the current situation on ground and also adapt it to local conditions

6. Amendment of the District Master Plans where necessary so as to allow for PSS to be put up and operate.

7. RURA to reflect on the cost for phasing out or relocation and who would bear the cost in cases where the PSS were constructed before the regulations in 2014 and if possible this to be to be reflected in the new regulations

8. RURA to collaborate with different institutions such as City of Kigali and Other Districts who might be having the missing information like construction date of the PSS which was seen very vital

13.2 On GIS Training to RURA staff

As the training was focused on introducing the participants to ArcGIS Desktop as well as spatial and technical analysis conducted on the PSS data, it was noted that the time allocated for the training which was conducted in the afternoons was not sufficient. Since the participants were new in using the ArcGIS Desktop software, everything about the software could not be taught within duration given in the contract.

Esri Rwanda therefore recommends the following:

1. Another training session be budgeted for to engage the participants more on the

software and also a follow up done to ensure that the participants are comfortable

in using the software and the computer application for monitoring PSS in general.

2. RURA to budget for the purchase of additional ArcGIS Desktop software as

currently only one license is available for the institution.

Page 114: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

114

13.3 On PSS Data analysis

During the data collection on field and data analysis, it was found that none of the 249 Operating PSS is complying 100% with RURA regulations. The data analysis has shown that:

40 (Forty) PSS corresponding to 16.06 % are completely inside a reserved or prohibited land use zone. These PSS cannot be upgraded and they have to be phased out.

194 (One Hundred and Ninety-Four) PSS corresponding 77.9 % are having a part of their parcel intersecting a prohibited land use zone. These PSS can be upgraded after doing significant investment on their parcel.

33 (Thirty-Three) PSS corresponding to 13.25 % are having their parcel size smaller than the required. These PSS can be upgraded after doing significant investment on their parcel.

11 (Eleven) PSS corresponding to 4.41 % are complying to the regulations about the parcel size and are completely in an authorized land use zone. These PSS can be upgraded by just improving their technical and risk management.

209 (Two Hundred and Nine) PSS corresponding to 83.93 % (except the 40 PSS to be phased out) have to improve their technical and risk management.

The above distribution of scores shows clearly that regulations are not respected at different levels by PSS. It is in this context that we are proposing the following recommendations to ensure that the regulations are respected:

1. RURA should carefully evaluate the feasibility of the PSS regulations especially the location-based regulations about required distances between PSS and its neighbourhood features. There are some regulations that have been judged to be not realistic because if they are applied they would disqualify most of the PSS (e.g. the required distance of 50m between PSS and residential house is disqualifying 92% of the PSS).

2. As a PSS can fulfil the required distance to residential houses or sensitive areas during the license application period and later on a residential house get built next to the PSS, we do recommend to RURA to lower the required distances but restrict these distances withn the PSS plot boundary. This implies reducing the distance to residential houses but increase in the size of the PSS plot. Therefore, we recommend the following distances that we consider to be reasonable for PSS: 20 meters to be kept within PSS parcel boundaries to the nearest residential or commercial building, and 100 meters to the sensitive areas from the PSS parcel boundaries.

3. RURA should improve its collaboration with City of Kigali and Districts One Stop Centers (OSC) and ensure that it is involved before a PSS is authorized for construction. While we understand that it is mainly the role of OSC to check if a PSS is in the right land use zone, results of the data analysis have revealed this not to be the case as some of the recently construted or upgraded PSS have been found in prohibited areas.

4. There are many PSS that have been found not having RURA licenses due to different reasons (i.e. constructed before the licenses were established, operating with Rwanda Devepment Board (RDB) business registration license etc.); while this is understandable in some cases, we are recommending RURA to give the license to qualifying PSS after they have completed the upgrades. A sensitization is also needed to make aware of this to the oil marketing companies.

Page 115: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

115

5. Based on our findings especially on how PSS operators do not take seriously the safety, security and risk prevention regulations, we would like to recommend RURA to introduce a safety operation license valid for one year so that operators do not neglect the regulations and start compromising safety of the population and surrounding environment.

6. Due to lack of professionalism for most of PSS regarding the safety mesures, we have found that PSS are more dangerous during the offloading which always happen at the same time with customers filling their cars. It is in this context that we would like to recommend RURA to set up evening hours (e.g. 10pm to 6am) for petrol offloading at PSS especially in cities and congested areas to mitigate the fire risks.

7. We would like to recommend to RURA to establish a certification programme for PSS managers during which they will have to be trained, pass an exam before becoming PSS registered managers. A registered manager would be accountable for anything that might happen to the PSS he manages. The certificate of the manager can be revoked in case of serious negligence and should be renewed every year after successfully participating in an annual refresher course.

8. PSS operators should be tasked to carryout semi annually enviromental, health and safety audits at the sites and submit a compliance report to the regulator.

9. PSS operators should maintain a daily wet-stock reconcilation in a proper documentation (i.e. we found many unproper books) and any variables should be explained to ensure intergrity of underground storage tanks and product lines.

10. PSS operators should have an impermeable floor at the forecourt and offloading area to contain any spills in additional to draining these floors through an interceptor.

11. PSS operators should ensure uniform colour coding and product labelling which was found to be very different.

12. Most PSS visited did not display safety signs i.e. no smoking and emergency contacts. This should be enforced. This should be extended to offloading points and vent pipes.

13. PSS operators should make sure that their staff are having uniform and protective clothing

14. PSS operators should maintain good housekeeping especially free and clear station entrance and exit without obstruction.

15. Ensure all staff are adequately trained (retain training records)

Page 116: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

116

14. Annexes

14.1 PSS Mapping Questionnaire

1.0 Petrol Service Station location and status:

1.1. Name of Station: 1.2. Geographic coordinates

1.3. Province name: 1.4. District name:

1.5. Sector name: 1.6. Cell name:

1.7. Village name: 1.8. Map code:

1.9. Street number/Road name: 1.10. Plot number:

1.11. Construction year: 1.12. Rehabilitation year:

1.13. Date of data collection:

1.14. Status: Operating ( ) Under construction ( ) Under rehabilitation ( ) Non-operating ( )

1.15. If non-operating, what is the reason for this?

1.16. Do you have an installation license from RURA? Yes ( ) No ( )

1.17. If yes, what is the license number?

1.18. Date of expiry of the license:

1.19. If No, what is the reason for you not having it?

1.20. Mode: Attendant operated ( ) Attended self-service ( ) Unattended self-service ( )

1.21. Petrol Station Overall picture:

2.0 Petrol Service Station Particulars:

2.1. Name of owner of Station: 2.2. Owner of Station phone number:

2.3. Owner of Station address number: P.O. Box 2.4. Owner of Station email address

2.5. Owner contract period: 2.6. Name of operator of station

Page 117: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

117

2.7. Operator of station phone number: 2.8. Operator of Station address number: P.O. Box

2.9. Operator of Station email address 2.10. Date the operator – owner contract will end:

2.11. Name of dealer of station: 2.12. Dealer of station phone number:

2.13. Dealer of Station address number: P.O. Box 2.14. Dealer of Station email address

2.15. Date the dealer – operator contract period will end: 2.16. Name of interviewee:

2.17. Position of interviewee: 2.18. Interviewee Phone number:

3.0 Petrol Service Station compliance to regulations:

3.1. Is the plot size complying with RURA regulations? Yes ( ) No ( )

3.2. Is the plot location complying with the Master Plan? Yes ( ) No ( )

3.3. Is the PSS near (<300m) a sensitive area? Yes ( ) No ( )

(National parks, rivers, streams, historical sites, areas of high ecological nature, major aquifers, hospitals, schools Health Centre, Bus stations/gare, Authorized Mosques, memorial sites, public markets, National Museums and Authorized Churches)

3.4. Distance from PSS property line to centre of the major road (M):

3.5. Distance from PSS property line centre of the minor road (M):

3.6. Is the Petrol Service Station on road curve or bend: Yes ( ) No ( )

3.7. Distance from PSS property line to cross cutting road junction (M):

3.8. Distance from PSS property line to nearest roundabout (M):

3.9. Distance from PSS property line to nearest residential area(M):

(an apartment, hotels and households)

3.10. Distance from nearest petrol station (M):

(on the same section of the single carriage/dual road)

3.11. Distance from nearest petrol station (M):

(on opposite side of a single carriage/dual road)

Page 118: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

118

4.0. Available services and facilities:

Facility Yes ( ) No ( )

4.1. Car service bay

4.2. Car Wash

4.3. Tyre service

4.4. Shop

4.5. Garage

4.6. ATM

4.7. None

5.0. Available public toilet/restrooms

Facility Yes ( ) No ( )

5.1. Gents

5.2. Ladies

5.3. People with Disabilities (PWD’s)

5.4. Common public toilet

5.5. No public toilet

6.0. Forecourt information

6.1. Forecourt floor material Macadam ( ) Reinforced Concrete ( ) Paved ( ) Earth material ( ) Stones ( ) Sand ( ) Other ( )

6.2. Forecourt Safety Signs No Smoking ( ) Switch phone Off ( ) Switch Engine Off ( )

6.3. What are the posted emergency Signs

Emergency Numbers ( ) Emergency procedures ( )

6.4. Are the Entry and Exit separate? Yes ( ) No ( )

6.5. Are there Entry and Exit signs? Entry ( ) Exit ( ) No sign ( )

Page 119: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

119

6.6. What is the width (in meters) of Entry?

6.7. What is the width (in meters) of Exit?

6.8. Is the PSS having a signage? Yes ( ) No ( )

6.9. What is the distance (in meters) of signage from road boundary

6.10. What is the height (in meters) of the signage from ground level?

6.11. Does the PSS has a boundary wall/fence

Yes ( ) No ( )

6.12. Picture of the forecourt

7.0. Parking information

7.1. Is the PSS having a parking area? Yes ( ) No ( )

7.2. Parking surface type Macadam ( ) Reinforced Concrete ( ) Paved ( ) Earth material ( ) Stones ( ) Sand ( ) Other ( )

7.3. Number of parking stalls

8.0. Canopy information

Item

8.1. Does the PSS have a canopy? Yes ( ) No ( )

8.2. Products under canopy Gasoline ( ) Diesel ( ) Kerosene ( )

8.3. Canopy floor material Macadam ( ) Reinforced Concrete ( ) Paved ( ) Earth material ( ) Stones ( ) Sand ( ) Other ( )

8.4. Canopy surface area in Square meters

8.5. Canopy structure material Plastic sheet ( ) Galvanized steel ( ) Prefabricated steel ( )

8.6. Canopy height in meters

Page 120: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

120

8.7. Picture of canopy

9.0. Building information

Building Usage Number of floors Height in meters (approx. 4m* number of floors)

Construction Material (Stone, Bricks, Concrete, Blocks, Others)

Picture of building

9.1.

10.0. Petrol Storage Tanks

Product( Gasoline

, Diesel,

Kerosene)

Type of

tank (Undergrou

nd

/ abovegroun

d)

Underneath

ground materia

l? (concrete, clay

soil, dry

sand)

Material of the tank

(carbon, mild steel plate, fibre-

reinforced

plastic)

Capacity of tank (Ltr)

Tank manhole cover

Labelled dipstick per tank ( Tanks should not share dipsticks and it

should be straight)

Distance from tank

to adjacent building ( Meters)

Distance from

tank to forecour

t( Meters)

Distance from tank to adjacent canopy( Meters)

Distance from tank to parking( Meters)

Distance from tank to boundary of the road (meters)

Is the tank having a security fence around it? (Yes/No)

Colour

Coded/Labelled

protected/locked

one per

tank ( Yes/No

)

Dipstick

straight (

Yes/No)

11.0. Vent Pipes

Vent pipe tank product ( Gasoline, Diesel, Kerosene)

Open area/enclosed area

Vent pipe height (metres)

11.1.

Page 121: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

121

12.0. Filling Points (Product offloading points)

Product (

Gasoline,

Diesel, Kerosene)

Identification

type? (Colour

code/Labelled, None)

Filling point

location (Offset/Di

rect)

Open area/enclos

ed area

Is it protected

and locked?

(Protected,

locked)

Distance from filling point tank to adjacent building (

Meters)

Distance from filling

point to parking ( Meters)

Distance from filling point to

adjacent canopy ( Meters)

Distance from filling point to

forecourt ( Meters)

Distance from filling point to

road boundary (

Meters)

12.1.

13.0. Dispensing Pump

Product(

Gasoline,

Diesel, Kerose

ne)

Product Label(

Yes/No)

Is dispen

ser under

the standar

d canopy Yes () No ()

Digital or

Analogue

(Digital,

Analogue)

Type (Single/Dual/Twin pump)

Date of last

Calibration

How often do you

calibrate?

Is there record of

last calibration Yes ( ) No ( )

Price displayed Yes ( ) No ( )

Volume displayed Yes ( ) No ( )

Distance between adjacent

dispensers

Picture of dispensing

pump

13.1.

Page 122: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

122

14.0. Islands

Give a number ID to this island

Distance between adjacent islands

Number of dispensers on the island

14.1.

15.0. Road tanker stand

Item

15.1. Is it in open area? Yes ( ) No ( )

15.2. Distance to adjacent building? (metres)

15.3. Distance to dispensers? (metres)

15.4. Distance to emergency escape route? (metres)

16.0. Stock Reconciliation and leak management (reports should be seen)

16.1. How often do you carry out stock reconciliation Daily ( ) Weekly ( ) Monthly( )

16.2. Can the PSS show the last record of reconciliation Yes ( ) No ( )

16.3. Can the PSS show you an automatic leak detector system Yes ( ) No ( )

16.4. Can the PSS show you a vapor balancing system Yes ( ) No ( )

16.5. Can the PSS show you an automated tank gauging system Yes ( ) No ( )

16.6. Does the PSS carry out hydrostatic testing? (pressure tests) Yes ( ) No ( )

16.7. Can the PSS provide records of hydrostatic testing? (pressure tests)

Yes ( ) No ( )

16.8. Can the PSS show a vapor hose to be connected to the road tanker during offloading

Yes ( ) No ( )

Page 123: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

123

17.0. Surface drainage and Interceptors / oil-water separators

Item Yes ( ) No ( )

17.1. Can you see the surface drainage surrounding the canopy?

17.2. Can you see the surface drainage surrounding the road tanker delivery point?

17.3. Can the PSS show you the interceptors (oil water separators)?

17.4. Can you see the surface drainage connected to interceptors or oil water separators?

18.0. Electrical Installations

18.1. What is the distance (in meters) between the tanks and the overhead power lines with more than 15 KV?(High and Medium Voltage lines)

18.2. What is the distance (in meters) between the truck delivery stand and the overhead power lines with more than 15 KV? (High and Medium Voltage lines)

18.3. Are circuit breakers installed for each dispensers? (Yes/No)

18.4. Is there an Isolation switch for all dispensers? (Yes/No)

18.5. Is there an emergency stop switch for the whole electrical power supply? (Yes/No)

18.6. Are the supplying electricity cable underground? (Yes/No)

18.7. Is the PSS having a back-up power supply (generator)? (Yes/No)

18.8. What is the capacity of the generator in KVA (kilovolts amps)?

18.9. Is the generator operational? (Yes/No)

18.10. Is the PSS having a generator room? (Yes/No)

Page 124: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

124

19.0. Fire, safety and security

Availability Yes ( ) No ( )

Accessible in open space Yes ( ) No ( )

Volume (Kgs or cubic meters)

19.1. Is there dry sand (Under canopy)

19.2. What is the volume of sand?

19.3. Are there fire extinguishers?

19.4. If yes, are the fire extinguishers under canopy?

19.5. What is the volume of the fire extinguishers under canopy?

19.6. How often do you service the fire extinguishers?

19.7. Can the PSS provide a record for the fire extinguishers maintenance?

19.8. Is there foam or other absorbent? (Under canopy)

19.9. What is the volume of the foam or absorbent?

19.10. Can the PSS provide a written spill management plan?

19.11. Is there a written emergency management plan?

19.12. Can the PSS show spill containment fill boxes?

19.13. Can the PSS show a working fire alarms?

19.14. Can the PSS show a functional CCTV?

19.15. Are public lights available for security?

19.16. Presence of a Security company (guard)?

19.17. Is the PSS insured?

19.18. Can the PSS show the insurance document?

Page 125: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

125

20.0. Staff Knowledge & Training

Yes ( ) No ( )

20.1. Are PSS attendants trained on operational (dispensing of flammable and combustible liquids) and emergency procedures?

20.2. How often are the attendants trained on operational (dispensing of flammable and combustible liquids) and emergency procedures?

20.3. Can the PSS show records of the past trainings?

20.5. Can an attendant explain how and when to use fire extinguisher, sand, and foam or other absorbent?

20.6. Can an attendant explain how to avoid and manage spills to reduce the risk of fire?

20.7. Can an attendant explain sources of ignition and appropriate measures to avoid risk of fire

20.8. Can an attendant show the location of main emergency stop button & pump and dispensers isolation switch?

21.0. Maintenance Activities

Item

21.1. How often do you conduct regular maintenance of equipments?

21.2. Date of last general maintenance of tanks and accessories

21.3. Name of accredited competent technician or company who carried out maintenance activities

21.4. Can the PSS provide records of the last maintenance?

Page 126: Consultancy Services to Conduct a Mapping Exercise for Petrol … · 2019-02-22 · E-mail: info@rura.rw Consultant: Esri Rwanda Ltd. P.O. Box 6867 Kigali, Rwanda info@esri.rw Date

© ESRI Rwanda Ltd., RURA –Mapping of Petrol Service Stations Countrywide– Final Report

126

22.0. Disposal of waste

Item

22.1. Is the PSS free from all forms of waste and general waste from station activity? Yes ( ) No ( )

22.1. How frequently is the station cleaned and waste collected? Daily, Once in two days, Once in three days, Weekly, Monthly

22.3. How is Oil contaminated wastes e.g. (waste containers of oil, radiator additives) disposed after collection and segregation?

(disposed together with the municipal waste, collected from the station by licensed used oil collecting agents, sold or given to local who used it for wood preservation or termite control, sold off to recyclers, Others)

22.4. Does the station collect used oil using appropriate containers that limits spillages?

Yes ( ) No ( )

22.5. Does the station segregate municipal waste from petrol and oil contaminated waste?

Yes ( ) No ( )

22.6. Can the PSS show an incinerator for burning the waste? Yes ( ) No ( )