© ABB Group September 08 Slide 1

BorWin1400 MW HVDC Light® connection for wind power

Marc Jeroense, ABB, ICC, March 23, 2010

Page 2: Connecting a 400 MW offshore wind farm cluster to the net

© ABB Group September 08 | Slide 2

BorWin1 Project

Customer E.ON Netz Offshore GmbH, Germany

Scope 400 MW HVDC Light® system off-shore

station on platform with sub-sea structure

Onshore station at E.ON substation Diele

170 kV GIS switchgear on platform

Telecommunication system

Control and protection of complete system

Cables Submarine AC cable 170 kV (1x1200 m)

DC cable submarine to onshore connection (2x125km)

DC cable on land (2x75km)

Fibre optic cable (200 km)

Page 3: Connecting a 400 MW offshore wind farm cluster to the net

© ABB Group September 08 | Slide 3

BorWin1 Schedule

2007-09-17 Contract award

2008 Jun Start installation of land cable

2008 Aug Start civil construction onshore

2008 Oct Start installation of equipment atoffshore fabrication yard

2009 March Start installation onshore

2009-05-23 Module & sub-sea structure readyto sail

2009 Jun Start installation offshore cable

2009-08-07 Offshore platform ready for cableinstallation

2009-08-15 HVDC system ready to energize

2009-09-01 System ready for transmission testing

2009-09-15 Start trial run

2009-11-24 Acceptance

Page 4: Connecting a 400 MW offshore wind farm cluster to the net

© ABB Group September 08 | Slide 4

BorWin1 Platform layout

Topside weight approx 3200 t(incl. 800 t ABB equipment)

Size approx 50 x 33,5 x 22 m Jacket 1700 t

(Height 62 m, sea level to topside approx 20 m)

Page 5: Connecting a 400 MW offshore wind farm cluster to the net

© ABB Group September 08 | Slide 5

BorWin1Fabrication at Heerema, Vlissingen, NLLower deck end August 2008

Page 6: Connecting a 400 MW offshore wind farm cluster to the net

© ABB Group September 08 | Slide 6

BorWin1Fabrication at Heerema, Vlissingen, NLView of jacket top leg sections at EEW Erndtebruker

Page 7: Connecting a 400 MW offshore wind farm cluster to the net

© ABB Group September 08 | Slide 7

BorWin1Fabrication at Heerema, Vlissingen, NLHelideck ready for the paintshop April 2009

Page 8: Connecting a 400 MW offshore wind farm cluster to the net

© ABB Group September 08 | Slide 8

BorWin1Fabrication at Heerema, Vlissingen, NLJacket structure roll-up April 2009

Page 9: Connecting a 400 MW offshore wind farm cluster to the net

© ABB Group September 08 | Slide 9

BorWin1Fabrication at Heerema, Vlissingen, NLTopside roll out May 4 2009

Page 10: Connecting a 400 MW offshore wind farm cluster to the net

© ABB Group September 08 | Slide 10

BorWin1Onshore HVDC Light station, Diele

Cooling Units

ReactorsValves

Chopper

AC Filter Yard

DC FilterYard

Power Transformer

Page 11: Connecting a 400 MW offshore wind farm cluster to the net

© ABB Group September 08 | Slide 11

BorWin1Onshore site at DieleConverter building slab November 2008

Page 12: Connecting a 400 MW offshore wind farm cluster to the net

© ABB Group September 08 | Slide 12

BorWin1Onshore site at DieleErection of converter building steel November 2008

Page 13: Connecting a 400 MW offshore wind farm cluster to the net

© ABB Group September 08 | Slide 13

BorWin1Onshore site at DieleConverter building & cooloing tower catch basin December 2008

Page 14: Connecting a 400 MW offshore wind farm cluster to the net

© ABB Group September 08 | Slide 14

BorWin1Onshore site at DieleConverter building January 2009

Page 15: Connecting a 400 MW offshore wind farm cluster to the net

© ABB Group September 08 | Slide 15

BorWin1Onshore site at DieleInstallation of valves April 2009

Page 16: Connecting a 400 MW offshore wind farm cluster to the net

© ABB Group September 08 | Slide 16

BorWin1 HVDC Light cable

121 km sea cable(1200 mm2 Cu)

8.4 km Wadden Sea, Norderney and Ems (1600 mm2 Cu)

73.6 km land cable(2300 mm2 Al)

Page 17: Connecting a 400 MW offshore wind farm cluster to the net

© ABB Group September 08 | Slide 17

BorWin1Submarine cableWaiting for installation March 2009

Page 18: Connecting a 400 MW offshore wind farm cluster to the net

© ABB Group September 08 | Slide 18

BorWin1Cable Installation LK AurichInstallation of land cable: summer 2008

Page 19: Connecting a 400 MW offshore wind farm cluster to the net

© ABB Group September 08 | Slide 19

BorWin1Cable Installation LK AurichCable jointing cubicle: summer 2008

Page 20: Connecting a 400 MW offshore wind farm cluster to the net

© ABB Group September 08 | Slide 20

BorWin1Cable Installation LK AurichCable jointing: summer 2008

Page 21: Connecting a 400 MW offshore wind farm cluster to the net

© ABB Group September 08 | Slide 21

BorWin1Cable Installation LK AurichDirectional drilling: summer 2008

Page 22: Connecting a 400 MW offshore wind farm cluster to the net

© ABB Group September 08 | Slide 22

Thank you for your attention!