17
Design Workshop Summary 233 ideas + proposed design solutions summarized in six priority investment strategies: *A combination of strategies is needed to improve Central Ave. Slowing traffic Improving bike/ped. safety Reducing conflicts Beautifying the corridor & place making Access to business Other ideas 1 2 3 4 5 6 1 2 3 4 5 6

ConnectMcKinleyville.com public engagement summary

Embed Size (px)

DESCRIPTION

ConnectMcKinleyville.com public engagement summary for Central Ave, a project powered by Crowdbrite for Humboldt County Public Works. Hundreds of respondents and thousands of interactions help to shape the plan for Downtown.

Citation preview

Page 1: ConnectMcKinleyville.com public engagement summary

Design Workshop Summary 233 ideas + proposed design solutions summarized in six priority investment strategies:

*A combination of strategies is needed to improve Central Ave.

Slowing traffic

Improving bike/ped. safety

Reducing conflicts

Beautifying the corridor & place making

Access to business

Other ideas

12

3

45

6

123456

Page 2: ConnectMcKinleyville.com public engagement summary

*A combination of strategies is needed to improve Central Ave.

Paint speed limit on roadway

Enhanced pedestrian crossings & bike

lanes

Enhanced striping or intermittent medians

with turn pockets

Colorized crosswalks & bike lanes

Create a central place/destination

Created  on  Streetmix.net  a  project  of  Code  for  America  

Connect McKinleyville.com

Page 3: ConnectMcKinleyville.com public engagement summary

Workshop Summary

Page 4: ConnectMcKinleyville.com public engagement summary

Crowdbrite Design Workshop Summary 1. Slow Traffic A) Flashing light with speed indicators B) Paint speed limit on roadway? C) Public education for safe bike, pedestrian and vehicles D) Regulatory Traffic Control - Police

2. Improved Bicycle/Pedestrian Safety A). Enhanced pedestrian crossings and bike lanes (10) colorized crosswalks and bike lanes (5) with improved lighting /flashing lights B) Use bulb outs and shorten the distance across the street. C) Signal improvements – tied together, bike actuated (2), longer pedestrian walk signals. D) Complete sidewalk connections

3. Reduce Conflicts Reduce turn conflicts with enhanced striping or intermittent medians with turn pockets A) mountable and vegetated intermittent medians B) dedicated right turn lanes C) pullouts for buses

24. Beautify the Corridor A) Create a central place/destination B) Preserve trees, landscaping and Create a gateway to the South 5. *Access to Local Business

Investment Strategies

Page 5: ConnectMcKinleyville.com public engagement summary

Connect McKinleyville.com

Page 6: ConnectMcKinleyville.com public engagement summary

Top Priorities

www.connectmckinleyville.com

Page 7: ConnectMcKinleyville.com public engagement summary

Implementation Strategies

www.connectmckinleyville.com

Page 8: ConnectMcKinleyville.com public engagement summary

Alt 1 Comments

www.connectmckinleyville.com

Page 9: ConnectMcKinleyville.com public engagement summary

Preferred Alternative

www.connectmckinleyville.com

Page 10: ConnectMcKinleyville.com public engagement summary

Alt. 2 Feedback

www.connectmckinleyville.com

Page 11: ConnectMcKinleyville.com public engagement summary

Treatment Options

www.connectmckinleyville.com

Page 12: ConnectMcKinleyville.com public engagement summary

7600 Views (1600+) per Plan

www.connectmckinleyville.com

Page 13: ConnectMcKinleyville.com public engagement summary

500+ responses 100+ respondents

www.connectmckinleyville.com

Page 14: ConnectMcKinleyville.com public engagement summary

Sept – Oct 15

Page 15: ConnectMcKinleyville.com public engagement summary

Overall Stats

Page 16: ConnectMcKinleyville.com public engagement summary

2!

STATION #A -– Your Priorities !

www.connectmckinleyville.com!

At#the#Spring#Workshop#233#ideas#were#iden5fied#along#with#five#priori5es#for#the#corridor.#A#combina5on#of#strategies#is#needed.##Poll##1##Iden5fy#&#confirm#the#top#themes#from#the#Design#Workshop.#Iden5fy#your#top#2#priori5es#from#the#following#list:#•  Slow#traffic#•  Improve#bicycle/pedestrian#safety#

•  Reduce#conflicts#•  Beau5fy#the#corridor#&#place#making#

•  Preserve#Access#to#business#

Add#addi5onal#comments.##Poll##2#Iden5fy#your#top#3#implementa5on#strategies#What#is#missing?#######

How#might#we#IMPROVE##Central#Avenue?#

McKinleyville Central Ave. Improvement Project

Crowdsourcing for Better Communities

SM

Workshop#Summary:#############

STATION #B -– Improvements!

www.connectmckinleyville.com!

A"combina*on"of"treatment"op*ons"is"needed."""Poll"#3"Iden*fy"which"treatment"op*ons"are"most"appropriate"for"Central"Avenue."You"may"also"provide"addi*onal"comments.""1."Intersec*on"Pedestrian"Refuge"Islands"2."Colored"Bike"Lanes"3."Mid"Block"Pedestrian"Crossings"4."Buffer"Strip"for"Bike"Lanes"5."Emergency"Vehicle"PreMemp*on"Equipment"6."Double"Red"Traffic"Light"Signals""""""""

McKinleyville Central Ave. Improvement Project

Crowdsourcing for Better Communities

SM

2!

3 !

Treatment"Op*ons"1.!

4.!

5.!

Page 17: ConnectMcKinleyville.com public engagement summary