August 2012 Wholesale Market Operations Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach Market Support and Analysis

Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach

  • Upload
    thad

  • View
    20

  • Download
    3

Embed Size (px)

DESCRIPTION

Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach. Market Support and Analysis. Changes from Current Approach to New Approach. Implemented CCT Logic for this Study. A constraint is “Competitive” if - PowerPoint PPT Presentation

Citation preview

Page 1: Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach

August 2012

Wholesale Market Operations

Constraints Competitiveness Tests (CCT) –Annual CCT 2013 Study Result with New Approach

Market Support and Analysis

Page 2: Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach

2

Changes from Current Approach to New Approach

ERCOT PublicAugust 2012

Current Approach New Approach

Shift factor referenceImport and export

terminalsDistributed load

ECI impactProduct of capacity and

shift factorProduct of capacity and

square of shift factor

ECI significant threshold1/3 of maximum SF as

well as not contributed to worst flow

Minimum of absolute 0.02 value and 1/3 of

maximum SF

Overload-ability (worst flow)

Accumulate generation impact from worst SF until meet system total

load impact +/- line limit, then compare

accumulated generation capacity to system total

load

Accumulate generation capacity from worst SF until meet system total

load, then compare accumulated generation

impact to line limit

Wind capacity available ratio

Expected on-peak output 0% for those with SF<0

Page 3: Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach

3

Implemented CCT Logic for this Study

• A constraint is “Competitive” if– Constraint can not be overloaded under worst case scenario

OR – Combination of

• There are resources with absolute Shift Factor >=2 %• AND positive-SF ECI of squared SF with min(0.02, 1/3)

threshold < 2500• AND negative-SF ECI of squared SF with min(0.02, 1/3)

threshold < 2000• AND no pivotal player exists

• Otherwise, it is “Non-Competitive”• An option up for consideration is ignoring the “overloaded

under worst case scenario” check– May be appropriate because we are only analyzing one month,

which is a peak load month, as oppose to 12 monthly cases

ERCOT PublicAugust 2012

Page 4: Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach

4

Constraint Sets and Models used in Annual CCT Study

• Models– SSWG 2013 Summer case (dated 2/27/2012) with CRR Annual

Auction August 2013 constraint and contingency definitions (dated 9/28/2011)

– CRR Auction August 2013 case (dated 7/23/2012)– Basic picture on both models

• Total generation capacity about 94,000 MW from registration data

• Total load about 74,000 MW from SSWG 2013 Summer case

• Entire topology considered, no outages on lines and transformers

• Constraint Sets– SCED historical constraints since go-live (693 distinct

constraints, all evaluated for both directions)– CSC/CRE (332 distinct constraints, all evaluated for both

directions)

ERCOT PublicAugust 2012

Page 5: Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach

5

Result on SCED Historical Constraints (Zero-out Negative Wind Flow, ECI Threshold [2000,2500], OL Flag Check)

ERCOT PublicAugust 2012

Current Approach

New ApproachSSWG Model

CountSSWG Model Percentage

CompetitiveCompetitive 1009 72.80%

Non-competitive 232 16.74%

Non-competitiveCompetitive 14 1.01%

Non-competitive 131 9.45%

Total 1386 100.00%

Current Approach

New ApproachCRR Auction Model Count

CRR Auction Model

Percentage

CompetitiveCompetitive 845 62.50%

Non-competitive 307 22.71%

Non-competitiveCompetitive 7 0.52%

Non-competitive 193 14.28%

Total 1352 100.00%

Page 6: Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach

6

Result on CSC/CRE Constraints (Zero-out Negative Wind Flow, ECI Threshold [2000,2500], OL Flag Check)

ERCOT PublicAugust 2012

Current Approach

New ApproachSSWG Model

CountSSWG Model Percentage

CompetitiveCompetitive 548 82.53%

Non-competitive 53 7.98%

Non-competitiveCompetitive 13 1.96%

Non-competitive 50 7.53%

Total 664 100.00%

Current Approach

New ApproachCRR Auction Model Count

CRR Auction Model

Percentage

CompetitiveCompetitive 503 75.75%

Non-competitive 90 13.55%

Non-competitiveCompetitive 13 1.96%

Non-competitive 58 8.73%

Total 664 100.00%

Page 7: Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach

7

Result on SCED Historical Constraints (Zero-out Negative Wind Flow, ECI Threshold [2000,2500], No OL Flag Check)

ERCOT PublicAugust 2012

Current Approach

New ApproachSSWG Model

CountSSWG Model Percentage

CompetitiveCompetitive 26 1.88%

Non-competitive 1215 87.66%

Non-competitiveCompetitive 13 0.94%

Non-competitive 132 9.52%

Total 1386 100.00%

Current Approach

New ApproachCRR Auction Model Count

CRR Auction Model

Percentage

CompetitiveCompetitive 33 2.44%

Non-competitive 1119 82.77%

Non-competitiveCompetitive 5 0.37%

Non-competitive 195 14.42%

Total 1352 100.00%

Page 8: Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach

8

Result on CSC/CRE Constraints (Zero-out Negative Wind Flow, ECI Threshold [2000,2500], No OL Flag Check)

ERCOT PublicAugust 2012

Current Approach

New ApproachSSWG Model

CountSSWG Model Percentage

CompetitiveCompetitive 199 29.97%

Non-competitive 402 60.54%

Non-competitiveCompetitive 12 1.81%

Non-competitive 51 7.68%

Total 664 100.00%

Current Approach

New ApproachCRR Auction Model Count

CRR Auction Model

Percentage

CompetitiveCompetitive 204 30.72%

Non-competitive 389 58.58%

Non-competitiveCompetitive 7 1.05%

Non-competitive 64 9.64%

Total 664 100.00%

Page 9: Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach

9

Summary of Study Results – Number of Competitive Constraints

ERCOT PublicAugust 2012

ECI Threshold Option ECI Threshold [2000,2500] ECI Threshold [2500,3000]

Overload Flag Check Option OL Flag Check No OL Flag OL Flag Check No OL Flag

Constraint Set ModelComp. or Non-

Comp.Count Pctg Count Pctg Count Pctg Count Pctg

SCED Historical

SSWGCompetitive 1023 73.81% 39 2.82% 1037 74.82% 70 5.05%

Non-Competitive 363 26.19% 1347 97.18% 349 25.18% 1316 94.95%

CRR AuctionCompetitive 852 63.02% 38 2.81% 879 65.01% 85 6.29%

Non-Competitive 500 36.99% 1314 97.19% 473 34.98% 1267 93.71%

CSC/CRE

SSWGCompetitive 561 84.49% 211 31.78% 621 93.53% 311 46.84%

Non-Competitive 103 15.51% 453 68.22% 43 6.47% 353 53.16%

CRR AuctionCompetitive 516 77.71% 211 31.77% 608 91.57% 334 50.31%

Non-Competitive 148 22.28% 453 68.22% 56 8.43% 330 49.70%

Page 10: Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach

10

Inconsistent Results Between the 2 Models (Switch between Competitive/Non-existing and Non-competitive)

ERCOT PublicAugust 2012

Dataset Description Count

cscCSC/CRE constraint set existing in both SSWG 2013

model and CRR auction Aug 2013 model45

sced_crraugSCED historical constraint set existing only in CRR

auction Aug 2013 model56

sced_sswgSCED historical constraint set existing only in SSWG

2013 model38

scedhistSCED historical constraint set existing in both SSWG

2013 model and CRR auction Aug 2013 model189

Total 328

(Zero-out Negative Wind Flow, ECI Threshold [2000,2500], OL Flag Check)

Page 11: Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach

11

Causes of Inconsistent Results between the 2 Models

• Actual topology change– Results in shift factor change– Results in ECI change

• Line limit change– Results in overload-ability change– Result in PPI change once compared pivotal flow to line limit

ERCOT PublicAugust 2012

Page 12: Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach

12

Concerns during Annual CCT Study

• DC-Ties (all DC-Ties have been considered in the study with entity as ERCOT)

• Only the decision making entity was considered for this study, not Affiliates

• Impact of peak load in cases that were studied– Significantly reduced the number of overload-able constraints, – A high-ECI constraint can be competitive just because it won’t

be overloaded in the worst case when generators with SF<0 are used to meet peak load

• Should negative WGR shift factors be included in the shift factor cut-off even if the MWs are considered to be 0

ERCOT PublicAugust 2012

Page 13: Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach

13

Additional Material

ERCOT PublicAugust 2012

Page 14: Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach

14

Summary of all New Study Results

ERCOT PublicAugust 2012

ECI Threshold Option ECI Threshold [2000,2500] ECI Threshold [2500,3000]

Overload Flag Check Option OL Flag Check No OL Flag OL Flag Check No OL Flag

Constraint Set Model Pattern Count Pctg Count Pctg Count Pctg Count Pctg

SCED Historical

SSWG

Comp to Comp 1009 72.80% 26 1.88% 1033 74.53% 67 4.83%

Comp to Non-Comp 232 16.74% 1215 87.66% 267 19.26% 1233 88.96%

Non-Comp to Comp 14 1.01% 13 0.94% 4 0.29% 3 0.22%

Non-Comp to Non-Comp 131 9.45% 132 9.52% 82 5.92% 83 5.99%

CRR Auction

Comp to Comp 845 62.50% 33 2.44% 879 65.01% 85 6.29%

Comp to Non-Comp 307 22.71% 1119 82.77% 359 26.55% 1153 85.28%

Non-Comp to Comp 7 0.52% 5 0.37% 0 0.00% 0 0.00%

Non-Comp to Non-Comp 193 14.28% 195 14.42% 114 8.43% 114 8.43%

CSC/CRE

SSWG

Comp to Comp 548 82.53% 199 29.97% 610 91.87% 300 45.18%

Comp to Non-Comp 53 7.98% 402 60.54% 36 5.42% 346 52.11%

Non-Comp to Comp 13 1.96% 12 1.81% 11 1.66% 11 1.66%

Non-Comp to Non-Comp 50 7.53% 51 7.68% 7 1.05% 7 1.05%

CRR Auction

Comp to Comp 503 75.75% 204 30.72% 581 87.50% 309 46.54%

Comp to Non-Comp 90 13.55% 389 58.58% 52 7.83% 324 48.80%

Non-Comp to Comp 13 1.96% 7 1.05% 27 4.07% 25 3.77%

Non-Comp to Non-Comp 58 8.73% 64 9.64% 4 0.60% 6 0.90%

Page 15: Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach

15

Results Presented During 8/6 CMWG Meeting

• For the results presented at the 8/6 CMWG Meetings, the ECI thresholds that were used were 3000 and 2500 (as oppose to 2500 and 2000)

• For the wind capacity ratio– ECI: 0% for the WGRs with shift factors < 0– PPI: 100% for all (impact on constraint considered to be 0)

ERCOT PublicAugust 2012

Page 16: Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach

16

Results Presented During 8/6 CMWG Meeting

• Results on SCED Historical Constraints – Overload Check

ERCOT PublicAugust 2012

Current Approach New ApproachSSWG Model

CountSSWG Model Percentage

CompetitiveCompetitive 1026 74.03%

Non-competitive 274 19.77%

Non-competitiveCompetitive 4 0.29%

Non-competitive 82 5.92%

Total 1386 100.00%

Current Approach New ApproachCRR Auction Model Count

CRR Auction Model Percentage

CompetitiveCompetitive 867 64.13%

Non-competitive 371 27.44%

Non-competitiveCompetitive 0 0.00%

Non-competitive 114 8.43%

Total 1352 100.00%

Page 17: Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach

17

Results Presented During 8/6 CMWG Meeting

• Results on CSC/CRE Constraints – Overload Check

ERCOT PublicAugust 2012

Current Approach New ApproachSSWG Model

CountSSWG Model Percentage

CompetitiveCompetitive 603 90.81%

Non-competitive 43 6.48%

Non-competitiveCompetitive 11 1.66%

Non-competitive 7 1.05%

Total 664 100.00%

Current Approach New ApproachCRR Auction Model Count

CRR Auction Model Percentage

CompetitiveCompetitive 571 85.99%

Non-competitive 62 9.34%

Non-competitiveCompetitive 25 3.77%

Non-competitive 6 0.90%

Total 664 100.00%

Page 18: Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach

18

Results Presented During 8/6 CMWG Meeting

• Results on SCED Historical Constraints – No Overload Check

ERCOT PublicAugust 2012

Current Approach New ApproachSSWG Model

CountSSWG Model Percentage

CompetitiveCompetitive 74 5.34%

Non-competitive 1226 88.46%

Non-competitiveCompetitive 4 0.29%

Non-competitive 82 5.92%

Total 1386 100.00%

Current Approach New ApproachCRR Auction Model Count

CRR Auction Model Percentage

CompetitiveCompetitive 91 6.73%

Non-competitive 1147 84.84%

Non-competitiveCompetitive 0 0.00%

Non-competitive 114 8.43%

Total 1352 100.00%

Page 19: Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach

19

Results Presented During 8/6 CMWG Meeting

• Results on CSC/CRE Constraints – No Overload Check

ERCOT PublicAugust 2012

Current Approach New ApproachSSWG Model

CountSSWG Model Percentage

CompetitiveCompetitive 301 45.33%

Non-competitive 345 51.96%

Non-competitiveCompetitive 11 1.66%

Non-competitive 7 1.05%

Total 664 100.00%

Current Approach New ApproachCRR Auction Model Count

CRR Auction Model Percentage

CompetitiveCompetitive 310 46.69%

Non-competitive 323 48.64%

Non-competitiveCompetitive 25 3.77%

Non-competitive 6 0.90%

Total 664 100.00%

Page 20: Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach

20

Other Previously Discussed Results

• If at another Load Profile - Compared to Previous Study in May 2012– Out of 542 CSC/CRE constraints, 522 are competitive and 20

are non-competitive with current CCT approach. Note it considers ECI, PPI and worst case flow.

– While with proposed min(0.02, 1/3) squared SF approach, out of 542 CSC/CRE constraints, 290 are competitive and 252 are non-competitive. Note it considers ECI, PPI and worst case flow as well.

– The competitive ratio for CSC set reduces from 96% to 53%.– Note that this version of result is based on DCCT 11/30/2011.

ERCOT PublicAugust 2012