CONSTRUCTION PROJECTS DELAY. INTRODUCTION. Causes contribute to construction delay . Attitude of Contractor and Company. Agreement between Contractors and consultants  . D esign changes, poor labour productivity and inadequate planning. Effect of construction projects delay. - PowerPoint PPT Presentation

Citation preview

Page 1: CONSTRUCTION PROJECTS DELAY

CONSTRUCTION PROJECTS

DELAY

Page 2: CONSTRUCTION PROJECTS DELAY

INTRODUCTION

Page 3: CONSTRUCTION PROJECTS DELAY

•Attitude of Contractor and Company 

Causes contribute to construction delay

•Agreement between Contractors and consultants  

•Design changes, poor labour productivity and inadequate planning 

Page 4: CONSTRUCTION PROJECTS DELAY

Effect of construction projects delay

•Time and cost overruns

•Misunderstanding will occur between the client and contractor

•A bad impression to clients

Page 5: CONSTRUCTION PROJECTS DELAY

How to Solve??•A Programme or Project Evaluation & Review Technique (PERT)

•Multi-agent System

•Visual 4D planning and scheduling techniques

Page 6: CONSTRUCTION PROJECTS DELAY

ObjectivesObjectives

Page 7: CONSTRUCTION PROJECTS DELAY

•To identify the factors contributing to the delay in constructions

•To identify the main effects on owner as a result of the delay

Page 8: CONSTRUCTION PROJECTS DELAY

Research Questions…… Distribute the questionnaire among civil

engineering students, academic and non-academic staff.

30 samples 20 undergraduates students and 10

academic and non-academic staffs. Analyse the result by using graph and chart.

Page 9: CONSTRUCTION PROJECTS DELAY

Data analysis

Page 10: CONSTRUCTION PROJECTS DELAY

inspection delays lack of equipments stop work orders stoppages poor scheduling0

2

4

6

8

10

12

14

16

18

20

1

4

1

5

19

Management factors that affect the most in construction project delay

inspection delays lack of equipments stop work orders stoppages poor scheduling

Res

pond

ents

Highest Frequency : Poor SchedulingSecond : StoppagesThird :Lack of equipmentLess : Stop work orders and Inspection delays

Page 11: CONSTRUCTION PROJECTS DELAY

0

2

4

6

8

10

12

6 6 6

1

11

Main site factor that affect the most in construction project delayed

materials shortage delays in material deliveries delays due to interference with others crews site access incidences

Res

pond

ents

The highest frequency is incidences.Material shortage, delays in material deliveries and delays due to interference with other crews shared same frequency.Lowest frequency is site access.

Page 12: CONSTRUCTION PROJECTS DELAY

environmental factors

management factors site factors manpower factors economy factors02468

10121416

5

16

12

6

Main factor that causes delay in construction projects

environmental factors management factors site factors manpower factors economy factors

Res

pond

ents

The highest choose by respondents is management factors Followed by economy factors.Third is environmental factorsFourth is manpower factors.Lowest is site factors.

Page 13: CONSTRUCTION PROJECTS DELAY

10%

20%

57%

13%

Effect toward the owner when construction delay

Loss of useIncrease interestFinancial problemAdditional Pro-fessional Fees

Effect toward the owner when construction delay

Highest percentage : Financial problemSecond : Increase interestThird : Additional Professional FeesLowest : Loss of use

Page 14: CONSTRUCTION PROJECTS DELAY

13%

13%

27%

47%

Long effect of construction delay

Bad signal to the foreign investorsDisruption of buildingLoss of productivityLoss of trustworthy

Long Effect of construction delay

Highest percentage :Loss of trustworthy (47%)Second :Loss of productivity(27%) Disruption of building and bad signal to the foreign investors shared same percentage (13%).

Page 15: CONSTRUCTION PROJECTS DELAY

Conclusion

Page 16: CONSTRUCTION PROJECTS DELAY

Our research conducted about construction projects delay which contribute to causes and factors. There are some of the solutions to improve the construction delay . Parties such as engineers , clients and contractors should count heavenly when a construction project to be delayed.

Page 17: CONSTRUCTION PROJECTS DELAY

Thank you