2
Connecting to the DCC
DCC
DC
C U
ser G
atew
ay E
quip
men
t
Back Office
Systems Technical
Orchestration Business
Orchestration
DUGIS Proprietary Interface
Challenge is mapping proprietary back office interfaces to 101
DUGIS Service Requests (and growing …)
3
Technical Orchestration
DCC
DC
C U
ser G
atew
ay E
quip
men
t
Business Orchestration Layer (BOL)
Back Office
Systems Technical
Orchestration
Update Security Credentials (6.15)
Critical, Non Sensitive (SME.C.C.1) 16 individual steps 3 calls to P&C 4 HSM steps
4
Business Orchestration
DCC
DC
C U
ser G
atew
ay E
quip
men
t
Business Orchestration
Back Office
Systems Technical
Orchestration
Business Service CoT
Service Requests Set to credit (1.6) Update tariff (1.1) Retrieve Billing Data Log (4.4.3) Set the Billing Calendar (6.8) Delete/create schedules (5.1, 5.2, 5.3) Restrict access for CoT (3.2) Reset Customer PIN (3.5) Display message (3.1)
5
CGI integration components
DCC
DC
C U
ser G
atew
ay E
quip
men
t
Back Office
Systems
DCC Adapter Business
Orchestration Layer (BOL)
6
DCC Adapter
DCC Adapter
Core DCC Adapter
DCC Adapter Optional Components
• UTRN Generation • Firmware Management • Service Request GUI • Anomaly Detection • Reporting • Single Sign-On • Oracle
DUGIS DCC Adapter
Internal Interface (DUGIS-like)
9
DCC Adapter Pricing
Item One-off licence
Annual support
One-off implement
ation
Core DCC Adapter Technical orchestration of Service Requests
£500,000 £100,000 £145,000
All prices are exclusive of VAT.
Item Description One-off licence
Annual support
One-off implement
ation
GUI Manual entry of Service Requests £75,000 £15,000 £3,500
UTRN Generation Generation of UTRNs for top-ups £20,000 £4,000 N/A
Firmware Management Receipt, validation and storage of F/W £40,000 £8,000 £1,500
Reporting Reporting environment for Audit Logs £65,000 £13,000 £4,000
Oracle Replaces MySQL with Oracle £110,000 £22,000 N/A
Anomaly Detection Mirrors DSP AD functionality £75,000 £15,000 £3,500
Single Sign-On Accepts SAML assertions £50,000 £10,000 £2,200
DNO/GNO options Currently being specified £TBD £TBD £TBD
10
Business Orchestration Layer (BOL)
BOL
Business Services
Business Functions • Activity Monitoring • Auditing • Bulk • Notification • Extraction • GUI • Reporting • Scheduling
Business Services
DCC Adapter Internal Interface
(DUGIS-like)
13
DCC Adapter Test Pack Optional Component
Source: SMIP UEPT DUGIS CTS Matrix 0.1 Draft, 12/06/2014
Key benefits • Rapid automated completion of mandatory,
optional and negative UEPT tests. • De-couples UEPT from market readiness. • Allows rapid progression to E2E testing with
back office systems and chosen Devices. Key features
• Based on DCC Adapter Test Harness. • Scripts editable to point at DCC-allocated
Devices. • Fully automated testing. • Flexible choice of test coverage (e.g. mandatory,
optional, negative). • CTS test scripts designed to:
o Provide maximum coverage; o Use minimum number of Device sets; o Complete in minimum execution time.
14
CTS Test Pack
A test harness and set of automated test scripts that provide full UEPT coverage.