109
In Joint  Venture 1

Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

Embed Size (px)

Citation preview

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 1/111

In Joint Venture

1

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 2/111

for al l my p resentat ions , please visi t 

http:/ /aproadbui ldqa.blogspot.com 

2

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 3/111

Important Publications for Rural Roads

1.Specifications for Rural Roads, MORD(2004).

2.Rural Roads Manual IRC:SP:20-2002.

3. MORD Quality Assurance Handbook

for Rural Roads Volume I and II :2007

4.Hill Road Manual: IRC:SP:48-1998.

5.IRC:SP: 72-2007: Guidelines for design

of flexible pavements for low volume RuralRoads

6. IRC:SP: 62-2004 Guidelines for Designof Rigid Pavements for Rural Roads

3

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 4/111

ADVANTAGES OF CONCRETE ROADS

Long Life

Practically Maintenance-Free PerformanceGood Riding Quality

Good Abrasion Resistance

Withstand Extremes of Weather 

Exclusion of Water 

Effect of oil Spillage Avoided

Skid Resistant

Used in Areas where soils have Poor Engineering Properties

Design Precision

Pollution –Free ConstructionGood Foundation for Strengthening

Fuel Saving

Economy in Life-Cycle Cost

4

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 5/111

5

Different Pavement Types

Subbase

Subgrade

Base

 Asphalt Layer

Subbase

Subgrade

Concrete Section Asphalt Section

Rigid Pavement Flexible Pavement

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 6/111

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 7/111

 Asphalt Layer

How Pavements Carry Loads

3000 kg.

pressure < 0.2 MPa

pressure 2.0 MPa

Concrete’s Rigidness spreads the load over alarge area and keeps pressures on the sub-grade

low.

3000 kg.

7

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 8/111

DISADVANTAGES OF CONCRETE ROADS

Problems of Underground Utilities

Do not Permit Stage Construction

Energy Content of ConcretePavements is high

8

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 9/111

Design Guidelines of IRC:58 areapplicable for roads having a daily

commercial traffic (vehicles with ladenweight more than 3t) over 150

Design guidelines contained inIRC:SP:62-2004 are applicable only for

low volume rural roads. It is alsoapplicable for conventional screed-compacted pavements and roller

compacted concrete pavements.9

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 10/111

Sub base for Rural Roads as per IRC:SP:62-

2004

1) It provides an uniform and reasonably

firm support

2) It prevents mud-pumping on sub-grade of 

clays and silts

3) It acts as a levelling course on distorted,non-uniform and undulating sub-grade

4) It acts as a capillary cut-off   10

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 11/111

Thickness of sub-base

1)For a designed wheel load of 51 kN, 150mm thick

WBM or GSB may be provided

2) For a designed wheel load of 30 kN, 75mm thick

WBM or GSB may be provided.

Note: When the above type of sub-base is provided,

effective k value may be taken as 20% more than

k value of the sub-grade.

A plastic sheet of 125 micron thick shall be provided

over the sub-base to act as a separation layer 

between the sub-base and concrete slab. 11

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 12/111

Zone Stages

Temperature Differential, ºC

in Slabs of Thickness

15

cm

20

cm

25

cm

30

cm

1

Punjab, U.P. Rajasthan, Haryana and North

M.P. excluding hilly regions and coastal

areas12.5 13.1 14.3 15.8

2

Bihar, West Bengal Assam and Eastern

Orrisa excluding hilly regions and coastal

areas15.6 16.4 16.6 16.8

3

Maharashtra, Karnataka, South M.P., Andhra

Pradesh, Western Orissa and North Tamil

Nadu excluding hilly regions and coastalareas

17.3 19.0 20.3 21.0

4Kerala and South Tamil Nadu excluding hilly

regions and coastal areas15.0 16.4 17.6 18.1

5 Coastal areas bounded by hills 14.6 15.8 16.2 17.0

6 Coastal areas unbounded by hills 15.5 17.0 19.0 19.2

Recommended Temperature Differentials for Concrete Slabs

as per IRC: SP:62-2004

12

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 13/111

The solution to cracking is notnecessarily to focus on increasing

concrete strength. Design strength

must be balanced with other factors

that affect cracking, such as volume

changes, curling and warping, loading,

weather and level of support

Curling and warping of slabs

13

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 14/111

Concretegrade 

Pavement Thickness(mm) 

Low Traffic(Wheel Load-30 kN) 

Heavy Traffic(Wheel Load-51kN) 

Zone-I Zone-II,IV,V,VI 

Zone-III  Zone-I Zone-II,IV,V,VI 

Zone-III 

Temperature Differential oC 

< 15o  15.1o to17o 

17. 1o to20o 

<15o  15.1o to17o 

17. 1o to20o 

30  150  160  170  190  190  200 

35  150  150  160  180  180  190 

40  150  150  150  170  180  180 

TABLE 5 : CONCRETE PAVEMENT THICKNESS FOR

RURAL ROADS as per IRC:SP 62-2004

Note: 1) maximum temperature is considered in the computation.

2) design thickness values are based on the 90-day strength.

CBR =4%, E=3.0X104 MPa, µ (Poisson’s ratio)=0.15,

Tyre Pressure=0.50MPa(For wheel load 30kN), 0.7MPa (for wheel load 51 kN),

Configuration of slab=3.75m x 3.75m  14

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 15/111

Cements that can be used as per IRC: 44-2008 

Any o f the fol low ing types o f cements capable of 

achiev ing the design st rength and durabi li ty may be 

used w ith the prior appro val of the Eng ineer.

1. Ordinary Port land Cement , 33 grade, IS: 269 

2. Ordinary Port land Cement, 43 grade, IS: 8112 

3. Ordinary Port land Cement, 53 grade, IS: 12269 

4. Port land Pozzalona Cement (f ly ash based, IS: 

1489, part1 

5. Por t land Slag Cement , IS: 455  15

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 16/111

Characterist ic 

Requirements 

33 grade 

IS: 269-1989 

43 grade 

IS: 8112- 

1989 

53 grade 

Is: 12269-1987 

Minimum compressive 

strength in N/mm 2  

3 days 

7 days 

28 days 

16 

22 

33 

23 

33 

43 

27 

37 

53 

Fineness (m inimum ) (M 2  /K g)   225 225 225 

Sett ing t im e (m inutes) Initial  – (min imum) 

Final  – (maximum) 

30 

600 

30 

600 

30 

600 

Soundness, expansion 

Le Chatleier  – (maximum ) mm 

Au toc lave test  –(maximum) %

10 

0.80 

10 

0.80 

10 

0.80 

Physical characteristic requirement of cement

16

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 17/111

IS Sieve

Size

Percent byWeight

Passing the

Sieve

26.5mm 10019 mm 80-100

9.5 mm 55-80

4.75 mm 35-60

0.600mm 10-35

0.075mm 0-8

MORD Table 1500.1: Combined Gradation of Coarse and fine

aggregates for CC roads

17

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 18/111

IS SieveDesignation

Percent passing for 

Grading

Zone-I

Grading

Zone-II

Grading

Zone-III

Grading

Zone-IV

10mm 100 100 100 100

4.75mm 90 – 100 90 – 100 90 – 100 95 – 1002.36mm 60 – 95 75 – 100 85 – 100 95 – 100

1.18mm 30 – 70 55 – 90 75 – 100 90 – 100

600microns 15 – 34 35 – 59 60 – 79 80 – 100

300microns 5 – 20 8 – 30 12 – 40 15 – 50

150microns 0 – 10 0 – 10 0 – 10 0 - 15

Fine Aggregate as per Table 4 0f IS: 383

Applicable for CC roads and Buildings.

Zone IV is not allowable for RCC works and CD works

as per MORT&H and MORD Specifications 18

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 19/111

Zone-I sand

FM=3.32

Zone-II sand

F M =3.08

Zone-III sand.

F.M =2.75Zone-IV sand

FM=2.24

Fine aggregate as per IS:383 that can be used in PlainCement Concrete roads

19

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 20/111

 

IS SieveSize

Percent by Weight Passing the

Sieve40 mm 20 mm 12.5 mm

63 mm 100 -- --

40 mm 95-100 100 --

20 mm 30-70 95-100 100

12.5 mm -- -- 90-100

10 mm 10-35 25-55 40-85

4.75 mm 0-5 0-10 0-10

Requirements of coarse (graded size) aggregate as per table

2 of IS: 383 (MORD table 800.1 or MORT&H 1000-1)

Maximum size of Coarse aggregate may be as large as

possible within the limits specified, but in no case greater than ¼th

of minimum thickness of member or 10mm less than the clear 

distance between individual reinforcement or 10mm less than clear 

cover to any reinforcement.

Single size

aggregates

shall not be

used for 

any

Concrete

item unless

specified

20

R i t f fi A t T bl 1000 2 f

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 21/111

IS Sieve

Designation 

Percent passing for 

GradingZone-I 

GradingZone-II 

GradingZone-III 

10mm  100  100  100 

4.75mm  90  – 100  90  – 100  90  – 100 

2.36mm  60 –

95  75 –

100  85 –

100 1.18mm  30  – 70  55  – 90  75  – 100 

600microns  15  – 34  35  – 59  60  – 79 

300microns  5  – 20  8  – 30  12  – 40 

150microns  0 –

10  0 –

10  0 –

10 

Requirements of fine Aggregate as per Table 1000-2 of 

MORT&H or table 4 of IS: 383

I II III

Clay lumps ≤ 4%, 

Coal and lignite ≤ 1% 

Material passing 75

micron IS sieve ≤

15% in case of 

crushed sand

21

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 22/111

Permissible limits for solids in Water 

Cl. 5.4 of IS: 456-2000

Tested as per 

Permissible limt

maximum

Organic IS 3025 part 18 200 mg/l

Inorganic IS 3025 part 18 3000 mg/l

Sulphate as SO3 IS 3025 part 24 400 mg/l

Chloride as cl IS 3025 part 322000 mg/l for PCC

500 mg/l for RCC

Suspended matter IS 3025 part 18 2000 mg/l

Water for mixing and curing as per IS:456 and

IS:3025 Potable water (pH value 6 to 8) is generally

considered satisfactory for both mixing and curing.

pH value shall not be less than 6

22

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 23/111

Function of Plasticizers(Admixtures conforming to IS:6925 and IS:9103

may be used up to 2% by weight as per IS:456)

Fine cement particles being very small clump

together and flocculate when water is added to

concrete. This ionic attraction between theparticles trap considerable volume of water and

hence water required for workability of concrete

mix is not fully utilised. Negative charges are

induced on the fine cement particles causingflocks to disperse and release the entrapped water.

Water reducing admixtures or plasticizers therefore

help to increase the flow of the concrete mix

considerably. 23

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 24/111

Dispersion of entrapped air with the addition of 

plasticizer  24

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 25/111

25

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 26/111

Coefficient of Permeability for different

W/C ratios

S.No W/C ratioCoefficient of 

Permeability

1 0.35 1.05 x 10-3

2 0.50 10.30 x 10-3

3 0.65 1000 x 10-3

26

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 27/111

Placing of concrete

Concrete shall be deposited on the sub base to the

required depth and width in successive batches

and in continuous operation. Care shall be taken tosee that no segregation takes place. Spreading

shall be as uniform as possible and shall be

accompanied by shovels. While being placed, the

concrete shall be rodded with suitable tools so thatformation of voids or honeycomb pockets are

avoided.

27

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 28/111

MORD 1501.13 concreting in hot weather 

No concreting shall be done when the concretetemperature is above 30°C measured at point of 

placing and or when ambient temperature isabove 35°C. In adverse conditions, like hightemperature, low relative humidity, excessivewind velocity, imminence of rains etc. freshly laidconcrete shall be adequately protected by

tarpaulins.

MORD 1501.14: Concreting in cold weatherNo concreting shall be done when the concrete

temperature is below 5°C 28

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 29/111

Compaction of Concrete

Compaction is necessary to remove entrapped air 

present in concrete after it is mixed, transported and placed.Compaction also eliminates stone pockets and remove all

types of voids. Consolidation is the process of making the

freshly placed PCC into a more uniform and compact mass

by eliminating undesirable air voids and causing it to movearound potential obstructions.

Vibrators work by rotating an eccentric weight which

causes the entire vibrator to move back and forth. This

movement excites particles within the PCC mass, causingthem to move closer together and better flow around

obstructions. On vibration, concrete mix gets fluidized

resulting in entrapped air raising to the surface and concrete

becoming denser  29

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 30/111

Guidelines for compaction with Pin Vibrator 

1) Insert poker quickly and allow it to penetrate by

its own weight to the bottom of layer so that theentrapped air is removed uniformly.

2) Leave the poker in concrete for 10 seconds.

Compaction time depends on slump.

3) Poker must be inserted quickly, but withdrawal

must be slow so that the hole left by the poker is

filled up as it is being withdrawn.

4) Locations of poker insertion should be staggered.5) Avoid touching the form work (and reinforcement)

with poker.

6) Poker should extend up to 100mm into the

previous layer. 30

MORD 1501 17: Texturing

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 31/111

MORD 1501.17: Texturing

Just before the concrete becomes non plastic,

the surface shall be textured with an approved long

handled steel or fiber brush. The brush shall bepulled gently over the pavement surface

transversely from one edge to the other. Adjacent

strokes shall be slightly overlapped. Texturing shall

be perpendicular to the center line of the pavement.The corrugations so produced will be uniform in

character, width and about 1.5mm deep. Texturing

shall be completed before the concrete reaches

such a stage that the surface is likely to be torn or unduly roughened by the operation. Texturing shall

be free from porous or rough spots, irregularities,

depressions and small pockets.31

TPQA Inspection of Madnur ZP Road to Bapuji Yanadi Colony

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 32/111

TPQA Inspection of Madnur ZP Road to Bapuji Yanadi Colony.

Checking the width of C.C Road with texture.

32

TPQA Inspection of Madnur ZP Road to Peddapattupalem

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 33/111

TPQA Inspection of Madnur ZP Road to Peddapattupalem

C.C Road with texture.

33

C t C i

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 34/111

Concrete Curing

Curing is the process of maintaining a satisfactory

moisture content and favorable temperature in the

concrete during hydration of cementetiousmaterial so that the desired properties of the

concrete are developed. Its objective is specifically

to keep the concrete saturated until the water filled

spaces in the fresh cement paste are filled to thedesired extent by products of the hydration.

Continuouswatersupply

Water evaporation from

concrete surface

34

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 35/111

MORD 15001.18: Curing

After finishing, the pavement surface shall be

entirely covered with wet hessian cloth (minimum of 

2 layers), burlap or jute mats. The coverings usedshall be of such size that when laid, will extend by

500mm beyond the slabs. They shall be placed as

soon as the concrete has set sufficiently to prevent

marring of the surface. They shall be maintained

fully wetted for 24 hours. The concrete slab shall not

be exposed for more than 30 minutes for saw cutting

of joints. After saw cutting of joints, it shall becovered and kept wet. Upon the removal of wet

covers after 24 hours, the slabs shall be thoroughly

wetted and then cured by ponding. Exposed edges

shall be banked with substantial amount of earth.35

Effects of Improper Curing

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 36/111

Effects of Improper Curing

Lowering of compressive and flexural strengths

Sanding and dusting of surface and lower abrasion

resistance

Higher permeability and lower durability

Cracks due to plastic shrinkage, drying shrinkage and

thermal cracking

Increased rate of Carbonation and chloride ingress

Lower weathering and frost resistance

36

TPQA Inspection of R&B Road to Pinnivaripalem- C C Road

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 37/111

TPQA Inspection of R&B Road to Pinnivaripalem C.C Road

Curing by ponding.

37

Surface due to ineffective curing before ponding

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 38/111

Surface due to ineffective curing before ponding

38

TPQA-NCRMP inspection of Kothapatnam RCS in

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 39/111

TPQA NCRMP inspection of Kothapatnam RCS in Visakhapatnam dist. On 15.05.2013. Cube casting.

39

TPQA-NCRMP inspection of Kothapatnam RCS in

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 40/111

TPQA NCRMP inspection of Kothapatnam RCS in Visakhapatnam dist. On 15.05.2013. Slump checking.

40

TPQA-NCRMP inspection of Kothapatnam RCS in

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 41/111

TPQA NCRMP inspection of Kothapatnam RCS in Visakhapatnam district on 15.05.2013. Slump checking.

41

TPQA-NCRMP inspection of Kothapatnam RCS in

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 42/111

TPQA NCRMP inspection of Kothapatnam RCS in Visakhapatnam district on 15.05.2013.

Material gradation checking.

42

TPQA-NCRMP inspection of Kothapatnam RCS in

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 43/111

TPQA NCRMP inspection of Kothapatnam RCS in Visakhapatnam district on 15.05.2013.

Temperature checking.

43

TPQA-NCRMP inspection of Road from R&B road to

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 44/111

Q p

Revupolavaram Cyclone shelter in Visakhapatnam district on

26.03.2013. Gunny rolls used for primary curing.

44

TPQA-NCRMP inspection of Kothapatnam RCS in

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 45/111

Q p p Visakhapatnam district on 15.05.2013. Coconut cover

waste for secondary curing

45

TPQA-NCRMP inspection of Kothapatnam RCS in

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 46/111

Q p p Visakhapatnam dist. On 25.05.2013. secondary curing

46

TPQA-NCRMP inspection of Kothapatnam RCS in

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 47/111

Q p p Visakhapatnam district on 25.05.2013.

47

TPQA-NCRMP inspection of Kothapatnam RCS in

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 48/111

Q p p Visakhapatnam district on 25.05.2013. Dowel bars

48

TPQA Inspection of KEM R&B Road to E.Pallepalem. Concreting in

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 49/111

progress.

49

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 50/111

TPQA Inspection of KEM R&B Road to E.Pallepalem – 

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 51/111

Leveling or finishing of C.C surface.

51

TPQA Inspection of KEM R&B Road to E.Pallepalem – 

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 52/111

Checking the width of C.C Road.

52

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 53/111

TPQA Inspection of KEM R&B Road to E.Pallepalem – 

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 54/111

Compaction of oncrete.

54

TPQA Inspection of KEM R&B Road to E.Pallepalem – 

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 55/111

Compaction of C.C Road.

55

TPQA Inspection of KEM R&B Road to E.Pallepalem – 

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 56/111

56

MORD 1501.7 Separation membrane

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 57/111

MORD 1501.8.1 Formation Of Jo in ts 

Saw cut t ing of joints of pavement slab as per 

st ipulated dimensions should be done when 

conc rete is nei ther too so f t nor too hard. Saw ing 

operat ions should start as early as possible depend ing upon the season. The ini t ial saw cut t ing 

and subsequent widening of groo ve shal l be done 

w i th the help of saw cut t ing machine wi th diamond 

studded blade.

MORD 1501.7 Separation membrane 

A separat ion membrane shal l be used between the 

concrete slab and sub-base. It shal l be 

impregnable plast ic sheet 125 micro ns thick laid w ithou t creases. Before p lacing i t , the sub-base 

shall be swept clean o f al l extraneous materials 

57

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 58/111

Types Of Joints

a)Contraction Joints (Transverse)

b) Construction Joints (Transverse)

c) Expansion Joints (Transverse)

d) Longitudinal joints

58

MORD 1501 8 3 Contract io n jo in ts:

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 59/111

MORD 1501.8.3 Contract io n jo in ts: 

The contract ion jo ints shal l consis t of a 

mechanical ly sawn jo int groove 3mm to 5mm 

w ide and ¼ to 1/3 of depth of slab as shown in 

the drawings. The sawn jo ints sh al l be cut as 

soon as the concrete has undergone in i t ia l 

hardening and is st rong enough to bear the 

weight of crew and cut t ing machine. These 

 jo in ts shall be subsequent ly w idened to 10mm 

width and 20mm depth by app rop r iate saw to house the sealant. These join ts shal l be spaced 

2.5m to 3.75m as per sketch in Fig.1500.1 

However the length of panel (in d irect ion of 

traf fic) shall no t be less than the w idth of panel .59

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 60/111

60

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 61/111

MORD 1501.8.4 Constru ct ion Jo ints : 

Construct ion jo ints shal l be placed when 

concret ing is completed after a  day’s work or is 

suspended for more than 30 m inutes . Cons truc t ion 

 jo in t shall be prov ided at the locat ion o f 

contract ion jo int . The joint shal l be a bu tt joint .

Steel bulkhead shal l be used to retain the 

concrete whi le surface is f in ished. The joint 

shal l be widened to 10mm width and 20mm 

depth to house the seal ing compound. No emergency jo int shall be al lowed in less than 

2m dis tance of any preceding or succeeding 

 jo in t pos it ion .

61

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 62/111

Construction Joint details 62

MORD 1501 8 5 E i J i t

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 63/111

MORD 1501.8.5 Expans ion Jo ints 

These shal l be pro vided only near the 

bridges or culverts. The expansion joint shal l 

consis t of a bi tumen impregnated jo int /pre- 

moulded synthet ic jo int f i l ler board about 

20mm thick comply ing w i th IS:1838 and dowel bars comply ing w ith cl 1501.9 or as speci f ied in 

the drawing s. The dowel bars shall be passing 

through the holes in the board. Fi l ler board 

shall be posi t ioned vertically along the l ine of the joint within the tolerances as per 

cl.1501.2.7. Adjacent slabs shall be ful ly 

separated by the f i l ler board 63

MORD 1501 9 D l b f i j i t

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 64/111

MORD 1501.9 Dowel bars for expans ion join ts 

Dowel bars shal l be mi ld s teel bars o f 25mm 

dia., 500mm long and spaced at 250mm center 

to center. They shal l be provided at mid depth 

within a tolerance of ± 20mm. They shal l be 

covered by thin p last ic sheathing no t th icker than 0.5mm for half leng th +50mm .

A closely f i tt ing cap of 100mm long o f water 

proofed cardboard or synthet ic mater ial l ike 

PVC shall be placed over the sheathed end of each dowel bar. An expansion gap f i l led w ith 

compress ib le sponge/ thermocol is to be 

prov ided.64

Expansion Joint at po ints of abu t ting st ructures

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 65/111

Expansion Joint at po ints of abu t ting st ructures 

Dowels: 25mmdia., 500mm long and spaced at 

250mmc/c 

Filler board: compressible Joint filler 20mm ± 1.5mm

Filler depth 25mm ± 3mm lower than slab thickness

Dowel bars (MS rounds) to be covered with plastic

sheathing for ½ length +50mm65

Shuttering sheets for MS dowels just removed.

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 66/111

Observe the bulkhead used to retain concrete

66

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 67/111

Mild steel dowel rods with sheathing and caps.

Groove cutting in progress at expansion joints.

Filler board shall be in one piece only. 67

 MORD1501.11.4.3.4 Paving near culverts and bridges

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 68/111

g g

Pipe culverts: Slab shal l be carr ied over pipe culverts 

New cu lvert / br idge: Struc tural slab o f cu lvert / br idge shal l be extended o ver fu l l width of abutment cap.

During cast ing dowel bars shall be f ixed at the end 

near expansion joint w ith the CC road. Exposed dowels 

are covered w ith sheathing and cap etc. 12mm thick f i l ler board in case of culvert and 20mm thick f i l ler 

board in case of bridge shal l be inserted before laying 

the pavement slab. Fil ler board, w ith holes for dowels,

shal l be for fu l l pavement w idth and shal l be in one 

length.

Exist ing br idge: Expans ion jo int shal l be prov ided at 

either end between the paving slab and the culvert / 

br idge slab 68

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 69/111

CC road jo int wi th new b r idge   69

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 70/111

CC road join t with exist ing cu lvert/ br idge   70

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 71/111

Details of expansion joint and sealing 71

MORD1501.8.6 Long itud inal Jo in ts: 

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 72/111

They shal l be provided for two-lane road or 

wherever shown in the drawings . For a sing le lane 

road longi tudinal joint is not needed. The 

concret ing in the ent i re width shal l be done in one 

go and the longi tud inal joint shal l be saw cu t . It 

shall be 3-5mm w ide and of depth equal to 1/3 rd 

the depth o f slab ± 5mm . The joint shal l be w idened to a 

groo ve of 6 to 8mm w idth and 12mm to 15mm depth 

and sealed w ith ho t poured sealant as per clause 

1501.22. Before sealant is poured , a baker th read o f non-combust ib le mater ial l ike jute thread or narial 

rope shal l be pressed into the widened g roove so 

as to leave unf i l led depth of 8mm to 10mm .72

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 73/111

Details of longitudinal joint and sealing 73

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 74/111

Groove cutting machine

74

Contraction joint 3 to 5 mm wide

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 75/111

1/3 to 1/4 in depth

75

Mohammadalipalem road in Guntur District. Joint cutting

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 76/111

76

Mohammadalipalem road in Guntur District. Joint cutting

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 77/111

77

Mohammadalipalem road in Guntur District.

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 78/111

78

Mohammadalipalem road in Guntur District

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 79/111

79

Mohammadalipalem road in Guntur District. Key wallshuttering

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 80/111

shuttering

80

Mohammadalipalem road in Guntur District.Plate vibratory compaction.

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 81/111

Plate vibratory compaction.

81

Mohammadalipalem road in Guntur District

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 82/111

82

Mohammadalipalem road in Guntur District

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 83/111

83

Mohammadalipalem road in Guntur District

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 84/111

84

Mohammadalipalem road in Guntur District

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 85/111

85

Mohammadalipalem road in Guntur District

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 86/111

86

Mohammadalipalem road in Guntur District

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 87/111

87

Hanumantnagar road in Bapatla mandal in Guntur District. CCroad under finishing

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 88/111

g

88

Hanumantnagar road in Bapatla mandal in Guntur District.

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 89/111

89

Hanumantnagar road in Bapatla mandal in Guntur District. CCroad thickness being verified.

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 90/111

g

90

TPQA inspection of R&B road to Mohammadalipalem road inGuntur District 0n 22-11-2011. Verifying outside

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 91/111

measurements.

91

TPQA inspection of R&B road to Mohammadalipalem road inGuntur District 0n 22-11-2011. Concrete strength testing by

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 92/111

rebound hammer which gives an approximate indication

92

TPQA inspection of R&B road to Mohammadalipalem road inGuntur District 0n 22-11-2011. Cube testing in the laboratory.

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 93/111

93

Causes of cracking in concrete roads

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 94/111

1) Plastic shrinkage of concrete surface due

to rapid loss of moisture

2) Drying shrinkage

3) High wind velocity associated with low

humidity

4) High ambient temperature

5) Delayed sawing of joints94

Shrinkage cracking probably due to late sawing (left)Joint raveling due to early sawing (right)

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 95/111

Timing the Sawing Wind ow: Joints are usually

constructed by saw-cutting the concrete a few hours

after placing. The optimum period of time to saw

contraction joints is known as the sawing window.The sawing window for conventional saws generally

begins when concrete is strong enough not to

ravel excessively along the saw cut. The window

ends when significant shrinkage occurs that induces

uncontrolled cracking

95

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 96/111

Crack caused by late joint sawing96

PQC concreting commenced over 125 micron thick plasticsheet as separation membrane

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 97/111

97

Preparation for slump test, casting cubes (150 mm)

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 98/111

Preparation for slump test, casting cubes (150 mm)

and beams(70 х 15 х 15 cm)

 Concrete Cores in CC roads:

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 99/111

Crushing strength of cylindrical specimens

=0.8×crushing strength of cubes when the height todiameter ratio of core is 2.

Crushing strength of cylinders with height to diameter 

ratio between 1 and 2 may be multiplied by a correction

factor f = 0.11n+0.78 where n is height to diameter ratio.Number of cores = minimum 3

The concrete in the core test shall be considered

acceptable if the average equivalent cube strength of the

cores is at least 85% of the cube strength of the grade of 

concrete specified for the corresponding age and no

individual core has a strength less than 75%99

 Acceptance Criteria for Cracked Concrete Slabs

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 100/111

Slabs with full depth cracks are totally

unacceptable as it amounts to structural failures.Other cracks which are deep and are likely to progress

in depth with time are also to be considered as serious

in nature. Fine crazy cracks are not serious.

Slabs with cracks having depth more than half slabdepth shall not be accepted.

Following type of cracked slabs are acceptable:

1) Length of single crack shall not be more than

750mm, eventhough its depth is less than half of slabdepth.

2) Cumulative length of cracks with depth of crack less

than half depth of slab in a panel not more than

1250mm100

TPQA inspection of R&B road to Mohammadalipalem road inGuntur District 0n 11-02-2012. Core cutting to verify inner 

d th d i t th

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 101/111

depth and compressive strength.

101

TPQA inspection of R&B road to Mohammadalipalem road inGuntur District 0n 11-02-2012. Core cutting to verify inner 

d th d i t th

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 102/111

depth and compressive strength.

102

TPQA inspection of R&B road to Mohammadalipalem road inGuntur District 0n 11-02-2012. Core cutting to verify inner 

d th d i t th

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 103/111

depth and compressive strength.

103

TPQA inspection of R&B road to Mohammadalipalem road inGuntur District 0n 14-02-2012. Core testing for assessing

i t th f M30 t

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 104/111

compressive strength of M30 concrete.

104

TPQA inspection of R&B road to Mohammadalipalem road inGuntur District 0n 14-02-2012. Core testing for assessing

i t th f M30 t

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 105/111

compressive strength of M30 concrete.

105

TPQA inspection of R&B road to Mohammadalipalem road inGuntur District 0n 14-02-2012. Core testing for assessing

i t th f M30 t

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 106/111

compressive strength of M30 concrete.

106

TPQA inspection of R&B road to Mohammadalipalem road inGuntur District 0n 14-02-2012. Core testing for assessing

i t th f M30 t

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 107/111

compressive strength of M30 concrete.

107

MORD Table 1800.8, Frequency of Quali ty Con tro l Tests fo r 

Paving Quali ty Cement Concrete Pavement 

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 108/111

Levels and Al ignment 

Level Tolerance To be checked for each day’s work (clause 1802.3)

Surface Regularity

Longitudinal & TransverseRegularly

Width of Pavement andposition of paving edges

To be checked for each day’s work (clause 1802.3)

Pavement Thickness Regularly at grid points

Alignment of joints To be checked for each day’s work 

Depth of Dowel bars To be checked for each day’s work 

108

MORD Table 1800.8, Frequency of Quali ty Con tro l Tests fo r 

Paving Quali ty Cement Concrete Pavement 

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 109/111

Cement and Water 

Item Test

methodfrequency

Cement:Physical and

Chemical tests

IS: 269, IS:455, 1489,

IS:8112

IS: 12269

One for each source of supply

and occasionally when called

for in case of long/ improper 

storage. Besides, the contractor 

shall also submit daily test data

on cement released by the

manufacturer.Water 

Chemical

Tests

IS: 456

Once for Approval of source of 

supply, subsequently in case of 

doubt

109

MORD Table 1800.-8, Frequency of Quali ty Con tro l Tests fo r 

Paving Quali ty Cement Concrete Pavement 

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 110/111

Coarse and Fine Agg regates 

Test Test Method Frequency

AIV IS: 2386-part 4 1 test per source

FIV IS: 2386-part 1 1 test per source

Deleterious

constituentsIS: 2386 part 2 1 test fo each day’s work 

Water 

Absorption/

Content

IS: 2386-part 3

Regularly as required subject to a

minimum of 1 test a day for 

coarse aggregate and 2 tests a

day for fine aggregates.

Soundness IS: 2386-part 5 1 test per source

Gradation IS: 2386-part 1 1 test per each day’s work 

Alkali Aggregate

ReactionIS: 2386-part 7 1 test per source

110

MORD Table 1800-8, Frequency o f Quali ty Contro l 

Tests fo r Paving Qual i ty 

7/27/2019 Construction and QC in Rigid Pavements for Low Volume Rural Roads by D.V.Bhavanna Rao

http://slidepdf.com/reader/full/construction-and-qc-in-rigid-pavements-for-low-volume-rural-roads-by-dvbhavanna 111/111

g y

Cement Conc rete Pavement 

Conc rete for pavement 

Strength of Concrete IS:516

Minimum 6 cubes and 6

beams per day’s work(3 each for 7 day 28 day

strength).

Workability

of frshconcrete

Slump test

IS: 1199

1 test per 3 cubic meters of 

concrete at paving site or 1test for each dumper laid at

plant site