CONSTRUCTION OF M.MULAHISLAND WASTE MANAGEMENT CENTRE
PREPARED BY:
MALDIVES CLEAN ENVIRONMENT PROJECTMINISTRY OF ENVIRONMENT AND ENERGY
2018
30200
2800
040
00
LEACHATE WELL
COMPOST PAD CONCRETE SCREED
DRY COMPOSTSTORAGE /
SCREENING AREA
USEFUL COMPOSTSTORAGE AREA
METALWASTE
GLASSWASTE
PLASTICSWASTE
PAPER,CARDBOARDAND OTHERWASTE
STOREROOM SORTING AREAREUSABLES
1500
3150 3150 4150 41503150 4850 4150
HAZARDOUSWASTE
3150
G1
849
GROUNDWATERWELL
D2
3400
GREENAREA
OFFICE
STAFFQUARTERS
G1
GREENAREA
5500
EQUIPMENTROOM
RSDRSD
4500
750
3000
4250
1975
1975
3000
D3
D1
R227
545
00
16003300
3483 3484
33343333
355017503525
4000
1350
1350
1150
2775
19350
W1
W2
W2
3558
3333
SD1 SD1
2656
1085
0
2650
2650
2650
2650
2650
1355
043
00
1000
0
4925
4925
1015
0
458
23750 4000
2573
25900 4300
257325732573257325732573257325732573
2656
2656
2656
RSD
750
SEPTIC TANK
PROJECT
CONSTRUCTION OF WASTE MANAGEMENT CENTRE
DWG NO. MULA-R4 A1-01
APPROVED BY
FLOOR PLAN
TITLE
CLIENT DEPARTMENT
DESIGN BY
STRUCTURE BY
DRAWN BY
SCALE 1:150
AFRAZ
DATE 05.06.2018
AMENDMENTS
PAPER SIZE A3
MCEPMINISTRY OF ENVIROMENT AND ENERGYGREEN BUILDING, HANDHUVAREE HIGUN,MAAFANNU, MALE' (20392), REPUBLIC OF MALDIVES,TEL: +960-3018431, +960-3018300, FAX: +960-328301
M. MULAH
3500mm HEIGHT WALL [150mm HOLLOW BOCK]
4000mm HEIGHT WALL [150mm HOLLOW BOCK]
PERIMETER FENCE [150mm HOLLOW BOCK]
WMPC DEPARTMENT
PAGE NO. 01
AFRAZ
AFRAZ
NOTE:750mm HEIGHT WALL [150mm HOLLOW BOCK]
1500mm HEIGHT WALL [150mm HOLLOW BOCK]
SEPTIC TANK ADDED
30200
2800
040
00
3150 3150 4150 41503150 4850 4150 3150
849
3000
4250
1975
1975
3000
3483 3484
33343333
193503558
3333
2656
1085
0
2650
2650
2650
2650
2650
1355
043
00
1000
0
4925
4925
1015
0
458
23750 4000
2573
25900 4300
257325732573257325732573257325732573
2656
2656
2656
340016003300
355017503525
4000
2775
750
PROJECT
CONSTRUCTION OF WASTE MANAGEMENT CENTRE
DWG NO. MULA-R3 A1-02
APPROVED BY
FOUNDATION BEAM PLAN
TITLE
CLIENT DEPARTMENT
DESIGN BY
STRUCTURE BY
DRAWN BY
SCALE 1:150
AFRAZ
DATE 18.04.2018
AMENDMENTS
PAPER SIZE A3
MCEPMINISTRY OF ENVIROMENT AND ENERGYGREEN BUILDING, HANDHUVAREE HIGUN,MAAFANNU, MALE' (20392), REPUBLIC OF MALDIVES,TEL: +960-3018431, +960-3018300, FAX: +960-328301
M. MULAH
NOTE:
FOUNDATION BEAMS [300mm width]
WMPC DEPARTMENT
PAGE NO. 02
AFRAZ
AFRAZ
COLUMN, C1 [150X150mm]
LAMP POST FOOTING [450X450mm]
COLLECTION BAY FOOTING [300X300mm]
23750
EXPANSIONJOINTS
B1B3
1° SLOPE
B1 B2
B1
B2 B2 B2 B1
B1 B1 B1 B1
1° SLOPE
1° SLOPE
1° SLOPE
1° SLOPE
1° SLOPE
1° SLOPE
1° SLOPE
B2 B2 B2 B2
B1 B1 B1 B1
1° SLOPE
1° SLOPE
1° SLOPE
1° SLOPE
1° SLOPE
1° SLOPE
B3 B3 B3 B3
B1 B1
1000
0
43904390439043904390
4550
4550
PROJECT
CONSTRUCTION OF WASTE MANAGEMENT CENTRE
DWG NO. MULA-R3 A1-03
APPROVED BY
COMPOST PAD FOUNDATION BEAM PLAN
TITLE
CLIENT DEPARTMENT
DESIGN BY
STRUCTURE BY
DRAWN BY
SCALE 1:150
AFRAZ
DATE 18.04.2018
AMENDMENTS
PAPER SIZE A3
MCEPMINISTRY OF ENVIROMENT AND ENERGYGREEN BUILDING, HANDHUVAREE HIGUN,MAAFANNU, MALE' (20392), REPUBLIC OF MALDIVES,TEL: +960-3018431, +960-3018300, FAX: +960-328301
M. MULAH
WMPC DEPARTMENT
PAGE NO. 03
AFRAZ
AFRAZ
14150
30200
4300
2° SLOPE
2° SLOPE 2° SLOPE 2° SLOPE 2° SLOPE 2° SLOPE 2° SLOPE 2° SLOPE2° SLOPE
16900
4000
2850
1150
2750
2° SLOPE
1015
0
4300
PROJECT
CONSTRUCTION OF WASTE MANAGEMENT CENTRE
DWG NO. MULA-R3 A1-04
APPROVED BY
FLOOR SCREED PLAN
TITLE
CLIENT DEPARTMENT
DESIGN BY
STRUCTURE BY
DRAWN BY
SCALE 1:150
AFRAZ
DATE 18.04.2018
AMENDMENTS
PAPER SIZE A3
MCEPMINISTRY OF ENVIROMENT AND ENERGYGREEN BUILDING, HANDHUVAREE HIGUN,MAAFANNU, MALE' (20392), REPUBLIC OF MALDIVES,TEL: +960-3018431, +960-3018300, FAX: +960-328301
M. MULAH
WMPC DEPARTMENT
PAGE NO. 04
AFRAZ
AFRAZ
30200
9600 116009000
4750
19350
8° SLOPE
8° SLOPE
1015
0
5050
8° SLOPE
4750
APPROVED BY AMENDMENTSPROJECT
CONSTRUCTION OF WASTE MANAGEMENT CENTRE
DWG NO. MULA-R3 A1-05
ROOF PLAN
TITLE
CLIENT DEPARTMENT
DESIGN BY
STRUCTURE BY
DRAWN BY
SCALE 1:150
AFRAZ
DATE 18.04.2018
PAPER SIZE A3
MCEPMINISTRY OF ENVIROMENT AND ENERGYGREEN BUILDING, HANDHUVAREE HIGUN,MAAFANNU, MALE' (20392), REPUBLIC OF MALDIVES,TEL: +960-3018431, +960-3018300, FAX: +960-328301
M. MULAH
WMPC DEPARTMENT
PAGE NO. 05
AFRAZ
AFRAZ
30200
9600 116009000
4750
19350
1015
0
5050
50X100mm RAFTERS@ 900C/C
50X35mm BATTENS@ 600C/C
50X100mm RAFTERS@ 900C/C
50X35mm BATTENS@ 600C/C
75X150mm TIMBERBEAM
75X150mm TIMBERBEAM
50X100mm RAFTERS@ 900C/C
50X35mm BATTENS@ 600C/C75X150mm TIMBERBEAM47
50
APPROVED BY AMENDMENTSPROJECT
CONSTRUCTION OF WASTE MANAGEMENT CENTRE
DWG NO. MULA-R3 A1-06
ROOF FRAMING
TITLE
CLIENT DEPARTMENT
DESIGN BY
STRUCTURE BY
DRAWN BY
SCALE 1:150
AFRAZ
DATE 18.04.2018
PAPER SIZE A3
MCEPMINISTRY OF ENVIROMENT AND ENERGYGREEN BUILDING, HANDHUVAREE HIGUN,MAAFANNU, MALE' (20392), REPUBLIC OF MALDIVES,TEL: +960-3018431, +960-3018300, FAX: +960-328301
M. MULAH
WMPC DEPARTMENT
PAGE NO. 06
AFRAZ
AFRAZ
4000
4300
1000
0
4925
4925
1015
0
355017503525
4000
193503483 3484 3558
30200
3150 3150 4150 41503150 4850 4150 3150
4000
4300
2800
0
1355
0
25900
RB
RB
RB
RB
RB
RB
RB
RB
RB
RB
RBRBRBRBRB
RB
RB
TRI TRI TRI TRI TRI TRIRB
RB
RB
RBRB
RB
RB
RB
RBRB
RBRBRBRBRBRB
RB
RB
RB
RB
RB
RB
PROJECT
CONSTRUCTION OF WASTE MANAGEMENT CENTRE
DWG NO. MULA-R3 A1-07
APPROVED BY
ROOF BEAM PLAN
TITLE
CLIENT DEPARTMENT
DESIGN BY
STRUCTURE BY
DRAWN BY
SCALE 1:150
AFRAZ
DATE 18.04.2018
AMENDMENTS
PAPER SIZE A3
MCEPMINISTRY OF ENVIROMENT AND ENERGYGREEN BUILDING, HANDHUVAREE HIGUN,MAAFANNU, MALE' (20392), REPUBLIC OF MALDIVES,TEL: +960-3018431, +960-3018300, FAX: +960-328301
M. MULAH
WMPC DEPARTMENT
PAGE NO. 07
AFRAZ
AFRAZ
PVC TAPDISTRIBUTION PIPE
GROUNDWATERWELL
PUMP
PVC TAP
PVC TAP PVC TAP
DISTRIBUTION PIPE
DIST
RIBU
TION
PIP
E
DIST
RIBU
TION
PIP
E
DIST
RIBU
TION
PIP
E
AMENDMENTSPROJECT
CONSTRUCTION OF WASTE MANAGEMENT CENTRE
DWG NO. MULA-R3 A1-08
APPROVED BY
ROOF BEAM PLAN
TITLE
CLIENT DEPARTMENT
DESIGN BY
STRUCTURE BY
DRAWN BY
SCALE 1:150
AFRAZ
DATE 18.04.2018
AMENDMENTS
PAPER SIZE A3
MCEPMINISTRY OF ENVIROMENT AND ENERGYGREEN BUILDING, HANDHUVAREE HIGUN,MAAFANNU, MALE' (20392), REPUBLIC OF MALDIVES,TEL: +960-3018431, +960-3018300, FAX: +960-328301
M. MULAH
WMPC DEPARTMENT
PAGE NO. 08
AFRAZ
AFRAZ
1 2
4750
3500
1500
75mm THK. SCREED
GROUND LEVEL
75mm Ø GI COLUMN
FOUNDATION DEPTHLEVEL
600
12
4750
3500
GROUND LEVEL
25mm Ø GI PIPE
GROUND LEVEL
50mm Ø GI PIPE
50mm Ø GI PIPE
ROOF TRUSS JOINT AT MID-POINT
75X75X10 ANGLEWELDED TO G.ICOLUMN/TRUSS
TIMBER RAFTERS/BEAMBOLTED TO ANGLESECTION
LYSAGHT ROOFING SHEET
50X35mm TIMBER BATTENS @ 600C/C
50X100mm RAFTERS @ 900C/C
25 X 200MM FACIA BOARD
GYPSUM CEILING (OFFICE AND TOILET)AT 3M HEIGHT
VINIYL GUTTER 5"
100X50mm TIMBER WALL PLATE
PROJECTAPPROVED BY
ELEVATIONS AND SECTIONS
TITLE
DESIGN BY AMENDMENTS
COLLECTION BAY SECTION
ROOF DETAIL
COLLECTION BAY ELEVATION
TRUSS [TR1]
CONSTRUCTION OF WASTE MANAGEMENT CENTRE
DWG NO. MULA-R3 A1-09
TITLE
CLIENT DEPARTMENT
STRUCTURE BY
DRAWN BY
SCALE 1:150
AFRAZ
DATE 18.04.2018
PAPER SIZE A3
MCEPMINISTRY OF ENVIROMENT AND ENERGYGREEN BUILDING, HANDHUVAREE HIGUN,MAAFANNU, MALE' (20392), REPUBLIC OF MALDIVES,TEL: +960-3018431, +960-3018300, FAX: +960-328301
M. MULAH
WMPC DEPARTMENT
PAGE NO. 09
AFRAZ
AFRAZ
COLLECTION BAY TRUSS ROOF FIXING
METER BOARD
PUMP
9000BTU
DISTRIBUTIONBOARDS
20W LED LIGHT(DAY LIGHT)
3 PHASE, 15APOWER POINTS[1.5m ABOVEGROUND]
CEILING FAN
METER BOARD METER BOARD
EXHAUST FAN
AC WITH OUTLET
13AMP DOUBLESOCKET
18W CEILINGMOUNT LIGHT(WARM WHITE)
PROJECTAPPROVED BY DESIGN BY AMENDMENTS
EQUIPMENT ROOM, OFFICE AND STAFF QUARTERS ELECTRICAL PLAN
LEGEND
HAZARDOUS WASTE AND STORECOMPOST SCREENING AND STORAGE AREA
CONSTRUCTION OF WASTE MANAGEMENT CENTRE
DWG NO. MULA-R3 A1-10
ELECTRICAL PLAN
TITLE
CLIENT DEPARTMENT
STRUCTURE BY
DRAWN BY
SCALE 1:150
AFRAZ
DATE 18.04.2018
PAPER SIZE A3
MCEPMINISTRY OF ENVIROMENT AND ENERGYGREEN BUILDING, HANDHUVAREE HIGUN,MAAFANNU, MALE' (20392), REPUBLIC OF MALDIVES,TEL: +960-3018431, +960-3018300, FAX: +960-328301
M. MULAH
WMPC DEPARTMENT
PAGE NO. 10
AFRAZ
AFRAZ
750X750mm ACCESSDOOR TO TANKSWITH TIMBER COVER950X950mm
2000
4025
AA-001
AA-001
DRAIN
COMPOST SLAB
AA-
002 A
A-00
2
1825
4025
2000
PRIMARY TANK 100mm OVERFLOW PIPEFROM PRIMARY TANKTO SECONDARY TANK
75mm THK. CONC. WALLT10 @ 150 BW SINGLE LAYER
AA-001
AA-001
950
950
100mm OVERFLOW PIPEFROM SECONDARYTANK TO TERTIARY TANK
SECONDARY TANK
TERTIARY TANK
PVC BALL VALVE [REACHABLETHROUGH THE TIMBERREMOVABLE TANK TOP
AA-
002 A
A-00
2
FILLED WITH 0.5M HEIGHTSTONE & SAND FILLING
1000
2000
300
PRIMARY TANK
TIMBER REMOVABLETANK TOP
75mm THK. CONC. WALLT10 @ 150 BW SINGLE LAYER
PVC BALL VALVE [REACHABLETHROUGH THE TIMBERREMOVABLE TANK TOP
50mm OVERFLOW PIPE FROMPRIMARY TANK TO SECONDARYTANK
750
75mm THK. CONC. WALLT10 @ 150 BW SINGLE LAYER
TIMBER REMOVABLETANK TOP
PRIMARY TANKSECONDARYTANK TERTIARY TANK
100mm OVERFLOW PIPEFROM SECONDARYTANK TO TERTIARY TANK
100mm OVERFLOW PIPEFROM PRIMARY TANKTO SECONDARY TANK
PVC BALL VALVE [REACHABLETHROUGH THE TIMBERREMOVABLE TANK TOP
750 750
1000
250
4025
1825 950950
FILLED WITH 500mm HEIGHTSTONE & SAND FILLING
4850
600 300
1500
600300
750
4850
T10@200C/CBW
CERAMIC TILES ONTOP OF RC SLAB
300mm THK.CONC.COLUMN
600 300
75mm THK. SCREED [F.F.L]
600300
650
100
1000
2000
TIMBER REMOVABLETANK TOP
75mm THK. CONC. WALLT10 @ 150 BW SINGLE LAYER
25mm HOLES EQUALLYDISTRIBUTED AS SHOWNBOTH WAYS, IN ALL THREESIDES OF TERTIARY TANK
VARI
ABLE
600
1000mm Ø WELL
ground water well
R6 @ 250C/C BW
GROUND LEVEL
BOTTOM SLAB
110
PROJECTAPPROVED BY
LEACHATE WELL [PLAN, SECTION, ELEVATION], GROUND WATER WELL SECTIONSORTING PLATFORM [PLAN, ELEVATION]
TITLE
DESIGN BY AMENDMENTS
LEACHATE WELL TOP PLANPLAN
A-002
A-001
SORTING PLATFORM: FRONT VIEW
SORTING PLATFORM: TOP VIEW
CONSTRUCTION OF WASTE MANAGEMENT CENTRE
DWG NO. MULA-R3 A1-11
TITLE
CLIENT DEPARTMENT
STRUCTURE BY
DRAWN BY
SCALE 1:50
AFRAZ
DATE 18.04.2018
PAPER SIZE A3
MCEPMINISTRY OF ENVIROMENT AND ENERGYGREEN BUILDING, HANDHUVAREE HIGUN,MAAFANNU, MALE' (20392), REPUBLIC OF MALDIVES,TEL: +960-3018431, +960-3018300, FAX: +960-328301
M. MULAH
WMPC DEPARTMENT
PAGE NO. 11
AFRAZ
AFRAZ
TERTIARY TANK SIDE VIEW
GROUND WATER WELL
PCC 1:2:3
T12 Anchor bars (12Nos)Welded to GI pipe column
450
600
100
GL
65 mm x 1.5mm thickMS equal Angle bar
4572
Hole for cabling
100mm GI Pipe(3.5mm thick)
Conduit pipefor cabling
LIGHT POST DETAILScale 1:50
End cap
* Concrete cover: 50mm* GI pipe to be painted with 1 coat of sealer & 2 coats of finishing paint. (Sigma, maroon colour)
Note:
25mm splayed edges
100
Refer detail (A)
300
200W halogenlight
4 R6 @ Equal
LIGHT POSTScale 1:50
16mmØ [J-BOLT, 316L][x4]
15
25
300
26
100mm GI Pipe weldedon to the 6mm thk. SS plate
6MM PLATE WELDED TO 100MMØ GI PIPE
6mm thick, 270x270 SS plate, welded to100mm Ø GI pipe
4 R6@ Equal
700
100
450
GL
LIGHT POST FOUNDATION FOOTING DETAIL 1:10
CONDUIT PIPE FOR CABLING
T10w200c/cBW
100
300
300
45°
135°
HDPEMEMBRANE
100
300
HDPEMEMBRANE
300
T10w200c/cBW
100
HDPEMEMBRANE
300
T10w200c/cBW
B3
100MM PVC PIPE CUT IN HALFWITH 1% SLOPE TO LEACHATE WELL
100
HDPEMEMBRANE
T10w200c/cBW
10
SILICONE
POLYTHENE JOINTFILLER FOAM
GR. LEVEL
50X50 PVC COATED MESH
150mm HOLLOW BLOCKMASONRY WALL12.5mm THK. PLASTERED ONBOTH SIDES
600
450
150
R6 @ 120mm c/c4T10
300
450
R178
GR. LEVEL
300X300X1050mmCONC. FOOTING
200X200mm PLATEWELDED TO THE BASEOF THE COLUMN
600
150
450
300
GR. LEVEL
300X300X450mmCONC. FOOTING
75mm GI PIPE
200X200mm PLATEWELDED TO THE BASEOF THE COLUMN
150
R6 @ 120mm c/c4T10
C1, WB, RB
150
150
150
R6 @ 120mm c/c4T10
FB
110
110 2T 10
R6 @ 150 C/C
110
110 2T 10
R6 @ 150 C/C
L1 S1
300
PROJECTAPPROVED BY DESIGN BY AMENDMENTS
B1 1:20
B2 1:20
B3 1:20
COMPOST BED SLAB DETAIL 1:20
PERIMETER FENCE FOUNDATION DETAIL PERIMETER FENCE WALL FOUNDATION DETAIL
COLUMN AND BEAM DETAILS
DETAILS
TITLE
CONSTRUCTION OF WASTE MANAGEMENT CENTRE
DWG NO. MULA-R3 A1-12
TITLE
CLIENT DEPARTMENT
STRUCTURE BY
DRAWN BY
SCALE
AFRAZ
DATE 18.04.2018
PAPER SIZE A3
MCEPMINISTRY OF ENVIROMENT AND ENERGYGREEN BUILDING, HANDHUVAREE HIGUN,MAAFANNU, MALE' (20392), REPUBLIC OF MALDIVES,TEL: +960-3018431, +960-3018300, FAX: +960-328301
M. MULAH
WMPC DEPARTMENT
PAGE NO. 12
AFRAZ
AFRAZ
1:50, 1:20, 1:10
2800
600
3000
GROUND LEVEL
50X50 PVC COATEDMESH
MS SHEET COATEDWITH PAINT
25mm Ø GI PIPE[ALL WELDS ARE 5mm FILLETWELDS AROUND NO.]
150mm THK.MASONRY WALL
GR. LEVEL
COLUMN, C1
150mm HOLLOW BLOCK MASONRY WALL12.5mm THK. PLASTERED ON BOTHSIDES
450
150
2000
[OFF
ICE/
EQUI
PMEN
T RO
OM B
UILD
ING]
450
150
FOUNDATION BEAM, FBFOUNDATION BEAM, FB
WALL BEAM, WB
ROOF BEAM, RB
COLUMN, C1
MASONRY WALLGR. LEVEL
300
WALL BEAM, WB
ROOF BEAM, RB
2000
[OFF
ICE/
EQUI
PMEN
T RO
OM B
UILD
ING]
1750
[COL
LECT
ION
BAY
AND
COM
POST
STO
RAGE
]17
50[C
OLLE
CTIO
N BA
Y AN
D CO
MPO
ST S
TORA
GE]
2800
600
GROUND LEVEL
EQUALLY DISTRIBUTED EQUALLY DISTRIBUTED
[REFER FLOOR PLAN]
50mm Ø GI PIPE[ALL WELDS ARE 5mmFILLET WELD AROUNDMEMBERS]
50X50 PVC COATEDMESH
150mm THK.MASONRY WALL
850
2150
D1
REMARKS
LOCATIONQUANTITY
OPEN AREA
SWING TYPE GATE
GI PIPE (50MM) FRAMED GATE WITH PVC COATED WIRE MESH ANDMS SHEET COATED WITH PAINT, GI PIPE TWO COAT PAINTED01 DOOR KNOB WITH LOCK SET04 HINGESGROUND FLOORNO.S 011.83 m²
F.F.L
2075
G1
BUILDINGS WALL DETAILBUILDINGS WALL ELEVATION
PERIMETER FENCE WALL DETAIL
NOTE:ALL WELDS FOR THEGI MEMBERS ARE5mm FILLET WELDS
PROJECTAPPROVED BY DESIGN BY AMENDMENTS
TITLE
CONSTRUCTION OF WASTE MANAGEMENT CENTRE
DWG NO. MULA-R3 A1-13
TITLE
CLIENT DEPARTMENT
STRUCTURE BY
DRAWN BY
SCALE
AFRAZ
DATE 18.04.2018
PAPER SIZE A3
MCEPMINISTRY OF ENVIROMENT AND ENERGYGREEN BUILDING, HANDHUVAREE HIGUN,MAAFANNU, MALE' (20392), REPUBLIC OF MALDIVES,TEL: +960-3018431, +960-3018300, FAX: +960-328301
M. MULAH
WMPC DEPARTMENT
PAGE NO. 13
AFRAZ
AFRAZ
GATE SCHEDULE, FENCING DETAIL, WALL DETAIL
1:50
3500
3.5m HEIGHT MASONRY WALL SLIDING GATE[TO LEFT]
GUIDE RAIL
GUIDE RAIL
2m HEIGHTSLIDING DOOR
MS SHEET
GROUND LEVELGROUND LEVEL
75mm THK.SCREED
3650
3500
3275
850
2150
D2
REMARKS
LOCATIONQUANTITY
OPEN AREA
SWING TYPE DOOR
ALUMINUM DOOR WITH CLEAR GLASS PANEL01 DOOR KNOB WITH LOCK SET04 HINGESDOOR STOPPER, FINISHED WITH WHITE COATED PAINTGROUND FLOORNO.S 011.83 m²
F.F.L
225
1175
W1
REMARKS
LOCATIONQUANTITY
OPEN AREA
ALUNINIUM LOUVER WINDOW
ALUMINUM FRAMED, ALUMINIUM LOUVERED, FINISHED WITHWHITE COATED PAINT
GROUND FLOORNO.S 10.15 m²
F.F.L
2465
700350
700
2150
D3
REMARKS
LOCATIONQUANTITY
OPEN AREA
SWING TYPE DOOR
ALUMINIUM DOOR WITH DOOR KNOB AND 1 LOCK SET
GROUND FLOORNO.S 071.51m²
F.F.L
567 567 567
1800
850
W2
REMARKS
LOCATIONQUANTITY
OPEN AREA
ALUMINIUM SLIDING WINDOW
GROUND FLOORNO.S 021.89 m²
ALUMINUM FRAMED, TINTED BLACK GLASS, FINISHED WITHTIMBER POWDER COATED PAINT
1050
HAZADIOUS WASTE SD1EQUIPMENT ROOM RSD
PROJECTAPPROVED BY DESIGN BY AMENDMENTS
TITLE
CONSTRUCTION OF WASTE MANAGEMENT CENTRE
DWG NO. MULA-R3 A1-14
TITLE
CLIENT DEPARTMENT
STRUCTURE BY
DRAWN BY
SCALE
AFRAZ
DATE 18.04.2018
PAPER SIZE A3
MCEPMINISTRY OF ENVIROMENT AND ENERGYGREEN BUILDING, HANDHUVAREE HIGUN,MAAFANNU, MALE' (20392), REPUBLIC OF MALDIVES,TEL: +960-3018431, +960-3018300, FAX: +960-328301
M. MULAH
WMPC DEPARTMENT
PAGE NO. 14
AFRAZ
AFRAZ
DOOR AND WINDOW SCHEDULE
1:50
400
600
2000
150MM MASONRY
WALL TANK WITH
WATERPROOF
PAINTING (DEPTH:
2000MM)
Ø100MM
PVC PIPE
FROM DRAIN
150MM MASONRY WALL TANK WITH
WATERPROOF PAINTING (DEPTH: 2000MM)
WITH 75MM THK CONCRETE BASE (1:2:4)
1000
75MM THK CONCRETE COVER
(R6 @ 150 C/C)
Ø25MMHOLES
EQUALLY
DISTRIBUTED AS
SHOWN TO
BOTH WAYS.
FILLED WITH
1000MM HEIGHT
CORAL STONE &
WHITE SAND
FILLING
1300
1000 150150
1300
1000
100
PROJECTAPPROVED BY DESIGN BY AMENDMENTS
TITLE
CONSTRUCTION OF WASTE MANAGEMENT CENTRE
DWG NO. MULA-R3 A1-15
TITLE
CLIENT DEPARTMENT
STRUCTURE BY
DRAWN BY
SCALE
AFRAZ
DATE 05.06.2018
PAPER SIZE A3
MCEPMINISTRY OF ENVIROMENT AND ENERGYGREEN BUILDING, HANDHUVAREE HIGUN,MAAFANNU, MALE' (20392), REPUBLIC OF MALDIVES,TEL: +960-3018431, +960-3018300, FAX: +960-328301
M. MULAH
WMPC DEPARTMENT
PAGE NO. 15
AFRAZ
AFRAZ
SEPTIC TANK DETAILS
1:50