Integrity Testing of RoofingIntegrity Testing of Roofingand Waterproofing Membraneand Waterproofing Membranes
How to find the leaks you know about as well as those you donHow to find the leaks you know about as well as those you dontt
7/28/2019 ConstructionInsitituteIntegrityTesting
2/51
Construction Institute
Remo R. Capolino, P.E., RRCRemo R. Capolino, P.E., RRC
Wiss, J anney, Elstner AssociatesWiss, J anney, Elstner AssociatesShelton, CtShelton, Ct
7/28/2019 ConstructionInsitituteIntegrityTesting
3/51
Construction Institute
Methods of Integrity TestingMethods of Integrity Testing
z
Spray Test (Commonly called Water Test)z Flood Test
z Capacitance or Impedance
zNuclear Meter
z Infrared
z High Voltage
z Low Voltage
7/28/2019 ConstructionInsitituteIntegrityTesting
4/51Construction Institute
Which Method Is Right?Which Method Is Right?
z
Depends upon many factors: Building structure
Roof Configuration
Roof Materials
z BE CAREFUL!!!
7/28/2019 ConstructionInsitituteIntegrityTesting
5/51Construction Institute
How To Solve The Puzzle?How To Solve The Puzzle?z Understand each test.
z Know the conditions.
z Match the test to the conditions.
Nuclear
Low V
High V
Cap.
I Red
FloodWater
7/28/2019 ConstructionInsitituteIntegrityTesting
6/51
Construction Institute
Spray TestSpray Test
z
The most basic.z Results are Interpretive
z Least technical.
z Equipment is garden variety water hose.
z Training is minimal.
7/28/2019 ConstructionInsitituteIntegrityTesting
7/51
Construction Institute
Candidate for a Water Test?Candidate for a Water Test?
7/28/2019 ConstructionInsitituteIntegrityTesting
8/51
Construction Institute
7/28/2019 ConstructionInsitituteIntegrityTesting
9/51
Construction Institute
7/28/2019 ConstructionInsitituteIntegrityTesting
10/51
Construction Institute
Spray Test In Progress
7/28/2019 ConstructionInsitituteIntegrityTesting
11/51
Construction Institute
Flood TestFlood Test
z
Low tech.z Results are Interpretive
z Few pieces of equipment required.
z Be patient.
7/28/2019 ConstructionInsitituteIntegrityTesting
12/51
7/28/2019 ConstructionInsitituteIntegrityTesting
13/51
7/28/2019 ConstructionInsitituteIntegrityTesting
14/51
Construction Institute
7/28/2019 ConstructionInsitituteIntegrityTesting
15/51
Construction Institute
7/28/2019 ConstructionInsitituteIntegrityTesting
16/51
Construction Institute
7/28/2019 ConstructionInsitituteIntegrityTesting
17/51
Construction Institute
Electrical CapacitanceElectrical Capacitance
z
Used to monitor moisture in the paper andlumber industries.
z Capacitance meter measures the ability of
a material to maintain a charge separation.z Air has a dielectric constant = 1.
z
Roof materials range between 4 and 6.z Water has a dielectric constant = 60+/-.
z Results are Interpretive.
7/28/2019 ConstructionInsitituteIntegrityTesting
18/51
Construction Institute
Electrical CapacitanceElectrical Capacitance
z
Very sensitive to water.z Roof surface must be dry.
z The meter is more sensitive to moisture
near the roof surface and less sensitive tomoisture at the deeper roof levels.
z
Gravel thickness can affect the readings.z Continuous readings.
z Conducted during the daylight.
7/28/2019 ConstructionInsitituteIntegrityTesting
19/51
Construction Institute
Electrical CapacitanceElectrical Capacitance
7/28/2019 ConstructionInsitituteIntegrityTesting
20/51
Construction Institute
NuclearNuclearzNuclear meters emit a stream of high
velocity neutrons that are about the samemass as a hydrogen atom.
z
When a neutron strikes a hydrogen atom, itgives up some energy and rebounds atslower speed.
z
The nuclear meter is sensitive to theseslower neutrons and records the slowerneutrons.
7/28/2019 ConstructionInsitituteIntegrityTesting
21/51
Construction Institute
NuclearNuclear
zNeutrons rebound off hydrogen atoms inwater and asphalts (hydrocarbons).
zNuclear meter does not know which
slowed neutrons rebounded off of water orasphalts. All it does is count the slowedneutrons and provide a digital reading.
z Core samples are required to establish abaseline.
7/28/2019 ConstructionInsitituteIntegrityTesting
22/51
Construction Institute
7/28/2019 ConstructionInsitituteIntegrityTesting
23/51
Construction Institute
7/28/2019 ConstructionInsitituteIntegrityTesting
24/51
Construction Institute
NuclearNuclear
z Before nuclear readings are taken, a grid ismarked on the roof surface. Usually, it is a
10 by 10 grid that is parallel to at leastone roof edge and each grid point ismarked by a dot of spray paint.
z Readings are taken and marked on the roofand the roof plan.
z Many times a pattern evolves and lendsitself to marking areas on the roof surface.
7/28/2019 ConstructionInsitituteIntegrityTesting
25/51
Construction Institute
7/28/2019 ConstructionInsitituteIntegrityTesting
26/51
Construction Institute
NuclearNuclearz Results are Interpretive
z Conducted during the daylight.
z Digital readout for analysis.
z Grid points can be used help layout areasof wet roofing.
z Requires a licensed operator.
7/28/2019 ConstructionInsitituteIntegrityTesting
27/51
Construction Institute
InfraredInfraredz Infrared Thermography is a continuous
process that senses the energy emittedfrom roof top surfaces.
z Infrared scanners (cameras) have opticalscanning devices that show infrared energyin real time on a screen.
7/28/2019 ConstructionInsitituteIntegrityTesting
28/51
Construction Institute
7/28/2019 ConstructionInsitituteIntegrityTesting
29/51
Construction Institute
7/28/2019 ConstructionInsitituteIntegrityTesting
30/51
Construction Institute
InfraredInfraredz Wet insulation loses much of its insulating value.
z In the winter time, more heat will pass throughwet insulation than dry insulation.
z
In the summer time, after sunset, the wetinsulation will hold heat longer and appear as ahot spot.
z
The different thermal images show as differentcolors on the screen.
z Results are Interpretive.
7/28/2019 ConstructionInsitituteIntegrityTesting
31/51
Construction Institute
InfraredInfraredz Since the scan is continuous, outlines of
suspected wet areas can be marked with ahigh degree of accuracy.
z Core tests should be done to verifysuspected wet areas.
z Infrared is usually done in the evening orduring the night.
7/28/2019 ConstructionInsitituteIntegrityTesting
32/51
Construction Institute
High VoltageHigh VoltagezNew to the United States.
z Several years in the United Kingdom.
z Relatively high voltage (and low amps).
z Uses the moisture that has passed throughthe membrane breach to complete the
circuit.z Results are Definitive - Breach in
membrane can be pinpointed.
7/28/2019 ConstructionInsitituteIntegrityTesting
33/51
Construction Institute
membranemembrane
groundground
groundground
High voltage testingHigh voltage testing
Electricity at sufficiently high voltage will arc acrossElectricity at sufficiently high voltage will arc across
holes in the membrane,holes in the membrane,provided thatprovided that ground is close
to the underside of membrane
7/28/2019 ConstructionInsitituteIntegrityTesting
34/51
Construction Institute
High VoltageHigh Voltagez The deck must be electrically conductive:
Either metal deck or concrete deck.
z The membrane must be an electrical
insulator:TPO, PVC, NBP, EIP.
z To detect a membrane breach, there mustbe a moisture path from the membranesurface to the deck.
7/28/2019 ConstructionInsitituteIntegrityTesting
35/51
Construction Institute
membranemembrane
High voltage testingHigh voltage testing
Electricity at sufficiently high voltage will arc acrossElectricity at sufficiently high voltage will arc across
holes in the membrane,holes in the membrane,provided thatprovided that ground is close
to the underside of membrane
7/28/2019 ConstructionInsitituteIntegrityTesting
36/51
Construction Institute
High VoltageHigh Voltagez Only tests on exposed membranes.
zNo water source required.
z Immediate pinpoint results available.
z Repair breach and retest.
7/28/2019 ConstructionInsitituteIntegrityTesting
37/51
Construction Institute
7/28/2019 ConstructionInsitituteIntegrityTesting
38/51
Construction Institute
7/28/2019 ConstructionInsitituteIntegrityTesting
39/51
Construction Institute
7/28/2019 ConstructionInsitituteIntegrityTesting
40/51
Construction Institute
7/28/2019 ConstructionInsitituteIntegrityTesting
41/51
Construction Institute
7/28/2019 ConstructionInsitituteIntegrityTesting
42/51
Construction Institute
7/28/2019 ConstructionInsitituteIntegrityTesting
43/51
Construction Institute
Low VoltageLow VoltagezNew to the United States.
z Several years in the United Kingdom/Europe.
z Low voltage and low amperes.
z Wet Membrane Surface.z Smooth Membrane Surface.
z Results are Definitive - Breach in membranecan be pinpointed.
z Repair breach and retest.
7/28/2019 ConstructionInsitituteIntegrityTesting
44/51
Construction Institute
7/28/2019 ConstructionInsitituteIntegrityTesting
45/51
Construction Institute
7/28/2019 ConstructionInsitituteIntegrityTesting
46/51
Construction Institute
++
looploop
x
7/28/2019 ConstructionInsitituteIntegrityTesting
47/51
Construction Institute
7/28/2019 ConstructionInsitituteIntegrityTesting
48/51
Construction Institute
7/28/2019 ConstructionInsitituteIntegrityTesting
49/51
Construction Institute
deckingdecking
vaporvapor retarderretarder
insulationinsulation
membranemembrane
currentcurrent flowflow
looploop looploop
7/28/2019 ConstructionInsitituteIntegrityTesting
50/51
Construction Institute
Membrane Integrity TestingMembrane Integrity Testingz There are a number of systems to select.
z Match the system to the conditions andyour needs.
z
Eliminate as many variables as possible.z Choose between the interpretive tests:
water, flood, nuclear and infrared or the
direct, pinpoint tests: low or high voltage.z Give yourself the opportunity to make a
sound decision.
7/28/2019 ConstructionInsitituteIntegrityTesting
51/51
Construction Institute
Thank You For AttendingThank You For Attending
Remo R. Capolino, P.E., RRCRemo R. Capolino, P.E., RRCWiss, J anney, Elstner AssociatesWiss, J anney, Elstner Associates
2 Trap Falls Rd2 Trap Falls RdShelton, CTShelton, CT