Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
87
Cycle St Bin St
Cycle St
GFserviceentry
Access.
Landing
Rise
r
Staircase
Width of means of escapeAdd door serving ground floor?
Extent of WCOptions over
Fire resistantconstruction
34
26
7
THIS DRAWING IS TO BE READ IN CONJUNCTION WITHALL RELEVANT SPECIFICATIONS AND DRAWINGSISSUED BY ARCTECH PARTNERSHIP LLP AND OTHERCONSULTANTS AND SPECIALISTS.
DO NOT SCALE THIS DRAWING, USE ONLY FIGUREDDIMENSIONS.
FOR DISCREPANCIES OR OMISSIONS CONTACTARCTECH PARTNERSHIP LLP PRIOR TO WORKCOMMENCING.
THE CONTRACTOR IS TO CHECK AND VERIFY ALLBUILDING AND SITE DIMENSIONS, LEVELS ANDSERVICES LOCATIONS INCLUDING SEWER INVERTLEVELS AT CONNECTION POINTS BEFORE WORKCOMMENCES.
MATERIALS AND WORKMANSHIP ARE TO COMPLY INALL RESPECTS WITH CURRENT BRITISH STANDARDS,BRITISH STANDARDS CODES OF PRACTICE, AND ASAPPROPRIATE THE BUILDING REGULATIONS, BUILDINGSTANDARDS (SCOTLAND) & (NORTHERN IRELAND)REGULATIONS.
ALL RIGHTS DESCRIBED IN CHAPTER IV OF THECOPYRIGHT, DESIGNS & PATENTS ACT 1988 AREGENERALLY ASSERTED.
THE COPYRIGHT OF THIS DRAWING IS VESTED INARCTECH PARTNERSHIP LLP AND MUST NOT BE COPIEDREPRODUCED OR USED IN ANY MANNER WHATSOEVERWITHOUT WRITTEN CONSENT.
C MMXX
IMPORTANT NOTES
PROJECT
PROPOSED NEW FACTORYAND OFFICES
CLIENT
CEDAR CWMBRAN LTD
TITLE
SITE PLAN
SCALE @ A1 PR0JECT NUMBER
1:500 8514
PROJ - ORIG - ZONE - LEVEL - TYPE - ROLE - NO. REV
8514-XX-XX-DR-A-120
PLANNING DRAFTSTATUS
S0PURPOSE OF ISSUE
CONSTRUCTIONRISKS
MAINTENANCE/CLEANINGRISKS
DEMOLITION/ADAPTATIONRISKS
In addition to the hazard/risks normally associated with the typesof work detailed on this drawing take note of the above.It is assumed that all works on this drawing will be carried out by acompetent contractor working, where appropriate, to anappropriate method statement.
HARLEY HOUSE 29 CAMBRAY PLACE CHELTENHAM GL50 1JN
[email protected] 01242 399 270
REVDESCRIPTION
DRAWN BY CHECKED BY APPROVED BYDATE DATE DATE
ARCTECH PARTNERSHIP LLP
DRAFT ISSUE
FOR DIS
CUSSION
Car parking:7 no. accessible spaces17 no. ULEV178 Total
Concrete Yard
SecurityKiosk
SecurityBarriers
Del
iver
ies
BinStore
CycleParkingMain
Entrance
AssociatesEntrance
CycleParking
Surface WaterAttenuation
Exte
nt o
f offi
ces o
ver
Grange Road
Llanfrechfa Way
Railway Line
P1
P1UPDATES FOLLOWING CLIENT MEETING
DV TD JE28.08.20 28.08.20 28.08.20
87
Cycle St Bin St
Cycle St
GFserviceentry
Access.
Landing
Rise
r
Staircase
Width of means of escapeAdd door serving ground floor?
Extent of WCOptions over
Fire resistantconstruction
26
122011
7615
0
THIS DRAWING IS TO BE READ IN CONJUNCTION WITHALL RELEVANT SPECIFICATIONS AND DRAWINGSISSUED BY ARCTECH PARTNERSHIP LLP AND OTHERCONSULTANTS AND SPECIALISTS.
DO NOT SCALE THIS DRAWING, USE ONLY FIGUREDDIMENSIONS.
FOR DISCREPANCIES OR OMISSIONS CONTACTARCTECH PARTNERSHIP LLP PRIOR TO WORKCOMMENCING.
THE CONTRACTOR IS TO CHECK AND VERIFY ALLBUILDING AND SITE DIMENSIONS, LEVELS ANDSERVICES LOCATIONS INCLUDING SEWER INVERTLEVELS AT CONNECTION POINTS BEFORE WORKCOMMENCES.
MATERIALS AND WORKMANSHIP ARE TO COMPLY INALL RESPECTS WITH CURRENT BRITISH STANDARDS,BRITISH STANDARDS CODES OF PRACTICE, AND ASAPPROPRIATE THE BUILDING REGULATIONS, BUILDINGSTANDARDS (SCOTLAND) & (NORTHERN IRELAND)REGULATIONS.
ALL RIGHTS DESCRIBED IN CHAPTER IV OF THECOPYRIGHT, DESIGNS & PATENTS ACT 1988 AREGENERALLY ASSERTED.
THE COPYRIGHT OF THIS DRAWING IS VESTED INARCTECH PARTNERSHIP LLP AND MUST NOT BE COPIEDREPRODUCED OR USED IN ANY MANNER WHATSOEVERWITHOUT WRITTEN CONSENT.
C MMXX
IMPORTANT NOTES
PROJECT
PROPOSED NEW FACTORYAND OFFICES
CLIENT
CEDAR CWMBRAN LTD
TITLE
FACTORY FLOOR PLAN
SCALE @ A1 PR0JECT NUMBER
1:200 8514
PROJ - ORIG - ZONE - LEVEL - TYPE - ROLE - NO. REV
8514-XX-XX-DR-A-121
PLANNING DRAFTSTATUS
S0PURPOSE OF ISSUE
CONSTRUCTIONRISKS
MAINTENANCE/CLEANINGRISKS
DEMOLITION/ADAPTATIONRISKS
In addition to the hazard/risks normally associated with the typesof work detailed on this drawing take note of the above.It is assumed that all works on this drawing will be carried out by acompetent contractor working, where appropriate, to anappropriate method statement.
HARLEY HOUSE 29 CAMBRAY PLACE CHELTENHAM GL50 1JN
[email protected] 01242 399 270
REVDESCRIPTION
DRAWN BY CHECKED BY APPROVED BYDATE DATE DATE
ARCTECH PARTNERSHIP LLP
DRAFT ISSUE
FOR DIS
CUSSION
P1
P1UPDATES FOLLOWING CLIENT MEETING
DV TD JE28.08.20 28.08.20 28.08.20
Line
of 1
st &
2nd
Flo
or o
ver
Access.
Lobby
Rise
r
Staircase
GFserviceentry
Female
Male
Access.
Tea making
Landing
Rise
rStaircase
GFserviceentry
Access.
Landing
Staircase
5194
9
11300
6966
11300
Office
Tea making
Rise
r
Cleaners St
WC
WC
WC
ALTERNATIVE WCCONFIGURATION
THIS DRAWING IS TO BE READ IN CONJUNCTION WITHALL RELEVANT SPECIFICATIONS AND DRAWINGSISSUED BY ARCTECH PARTNERSHIP LLP AND OTHERCONSULTANTS AND SPECIALISTS.
DO NOT SCALE THIS DRAWING, USE ONLY FIGUREDDIMENSIONS.
FOR DISCREPANCIES OR OMISSIONS CONTACTARCTECH PARTNERSHIP LLP PRIOR TO WORKCOMMENCING.
THE CONTRACTOR IS TO CHECK AND VERIFY ALLBUILDING AND SITE DIMENSIONS, LEVELS ANDSERVICES LOCATIONS INCLUDING SEWER INVERTLEVELS AT CONNECTION POINTS BEFORE WORKCOMMENCES.
MATERIALS AND WORKMANSHIP ARE TO COMPLY INALL RESPECTS WITH CURRENT BRITISH STANDARDS,BRITISH STANDARDS CODES OF PRACTICE, AND ASAPPROPRIATE THE BUILDING REGULATIONS, BUILDINGSTANDARDS (SCOTLAND) & (NORTHERN IRELAND)REGULATIONS.
ALL RIGHTS DESCRIBED IN CHAPTER IV OF THECOPYRIGHT, DESIGNS & PATENTS ACT 1988 AREGENERALLY ASSERTED.
THE COPYRIGHT OF THIS DRAWING IS VESTED INARCTECH PARTNERSHIP LLP AND MUST NOT BE COPIEDREPRODUCED OR USED IN ANY MANNER WHATSOEVERWITHOUT WRITTEN CONSENT.
C MMXX
IMPORTANT NOTES
PROJECT
PROPOSED NEW FACTORYAND OFFICES
CLIENT
CEDAR CWMBRAN LTD
TITLE
OFFICE FLOOR PLANS
SCALE @ A1 PR0JECT NUMBER
1:200 8514
PROJ - ORIG - ZONE - LEVEL - TYPE - ROLE - NO. REV
8514-XX-XX-DR-A-122
PLANNING DRAFTSTATUS
S0PURPOSE OF ISSUE
CONSTRUCTIONRISKS
MAINTENANCE/CLEANINGRISKS
DEMOLITION/ADAPTATIONRISKS
In addition to the hazard/risks normally associated with the typesof work detailed on this drawing take note of the above.It is assumed that all works on this drawing will be carried out by acompetent contractor working, where appropriate, to anappropriate method statement.
HARLEY HOUSE 29 CAMBRAY PLACE CHELTENHAM GL50 1JN
[email protected] 01242 399 270
DESCRIPTION
DRAWN BY CHECKED BY APPROVED BYDATE DATE DATE
ARCTECH PARTNERSHIP LLP
GROUND FLOOR PLANFIRST FLOOR PLANSECOND FLOOR PLAN
DRAFT ISSUE
FOR DIS
CUSSION
P1
P1UPDATES FOLLOWING CLIENT MEETING
DV TD JE28.08.20 28.08.20 28.08.20
THIS DRAWING IS TO BE READ IN CONJUNCTION WITHALL RELEVANT SPECIFICATIONS AND DRAWINGSISSUED BY ARCTECH PARTNERSHIP LLP AND OTHERCONSULTANTS AND SPECIALISTS.
DO NOT SCALE THIS DRAWING, USE ONLY FIGUREDDIMENSIONS.
FOR DISCREPANCIES OR OMISSIONS CONTACTARCTECH PARTNERSHIP LLP PRIOR TO WORKCOMMENCING.
THE CONTRACTOR IS TO CHECK AND VERIFY ALLBUILDING AND SITE DIMENSIONS, LEVELS ANDSERVICES LOCATIONS INCLUDING SEWER INVERTLEVELS AT CONNECTION POINTS BEFORE WORKCOMMENCES.
MATERIALS AND WORKMANSHIP ARE TO COMPLY INALL RESPECTS WITH CURRENT BRITISH STANDARDS,BRITISH STANDARDS CODES OF PRACTICE, AND ASAPPROPRIATE THE BUILDING REGULATIONS, BUILDINGSTANDARDS (SCOTLAND) & (NORTHERN IRELAND)REGULATIONS.
ALL RIGHTS DESCRIBED IN CHAPTER IV OF THECOPYRIGHT, DESIGNS & PATENTS ACT 1988 AREGENERALLY ASSERTED.
THE COPYRIGHT OF THIS DRAWING IS VESTED INARCTECH PARTNERSHIP LLP AND MUST NOT BE COPIEDREPRODUCED OR USED IN ANY MANNER WHATSOEVERWITHOUT WRITTEN CONSENT.
C MMXX
IMPORTANT NOTES
PROJECT
PROPOSED NEW FACTORYAND OFFICES
CLIENT
CEDAR CWMBRAN LTD
TITLE
ELEVATIONS SHEET 1
SCALE @ A1 PR0JECT NUMBER
1:200 8514
PROJ - ORIG - ZONE - LEVEL - TYPE - ROLE - NO. REV
8514-XX-XX-DR-A-123
PLANNING DRAFTSTATUS
S0PURPOSE OF ISSUE
CONSTRUCTIONRISKS
MAINTENANCE/CLEANINGRISKS
DEMOLITION/ADAPTATIONRISKS
In addition to the hazard/risks normally associated with the typesof work detailed on this drawing take note of the above.It is assumed that all works on this drawing will be carried out by acompetent contractor working, where appropriate, to anappropriate method statement.
HARLEY HOUSE 29 CAMBRAY PLACE CHELTENHAM GL50 1JN
[email protected] 01242 399 270
REVDESCRIPTION
DRAWN BY CHECKED BY APPROVED BYDATE DATE DATE
ARCTECH PARTNERSHIP LLP
NORTH ELEVATION
DRAFT ISSUE
FOR DIS
CUSSION
WEST ELEVATION
P1
P1UPDATES FOLLOWING CLIENT MEETING
DV TD JE28.08.20 28.08.20 28.08.20
Lifting beamheight justworks!?
1000
0
FFORDD LLANFRECHFALLANFRECHFA WAY /LANDSCAPED
EMBANKMENT
RAILWAY
SITEADJACENT LAND
GRANGE ROAD
BOUN
DA
RY
BOUN
DA
RY
BOUN
DA
RY
BOUN
DA
RY
BUILDINGYARD PARKING SURFACE WATER STORAGE
SITE
BUILDINGPARKING ACCESS
87
Cycle St Bin St
Cycle St
GFserviceentry
Access.
Landing
Rise
r
Staircase
Width of means of escapeAdd door serving ground floor?
Extent of WCOptions over
Fire resistantconstruction
34
26
7
x 50.550
FFL 50.875
x 50.725 x 50.725
x 50.375
x 50.375x 50.375
x 50.600
x 50.600
x 50.375x 50.250
A
B B
A
THIS DRAWING IS TO BE READ IN CONJUNCTION WITHALL RELEVANT SPECIFICATIONS AND DRAWINGSISSUED BY ARCTECH PARTNERSHIP LLP AND OTHERCONSULTANTS AND SPECIALISTS.
DO NOT SCALE THIS DRAWING, USE ONLY FIGUREDDIMENSIONS.
FOR DISCREPANCIES OR OMISSIONS CONTACTARCTECH PARTNERSHIP LLP PRIOR TO WORKCOMMENCING.
THE CONTRACTOR IS TO CHECK AND VERIFY ALLBUILDING AND SITE DIMENSIONS, LEVELS ANDSERVICES LOCATIONS INCLUDING SEWER INVERTLEVELS AT CONNECTION POINTS BEFORE WORKCOMMENCES.
MATERIALS AND WORKMANSHIP ARE TO COMPLY INALL RESPECTS WITH CURRENT BRITISH STANDARDS,BRITISH STANDARDS CODES OF PRACTICE, AND ASAPPROPRIATE THE BUILDING REGULATIONS, BUILDINGSTANDARDS (SCOTLAND) & (NORTHERN IRELAND)REGULATIONS.
ALL RIGHTS DESCRIBED IN CHAPTER IV OF THECOPYRIGHT, DESIGNS & PATENTS ACT 1988 AREGENERALLY ASSERTED.
THE COPYRIGHT OF THIS DRAWING IS VESTED INARCTECH PARTNERSHIP LLP AND MUST NOT BE COPIEDREPRODUCED OR USED IN ANY MANNER WHATSOEVERWITHOUT WRITTEN CONSENT.
C MMXX
IMPORTANT NOTES
PROJECT
PROPOSED NEW FACTORYAND OFFICES
CLIENT
CEDAR CWMBRAN LTD
TITLE
SECTIONS
SCALE @ A1 PR0JECT NUMBER
1:200 1:500 8514
PROJ - ORIG - ZONE - LEVEL - TYPE - ROLE - NO. REV
8514-XX-XX-DR-A-124
PLANNING DRAFTSTATUS
S0PURPOSE OF ISSUE
CONSTRUCTIONRISKS
MAINTENANCE/CLEANINGRISKS
DEMOLITION/ADAPTATIONRISKS
In addition to the hazard/risks normally associated with the typesof work detailed on this drawing take note of the above.It is assumed that all works on this drawing will be carried out by acompetent contractor working, where appropriate, to anappropriate method statement.
HARLEY HOUSE 29 CAMBRAY PLACE CHELTENHAM GL50 1JN
[email protected] 01242 399 270
REVDESCRIPTION
DRAWN BY CHECKED BY APPROVED BYDATE DATE DATE
ARCTECH PARTNERSHIP LLP
CROSS SECTION
DRAFT ISSUE
FOR DIS
CUSSION
SITE SECTION A-A
SITE SECTION B-B
P1UPDATES FOLLOWING CLIENT MEETING
DV TD JE28.08.20 28.08.20 28.08.20
P1