Gas Customer Forum 27 July 2009. Consideration of issues raised by UNC Modification Proposal 0244. Background. Reduced demand at DM Supply Points as a consequence of economic downturn Mothballed plant Reduced / curtailed production Current UNC rules limit opportunities for the reduction of - PowerPoint PPT Presentation
Citation preview
Consideration of issues raised by UNC Modification Proposal 0244
Gas Customer Forum
27 July 2009
2
Background
Reduced demand at DM Supply Points as a consequence of
economic downturn Mothballed plant Reduced / curtailed production
Current UNC rules limit opportunities for the reduction ofRegistered DM Capacity
Concerns raised by Consumers at Gas Customer Forum
UNC Modification Proposal 0244 (and 2 alternates) soughtchanges to UNC regime governing reduction of theRegistered DM Capacity
Ofgem rejected all three proposals in May 2009 Decision letter “…it may be appropriate for GDNs to consider whether
some form of transitional relief is appropriate…”, “…The industry may wish to consider whether…they wish to consider developing further proposals…”, “…We therefore consider that the GDNs should consider alternative solutions to target the potential problem identified…”
3
Proposed Approach
xoserve ‘Rules and Options Analysis’ in progress
Raise UNC Review Proposal – Convene Review Group Involves all UNC parties in consideration of whether change is necessary Requires participation of Users and consumers to accurately identify the
scale and significance of the issue Opportunity to identify and collate evidence
– Ofgem identified that there was a lack of analysis in respect of the 0244 Mods Priority given to discussion and development of short term measures
– Xoserve’s analysis used as necessaryFeedback welcome in respect of the scope of work: possible ‘transitional relief’ (short term).
– Focus on charging regime?– UNC or other e.g. supply contract remedy?
possible changes to the BSSOQ / ratchet regimes (long term) In respect of any solutions identified
– mitigation measures to prevent inappropriate behaviours – likely impact of any changes on consumers affected – likely impact of changes on other consumers charges (i.e. costs that are
recovered from the rest of the GDN consumer base)– the impact on investment decisions
Raise UNC Modification Proposal if necessary (can beduring course of group discussion)
4
Proposed timetable of events
xoserve ‘Rules and OptionsAnalysis’ request raised
Publish proposed timetable toUNC Distribution Workstream
Publish proposed timetable toGas Customer Forum
Raise Review Proposal at UNCModification Panel. Identify andagree Terms of Reference (toinclude a requirement to Identifypossible short and long termsolutions). Convene group
Review Report to UNCModification Panel
Raise UNC ModificationProposal (if required)
Develop and implement processand systems solutions (ifrequired)
1st June 2009
23rd July 2009
27th July 2009
6th August 2009
December 2009
January 2010
January 2010onwards
Short term measures pursued as a priority (eg: UNC Mod)