connect • communicate • collaborate
1
TF-MSP – Product Management in GN3plus
Toby Young – Head of Product management
Madrid – 6th May 2013
connect • communicate • collaborate
2 2
Year 3 EC Review Comments
During the GN3 Year 3 Review, held in Brussels in June 2012, the EC reviewers recommended that:
• 7 The business cases, service descriptions, KPIs, and SLAs, statistics and the product manager's name should be published in a uniform way from links on a single page on the GÉANT portal.
• 34 The activities related to the defined service life cycles should be better documented to demonstrate adherence to process and to offer traceability to such activities.
• 38-41 Roadmaps should be developed for the future plans of each service and performance against the roadmaps should be monitored and reported on. It is expected that this will be included in the next GN3 review.“ …….and……..KPIs, SLAs, Roadmaps must be presented in a uniform way
connect • communicate • collaborate
3 3
Introduction to Product Portal
http://plm.geant.net/
Also under the GEANT homepage “management” link
Formally available 15th March
Meets requirements from EC Year 3 reviewers
A single portal for all Service related information
Provides a Management Level “at a glance” project status
A tool for management of the entire Service Portfolio for GN3
Defines a Process for Product Lifecycle Management within GN3 and
GN3plus
All GN3 and GN3plus ALs, TLs, and Product Managers “workshopped”
28 Feb – 4th March
connect • communicate • collaborate
4 4
PLM Homepage
Drop down toolbar
connect • communicate • collaborate
5 5
At a Glance……….
A Service Matrix
Shows what documents exist for each service (hyperlinked)
When they were last updated
Document owner
connect • communicate • collaborate
6 6
KPIshow are we doing?
KPIs – 1 page per Service
Reviewed quarterly
connect • communicate • collaborate
7 7
RoadmapsWhat are our plans?
Roadmaps – one per service
Updated quarterly as a minimum
connect • communicate • collaborate
8 8
PLM Process
connect • communicate • collaborate
9 9
PLM Stages
connect • communicate • collaborate
10 10
Other features
Defines the Role of the Product Manager in GN3 and GN3 plus
Daily, quarterly and annual deliverables
RACI matrix
Can support surveys….…
Feature-set requests
Questionnaires
Currently porting to GN3plus site and enhancements being added.
connect • communicate • collaborate
11
Thank You