Construction Site

Stormwater Management

Building Green in Bowling Green

Barry Tonning Tetra Tech

Page 2: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

State and local rules require:

•Local and state permit coverage

•SWPPP available for review

•BMPs in the field that match the SWPPP

•Contractors’ weekly inspection forms available for review

Page 3: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Minimizing the active construction area

Page 4: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech
Page 5: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech
Page 6: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech
Page 7: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Site Grading

Plan

Site Building

Plan

Site Drainage

Plan

Existing Site

Conditions

Stormwater

Pollution Preventio

n Plan

Final Site Land-

scaping Plan

Consistency between what’s in the SWPPP and BMPs installed in the

field

Page 8: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

SWPPP Applicability, Preparation, Contents, and Process for Amending• SWPPP applies to the site AND offsite

borrow/disposal areas• SWPPP is prepared BEFORE filing the NOI and

beginning work• SWPPP describes site, pollutants at site, plan

for controlling pollutant discharges, construction procedure, & responsible parties

• SWPPP is amended by site personnel or project engineer as construction proceeds on an as-needed basis

Page 9: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Basic SWPPP outline• Site description & map• Description of receiving waters• Description of construction

project• Identification of pollutants,

sources, and any non-stormwater discharges

• Erosion & sediment controls• Controls for other pollutants• Procedures for inspections, BMP

maintenance, and recordkeeping• Certification & signatures

Page 10: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Building, stabilizing, and preserving the drainage system (ditches, traps, ponds)

Page 11: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

• Inlets for storm drains and channels– Pond up the runoff to settle & filter it– Use rock berms, rock bags, or other items

• Storm drain & channel outlets– Protect areas receiving discharge flows from

erosion caused by flow velocities– Use rock or turf reinforcement mats; seed

heavily

• Ditches – convey water without eroding• Traps – pond and settle out muddy runoff

Drainage system controls

Page 12: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Good application of silt fence and rock bags for inlet protection – Lots of options available

Page 13: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Other inlet protection approaches

Page 14: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Outlet Protection

Page 15: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Drainage ditch liner materials

• Steep or high flow channels (> 20%)– Use concrete or riprap

• Moderately steep channels (~ 10%)– Use riprap or turf mats & seeding

• Slightly sloping channels (~5%)– Use turf mats or blankets & seeding

• Mostly flat channels (~2%)– Use seeding with blankets

Seed ditches immediately after construction

Triple the seeding rate

Page 16: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech
Page 17: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

• Designed & placed to pool runoff so sediment can settle out

• Installed before grading/fill work begins!

• Seeded immediately after construction

• Located in swales or low-lying areas where flows are concentrated

• Should not be placed near flowing streams

• Outlets should be made of rock or pipe

Sediment traps & basins

Page 18: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Rock filter as sediment trap

Page 19: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Good siting & installation of sediment traps

Page 20: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Protecting riser during construction!

* Wrap with filter fabric* Use rock inlet dam* Pile #57s around pipe

Page 21: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech
Page 22: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Buffer zone requirements• 25 ft undisturbed buffer between disturbed

areas and bankfull elevation of high quality waters / impaired waters

• 50 buffer required between sediment-impaired waters with no TMDL and disturbed areas

• Dredge/fill areas,stream crossings,or other deviationsrequire “adequately protective” alternate practices, explainedin SWPPP

Page 23: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Buffer Zone• Edge of Receiving Water is defined as

bankfull elevation of a water of the Commonwealth

Page 24: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Slope stabilization

Page 25: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Slope protection basics

•Seed and mulch immediately after grading•Divert upland runoff with berms or channels•Tread-track or terrace highly erodible soils• Install sediment barriers at toe of slope and

at correct spacing on long slopes•Use blankets, mats, or mulch on steep slopes•Control runoff from upland areas with drain

pipes or lined downdrain channels

Page 26: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Mass grading tips

• Install all downgradient silt fences, traps, basins before clearing & grubbing

•Use grubbed-out debris as sediment barriers / berms downhill from your work

•Use soil stockpiles as sediment berms / traps that intercept concentrated/sheet flow

•Seed and mulch/blanket/mat your ditches and slopes as soon as you build them

Page 27: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Blankets and mats(rolled erosion control products)

• Excellent for slope and channel protection

• Use blankets for slopes flatter than 3:1 and channels flatter than 20:1

• Use mats for slopes greater than 3:1 and channels steeper than 20:1

• KY TC requires blankets in all channels & slopes > 4:1

Page 28: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Wishful thinking . . .

Page 29: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Stabilization requirements

•Temporary stabilization required on portions of the site where construction activities have temporarily ceased shall be initiated within 14 days

•Final stabilization also required within 14 days after permanently ceasing work

•Final stabilization required if work is suspended for more than 180 days

Page 30: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Homebuilder lot BMP compliance

Page 31: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech
Page 32: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech
Page 33: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech
Page 34: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech
Page 35: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Fiber roll installation

Page 36: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Good housekeeping & pollution prevention

Page 37: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Good housekeeping

•Mud tracking on roadways

•Fuel, oil, paint, hazardous waste mgmt

•Concrete washout sites

•Trash & debris management

•Sewage management

•Dust control (if needed)

Page 38: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Waste management

Provide convenient, well-maintained toilet facilities

Page 39: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech
Page 40: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Establish proper building material handling and storage areas

Building materials with runoff potential should be stored indoors or under cover

Page 41: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Designate concrete washout areas

Or wash out material in formed-up areas ready for the next pour

Page 42: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech
Page 43: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech
Page 44: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Establish proper equipment/vehicle fueling and maintenance practices

•Your on-site fueling and maintenance area should have a spill kit

•Conduct vehicle fueling and maintenance activities in areas away from ditches

•Conduct maintenance on vehicles and equipment off-site if possible

Page 45: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Develop a spill prevention and response plan

•Note the locations of chemical storage areas, storm drains, ditches, and surface waters

•Specify how to notify appropriate authorities

•Describe the procedures for spill cleanup

• Identify personnel responsible for implementing the plan

Page 46: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

The Good, The Bad, and the Ugly

•The Good – stabilized exit pads, initial silt fence installation, initial inlet protection

•The Bad – temporary seeding/mulching, silt fence maintenance, inlet maintenance, waste and materials management

•The Ugly – ditch and channel protection, some homebuilder lots

Page 47: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Fair construction entrance; poor silt fence

Page 48: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Good fence, needs seed/mulch

Page 49: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Good inlet protection

Page 50: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Good stabilization on pipe job

Page 51: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Well vegetated sediment basin, with poorly vegetated inactive area in foreground

Page 52: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Poor vegetation and no sign of active grading

Page 53: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Unstabilized slope

Page 54: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Lot with poor vegetation and poor silt fencing

Page 55: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Lack of inlet maintenance and sediment management

Page 56: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Poor stabilization & drainage management

Page 57: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Eroding, unstabilized drainage swale

Page 58: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Poor site stabilization, drainage system, and sediment trap construction & maintenance

Page 59: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Overflowing concrete washout

Page 60: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Vacant inactive site with poorly installed silt fence and poor

vegetation

Page 61: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Poor soil stabilization, shaky silt fence, ineffective inlet protection

Page 62: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Torn and frayed

Page 63: Construction Site Stormwater Management Building Green in Bowling Green Barry Tonning Tetra Tech

Poor site management