Construction & Post-Construction Stormwater Ordinance
City of Wenatchee, Public Works Department
Jessica Shaw, Environmental Manager
Eastern WA Phase II Municipal Stormwater Permit
Issued by Department of Ecology to cities and counties with specific urban densities in 2007.
Passes along federal stormwater regulations and additional state requirements.
Sets forth a timeline for cities/counties to adopt stormwater regulations and implement a stormwater program
Stormwater Program Elements
1. Public Education & Outreach2. Public Involvement & Participation3. Illicit Discharge Detection & Elimination4. Construction Site Stormwater Runoff
Control5. Post-Construction Stormwater
Management for New Development & Redevelopment
6. Pollution Prevention & Good Housekeeping for Municipal Operations
Construction & Post-Construction Regulatory Requirements
Adopt an ordinance addressing construction site runoff and post-construction management of stormwater facilities no later than February 16, 2010.
The ordinance must become effective no later than February 16, 2011.
The Eastern WA Phase II Municipal Stormwater Permit also specifies minimum requirements for the ordinance.
Minimum Ordinance RequirementsConstruction & Post-Construction
The ordinance shall at a minimum apply to construction sites disturbing greater than or equal to one acre, and to construction projects less than one acre that are part of a common plan of development or sale.◦ Example: ¼ acre lot, that is part of a 2 acre
subdivision. All lots within the initial development are regulated.
Minimum Ordinance RequirementsConstruction & Post-Construction
Provide enforcement procedures & actions
Insure access to inspect construction and post-construction stormwater BMPs located on private properties that discharge to the stormwater system
Adopt the Stormwater Management Manual for Eastern Washington (or other DOE approved manual)
Minimum Ordinance RequirementsConstruction
Construction site operators must: Prepare a Construction Stormwater
Pollution Prevention PlanImplement appropriate erosion &
sediment control Best Management Practices (BMPs)
Control waste (concrete washout, litter, chemicals, discarded building supplies)
Minimum Ordinance RequirementsPost Construction
Project proponents and property owners must:
Insure the BMP selection, design, installation, operation, and maintenance meet minimum technical requirements.
Implement appropriate runoff treatment, flow control & source control BMPs
Provide adequate ongoing long-term operation & maintenance of BMPs