CONSULTANCY DETAILS FROM JULY 2009 ONWARDS
S. No. Date Name of the Client Tests Amount
1 02/07/2009 M/s. K.Venkata Raju Engg & Contractors,
ROB Site, Ninavaram Steel 4640.00
2 02/07/2009 M/s.Suraj Constructions, FEC Project, Vja Cubes 1000.00
3 02/07/2009 M/s. The plant incahrge, Lafarge Aggregates
pvt ltd, Tadepalli
Aggregate
Test 11000.00
4 3/7/2009 M/s. SP.Jain, Nagarjuna Nagar, Guntur. Cubes 500.00
5 06/07/2009 M/s. Dy Executive Engg, Panchayat Raj, Sub
Division, Vemuru. Soil 5600.00
6 07/07/2009 M/s.Suraj Constructions, FEC Project, Vja Cubes 500.00
7 11/07/2009 M/s. Executive Engg,I/C,RWS&S Division,
Gnt Soil 3000.00
8 14/7/2009 M/s S.S.Engineering contractors, H.P.C.L,
Kondapalli Cubes 3000.00
9 14/7/2009 M/s K.Venkata Raju Engineers & Contractors,
Nainavaram Steel 1000.00
10 14/7/2009 M/s. K.Venkata Raju Engg & Contractors,
ROB Site, Ninavaram Steel 1800.00
11 14/7/2009 M/s. Deputy Executive Engineer, RWS&S sub
division,Tenali Soil 2200.00
12 14/7/2009 M/s.M.Surendra Kumar, Contractors, Tenali Cement 1500.00
13 16/7/2009 M/s. Potluri Krishna Mohan, Eswar puri
colony, Sec Cubes 1000.00
14 17/7/2009 M/s. K.Venkata Raju Engg & Contractors,
ROB Site, Ninavaram
Steel,
Cement,
Cubes
4000.00
15 20/7/2009 M/s.Suraj Constructions, FEC Project, Vja Cubes 500.00
16 22/7/2009 M/s V.N.S.Redimis, Kolanukonda, Guntur Cubes 500.00
17 22/7/2009 M/s Deputy Executive Engineer APSIDC, Sub
Division, Guntur
Sand,
Cement,
Steel, Metal
10200.00
18 22/7/2009 M/s Potluri Krishna Mohan Krishana Kavuru, Cubes 1000.00
Vja
19 24/7/2009 M/s.Suraj Constructions, FEC Project, Vja Cubes 1000.00
20 27/7/2009 M/s.Suraj Constructions, FEC Project, Vja Cubes 500.00
21 28/7/2009 M/s Deputy Executive Engineer APSIDC, Sub
Division, Guntur
Cement,
Steel,
Aggrigates
4000.00
22 29/7/2009 M/s Deputy Executive Engineer APSIDC, Sub
Division, Guntur
Concrete
Mixed Design 5000.00
23 30/7/2009 M/s Balaram Flyash Bricks & Floorliles,
Surampalli, Ganavaram Bricks 300.00
24 30/7/2009 M/s. Depeka Inforteck Pvt. Ltd, Hydarabad Soil 4000.00
25 03/08/2009 M/s. Nimmagadda Foundation, ZP High
School, Duggiralla Mixed Design 2000.00
26 06/08/2009 M/s. ARC Infra Cubes 500.00
27 06/08/2009 M/s. Deputy Executive engineer, PR Sub
Division, Vemuru, Tenali
Gravel Stone
Dust 2000.00
28 08/08/2009 M/s. Suraj Constructions, FEC Project, VJA Cubes 500.00
29 13/8/2009 M/r. Dr.N.Vishnu Vardhan Rao, Sri Sita
Gardens, Edupugallu Cement 1500.00
30 13/8/2009
M/s. K.Venkata Raju Engineering &
Contractors, ROB site
Nainavaram.
Steel 3300.00
31 17/8/2009 M/s. Suraj Constructions, FEC Project, VJA Cubes 1000.00
32 17/8/2009 M/s. V.N.S. Redimix, Kolanukonda, Tadepalli,
Guntur (Dt) Cubes 1000.00
33 18/8/2009 M/r. CH.Raju, AERWS, Nizampatnam, Repalle Steel 1000.00
34 18/8/2009 M/s. Deputy Executive Engineer, RWS & S
Sub Division, Guntur.
Cement,
Sand,
Metal, Steel
5900.00
35 20/8/2009 M/s. V.N.S. Redimix, Kolanukonda, Tadepalli,
Guntur (Dt)
Cubes,
Cement,
Aggregate
6500.00
36 20/8/2009 M/s. V.N.S. Redimix, Kolanukonda, Tadepalli,
Guntur (Dt) Aggregate 3000.00
37 20/8/2009 M/s. V.N.S. Redimix, Kolanukonda, Tadepalli, Water 1500.00
Guntur (Dt)
38 20/8/2009
Ms. K.Venkata raju Engineer & Contractors,
ROB Site, Nainavaram Steel 5100.00
39 21/8/2009 M/s. Beekay Steel, Balanagar, Hydarabad Steel 700.00
40 26/8/2009
M/s. V.Kishore Kumar, Prop, Sri Devi
Jewellers, Sharaff Bazar, Mangalagiri Cubes 500.00
41 26/8/2009 M/s.Beekay Steel, Balanagar, Hydarabad Steel 700.00
42 28/8/2009 M/s.Arc Infra, Vijayawada Cubes 500.00
43 28/8/2009 M/s. Corrtech India Pvt Ltd, G.Konduru, Cubes 2000.00
44 29/8/2009
M/s. Dy Executive Engineer, RWS&S Sub
Division, Piduguralla Soil 2200.00
45 29/8/2009 M/s. D.Om prakash, Srinivasa Redimix Cubes 500.00
46 07/09/2009 M/s Arc Infra, Labbipet, Vijayawada Cubes 500.00
47 09/09/2009
M/s. Deputy Executive Engineering, PR Sub
Division, Duggiralla. Soil 3500.00
48 15/9/2009
M/s. Asst Executive Engineer, RWS & S Sub
Division, Piduguralla. Soil 2200.00
49 15/9/2009 M/s. Suraj Constructions, FEC Project, Vja Cubes 500.00
50 15/9/2009 M/s.Arc Infra, Labbipet, Vijayawada Cubes 500.00
51 15/9/2009 M/s. VNS Ready Mix, Kolanukonda, Tadepalli. Cubes 500.00
52 16/9/2009 M/s. BGR Energy Systems Ltd, VTPS, VJA Steel 1050.00
53 23/9/2009
M/s Deputy Executive Engineer, RWS & S
Sub Division / 1, Sattenapalli Soil 2200.00
54 23/9/2009
M/s Deputy Executive Engineer, RWS & S
Sub Division / 1, Sattenapalli Steel 1800.00
55 07/10/2009 M/s Suraj Constructions, Vijayawada Cubes 500.00
56 07/10/2009
M/s Deputy Executive Engineer, APEWIDC,
Guntur Soil 2200.00
57 14/10/2009 M/s Arc Infra, Vijayawada Cubes 500.00
58 14/10/2009 M/s Suraj Constructions, Vijayawada Cubes 500.00
59 15/10/2009
M/s Deputy Executive Engineer, PR Sub
Division, Vemuru, Tenali Gravel Dust 3600.00
60 15/10/2009 M/s BGR Energy Systems Ltd, VTPS, VJA Steel 1200.00
61 15/10/2009
M/s Executive Engineer, RWS & S Sub
Division, Narasarao pet Soil 2200.00
62 19/10/2009 M/s K.Venkata Raju Engineering & Steel 2400.00
Contractors, Nainavaram
63 22/10/2009 M/s Arc Infra, Vijayawada Cubes 500.00
64 27/10/2009
M/s K.Venkata Raju Engineering &
Contractors, Nainavaram Cubes 500.00
65 30/10/2009
M/s Dy Exe Engineer, RWS & S Sub Division,
Piduguralla Soil 2200.00
66 31/10/2009
M/s Executive Engineer, NSJCO&M Division,
Satenapalli, Guntur (Dist0 Soil 20000.00
67 10/11/2009 M/s.Suraj Constructions, FEC Project, Vja Cubes 500.00
68 13/11/2009 M/s. Pranob Kumar Ch. NDT Test 1500.00
69 17/11/2009 M/s M.Samuel, Deputy Executive
Engineering, Social Welfare, Guntur
Steel,
Metal,Bricks,C
e ment,Sand 5900.00
70 17/11/2009 M/s. BGR Energy Systems Ltd, VTPS, VJA Steel 600.00
71 18/11/2009
M/s, Executive Engineering, RWS&S Division,
Narasarao Pet Soil 2200.00
72 19/11/2009
M/s.Deputy Executive Engineering,
Panchayat Raj, Macharla Soil 4400.00
73 20/11/2009 VGTM UDA, VJA
.5
Consultancy 19029.00
74 20/11/2009 VGTM UDA, VJA
.5
Consultancy 16748.00
75 21/11/2009 M/s.ARC Infra, VJA Cubes 500.00
76 24/11/2009
Sri. Pandu Ranga Spun pipes company,
Golapudi Cement, Steel 3500.00
77 25/11/2009
M/s. K.Venkataraju Engineering &
Contractors, Nainavaram Cubes 1500.00
78 25/11/2009
M/s. K.Venkataraju Engineering &
Contractors, Nainavaram Steel 1200.00
79 26/11/2009
M/s. Executive Engineer, RWS & S Division,
Narasarao Pet Soil 4400.00
80 01/12/2009 M/s.Suraj Constructions, FEC Project, Vja Cubes 500.00
81 3/12/2009
M/s K.Venkata Raju Engineer & Contractors,
ROB Site,
Nainavaram Steel 900.00
82 04/12/2009 M/s. ARC Infra, VJA Cubes 500.00
83 28/12/2009 M/s.Papular Shoe Mart I, Gandhi nagar, Vja 3 Cubes 500.00
84 28/12/2009
M/s. G.Venkata Subbiah S/o.Basavaiah, Sri
Nagarcolony, Vja Soil 2200.00
85 29/12/2009
M/s. Dy.Executive Engineering, PR sub
division, Sattenapalli Mix Design 6500.00
86 29/12/2009 M/s. Satya Constructions, brodipet, Gnt Steel 2700.00
87 30/12/2009 M/s. K.Venkata Raju Engineer & Contractors Cubes 1000.00
88 31/12/2009
M/s Panduranga Spun pipes company,
Golapudi Mix Design 3400.00
89 02/01/2010 M/s. Satya Constractions, Brodipet, Guntur Steel 900.00
90 02/01/2010 M/s.ARC Infra, Vijayawada Cubes 500.00
91 06/01/2010 M/s. Riazudden, Patamata, VJA Cubes 500.00
92 06/01/2010 HPCL LPG Bottling Plant, Kondapalli Cubes 500.00
93 07/01/2010
M/s. K.Venkata Raju Engineering &
Contractors, Vja Steel 2700.00
94 07/01/2010
M/s. K.Venkata Raju Engineering &
Contractors, Vja Steel 1500.00
95 07/01/2010 Sri Panduranga span pipes company, VJA Steel 600.00
96 11/01/2010 M/s.ARC Infra, Vijayawada Cubes 500.00
97 20/1/2010
M/s. K.Venkata Raju Engineering &
Contractors, Vja Cement 1500.00
98 20/1/2010
M/s. K.Venkata Raju Engineering &
Contractors, Vja Cubes 500.00
99 20/1/2010
M/s. K.Venkata Raju Engineering &
Contractors, Vja Cubes 500.00
100 20/1/2010
M/s. K.Venkata Raju Engineering &
Contractors, Vja Steel 900.00
101 27/1/2010 M/s.ARC Infra, Vijayawada Cubes 500.00
102 28/1/2010 DC No / 10, Nakerekallu Soil 35080.00
103 28/1/2010 DC No / 11, Muppala Soil 35080.00
104 28/1/2010 DC No / 12, Sattenapalli Soil 32620.00
105 28/1/2010 DC No / 13, Medikonduru Soil 35080.00
106 28/1/2010 DC No / 14, Pedakurapadu Soil 45604.00
107 28/1/2010 DC No / 15, Amaravathi Soil 35080.00
108 28/1/2010 DC N0 / 16, Pirangipuram Soil 35080.00
109 28/1/2010 DC No / 17, Guntur Soil 38588.00
110 28/1/2010 DC No / 18, Ponnekallu Soil 35080.00
111 05/02/2010
M/s. Ravi Associates Represented by
Managing parteners Soil 2200.00
112 09/02/2010
M/s. K.Venkata Raju Engineer&Contractor,
Nainavaram, Vijayawada. Steel 1500.00
113 10/02/2010 M/s. Veeravali Concrete pvt Ltd, VJA Water 2000.00
114 11/02/2010
M/s. K.Venkata Raju Engineer&Contractor,
Nainavaram,
Vijayawada. Cement 1500.00
115 13/2/2010
M/s. A.Prushotham Civil Engineering Block,
Nagarjuna
University. Steel 3300.00
116 15/2/2010
The Executive Engineer RWS&S, Narasarao
Pet Soil 4400.00
117 15/2/2010 M/s. A.R.C Infra, Vijayawada Cubes 500.00
118 17/2/2010
Sri Lakshmi Narasimha Swamy Temple,
Mangalagiri NDT Test 3500.00
119 20/2/2010 M/s. A.Venkateswarlu, Contractor, Epatam Cubes 500.00
120 22/2/2010 V.G.T.M UDA, Vijayawada 0.5 Cons 13327.00
121 22/2/2010 The Asst Divisional Engineer, APSPDCL, Gnt Steel 1800.00
122 22/2/2010 The Asst Divisional Engineer, APSPDCL, Gnt Cement 1500.00
123 23/2/2010
M/s. M.D.Riazuden S/o.Sirazudin, Patamata,
Vja Steel 1200.00
124 24/2/2010 M/s. Purusotham & Company Mixed Design 13000.00
125 02/03/2010
M/s. A.Purushotham , Acharya Nagarjuna
University Bricks 1000.00
126 02/03/2010
M/s. A.Purushotham , Acharya Nagarjuna
University Cubes 1000.00
127 05/03/2010
M/s. K. Venkataraju engineers & Contractors,
ROB Site,
Nainavaram Cement 1500.00
128 08/03/2010 VMS Ferro Allos (Pvt) Ltd, Jagaiahpet Soil 2200.00
129 08/03/2010 M/s. Abhinandana Realtors Ltd, Vijayawada Cubes 500.00
130 11/03/2010 M/s. Sri Durga Fly ash Bricks Industry, Bricks 900.00
Mangalagiri
131 11/03/2010
M/s. Sri Venkata triveni Fly Ash Bricks
Industry, Yaraballem Bricks 900.00
132 15/3/2010 M/s. Nagarjuna Construction com Ltd, Eluru Stons 3750.00
133 22/3/2010 M/s. ARC Infra, Vijayawada Cubes 500.00
134 23/3/2010 M/s. Abhinandana Realtors Ltd, Vijayawada
Steel
Cement, 1800.00
135 23/3/2010 M/s. IJM Infrastructure Ltd, Nambur
Aggregate,
Water, Blocks 10700.00
136 23/3/2010
M/s. Executive officer, Sri lakshmi Narasimha
swamy Temple
Mangalagiri Drawing,
Design 8000.00
137 01/04/2010 M/s Arc Infra, Vja Cubes 500.00
138 07/04/2010 The Viche Chairman, VGTM Uda Wet Mix 6000.00
139 07/04/2010 Kamineni Infra Venchars Pvt Ltd, Poranki Steel 600.00
140 08/04/2010 Kamineni Infra Venchars Pvt Ltd, Poranki Steel 3300.00
141 09/04/2010 JE, CPWD, Guntur Cement, Steel 3300.00
142 09/04/2010 JE, CPWD, Guntur Bricks, Water 2200.00
143 10/04/2010
The Executive engineer RWS & S Division,
Narasaraopet Steel 6000.00
144 12/04/2010 The Viche Chairman, VGTM Uda Cubes 1000.00
145 13/4/2010 M/s Arc Infra, Vja Cubes 500.00
146 20/4/2010
Deputy Executive Engineer, PRI Sub Division,
Tadikonda Gravel, Sand 3000.00
147 21/4/2010 VGTM UDA Guntur Cubes 1000.00
148 26/4/2010 VGTM UDA Tenali Wet Mix 6500.00
149 01/05/2010
M/s. The Deputy Executive Engineer, RWS &
S Sub Division,
Sattenapalli Soil 2200.00
150 04/05/2010 VGTM UDA, Tenali
Wet Mix
Macadam 6500.00
151 06/05/2010
M/s. Vijai Bavani Power tech Pvt Ltd,
Vijayawada Steel 700.00
152 07/05/2010 Kamineni Infra venture pvt ltd Cubes 500.00
153 08/05/2010
Sri. Laksmi Narasimha Swamy Temple,
Mangalagiri Cubes 500.00
154 11/05/2010 M/s IJM (India) Infrstracture limited, Number
Steel, Cubes,
Water 7100.00
155 17/5/2010
V. Peda somaiah , Contractor,
Vadlamudivaripalem
Wet Mix
Macadam 6500.00
156 17/5/2010
The seniou manager, KCP Limited, Macharla,
Guntur (Dist)
Drawing,
12200.00 Soil
157 24/5/2010 Deputy Excutive Engineer, APEWIDC, Guntur Sand 500.00
158 24/5/2010 Deputy Excutive Engineer, APEWIDC, Guntur Sand 500.00
159 29/5/2010 JE, CPWD, Vijayawada Steel 3300.00
160 29/5/2010
Mr. M.Samuel, Deputy Executive Engineer,
APEWIDC Guntur
Steel,
Cement,
Bricks, course
Agg, Mix
design 17050.00
161 29/5/2010
Mr. M.Samuel, Deputy Executive Engineer,
APEWIDC,
Guntur Steel 600.00
162 29/5/2010
Sri. Ghanta Sambasirva Rao, Contractor,
Tenali
Wet Mix
Macadam 6500.00
163 04/06/2010 The Commisnor, Municipal Corporation, VJA Cubes 1000.00
164 14/6/2010 M/s. Kiran Kumar Reddy, Contractor Mix Design 32500.00
165 16/6/2010 M/s. Assistant Engineer, CPWD, VJA Steel 1000.00
166 23/6/2010 VGTM UDA, VJA
0.5
Consultancy 13154.00
167 26/6/2010 M/s. Stride Engineers and Contractors, Tenali Soil 2000.00
168 06/07/2010 M. Samuel, DEE, APEWIDC, Guntur Soil 2200.00
169 08/07/2010 T. Anjaneyulu, Contractor
Soil, Steel,
Sand, Metal 8200.00
170 09/07/2010 Mahammad Ejajudden, Patamata, VJA Cubes 500.00
171 09/07/2010 Satya Constractions, Brodipet, Guntur Steel 2700.00
172 13/7/2010 Satya Constractions, Brodipet, Guntur Steel 600.00
173 15/7/20
10
Executive officer, Sri Mahankhali Ammavari
Temple,
Duggiralla Cubes 500.00
174 17/7/2010 Smt. L. Vasantha Kumari, Gudivada Soil 2200.00
175 30/7/2010 VGTM UDA Mix Design 6500.00
176 31/7/2010 Y. Ramesh Babu, Contractor, Tenali Mix Design 6500.00
177 03/08/2010 USHA Constraction Engineers & Contractors
Steel, Mix
Design 10400.00
178 05/08/2010 K.S.V.B.K.Prasad, Vijayawada Cubes 500.00
179 06/08/2010 Ganta Sambasiva Rao, Tenali
Steel, Bricks,
Cement, Mix
Design,
Course Agg 14950.00
180 12/08/2010 The Executive Engineer I/C, APEWIDC Expert Fee 10000.00
181 18/8/2010 Sri Veveka Institue of Technology Cubes 1000.00
182 24/8/2010 V. Narendra Babu, Contractor, Tenali Mix Design 6500.00
183 08/09/2010 The Vice Chairman, VGTM UDA, VJA Mix Design 6500.00
184 14/9/2010
Sri Viveka Institute of Technology, Nunna,
VJA Cubes 500.00
185 17/9/2010
Executive Engineer, Municipal corporation,
VJA Cubes 1000.00
186 27/9/2010 Bajaj Electrical Ltd Cubes 500.00
187 30/9/2010 SEW Infrastructure Ltd, VJA Soil 108123.00
188 1/10/2010 Bajaj Electrical Ltd Cubes 500.00
189 1/10/2010 IJM (India) Infrastructure Limited
Cement,
Course
Agg, Fine
Agg,
Bricks, Water 14250.00
190 07/10/2010 Sri. Viveka Institue of Technology Cubes 500.00
191 13/10/2010
Deputy Excutive Engineer, RWS Sub Division,
CPT Soil 2200.00
192 14/10/2010 R. V. Rayanam, Gunadala, Vijayawada Survey work 4000.00
193 14/10/2010 Deputy Excutive Engineer, RWS Sub Division, Soil 2200.00
Sattenapalli
194 14/10/2010 IJM (India) Infrastructure Limited Tiles & Wood 4500.00
195 20/10/2010 Sri. Viveka Institue of Technology Cubes 500.00
196 21/10/2010 Bajaj Electrical Ltd Cubes 500.00
197 21/10/2010 Bajaj Electrical Ltd Cubes 500.00
198 23/10/2010
Deputy Executive Engineer,
APEWIDC,Ravela, Guntur Soil 2200.00
199 23/10/2010
Deputy Executive Engineer, APEWIDC,
Guntur Soil 2200.00
200 25/10/2010
Deputy Executive Engineer, APEWIDC,
Ilavaram, Guntur Soil 2200.00
201 26/10/2010
Deputy Executive Engineer, APEWIDC,
Tadepalli, Guntur Soil 2200.00
202 26/10/2010
Executive Engineer, PRI Tenali Deivision,
Tenali Soil 2200.00
203 26/10/2010
Deputy Executive Engineer, APEWIDC,
Anurthaluru, Guntur Soil 2200.00
204 28/10/2010
Assistant Engineer, Municipal Corporation,
VJA Steel 3000.00
205 28/10/2010
Deputy Executive Engineer, APEWIDC,
Kakumanu, Guntur Soil 2200.00
206 30/10/2010 SEW Infrastructure, Tenali Soil 186157.00
207 01/11/2010 Assistant Engineer, SC Railway, Bapatla Ballast 1800.00
208 03/11/2010 A. Purushotam, Nagarjuna University, VJA
Cement,
Bricks,
Water 5000.00
209 09/11/2010 Assistant Engineer, SC Railway, Bapatla Ballast 1200.00
210 09/11/2010 Assistant Engineer, SC Railway, Bapatla Ballast 600.00
211 10/11/2010 Sri. Viveka Institue of Technology Cubes 500.00
212 10/11/2010 IJM (INDIA) Infrastructure Limited Cubes, Steel 6300.00
213 11/11/2010
Deputy Executive Engineer, APEWIDC,
Guntur, Chandole Soil 2200.00
214 11/11/2010
Deputy Executive Engineer, APEWIDC,
Guntur, Kazipalem Soil 2200.00
215 11/11/2010
Sri. K. Vijaya Kumari, Yedugundlapadu,
Madipadu Soil 2200.00
216 11/11/2010 Sarpanch, Grama Punchayat, Kaza, MGL Soil 2200.00
217 15/11/2010 Assistant Engineer, SC Railway, Bapatla Ballast 300.00
218 16/11/2010
Deputy Executive Engineer, RWS & S Sub
Division Soil 2200.00
219 18/11/2010 Sarpanch, Grama Punchayat, Nuttaki, MGL Soil 2200.00
220 19/11/2010 Sri. Viveka Institue of Technology Cubes 500.00
221 22/11/2010 Nirmala College of Pharmacy, Atmakuru, MGL Cubes 500.00
222 30/11/2010 DE, PRI Sub Division, Tadikonda, Guntur Mix Design 6500.00
223 30/11/2010 Assistant Engineer, SC Railway, Bapatla Ballast 1200.00
224 2/12/2010 Satya Constructions, Brodipet, Guntur Cement, Steel 3900.00
225 2/12/2010 Sri. Viveka Institue of Technology Cubes 500.00
226 9/12/2010 Sri. Viveka Institue of Technology Cubes 500.00
227 11/12/2010 Nirmala College of Pharmacy, Atmakuru, MGL Cubes 500.00
228 14/12/2010 Satya Constructions, Brodipet, Guntur Cement 1500.00
229 16/12/2010 A. Purushotam, Contractor, ANU Cubes 1000.00
230 18/12/2010 P. V. Krishna, Vijayawada Soil 2200.00
18/12/2010
Deputy Executive Engineer, PRI Sub division,
Tadikonda, Gnt
Cubes, Mix
8000.00 231 Design
232 20/12/2010 Assistant Engineer, SC Railway, Bapatla Ballast 1800.00
233 20/12/2010 Assistant Engineer, SC Railway, Bapatla Ballast 900.00
234 21/12/2010 A. Purushotam, Contractor, ANU Cubes 1000.00
235 28/12/2010
Deputy Executive Engineer, RWS S Sub
Division, Sattenapalli Soil 2200.00
236 29/12/2010
Deputy Executive Engineer, APEWIDC,
Guntur Soil 15400.00
237 29/12/2010
Deputy Executive Engineer, APEWIDC,
Guntur Cubes 4000.00
29/12/2010
Deputy Executive Engineer, APEWIDC,
Guntur
Steel, Mix
Design 4600.00 238
29/12/2010
Deputy Executive Engineer, APEWIDC,
Guntur
Steel, Mix
Design 4900.00 239
240 30/12/2010 Ch. Sambasiva Rao, Contractor, Gudivada Soil 2000.00
241 04/01/2011 Sri. Viveka Institue of Technology Cubes 500.00
242 04/01/2011
Deputy Executive Engineer, RWS S Sub
Division, Guntur Steel 2400.00
243 04/01/2011
Deputy Executive Engineer, RWS S Sub
Division, Guntur Soil 2200.00
244 05/01/2011 Servomax India Limited, Hyderabad Soil 8800.00
245 11/01/2011 Servomax India Limited, Hyderabad Soil 4400.00
246 12/01/2011 A. Purushotam, Contractor, ANU Cubes 4000.00
247 12/01/2011
Deputy Exective Engineer, RWS S Sub
Division, Macherla Soil 19800.00
248 17/1/2011 VNS Ready Mix, Kolanukonda Cubes 4000.00
249 24/01/2011 Sri. Murali Refractories Pvt Ltd Bricks 750.00
250 24/01/2011
Deputy Executive Engineer, APEWIDC,
Guntur Bricks 750.00
251 25/01/2011
Sr. Section Engineer, SC Railway,
Bhimavaram Ballast 1500.00
252 30/01/2011 J. Venkatarao, Tenali Cubes 500.00
253 01/02/2011 VNS Ready Mix, Kolanukonda Cement 3000.00
254 01/02/2011 A. Purushotam, Contractor, ANU Cubes 2000.00
255 07/02/2011 M/s G.V.R Infra Ltd, Hyd Soil 50000.00
256 08/02/2011 SEW Infrastructure Ltd, Hyd Soil 141022.00
257 12/02/2011 J. Sambasiva Rao, Kolanukonda Soil 2200.00
258 12/02/2011 M. Ajoy babu, Ongole Soil 2200.00
259 14/2/2011 Asst Engineer, PR, Duggiralla Mix Design 6000.00
260 14/2/2011 J. Venkatarao, Tenali Cubes 500.00
261 15/2/2011 M/s G.V.R Infra Ltd, Hyd Soil 41320.00
262 15/2/2011 Junior Engineer, SC Railway Ballast 600.00
263 22/2/2011 VGTM UDA, Vijayawada Soil 16745.00
264 22/2/2011
Deputy Executive Engineer, RWS & S Sub
Division, Guntur Soil, Steel 5200.00
265 26/2/2011
Saivenkat Engineers & Contractors,
Venkatapuram GSB, WMM 13000.00
266 28/2/2011 VGTM UDA, Vijayawada WMM, BM 19500.00
267 01/03/2011
Deputy Executive Engineer, Eastern Sub
Division, Repalli Steel, Gravell 4600.00
268 03/03/2011 IJM (India) Infrastructure Ltd, Nambur Soil 11000.00
269 04/03/2011 The Lelorophyll (India) sports pvt Ltd Soil 2000.00
270 07/03/2011 G.Lakshmi Narayana, VJA Soil 2200.00
271 07/03/2011 Aster Private Ltd, Hydarabad Soil, Mix 121500.00
Designs
272 11/03/2011 Patel Engg Ltd, Vijyawada Soil 59562.00
273 14/3/2011 Servomax India Ltd, Hydarabad Metal 500.00
274 14/3/2011 A. Purushotham, Contractor, ANU Cubes 2500.00
275 16/3/2011
Dy. Executive Engineer, RWS & S Sub
Division Soil 2200.00
276 16/3/2011
Deputy Executive Engieer, RWS & S Sub
Division,
Sattenapalli Soil 4400.00
277 16/3/2011
Deputy Executive Engieer, RWS & S Sub
Division,
Sattenapalli Soil 2200.00
278 16/3/2011
Deputy Executive Engineer, RWS & S Sub
Division, VJA Soil 2200.00
279 17/3/2011 RMC Redimix India, MAG Cubes 500.00
280 18/3/2011 M/s E. Subba Reddy, Contractor, Guntur Mix Design 5000.00
281 18/3/2011 Asst. Engineer, PRI, Duggiralla Mix Design 500.00
282 21/3/2011 Sri. Veveka Institute of Technology Cubes 500.00
283 24/3/2011
Deputy Executive Engineer, RWS & S Sub
Division, Macherla
Steel, Sand,
Aggregate 4500.00
284 26/3/2011 Patel Engg Ltd, Vijyawada Soil 47429.00
285 01/04/2011 Sree Devi Engineering Enterprises, VJA Soil 25369.00
286 01/04/2011 E. Subba Reddy, Concretor, Guntur Mix Design 1500.00
287 01/04/2011
Deputy Executive Engineer, PRI Sub Division,
Tenali
Gravel, Mix
Deisgn 4000.00
288 01/04/2011 Sri Venkaiah Swamy Consturction, Tirupathi
Bricks, Metal,
Sand 2250.00
289 05/04/2011
Deputy Executive Enigneer, RWS & S Sub
Division, Macharla Cubes 2000.00
290 06/04/2011
Deputy Executive Engineer, PRI Sub Division,
Vemuru Gravel, Sand 5000.00
291 08/04/2011 Sree Devi Engineering Enterprises, VJA Soil 11000.00
292 08/04/2011 Deputy Executive Enigneer, RWS & S Sub Soil, Steel, 9500.00
Division, Repalle Cement
293 08/04/2011
Deputy Executive Enigneer, RWS & S Sub
Division, Repalle
Soil, Steel,
Cement 11700.00
294 09/04/2011 IJM (INDIA) Infrastructure Ltd, Number
Cement,
Aggregates 11000.00
295 11/04/2011 Executive Enigneer, PRI, Tenali Mix Design 6500.00
296 15/4/2011 VGTM UDA, Tenali CBR Test 2000.00
297 21/4/2011
Deputy Executive Engineer, RWS & S Sub
Division, Repalle
Cement,
Steel,
Mix Design 11000.00
298 21/4/2011
Deputy Executive Engineer, RWS & S Sub
Division, Repalle Soil 2200.00
299 21/4/2011 Krishna Reddy, Undavalli Cubes 500.00
300 23/4/2011 Kota Project Ltd
Steel, Mix
Design 8900.00
301 23/4/2011
Dy Executive Engineer, RWS & S Sub
Division, Sattenapalli Soil 8800.00
302 27/4/2011
Deputy Executive Engineer, PRI Sub Division,
Vemuru Gravel, Sand 2500.00
303 27/4/2011 Sree Devi Engineering Enterprises, VJA Soil 4000.00
304 27/4/2011
Dy Executive Engineer, RWS & S Sub
Division, Sattenapalli Steel 3600.00
305 27/4/2011
Dy Executive Engineer, RWS & S Sub
Division, Sattenapalli Metarial Tests 8500.00
306 30/4/2011
Deputy Executive Engineer, RWS & S Sub
Division, Macherla
Mix Design,
Cubes 8000.00
307 30/4/2011
Vallabhanieni Construction PVT Ltd,
Machilipatnam Cement 1500.00
308 30/4/2011 V.G.T. M, UDA, VJA
0.5
Consultancy 5883.00
309 30/4/2011 Patel Engineering Ltd, VJA Soil 17648.00
310 03/05/2011 MTVS Goplarao, Hydarabad Mix design 13000.00
311 05/05/2011 Sree Devi Engineering Enterprises, VJA Soil 7000.00
312 13/5/2011 Executive Enigneer, PRI Division, Guntur Mix Design 13000.00
313 14/5/2011 Vijayanagaram Constructions, Undavalli Cubes 500.00
314 16/5/2011 G.V.R Infraprojects ltd, Perala Steel 7000.00
315 16/5/2011 S. Govardhan Reddy, PRI, Guntur Gravel 7000.00
316 20/5/2011 SEW Infrastructure ltd, VJA Soil 339013.00
317 23/5/2011 VGTM UDA, VJA
0.5
Consultancy 490167.00
318 23/5/2011 Servomax India Ltd Metal 3000.00
319 23/5/2011 Sri. M. Sivaji, Pedavadlapadu Mix Design 6500.00
320 28/5/2011 M/s Patel Engineering Works Soil 38605.00
321 30/5/2011 Executive Engineer, NSJC O&M, Sattenapalli Soil 25000.00
322 30/5/2011 Executive Engineer, NSJC O&M, Sattenapalli Soil 25000.00
323 01/06/2011 Servomax India Ltd, Hydarabad Soil 4400.00
324 01/06/2011 M.V.Mallikarjuna Rao, Guntur Mix Design 6500.00
325 03/06/2011 M.V.Mallikarjuna Rao, Guntur Mix Design 2000.00
326 03/06/2011 S. Sundara Babu, Thullur Mix Design 6500.00
327 08/06/2011 D.V. Bhavani Prasad Cubes 500.00
328 14/6/2011 Deputy Executive Engineer, Sattenapalli Soil 2200.00
329 18/6/2011 RVS Construction Pvt Ltd, Hyderabad
Mix Design,
Water 34000.00
330 18/6/2011 G.V.R Infra Structure Ltd
Mix Design,
Steel 60100.00
331 18/6/2011 Sree Devi Engineering Enterprises, VJA Soil 4000.00
332 23/6/2011 G.I.C, Guntur Soil 50000.00
333 23/6/2011 Sree Devi Engineering Enterprises, VJA Soil 6000.00
334 24/6/2011 DE, PR, PIU Sub Division, Repalle Mix Design 6500.00
335 25/6/2011 SEW Infrastructure Ltd Soil 267600.00
336 27/6/2011 Deputy Executive Engineer, Sattenapalli
Steel, Mix
Design 9500.00
337 28/6/2011 S. Sundara Babu, Thullur Steel 2400.00
338 28/6/2011 Vishwas Group, VJA Steel 1800.00
339 28/6/2011 Sree Devi Engineering Enterprises, VJA Soil 6000.00
340 29/6/2011 Cormandal Infrastructure Ltd, HYD Soil 13300.00
341 29/6/2011 Deputy Executive Engineer, Tadikonda Mix Design 6500.00
342 01/07/2011 S. Suresh Babu, Assistant Engineer, MPP, Cubes 500.00
Thullur
343 01/07/2011
Deputy Executive Engineer, RWS & S Sub
division,
Sattenapalli Soil 2200.00
344 04/07/2011 MPDO, Mandal Praja Parishaat, Thullur Cubes, Metal 9600.00
345 07/07/2011
Deputy Executive Enigneer, RWS&S Sub
Division, Sattenapalli Steel 500.00
346 13/7/2011 DHEL, VJA Cubes 1000.00
347 13/7/2011 HK Constructions, Guntur
Steel, Mix
Design 16000.00
348 13/7/2011 HK Constructions, Guntur
Steel, Mix
Design 20000.00
349 13/7/2011 V.N.S Ready Mix, Kolanukonda
Cubes,
Cement 3000.00
350 14/7/2011
Deputy Executive Engineer, APSIDC Sub
Division, Guntur
Mix Design,
Steel 7700.00
351 15/7/2011
Deputy Executive Enigneer, PRI Sub Division,
Mag Mix Design 6500.00
352 15/7/2011 S. Surendra Babu, A.E, MPP, Thullr Cubes 500.00
353 16/7/2011 S. Surendra Babu, A.E, MPP, Thullr Cubes 2000.00
354 18/7/2011
Deputy Executive Engineer, PIU Sub Division,
Sattenapalli
Mix Design,
CBR 9000.00
355 19/7/2011 S. Surendra Babu, A.E, MPP, Thullr Cubes 1000.00
356 19/7/2011
Deputy Executive Engineer, PRI Sub Division,
Sattenapalli Mix Design 6500.00
357 20/7/2011
Deputy Executive Engineer, RWS & S Sub
division, Soil 9200.00
358 20/7/2011
M. Srinvasa Kumar, Dy Executive Engineer,
Narasaraopet Soil 2200.00
359 20/7/2011
R. Suresh, D.E.E, R.W.S & S Sub Division,
Guntur Steel 4000.00
360 20/7/2011
R. Suresh, D.E.E, R.W.S & S Sub Division,
Guntur Mix Design, 11500.00
361 21/7/2011 R. Suresh, D.E.E, R.W.S & S Sub Division, Soil 13200.00
Guntur
362 22/7/2011 S. Surendra Babu, A.E, MPP, Thullr Cubes 2000.00
363 25/7/2011 VNS Ready Mix, Kolanukonda
Cement,
Gravel 6500.00
364 25/7/2011 IJM (INDIA) Infrastracture Ltd, Nambur Cubes, Steel 6700.00
365 26/7/2011 Sree Devi Engineer Enterprises, Vja Soil 3000.00
366 29/7/2011 Ram Reddy Constructions, Achampeta Cubes 1500.00
367 29/7/2011 Executive Engineer, NSJC O&C, Sattenapalli Soil 20000.00
368 02/08/2011 VNS Ready Mix, Kolanukonda Cubes 500.00
369 02/08/2011 AKR Costal Projects, HYD Soil 5000.00
370 03/08/2011
Deputy Executive Engineer, RWS & S Sub
division,
Sattenapalli Soil 2200.00
371 04/08/2011 B. Srinivasa Rao, MPDO, MPP, Thullur Cubes 1000.00
372 08/08/2011
T. Bapi Reddy, Deputy Executive Engineer,
PRI Sub Division Soil 6600.00
373 09/08/2011 Sri. S. Surendra Babu, AE, Thullur Cubes 1000.00
374 10/08/2011 Ram Reddy Constructions, Achampeta
Steel, Mix
Design,
Cement 10700.00
375 11/08/2011 Sri. S. Sambasiva Rao, Vja Ballast 1500.00
376 12/08/2011 Surpanch, Grama Panchayathi, Challagulla Soil 2200.00
377 12/08/2011 Surpanch, Grama Panchayathi, Inumetla Soil 2200.00
378 19/8/2011 Works Executive member, Pedaparimi Cubes 1000.00
379 20/8/2011
Deputy Executive Engineer, Drainage Sub
Division Cubes 500.00
380 23/8/2011 Surpanch, Grama Panchayathi, Mokapadu Soil 4400.00
381 23/8/2012 S. Surendra Babu, A.E, MPP, Thullr Cubes 10000.00
382 30/8/2011 Trendset Builders (P) ltd, Vja Steel 1500.00
383 06/09/2011 VNS Ready Mix, Kolanukonda Cubes 500.00
384 06/09/2011 E. Sekhar Babu, J.E, CPWD Cubes 500.00
385 06/09/2011 Coramandal Infra Structure Pvt Ltd, HYD Cubes 1000.00
386 09/09/2011 A. Tirupathi Rao, Thullur Cubes 500.00
387 13/9/2011
Asst Engineer, VJA, Central Sub Division,
CPWD Steel, Cubes 8000.00
388 14/9/2011
Deputy Executive Engineer, PRI Sub Division,
Sattenapalli Soil 2200.00
389 15/9/2011 Aster Prvate Ltd, Hyd Soil 12514.00
390 15/9/2011 Sree Devi Engineering Enterprises, VJA Soil 12400.00
391 15/9/2011 Coramandal Infra Structure Pvt Ltd, HYD Cubes 500.00
392 17/9/2011
Deputy Executive Engineer, RWS & S Sub
Division,. Repalle Soil 2200.00
393 17/9/2011
Deputy Executive Engineer, RWS & S Sub
Division,. Repalle Mix Design 6500.00
394 20/9/2011 Executive Engineer, Panchayat Raj, Guntur Drawing 10000.00
395 21/9/2011 MPDO, MPP Thullur
Cubes,
Cement,
Aggregate 4500.00
396 21/9/2011 Srinivasa Edifice Private Ltd, VJA
Cubes
Metal 15250.00
397 22/9/2011 Ms Mixy Kalyana Mandapam, Venigandla Drawing 5000.00
398 24/9/2011 Vizia Nagar Construction,VJA Cubes 500.00
399 27/9/2011 P. Surya Prakash, VJA
Steel, Mix
Design 10500.00
400 28/9/2011
Executive Engineer, RWS S Sub Division,
Guntur Cubes 1000.00
401 28/9/2011 MPDO, MPP Thullur
Cubes,
Cement,
Aggregates 3500.00
402 29/9/2011 Sanjay Technical Services Pvt Ltd Cubes 9500.00
403 29/9/2011 Coramandal Infra Structure Pvt Ltd, HYD Cubes 500.00
404 30/9/2011 B.Venkateswara Rao, Contractor, Guntur Steel 1000.00
405 01/10/2011 Sree Devi Engineering Enterprises, VJA Soil 9000.00
406 1/10/2011 B.Venkateswara Rao, Contractor,. Gnt Steel 3500.00
407 08/10/2011 Works Committee, Mandadam, CC Road Cubes 1000.00
408 10/10/2011 A. Tirupathi Rao, Thullur Cubes 500.00
409 14/10/2011 MPDO, MPP Thullur Cubes, Metal 7000.00
410 17/10/2011 P. Surya Praksah, VJA
Cubes, Steel,
Mix Design 11500.00
411 21/10/2011 IJM India Infrastrature Ltd
Water,
Cement,
Aggregates 12450.00
412 21/10/2011 Sri. JJ Danamma Dwakra group Cubes 500.00
413 22/10/2011
Deputy Executive Engineer, PRI Sub Division,
Ponnur Mix Design 6500.00
414 25/10/2011 Asst Engineer, PRI MP, Guntur BT 2000.00
415 25/10/2011 Asst Engineer, PRI MP, Guntur Cubes 1000.00
416 29/10/2011 Vizianagar Constructions Cubes 500.00
417 31/10/2011 Sri. GVR Infr Structure Ltd, Chirala Soil 169862.00
418 31/10/2011 Sree Devi Engineering Enterprises, VJA Soil 8000.00
419 04/11/2011 Rami Reddy Construction, Acthampeta Cubes 1500.00
420 04/11/2011 Irish Infra Service Pvt Ltd, Aburu Metal 5000.00
421 09/11/2011 Irish Infra Service Pvt Ltd, Aburu Metal 5750.00
422 09/11/2011
Asst Executive Engineer, RWS & S Sub
Division, Narasaraopet Soil 10000.00
423 17/11/2011
Lingayas Institute of Management and
Technology Cubes 500.00
424 17/11/2011 V. Prudhividhara Rao,Contractor Soil 5000.00
425 17/11/2011 SEW Infra structure ltd
Soil
Bricks, 93679.00
426 23/11/2011 M. Sitaramaih, Contractor, Kondapalli
Sand,
Course Agg 5750.00
427 23/11/2011
Asst Executive Engineer, PIU Sub Dision,
Narasaraopet Cubes 1000.00
428 29/11/2011 RSV Construction Pvt Ltd, Ameerpet, HYD Soil 4400.00
429 29/11/2011 Sree Devi Engineering works, VJA Soil 11800.00
430 01/12/2011 Vizianagar Construction, VJA Cubes 500.00
431 02/12/2011
Deputy Executive Engineer, RWS & S Sub
division,
sattenapalli Soil 20000.00
432 14/12/2011 Executive Engineer, Panchayati Raj, Tenali Soil 2200.00
433 14/12/2011 Asst Divisional Engineer, SC Railway, Eluru Soil 3000.00
434 14/12/2011 DEE, Panchayat Raj, Ponnur Cubes 500.00
435 15/12/2011 Vishnavi Construction, Vijayawada Steel 6600.00
436 16/12/2011 Srinivasa Edifice Pvt Ltd Ballast 2000.00
437 20/12/2011
Deputy Executive Engineer, RWS & S Sub
division,
sattenapalli Soil 6600.00
438 22/12/2011
Deputy Executive Engineer, RWS & S Sub
Division,
Achampeta Cubes 1000.00
439 22/12/2011 MVTAWS, Guntur WMM 6500.00
440 23/12/2011
Deputy Executive Engineer, RWS & S
Division, Narasaraopet
Cement,
Steel,
Course Agg 30000.00
441 23/12/2011 Sri. S. V. Nageswara Rao, Contractor, Vja Ballast 4000.00
442 28/12/2011 M. Sitha Ramaiah, Contractor, Vja Cubes 2000.00
443 29/12/2011 Rami Reddy Construction, Achampet Cubes 1000.00
444 30/12/2011 MVTAWS, Guntur Steel 2400.00
445 03/01/2012 MVTAWS, Guntur Gravel 5000
446 09/01/2012 MPDO, Thullur Mix Design 6500.00
447 18/1/2012 Ratna Construction, Guntur Steel 3000.00
448 21/1/2012 P. Chandra Reddy & Co Cubes 1500.00
449 27/1/2012 SEW Infra Structure Ltd, Tenali Mix Design 70110.00
450 27/1/2012 Sri. N.V Nageswararao, VJA Ballast 2000.00
451 28/1/2012 MPDO, MPP, Tadikonda Cubes 4000.00
452 28/1/2012 K. Venkateswara Rao, Vijayawada Cubes 1000.00
453 30/1/2012 V.N.S Ready Mix, Kolanukonda Cubes 1000.00
454 30/1/2012 Ramky Infrastructure Ltd, Repalle Soil 10000.00
455 31/1/2012
Deputy Executive Engineer, RWS & S Sub
Division,
Sattenapalli Soil 2200.00
456 31/1/2012
Deputy Executive Engineer, RWS & S Sub
Division,
Sattenapalli Steel 3000.00
457 31/1/2012 K. Venkateswara Rao, Vijayawada Mix Design, 11500.00
Metal
458 06/02/2012 Srinivasa Edifice Pvt Ltd Ballast 4500.00
459 07/02/2012 MPDO, Tadikonda Cubes 3000.00
460 07/02/2012 MPDO, Tadikonda Cubes 4500.00
461 07/02/2012 MPDO, Tadikonda Mix Design 6500.00
462 09/02/2012
O. M. Sudhakar Reddy, AEE PIU SD,
Sattenapalli Soil 5000.00
463 09/02/2012 Y. V. Ramesh Babu, AEE PIU Sattenaplli Soil 7500.00
464 13/2/2012 Ramky Infrastructure Ltd, Repalle Soil 6000.00
465 16/2/2012 M. Sitha Ramaiah, Contractor Cubes 1000.00
466 21/2/2012 TLC Sub Division / 1, AP Transco, Guntur
Aggregate,
Cement 6500.00
467 29/2/2012
Deputy Executive Engineer, RWS & S Sub
Division,
Sattenapalli Soil 2200.00
468 29/2/2012 Sowil Limited Consulting Engineering, VJA
Bituman
Extractor 25000.00
469 01/03/2012 Sri vara Malleswara Swamy varla Devasthan Mix Design 6500.00
470 01/03/2012 D. Purna Chandra rao, Contractor, VJA Course Agg 1500.00
471 01/03/2012 D. Purna Chandra rao, Contractor, VJA Mix Design 6500.00
472 01/03/2012
Deputy Executive Engineer, RWS & S Sub
Division,
Sattenapalli Soil 2200.00
473 01/03/2012 Sri. B. Venkanna, ANU, Nagarjuna Nagar Cubes 1500.00
474 02/03/2012
The Executive Engineer, Civil, AP Tanco, AP
Transco, VJA Course Agg 2500.00
475 05/03/2012 Prograssive Construction Ltd, Eluru Soil 28000.00
476 07/03/2012 Prograssive Construction Ltd, Eluru Soil 12000.00
477 09/03/2012 D.V.Bhavani Prasad, VJA Cubes 500.00
478 10/03/2012 Executive Engineer, Punchayat Raj, Gnt Soil 5000.00
479 17/3/2012
Deputy Executive Engineer, RWS & S Sub
Division,
Narasaraopeta Gravel 5250.00
480 17/3/2012 MPDO, MPP, Tadikonda Cubes 1000.00
481 17/3/2012 MPDO, MPP, Tadikonda Cubes 3000.00
482 17/3/2012 MPDO, MPP, Tadikonda Cubes 2000.00
483 19/3/2012 SEW Infrastructure Ltd, Tenali Soil 361581.00
484 19/3/2012 Maruthi Associates, VJA Soil 2200.00
485 20/3/2012 MPDO, MPP, Thullur Gravel 6500.00
486 20/3/2012 Maruthi Associates, VJA Water 1000.00
487 20/3/2012 IJM India Infrastruture Ltd, Number Water 1500.00
488 26/3/2012 Prograssive Construction Ltd, Eluru Soil 11000.00
489 02/04/2012 D. Poornachandra Rao, Guntur WMM, GSB 11500.00
490 03/04/2012 Prograssive Construction Ltd, Eluru Soil 14000.00
491 04/04/2012
Deputy Executive Engineer, PRI Sub Division,
Tenali Soil 2200.00
492 09/04/2012
Deputy Executive Engineer, PRI Sub Division,
Machilipatnam
Steel,
Cement,
Mix Design 14400.00
493 10/04/2012
Deputy Executive Engineer, R&D Sub
Division, Khamama Soil 6600.00
494 13/4/2012
Executive Engineer, Punchayat Raj,
Tadikonda Cubes 500.00
495 17/4/2012
Deputy Executive Engineer, R&D Sub
Division, Khamama Soil 4400.00
496 20/4/2012
Deputy Executive Engineer, RWS & S Sub
Division, Ongole
Steel, Mix
Design 12300.00
497 20/4/2012
Deputy Executive Engineer, RWS & S Sub
Division, Podili
Steel, Mix
Design 12300.00
498 01/05/2012 K. Manohar, Patamata, Vja Soil, Water 4000.00
499 01/05/2012 VNS Ready Mix, Kolanukonda Cubes 1500.00
500 07/05/2012 Sri. Venkatesh swamy construction, Tirupathi Metal 1000.00
501 07/05/2012
Deputy Executive Engineer, PRI Sub Division,
Vemuru Soil 2200.00
502 08/05/2012
Assistant Engineer, Mandal Praja Parishad,
Thullur Soil 4400.00
503 09/05/2012 Srinivasa Ediface Pvt Ltd, VJA Sand 2000.00
504 11/05/2012 Deputy Executive Engineer, R&D Sub Soil 4400.00
Division, Khamama
505 11/05/2012 M. Basava Purna, Autonagar, VJA Cubes 500.00
506 14/5/2012 Prograssive Construiction Ltd, Eluru Steel, Soil 8900.00
507 18/5/2012
The Asst Executive Engineer, TLC Sub
Division, VJA Cubes 9500.00
508 21/5/2012 P Surya Prkash Rao Soil 41000.00
509 23/5/2012 Prograssive Construiction Ltd, Eluru Soil 13000.00
510 25/5/2012 M.S. Sayana Infrastructuree Soil 6600.00
511 30/5/2012
Sri. Durga Malleswara Swamivarla Temple,
Vja Bricks 500.00
512 30/5/2012 Bhavani Construction Pvt Ltd, Vja Soil 9027.00
513 30/5/2012 Bhavani Construction Pvt Ltd, Vja Soil 12133.00
514 01/06/2012 AP Tranco Sand 2500.00
515 01/06/2012 Shilpa Electrification Sand, Metal 5000.00
516 05/06/2012 Progressive construction Soil 26000.00
517 08/06/2012
Deputy Executive Engineer, RWS & S Sub
Division Soil 20000.00
518 11/06/2012 P Chandra Reddy & Co Sand, Metal 7500.00
519 13/6/2012
Deputy Executive Engineer, R&B Sub
division, Khammam Soil 13200.00
520 18/6/2012
Deputy Executive Engineer, APSIDC, LI
SCHEME, Krosuru Cubes 1000.00
521 18/6/2012
Deputy Executive Engineer, APSIDC, LI
SCHEME,
Ananthavaram Cubes 1000.00
522 19/6/2012
Dy Executive Enigneer, Panchayatiraj,
Narasaraopet Gravel 2250.00
523 23/6/2012 Power Mech infra Ltd, Vijayawada Steel 1800.00
524 25/6/2012 IJM Infrastructure Ltd, Numbur Water 1500.00
525 26/6/2012
Deputy Executive Engineer, R&B Sub
division, Huzunagar
Mix Deising,
Steel 10000.00
526 03/07/2012 Vijay Nirman Company Ltd
Cement
Bricks 3500.00
527 04/07/2012 MDK Rao, Tadepalli Water 1000.00
528 05/07/2012 Dy Executive Enigneer, RWS S Sub Division, Steel, Mix 11100.00
Podili Design, Soil
529 05/07/2012
Dy Executive Enigneer, RWS S Sub Division,
Podili
Steel, Mix
Design, Soil 11100.00
530 05/07/2012
Deputy Executive Engineer, RWS & S Sub
Division, Kanigiri Soil 2200.00
531 13/7/2012 IJM Infrastructure Ltd, Numbur Water 1500.00
532 17/7/2012
Lingayas Institute of Management &
Technology Cubes 500.00
533 19/7/2012 Amaneto Prllinos Pvt Ltd Soil 11000.00
534 24/7/2012
Deputy Executive Engineer, RWS & S Sub
Division,
Sattenapalli Soil 4400.00
535 24/7/2012 Bhavani Bohole Works, Vijayawada Soil 37332.00
536 24/7/2012 SEW Infrastrcture Ltd, Tenali Mix Designs 73187.00
537 30/7/2012 Sri. M.Appa Rao, Vijayawada Cubes 500.00
538 30/7/2012 Sri. P. V. Krishna, Kankipadu Soil 4400.00
539 30/7/2012 Project Director, NHAI, Vijayawasa Bituman 16685.00
540 30/7/2012
Sowmya Granites Pvt ltd, Autonagar,
Mangalagiri Soil 2000.00
541 01/08/2012 Trendset Builders (P) Ltd, Hyd Cubes 500.00
542 09/08/2012 TLC, Civil Sub Division, Guntur Cubes 2500.00
543 09/08/2012 TLC, Civil Sub Division, Guntur Metal, Sand 5750.00
544 11/08/2012
Dy Executive Enigneer, RWS S Sub Division,
Sattenapalli Soil 2200.00
545 14/8/2012 MPDO, MPP, Thullur Cubes 5000.00
546 16/8/2012
Deputy Executive Engineer, RWS & S Sub
Division, S Konda
Soil, Mix,
Steel 12300.00
547 16/8/2012
Deputy Executive Engineer, RWS & S Sub
Division, Ongole
Soil, Mix,
Steel 12300.00
548 16/8/2012
Deputy Executive Engineer, RWS & S Sub
Division, Ongole
Soil, Mix,
Steel 49200.00
549 17/8/2012 V. Venkateswarlu, Joythi Electricals, Macherla Metal 1500.00
550 21/8/2012
M. Samuel, Executive Engineer, APEWIDC,
Guntur Expert Fee 3000.00
551 22/8/2012 Kesineni Hotel Pvt Ltd, VJA Cubes, Steel 1100.00
552 22/8/2012 Sujala Infra Structure Pvt Ltd, Khammam Soil 13200.00
553 27/8/2012 M. Apparao, Vja Cubes 500.00
554 30/8/2012
Deputy Executive Engineer, RWS & S sub
Division
Soil, Steel,
Cement 22650.00
555 30/8/2012 D.E, RWS & S Sub Division, Sattenapalli Soil 2200.00
556 06/09/2012 M. Apparao, Vja Cubes 500.00
557 07/09/2012 G. Prabhakar, Contractor, Ananthapur Steel, Cement 4500.00
558 11/09/2012
Lingayas Institute of Management &
Technology Cubes 500.00
559 13/9/2012
Dy Executive Enigneer, PRI Sub Division,
Ponnour Mix Design 6500.00
560 14/9/2012 Mahima Falgi Bricks Industry, Mandadam Bricks 750.00
561 17/9/2012 AE, MPP, Thullur Cubes 500.00
562 18/9/2012
The Assistant Engineer, TLC Sub Division, AP
Transco, GNT Cubes 3000.00
563 25/9/2012 K. Tirupalu, Contractor, Sattenapalli
Soil, Mix,
Steel,
Steel 20000.00
564 27/9/2012 S. Veerabhdrarao, Nuziveedu Aggregates 1500.00
565 27/9/2012
Deputy Executive Engineer, RWS & S sub
Division,
Sattenapalli
Soil, Steel,
Cement 22650.00
566 05/10/2012 SDMSD, Vijayawadea Cubes 1000.00
567 11/10/2012 SEW Infrastrutuer Ltd Soil 298894.00
568 15/10/2012 The Asst Engineer, TLC, Guntur Cubes 4000.00
569 20/10/2012 Ch. Anil Kumar, Guntur Soil 2200.00
570 12/11/2012 EE, RWS & S Sub Division, Narasaraopet Expert Fee 5000.00
571 15/11/2012 DEE, R&B Sub Division, Khammam Soil 8800.00
572 03/12/2012 Maruthi Associates, Vijayawada Soil 2200.00
573 04/12/2012
Deputy Executive Engineer, RWS&S Sub
Division, Podili
Steel, Mix
Design 9500.00
574 10/12/2012
Sri. P. Satya Prkash Rao, Contractor,
Vijayawada Cubes 2000.00
575 11/12/2012 Deputy Executive Engineer, RWS&S Sub Soil 2200.00
Division, Podili
576 11/12/2012
Deputy Executive Engineer, R&B Sub
Division, Khammam Soil 6600.00
577 11/12/2012
Deputy Executive Engineer, R&B Sub
Division, Khammam
Steel, Mix
Design 9800.00
578 12/12/2012
Deputy Executive Engineer, RWS&S Sub
Division,
Gannavaram Soil 2200.00
579 14/12/2012 Sri. V. Siva Rama Prasad, Vijayawada Soil 2200.00
580 17/12/2012 Assistant Engineer, MPP, Tadikonda Cubes 500.00
581 21/12/2012 Lanco Infratech Ltd, Kondapalli, VJA Soil 4000.00
582 27/12/2012 Sai Bhaskar Iron Ltd, Guntur Steel 5700.00
583 02/01/2013 EE, I&CAD Dept, Tanali Mixdesign 26000.00
584 04/01/2013
Deputy Executive Engineer, R&B Sub
Division, Khammam Soil 24200.00
585 09/01/2013
Deputy Executive Engineer, RWS S
SubDivision/1, Guntur
Steel, Mix
Design,Soil 9500.00
586 11/01/2013 IJM India Ltd, Nambur Water 1500.00
587 11/01/2013 M. Sitha Ramaiah, Contractor, Vijayawada
Sand, Stone,
Cement,
Water 11500.00
588 12/01/2013 Patel Engieering Ltd, Vijayawada Soil 20000.00
589 17/1/2013 K. Venkateswarlu, Contractor, Guntur
Soil, Steel,
Mix
Design 10000.00
590 18/1/2013 Gowthami Residency Pvt Ltd, Tenali Cubes 1000.00
591 23/1/2013 Vigneswara Construction, Mangalagiri Cubes 1500.00
592 23/1/2013 Sri Satya Flyash Briks Industry, Tenali Bricks 500.00
593 29/1/2013 SEW Infrastructure Ltd, Vijayawada
Mixdesign,
Soil 211885.00
594 30/1/2013
Deputy Executive Engineer, PRI Sub Division,
Sattenapalli Mixdesign 6500.00
595 02/02/2013 T. Anjaneyulu, Contractor, Guntur
Mixdeisng,
Steel 10400
596 04/02/2013 Vigneswara Construction, Mangalagiri Cubes 500
597 09/02/2013 Gowthami Residency Pvt Ltd, Tenali Cubes 1500
598 14/2/2013
Deputy Executive Engineer, RWS & S Sub
Division,
Sattenapalli Soil 2200
599 18/2/2013
Deputy Executive Engineer, RWS & S Sub
Division, Markapur Soil 2200
600 19/2/2013 Executive Enigneer, PRI Sub Division, Guntur Soil 2200
Total Amount 6410222