    Construction Institute

    Integrity Testing of RoofingIntegrity Testing of Roofingand Waterproofing Membraneand Waterproofing Membranes

    How to find the leaks you know about as well as those you donHow to find the leaks you know about as well as those you dontt

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    2/51

    Construction Institute

    Remo R. Capolino, P.E., RRCRemo R. Capolino, P.E., RRC

    Wiss, J anney, Elstner AssociatesWiss, J anney, Elstner AssociatesShelton, CtShelton, Ct

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    3/51

    Construction Institute

    Methods of Integrity TestingMethods of Integrity Testing

    z

    Spray Test (Commonly called Water Test)z Flood Test

    z Capacitance or Impedance

    zNuclear Meter

    z Infrared

    z High Voltage

    z Low Voltage

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    4/51Construction Institute

    Which Method Is Right?Which Method Is Right?

    z

    Depends upon many factors: Building structure

    Roof Configuration

    Roof Materials

    z BE CAREFUL!!!

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    5/51Construction Institute

    How To Solve The Puzzle?How To Solve The Puzzle?z Understand each test.

    z Know the conditions.

    z Match the test to the conditions.

    Nuclear

    Low V

    High V

    Cap.

    I Red

    FloodWater

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    6/51

    Construction Institute

    Spray TestSpray Test

    z

    The most basic.z Results are Interpretive

    z Least technical.

    z Equipment is garden variety water hose.

    z Training is minimal.

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    7/51

    Construction Institute

    Candidate for a Water Test?Candidate for a Water Test?

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    8/51

    Construction Institute

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    9/51

    Construction Institute

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    10/51

    Construction Institute

    Spray Test In Progress

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    11/51

    Construction Institute

    Flood TestFlood Test

    z

    Low tech.z Results are Interpretive

    z Few pieces of equipment required.

    z Be patient.

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    12/51

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    13/51

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    14/51

    Construction Institute

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    15/51

    Construction Institute

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    16/51

    Construction Institute

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    17/51

    Construction Institute

    Electrical CapacitanceElectrical Capacitance

    z

    Used to monitor moisture in the paper andlumber industries.

    z Capacitance meter measures the ability of

    a material to maintain a charge separation.z Air has a dielectric constant = 1.

    z

    Roof materials range between 4 and 6.z Water has a dielectric constant = 60+/-.

    z Results are Interpretive.

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    18/51

    Construction Institute

    Electrical CapacitanceElectrical Capacitance

    z

    Very sensitive to water.z Roof surface must be dry.

    z The meter is more sensitive to moisture

    near the roof surface and less sensitive tomoisture at the deeper roof levels.

    z

    Gravel thickness can affect the readings.z Continuous readings.

    z Conducted during the daylight.

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    19/51

    Construction Institute

    Electrical CapacitanceElectrical Capacitance

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    20/51

    Construction Institute

    NuclearNuclearzNuclear meters emit a stream of high

    velocity neutrons that are about the samemass as a hydrogen atom.

    z

    When a neutron strikes a hydrogen atom, itgives up some energy and rebounds atslower speed.

    z

    The nuclear meter is sensitive to theseslower neutrons and records the slowerneutrons.

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    21/51

    Construction Institute

    NuclearNuclear

    zNeutrons rebound off hydrogen atoms inwater and asphalts (hydrocarbons).

    zNuclear meter does not know which

    slowed neutrons rebounded off of water orasphalts. All it does is count the slowedneutrons and provide a digital reading.

    z Core samples are required to establish abaseline.

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    22/51

    Construction Institute

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    23/51

    Construction Institute

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    24/51

    Construction Institute

    NuclearNuclear

    z Before nuclear readings are taken, a grid ismarked on the roof surface. Usually, it is a

    10 by 10 grid that is parallel to at leastone roof edge and each grid point ismarked by a dot of spray paint.

    z Readings are taken and marked on the roofand the roof plan.

    z Many times a pattern evolves and lendsitself to marking areas on the roof surface.

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    25/51

    Construction Institute

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    26/51

    Construction Institute

    NuclearNuclearz Results are Interpretive

    z Conducted during the daylight.

    z Digital readout for analysis.

    z Grid points can be used help layout areasof wet roofing.

    z Requires a licensed operator.

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    27/51

    Construction Institute

    InfraredInfraredz Infrared Thermography is a continuous

    process that senses the energy emittedfrom roof top surfaces.

    z Infrared scanners (cameras) have opticalscanning devices that show infrared energyin real time on a screen.

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    28/51

    Construction Institute

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    29/51

    Construction Institute

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    30/51

    Construction Institute

    InfraredInfraredz Wet insulation loses much of its insulating value.

    z In the winter time, more heat will pass throughwet insulation than dry insulation.

    z

    In the summer time, after sunset, the wetinsulation will hold heat longer and appear as ahot spot.

    z

    The different thermal images show as differentcolors on the screen.

    z Results are Interpretive.

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    31/51

    Construction Institute

    InfraredInfraredz Since the scan is continuous, outlines of

    suspected wet areas can be marked with ahigh degree of accuracy.

    z Core tests should be done to verifysuspected wet areas.

    z Infrared is usually done in the evening orduring the night.

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    32/51

    Construction Institute

    High VoltageHigh VoltagezNew to the United States.

    z Several years in the United Kingdom.

    z Relatively high voltage (and low amps).

    z Uses the moisture that has passed throughthe membrane breach to complete the

    circuit.z Results are Definitive - Breach in

    membrane can be pinpointed.

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    33/51

    Construction Institute

    membranemembrane

    groundground

    groundground

    High voltage testingHigh voltage testing

    Electricity at sufficiently high voltage will arc acrossElectricity at sufficiently high voltage will arc across

    holes in the membrane,holes in the membrane,provided thatprovided that ground is close

    to the underside of membrane

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    34/51

    Construction Institute

    High VoltageHigh Voltagez The deck must be electrically conductive:

    Either metal deck or concrete deck.

    z The membrane must be an electrical

    insulator:TPO, PVC, NBP, EIP.

    z To detect a membrane breach, there mustbe a moisture path from the membranesurface to the deck.

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    35/51

    Construction Institute

    membranemembrane

    High voltage testingHigh voltage testing

    Electricity at sufficiently high voltage will arc acrossElectricity at sufficiently high voltage will arc across

    holes in the membrane,holes in the membrane,provided thatprovided that ground is close

    to the underside of membrane

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    36/51

    Construction Institute

    High VoltageHigh Voltagez Only tests on exposed membranes.

    zNo water source required.

    z Immediate pinpoint results available.

    z Repair breach and retest.

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    37/51

    Construction Institute

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    38/51

    Construction Institute

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    39/51

    Construction Institute

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    40/51

    Construction Institute

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    41/51

    Construction Institute

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    42/51

    Construction Institute

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    43/51

    Construction Institute

    Low VoltageLow VoltagezNew to the United States.

    z Several years in the United Kingdom/Europe.

    z Low voltage and low amperes.

    z Wet Membrane Surface.z Smooth Membrane Surface.

    z Results are Definitive - Breach in membranecan be pinpointed.

    z Repair breach and retest.

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    44/51

    Construction Institute

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    45/51

    Construction Institute

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    46/51

    Construction Institute

    ++

    looploop

    x

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    47/51

    Construction Institute

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    48/51

    Construction Institute

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    49/51

    Construction Institute

    deckingdecking

    vaporvapor retarderretarder

    insulationinsulation

    membranemembrane

    currentcurrent flowflow

    looploop looploop

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    50/51

    Construction Institute

    Membrane Integrity TestingMembrane Integrity Testingz There are a number of systems to select.

    z Match the system to the conditions andyour needs.

    z

    Eliminate as many variables as possible.z Choose between the interpretive tests:

    water, flood, nuclear and infrared or the

    direct, pinpoint tests: low or high voltage.z Give yourself the opportunity to make a

    sound decision.

  • 7/28/2019 ConstructionInsitituteIntegrityTesting

    51/51

    Construction Institute

    Thank You For AttendingThank You For Attending

    Remo R. Capolino, P.E., RRCRemo R. Capolino, P.E., RRCWiss, J anney, Elstner AssociatesWiss, J anney, Elstner Associates

    2 Trap Falls Rd2 Trap Falls RdShelton, CTShelton, CT