21
Construction Coordination BIM Curriculum 06

Construction Coordination BIM Curriculum 06. Topics Problems of the Construction Industry Objectives The Virtual Construction Model Benefits

Embed Size (px)

Citation preview

Page 1: Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits

Construction Coordination

BIM Curriculum 06

Page 2: Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits

Topics

Problems of the Construction Industry Objectives The Virtual Construction Model Benefits

Page 3: Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits

Problem Definition Design

Sub Contractor Cost

Construction

Facility Management

• No direct cost feedback on design decisions• Coordination of trades

• Missing / Incorrect Design Information• Inability to reuse data for shop drawings• Field rework required for prefabricated components• Padding to compensate for risks• Poor subcontractor work flow – “Starts and Stops”• Inadequate quantity information for planning

• Lack of owner trust – difficulties in communicating cost and schedule issues• Production control is based on subjective information • Frequent starts and stops• Estimating is time-consuming and occasionally inaccurate

• Insufficient as-built project documentation • Renovation, addition and demolition planning is time-consuming

Page 4: Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits

Money Manpower

MaterialsMachinery

Objectives

Winning the bid Fast design feedback

loop Fast & accurate

estimates Value engineering Constructability analysis

Managing the 4 Ms Money Manpower Machinery Materials

Page 5: Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits

Model Estimating ProcurementSequencing Site Management

Constructability

Analysis Drives Estimating Provides Locations Zone Planning Design to Build /Build to Design

Schedule Analysis Line of Balance Integrated Monte Carlo 4D Simulation Drives Procurement

Data Mining for Supplier Negotiations Tracking of High Risk, Long Lead Items Integrated with the Project Schedule Drives Site Management Process

Short Lead Procurement Site Planning for Materials & Equipment Locations

Fast & Accurate Easy Updates - Linked Drives Sequencing

Construction Planning

Page 6: Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits

Level of

Deta

il

Time

Review SD QT Price

Schematic Design Phase

Review DD QT Price

Detailed Design Phase

Review CD QT Price

Construction Documents Phase

rework

rework

Traditional Design Process

Page 7: Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits

Level of

Deta

il

Time

Schematic Design Phase

SD

QT Price

Detailed Design Phase

DD

QT Price

Construction Documents Phase

CD

QT Price

support for iterative design process

New Design Process

Page 8: Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits

Time (4D) Cost (5D)

Linked Schedules

Linked Estimating

Recipes

The Virtual Construction Model (5D)

BIM Model (3D)

Page 9: Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits

Project Control

Fabrication 2D Drawings

Constructability Analysis and Coordination

Procurement Schedule

Accounting

Cost Estimate 5D Model

5D Work Flow

Page 10: Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits

Level of

Deta

il &

Com

ple

xit

y

Design Intent Model

Construction Model

Construction Modeling

Page 11: Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits

Construction Modeling

Page 12: Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits

Completed Column

Recipe

Recipes

Page 13: Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits

Concrete

Reinforcing Bars

Formwork

Cladding / Surface finish

RecipeMethods

Stages Required to Finish Column

Methods

Page 14: Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits

RecipeMethods

Resources

Resources

Page 15: Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits

Recipe Methods Resources

Zones/Floors +

=

/ /

The 5D Model

Page 16: Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits

Benefits: Clash Detection

Conventional methods of coordination are extremely time consuming and error-prone.

Using internal or external clash detection software helps to identify the construction errors in the BIM model

Construction risks and costs can be reduced significantly

Page 17: Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits

Benefits: Cost Variances

Early Design phases: Which materials? Price of materials?

Solution: Calculate cost ranges

instead of fixed prices

Office

18 sq. m.

Office

22 sq. m.

CorridorOffice

22 sq. m.

Office

20 sq. m.

CorridorOffice

11 sq. m.

Exterior Wall type?

Cost of a double swing door?

Page 18: Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits

Variance Estimating©

Expected price range:$20 – $25

Page 19: Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits

Benefits: Design to Build

Design follows construction methodology Acceptable Tolerance Coordination of Trades Quality Check

Page 20: Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits

Benefits: Build to Design

Measure points Check Onsite Guarantee Fit

X, Y, Z

Page 21: Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits

Virtual Construction™ Products

Construction Modelers / Project

Engineers

Estimators

Schedulers / PM’s / Supers