5
87 Cycle St Bin St Cycle St GF service entry Access. Landing Riser Staircase Width of means of escape Add door serving ground floor? Extent of WC Options over Fire resistant construction 34 26 7 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT SPECIFICATIONS AND DRAWINGS ISSUED BY ARCTECH PARTNERSHIP LLP AND OTHER CONSULTANTS AND SPECIALISTS. DO NOT SCALE THIS DRAWING, USE ONLY FIGURED DIMENSIONS. FOR DISCREPANCIES OR OMISSIONS CONTACT ARCTECH PARTNERSHIP LLP PRIOR TO WORK COMMENCING. THE CONTRACTOR IS TO CHECK AND VERIFY ALL BUILDING AND SITE DIMENSIONS, LEVELS AND SERVICES LOCATIONS INCLUDING SEWER INVERT LEVELS AT CONNECTION POINTS BEFORE WORK COMMENCES. MATERIALS AND WORKMANSHIP ARE TO COMPLY IN ALL RESPECTS WITH CURRENT BRITISH STANDARDS, BRITISH STANDARDS CODES OF PRACTICE, AND AS APPROPRIATE THE BUILDING REGULATIONS, BUILDING STANDARDS (SCOTLAND) & (NORTHERN IRELAND) REGULATIONS. ALL RIGHTS DESCRIBED IN CHAPTER IV OF THE COPYRIGHT, DESIGNS & PATENTS ACT 1988 ARE GENERALLY ASSERTED. THE COPYRIGHT OF THIS DRAWING IS VESTED IN ARCTECH PARTNERSHIP LLP AND MUST NOT BE COPIED REPRODUCED OR USED IN ANY MANNER WHATSOEVER WITHOUT WRITTEN CONSENT. C MMXX IMPORTANT NOTES PROJECT PROPOSED NEW FACTORY AND OFFICES CLIENT CEDAR CWMBRAN LTD TITLE SITE PLAN SCALE @ A1 PR0JECT NUMBER 1:500 8514 PROJ - ORIG - ZONE - LEVEL - TYPE - ROLE - NO. REV 8514-XX-XX-DR-A-120 PLANNING DRAFT STATUS S0 PURPOSE OF ISSUE CONSTRUCTION RISKS MAINTENANCE/ CLEANING RISKS DEMOLITION/ ADAPTATION RISKS In addition to the hazard/risks normally associated with the types of work detailed on this drawing take note of the above. It is assumed that all works on this drawing will be carried out by a competent contractor working, where appropriate, to an appropriate method statement. HARLEY HOUSE 29 CAMBRAY PLACE CHELTENHAM GL50 1JN [email protected] 01242 399 270 REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY DATE DATE DATE ARCTECH PARTNERSHIP LLP DRAFT ISSUE FOR DISCUSSION Car parking: 7 no. accessible spaces 17 no. ULEV 178 Total Concrete Yard Security Kiosk Security Barriers Deliveries Bin Store Cycle Parking Main Entrance Associates Entrance Cycle Parking Surface Water Attenuation Extent of offices over Grange Road Llanfrechfa Way Railway Line P1 P1 UPDATES FOLLOWING CLIENT MEETING DV TD JE 28.08.20 28.08.20 28.08.20

construction Railway Line DRAFT ISSUEFOR DISCUSSION

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: construction Railway Line DRAFT ISSUEFOR DISCUSSION

87

Cycle St Bin St

Cycle St

GFserviceentry

Access.

Landing

Rise

r

Staircase

Width of means of escapeAdd door serving ground floor?

Extent of WCOptions over

Fire resistantconstruction

34

26

7

THIS DRAWING IS TO BE READ IN CONJUNCTION WITHALL RELEVANT SPECIFICATIONS AND DRAWINGSISSUED BY ARCTECH PARTNERSHIP LLP AND OTHERCONSULTANTS AND SPECIALISTS.

DO NOT SCALE THIS DRAWING, USE ONLY FIGUREDDIMENSIONS.

FOR DISCREPANCIES OR OMISSIONS CONTACTARCTECH PARTNERSHIP LLP PRIOR TO WORKCOMMENCING.

THE CONTRACTOR IS TO CHECK AND VERIFY ALLBUILDING AND SITE DIMENSIONS, LEVELS ANDSERVICES LOCATIONS INCLUDING SEWER INVERTLEVELS AT CONNECTION POINTS BEFORE WORKCOMMENCES.

MATERIALS AND WORKMANSHIP ARE TO COMPLY INALL RESPECTS WITH CURRENT BRITISH STANDARDS,BRITISH STANDARDS CODES OF PRACTICE, AND ASAPPROPRIATE THE BUILDING REGULATIONS, BUILDINGSTANDARDS (SCOTLAND) & (NORTHERN IRELAND)REGULATIONS.

ALL RIGHTS DESCRIBED IN CHAPTER IV OF THECOPYRIGHT, DESIGNS & PATENTS ACT 1988 AREGENERALLY ASSERTED.

THE COPYRIGHT OF THIS DRAWING IS VESTED INARCTECH PARTNERSHIP LLP AND MUST NOT BE COPIEDREPRODUCED OR USED IN ANY MANNER WHATSOEVERWITHOUT WRITTEN CONSENT.

C MMXX

IMPORTANT NOTES

PROJECT

PROPOSED NEW FACTORYAND OFFICES

CLIENT

CEDAR CWMBRAN LTD

TITLE

SITE PLAN

SCALE @ A1 PR0JECT NUMBER

1:500 8514

PROJ - ORIG - ZONE - LEVEL - TYPE - ROLE - NO. REV

8514-XX-XX-DR-A-120

PLANNING DRAFTSTATUS

S0PURPOSE OF ISSUE

CONSTRUCTIONRISKS

MAINTENANCE/CLEANINGRISKS

DEMOLITION/ADAPTATIONRISKS

In addition to the hazard/risks normally associated with the typesof work detailed on this drawing take note of the above.It is assumed that all works on this drawing will be carried out by acompetent contractor working, where appropriate, to anappropriate method statement.

HARLEY HOUSE 29 CAMBRAY PLACE CHELTENHAM GL50 1JN

[email protected] 01242 399 270

REVDESCRIPTION

DRAWN BY CHECKED BY APPROVED BYDATE DATE DATE

ARCTECH PARTNERSHIP LLP

DRAFT ISSUE

FOR DIS

CUSSION

Car parking:7 no. accessible spaces17 no. ULEV178 Total

Concrete Yard

SecurityKiosk

SecurityBarriers

Del

iver

ies

BinStore

CycleParkingMain

Entrance

AssociatesEntrance

CycleParking

Surface WaterAttenuation

Exte

nt o

f offi

ces o

ver

Grange Road

Llanfrechfa Way

Railway Line

P1

P1UPDATES FOLLOWING CLIENT MEETING

DV TD JE28.08.20 28.08.20 28.08.20

AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
SV
AutoCAD SHX Text
SV
AutoCAD SHX Text
SV
AutoCAD SHX Text
SV
AutoCAD SHX Text
SV
AutoCAD SHX Text
SV
AutoCAD SHX Text
101
AutoCAD SHX Text
51.760
AutoCAD SHX Text
1
AutoCAD SHX Text
55.814
AutoCAD SHX Text
102
AutoCAD SHX Text
51.610
AutoCAD SHX Text
103
AutoCAD SHX Text
51.207
AutoCAD SHX Text
3
AutoCAD SHX Text
51.552
AutoCAD SHX Text
104
AutoCAD SHX Text
50.438
AutoCAD SHX Text
TIC
AutoCAD SHX Text
TIC
AutoCAD SHX Text
46.75
AutoCAD SHX Text
46.68
AutoCAD SHX Text
46.65
AutoCAD SHX Text
46.62
AutoCAD SHX Text
1
Page 2: construction Railway Line DRAFT ISSUEFOR DISCUSSION

87

Cycle St Bin St

Cycle St

GFserviceentry

Access.

Landing

Rise

r

Staircase

Width of means of escapeAdd door serving ground floor?

Extent of WCOptions over

Fire resistantconstruction

26

122011

7615

0

THIS DRAWING IS TO BE READ IN CONJUNCTION WITHALL RELEVANT SPECIFICATIONS AND DRAWINGSISSUED BY ARCTECH PARTNERSHIP LLP AND OTHERCONSULTANTS AND SPECIALISTS.

DO NOT SCALE THIS DRAWING, USE ONLY FIGUREDDIMENSIONS.

FOR DISCREPANCIES OR OMISSIONS CONTACTARCTECH PARTNERSHIP LLP PRIOR TO WORKCOMMENCING.

THE CONTRACTOR IS TO CHECK AND VERIFY ALLBUILDING AND SITE DIMENSIONS, LEVELS ANDSERVICES LOCATIONS INCLUDING SEWER INVERTLEVELS AT CONNECTION POINTS BEFORE WORKCOMMENCES.

MATERIALS AND WORKMANSHIP ARE TO COMPLY INALL RESPECTS WITH CURRENT BRITISH STANDARDS,BRITISH STANDARDS CODES OF PRACTICE, AND ASAPPROPRIATE THE BUILDING REGULATIONS, BUILDINGSTANDARDS (SCOTLAND) & (NORTHERN IRELAND)REGULATIONS.

ALL RIGHTS DESCRIBED IN CHAPTER IV OF THECOPYRIGHT, DESIGNS & PATENTS ACT 1988 AREGENERALLY ASSERTED.

THE COPYRIGHT OF THIS DRAWING IS VESTED INARCTECH PARTNERSHIP LLP AND MUST NOT BE COPIEDREPRODUCED OR USED IN ANY MANNER WHATSOEVERWITHOUT WRITTEN CONSENT.

C MMXX

IMPORTANT NOTES

PROJECT

PROPOSED NEW FACTORYAND OFFICES

CLIENT

CEDAR CWMBRAN LTD

TITLE

FACTORY FLOOR PLAN

SCALE @ A1 PR0JECT NUMBER

1:200 8514

PROJ - ORIG - ZONE - LEVEL - TYPE - ROLE - NO. REV

8514-XX-XX-DR-A-121

PLANNING DRAFTSTATUS

S0PURPOSE OF ISSUE

CONSTRUCTIONRISKS

MAINTENANCE/CLEANINGRISKS

DEMOLITION/ADAPTATIONRISKS

In addition to the hazard/risks normally associated with the typesof work detailed on this drawing take note of the above.It is assumed that all works on this drawing will be carried out by acompetent contractor working, where appropriate, to anappropriate method statement.

HARLEY HOUSE 29 CAMBRAY PLACE CHELTENHAM GL50 1JN

[email protected] 01242 399 270

REVDESCRIPTION

DRAWN BY CHECKED BY APPROVED BYDATE DATE DATE

ARCTECH PARTNERSHIP LLP

DRAFT ISSUE

FOR DIS

CUSSION

P1

P1UPDATES FOLLOWING CLIENT MEETING

DV TD JE28.08.20 28.08.20 28.08.20

Page 3: construction Railway Line DRAFT ISSUEFOR DISCUSSION

Line

of 1

st &

2nd

Flo

or o

ver

Access.

Lobby

Rise

r

Staircase

GFserviceentry

Female

Male

Access.

Tea making

Landing

Rise

rStaircase

GFserviceentry

Access.

Landing

Staircase

5194

9

11300

6966

11300

Office

Tea making

Rise

r

Cleaners St

WC

WC

WC

ALTERNATIVE WCCONFIGURATION

THIS DRAWING IS TO BE READ IN CONJUNCTION WITHALL RELEVANT SPECIFICATIONS AND DRAWINGSISSUED BY ARCTECH PARTNERSHIP LLP AND OTHERCONSULTANTS AND SPECIALISTS.

DO NOT SCALE THIS DRAWING, USE ONLY FIGUREDDIMENSIONS.

FOR DISCREPANCIES OR OMISSIONS CONTACTARCTECH PARTNERSHIP LLP PRIOR TO WORKCOMMENCING.

THE CONTRACTOR IS TO CHECK AND VERIFY ALLBUILDING AND SITE DIMENSIONS, LEVELS ANDSERVICES LOCATIONS INCLUDING SEWER INVERTLEVELS AT CONNECTION POINTS BEFORE WORKCOMMENCES.

MATERIALS AND WORKMANSHIP ARE TO COMPLY INALL RESPECTS WITH CURRENT BRITISH STANDARDS,BRITISH STANDARDS CODES OF PRACTICE, AND ASAPPROPRIATE THE BUILDING REGULATIONS, BUILDINGSTANDARDS (SCOTLAND) & (NORTHERN IRELAND)REGULATIONS.

ALL RIGHTS DESCRIBED IN CHAPTER IV OF THECOPYRIGHT, DESIGNS & PATENTS ACT 1988 AREGENERALLY ASSERTED.

THE COPYRIGHT OF THIS DRAWING IS VESTED INARCTECH PARTNERSHIP LLP AND MUST NOT BE COPIEDREPRODUCED OR USED IN ANY MANNER WHATSOEVERWITHOUT WRITTEN CONSENT.

C MMXX

IMPORTANT NOTES

PROJECT

PROPOSED NEW FACTORYAND OFFICES

CLIENT

CEDAR CWMBRAN LTD

TITLE

OFFICE FLOOR PLANS

SCALE @ A1 PR0JECT NUMBER

1:200 8514

PROJ - ORIG - ZONE - LEVEL - TYPE - ROLE - NO. REV

8514-XX-XX-DR-A-122

PLANNING DRAFTSTATUS

S0PURPOSE OF ISSUE

CONSTRUCTIONRISKS

MAINTENANCE/CLEANINGRISKS

DEMOLITION/ADAPTATIONRISKS

In addition to the hazard/risks normally associated with the typesof work detailed on this drawing take note of the above.It is assumed that all works on this drawing will be carried out by acompetent contractor working, where appropriate, to anappropriate method statement.

HARLEY HOUSE 29 CAMBRAY PLACE CHELTENHAM GL50 1JN

[email protected] 01242 399 270

DESCRIPTION

DRAWN BY CHECKED BY APPROVED BYDATE DATE DATE

ARCTECH PARTNERSHIP LLP

GROUND FLOOR PLANFIRST FLOOR PLANSECOND FLOOR PLAN

DRAFT ISSUE

FOR DIS

CUSSION

P1

P1UPDATES FOLLOWING CLIENT MEETING

DV TD JE28.08.20 28.08.20 28.08.20

Page 4: construction Railway Line DRAFT ISSUEFOR DISCUSSION

THIS DRAWING IS TO BE READ IN CONJUNCTION WITHALL RELEVANT SPECIFICATIONS AND DRAWINGSISSUED BY ARCTECH PARTNERSHIP LLP AND OTHERCONSULTANTS AND SPECIALISTS.

DO NOT SCALE THIS DRAWING, USE ONLY FIGUREDDIMENSIONS.

FOR DISCREPANCIES OR OMISSIONS CONTACTARCTECH PARTNERSHIP LLP PRIOR TO WORKCOMMENCING.

THE CONTRACTOR IS TO CHECK AND VERIFY ALLBUILDING AND SITE DIMENSIONS, LEVELS ANDSERVICES LOCATIONS INCLUDING SEWER INVERTLEVELS AT CONNECTION POINTS BEFORE WORKCOMMENCES.

MATERIALS AND WORKMANSHIP ARE TO COMPLY INALL RESPECTS WITH CURRENT BRITISH STANDARDS,BRITISH STANDARDS CODES OF PRACTICE, AND ASAPPROPRIATE THE BUILDING REGULATIONS, BUILDINGSTANDARDS (SCOTLAND) & (NORTHERN IRELAND)REGULATIONS.

ALL RIGHTS DESCRIBED IN CHAPTER IV OF THECOPYRIGHT, DESIGNS & PATENTS ACT 1988 AREGENERALLY ASSERTED.

THE COPYRIGHT OF THIS DRAWING IS VESTED INARCTECH PARTNERSHIP LLP AND MUST NOT BE COPIEDREPRODUCED OR USED IN ANY MANNER WHATSOEVERWITHOUT WRITTEN CONSENT.

C MMXX

IMPORTANT NOTES

PROJECT

PROPOSED NEW FACTORYAND OFFICES

CLIENT

CEDAR CWMBRAN LTD

TITLE

ELEVATIONS SHEET 1

SCALE @ A1 PR0JECT NUMBER

1:200 8514

PROJ - ORIG - ZONE - LEVEL - TYPE - ROLE - NO. REV

8514-XX-XX-DR-A-123

PLANNING DRAFTSTATUS

S0PURPOSE OF ISSUE

CONSTRUCTIONRISKS

MAINTENANCE/CLEANINGRISKS

DEMOLITION/ADAPTATIONRISKS

In addition to the hazard/risks normally associated with the typesof work detailed on this drawing take note of the above.It is assumed that all works on this drawing will be carried out by acompetent contractor working, where appropriate, to anappropriate method statement.

HARLEY HOUSE 29 CAMBRAY PLACE CHELTENHAM GL50 1JN

[email protected] 01242 399 270

REVDESCRIPTION

DRAWN BY CHECKED BY APPROVED BYDATE DATE DATE

ARCTECH PARTNERSHIP LLP

NORTH ELEVATION

DRAFT ISSUE

FOR DIS

CUSSION

WEST ELEVATION

P1

P1UPDATES FOLLOWING CLIENT MEETING

DV TD JE28.08.20 28.08.20 28.08.20

Page 5: construction Railway Line DRAFT ISSUEFOR DISCUSSION

Lifting beamheight justworks!?

1000

0

FFORDD LLANFRECHFALLANFRECHFA WAY /LANDSCAPED

EMBANKMENT

RAILWAY

SITEADJACENT LAND

GRANGE ROAD

BOUN

DA

RY

BOUN

DA

RY

BOUN

DA

RY

BOUN

DA

RY

BUILDINGYARD PARKING SURFACE WATER STORAGE

SITE

BUILDINGPARKING ACCESS

87

Cycle St Bin St

Cycle St

GFserviceentry

Access.

Landing

Rise

r

Staircase

Width of means of escapeAdd door serving ground floor?

Extent of WCOptions over

Fire resistantconstruction

34

26

7

x 50.550

FFL 50.875

x 50.725 x 50.725

x 50.375

x 50.375x 50.375

x 50.600

x 50.600

x 50.375x 50.250

A

B B

A

THIS DRAWING IS TO BE READ IN CONJUNCTION WITHALL RELEVANT SPECIFICATIONS AND DRAWINGSISSUED BY ARCTECH PARTNERSHIP LLP AND OTHERCONSULTANTS AND SPECIALISTS.

DO NOT SCALE THIS DRAWING, USE ONLY FIGUREDDIMENSIONS.

FOR DISCREPANCIES OR OMISSIONS CONTACTARCTECH PARTNERSHIP LLP PRIOR TO WORKCOMMENCING.

THE CONTRACTOR IS TO CHECK AND VERIFY ALLBUILDING AND SITE DIMENSIONS, LEVELS ANDSERVICES LOCATIONS INCLUDING SEWER INVERTLEVELS AT CONNECTION POINTS BEFORE WORKCOMMENCES.

MATERIALS AND WORKMANSHIP ARE TO COMPLY INALL RESPECTS WITH CURRENT BRITISH STANDARDS,BRITISH STANDARDS CODES OF PRACTICE, AND ASAPPROPRIATE THE BUILDING REGULATIONS, BUILDINGSTANDARDS (SCOTLAND) & (NORTHERN IRELAND)REGULATIONS.

ALL RIGHTS DESCRIBED IN CHAPTER IV OF THECOPYRIGHT, DESIGNS & PATENTS ACT 1988 AREGENERALLY ASSERTED.

THE COPYRIGHT OF THIS DRAWING IS VESTED INARCTECH PARTNERSHIP LLP AND MUST NOT BE COPIEDREPRODUCED OR USED IN ANY MANNER WHATSOEVERWITHOUT WRITTEN CONSENT.

C MMXX

IMPORTANT NOTES

PROJECT

PROPOSED NEW FACTORYAND OFFICES

CLIENT

CEDAR CWMBRAN LTD

TITLE

SECTIONS

SCALE @ A1 PR0JECT NUMBER

1:200 1:500 8514

PROJ - ORIG - ZONE - LEVEL - TYPE - ROLE - NO. REV

8514-XX-XX-DR-A-124

PLANNING DRAFTSTATUS

S0PURPOSE OF ISSUE

CONSTRUCTIONRISKS

MAINTENANCE/CLEANINGRISKS

DEMOLITION/ADAPTATIONRISKS

In addition to the hazard/risks normally associated with the typesof work detailed on this drawing take note of the above.It is assumed that all works on this drawing will be carried out by acompetent contractor working, where appropriate, to anappropriate method statement.

HARLEY HOUSE 29 CAMBRAY PLACE CHELTENHAM GL50 1JN

[email protected] 01242 399 270

REVDESCRIPTION

DRAWN BY CHECKED BY APPROVED BYDATE DATE DATE

ARCTECH PARTNERSHIP LLP

CROSS SECTION

DRAFT ISSUE

FOR DIS

CUSSION

SITE SECTION A-A

SITE SECTION B-B

P1UPDATES FOLLOWING CLIENT MEETING

DV TD JE28.08.20 28.08.20 28.08.20

P1

AutoCAD SHX Text
101
AutoCAD SHX Text
51.760
AutoCAD SHX Text
1
AutoCAD SHX Text
55.814
AutoCAD SHX Text
102
AutoCAD SHX Text
51.610
AutoCAD SHX Text
103
AutoCAD SHX Text
51.207
AutoCAD SHX Text
3
AutoCAD SHX Text
51.552
AutoCAD SHX Text
104
AutoCAD SHX Text
50.438
AutoCAD SHX Text
COBBLES
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
GATE
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
GATE
AutoCAD SHX Text
TIC
AutoCAD SHX Text
TIC
AutoCAD SHX Text
GATE
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
46.75
AutoCAD SHX Text
46.68
AutoCAD SHX Text
46.65
AutoCAD SHX Text
46.62
AutoCAD SHX Text
TREE TRUNKS
AutoCAD SHX Text
"CB CARS"
AutoCAD SHX Text
FACTORY
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
STREAM
AutoCAD SHX Text
KERB
AutoCAD SHX Text
EMBANKMENT
AutoCAD SHX Text
EMBANKMENT
AutoCAD SHX Text
RAILWAY
AutoCAD SHX Text
BRIDGE PARAPET
AutoCAD SHX Text
BEECH HEDGE
AutoCAD SHX Text
BEECH HEDGE
AutoCAD SHX Text
METAL FENCE, 2.3m
AutoCAD SHX Text
METAL FENCE, 2.3m
AutoCAD SHX Text
CHAINLINK FENCE, 2.2m
AutoCAD SHX Text
CHAINLINK FENCE, 2.2m
AutoCAD SHX Text
METAL FENCE, 2.3m
AutoCAD SHX Text
LLANFRECHFA WAY
AutoCAD SHX Text
GRANGE ROAD
AutoCAD SHX Text
KERB
AutoCAD SHX Text
KERB
AutoCAD SHX Text
KERB
AutoCAD SHX Text
FOOTPATH
AutoCAD SHX Text
FOOTPATH
AutoCAD SHX Text
FOOTPATH
AutoCAD SHX Text
FOOTPATH
AutoCAD SHX Text
FOOTPATH
AutoCAD SHX Text
KERB
AutoCAD SHX Text
KERB
AutoCAD SHX Text
KERB
AutoCAD SHX Text
KERB
AutoCAD SHX Text
KERB
AutoCAD SHX Text
KERB
AutoCAD SHX Text
KERB
AutoCAD SHX Text
RETAIL UNIT
AutoCAD SHX Text
BED LEVEL
AutoCAD SHX Text
WATER'S EDGE
AutoCAD SHX Text
AREA OF JAPANESE
AutoCAD SHX Text
KNOTWEED NOW REMOVED
AutoCAD SHX Text
TO A DEPTH OF 2.7M