This is an example of a construction document set created by Daniel Kliewer
Citation preview
KD
A r c h i t e c t u r e
Project
237 S. WashingtonWichita, Kansas 67202
Designer
Danny Kliewer
Date 11.30.2011
I c e S t o n e Factory
N
KD
A r c h i t e c t u r e
Project
237 S. WashingtonWichita, Kansas 67202
Designer
Danny Kliewer
Date 11.30.2011
SP 1.1............................................................................................. S ite PlanA1.1....................................................................................Ground Floor PlanA1.2.....................................................................................Second Floor PlanA1.3................................................................First Floor Reflected Ceiling PlanA1.4............................................................Second Floor Reflected Ceiling PlanA1.5................................................................................................Roof PlanA2.1...................................................... . . . . . . . . .North Elevation, East ElevationA2.2..................................................... . . . . . . . . .South Elevation, West ElevationA3.1............................................................................Section A-A, Section B-BA4.1........................................................................................ .Wall Section 1A4.2........................................................................................ .Wall Section 2A4.3........................................................................................ .Wall Section 3A5.1............................................................ . Operable/Removable Glass Panel A5.2..................................................................In-Wall Water Drainage SystemA5.3....................................... . Concrete Structural Wall to Concrete Slab BandA5.4.....................................................Plan Detail of Glass Facade at the CornerA5.5.........................Plan Detail of Glass Facade to Structural Wall ConnectionA5.6................................................. .Glass Facade to Concrete Foundation WallA5.7................................Concrete Facade Panel to Structural Wall Connection A5.8.................................... .Steel Lateral Bracing to Structural Wall ConnectionA5.9.................................................................Clerestory Window ConnectionA5.10........................................................... . Wind Intake Green Roof System
Table of Contents
Occupancy Type: F-2Total Occupancy of Building: 327Construction Type: Type II-AAllowable Total Square Footage of Building: No LimitActual Total Square Footage of Building: 13,938 sq. ft.
Building Information
Sample Page Reference
KD
A r c h i t e c t u r e
Project
237 S. WashingtonWichita, Kansas 67202
Designer
Danny Kliewer
Date
Scale
11.30.2011
Exterior Materials1 ...................Cleveland Pear2 ....................Hybrid Poplar3 .............Concrete Sidewalk4 .Recycled Material Pavers5 ........Natural Fescue Grass6 .......................Zoysia Grass7 .................Asphalt Parking
Site Plan SP1.1
3/64”=1’-0”
11.30.2011
KD
Project
237 S. WashingtonWichita, Kansas 67202
Designer
Danny Kliewer
Date
Scale
A1.1Ground Floor Plan
1/16”=1’-0”
Space Legend1 ............................ShowroomArea: 1416 s.f. Occ: 142 ....................Education AreaArea: 625 s.f. Occ: 313 ........................Factory FloorArea: 5602 s.f. Occ: 564 ...........................WarehouseArea: 1205 s.f. Occ: 45 .................Staff Break RoomArea: 195 s.f. Occ: 46 ..........................Mech./Elec.Area: 109 s.f. Occ: 17 ..................................StorageArea: 50 s.f. Occ: 1
Material Legend1 Recycled Material Flooring2 ...................................Carpet3 ......Concrete Stair Landing
11.30.2011
KD
A r c h i t e c t u r e
Project
237 S. WashingtonWichita, Kansas 67202
Designer
Danny Kliewer
Date
Scale
A1.2Second Floor Plan
1/16”=1’-0”
Space Legend1 ........................Waiting AreaArea: 1897 s.f. Occ: 1262 ................Conference RoomArea: 425 s.f. Occ: 43 ...........................CEO OfficeArea: 175 s.f. Occ: 24 ............................CFO OfficeArea: 175 s.f. Occ: 25 .................Store Mgr. OfficeArea: 154 s.f. Occ: 2
Material Legend1 ...................................Carpet2 ......................Concrete Tiles3 ......Concrete Stair Landing
KD
A r c h i t e c t u r e
Project
237 S. WashingtonWichita, Kansas 67202
Designer
Danny Kliewer
Date
Scale
11.30.2011
A1.3First Floor Reflected Ceiling Plan
1/16”=1’-0”
KD
A r c h i t e c t u r e
Project
237 S. WashingtonWichita, Kansas 67202
Designer
Danny Kliewer
Date
Scale
11.30.2011
A1.4Second Floor Reflected Ceiling Plan
1/16”=1’-0”
KD
A r c h i t e c t u r e
Project
237 S. WashingtonWichita, Kansas 67202
Designer
Danny Kliewer
Date
Scale
11.30.2011
A1.5Roof Plan
1/16”=1’-0”
KD
A r c h i t e c t u r e
Project
237 S. WashingtonWichita, Kansas 67202
Designer
Danny Kliewer
Date
Scale
11.30.2011
A2.1
North Elevation
East Elevation
1/16”=1’-0”
KD
A r c h i t e c t u r e
Project
237 S. WashingtonWichita, Kansas 67202
Designer
Danny Kliewer
Date
Scale
11.30.2011
South Elevation
West Elevation
IceStone
IceStone
1/16”=1’-0”
A2.2
KD
A r c h i t e c t u r e
Project
237 S. WashingtonWichita, Kansas 67202
Designer
Danny Kliewer
Date
Scale
11.30.2011
A3.1
Section A-A
Section B-B
1/16”=1’-0”
Space Legend:Sec. A-A1 ...........................Warehouse2 ........................Factory Floor3 ......................Office Balcony
Space Legend:Sec. B-B1 ........................Factory Floor2 ............................Showroom3 ........................Waiting Area
KD
A r c h i t e c t u r e
Project
237 S. WashingtonWichita, Kansas 67202
Designer
Danny Kliewer
Date
Scale
11.30.2011
A4.1Wall Section 1
1/4”=1’-0”
KD
A r c h i t e c t u r e
Project
237 S. WashingtonWichita, Kansas 67202
Designer
Danny Kliewer
Date
Scale
11.30.2011
A4.2Wall Section 2
1/4”=1’-0”
*Water Drain. SystemThe water Drainage System consists of the roof drain gate, the steel drain mesh, and the steel drainage pipe.
KD
A r c h i t e c t u r e
Project
237 S. WashingtonWichita, Kansas 67202
Designer
Danny Kliewer
Date
Scale
11.30.2011
A4.3Wall Section 3
1/4”=1’-0”
KD
A r c h i t e c t u r e
Project
237 S. WashingtonWichita, Kansas 67202
Designer
Danny Kliewer
Date
Scale
11.30.2011
Operable/Removable Glass Panel A5.1
1 1/2”=1’-0”
KD
A r c h i t e c t u r e
Project
237 S. WashingtonWichita, Kansas 67202
Designer
Danny Kliewer
Date
Scale
11.30.2011
In-Wall Water Drainage System A5.2
1”=1’-0”
KD
A r c h i t e c t u r e
Project
237 S. WashingtonWichita, Kansas 67202
Designer
Danny Kliewer
Date
Scale
11.30.2011
Concrete Structural Wall to Concrete Slab Band A5.3
1”=1’-0”
KD
A r c h i t e c t u r e
Project
237 S. WashingtonWichita, Kansas 67202
Designer
Danny Kliewer
Date
Scale
11.30.2011
1 1/2”=1’-0”
Plan Detail of Glass Facade at the Corner A5.4
KD
A r c h i t e c t u r e
Project
237 S. WashingtonWichita, Kansas 67202
Designer
Danny Kliewer
Date
Scale
11.30.2011
1 1/2”=1’-0”
Plan Detail of Glass Facade to Structural Wall Connection A5.5
KD
A r c h i t e c t u r e
Project
237 S. WashingtonWichita, Kansas 67202
Designer
Danny Kliewer
Date
Scale
11.30.2011
1 1/2”=1’-0”
Glass Facade to Concrete Foundation Wall A5.6
KD
A r c h i t e c t u r e
Project
237 S. WashingtonWichita, Kansas 67202
Designer
Danny Kliewer
Date
Scale
11.30.2011
1 1/2”=1’-0”
Concrete Facade Panel to Structural Wall Connection A5.7
KD
A r c h i t e c t u r e
Project
237 S. WashingtonWichita, Kansas 67202
Designer
Danny Kliewer
Date
Scale
11.30.2011
1 1/2”=1’-0”
Steel Lateral Bracing to Structural Wall Connection A5.8
KD
A r c h i t e c t u r e
Project
237 S. WashingtonWichita, Kansas 67202
Designer
Danny Kliewer
Date
Scale
11.30.2011
Clerestory Window Connection
1”=1’-0”
A5.9
KD
A r c h i t e c t u r e
Project
237 S. WashingtonWichita, Kansas 67202
Designer
Danny Kliewer
Date
Scale
11.30.2011
Wind Intake Green Roof System
1 1/2”=1’-0”
A5.10