Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
CONSTRUCTION PERMITTING REFORMS
IN EASE OF DOING BUSINESS IN RWANDA
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
BACKGROUND OF REFORMS
Source: Doing business report 2019
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
Source: Doing business report 2019
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
DB RANKING 2019
Source: Doing business report 2019
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
COMPARISON WITH DB RANKING 2018
Source: Doing business report 2018
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
CASE STUDY ASSUMPTIONS(SIMPLE WAREHOUSE)
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
Will be used for general storage activities, such as storage of books or
stationery. The warehouse will not be used for any goods requiring special
conditions, such as food, chemicals, or pharmaceuticals.
Will have maximum two stories (G+1), both above ground, with a total
constructed area of approximately 1,300.6 square meters
Will be located on a land plot of approximately 929 square meters
Will not be located in a special economic or industrial zone.
Will have road access and be located in the periurban area of the economy’s
largest business city (that is, on the fringes of the city but still within its official
limits).
Will take 30 weeks to construct (excluding all delays due to administrative
and regulatory requirements).
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
REFORMS FOR DB 2020
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
1. A new Ministerial Order Determining the Categorization of Buildings,
Conditions and Procedures for application of Building Permits was adopted;
2. A new Ministerial Order determining Urban Planning and Building
Regulations was adopted;
4. revised Rwanda Building Code;
5. Ministerial Order on Environmental Impact Assessment also adopted
5. Revision of Annex 3 on Faults and Sanctions related to Rural and Urban
Planning ;
6. Green Building Minimum Compliance Requirements were adopted.
AMENDMENT OF THE CODE AND MINISTERIAL ORDERS
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
NEW COMPONENTS02
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
Ministerial Order on Building Categorization and Permitting,
Art 3 & RBC, Section 1.3.3.9.
Buildings are categorized in the
following categories:
1º category 1;
2º category 2;
3º category 3;
4º category 4;
5º category 5;
6º category 6.
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
Category 1 characteristics:
1° not requiring a building permit;
2° having a total floor area not exceeding one thousand (1000 sqm);
3° being non-storeyed and basement free structure;
4° accommodating not more than five hundred (500) people;
5° having a validity not exceeding two (2) years;
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
category 2 are characterized by the following:
1° having total floor area not exceeding two hundred (200 sqm);
2° non storeyed and basement-free;
3° capacity to host fifteen (15) people maximum.
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
1. Total floor area not exceeding 1500 m2 and plot size not exceeding 1000m2;
not higher than two storied building (G+1);
2. Capacity to host 50 people or less;
3. The total height of the building not exceeding 7m.
Category 3 are characterized by the following
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
1º buildings with three (3) storeys and above with or without basements,
2º having capacity to host people not exceeding five hundred (500).
Category 4 are characterized by the following
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
1º Sports facilities, social, cultural, assembly and religious buildings, health facilities,
educational buildings >500 people;
2º Industrial buildings and hazardous buildings;
3º Memorial sites;
4º All other structures not specified in any other category
Category 5 are characterized by the following
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
Category 6 are characterized by the following
1. Specific buildings for national security excluding social, residential and commercial
buildings;
2. temporary shelter for returnees, refugees and internally displaced people.
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
Article 14: Specific requirements for a new construction building permit application file
04
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
An application for a building permit for anew construction contains the
following:
1. Project brief including a description of methods and techniques applied, except for
buildings of category 2;
2. Site plan and landscaping;
3. Copy of geotechnical report, except for buildings of category 2 and 3;
4. Copy of environmental impact assessment documents, except for buildings of
category 2 and 3;
5. No topographic survey needed except in district with no online masterplans
6. Architectural drawings;
7. Plans for mechanical, electrical, sanitation, internet broadband connectivity plans and
fire safety except for buildings of category 2;
8. Structural design comprising plans and calculations, except for buildings of category 2
and 3;
9. Bill of quantities and cost estimate, except for buildings of category 2;
10. Certification of works signed by certified architect or engineer, except for buildings of
category 2;
11. Copy of green building minimum compliance report, except for buildings of category
2 and 3.
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
Article 12: Required conditions for building permit application
• Application file for building permit for buildings of category 2 does not require
certification by an architect or a civil engineer.
• Application file for building permit for buildings of category 3 must be certified by
an architect or a civil engineer.
• Application file for building permit for buildings of category 4 and 5 must be
certified by both architect and civil engineer.
• Works for constructions in category 6 must be undertaken under supervision of an
architect or engineer.
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
INSPECTIONS
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
• Amended Buiding Code removed notifying the One Stop Center of the
commencement of construction
• Removal of the site mobilization inspection and setting out
The stages of inspection shall go along with construction processes as follows:
(i) Stage 1: Before construction works:
This stage of inspection is conducted before a building permit issuance and it
covers the site mobilization
(ii) Stage 2: During construction works:
This stage includes the inspection foundation, building structure, masonry works,
finishing, landscaping
(iii)Stage 3: After construction works: This stage includes the joint site inspection for
occupancy permit and Freehold title
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
PROFESSIONAL LIABILITY AND INDEMNITY
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
1.3.2.7: Professional Liability
The Engineers, Architects or any other professional who undertakes design or supervision works
associated with building or non-building structure shall be liable for such design works for a
period of 10 years from the date of final acceptance of the structure. The contractor is equally
liable for the same period of 10 years for works executed, from the date of their final
acceptance.
1.3.2.8: Professional indemnity:
Different professionals involved in implementation of the provisions of the Code shall be
required to hold a professional indemnity insurance from their respective professional bodies or
any insurance company.
1.3.2.9: Latent defect liability:
Any parties involved in the construction process are legally required to obtain latent defect
liability –or decennial (10years) liability insurance policy to cover possible structural flaws or
problems in building once it is in use.
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
TAKE HOME REFORMS
Detailed District Physical Plans for Kicukiro & Gasabo, Kigali, RwandaDetailed District Physical Plans for Kicukiro & Gasabo, Kigali, Rwanda
Reform 1: Removal of the requirement to request and obtain a geotechnical study
Reform 2: Removal of the requirement to obtain an Environmental Impact Assessment.
Reform 3: Removal of the requirement to request and obtain a topographic survey
Reform 4: Introduction of mandatory decennial insurance.
Reform 5: Removal of the requirement to fill Form 5 notifying the One Stop Center of the
commencement of construction
Reform 6: Removal of the site mobilization inspection
Reform 7: Reduction in the time to obtain a water connection from 30days to 10 days