35
CONSTRUCTION BEST MANAGEMENT PRACTICES PLAN FOR ALDOT PROJECT NUMBER RESPONSIBLE OFFICIAL: ALDOT Region Engineer for Don T. Arkle, P.E., ALDOT Chief Engineer CBMPP COMPILER: company, title DESIGN QUALIFIED CREDENTIALED PROFESSIONAL: company, title OPERATIONAL QUALIFIED CREDENTIALED PROFESSIONAL: ALDOT Stormwater Coordinator TIGER-NH-0157(506) Additional Lanes on SR - 157 Cullman County PS 1964 Curtis W Vincent, P.E. ALDOT Region Engineer for Don T. Arkle, P.E., ALDOT Chief Engineer Jonmark Henry ALDOT, CEG LaTasha Merchant, PE ALDOT, State Roadway Design Engineer Jordan Flemming, P.E. ALDOT Stormwater Coordinator

CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

CONSTRUCTION BEST MANAGEMENT PRACTICES PLAN

FOR ALDOT PROJECT NUMBER

project number project location/description

county stormwater permit sequence number

RESPONSIBLE OFFICIAL:

responsible official ALDOT Region Engineer for Don T. Arkle, P.E., ALDOT Chief Engineer

CBMPP COMPILER:

CBMPP compiler company, title

DESIGN QUALIFIED CREDENTIALED PROFESSIONAL:

CBMPP certifier company, title

OPERATIONAL QUALIFIED CREDENTIALED PROFESSIONAL:

operational QCP ALDOT Stormwater Coordinator

TIGER-NH-0157(506)Additional Lanes on SR - 157

Cullman CountyPS 1964

Curtis W Vincent, P.E.ALDOT Region Engineer for Don T. Arkle, P.E., ALDOT Chief Engineer

Jonmark HenryALDOT, CEG

LaTasha Merchant, PEALDOT, State Roadway Design Engineer

Jordan Flemming, P.E.ALDOT Stormwater Coordinator

Page 2: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

ALDOT CBMPP Version December 2016

INDEX

CBMPP Explanation CBMPP Certifications ALDOT Contact Information

CBMPP DESIGN COMPONENT

I. Project Information

a. ADEM NPDES Notice of Intent

b. Project Plan Checklist

c. Soil Properties

d. Hydraulics/Hydrology

II. Environmental Concerns and Commitments

a. Environmental Concerns

b. Environmental Commitments

III. Environmental Best Management Practices

a. Project Specific Best Management Practices

i. ALDOT Project Specific Special Provisions

ii. ALDOT Special Project Details

b. Standard Best Management Practices

i. 2012 ALDOT Standard Specifications and General Application Special Provisions

ii. 2017 ALDOT Special Drawings

iii. ALDOT Construction Manual – Section 2.5 Construction Stormwater

iv. ALDOT Approved Treatment Chemicals

CBMPP OPERATIONAL COMPONENT

IV. Contractor Submitted Components

V. Inspections and CBMPP Review Log

VI. Rainfall Journal and Rain Gauge Log

VII. Regulatory Documentation and Actions Log

VIII. CBMPP Modifications Log

2020

2020

ALDOT CBMPP Version January 2020

Page 3: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

ALDOT CBMPP Version December 2016

CBMPP Explanation This ALDOT Construction Best Management Practices Plan (CBMPP) is intended to satisfy the requirements of the Alabama Department of Environmental Management (ADEM) Administrative Code and the National Pollutant Discharge Elimination System (NPDES) Construction General Permit. This CBMPP is also a means to gather and communicate environmental concerns, commitments, and contract requirements to ALDOT design and construction personnel as well as Contractors. This document, all referenced or attached documents, and those posted on the Electronic CBMPP webpage together constitute the CBMPP for this project. This CBMPP is provided to ALDOT Contractors prior to project letting. The CBMPP is comprised of two main components; a Design Component and an Operational Component. The Design Component is created and updated during the planning and design phase by ALDOT and/or consultant design personnel. The Design Qualified Credentialed Professional (QCP) certifies the Design Component of the CBMPP as having addressed all known environmental concerns, and that these concerns have been addressed in the project design. The Operational Component is created and updated during the construction phase by ALDOT project personnel and contractor personnel. The Operational Qualified Credentialed Professional (QCP) certifies that the Design Component will be adhered to as closely as possible, and that the Operational Component will be created, updated, and adhered to during construction of the project. This CBMPP is to be maintained at the Project Office during active construction on the project and retained with the project records after project completion. The CBMPP is to be made available to all project staff including all Contractors, ALDOT staff, and Regulators.

ALDOT CBMPP Version January 2020

Page 4: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase
Page 5: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

ALDOT CBMPP Version December 2016

Operational QCP Certification of Receipt and Responsibility I certify under penalty of law that the Design Component of this CBMPP and all attachments will be adhered to in a manner consistent with applicable ADEM Administrative Code and the National Pollutant Discharge Elimination System (NPDES) Construction General Permit. I further certify that modifications and additions to the Operational Component of this CBMPP will be made under my direction or supervision and that the Operational Component of this CBMPP will be, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

Date: operational QCP ALDOT Stormwater Coordinator project number county

Jordan Flemming, P.E.ALDOT Stormwater Coordinator

TIGER-NH-0157(506)Cullman County

ALDOT CBMPP Version January 2020

3/30/3020

Page 6: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

ALDOT CBMPP Version December 2016

ALDOT Contact Information

RESPONSIBLE OFFICIAL: responsible official ALDOT Region Engineer for Don T. Arkle, P.E., ALDOT Chief Engineer street address city, state zip business phone Phone business fax Fax email

DESIGN QUALIFIED CREDENTIALED PROFESSIONAL: CBMPP certifier company, title street address city, state zip business phone Phone business fax Fax

OPERATIONAL QUALIFIED CREDENTIALED PROFESSIONAL: operational QCP ALDOT Stormwater Coordinator street address city, state zip business phone Phone business fax Fax email

Curtis W Vincent, P.E.ALDOT Region Engineer for Don T. Arkle, P.E., ALDOT Chief Engineer1525 Perimeter Parkway Suite 400Huntsville, AL 35806Phone (256) [email protected]

LaTasha Merchant, PEALDOT, State Roadway Design Engineer1409 Coliseum BlvdMontgomery AL, 36109Phone (334) [email protected]

Jordan Flemming, P.E.ALDOT Stormwater Coordinator23445 US Highway 431 NGuntersville AL, 35976Phone (256) [email protected]

ALDOT CBMPP Version January 2020

Page 7: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

1964March 25, 2020 - 14:16:17

NOTICE OF INTENT - GENERAL PERMIT NUMBER ALR100000

Mail to: Alabama Department of Environmental ManagementWater DivisionStormwater Management BranchPost Office Box 301463Montgomery, Alabama 36130-1463

SITES LESS THAN ONE ACRE BUT ARE PART OF A LARGER COMMON PLAN OR DEVELOPMENT OR SALE

OTHER INFORMATION AS NEEDED. PLEASE TYPE OR PRINT LEGIBLY IN INK.

NPDES PERMIT NUMBER ALR100000 IS A GENERAL PERMIT AUTHORIZING DISCHARGES ASSOCIATED WITHCONSTRUCTION ACTIVITIES THAT RESULT IN A TOTAL LAND DISTURBANCE OF ONE ACRE OR GREATER AND

PLEASE COMPLETE ALL QUESTIONS. INCOMPLETE OR INCORRECT ANSWERS, OR MISSING SIGNATURES WILL DELAYPROCESSING. IF SPACE IS INSUFFICIENT, CONTINUE ON AN ATTACHED SHEET(S) AS NECESSARY. ATTACH CBMPP AND

Responsible Official Phone NumberPermittee Name (Legal Name)

Modification:Initial: I. PERMITTEE INFORMATION Transfer: Renewal: Previous ALR

Curtis W. Vincent, PE, ALDOT Region Engineer

Huntsville, AL 35806

Huntsville, AL 35806

Responsible Owner/Operator or Official, and Title

City, State and Zip

Responsible Official (RO) Street/Physical Address City, State and Zip

Responsible Official (RO) Mailing Address

Responsible Official E-Mail Address

Corporation Individual Sole Proprietorship Partnership LLC LLP

1525 Perimeter Parkway, Suite 400

1525 Perimeter Parkway, Suite 400

[email protected]

II. FACILITY INFORMATION

Government Agency Other

SR-157, ADDITIONAL LANES AND BRIDGES FROM SR-69TO EAST OF SR-3 (US-31) NORTH OF CULLMAN. BRIDGESOVER LAKE CATOMA AND CSX RAILROAD

Jordan M. Fleming, PE, ALDOT Guntersville Area SWCTIGER-NHF-0157(506) PS1964

ZipCity County(s)CULLMAN 35055 CULLMAN

Facility Street Address or Location Description Facility Contact Phone Number

Facility Contact and TitleFacility/Site Name

Facility Contact Company Name

ALABAMA DEPARTMENT OF TRANSPORTATION

(256) 571-7242

(256) 505-4956ALABAMA DEPARTMENT OF TRANSPORTATION

Beginning / Ending Project Latitude and Longitude Facility Contact e-Mail Address:

34° 11' 33" 86° 47' 12" 34° 12' 23" 86° 51' 23" [email protected]

Detailed Directions to the Site

SR-157, ADDITIONAL LANES AND BRIDGES FROM SR-69 TO EAST OF SR-3 (US-31) NORTH OF CULLMAN. BRIDGES OVERLAKE CATOMA AND CSX RAILROAD

III. ACTIVITY DESCRIPTION

Brief Description of Construction / Land disturbance activity(s): GRADE, DRAIN, BASE AND PAVE

Primary NAICS Code: 237310Primary SIC Code: 1622

IV. PROPOSED SCHEDULE

(For Modifications Only) Brief description of the action / change that has resulted in the request for permit modification:

Anticipated Activity Schedule: Completion date:Commencement date: 08/21/2024

Area of the Registered site: 63Total disturbed area in acres:Total site area in acres:

05/29/2020

93

V. PRIORITY CONSTRUCTION SITE

copy of the CBMPP that meets or exceeds the requirements of Parts III A. and E. of the construction stormwater general permit.Yes NoIs this a Priority Construction Site as defined by Part V of the construction stormwater general Permit? If yes, attach/submit a

Page 1 of 3 ADEM Form 24 XX/16 m1

Page 8: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase
Page 9: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

1964March 25, 2020 - 14:16:17

NOTICE OF INTENT - GENERAL PERMIT NUMBER ALR100000ATTACHMENTS

VII. RECEIVING WATERS

Waterbody ClassificationLatitude LongitudeReceiving WaterFW34° 11' 32" 86° 47' 12"UT Eightmile Creek1.0

FW34° 11' 50" 86° 47' 25"UT Eightmile Creek2.0

FW34° 11' 51" 86° 47' 32"UT Eightmile Creek3.0

FW34° 11' 53" 86° 47' 35"UT Eightmile Creek4.0

FW34° 11' 55" 86° 47' 43"UT Eightmile Creek5.0

FW34° 11' 55" 86° 47' 48"UT Eightmile Creek6.0

FW34° 11' 55" 86° 47' 52"UT Eightmile Creek7.0

FW34° 11' 55" 86° 47' 58"UT Eightmile Creek8.0

FW34° 11' 54" 86° 48' 05"UT Eightmile Creek9.0

FW34° 11' 54" 86° 48' 13"UT Eightmile Creek10.0

FW34° 11' 54" 86° 48' 20"UT Eightmile Creek11.0

FW34° 11' 53" 86° 48' 44"Eightmile Creek12.0

FW34° 11' 54" 86° 48' 38"UT Eightmile Creek12.A

FW34° 11' 57" 86° 48' 37"UT Eightmile Creek12.B

FW34° 11' 56" 86° 48' 35"UT Eightmile Creek12.C

FW34° 11' 56" 86° 48' 47"Eightmile Creek12.D

FW34° 11' 57" 86° 48' 47"Eightmile Creek12.E

FW34° 11' 58" 86° 48' 47"Eightmile Creek12.F

FW34° 11' 58" 86° 49' 09"UT Eightmile Creek13.0

FW34° 12' 02" 86° 49' 18"Eightmile Creek14.0

FW34° 12' 05" 86° 49' 25"UT Eightmile Creek15.0

FW34° 12' 13" 86° 49' 52"Bridge Creek16.0

FW34° 12' 16" 86° 49' 57"Bridge Creek17.0

FW34° 12' 18" 86° 50' 04"UT Bridge Creek18.0

FW34° 12' 19" 86° 50' 18"UT Bridge Creek19.0

FW34° 12' 19" 86° 50' 19"UT Bridge Creek20.0

FW34° 12' 20" 86° 50' 33"UT Bridge Creek21.0

FW34° 12' 21" 86° 50' 39"UT Bridge Creek22.0

FW34° 12' 20" 86° 50' 46"UT Bridge Creek23.0

FW34° 12' 20" 86° 51' 05"Bridge Creek24.0

Page 3 of 3 ADEM Form 24 XX/16 m1

Page 10: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase
Page 11: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

MADE BY JONMARK HENRY

TIGER-NH-0157(506)

3/24/2020

SCALE 1:24000 / 1" = 2000'MAP 2/2

86°47'09.79" W

34°11'30.92" N

| CONST

STA=75+00.00

BEGIN PROJECT

QUAD MAP

QUAD MAP

PLAN SUBMITTAL

DATE:

DESIGNER:

DATE:

SUPERVISOR:

DATE:

TENNESSEE

FLORIDA

GulfofMexico

GEOR

GIA

MISSISSIP

PI

ALABA A

DEPARTMENT OF TANS

POATIO

N

TENNESSEE

FLORIDA

GulfofMexico

GEOR

GIA

MISSISSIP

PI

ALABA A

DEPARTMENT OF TANS

POATIO

N

TENNESSEE

FLORIDA

GulfofMexico

GEOR

GIA

MISSISSIP

PI

ALABAMA

DEPARTMENT OF TRANS

PORT

ATIO

NRESPONSIBLE PE:

YEAR

REFERENCE FISCAL SHEET

PROJECT NO NO

000 ROUTE

HORIZOF TRANSPORTATION

ALABAMA DEPARTMENT SHEET TITLE

(FEET)SCALE

Y:\

100038838\Project_

Desig

n\Erosion_Control\

CB

MPP\38838_Q

UA

D_B.d

gn

henryj

11:3

7:0

3

AM

3/24/2020

2020

DESIGN BUREAU SECTION D5

TIGER-NH-0157(506)

SR-157

1000 1000

3.0

4.0

1.0

1.1

2.0

3.1

5.4

5.2

5.3

5.1

5.0

6.07.0

8.0

9.0

6.1

6.2

7.1

8.1

9.1

9.29.3

9.4

9.5

2.1

Page 12: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

ALDOT CBMPP Version December 2016

I.b. Project Plan Checklist Detailed project information relevant to environmental design, protection, and compliance is located in the plan set. Information contained in the plan sheets satisfies the requirements of the ADEM Administrative Code and the NPDES Construction General Permit. Please reference the following applicable plan sheets. Their location within the plan set can be found on sheet 1A, the Index to Sheets.

Yes

No

Plan Sheet Name

Plan and Profile Sheets

Utility Sheets

Sequence of Construction

Erosion & Sediment Control Plans

Erosion & Sediment Control Schematics

Hydraulic Data Sheet

Drainage Sections

Soil Boring Logs

Cross Sections

ALDOT CBMPP Version January 2020

Page 13: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

Custom Soil Resource Report for

6

Page 14: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

2 6

Page 15: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

3 6

Page 16: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

4 6

Page 17: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

5 6

Page 18: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase
Page 19: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

ALDOT CBMPP Version December 2016

I.d. Hydraulics/Hydrology Pre/Post Development Flow Statement (select all applicable statements):

There will be no significant difference in pre- and post- development peak flows.

There will be no significant difference in pre- and post- development hydraulic velocities.

There will be no significant difference in pre- and post- development runoff volume.

Hydraulic Analysis (select one):

A hydraulic analysis was conducted for this project using ____________________ . Calculations are available upon request.

Hydraulic calculations were not performed due to ____________________ .

Anticipated Rainfall Conditions

The following information was obtained from (select all that apply):

NOAA’s National Weather Service Hydrometeorological Design Studies Center Precipitation Frequency Data Server (NOAA Atlas 14)

USDA’s National Resources Conservation Service eFOTG Alabama Supplements to the National Engineering Field Handbook – Chapter 2

Other

Minimum Design Storm for Temporary BMPs = 2-year frequency, 24-hour duration = inches

Other 2-year Frequency Events (inches) 30 min 1 hr 2 hr 3 hr 6 hr 12 hr 2 day 4 day 7 day 10 day

Average Monthly Precipitation (inches)

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Other Hydraulics/Hydrology Notes

Not Applicable

HY - 8___________________________________________.

_______________________________________________________.

4.11

1.26 1.66 2.06 2.33 2.85 3.45 4.8 5.56 6.48 7.32

4.74 4.65 5.06 4.46 4.72 4.44 4.69 3.74 3.74 3.45 4.82 5.06

Not Applicable

ALDOT CBMPP Version January 2020

Page 20: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

ALDOT CBMPP Version December 2016

II.a. Environmental Concerns Environmental Review

The location of this project has not been reviewed in accordance with FHWA’s required NEPA procedures. explanation

The location of this project has been reviewed in accordance with FHWA’s required NEPA procedures. (select one of the following): Categorical Exclusion Programmatic Exclusion

Finding of No Significant Impact Environmental Impact Statement

The area reviewed for environmental concerns includes the limits of all work areas anticipated to be impacted by the project.

Environmental Concerns Found (select all that apply):

Priority Construction Site (select one of the following Discharge conditions): 303(d) Listed – Impaired by Turbidity, Siltation, or Sedimentation TMDL Finalized/Approved – Impaired by Turbidity, Siltation, or Sedimentation Outstanding Alabama Water Use Classification Outstanding Natural Resource Water Use Classification Treasured Alabama Lake Use Classification Other

Jurisdictional/Navigable Waters of the State including Wetlands

Groundwater Well

Threatened/Endangered Species and/or Habitat

Historical/Archaeological Site

Hazardous Materials Location (Paint, Asbestos, Underground Storage Tank, other)

Proximity to Existing Municipal or Public Water Intake (½ Mile Upstream or ¼ Mile Downstream)

Potential Pollutants (select all that apply):

This project will expose erodible material and thus create a potential source of sediment.

Fuels, oils, and other chemicals associated with motorized equipment and vehicles may be present.

Construction and worker debris may be present.

See Section III. of this document for additional information regarding pollution prevention requirements.

Other Environmental Concerns or Design Considerations

Not Applicable Not Applicable

ALDOT CBMPP Version January 2020

Page 21: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

ALDOT CBMPP Version December 2016

II.b. Environmental Commitments

Permits, Agreements, Clearances, Easements (note applicability for each)

Yes

No

Commitment Type Identification No.

Applied Received Expires

(Date) (Date) (Date) NPDES MS4 Permit USACOE 404 Individual Permit1 USACOE 404 Nationwide Permit1

Corps Notification - Required Not Required EPA FEMA TVA U. S. Coast Guard U. S. Fish & Wildlife / Endangered Species Historical/Archaeological Clearance Hazardous Materials Clearance FERC Approval

Note1: This project is covered under a USACOE 404 permit, and thus, it is exempt from the Construction General Permit’s requirement to provide and maintain a 25-foot undisturbed natural buffer. However, the project will utilize BMPs to treat stormwater discharges from earth disturbances within 25 feet of the surface water to the maximum extent practicable.

Soil Exposure

This project has 0

The project maximum area of exposed erodible material at one time is limited to 17 acres, or the permitted disturbance acreage, whichever is less.

Turbidity Monitoring and Construction Stormwater Sampling Not Required

Required for ALL drainage areas at the associated Primary Stormwater Discharge and Background Points

Required for SELECT drainage areas at the associated Primary Stormwater Discharge and Background Points Selected sites: list sites

Other Environmental Commitments, Obligations, or Expectations

Not Applicable

Documentation follows addressing all Environmental Commitments noted below. ADEM NPDES Construction General Permit NOI and Receipt Letter are located in Section I. of this document.

SAM - 2019 - 00901 - JSC Pending

2011 - TA - 0021 4 - 3 - 19AHC # 03 - 0632 7 - 12 - 19

6 - 13 - 19

17 acres, or the permitted disturbance

No commitments

ALDOT CBMPP Version January 2020

63.00 acres of ADEM NDPES permitted disturbance.

Page 22: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase
Page 23: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase
Page 24: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase
Page 25: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase
Page 26: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase
Page 27: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase
Page 28: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

III. a. Project Specific Best Management Practices

The scope of this project, TIGER NH 0157(506), consists of adding additional lanes on SR 157, beginningat SR 69 and ending at SR 3/US 31, in Cullman County, in and near the city of Cullman, Alabama. Thisproject is approximately 4.25 miles long. This project also includes constructing bridges across CatomaLake and CSX Railroad to accommodate the additional lanes.

The project site and adjacent properties shall be protected from contaminated stormwater runoff inaccordance with the project’s NPDES Construction General Permit. Project site housekeeping practices,pollution control, inspections and best management practices quality assurance shall be as outlined inALDOT’s Standard Specifications for Highway Constructions, sections 107.21 107.24.

All erosion and sediment control items shall be placed as shown on the plans unless otherwise directedby the Project Manager and/or the Qualified Credentialed Professional. Plan sheets 75 – 78 O containTemporary Erosion and Sediment Control Plans with discharge and background points labeled. Followingis a Narrative for BMP placement:

Plan Sheet Number Description

2P Ditch Schedules

2Y Project Notes 903, 905, and 906

75 – 78 O Erosion and Sediment Control Sheets

The site disturbance is approximately 63 acres within the project limits. The erosion and sediment control planfor this project includes three phases. The Pre Construction Phase, found on plan sheets 76 – 76 O,outlines any BMPs that are to be used before any clearing and grubbing work. The next is theConstruction Phase, found on plan sheets 77 – 77 O, outlines BMPs to be used during the constructionprocess. The final phase, the Post Construction Phase, found on plan sheets 78 – 78 O outlines BMPs tobe used as work is completed and permanent vegetation is established.

During the initial phase, stabilized construction entrances shall be constructed where indicated in theplans. Silt fences shall be placed where indicated in the plans. The places where silt fences shall beplaced includes, but is not limited to, the culvert at STA 102+50, CR 1466 at STA 113+00, the bridge overCatoma Lake at STA 165+00, CR 1402 at STA 181+00, STA 240+00, and the culvert at STA 249+00.

Page 29: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

During the construction phase, wattles shall be installed in the middle and northern ditches throughout the project as indicated in the plans. Inlet protections shall be placed at inlets throughout the project as indicated in the plans. Silt fence ditch checks shall be placed going into Catoma Lake as indicated in the plans. Temporary Earth Berms and Temporary Inflation Swales shall be placed where indicated in the plans. 

After the construction phase, temporary erosion control products shall be removed as indicated in the plans. Solid sodding shall be placed in the middle ditch as indicated in the plans. ECP Type S3 shall be placed along fill slopes as indicated in the plans. ECP Type C4 through C10 shall be placed in ditches as indicated in the plans. 

All BMPs will be implemented and maintained in accordance with the “2018 Alabama Handbook for Erosion Control, Sediment Control, and Stormwater Management on Construction Sites and Urban Areas” and shall meet or exceed current industry standards. This information is for supplemental information only and shall in no way supersede the 2020 ALDOT Special and Standard Highway Drawings, Standard Specification for Highway Construction Manual, the General Application Special Provisions, or direction of the Project Engineer. 

The following items shall be used for erosion and sediment control:  

o 3544 SY of Filter Blanket, Geotextile o 15531 SY of ECP Type S3 o 23 SY of ECP Type C2 o 139 SY of ECP Type C4 o 167 SY of ECP Type C8 o 82 SY of ECP Type C10 o 454 LF of Temporary Pipe o 6 Temporary Pipe End Treatments o 500 SY of Polyethylene o 100 Sand Bags o 82 Tons of Temporary RipRap Class 2 o 9977 LF of Silt Fence and Silt Fence Removal o 25 Inlet Protections, Stage 3 or Stage 4 o 1660 LF Wattles 

 

Page 30: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

ALDOT CBMPP Version December 2016

INSERT FINAL DOCUMENTATION

OF ALL ENVIRONMENTAL

COMMITMENTS

8.5” x 11” Preferred 11” x 17” Maximum

THIS PAGE TO BE REMOVED/REPLACED

ALDOT CBMPP Version January 2020

Page 31: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

ALDOT CBMPP Version December 2016

IF APPLICABLE, INSERT TSS%

LOAD REDUCTION SCHEMATIC

THIS PAGE TO BE REMOVED/REPLACED

ALDOT CBMPP Version January 2020

Page 32: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

ALDOT CBMPP Version December 2016

INSERT PROJECT SPECIFIC SPECIAL

PROVISIONS (Relevant to Environmental Protection)

THIS PAGE TO BE REMOVED/REPLACED

ALDOT CBMPP Version January 2020

Page 33: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

ALDOT CBMPP Version December 2016

III.b. Standard Best Management Practices ALDOT Standard Specifications and General Applications Special Provisions Contract specification requirements regarding environmental protection during construction may be found in the ALDOT Standard Specifications for Highway Construction or in the contract document in the form of a special provision. Special provisions may be General Application Special Provisions approved for general use and incorporation into the standard specifications in the future or as Project Specific Special Provisions created specifically for the project at hand. Please reference the following applicable 2012 ALDOT Standard Specifications sections.

106.01(b) Clearances and Acknowledgements for the Use of Offsite Areas - GASP 12-0399(3). 106.01(c) Operation of Offsite Pits and Waste Areas. 107.09 Construction Over or Adjacent to Waters of the United States. 107.12 Protection and Restoration of Property, Landscape and Utility Facilities. 107.13 Woodland Protection, Conservation, Abatement of Water Pollution and Quarantine Regulations. 107.14 Responsibility for Damage Claims. 107.21 Stormwater Management. 107.22 Environmental Protection and Spill Prevention. 107.23 Temporary Construction Encroachment into Streams, Water Bodies and Wetlands. 107.24 Permits for Pesticide Application. 108.04 Prosecution of Work. 201.03 Clearing and Grubbing. 205.03 Removal and Relocation of Structures. 206.04 Disposal of Materials. 210.03 Excavation and Embankment. 250.03 Removal of Underground Storage Tanks and Contaminated Soil. 521.04 Blast Cleaning, Mechanical Cleaning and Surface Roughness. 521.05 Containment System for Removal of Coating from Existing Bridge. 521.06 Collection and Disposal of Coating Material Waste from Existing Bridge. 521.07 Surface Preparation Plan Submittal for the Removal of Existing Coatings. 521.08 Final Cleaning of Blast Cleaned Surfaces. 521.14 Worker Protection. 524.03(a)2. Water Quality Protection 534 Cleaning Existing Drainage Structures. 650 Topsoil. 652 Ground Preparation, Vegetation Establishment and Mowing. 654 Solid Sodding. 656 Mulching for Vegetation Establishment. 659 Rolled and Hydraulic Erosion Control Products. 665 Temporary Soil Erosion and Sediment Control - GASP 12-0399(3). 666 Pest Control. 668 Pre-Emergent Herbicide Treatment. 669 Post-Emergent Herbicide Treatment. 672 Stormwater Turbidity Control - GASP 12-0575. 810 Geotextiles. 814 Riprap Materials. 860.01 Seed. 860.03 Mulching Material. 860.05 Solid Sod. 860.11 Rolled and Hydraulic Erosion Control Products.

2020

ALDOT CBMPP Version January 2020

Page 34: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

ALDOT CBMPP Version December 2016

ALDOT Special Drawings Contract requirements regarding environmental protection during construction may be found in the form of construction detail drawings in the plan set or in the applicable ALDOT Special and Standard Highway Drawings book. Detail drawings found in the plan set are referred to as Special Project Details and consist of details that are not included in the Special and Standard Drawings book. Please reference the following applicable 2017 ALDOT Special Drawings.

Drawing No. Description Index No. ESC-100-1 Best Management Practice Reference Matrix 1160 ESC-100-2 Best Management Practice Reference Matrix 1160-A ESC-200-1 Typical Temporary Erosion/Sediment Control Applications 1161 ESC-200-2 Details of Temporary Slope Drain, Berms and Energy Dissipator 1161-A ESC-200-3 Details of Sediment Barrier Applications 1161-B ESC-200-4 Details of Silt Fence Installation 1161-C ESC-200-5 Details of Sediment Retention Barrier 1161-D ESC-300-1 Ditch Check Structures, Typical Applications and Details 1162 ESC-300-2 Details of Hay Bale Ditch Checks 1162-A ESC-300-3 Details of Sandbag Ditch Check 1162-B ESC-300-4 Details of Erosion Control Wattle Ditch Check 1162-C ESC-300-5 Details of Silt Dike Ditch Check 1162-D ESC-300-6 Details of Rock Ditch Check 1162-E ESC-300-7 Details of Rock Ditch Check with Sump Excavation 1162-F ESC-300-8 Details of Silt Fence Ditch Check 1162-G ESC-400-1 Inlet Protection Typical Applications and Details 1163 ESC-400-2 Inlet Protection Details for Coarse Aggregate on Grades & Sags 1163-A ESC-400-3 Inlet Protection Details of Wattles 1163-B ESC-400-4 Inlet Protection Details of Silt Fence 1163-C ESC-400-5 Inlet Protection Details of Sand Bags 1163-D ESC-501 Floating Basin Boom 1164 ESC-502 Stabilized Construction Entrance 1165 ESC-503 Temporary Dewatering Structures 1166 ESC-504 Temporary Culvert Stream Crossing 1167 ESC-505 Temporary Stream Diversion 1168 ESC-506-1 Suspended Pipe Diversion (Downstream) 1169 ESC-506-2 Suspended Pipe Diversion (Upstream) 1169-A ESC-507 Temporary Sedimentation Basin 1170 ESC-508 Flocculant Usage Guide 1171 ESC-509 Details of Rolled and Hydraulic Erosion Control Product Installation 1172

ALDOT Construction Manual – Section 2.5 Construction Stormwater ALDOT Construction Manual, Section 2.5 contains internal policies and procedures relating to construction stormwater. This manual is intended as a job specific guidance resource for ALDOT inspectors. It is utilized in addition to standard specifications, standard drawings, and contract specific documents.

2020

ALDOT CBMPP Version January 2020

6650166502

6650666505

665076650866509

6651266513665146651566516665176651866519

6652266523665246652566526

66529665326653566538665416654466545665486720165901

Page 35: CONSTRUCTION BEST MANAGEMENT PRACTICES PLANalletting.dot.state.al.us/CBMPP/2020 CBMPP Files... · The Design Component is created and updated during the planning and design phase

ALDOT CBMPP Version December 2016

ALDOT Approved Treatment Chemicals Contract requirements regarding flocculants and chemical stabilization during construction may be found in the form of contract pay items on the Quantities Sheets and their usage locations are shown on the Erosion and Sediment Control Sheets in the plan set. Proper usage requirements are included in the applicable 2017 ALDOT Special and Standard Highway Drawings book and applicable 2012 ALDOT Specifications. These products may only be used if they have been reviewed and included on the applicable approved products lists of the ALDOT Materials, Sources, and Devices with Special Acceptance Requirements Manual which is maintained on the ALDOT website. Safety Data Sheets and manufacturer’s dosage instructions for these products are also maintained on the ALDOT website. Please visit the applicable ALDOT webpages for the most current information. Specific products selected for use on a project and associated documentation is submitted as part of the Contractor’s Stormwater Management Plan and included in the CBMPP after project award.

Flocculants APS 700 Series Applied Polymer Systems EnviroPam (Granular) Innovative Turf Solutions FLOC Innovative Turf Solutions HaloKlear/StormKlear DBP-2100 & Gel Floc (System) HaloSource, Inc. Tackifiers FINN HydroStik FINN Corporation Tacking Agent 3 Profile Products EnviroPam (Granular) Innovative Turf Solutions Enviro-Tak Central Fiber Hydraulic Mulches Conwed Fibers Hydro Mulch 2000 Profile Products EcoFibre Plus Tackifier Profile Products Enviro-Mix Wood Fiber Blend Central Fiber HydroCover Wood Fiber with Tack Profile Products Hydro-Spray Wood with Tack Profile Products Second Nature Wood Fiber Blend Central Fiber SoilCover Wood Fiber with Tack Profile Products Terra-Wood with Tacking Agent 3 Profile Products Hydraulic Erosion Control Products Safe Slope Xtreme Landmark Earth Solutions ProMatrix Profile Products Ground Control HY-C3 East Coast HydraCM North American Green HydroStraw Bonded Fiber Matrix HydroStraw, LLC Bindex BFM American Excelsior EcoMatrix Profile Products Enviro-Matt Central Fiber Ground Control HY-C4 East Coast Hydra CX2 North American Green SprayMatt Central Fiber EnviroMatrix Central Fiber Flexterra HP-FGM Profile Products SprayMatrix Central Fiber EarthGuard Terra Novo, Inc.

20202020

ALDOT CBMPP Version January 2020