Construction of the Breakwater Road Cycleway Napier “The Devil is in the Detail” Presented by Tony Fong, Project Engineer Resolve Group Ltd

Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction of the Breakwater Road Cycleway Napier

“The Devil is in the Detail”

Presented by Tony Fong, Project Engineer

Resolve Group Ltd

Page 2: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Presentation Outline

• Background• Location of site• Design phase• Tendering• Construction phase

Page 3: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Background

Project initiated by Rotary Pathways Trust

Trust has 10 year plan to build cycle network in Hawkes Bay region started 2003

Currently at Stage 4 of 7 stages

Project funding 47% from Land Transport New Zealand subsidyBalance from Napier City Council

Page 4: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Napier Airport

Location of Site

Area of Works

Page 5: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Location of Site cont’d

Marine Parade

War Memorial Centre

Hardinge Rd

Page 6: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Design Phase

Design generally in accordance with Transit’s Supplement to Austroads GTEP Part 14

Cycleway 1.6km long, typically 3.5m wide

Concrete cantilever specifically design by Maunsell as design subconsultant

Consulted with Transit, Napier City, Port of Napier and Ontrack

Page 7: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Design Phase cont’d

Combined pedestrian & cycleway

Included signage

Page 8: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Tendering

Physical works let as a Transit contract

Four (4) week tender period

15 set of tender documents issued to potential tenderers

Potential tenderers located from Wellington to New Plymouth, Tauranga & Hawke Bay

Received four (4) tenders

Page 9: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Tender cont’d

Tenders evaluated using LTNZ’s Lowest Price Confirming method.

Winning tenderer was Tuck Contractors Ltd from Hastings.

Project budget was $600,000 Excl GST.

Contract period was originally 8 weeks.

Page 10: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction Phase

Page 11: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Location of cantilever & gabion wall overlooking Breakwater

BeachMarine Parade

Port of Napier

Breakwater Rd

Construction Phase cont’d

Page 12: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction Phase cont’d

Footpath over gabion wall before cantilever construction,overlooking Breakwater Beach

Existing gabion wall

Page 13: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction Phase cont’d

Cantilever construction propped falsework

Existing gabion wall

Page 14: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction Phase cont’d

Cantilever construction to extend cycleway above existing gabion wall

Page 15: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction Phase cont’d

Completed cantilever

Page 16: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction Phase cont’d

Marine Parade

Breakwater Rd

Location of western rail

level crossing

Port of Napier

Page 17: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction Phase cont’d

Rail level crossing at western end before works commenced

Page 18: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction Phase cont’d

Rail level crossing at western end during construction

Page 19: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction Phase cont’d

Completed rail level crossing with maze fencingat western end

Page 20: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction Phase cont’d

Marine Parade

Breakwater Rd

Location of Gate 3 port of Napier heavy

truck crossing

Port of Napier

Page 21: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction Phase cont’d

Gate 3 heavy truck entry into Port of Napierbefore works started

Page 22: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction Phase cont’d

Gate 3 heavy truck entry into Port of Napierpedestrian & cyclist crossing

Page 23: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction Phase cont’d

Completed pedestrian & cyclist crossing Gate 3 heavy truck entry at Port of Napier

Page 24: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction Phase cont’d

Marine Parade

Breakwater Rd

Concrete cycleway

construction

Port of Napier

Page 25: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction Phase cont’d

Typical steel reinforcing dowels between successive sections to minimise differential settlement

Page 26: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction Phase cont’d

Breakwater Rd

Marine Parade

Port of Napier

Location of kerb & channel level

adjustments to match adjacent pavement

Page 27: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction Phase cont’d

Checking to match kerb & channel levels to existing pavement

Page 28: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction Phase cont’dConstruction Phase cont’d

Marine Parade

Breakwater Rd

Location of rail level crossing

opposite Coolstore

Port of Napier

Page 29: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction Phase cont’d

Rail level opposite Coolstore

Page 30: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction Phase cont’d

Completed rail level opposite Coolstore

Page 31: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction Phase cont’dConstruction Phase cont’d

Marine Parade

Breakwater Rd

Approx location of guardrail

Port of Napier

Page 32: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction Phase cont’d

Guardrail installation at chainage 600m

Page 33: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Completed guardrail end terminal

Construction Phase cont’d

Page 34: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction Phase cont’d

Marine Parade

Breakwater Rd

Location of Port of Napier

Gate 1

Port of Napier

Page 35: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction Phase cont’d

Cycleway at eastern end by Port’s Gate 1 entry

Page 36: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Construction Phase cont’d

Completed cycleway at eastern end by Port’s Gate 1 entry

Page 37: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Completed cycleway at eastern end by Port’s Gate 1 entry

Construction Phase cont’d

Page 38: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Summary

• Project is Pathways Trust initiative

• Stage 4 of 7 stages

• Project funding from LTNZ and NCC

• Constructed by Tuck Contractors Ltd

• Project budget $600,000.00

Page 39: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Summary cont’d

• Key design features» Two rail level crossings» Two heavy truck crossings into Port» Concrete cantilever over Breakwater Beach

Page 40: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative

Acknowledgements

• Mike Wong, Transit New Zealand

• Peter Scott, Napier City Council