Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
@goSBCTA
goSBCTA.com/arrow
Stay Connected
WHAT TO EXPECT7th Street will be closed at the rail crossing Monday, July 27 at 5:00 a.m. through Friday, July 31 at 5:00 a.m. Crews will be layingnew railroad track and paving in and around the crossing. Pedestrian access will be available. All businesses are open and accessible during construction. Please plan ahead, leave early, and allow extra time to reach your destination. The noise you can expect during this time will be from back up alarms from construction equipment.
SAMPLE SIGNAGE
Panel 1 Panel 2
businesses
open
7th street
closed
CONSTRUCTION NOTICE
7TH STREET RAIL CROSSING CLOSURE
Monday, July 27 at 5:00 a.m. through Friday, July 31 at 5:00 a.m.