Construction Report as on 28 th July 2020

Construction ReportFlorida Riverwalk–July’20 • ‘B’ BUILDING: • RCC work completed for 1st to 8th slab • Brickwork completed for 1st to 4th floor • INFRASTRUCTURE WORK:

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Construction ReportFlorida Riverwalk–July’20 • ‘B’ BUILDING: • RCC work completed for 1st to 8th slab • Brickwork completed for 1st to 4th floor • INFRASTRUCTURE WORK:

Construction Reportas on 28th July 2020

Page 2: Construction ReportFlorida Riverwalk–July’20 • ‘B’ BUILDING: • RCC work completed for 1st to 8th slab • Brickwork completed for 1st to 4th floor • INFRASTRUCTURE WORK:

Keshav Nagar, Pune

Page 3: Construction ReportFlorida Riverwalk–July’20 • ‘B’ BUILDING: • RCC work completed for 1st to 8th slab • Brickwork completed for 1st to 4th floor • INFRASTRUCTURE WORK:

Florida Riverwalk– July’20

• ‘A’ BUILDING:

• RCC work completed for all floors slabs

• Block work completed for all floors

• Electrical wall conducting completed for all floors

• Internal plaster work completed

• Gypsum work completed

• Internal toilet concealed plumbing work completed

• External plaster work completed

• Bath Dado tiles, kitchen platform and bath granite frames work completed

• Tile flooring work completed

• Waterproofing work completed

• UPVC window work completed

• 60% work complete of internal painting

• 60% work complete for external painting

• 98% work complete for external duct and terrace plumbing

• 98% work complete for door fixing & 90% work complete for SS railing

• Fire fighting work completed

• 85% Solar work completed

• 60% work complete for wiring and switch plate

Page 4: Construction ReportFlorida Riverwalk–July’20 • ‘B’ BUILDING: • RCC work completed for 1st to 8th slab • Brickwork completed for 1st to 4th floor • INFRASTRUCTURE WORK:

Florida Riverwalk– July’20

• ‘B’ BUILDING:

• RCC work completed for 1st to 8th slab

• Brickwork completed for 1st to 4th floor

• INFRASTRUCTURE WORK:

• Underground water tank RCC work completed

• Club House: excavation work completed and 80% RCC work complete

• Transformer Room: excavation work, RCC, brickwork, plaster completed, commissioning is pending

• Swimming Pool: excavation work completed and 70% RCC work complete

• Compound Wall and Retaining Wall brickwork completed

• Underground Services Drainage + Storm + Electrical – RCC piping work completed

• Fire Fighting work completed

• Road Trimix work 90% complete for ‘A’ building surrounding area

• Genset work completed

• 90% STP RCC work complete

• 95% work completed for security cabin and gate

Page 5: Construction ReportFlorida Riverwalk–July’20 • ‘B’ BUILDING: • RCC work completed for 1st to 8th slab • Brickwork completed for 1st to 4th floor • INFRASTRUCTURE WORK:
Page 6: Construction ReportFlorida Riverwalk–July’20 • ‘B’ BUILDING: • RCC work completed for 1st to 8th slab • Brickwork completed for 1st to 4th floor • INFRASTRUCTURE WORK:
Page 7: Construction ReportFlorida Riverwalk–July’20 • ‘B’ BUILDING: • RCC work completed for 1st to 8th slab • Brickwork completed for 1st to 4th floor • INFRASTRUCTURE WORK:
Page 8: Construction ReportFlorida Riverwalk–July’20 • ‘B’ BUILDING: • RCC work completed for 1st to 8th slab • Brickwork completed for 1st to 4th floor • INFRASTRUCTURE WORK: