11
Construction Piping Engineer PROFILE I am a Mechanical Engineer (Site Construction Engineer) by profession having a consolidated more than 15+ years of experience in the relevant field in supervisory level. With a wealth of practical experience in all aspects of mechanical construction including piping, welding, offshore hookups, structural steelwork, fabrication, pump packages, blowers, heat exchangers, Tank construction, Vessels, filters and associated piping systems etc - in industries such as Oil & Gas, Petroleum, Petro-chemicals, Refineries & Power plants etc. SUMMARY OF SKILLS • 15+ years experience in Supervisory level with emphasis on Mechanical • Hands on exposure to Petroleum & Petrochemical Construction Projects • In-depth knowledge & Experience in Refinery, Power Plant & Petrochemical Projects • Strength of technical know –how in Piping & Structural Erection • Considerable years of experience in Oil & Gas Pipeline projects • Ample exposure to Heavy Equipments, Storage tanks and related activities • All round exposure to Blasting & Painting • Strong Knowledge in international codes & standards • Able to monitor and lead a group & assignments entrusted • Skills in handling office communication activities independently EDUCATIONAL QUALIFICATIONS • Diploma in Mechanical Engineering (Technical)

Construction Piping Engsdsineer

Embed Size (px)

DESCRIPTION

dfgd

Citation preview

Construction Piping EngineerPROFILEI am a Mechanical Engineer (Site Construction Engineer) by profession having a consolidated more than 15+ years of experience in the relevant field in supervisory level. With a wealth of practical experience in all aspects of mechanical construction including piping, welding, offshore hookups, structural steelwork, fabrication, pump packages, blowers, heat exchangers, Tank construction, Vessels, filters and associated piping systems etc - in industries such as Oil & Gas, Petroleum, Petro-chemicals, Refineries & Power plants etc.SUMMARY OF SKILLS 15+ years experience in Supervisory level with emphasis on Mechanical Hands on exposure to Petroleum & Petrochemical Construction Projects In-depth knowledge & Experience in Refinery, Power Plant & Petrochemical Projects Strength of technical know how in Piping & Structural Erection Considerable years of experience in Oil & Gas Pipeline projects Ample exposure to Heavy Equipments, Storage tanks and related activities All round exposure to Blasting & Painting Strong Knowledge in international codes & standards Able to monitor and lead a group & assignments entrusted Skills in handling office communication activities independentlyEDUCATIONAL QUALIFICATIONS Diploma in Mechanical Engineering (Technical) Pre Degree (Academic)TRAINING & SKILL UPDATING PROGRAM ATTENDED ASNT LEVEL II Certificate in RT, PT, UT, MT BASIC OFFSHORE SAFETY INDUCTION & EMERGENCY TRAINING (BOSIET)(OPITO APPROVED) FROM YKK Kazakhstan (Valid Till 2015) HELICOPTER UNDER WATER ESCAPE,TEMPSC,BASIC FIRE AWARENESS &SEA SURVIVAL TRAINING FROM YKK Kazakhstan (Valid Till 2015) PTW Training, ADCO, Abu Dhabi (Job Performer) PTW Training, KARACHAGANAK PETROLEUM OPERATING B V. Kazakhstan PTW Training, ADMA, Abu Dhabi PTW Training, KNPC, Kuwait PTW Training, ADNOC TAKREER, Abu DhabiCAREER HISTORYAGIP KCO THROUGH KAZAKHSTAN CASPIAN OFFSHORE INDUSTRIES (27 MARCH 2012-TILL DATE)Currently working as Mechanical Completion Engineer On the KFDP project in Kashagan Offshore,D Island, ATYRAU, KAZAKHSTAN for AGIP KCO (23 MARCH 2012 TILL DATE)ADCO THROUGH M/S PETROFAC INTL LTD (PIL) (23 MARCH 2011 23 MARCH 2012)Employed as a Construction Piping Engineer on the ASAB FFD project in ABU DHABI, UAE for The ABU DHABI COMPANY FOR ONSHORE OIL OPERATIONS (ADCO). My main area of responsibility is to manage the overall safe installation of Mechanical Equipments and Associated Piping Systems at site.M/S SIDEM Post Held : PIPING SUPERVISOR Client : RAS GIRTAS POWER COMPANY (RGPC) Project : "C" IWPP Period : 30 APRIL 2009 31 MAY 2010 Place of project : RAS LAFFAN, QATARDUTIES AND RESPONSIBILITIES Scheduling of work prioritizing in sequential order Planning & Allocating of Manpower, Materials & Equipments Planning of Work and scheduling Liaison with Quality Control Personnel for inspection and ensuring error - free Supervision of Piping Pre Fabrication, Erection, Hydro Testing & Commissioning Supervision of Pipe Stringing, Welding, Lowering, Hot Tapping etc Supervision of Boiler Structure and Piping Erection Coordination of Tank construction works Work Permit Management for Safe working Inspection of the work to adhere to strict Quality Maintenance Overseeing of Safety Management System at the work place Handling of Complete Documentation work & Record Keeping Assists the Const: Manager in the supervising and monitoring of work execution at site. Responsible of Contractors supply material as per Construction documents. Review/approve the project schedule and mobilization plan Review Method Statements, rigging plan, facilitate TRAs, Liaise with operations, safety, QA/QC for smooth functioning of SD jobs Foresee constructability difficulties and prepare a solution. Participate in daily review meeting and report progress/areas of concern. Verifies the adequacy of equipment to perform work safely. Supervise and coordinate the activities of construction contractors. Ensure that contractors comply with all aspects of the worksite HSE plan and policy; site regulations, permit to work and client requirements. Ensure by leadership and guidance, that contracted works meets all practical, commercial, requirements of productivity, quality and contract target completions. Maintain daily supervisory surveillance checks and records ensuring that contractors management and supervision are providing safe working conditions and permitting procedures, all required competent personnel protective equipment, adequate supervision and manpower, with reliable, well maintained equipment to execute the contracted works as per contract schedule and targets. Ensure by leadership and guidance, that contracted works meets all practical, commercial, requirements of productivity, quality and contract target completions. Verifies competence of construction contractors personnel. Assures completion of the pre-commissioning works and participates with the commissioning and start up activities Routinely study, check and review all contractors scope as detailed in drawings, specifications and instructions, ensuring contractors proper interpretation and compliance with the lasted AFC drawings and specifications. Ensure proper change control by issuing field instructions for all changes, reviewing technical queries to ensure responses are appropriate and practical, and reviewing advanced revision notices prior to issue to contractors to ensure correct use of construction resources. Ensure contractors dimensional control methods for checking that the works are properly set out. Supervise specialist surveying contractors where necessary. Ensure supervisors carryout the witness, inspection and surveillance checks in accordance with the quality plan and the requirements of the quality control manager.M/S IGS-SICIM Post Held : PIPING SUPERVISOR Consultant : KARACHAGANAK PETROLEUM OPERATING, B.V, (KPO) Client : PETROFAC (PFEC) Project : 4TH STABILIZATION AND SWEETENING TRAIN PROJECT Period : 08 JUNE 2008 30 DEC 2008 Place of project : AKSAI, KAZAKHSTANDUTIES AND RESPONSIBILITIES Piping Supervisor Responsible for the supervision of fabrication and installation of carbon steel and stainless steel pipes . The work included installation of mechanical equipments fabrication and installation of connecting Carbon Steel and Stainless Steel pipework, installation of chemical dosing equipment and pipework, installation of pump stations, pressure testing. Receiving the approved drawing for fabrication. Preparing the fabrication schedule according to priority. Preparing the spool pack for traceability. Allocating the task according to the ability of foremans. Preparing the material request according to the requirement of spool. Inspect the pipes and piping materials as per specification. Visual inspection and receiving the materials from store. Guiding the sub ordinate and workers regarding proper use of tools and tackles. Resolving field problems and liaison client under the supervision of Mech. Engg. and process Depts. Adherence to construction safety and special safety requirement for working at plant. Allocation of jobs among various working groups. During the fabrication activities visual inspection of pipes and all fittings, edge preparation, fit up of the pipe, welding quality of the pipe and D.P.T. Co-ordination with concerned person. during fabrication & erection. Planning & supervision of piping fabrication. Checking the daily progress report . Reporting the Senior Engineer and construction manager regarding whole day production Monitoring the front availability.M/S SENIMDI KURYLYS (SK) Post Held : PIPING SUPERVISOR Client : TENGIZ CHEVER OIL (TCO) Project : SOUR GAS INJECTION (SGI)\SECOND GENERATION (SGP) Period : 06 DEC 2006 06 DEC 2007 Place of project : TENGIZ, KAZAKHSTANDUTIES AND RESPONSIBILITIES Carry out progressive Punch listing within the authorized areas of responsibility to ensure that the works are completed to the fullest extent possible prior to Acceptance of the work. Sign-off punch lists after the completion of the work. Make sure that construction plant equipment certification is current and inspection and maintenance is carried out in the prescribed manner. Make sure that all necessary safe working and tag/lock out procedures implemented during pre-commissioning. Ensure that method statements, risk assessments and job safety analysis has been undertaken and agreed prior to commencement of any new work activity if the activity has any potential to material or personnel. Ensure that all work is carried out in accordance with agreed method statements, risk assessments and job safety analysis, ensure that the contractor maintains standards with in work areas. Attend contractors HSE Toolbox talks and safety meetings. Carryout witness, inspection and surveillance checks in accordance with Site Quality Plans and procedures. Ensure that all safety practices and procedures for safe working are fully implemented. Planning of Work and scheduling. Work permit management for safe working. Records keeping & File work for administrative purpose.M/S KHARAFI NATIONAL Post Held : PIPING SUPERVISOR Client : KUWAIT NATIONAL PETROLEUM COMPANY (KNPC) Project : GRTA 2006 SHUT DOWN Period : 30 MARCH 2006 06 MAY 2006 Place of project : SHUAIBA, KUWAITDUTIES AND RESPONSIBILITIES Inspection of the work to adhere to strict Quality Maintenance. Controlling & Monitoring of resources, Manpower, Materials, Equipments etc. Planning of Work and scheduling Work permit management for safe working Ensuring proper Safety systems at the work place Records keeping & File work for administrative purposeM/S AL- JABER LTA ENGG. AND CONT. (ALEC) Position Held : PIPING SUPERVISOR Client : ADNOC TAKREER Project : ULG/LSGO Period : 05 MAY 2000 25 APRIL 2005 Place of work : RUWAIS, ABU DHABIDUTIES AND RESPONSIBILITIES Piping Supervisor Responsible for the supervision of fabrication and installation of carbon steel and stainless steel pipes . The work included installation of mechanical equipments fabrication and installation of connecting Carbon Steel and Stainless Steel pipe work, installation of chemical dosing equipment and pipe work, installation of pump stations, pressure testing. Receiving the approved drawing for fabrication. Preparing the fabrication schedule according to priority. Preparing the spool pack for traceability. Allocating the task according to the ability of foremans. Preparing the material request according to the requirement of spool. Inspect the pipes and piping materials as per specification. Visual inspection and receiving the materials from store. Guiding the sub ordinate and workers regarding proper use of tools and tackles. Resolving field problems and liaison client under the supervision of Mech. Engg. And process Depts. Adherence to construction safety and special safety requirement for working at plant. Allocation of jobs among various working groups. During the fabrication activities visual inspection of pipes and all fittings, edge preparation, fit up of the pipe, welding quality of the pipe and D.P.T. Co-ordination with concerned person. during fabrication & erection. Planning & supervision of piping fabrication. Checking the daily progress report . Reporting to the construction manager regarding whole day production monitoring the front availability.M/S HOUSTEN Position Held : PIPING SUPERVISOR Client : BECHTEL INTERNATIONAL INC; Project : TAWEELA B EXTENSION Period : 01 NOVEMBER 1997 15 MARCH 2000 Place of work : ABU DHABI, UAEDUTIES AND RESPONSIBILITIES Monitoring of Erection of Piping and related Structural works. Co-ordination with Materials Department for issue and delivery. Checking for quality control. Liaison work with sub contractors and supporting staffM/S COSTAIN Position Held : PIPING SUPERVISOR Client : ABUDHABI MARINE OPERATING COMPANY (ADMA) Project : CTU SHUT DOWN Duration : TWO MONTHS Place of work : DAS ISLAND, ABUDHABIDUTIES AND RESPONSIBILITIES Inspection of the work to adhere to strict Quality Maintenance. Controlling & Monitoring of resources, Manpower, Materials, Equipments etc. Planning of Work and scheduling Work permit management for safe working Ensuring proper Safety systems at the work place Records keeping & File work for administrative purposeM/S KS OILS LTD Position Held : PIPING FOREMAN Client : OILEX ENGINEERS Project : K S OIL REFINARY PROJECT Period : 19 MARCH 1992 22 APRIL 1995 Place of work : CHEMBUR, MAHARASTRADUTIES AND RESPONSIBILITIES Monitoring of Erection of Piping and related Structural work Co-ordination with Materials Department for issue and delivery. Checking for quality control. Liaison work with sub contractors and supporting staff Supervision of Piping Fabrication Work SchedulingVALID DRIVING LICENSE IN QATAR 2010 - 2015COUNTRY VISITED ON ASSIGNMENT KAZAKHSTAN, UAE, QATAR, KUWAITCOMPUTER SKILLS Knowledge in Auto Cad, MS OfficeLANGUAGES KNOWN English, Russian, Hindi, Tamil & MalayalamPERSONAL DATA Name : VINCENT JOBAI MARITAL STATUS : Married Date Of Birth : 30 MAY 1976 Passport Number : E 9423262 Date Of Expiry : 12th FEB 2014 Nationality : IndianDeclarationI hereby declare that all the information furnished by me is true to best of my knowledge and belief.Yours FaithfullyVincent Jobai

http://www.postjobfree.com/resume/acn9ny/nursing-surgical-sri-pic-tn-629171-india