60
Zuhair Haddad/ Amr ElSersy CCC Consolidated Contractors International Company, (CCC) Building Information Modeling (BIM) CCC Group First Digital Facility Modeling Conference in Kazakhstan

Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

  • Upload
    vananh

  • View
    220

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

Consolidated Contractors International Company, (CCC)

Building Information Modeling (BIM) CCC Group

First Digital Facility Modeling Conference in Kazakhstan

Page 2: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

Company Introduction

Building Information Modeling (BIM) CCC Group

Consolidated Contractors Company (CCC) was originally formed in 1952 in Lebanon

CCC, with it’s managing office based in Athens - Greece, currently employs approximately 114,000 people in its worldwide operations

CCC is an ISO 14001 and OHSAS 18001 certified company with the highest level of commitment to HSE

CCC is an ISO 9001:2008 certified company with the highest level of commitment to Quality

CCC is predominately a construction company, providing project management, engineering, procurement and construction services to the industry

Currently ranked 18th in ENR Top International Contractors (2011)

Ranked 1st in the Middle East

Page 3: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

Our CCC Family

Building Information Modeling (BIM) CCC Group

CCC is a family company with a unique set of family oriented values and traditions. They embody Trust, loyalty and hard work. Long term commitment Human Touch with our partners and workers. The

“Mu’allem” Concept Basic decentralized structures with strong central support

and audit functions (Matrix Structure). This resulted in: Maintaining an entrepreneurial attitude Localized touch, knowledge and relations Focus on quality and safety Commercial acumen. Long term oriented client relationship especially those working in multi location

Our family values and traditions contribute to our long term and successful mode of operations.

Page 4: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

HSE Certificates & Awards

Building Information Modeling (BIM) CCC Group

ExxonMobil Development Company (EMDC)

Safe Contractor HSE Award of the year 2009 for QGXII

Project in Qatar

75 million manhours worked without a Lost Time Incident at Pearl GTL Project in Qatar

Page 5: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

CCC Group

Building Information Modeling (BIM) CCC Group

Page 6: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

CCC Group

Building Information Modeling (BIM) CCC Group

Page 7: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

CCC Group

Building Information Modeling (BIM) CCC Group

Page 8: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

CCC Group

Building Information Modeling (BIM) CCC Group

Page 9: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

Engineering & Procurement

Building Information Modeling (BIM) CCC Group

Expertise

Buildings / Civil Works Oil and Gas Up Stream Gas Treatment Pipelines Seawater and Cooling Water Networks

Engineering Procurement & Support Office Facilities

Total of 400 Engineers, Designers, Expeditor Staff Office Area: 16,800 m2 in Mussafah Space for 600 plus staff & Client representatives

Current Annual Engineering Internal capacity

800,000 MHR

600,000 MHR ( Pure Engineering)

Page 10: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

CCC Plant & Equipment

Building Information Modeling (BIM) CCC Group

WORK/SURVEY BOATS& STANDARD FACILITIES

168

EARTHMOVINGEQUIPMENT

906

PIPELAYINGEQUIPMENT

201

WELDING MACHINES

8,131

AIRCOMPRESSORS

454

CIVIL ENGINEERING& CONSTRUCTION EQUIPMENT

1,345HEAVY DUTY

VEHICLES

2,319VEHICLES

& LIGHT TRUCKS

2,625CRANES977

ELECTRIC GENERATORS& LIGHTING TOWERS

675

TOTAL NO. OF EQUIPMENT:TOTAL VALUE OF EQUIPMENT:

17,801US$ 1,049 MILLION

Page 11: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

Heavy Lift Division

Building Information Modeling (BIM) CCC Group

CCC has been involved in the heavylift business since 1980 empoweredby a professional team consisting ofEngineers, draftsmen, specialists andsupervisors dedicated for this criticaloperation and following CompanySafety and Quality standards

The Heavy Lift Division provides thefollowing services: Heavy Lift turnkey project Heavy Lift Execution Heavy Lift Consultation Heavy Lift Management Heavy Lift Engineering

CCC owns over 978 cranes with acapacity ranging from 1600 to 5 tons.

Page 12: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

Fabrication Facilities

Building Information Modeling (BIM) CCC Group

CCC provides both mobile and permanent fabrication facilities.

Facility Type / Location Monthly Production

Mobile Facilities 40 Fabrication Shops

Pipe spool fabrication: 700 tons per fabshop

Steel structure fabrication: 300 tons per fabshop

ECG Facilities Permanent Facility in Equatorial Guinea

Pipe spool fabrication: 600 tons

Steel structure fabrication: 700 tons

NPCC Fabrication Facility

Permanent Facility in UAE

5,800 tons of fabricated steel structures for wellhead Jackets, Decks, Topsides, Modules, loading Terminals

Page 13: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

CCC Projects Highlights

Building Information Modeling (BIM) CCC Group

Dubai Mall

Dubai MallRas Laffan Common CoolingWater System - Qatar

Khursaniyah Gas Plant - KSA

Muscat International Airport - Oman

Page 14: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

CCC Projects Highlights

Building Information Modeling (BIM) CCC Group

Isomerization andRefinery Revamp - Oman

Baku - Tbilisi - Ceyhan Oil Pipeline Azerbijan

The Landmark Tower Abu Dhabi

Presidential PalaceAbu Dhabi

Sports Hall at Khalifa Sports City - Qatar

Page 15: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

CCC Projects Highlights

Building Information Modeling (BIM) CCC Group

Alba Phase II Expansion

Bioko Island, Equatorial Guinea

Komo Airport Papua New Guinea

Princess Noura - KSA

Nile Corniche Towers – Cairo Egypt

Pearl GTL Project - Qatar

Page 16: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

CCC Projects Highlights

Building Information Modeling (BIM) CCC Group

Qatargas II LNG

Ras Laffan Port Expansion - Qatar

New Port at Al Duqm - Oman

Barwa Commercial Avenue - Qatar

Karachaganak - Kazakhstan

Page 17: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

The BIM-5D Approach

Building Information Modeling (BIM) CCC Group

Conventional BIM-5D

vs.

Page 18: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

The BIM-5D Technology & Potentials - PLC

Building Information Modeling (BIM) CCC Group

Page 19: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

BIM-5D Challenges

Building Information Modeling (BIM) CCC Group

Challenges Psychological

(Traditional Methods, Resistance to Change, Accepting IT Solutions, Trust,

Complexity of the Construction Processes, Fast Increasing Demands of the Industry)

Challenges Technological

(SV competitions, Focus on Design, Interoperability, SW Pricing Strategies,

Lack of Efficient Solutions, Business Logic & Communicating Business

Needs)

Page 20: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

Interoperability an Infrastructural Challenge

Building Information Modeling (BIM) CCC Group

Different BIM Platforms Means

Disintegrated BIM (interoperability challenges)

How Can we Achieve An

Integrated BIM?

BIM1SV 1

BIM4 SV 4

BIM2 SV 2

INTEGRATED BIM

BIM3 SV 3

BIM1SV 1

BIM4 SV 4

BIM3 SV 3

BIM2 SV 2

DISINTEGRATED BIM

Page 21: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

Elements For Success Of BIM-5D Implementation

Building Information Modeling (BIM) CCC Group

Management Embracement of the 5D-BIM Methodology

Availability of Professional BIM Resources and Ensuring Their Commitment & Quality

Strong IT Infrastructure and Capabilities

Availability of Cost Effective Project Controls Solutions

Strong 5D Collaboration Platforms

Cultural Change & Transparency Building

Integrating BIM within Company’s/Project’s Workflows and Processes

Developing 5D-BIM Awareness & Training Strategies

Page 22: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

BIM-5D requirements for further response

Building Information Modeling (BIM) CCC Group

BIM-5D is about access to rich integrated information

BIM-5D is a work process that streamlines your operation

BIM-5D is a management paradigm BIM-5D Enhances project delivery to

be more efficient and more effective

Towards BIM for Construction (5D)

Page 23: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

CCC BIM-5D History

Building Information Modeling (BIM) CCC Group

Engineering Workflows Automation Concept was the Entrance 1995 - CCC was awarded the first project to be delivered in Bentley Microstation Format 1996 - There was a need to find a solution that can enhance and automate the process of

quantification – 1996 (Traditional techniques are inaccurate and time consuming) 1996 - BRICS, Belgium SW, was proposed as a solution Bentley bought BRICS end of 1996 and called it Triforma Beginning of 1997 - CCC Bought three licensee of Triforma for testing After extensive testing by an Automation / Civil Engineer Triforma was to be an efficient &

promising 3D based (model based) quantification solution In three months, 1 senior engineer and two draftsmen were self trained on 3D Information modeling for buildings (BIM) using Bentley Triforma End of 1997 – The first challenge – Ritz Carlton Hotel – Doha – Qatar – First model based Estimation Project

First Success Story

Page 24: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

CCC BIM-5D Centers of Excellence

Building Information Modeling (BIM) CCC Group

Information System Department (ISD) has established professional BIM Centers (Centers of Excellence), where a group of specialized engineers have been recruited, then intensively trained to be able to develop efficiently quality BIM with the controls methodology in the background.

The main center is located in Cairo, another two branches already exist, one in Athens and the other one in Palestine, in addition to some BIM resources that are offering BIM services in several projects across the globe.

Page 25: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

CCC BIM-5D Services

Building Information Modeling (BIM) CCC Group

Contractual, Quantity Surveying and Material Take-off Services

Develop BOQs based on CSI coding or any other coding required by the client Develop summarized and detailed Material Take-Offs (MTOs) per BOQ (Bill of

Quantity) aggregated on any Work Breakdown Structure (WBS) level for planning and scope of work definition

Develop Material Take-off reports per BOQ per object (coded as per the unique project object coding system) to link the 3D BIM with in-house as well as other project controls system

Develop and implement a 3D BIM based Quantity Surveying (QS) system with automatically generated valuation sheets

Support procurement operations Change Management Support

Page 26: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

Model Quantities

Building Information Modeling (BIM) CCC Group

Page 27: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

Scenario Browser

Building Information Modeling (BIM) CCC Group

Change Management Control (Scenario Browser)

Page 28: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

CCC BIM-5D Services

Building Information Modeling (BIM) CCC Group

Engineering Services

Develop professional high quality presentations and photo-realistic images (Digital Mockups)

Support and automate the engineering production of design drawings

Act as an integrated system for design coordination and clash detection

Assist in value engineering studies

Page 29: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

BIM Drawings Development – 3D Model

Building Information Modeling (BIM) CCC Group

Power Plan

Page 30: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

BIM Drawings Development – 3D Model

Building Information Modeling (BIM) CCC Group

HVAC Plan

Page 31: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

BIM Drawings Development – 3D Model

Building Information Modeling (BIM) CCC Group

FFT Plan

Page 32: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

BIM Drawings Development – 3D Model

Building Information Modeling (BIM) CCC Group

ARCH. Plan

Page 33: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

BIM Drawings Development – 3D Model

Building Information Modeling (BIM) CCC Group

STR. Plan

Page 34: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

Composite 3D Model

Building Information Modeling (BIM) CCC Group

Page 35: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

Clash Detection

Building Information Modeling (BIM) CCC Group

Page 36: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

CCC BIM-5D Services

Building Information Modeling (BIM) CCC Group

Construction and Project Controls Services

Provide visual planning and visual progress monitoring functionalities Establish visual reporting and querying systems Establish 3D crane layouts and utilization studies Develop logistic plans, site accessibility & constructability studies Develop visual simulations for construction method statements Support and validate subcontractors’ work and integrate their systems

with CCC in-house systems using EDI procedures

Page 37: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

Site Planner

Building Information Modeling (BIM) CCC Group

Page 38: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

3 Week Look Ahead Meeting

Building Information Modeling (BIM) CCC Group

Site Engineer Work-packaging

ProjectEngineers

FormanUpdate Progress

Page 39: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

4D Planned vs. Actual

Building Information Modeling (BIM) CCC Group

Page 40: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

BIM-5D Based Visual Project Controls System

Building Information Modeling (BIM) CCC Group

Page 41: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

BIM-5D Projects at CCC

Building Information Modeling (BIM) CCC Group

AUC New campus (Egypt)

College of Business and Computer Science Esquissée (Algeria)

Aramco Hawiyah Gas Plant Control Room (KSA)

Page 42: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

BIM-5D Projects at CCC

Building Information Modeling (BIM) CCC Group

Mubadala Erwda (UAE) Khalifa Sports Hall (Qatar)

Saudi Embassy (Egypt) Khartoum (Sudan)

Page 43: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

BIM-5D Projects at CCC

Building Information Modeling (BIM) CCC Group

Ahmadi Hospital (Kuwait) Jumirah Island Heights (UAE)

Qatari Emiri Naval Forces Mubarak Al-hassawi - Medical Institute

Page 44: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

BIM-5D Projects at CCC

Building Information Modeling (BIM) CCC Group

Novotel Resort (Jordan) West Bay Lagoon (Qatar)

Haradh Project Plant (KSA) Central Bank (Kuwait)

Page 45: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

BIM-5D Projects at CCC

Building Information Modeling (BIM) CCC Group

High Rise Office Building (Qatar) Presidential Palace (UAE)

Qatar Faculty Of Islamic Studies (Qatar) New Administration Building (USA)

Page 46: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

Deviation Analysis at QFIS

Building Information Modeling (BIM) CCC Group

The deviation analysis method aims to interpret sources, types, and magnitude of errors in different phases of the construction workflow by comparing the 3D laser scan points (As-Built) to the digital reference CAD model (BIM).

Page 47: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

Meeting European Construction’s BIM Requirements

Building Information Modeling (BIM) CCC Group

CCC is an ENCORD member www.encord.org The European Network of Construction Companies for Research and Development (ENCORD) is a network of active members from the construction industry, represented by decision-makers and executives working on research, development and innovation (R,D&I) and providing service to experts and the operational sites within the member companies

Page 48: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

Meeting European Construction’s BIM Requirements

Building Information Modeling (BIM) CCC Group

CCC is a founding member for the 5Di Group www.5d-initiative.com A group of international European contractors who emerged from the ENCORD organization with a

target Initiative to develop new IT tools for design, realization and operation of buildings and infrastructure

Page 49: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

The 5Di Response

Building Information Modeling (BIM) CCC Group

Founded in 1869 HQ in Netherlands

5,4 billion Euro 26.000 employees

Merged in 2006 HQ in Germany 12,8 billion Euro

73.600 employees

Merged in 1929 HQ in Germany 1,4 billion Euro

6.000 employees

Merged in 1969 HQ in Netherlands

1,4 billion euro 4.000 employees

5Di MEMBERS

Founded in 1952 HQ in Greece

5,3 billion Euro 165.750 employees

ENCORD and ENCORD VCP support 5D Initiative in which many of their members are actively involved

Page 50: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

Achievements – 5Di Use-Cases

Building Information Modeling (BIM) CCC Group

Building Process Integration – Systems Engineering and BIM / Client Requirements Processing

Manage Change – Change Δ Managed

Design to Fabrication

Model-based Estimation – QTO Processes

Progress Collection, Monitoring and Control

Page 51: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

Target 5Di Platform Should Answer

Construction Processes During Project Lifecycle

Building Information Modeling (BIM) CCC Group

Page 52: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

Target 5Di Platform – 5Di Solution Components

Building Information Modeling (BIM) CCC Group

5D Process Managementdirect communication on model and database

Oper

atio

nal D

ata

listin

gs /

anal

ysis

5D Modeller3D / object oriented / parametric

5D Viewernative interface to 2D/3D/database

5D Expert Systemsstatics / MEP / calculation /

simulation / scheduling /ERP / etc.

5D Data Management

2D D

rawi

ngs

arch

itect

ural

/ st

ruct

ure

/ etc

.

graphics-driven database-driven

Page 53: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

CCC – 5Di Use-Case

Building Information Modeling (BIM) CCC Group

Page 54: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

CCC – Progress Collection, Monitoring and Control

Building Information Modeling (BIM) CCC Group

Three Weeks Look Ahead Planning & What If Scenarios

Page 55: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

CCC – Progress Collection, Monitoring and Control

Building Information Modeling (BIM) CCC Group

Progress Visual Reporting

Page 56: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

5Di Partners with Major SW Vendors

Building Information Modeling (BIM) CCC Group

Page 57: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

Building Information Modeling (BIM) CCC Group

5Di Presentation by CCC ICE Conference, 19 October 2011 - London, UK

Page 58: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCCBuilding Information Modeling (BIM) CCC Group

CCC Sponsoring & Organizing First Middle East BIM Conference

Page 59: Consolidated Contractors International Company, (CCC)€¦ ·  · 2018-03-01Consolidated Contractors International Company, (CCC) Building Information Modeling ... Seawater and Cooling

Zuhair Haddad/ Amr ElSersyCCC

Building Information Modeling (BIM) CCC Group

CCC was granted a CETI Award in April, 2012 for its Outstanding Efforts & Leading Role in the EPC Industry