AREA UNDER CONSTRUCTION
AREA UNDER CONSTRUCTION
AREA UNDER CONSTRUCTION
STAGE 1
STAGE 2
12Spring Lake
17
Spring Lake Regional
Park
Staging Considerations:
Schedule:•
•
•
•
What is Construction Staging?
•
•
•
•
• services
•
•
•
STAGE 1
DULUTH AVE*
Fair
law
n A
ve
180th St E
Franklin Trail SE
Pleasant St SE
AREA UNDER CONSTRUCTION
AREA UNDER CONSTRUCTION
AREA UNDER CONSTRUCTION
Spring Lake
Spring Lake Regional
Park
Staging Considerations:
Schedule:•
•
•
•
•
•
•
•
•services
•
•
•
DULUTH AVE
CTI
Fair
law
n A
ve
180th St E
Franklin Trail SE
Pleasant St SE
Construction Staging Overview
Detour Routes Rules of Thumb1/3 follow detour1/3 destinations within1/3 find different route or change trip
STAGE 2
STAGE 1
12Upper P
rior La
ke
Spring Lake
MA
RSCH
ALL
RD.
17
Spring Lake Regional
Park
140TH ST. NE
TEXA
S AV
E.
154TH ST. NW
160TH ST. SE
42
Cleary Lake Regional
Park
Mystic Lake Casino Hotel
Cynthia Lake
LAN
GFO
RD A
VE.
23
8
190TH ST. E
PAN
AM
A AV
E.
220TH ST. E
TH 13 Detour16 min (10.5 mile)
detour routevs.
12 min (8 mile)regular route
CH 21 Detour14 min (8 mile)
detour routevs.
10 min (6 mile)regular route
Alternate route toaccommodate
TH 13 South ↔CH 21 East Traffic
STAGE 1
Regional Detour RoutesCH 21 Downtown Prior Lake Improvement & TH 13 Reconstruction Projects
Collective Business Messaging
12
Franklin Trail SE
Du
luth
Ave
SE
Five
Haw
ks A
ve S
E
Village Lake Dr SE
Pleasant St SE
Colorado St SE
We
st A
ve S
E
12
Franklin Trail SE
Du
luth
Ave
SE
Five
Haw
ks A
ve S
E
Village Lake Dr SE
Pleasant St SE
Colorado St SE
We
st A
ve S
E
Local Access Routes
Spring Lake
17
Fair
law
n A
ve
180th St E
Ve
rgu
s A
ve
Sun
ray
Blv
d S
W
Pan
ama
Ave
Stage 1A (TH 13)
Stage 1B (TH 13)
Stage 1A (CH 21)
Stage 1C (TH 13)
Stage 2A (TH 13)
Stage 2A (CH 21)
Integra Utility Relocation
Stage 2B (TH 13/CH 21)
2019
May June July Aug.April Sept. Oct.
STAGE 1A West project termini to Vergus Ave
STAGE 1B Vergus Ave to CH-81 (Fairlawn Ave)
STAGE 1C CH 81 to CH 12/S. Half of TH 13 from
CH 12 to CH 23 (Panama Ave)
STAGE 1A
East project termini to Duluth Ave
We
st A
ve S
E
Du
luth
Ave
SE
Colorado St SE
See Stage 2 Board
12Spring Lake
17
Fair
law
n A
ve
180th St E
Ve
rgu
s A
ve
Sun
ray
Blv
d S
W
Pan
ama
Ave
Stage 1A (TH 13)
Stage 1B (TH 13)
Stage 1A (CH 21)
Stage 1C (TH 13)
2019
May June July Aug.April Sept. Oct.
Stage 2A (TH 13)
Stage 2A (CH 21)
Integra Utility Relocation
Stage 2B (TH 13/CH 21)
West project termini to Vergus Ave
Vergus Ave to CH-81 (Fairlawn Ave)
CH 81 to CH 12/S. Half of TH 13 from CH 12 to CH 23 (Panama Ave)
East project termini to Duluth Ave
We
st A
ve S
E
Du
luth
Avee
SSE
Colorado St SEC l d S SE
See Stage 2 Board
12
Construction Stage 1
Upper Prior Lake
Du
luth
Ave
SE
Village Lake Dr SE
Franklin Trail SE
Pleasant St SE
Five
Haw
ks A
ve S
E
Willowwood St SW
Will
ow
wo
od
Ln
SW
Mai
n A
ve S
E
Lyons Ave SE
Blind Lake Trail SE
Stage 1A (TH 13)
Stage 1B (TH 13)
Stage 1A (CH 21)
Stage 1C (TH 13)
Stage 2A (TH 13)
Stage 2A (CH 21)
Integra Utility Relocation
Stage 2B (TH 13/CH 21)
2019
May June July Aug.April Sept. Oct.
Stage 1A (TH 13)
Stage 1B (TH 13)
Stage 1A (CH 21)
Stage 1C (TH 13)
Stage 2A (TH 13), Stage 2A
(CH 21), Stage 2B (CH 21) *Expected 3 week schedule reduction with all downtown work completed at the same time
2019
April May June July Aug. Sept. Oct.
STAGE 2A CH 21/Arcadia Ave roundabout & South leg of TH 13/CH 21 roundabout
STAGE 2B
STAGE 2A N. Half of TH 13 from CH 12 to CH 23 /
See Stage 1 Board
See Stage 1 Board
Du
luth
Ave
SE
Village Lake Dr SE
Franklin Trail SE
Pleasant St SE
Five
Haw
ks A
ve S
E
Willowwood St SW
Will
ow
wo
od
Ln
SW
Mai
n A
ve S
E
Lyons Ave SE
Blind Lake Trail SE
Stage 2A (TH 13)
Stage 2A (CH 21)
Integra Utility Relocation
Stage 2B (TH 13/CH 21)
2019
May June July Aug.April Sept. Oct.
Stage 2A (TH 13), Stage 2A
(CH 21), Stage 2B (CH 21)*Expected 3 week schedule reduction with all downtown work completed at the same time
2019
April May June July Aug. Sept. Oct.
Stage 1A (TH 13)
Stage 1B (TH 13)
Stage 1A (CH 21)
Stage 1C (TH 13)
Stage 1A (TH 13)
Stage 1B (TH 13)
Stage 1A (CH 21)
Stage 1C (TH 13)
CH 21/Arcadia Ave roundabout & South leg of TH 13/CH 21 roundabout
N. Half of TH 13 from CH 12 to CH 23 /
See Stage 1 Board
See Stage 1 Board
Construction Stage 2
12
SCENE
Scott County will be responsible for regional detour signage during the project. Updates regarding closures, and detours will be shared through their email notification system, Notify Me. Their bi-monthly publication SCENE will provide project updates throughout construction.
Sign up here!
The WavelengthPrior Lake:
A Wonderful Place To Live, Work and Play for a Lifetime.
June/July ‘18
In addition to active social media pages, the weekly e-mail, City Newswire, and the bi-monthly publication, The Wavelength, will
contain project updates throughout construction. Sign up to receive these updates on the City website.
Several communication outlets will be utilized during construction to share current activities, impacts, and milestones with the public. The project team will provide content to all agencies so that messaging is clear, consistent, and timely.
movingforward13-21.com SOUTHVIEW BLVDRECONSTRUCTION
HOTLINE612-619-6284
EMERGENCY651-322-2323
Community Liaison (CL)The CL will act as the central point of contact for the community and will relay any concerns to the project team and agencies.
Contact CardsThese will be distributed to residents, businesses, and stakeholders as construction nears and will include pertinent contact information.
A short video will be released as construction staging details are finalized in order to share construction details and timeline with the community. This graphic timeline will be used with written project updates (shared electronically) to track progress.
Keep watching the project
Facebook page and website
for updates!
Example contact cards
Scott County will be responsible for regionaldetour signage during the project. Updatesregarding closures, and detours will be shared through their email notification system, Notify Me. Their bi-monthly publication SCENE will provide project updates throughout construction.
Sign nup here!
Newsletter of the City of Prior Lake www.cityofpriorlake.comwww cityofpriorlake com
Prior Lake:AA f y f fA Wonderful Place To Live, Work and Play for a Lifetime.A Wonderful Place To Live, Work and Play for a Lifet
June/July ‘18
In addition to active social media pages, the weekly e-mail, City Newswire, and the bi-monthlypublication, The Wavelength, will
contain project updates throughout construction. Sign up to receive these updates on the City website.
Several communication outlets will be utilized during construction to share current activities, impacts, and milestones with the public. The project team will provide content to all agencies so that messaging is clear, consistent, and timely.
SOUTHVIEW BLVDRECONSTRUCTION
HOTLINE612-619-6284
EMERGENCY651-322-2323
Community Liaison (CL)The CL will act as the centralpoint of contact for thecommunity and will relay any concerns to the project team andagencies.
Contact CardsThese will be distributed to residents, businesses, and stakeholders as construction nears and will include pertinent contact information.
A short video will be released as construction staging details are finalized in order to share construction details and timelinewith the community. This graphic timeline will be used withwritten project updates (sharedelectronically) to track progress.
Keep watching the project
Facebook page and website
for updates!
Example contact cardsExample contact cards
Construction Communications - What to Expect
Roundabout RodeoSt. James, MN
Brought to you by the
...By Engineer/Contractor
...By Communities!
Construction Communications!
Business Wayfinding Signage
Community Events
Guiding Documents
The events below are Community organized events from other Minnesota cities that brought visitors downtown during construction.
The Main EventRedwing, Minnesota
On the Road AgainSouth St. Paul, Minnesota
Branded communication tools can rally the community during construction and clearly
communicate what is part of the project. Two examples from Buffalo and Hopkins are shown here.
Preparing for construction is key. St. James developed a "Business Survival Guide” with their Chamber of Commerce to prepare downtown businesses and unify the downtown as one big destination rather than individual business owners.
Roundabout RodeoSt. James, MN
Brought to you by the
The events below are Community organized events from other Minnesota cities that brought visitors downtown during construction.
he Main EventThedwing, MinnesotaR
On the Road AgainSouth St. Paul, Minnesota
ed communication tools can rally the Brandemmunity during construction and clearly comccommunicate what is part of the project. Two cc
examples from Buffalo and Hopkins areeshown here.shown here.s
Preparing for construction is key. St. James developed a "Business Survival Guide” with their Chamber of Commerce to prepare downtown businesses and unify the downtown as one big destination rather than individual business owners.
Construction Communications - What can the community do?