37
1 From: NOE Susan(SM) - BRUCE POWER <[email protected]> Sent: June 28, 2019 11:28 AM To: Torrie, Brian (CNSC/CCSN); Sigouin2, Luc (CNSC/CCSN); Poirier2, Julie (CNSC/CCSN); Gallant, Alexis (CNSC/CCSN); Consultation (CNSC/CCSN) Subject: CNSC Correspondence: NK21-15195 / NK29-15981 / NK37-03228 - Bruce Power comments on draft REGDOC-2.11.1, Waste Management, Volume I: Management of Radioactive Waste Attachments: NK21-15195_NK29-15981_NK37-03228.pdf Good morning, The attached correspondence has been issued by Bruce Power and is being provided electronically for your convenience. The official hard copy of the correspondence will be provided separately. Thank you, Susan Susan Noe | Business Support Representative | Licensing l B10-02E | Bruce Power | T: 519.361.2673 ext.11625 Confidentiality Notice: This e-mail and its attachments are confidential, may be privileged and are intended only for the authorized recipients of the sender. Recipient is not permitted to publish, copy, disclose or transmit the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have received this e-mail in error, please delete it immediately and advise the sender by return e- mail.

Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

1

From: NOE Susan(SM) - BRUCE POWER <[email protected]>

Sent: June 28, 2019 11:28 AM

To: Torrie, Brian (CNSC/CCSN); Sigouin2, Luc (CNSC/CCSN); Poirier2, Julie (CNSC/CCSN);

Gallant, Alexis (CNSC/CCSN); Consultation (CNSC/CCSN)

Subject: CNSC Correspondence: NK21-15195 / NK29-15981 / NK37-03228 - Bruce Power

comments on draft REGDOC-2.11.1, Waste Management, Volume I: Management of

Radioactive Waste

Attachments: NK21-15195_NK29-15981_NK37-03228.pdf

Good morning,

The attached correspondence has been issued by Bruce Power and is being provided electronically for your convenience. The official hard copy of the correspondence will be provided separately.

Thank you,

Susan

Susan Noe | Business Support Representative | Licensing l B10-02E | Bruce Power | T: 519.361.2673 ext.11625

Confidentiality Notice: This e-mail and its attachments are confidential, may be privileged and are intended only for the authorized recipients of the sender. Recipient is not permitted to publish, copy, disclose or transmit the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have received this e-mail in error, please delete it immediately and advise the sender by return e-mail.

Page 2: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bruce PowerInnovation at work

June 28, 2019

NK21 -CORR-00531 -15195NK29-CORR-00531 -15981NK37-CORR-00531 -03228

Mr. B. TorrieDirector General, Regulatory Policy DirectorateCanadian Nuclear Safety CommissionP.O. Box 1046280 Slater StreetOttawa, OntarioK1P 5S9

Dear Mr. Torrie:

Bruce Power comments on draft REGDOC-2.1 1.1,Waste Management, Volume I: Management of Radioactive Waste

The purpose of this letter is to provide Bruce Power’s comments on draft REGDOC2. 11. 1, Waste Management, Volume 1: Management of Radioactive Waste.

Following a collaborative review of the draft document with our industry peers, we havecompiled a series of detailed observations and requests for clarification in Attachment Afor the CNSC’s consideration. In general, licensees found the language in some sectionsof the draft to be either unclear or imprecise. In some areas, references were made toregulatory documents that have not yet been published and key terms were either notdefined or their definitions not included or aligned with those in REGDOC-3.6, Glossaryof CNSC Terminology.

More specifically, Bruce Power encourages the CNSC to clearly differentiate between a“waste generator” and a “waste owner” by amending the opening paragraph in Section 2to read, “Under Canada’s Radioactive Waste Policy Framework, waste owners arerequired to ensure the safe and secure management of radioactive waste and to makearrangements for its long-term management. This includes waste generated by anotherlicensee and transferred under a commercial agreement to a waste owner to process,store and dispose.”

This would clarify that radioactive waste management may be the responsibility of morethan one licensee and that robust agreements are in place to ensure it is managedsafely and securely. We believe clear, accessible language equates to improvedcompliance and public understanding of the scientific rigor that forms industry’s wastemanagement programs.

NK21-CORR-00531 -15195 Bruce Power Meury Burton, Senior Director. Regulatory Attars

NK29-CORR-00531-15981 P.O. Box 1540 BlO 2nd Floor E. Tiverton ON NOG 2T0NK37C0RR0053103228 Telephone 519-361-5291 Facsimile 519-361-4559

maury,burton a brucepowercom

Page 3: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

2Mr. B. Torrie June 28, 2019

If you require further information or have any questions regarding this submission,please contact Steve Cannon, Senior Strategist, Regulatory Affairs, at (519)-361-6559,or [email protected].

Yours truly,

aury BurtonSenior Director, Regulatory AffairsBruce Power

cc: CNSC Bruce Site Office (Letter only)

Attach.

NK21 -CORR-00531 -15195NK29-CORR-00531 -15981NK37-CORR-00531 -03228

Page 4: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Attachment A

Bruce Power comments on draft REGDOC-2.11.1, Waste Management, Volume I:Management of Radioactive Waste

NK21 -CORR-00531 -15195NK29-CORR-00531 -15981NK37-CORR-00531 -03228

Page 5: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bruce

Pow

er

com

ments

on

draft

RE

GD

OC

-2.11.1,

Waste

Man

agem

ent,

Volum

eI:

Man

agem

en

tof

Rad

ioactiv

eW

aste

Major

#S

ectionIndustry

IssueS

uggestedC

hange(if

ap

plicable)

Com

ment!

Impact

onIndustry,

if

major

com

ment

Clarification

1.G

eneralL

icenseesfound

thelanguage

insom

esections

Given

thepublic

interestin

thesubject,

industryM

AJO

RA

lackof

claritycan

inadvertentlylead

ofthe

draftR

EGD

OC

tobe

eitherunclear

orencourages

theCN

SCto

ensurethe

languageused

toto

misunderstanding

ofrequirem

ents

imprecise,

which

made

itchallenging

attim

esto

describerequirem

entsand

guidancein

futuredrafts

andthe

reasonsfor

them.

Clear,

offera

thorough,contextual

review.

Insom

eis

clearto

allinterested

readers.A

sthose

accessiblelanguage

equatesto

sections,review

ersfound

referencesto

responsiblefor

thesafe

managem

entof

radioactiveim

provedcom

plianceand

public

regulatorydocum

entsth

athave

notyet

beenw

aste,licensees

appreciatethe

scientificbasis

that

understandingof

thescientific

rigor

publishedand

alignment

torelated

documents

supportsthe

CN

SC’s

requirements

inthis

REG

DO

C.

that

forms

industry’sw

aste

suchas

IAEA

standardsto

beunclear.

InH

owever,

industryalso

appreciatesthe

needfor

thism

anagement

programs.

addition,several

keyterm

sw

ereeither

nottechnical

information

tobe

presentedin

aw

ayth

at

definedor

theirdefinitions

notincluded

oris

accessibleto

peopleof

alllevels

oftechnical

alignedw

iththose

inR

EG

DO

C-3

.6

,G

lossary

of

expertise.

CN

SC

Term

inology.

Please

seespecific

examples

inthe

tablebelow

for

areasth

atcould

beam

endedfor

clarity.

2.G

eneralT

hedraft

REG

DO

Cdoes

notclearly

distinguishT

heR

EGD

OC

shouldbe

more

specificabout

theM

AJO

RU

nclearexpectations

couldchallenge

between

facilitytypes

orthe

requirements

that

timefram

ew

henrequirem

entsapply.

Forexam

ple,com

plianceverification.

This

could

applyto

themat

varioustim

esin

theirlifecycle.

there

arem

anyreferences

to“prior

toclosure”

that

alsoinadvertently

resultin:

additional

Forcontext,

adisposal

facilitygenerally

hasthe

shouldbe

clarifiedand

there

arerequirem

entsth

atrequirem

entsbeing

appliedto

low-risk

following

lifecyclephases:

siting;construction;

shouldnot

applyto

the

post-closurephase.

facilitiesw

ithno

comm

ensurate

operation;pre-closure

monitoring;

closure;im

pacton

safety;confusion

for

decomm

issioningof

ancillaryfacilities;

post-P

leasesee

specificexam

plesin

thetable

belowfor

mem

bersof

thepublic

asto

expected

closure.H

owever,

forsom

edeep

geologicitem

sth

atcould

beam

endedfor

clarityrequirem

entsfor

facilities.

repositories(D

GR

),SSC5

will

be“closed”

duringthe

operationalphase

(e.g.,used

fuelcontainers

andplacem

entpanels)

andnot

accessibleprior

toclosure

ofthe

DG

Rand

duringthe

post

closurephase.

Applicability

ofrequirem

entsfor

these

timefram

esneed

toclear

andshould

notinadvertently

createoth

ersafety

issues.

NK

21-CO

RR

-00531-15195/

NK

29-CO

RR

-00531-15981/

NK

37-CO

RR

-00531-03228P

age

1of

15

Page 6: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bruce

Po

wer

com

ments

on

draft

RE

GD

OC

-2.11.1,

Waste

Managem

ent,

Volu

me

I:

Managem

ent

of

Radio

active

Waste

As

percom

ment

#1,th

epurpose

ofthe

document

isunclear

ascurrently

written

andcould

gen

erateconfusion

regardingw

hichrequirem

entsor

guidanceapplies

tovarious

facilitytypes,

suchas

storageand

disposalfacilities.

Licensees

believethe

purposeshould

clearlytell

readersw

hichtype

(low,

intermediate,

orhigh-

level)radioactive

waste

tow

hichthe

guidanceapplies.

Itshould

alsorecognize

there

arevarying

opinionsand

conventionson

what

constitutesstorage

versusdisposal.

(RE

GD

OC

3.6,G

lossaryof

CN

SCT

erminology

doesnot

providefull

definitions.

Am

endto

read,“T

hepurpose

ofthis

document

isto

providerequirem

entsand

guidance:•

onradioactive

waste

managem

entapplicable

todifferent

typesof

CN

SClicensees

•related

toCSA

Group

standardsapplicable

toradioactive

waste

managem

ent•

supplemental

tospecific

topicsin

radioactivew

astem

anagement

standards.R

equirements

andguidance

will

varydepending

onthe

levelof

radioactivew

astebeing

managed

andthe

facilitytype,

suchas

storageand

disposalfacilities,

usinga

gradedapproach

comm

ensuratew

iththeir

relativerisks.”

Foradditional

clarity,definitions

ofstorage

anddisposal

facilitiesshould

beadded

toR

EG

DO

C-3.6,

Glossary

of

CN

SCT

erminology

andreferenced

inthis

REG

DO

C.

An

unclearpurpose

couldlead

toincorrect

assumptions

regardingrequirem

entsfor

facilitytype

storagevs

disposal.For

context,the

time

periodfor

storagefacilities

ism

easuredin

decadesas

opposedto

centuriesfor

disposalfacilities.

3.1.1

MA

JOR

4.1.2

As

percom

ment

#1,the

Scope

isnot

entirelyA

mend

the1

stsentence

toread,

“The

requirements

Clarification

clearto

allreaders.

Forinstance,

itdoes

notand

guidancein

thisdocum

entpertain

toC

NSC

alignw

ithS

ection24

ofthe

NSCA

,w

hichsays

licensedactivities

facilitics...”activities

arelicensed,

notfacilities.

Nor

doesit

definethe

term“w

astem

anagement”

orD

efinethe

terms

“waste

managem

ent”and

“endhighlight

what

the“end

goal”is

with

respectto

goal”to

ensurerequirem

entsare

clearfor

licenseesw

astem

anagement

facilities.T

hiscould

leadand

CN

SCinspectors.

licenseesto

definedifferent

“endgoals”

and,in

turn,drive

thesolutions

toaddress

waste

managem

ent.5.

1.3A

sper

comm

ent#1,

thelist

ofrelevant

Add

referencesto

theN

uclearS

ubstan

cesan

dC

larificationlegislation

isincom

plete.R

adiationD

evicesR

egulationsand

theN

uclearF

uelW

asteA

ct.

NK

21-C

OR

R-00531

-15195/

NK

29-CO

RR

-00531-15981

/N

K37-C

OR

-OO

531-03228

Page

2of

15

Page 7: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bruce

Pow

er

com

ments

on

draft

RE

GD

OC

-2.11.1,

Waste

Managem

ent,

Volum

eI:

Man

agem

ent

of

Rad

ioactiv

eW

aste

6.2

As

percom

ment

#2,the

REG

DO

Cshould

Am

endthe

15t

paragraphto

read,“U

nderC

anada’sM

AJO

RT

hem

anagement

ofradioactive

waste

differentiatebetw

eena

‘waste

generator’and

aR

adioactiveW

astePolicy

Fram

ework

[4],w

astem

aybe

theresponsibility

ofm

ore

‘waste

owner.’

owners

arerequired

toensure

thesafe

andsecure

thanone

licensee.R

einforcingthis

in

managem

entof

radioactivew

asteand

tom

akethe

REG

DO

Cw

ouldhelp

clarifythe

arrangem

ents

forits

long-termm

anagement.

This

rolesand

responsibilitiesfor

waste

includesw

astegenerated

byan

oth

erlicensee

andgenerators

andw

asteow

ners.

transferredunder

acom

mercial

agreement

toa

waste

owner

toprocess,

storeand

dispose.”

7.2.1

As

percom

ment

#1,the

CSAstandard

forInclude

N294,

Decom

missioning

of facilities

Clarification

decomm

issioningis

missing

fromthe

listof

Containing

Nuclear

Substances.

complem

entarydocum

ents.

8.3

As

percom

ment

#1,the

definitionof

radioactiveA

mend

the1st

paragraphto

alignw

iththe

definitionM

AJO

RU

nclearexpectations

couldchallenge

waste

doesnot

alignw

ithth

atin

RE

GD

OC

3.6,of

radioactivew

astein

RE

GD

OC

-3.6com

plianceverification.

which

says“the

owner

declaresto

bew

aste”vs

“nofurther

useif

foreseen.”T

hisintroduces

aA

mend

the2

paragraphto

read,“A

llnuclear

Generation,

controland

handlingare

questionas

tow

hom

ustforesee

“nofurther

substancesassociated

with

licensedactivities

will

typicallyin-facility

activities.

use”of

thew

aste.eventually

become

radioactivew

aste.T

herefore,t

Processing

may

bein-facility

orit

may

The

safem

anagement

oft1

atw

asteis

consideredbe

contractedto

anexternal

party.

As

perC

omm

ent#2,

itis

notclear

that

thesteps

duringall

stepsof

itsm

anagement

andm

ayinvolve

Storage,

transp

ort

anddisposal

may

listedfor

them

anagement

ofradioactive

waste

severallicensees.

The

stepsinvolved

inthe

bem

anagedby

thelicensee

who

may

bethe

responsibilityof

more

thanone

managem

entof

radioactivew

astecan

include:”generated

thew

aste,but

may

alsobe

licenseeand

may

involvetran

sfers/han

doffs

managed

bya

contractedparty.

between

licensees.A

lso,the

factth

atnot

allradioactive

substancesw

illbecom

eradioactive

As

currentlyw

ritten,the

background

waste

isnot

identifiedin

thebackground.

Som

esection

potentiallylim

itsthe

abilityfor

substancesm

aysim

plydecay

away

tothe

pointw

asteto

decayto

safelevels

andbe

thew

asteis

nolonger

radioactivew

aste.treated

asnon-radioactive

waste.

9.4

The

sectionon

General

Requirem

entsis

unclearA

mend

thebullets

forclarity

inthe

following

ways:

MA

JOR

Generally,

alack

ofclarity

may

inm

anyareas.

inadvertentlylead

publicexpectations

Bullet

#1:“m

anageradioactive

waste

soas

toavoid

forlow

-levelw

asteto

bethe

same

as

Bullet

#1requires

alllicensees

tofind

long-termim

posingan

undueburden

onfuture

generations,by

that

forhigh-level

waste.

managem

entsolutions

that

“avoidim

posingan

findingsafe,

practicableand

environmentally

undueburden

onfuture

generations.”W

hileacceptable

solutionsfor

thelong-term

”Specifically,

forthe

1st

bullet,licensees

licenseesunderstand

theintent

ofthis

phrase,it

donot

havethe

authorityto

define

NK

21-CO

R-O

O531-15195

IN

K29-C

OR

R-00531-15981

IN

K37-C

OR

R-00531-03228

Pag

e3

of15

Page 8: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bruce

Pow

erco

mm

ents

ondraft

RE

GD

OC

-2.11.1,W

asteM

anag

emen

t,V

olume

I:M

anag

emen

tof

Radioactive

Waste

isa

policystatem

ent

inap

pro

priately

emb

edd

edin

aR

EG

DO

C.

This

requ

iremen

tis

notpart

ofth

efederal

policyon

radioactivew

astem

anag

emen

t.

Bullet

#3need

sto

berelated

tospecific

waste

types

solicensee

andth

eC

NSC

candem

onstrate

toth

epublic

that

waste

isbeing

safelym

anag

edin

am

ann

erco

mm

ensu

ratew

ithth

epoten

tialhazard

ofth

ew

aste.

Bullet

#4is

unclearas

tow

hat

aspects

arein

terdep

end

encies

tobe

taken

inaccount

for.N

oris

itclear

if“evaluation”

refersto

CN

SCin

spectio

ns

orinternal

self-assessmen

tsby

licensees.

Bullet

#5should

notplace

the

emphasis

onth

ed

ocu

men

tation

.T

helicensee

doesnot

“implem

ent

the

docu

men

tation”

—th

eyim

plem

ent

andd

ocu

men

tth

eprogram

,pro

cedures,

etc.T

hisstatem

ent

shouldalso

pointto

guidanceon

what

isconsidered

acceptab

leas

perth

egrad

edapproach.

Bullet

#6:W

henis

con

tamin

atedm

aterialheld

insto

rage

nolonger

“useful”and

isdesig

nated

asw

aste?

Bullet

#7:T

heuse

ofO

PEX,

lessonslearned

andad

van

cesin

scienceand

technologyshould

beco

mm

ensu

ratew

ithth

erisk

associatedw

ith

Bullet

#3:C

larifyth

especific

waste

types

thisbullet

relatesto.

Bullet

#4:C

larifyw

hatasp

ectsof

interd

epen

den

ciesneed

tod

ocu

men

tedand

who

isex

pected

to“evaluate”

andby

what

means.

Am

endto

saylicensees

shouldconsider

allknow

nstep

s,but

the

integ

ration

waste

man

agem

ent

system

sshould

detailhow

interd

epen

den

ciesw

illbe

addressed

.

Bullet

#5:A

mend

toread,

“develop,d

ocu

men

tand

implem

ent

programs,

pro

cedu

resand

instructionsto

ensu

reth

esafety

ofall

waste

man

agem

ent

activitiesfor

which

they

areresponsible

com

men

surate

with

the

scaleof

the

licensedfacility

oractivity

andth

einventory.”

Bullet

#6:C

learlystate

when

con

tamin

atedm

aterialis

desig

nated

asw

aste.A

pplyth

edefinition

of“w

aste.”

Bullet

#7:A

mend

toalign

with

the

5thbullet

andread:

“useoperatio

nal

experien

ce,lessons

learnedfrom

oth

ersim

ilarfacilities

oractivities,

andad

van

cesin

scienceand

technologyin

aneffort

tocontinuously

improve

the

safetyof

the

waste

man

agem

ent

facilityor

activityco

mm

ensu

ratew

iththe

scaleof

the

licensedactivity

andth

einventory.”

Bullet

#8:A

mend

toclearly

stateth

ereq

uirem

ent

toprovide

information

isupon

request/au

dit.

“undueburden”

onfu

ture

gen

erations.

That

responsibilityrests

with

gov

ernm

ent.

Regarding

the

bullet,industry

hashad

challengesin

the

pastw

ithapplying

grad

edap

pro

aches,

which

causes

uncertain

tyin

the

licensingprocess

when

the

regulato

rdoes

not

accom

mo

date

thisapproach

forlow

-risk

activities.

Regarding

the

bullet,th

etim

eand

resources

required

toidentify

trulyrelev

ant

OPEX

,lessons

learnedand

advan

cesin

scienceand

technologyfor

licenseesw

hogen

eratelow

-levelradioactive

waste,

andare

notW

asteM

anag

emen

tF

acilities,is

notalw

aysco

mm

ensu

ratew

ithth

eim

pacton

nuclearsafety.

Agraded

appro

achw

ouldim

provethis

requirem

ent.

waste.

Ifth

erisk

isvery

low,

itshould

notbe

areq

uirem

ent

touse

“advancesin

scienceand

NK

21-C

OR

R-00531

-15195/

NK

29-CO

RR

-00531-15981

/N

K37-C

OR

R-00531

-03228P

age

4of

15

Page 9: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bru

ce

Pow

er

com

ments

on

draft

RE

GD

OC

-2.11.1,

Waste

Managem

ent,

Volum

eI:

Man

agem

en

tof

Rad

ioactiv

eW

aste

technology”for

continuousim

provement.

BuIIet#8:

Reporting

requirements

arenot

well

defined!specified.

Mandatory

andperiodic

versusdiscretionary

andonly

uponrequest?

10.4

&5

Forclarity,

theG

eneralR

equirements

inS

ectionA

mend

the15tsentence

inS

ection4

toread,

“All

MA

JOR

The

managem

entof

radioactivew

aste

4and

requirements

inS

ection5

onthe

Waste

licenseesw

hom

anageradioactive

waste

theym

aybe

theresponsibility

ofm

ore

Managem

entP

rogramshould

includethe

gen

erateor

assume

ownership

forshall:”

thanone

licensee.R

einforcingthis

in

option/abilityof

alicensed

waste

gen

erator

tothe

REG

DO

Chelps

clarifythe

rolesand

contractually(com

mercially)

engagethe

servicesA

mend

the1

5tparagraph

ofS

ection5

toread,

“The

responsibilitiesfor

waste

gen

erators

ofoth

erlicensed

partiesto

transport,process,

licenseeshall

developand

implem

enta

waste

andw

asteow

ners.

storeand

disposeof

radioactivew

aste.T

hem

anagement

programto

controlthe

managem

ent

contractualarran

gem

ent

might,

insom

eof

radioactivew

astew

hereit

isgenerated,

handled,

instances,involve

thetransfer

ofcare

&custody,

processed,stored,

transp

orted

ordisposed

of.

orof

title,to

certainw

aste;i.e.

achange

waste

Licensees

may

contractuallyengage

anoth

erlicensed

ownership

&going

forward

responsibility,party

tocarry

outsom

eor

allof

theseactivities.”

11.5

Facilitiesth

atrequire

aw

astem

anag

emen

tR

emove

thefirst

3-bulletsas

theyare

alreadyC

larification

programcom

plyw

ithCSA

N286-12

aspart

ofaddressed

inlicensee’s

LCHs

forM

anagement

theirlicence.

As

such,this

REG

DO

Cshould

onlyS

ystems.

capturem

anagement

systemrequirem

entsth

atare

incremental

tothe

requirements

inN

286-12A

mend

thefinal

senten

cein

thesection

toread,

“For

tom

inimize

duplicationand

inconsistenciesw

ithm

oreinform

ationon

managing

programs

generalm

anagement

systemrequirem

ents.It

managem

entsystem

s,consult

RE

GD

OC

-2.1.1,

shouldalso

beclear

that

N286

doesnot

provideM

anagement

System

[6],and

CSAN

286,

information

onhow

tom

anageprogram

s,but

Managem

entsystem

requirements

fornuclear

howto

establishan

integratedm

anagement

facilities[7].”

system.

12.5

As

percom

ment

#1,clarity

issought

forseveral

Bullet

#5A

mend

toread,

“manage

addrcssall

waste

Clarification

ofthe

bulletpoints

inthis

section.stream

sassociated

with

orpotentially

contaminated

Bullet

#5:clarify

what

ism

eantby

“addressall

bynuclear

substances”w

astestream

s.”N

otall

waste

streams

needto

beaddressed,

butthey

shouldbe

identifiedso

Bullet#6:

The

requirements

regardingthe

waste

NK

21-CO

RR

-00531-15195/

NK

29-CO

RR

-00531-15981/

NK

37-CO

RR

-00531-03228

Pag

e5

of15

Page 10: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bruce

Po

wer

com

ments

on

draft

RE

GD

OC

-2.11.1,

Waste

Managem

ent,

Volum

eI:

Man

agem

ent

of

Radioactive

Waste

aninform

eddecision

canbe

made

toim

plement

managem

enthierarchy

needto

beclarified

eitherin

actionsw

henrequired.

thetext

orin

theglossary.

Ifthehierarchy

in7.1

isto

beaddressed

insection

5,B

ullet#6

requiresthe

licenseeto

considerthe

itshould

beclearly

stated.w

aste‘hierarchy’

butthis

isthe

firsttim

eit

ism

entionedand

theterm

isnot

defined.L

ater,S

ection7.1

listsfour

items

inthe

‘hierarchy’(prevent

generation,reduce

volume

andradioactivity

content,reuse

andrecycle,

dispose).13.

6.1A

sper

comm

ent#1,

thesection

onw

asteA

mend

the2nd

sentenceof

the1st

paragraphto

MA

JOR

Alack

ofclarity

caninadvertently

leadclassification

isnot

clearor

consistent.For

read,“W

hereappropriate,

Tthe

classificationsystem

tom

isunderstandingof

requirements

example:

shallbe

basedon

thespecific

safetycase

andsafety

andthe

reasonsfor

themby

licensees,assessm

entrequired

forthe

waste

managem

entthe

regulatorand

thepublic.

.H

istorically,not

allw

astem

anagement

facilityor

activity.facilities

haverequired

safetyassessm

ents.For

thissection,

itm

ayresult

inIs

thisphrase

beingused

generically?A

mend

4thbullet

toread,

“Due

toits

long-livedlicensee’s

developingunique

.T

he4’

bulletis

apotentially

misleading

orradionuclides,

LWgcncrally

may

requirea

higherclassifications

andunintended

biasingstatem

ent.

There

arecurrent

planslevel

ofcontainm

entand

isolationthan

canbe

confusionw

hendiscussing

waste.

Ifto

placeILW

inaboveground

mounds.

providedin

nearsurface

repositories.“

potentialm

anag

emen

tand

disposal.

Does

the5

thbullet

consideracid

rockapproaches

areto

becited,

thisdrainage

andthe

needfor

subaqueousA

mend

the5th

bulletto

read,“In

gen

crl,L

ong-termdocum

entshould

doso

forall

typesof

disposal?S

ubaqueousdisposal

hasbeen

managem

entin

near-surfacefacilities

adjacentto

waste.

Currently,

itonly

providesthis

employed

atE

lliottLake.

Also,

hasth

erem

inesand

mills

isthc

onlyone

ofthe

more

practicalinform

ationfor

some

ofthe

waste

beenno

backfillingof

undergrounduranium

optionsfor

thesew

astes,given

thelarge

volumes

oftypes.

mines

inC

anada?w

astegen

eratedin

mining

andm

illingoperations.

.T

hecurrent

wording

doesnot

providesufficient

guidanceas

tothe

rangeof

factorsIndustry

suggeststhis

sectionshould

listfactors

liketh

atshould

beconsidered

when

determining

waste

form(solid,

liquid,gas

etc.)th

atshould

becontainm

entand

isolationrequirem

ents,considered

when

determining

thedegree

ofw

hichm

aylead

toinappropriate

containment

andisolation.

requirements.

•T

hesection

doesnot

make

itclear

who

Itshould

alsoclarify

who

classifiesw

asteand

addto

classifiesthe

waste.

Canada

alreadyhas

fourthe

definitionof

ILWeg

>2m

Sv/hr

nearcontact.

NK

21-C

OR

R-00531

-15195/

NK

29-CO

RR

-00531-15981

/N

K37-C

OR

R-00531

-03228P

age

6of

15

Page 11: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bru

ce

Pow

er

com

ments

on

draft

RE

GD

OC

-2.11.1,

Waste

Man

agem

ent,

Volum

eI:

Managem

ent

of

Rad

io

activ

eW

aste

As

percom

ment

#1,there

isan

opportunityto

clarifythe

languageand

intentof

the15t

paragraph.

Am

endthe

15t

paragraphto

read,“T

helicensee

shall

performw

astecharacterization

atthe

variousap

pro

priate

step(s)for-4w

them

anagement

of

radioactivew

astethe

specificradioactive

waste.

Waste

characterizationshall

includeassessing

the

physical,m

echanical,chem

ical,biological,

thermal

and

/or

radiologicalproperties

ofthe

waste

material,

asapplicable.

Thc

licenseem

ustjustify

tothe

CNSC

theaspects

that

donot

apply.T

helicensee

shallm

aintaindetailed

recordsof

thecharacterization

performed.”

As

written,

thefirst

requirement

hasno

clearpurpose.

Clarity

isneeded

asto

why

thecharacterization

isperform

edand

atw

hatstage(s)

thecharacterization

shouldbe

performed.

As

written,

thism

ayresult

incharacterization

beingundertaken

when

notrequired

and/o

rcharacterization

notbeing

performed

when

required.In

the3”

sentence,by

default,aspects

that

donot

applyw

illbe

ruledout

duringthe

varioussteps

ofthe

characterizationsand

recordedin

detail.A

sw

ritten,licensees

arebeing

askedto

provea

negative,w

hichis

notclear

direction.T

hispassage

alsoraises

aseries

ofunintended

questions:A

tw

hatstage(s)

ofthe

fulllife

cyclew

astem

anagement

processis

documented

waste

characterizationapplicable?

Ifit

isprim

arilyfor

longterm

storageand

disposal,the

requirement

isim

posedupon

agen

erator

bythe

serviceprovider

ofw

astestorage

anddisposal

services.W

hatexactly

arethe

requirements

for

14.6.2

main

waste

classifications,but

theR

EGD

OC

indicateslicensees

shouldclassify

thew

aste.

.In

some

casespotential

“disposal”solutions

arepresented.

Inothers,

theyare

not.•

There

isno

referencefor

sourceof

radioactivew

asteclasses

anda

lackof

clarityon_the_definition_of_L

W.

MA

JOR

NK

21-C

OR

R-00531

-15195/

NK

29-CO

RR

-00531-15981

/N

K37-C

OR

R-00531

-03228P

age7

of15

Page 12: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bruce

Pow

er

com

ments

on

draft

RE

GD

OC

-2.11.1,

Waste

Man

agem

ent,

Volum

eI:

Man

ag

em

en

tof

Radio

active

Waste

satisfactory

characterizatio

nof

waste?

Are

the

requ

iremen

tsuniversal

andstan

dard

izedacross

the

industry,or

areth

eyvariable

bygen

erator

/

serviceprovider.

15.6.3

This

entire

sectionon

WA

Cis

onlyapplicable

toM

oveS

ection6.3

tonew

subsectio

ns

inS

ections9

Clarification

Waste

Storage

Facilities,

orW

asteD

isposaland

10.F

acilities.A

sper

Section

1.2(S

cope),th

een

tiretyof

Section

6is

applicableto

alllicensees

that

havea

waste

man

agem

ent

program.

16.6.3

The

l’paragraph

isin

com

plete

asw

rittenw

ithA

mend

toread,

“Forw

asteit

gen

eratesor

forw

hichM

AJO

RW

herea

licensee(w

asteg

enerato

r)regard

tow

asteow

nersh

ipand

gen

eration

.it

assum

esow

nership,th

elicensee

shalldevelop

engag

esth

eservice

ofan

oth

erw

asteaccep

tance

criteria,co

nsisten

tw

ithand

licenseeto

accept,

process,sto

reand

Also,

there

isno

needto

include“u

npack

aged

derivedfrom

the

safetycase

andsafety

assessmen

t.dispose

ofw

aste,th

eservice

providingw

aste.”T

hisis

coveredby

“waste.”

Unpackaged

The

waste

acceptan

cecriteria

shallspecify

the

licenseeprescribes

the

waste

waste

will

beaccep

tedfor

handling,processing,

chemical,

physical,radiological,

mechanical,

acceptan

cecriteria

forboth

Routine

storag

e,tran

spo

rtan

d/o

rdisposal

atth

efacility

biologicaland

oth

erch

aracteristicsof

waste,

waste

Waste

andN

on-Routine

Waste.

orplace

ofth

eactivity.

Clarity

isalso

sought

with

forms

unpck

agcd

wte

andpackages

that

will

respect

toex

pectatio

ns

forth

eterm

“placeof

be...”activity.”

17.7.1

As

perco

mm

ent

#1,th

e2”

parag

raph

does

notC

larifyth

eo

rder

ofpreferen

ceand

amen

dth

e2

nd

Clarification

clearlystate

that

wh

atis

listedis

ino

rder

ofparag

raph

toread,

“The

licenseeshould

&a44

preferen

ceand

inap

pro

priately

links“red

uce

considerw

here

practicableth

ew

astehierarchy

involum

eand

radioactivityco

nten

t.”T

hew

ordth

em

anag

emen

tof

radioactivew

aste,including

“some”

isnot

need

ed”

inth

e3rd

parag

raph.

Itprev

ent

gen

eration

,reduce

volume,

a.n4preclu

des

the

poten

tialfor

allw

asteto

beradioactivity

conten

tcleared

inthis

man

ner.

Delete

the

word

“some”

inth

e3

rdparagraph.

18.7.3

The

sectionon

processingis

notco

mplete.

Am

endto

stateth

atany

processingof

waste

isM

AJO

RA

licensee’soptio

nto

processw

astesubject

toth

ew

asteaccep

tance

criteriaof

theparty

may

beco

nstrain

edby

itscom

mercial

licensedto

receive,sto

reand

disposeof

waste.

agreem

ent

with

anoth

erlicensee.

Any

proposalor

initiativeto

processw

aste

NK

21-C

OR

R-00531

-15195/

NK

29-CO

RR

-00531-15981

/N

K37-C

OR

R-00531

-03228P

age

8o

f15

Page 13: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bru

ce

Pow

er

com

ments

on

draft

RE

GD

OC

-2

.1

1.1

,W

aste

Managem

ent,

Volum

eI:

Man

agem

ent

of

Radio

active

Waste

tochange

itsphysical

form,

characteristicsor

packagingis

subjectto

theo

ther

licensee’sreview

andapproval

tobe

compliant

with

prescribedw

asteacceptance

criteriafor

receipt,storage

anddisposal.

19.7.3

As

perC

omm

ent#1,

therequirem

entis

unclearD

eleteor

clarify.U

nclearhow

todem

onstrate

Clarification

inthe

firstparagraph.

What

demands?

compliance

20.7.5

As

percom

ment

#1,clarity

isneeded

forthis

Clarify.

Decay

may

notbe

until“final

disposal.”C

larification

section.L

icenseessuggest

using“disposition.”

Can

decaystorage

takeplace

atfinal

disposal,w

itha

viewof

limiting

thenum

berof

times

waste

ishandled?

Issegregation

arequirem

entor

recomm

endationw

hatis

theexpectation?

21.7.5

As

percom

ment

#2,the

sectionon

storageA

mend

toread,

“The

licenseeshall

store,or

make

Clarification

needsto

beclarified.

The

requirement

toarrangem

entsfor

thestorage

of,radioactive

waste

differentiate‘staging’

versus‘storing’

shouldbe

...“

broadened.A

san

example,

forR

outineLLW

andILW

,a

licenseecan

holdor

stagethe

waste

pendingout-of-facility

shipment.

22.7.6

The

licenseeshall

disposeof

radioactivew

asteA

mend

toread,

“The

licenseeshall

disposeof

Clarification

safely,in

am

annerth

atprovides

forthe

radioactivew

astesafely,

ina

manner

that

provides

protectionof

peopleand

theenvironm

ent,and

forthe

protectionof

peopleand

theenvironm

ent,in

accordancew

ithregulatory

requirements.

andin

accordancew

ithregulatory

requirements

atthe

time

ofthe

licenceapplication.”

23.7.6

As

percom

ment

#2,the

sectionon

disposalA

mend

toread,

“The

licenseeshall

disposeof,

orC

larification

needsto

beclarified,

make

arrangements

forthe

disposalof,

radioactivew

aste....“

NK

21-CO

RR

-00531-15195/

NK

29-CO

RR

-00531-15981/

NK

37-CO

RR

-00531-03228P

age

9of

15

Page 14: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bruce

Pow

er

com

ments

on

draft

RE

GD

OC

-2

.1

1.1

,W

aste

Man

agem

ent,

Volum

eI:

Man

agem

ent

of

Radio

active

Waste

24.8

Industryhas

concern

sw

ithth

eopening

senten

ceA

mend

the

senten

ceto

read,“T

helicensee

shallM

AJO

RN

otall

licenseesen

gin

eerth

eirow

nin

the

sectionon

Waste

Packages.

Not

alluse

engin

eeredw

astepackages

asrequired

topackages;

and

/or

notall

packagesare

contain

ersw

illbe

forsto

rage

anddisposal

asthis

containradioactive

waste

inacco

rdan

cew

ithrequired

tobe

engin

eered.

seems

toim

ply.applicable

regulations,both

duringnorm

alo

peratio

nand

inaccid

ent

conditionsof

itsin

tended

use.25.

9.1S

ayingsafety

caseand

safetyassessm

ent

isnot

Delete

“andsupporting

safetyassessm

ent”

Clarification

required

.By

maintaining

anup

todate

safetycase,

the

safetyassessm

ent

would

haveto

beup

todate.

Inaddition,

more

than

just

asafety

assessmen

tw

ouldgo

intoa

safetycase.

There

would

bem

ultiplesu

pportin

gdocu

men

tsth

atw

ouldhave

tobe

keptup

todate.

26.9.1,

10.1,10.2,

Draft

RE

GD

OC

sare

men

tioned

inth

esesections.

Cite

onlycurrently

publishedversions

ofR

EG

DO

Cs.

Clarification

10.5A

sa

matter

ofprinciple,

draft

RE

GD

OC

sshould

onlyreferen

ceo

ther

RE

GD

OC

sth

atare

currentlypublished

andnot

outfor

review.

Otherw

ise,ap

pro

ved

requ

iremen

tsm

aynot

befully

un

dersto

od

andinform

edco

mm

ents

cannot

beprovided.

27.9.3

As

perco

mm

ent

#2,this

sectionapplies

toA

mend

toread,

“The

licenseeshall

designth

enew

MA

JOR

The

executionof

additionalw

orkfor

facilitystates

that

may

notbe

applicableto

allsto

rage

facilitiesto

fulfillth

cfu

nd

amen

talapplicable

operatin

gstates

beyondth

ose

ofth

ew

astem

anag

emen

tsto

rage

facilities.T

hesafety

functionsfor

the

statesdefined

forth

efacility

analysisis

required

inth

elicenses

requ

iremen

tsshould

applyto

onlynew

facilities,during

normal

operatio

n,

anticip

atedop

erational

basis.occu

rrences,

designbasis

acciden

tsand

designextension

conditions,as

follows

28.9.4

This

shouldbe

focusedon

SSC“im

portan

tto

Specify

“SSCim

portan

tto

safety”M

AJO

RP

reventsin

creasedcom

missioning

safety.”O

ther

equ

ipm

ent

isan

operatio

nal

issuereq

uirem

ents

onsystem

sth

atare

notonly

andshould

notbe

anuclear

safetyconcern,

safetyrelated

.29.

9.4A

sper

com

men

t#1,

clarityis

soughton

the

3rd

Am

endto

read,“T

helicensee

shallverify

that

the

MA

JOR

The

phrase“conditions

ofparag

raph.

Com

missioning

requirem

ents

may

equ

ipm

ent

orSSC

sim

portan

tto

safetyperform

asau

thorizatio

n”

isnot

definedand

will

bem

etth

rough

oth

erm

eans

oth

erth

antestin

g.

perdesign

perfo

rman

cecriteria.

Upon

the

make

itdifficult

forlicensees

toW

hatare

“conditionsof

auth

orizatio

n”

andcom

pletionof

comm

issioning,th

elicensee

shallcom

plyand

CN

SCin

specto

rsto

aud

itw

here

arethey?

pro

duce

afinal

comm

issioningrep

ort.

The

repo

rtagainst.

shallprovide

assuran

ceth

atall

licenceconditions

NK

21-C

OR

R-00531

-15195/

NK

29-CO

RR

-00531-15981

/N

K37-C

OR

R-00531

-03228P

ag

e10

of

15

Page 15: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bru

ce

Pow

er

com

ments

on

draft

RE

GD

OC

-2.11.1,

Waste

Managem

ent,

Vo

lu

me

I:

Managem

ent

of

Radio

active

Waste

havebeen

satisfied.”docum

ent:the

asbuilt

statusof

thefacility;

thetesting

conductedw

ithevidence

tosupport

thesuccessful

completion

ofthe

testing;and,

anym

odificationsm

adeto

thefacility

orto

proceduresduring

construction.T

hereport

shallprovide

assuranceth

atall

theconditions

ofauthorization

havebeen

satisfied.

30.9.5

As

percom

ment

#1,licensees

haveconcerns

Am

endto

read,“T

helicensee

shouldm

aintain,test

Clarification

with

theclarity

ofthe

finalparagraph

onpage

8.and

inspectin

accordancew

iththe

designintent.”

thefacility

ata

frequencyth

atensures

that

thereliability

ofthe

equipment

remains

highand

that

theeffectiveness

ofthe

systems

remain

inaccordance

with

thedesign

intentfor

thefacility.

31.10

Agraded

approachcould

beapplied

tothe

Suggest

addingw

ordingto

clearlyenable

agraded

Clarification

waste

facilityin

considerationof

suchthings

asapproach

tobe

appliedbased

onw

astetype.

thew

astetype

tobe

managed

andhazards

orconsequences.

32.10.1

This

sectioncould

beclarified

ina

number

ofA

mend

to:C

larification

small

ways.

•M

akeit

clearthis

alsoincludes

Post

Closure

•A

sper

comm

ent#2,

thelicensee

shallS

afetyassessm

entsdevelop,

implem

ent,and

maintain

asafety

•C

hangefrom

“optionsfor

design”to

“design”case

andsupporting

safetyassessm

entfor

•C

hangefunction

to“barriers”

theentire

lifecycleof

aw

astem

anagement

•M

akerequirem

entm

orespecific:

SSCim

portantdisposal

facility.T

hisshould

includePost

tosafety

and“norm

al”SSC.

Closure

assessments.

•D

eletethe

4th

paragraph.•

Second

paragraph—

why

theoptions

fordesign

andnot

thedesign

itself?•

Safefacility

operationis

nota

function.•

As

percom

ment

#1,w

hatis

meant

by“classify

SSC”?

•T

he4th

paragraphis

aduplication

ofexisting

licensingprocesses

andoth

erregulatory

documents

NK

21-C

OR

R-00531

-15195/

NK

29-CO

RR

-00531-15981

/N

K37-C

OR

R-00531

-03228P

age

11of

15

Page 16: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bruce

Po

wer

com

men

tson

draft

RE

GD

OC

-2.11.1,W

asteM

anag

emen

t,V

olume

I:M

anag

emen

tof

Rad

ioactiv

eW

aste

33.10.1

&9.1

As

perco

mm

ent

#2,it

isunclear

ifth

ereis

aL

icenseessuggest

the

requ

iremen

tsfor

Long

Term

Clarification

differen

ceb

etween

Long

Term

Storage

anda

Waste

Man

agem

ent

beonly

specifiedin

one

place.D

isposalFacility.

Or,

additionalguidance

couldbe

added

tom

akeit

Confusingly,

bothsectio

ns

reference

draft

clearw

hat

the

differen

cesin

requ

iremen

tsfor

the

RE

GD

OC

-2.11.1W

asteM

anag

emen

tV

olume

Illtw

odifferen

tfacilities

Safety

Case

for

Long

Term

Radioactive

Waste

Man

agem

ent.

34.10.2

As

currentlyw

ritten,

thissection

inap

pro

priately

Forclarity

andto

avoidconfusion,

licenseessu

ggest

Clarification

suggeststh

atonly

DG

Rs

arean

acceptab

lerem

ovingth

esecond

parag

raph.

meth

od

ofw

astedisposal.

Licensees

would

liketo

seestatem

ents

herereferring

too

ther

Foradditional

clarity,industry

believesth

ephrase

meth

ods

ofw

astedisposal,

especiallyas

earlier“long-term

waste

man

agem

ent”

shouldbe

usedsectio

ns

men

tion

near

surfaceand

interm

ediate

insteadof

“disposal”w

here

appro

priate

thro

ughout

dep

thdisposal.

This

shouldalso

describeth

edocu

men

t.an

ticipated

levelsof

detailreq

uired

forvarious

types

ofw

asteand

disposalm

ethods.

35.10.3

As

perco

mm

ent

#1,licensees

believethis

Enhance

clarityin

futu

redrafts

by:C

larificationsection

andits

bulletsare

unclearand

itsreq

uirem

ents

arevague.

Forinstance,

•M

ovingparagraph

6&

7to

the

beginningof

thisparag

raphs

6and

7do

notseem

tobe

properlysection

sequen

ced.

•E

xplicitlystating

the

bulletsrelate

todifferen

tphases

ofth

efacility’s

lifecycleand

thisis

anA

sper

com

men

t#2,

licenseesalso

believeth

eiterativ

eprocess

that

takes

placeduring

the

bulletscan

berevised

tobetter

relateto

design.differen

tphases

ofa

facility’slifecycle.

•A

mending

Bullet

#1of

the

firstbullet

listto

read,“to

beem

placedin

accord

ance

with

the

Forth

esecond

listof

bullets,som

eSSC

sw

illbe

expected

perfo

rman

ceof

the

facility.”“closed”

priorto

DG

Rclosure

(asper

com

men

t•

Am

endingB

ullet#1

ofth

esecond

listto

read,#2).

Insom

ecases,

amo

un

tsof

water

couldbe

“allows

forth

em

easurem

ent

orcalculations

ofbounded

byoth

erev

iden

ceand

calculatedas

water

insafety-significant

SSCs

priorto

closureopposed

tom

easured

.of

the

specificSSC

”•

Updating

the

secondlist

ofbullets

toonly

NK

21-CO

RR

-00531-15195/

NK

29-CO

RR

-00531-15981/

NK

37-CO

RR

-00531-03228

Pag

e12

of15

Page 17: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bruce

Pow

erco

mm

ents

ond

raftR

EG

DO

C-2.11.1,

Waste

Man

agem

ent,

Volum

eI:

Man

agem

ent

ofR

adioactiveW

aste

Also,

thesecond

listof

bulletsis

am

ixtureof

high-levelrequirem

entsand

specificdesign

requirements,

which

canlead

toconfusion.

The

scopeof

thefinal

paragraphneeds

tobe

more

clearlydefined

toensure

engineeringrequirem

entsand

monitoring

programs

areappropriate

andcom

mensurate

with

potentialsrisks.

As

percom

ment

#1,the

1paragraph

isunclear

andshould

focuson

SSC’s

important

tosafety,

notequipm

entof

anoperational

natureand

nota

nuclearsafety

concern.T

he15tsentence

isself-

evidentand

notneeded.

The

2nd

paragraphis

notpractical.

Ifsitepreparation

isundertaken,

thelocal

environment

will

beim

pacted.T

heim

pactof

constructionneeds

tobe

consideredand

anygeological

features

creditedby

thefacility

designm

ustbe

shown

notto

beadversely

impacted

duringconstruction.

includehigh-level

requirements.

Exam

plesof

specificrequirem

entsfor

systems

important

tosafety

canbe

cited,but

theactual

requirements

relatedto

thehazards

(i.e.the

typeof

waste,

lowlevel,

intermediate,

fueletc.)

must

beclear.

•E

nsuringthe

bulletsrefer

toradioactive

waste,

notradioactive

material

•A

mend

thefinal

paragraphto

read,“T

helicensee

shalldesign

thedisposal

facilityto

facilitatethe

inspection,m

onitoring,testing,

andm

aintenanceof

thesystem

sim

portantto

safetyfacility

andthe

elements

ofthe

hostenvironm

entth

atare

creditedin

thesafety

case.,as

applicable.T

helicensee

must

justi’

tothe

CN

SCthe

vnrc

tcth

atdo

notapply.

Forclarity:

•Specify

“SSCim

portantto

safety”

•A

mend

the15t

paragraphto

read,“T

helicensee

shallconstruct

thedisposal

facilityin

accordance

with

itsdesign.

The

licenseeshall

havesufficient

evidenceth

atthe

closuredesign

will

functionas

intendedbefore

constructionactivities

comm

ence•

Am

endthe

2sen

tence

ofthe

2,d

paragraphto

read,“T

helicensee

shouldperform

allconstruction

activitiesso

that

containment

andisolation

features

ofthe

hostenvironm

entas

creditedin

thesafety

caseare

preserved.”

•T

helicensee

shallverify

that

theequipm

entm

eetsdesign

specificationsrequirem

entsand

performcom

missioning

validationactivities

todem

onstrate

that

theequipm

entand

SSC5perform

asexpected

insupport

ofoperations.”

36.10.4

Clarification

NK

21-C

OR

R-00531

-15195/

NK

29-CO

RR

-00531-15981

/N

K37-C

OR

R-00531

-03228P

age

13of

15

Page 18: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bruce

Pow

er

com

ments

on

draft

RE

GD

OC

-2.11.1,

Waste

Managem

ent,

Volu

me

I:

Man

agem

ent

of

Radio

active

Waste

37.10.6

The

titleis

misleading.

Disposal

facilitiesare

notC

hangethe

titleto

‘Closure

andD

ecomm

issioningof

Clarification

normally

decomm

issioned.A

ncillaryand

supporta

waste

managem

entdisposal

facility’stru

ctures

neededduring

operationsare

theelem

entsth

atare

decomm

issioned.A

mend

the1

sentenceof

the2d

paragraphto

read,“T

helicensee

shallclose

thedisposal

facilityin

aw

ayT

hesecond

paragraphcan

beclarified,

that

maintains

theintegrity

ofthose

SSC5th

atperform

safetyfunctions

that

havebeen

shown

tobe

important

tosafety

inthe

a4tefpost-closure

phases.38.

10.7A

sper

comm

ent#1,

thissection

couldbe

editedA

mend

thefinal

bulletto

read,“m

aintainrecords

ofC

larificationslightly

toenhance

clarity,the

information

onthe

disposalfacility,

thesite

andthe

environment

itssurroundings

Am

endthe

finalsentence

toread,

“After

closureand

untilrem

ovalfrom

CN

SClicensing

revocationof

thelicence,

thelicensee

shallrem

ainresponsible

forsurveillance

ofthe

disposalsystem

andfor

anyrem

edialaction

that

might

berequired.

39.10.8

The

lastparagraph

states“active

controlsm

ayA

mend

toclarify

which

statemen

tis

accuratein

theC

larificationbe

followed

eventuallyby

passivecontrols,”

lastparagraph

what

requirements

applyto

them

akingthe

implem

entationof

passivecontrols

“institutionalcontrol

period.”sound

optional.H

owever,

Section

10.1says,

“The

licenseeshall

site,design,

construct,A

mend

the2d

bulletto

read,“operation

andcom

mission,

operate

andclose

thedisposal

maintenance

ofa

monitoring

systemto

providefacility

insuch

aw

ayth

atsafety

isensured

byearly

warning

ofthe

releaseof

radionuclidesw

illbe

passivem

eansto

thefullest

extentpossible”

preparedand

acceptedin

supportof

theT

hesetw

ostatem

ents

seemat

oddsw

ithone

decomm

issionlicence

beforethey

leavethe

siteanother.

boundary”

The

phrase“institutional

controlperiod”

isused

Am

endthe

3”bullet

toread,

“Replace

thisfor

thefirst

time

insection

10.8,but

itsstatem

ent

with

“Implem

entationof

activecontrols,

requirement

isunclear.

The

phraseshould

alsow

hererequired,

toprevent

unauthorizedaccess

tobe

in10.6

and10.7.

thesite.”

NK

21-C

OR

R-00531

-15195/

NK

29-CO

RR

-00531-15981

/N

K37-C

OR

R-00531

-03228P

age

14of

15

Page 19: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bruce

Pow

er

com

ments

on

draft

RE

GD

OC

-2

.1

1.1

,W

aste

Managem

ent,

Volum

eI:

Managem

ent

of

Radio

active

Waste

The

2bullet’s

expectationsfor

actionsto

beR

emove

thenote

onactive

controls.

takenduring

theinstitutional

controlperiod

shouldbe

clarified.S

urfaceand

groundwater

pathways

aresite-specific

andthe

“siteboundary”

isopen

tointerpretation

andunknow

nuntil

aspecific

siteand

thefinal

repositoryare

assessed.

Inthe

3”bullet,

theuse

ofactive

controlsis

contraryto

theP

rovinceof

Saskatchew

an’sIC

programth

atis

basedon

anexpectation

that

passivecontrols

will

beused

wherever

possibleto

reducefuture

maintenance

requirements

ofa

sitein

theprogram

.T

hegoal

ofm

anydecom

missioning

plansis

toallow

futureland

usersto

have“unrestricted

accessto

thesite”.

Regarding

thenote

inthe

finalsentence

-

controllingfuture

landuse

permitting

isnot

controlledaccess.

40.G

lossaryA

sper

comm

ent#1,

there

areoth

erterm

sthat

Define:

SSC5-

System

sIm

portantto

Safety

Clarification

arenot

definedin

RE

GD

OC

-3.6th

atw

ouldbe

usefulfor

thisglossary.

NK

21-C

OR

R-00531

-15195/

NK

29-CO

RR

-00531-15981

/N

K37-C

OR

R-00531

-03228P

age

15of

15

Page 20: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bruce PowerInnovation at work

June 28, 2019

NK21 -CORR-00531 -15195NK29-CORR-00531 -15981NK37-CORR-00531 -03228

Mr. B. TorrieDirector General, Regulatory Policy DirectorateCanadian Nuclear Safety CommissionP.O. Box 1046280 Slater StreetOttawa, OntarioK1P 5S9

Dear Mr. Torrie:

Bruce Power comments on draft REGDOC-2.1 1.1,Waste Management, Volume I: Management of Radioactive Waste

The purpose of this letter is to provide Bruce Power’s comments on draft REGDOC2. 11. 1, Waste Management, Volume 1: Management of Radioactive Waste.

Following a collaborative review of the draft document with our industry peers, we havecompiled a series of detailed observations and requests for clarification in Attachment Afor the CNSC’s consideration. In general, licensees found the language in some sectionsof the draft to be either unclear or imprecise. In some areas, references were made toregulatory documents that have not yet been published and key terms were either notdefined or their definitions not included or aligned with those in REGDOC-3.6, Glossaryof CNSC Terminology.

More specifically, Bruce Power encourages the CNSC to clearly differentiate between a“waste generator” and a “waste owner” by amending the opening paragraph in Section 2to read, “Under Canada’s Radioactive Waste Policy Framework, waste owners arerequired to ensure the safe and secure management of radioactive waste and to makearrangements for its long-term management. This includes waste generated by anotherlicensee and transferred under a commercial agreement to a waste owner to process,store and dispose.”

This would clarify that radioactive waste management may be the responsibility of morethan one licensee and that robust agreements are in place to ensure it is managedsafely and securely. We believe clear, accessible language equates to improvedcompliance and public understanding of the scientific rigor that forms industry’s wastemanagement programs.

NK21-CORR-00531 -15195 Bruce Power Meury Burton, Senior Director. Regulatory Attars

NK29-CORR-00531-15981 P.O. Box 1540 BlO 2nd Floor E. Tiverton ON NOG 2T0NK37C0RR0053103228 Telephone 519-361-5291 Facsimile 519-361-4559

maury,burton a brucepowercom

Page 21: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

2Mr. B. Torrie June 28, 2019

If you require further information or have any questions regarding this submission,please contact Steve Cannon, Senior Strategist, Regulatory Affairs, at (519)-361-6559,or [email protected].

Yours truly,

aury BurtonSenior Director, Regulatory AffairsBruce Power

cc: CNSC Bruce Site Office (Letter only)

Attach.

NK21 -CORR-00531 -15195NK29-CORR-00531 -15981NK37-CORR-00531 -03228

Page 22: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Attachment A

Bruce Power comments on draft REGDOC-2.11.1, Waste Management, Volume I:Management of Radioactive Waste

NK21 -CORR-00531 -15195NK29-CORR-00531 -15981NK37-CORR-00531 -03228

Page 23: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bruce

Pow

er

com

ments

on

draft

RE

GD

OC

-2.11.1,

Waste

Man

agem

ent,

Volum

eI:

Man

agem

en

tof

Rad

ioactiv

eW

aste

Major

#S

ectionIndustry

IssueS

uggestedC

hange(if

ap

plicable)

Com

ment!

Impact

onIndustry,

if

major

com

ment

Clarification

1.G

eneralL

icenseesfound

thelanguage

insom

esections

Given

thepublic

interestin

thesubject,

industryM

AJO

RA

lackof

claritycan

inadvertentlylead

ofthe

draftR

EGD

OC

tobe

eitherunclear

orencourages

theCN

SCto

ensurethe

languageused

toto

misunderstanding

ofrequirem

ents

imprecise,

which

made

itchallenging

attim

esto

describerequirem

entsand

guidancein

futuredrafts

andthe

reasonsfor

them.

Clear,

offera

thorough,contextual

review.

Insom

eis

clearto

allinterested

readers.A

sthose

accessiblelanguage

equatesto

sections,review

ersfound

referencesto

responsiblefor

thesafe

managem

entof

radioactiveim

provedcom

plianceand

public

regulatorydocum

entsth

athave

notyet

beenw

aste,licensees

appreciatethe

scientificbasis

that

understandingof

thescientific

rigor

publishedand

alignment

torelated

documents

supportsthe

CN

SC’s

requirements

inthis

REG

DO

C.

that

forms

industry’sw

aste

suchas

IAEA

standardsto

beunclear.

InH

owever,

industryalso

appreciatesthe

needfor

thism

anagement

programs.

addition,several

keyterm

sw

ereeither

nottechnical

information

tobe

presentedin

aw

ayth

at

definedor

theirdefinitions

notincluded

oris

accessibleto

peopleof

alllevels

oftechnical

alignedw

iththose

inR

EG

DO

C-3

.6

,G

lossary

of

expertise.

CN

SC

Term

inology.

Please

seespecific

examples

inthe

tablebelow

for

areasth

atcould

beam

endedfor

clarity.

2.G

eneralT

hedraft

REG

DO

Cdoes

notclearly

distinguishT

heR

EGD

OC

shouldbe

more

specificabout

theM

AJO

RU

nclearexpectations

couldchallenge

between

facilitytypes

orthe

requirements

that

timefram

ew

henrequirem

entsapply.

Forexam

ple,com

plianceverification.

This

could

applyto

themat

varioustim

esin

theirlifecycle.

there

arem

anyreferences

to“prior

toclosure”

that

alsoinadvertently

resultin:

additional

Forcontext,

adisposal

facilitygenerally

hasthe

shouldbe

clarifiedand

there

arerequirem

entsth

atrequirem

entsbeing

appliedto

low-risk

following

lifecyclephases:

siting;construction;

shouldnot

applyto

the

post-closurephase.

facilitiesw

ithno

comm

ensurate

operation;pre-closure

monitoring;

closure;im

pacton

safety;confusion

for

decomm

issioningof

ancillaryfacilities;

post-P

leasesee

specificexam

plesin

thetable

belowfor

mem

bersof

thepublic

asto

expected

closure.H

owever,

forsom

edeep

geologicitem

sth

atcould

beam

endedfor

clarityrequirem

entsfor

facilities.

repositories(D

GR

),SSC5

will

be“closed”

duringthe

operationalphase

(e.g.,used

fuelcontainers

andplacem

entpanels)

andnot

accessibleprior

toclosure

ofthe

DG

Rand

duringthe

post

closurephase.

Applicability

ofrequirem

entsfor

these

timefram

esneed

toclear

andshould

notinadvertently

createoth

ersafety

issues.

NK

21-CO

RR

-00531-15195/

NK

29-CO

RR

-00531-15981/

NK

37-CO

RR

-00531-03228P

age

1of

15

Page 24: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bruce

Po

wer

com

ments

on

draft

RE

GD

OC

-2.11.1,

Waste

Managem

ent,

Volu

me

I:

Managem

ent

of

Radio

active

Waste

As

percom

ment

#1,th

epurpose

ofthe

document

isunclear

ascurrently

written

andcould

gen

erateconfusion

regardingw

hichrequirem

entsor

guidanceapplies

tovarious

facilitytypes,

suchas

storageand

disposalfacilities.

Licensees

believethe

purposeshould

clearlytell

readersw

hichtype

(low,

intermediate,

orhigh-

level)radioactive

waste

tow

hichthe

guidanceapplies.

Itshould

alsorecognize

there

arevarying

opinionsand

conventionson

what

constitutesstorage

versusdisposal.

(RE

GD

OC

3.6,G

lossaryof

CN

SCT

erminology

doesnot

providefull

definitions.

Am

endto

read,“T

hepurpose

ofthis

document

isto

providerequirem

entsand

guidance:•

onradioactive

waste

managem

entapplicable

todifferent

typesof

CN

SClicensees

•related

toCSA

Group

standardsapplicable

toradioactive

waste

managem

ent•

supplemental

tospecific

topicsin

radioactivew

astem

anagement

standards.R

equirements

andguidance

will

varydepending

onthe

levelof

radioactivew

astebeing

managed

andthe

facilitytype,

suchas

storageand

disposalfacilities,

usinga

gradedapproach

comm

ensuratew

iththeir

relativerisks.”

Foradditional

clarity,definitions

ofstorage

anddisposal

facilitiesshould

beadded

toR

EG

DO

C-3.6,

Glossary

of

CN

SCT

erminology

andreferenced

inthis

REG

DO

C.

An

unclearpurpose

couldlead

toincorrect

assumptions

regardingrequirem

entsfor

facilitytype

storagevs

disposal.For

context,the

time

periodfor

storagefacilities

ism

easuredin

decadesas

opposedto

centuriesfor

disposalfacilities.

3.1.1

MA

JOR

4.1.2

As

percom

ment

#1,the

Scope

isnot

entirelyA

mend

the1

stsentence

toread,

“The

requirements

Clarification

clearto

allreaders.

Forinstance,

itdoes

notand

guidancein

thisdocum

entpertain

toC

NSC

alignw

ithS

ection24

ofthe

NSCA

,w

hichsays

licensedactivities

facilitics...”activities

arelicensed,

notfacilities.

Nor

doesit

definethe

term“w

astem

anagement”

orD

efinethe

terms

“waste

managem

ent”and

“endhighlight

what

the“end

goal”is

with

respectto

goal”to

ensurerequirem

entsare

clearfor

licenseesw

astem

anagement

facilities.T

hiscould

leadand

CN

SCinspectors.

licenseesto

definedifferent

“endgoals”

and,in

turn,drive

thesolutions

toaddress

waste

managem

ent.5.

1.3A

sper

comm

ent#1,

thelist

ofrelevant

Add

referencesto

theN

uclearS

ubstan

cesan

dC

larificationlegislation

isincom

plete.R

adiationD

evicesR

egulationsand

theN

uclearF

uelW

asteA

ct.

NK

21-C

OR

R-00531

-15195/

NK

29-CO

RR

-00531-15981

/N

K37-C

OR

-OO

531-03228

Page

2of

15

Page 25: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bruce

Pow

er

com

ments

on

draft

RE

GD

OC

-2.11.1,

Waste

Managem

ent,

Volum

eI:

Man

agem

ent

of

Rad

ioactiv

eW

aste

6.2

As

percom

ment

#2,the

REG

DO

Cshould

Am

endthe

15t

paragraphto

read,“U

nderC

anada’sM

AJO

RT

hem

anagement

ofradioactive

waste

differentiatebetw

eena

‘waste

generator’and

aR

adioactiveW

astePolicy

Fram

ework

[4],w

astem

aybe

theresponsibility

ofm

ore

‘waste

owner.’

owners

arerequired

toensure

thesafe

andsecure

thanone

licensee.R

einforcingthis

in

managem

entof

radioactivew

asteand

tom

akethe

REG

DO

Cw

ouldhelp

clarifythe

arrangem

ents

forits

long-termm

anagement.

This

rolesand

responsibilitiesfor

waste

includesw

astegenerated

byan

oth

erlicensee

andgenerators

andw

asteow

ners.

transferredunder

acom

mercial

agreement

toa

waste

owner

toprocess,

storeand

dispose.”

7.2.1

As

percom

ment

#1,the

CSAstandard

forInclude

N294,

Decom

missioning

of facilities

Clarification

decomm

issioningis

missing

fromthe

listof

Containing

Nuclear

Substances.

complem

entarydocum

ents.

8.3

As

percom

ment

#1,the

definitionof

radioactiveA

mend

the1st

paragraphto

alignw

iththe

definitionM

AJO

RU

nclearexpectations

couldchallenge

waste

doesnot

alignw

ithth

atin

RE

GD

OC

3.6,of

radioactivew

astein

RE

GD

OC

-3.6com

plianceverification.

which

says“the

owner

declaresto

bew

aste”vs

“nofurther

useif

foreseen.”T

hisintroduces

aA

mend

the2

paragraphto

read,“A

llnuclear

Generation,

controland

handlingare

questionas

tow

hom

ustforesee

“nofurther

substancesassociated

with

licensedactivities

will

typicallyin-facility

activities.

use”of

thew

aste.eventually

become

radioactivew

aste.T

herefore,t

Processing

may

bein-facility

orit

may

The

safem

anagement

oft1

atw

asteis

consideredbe

contractedto

anexternal

party.

As

perC

omm

ent#2,

itis

notclear

that

thesteps

duringall

stepsof

itsm

anagement

andm

ayinvolve

Storage,

transp

ort

anddisposal

may

listedfor

them

anagement

ofradioactive

waste

severallicensees.

The

stepsinvolved

inthe

bem

anagedby

thelicensee

who

may

bethe

responsibilityof

more

thanone

managem

entof

radioactivew

astecan

include:”generated

thew

aste,but

may

alsobe

licenseeand

may

involvetran

sfers/han

doffs

managed

bya

contractedparty.

between

licensees.A

lso,the

factth

atnot

allradioactive

substancesw

illbecom

eradioactive

As

currentlyw

ritten,the

background

waste

isnot

identifiedin

thebackground.

Som

esection

potentiallylim

itsthe

abilityfor

substancesm

aysim

plydecay

away

tothe

pointw

asteto

decayto

safelevels

andbe

thew

asteis

nolonger

radioactivew

aste.treated

asnon-radioactive

waste.

9.4

The

sectionon

General

Requirem

entsis

unclearA

mend

thebullets

forclarity

inthe

following

ways:

MA

JOR

Generally,

alack

ofclarity

may

inm

anyareas.

inadvertentlylead

publicexpectations

Bullet

#1:“m

anageradioactive

waste

soas

toavoid

forlow

-levelw

asteto

bethe

same

as

Bullet

#1requires

alllicensees

tofind

long-termim

posingan

undueburden

onfuture

generations,by

that

forhigh-level

waste.

managem

entsolutions

that

“avoidim

posingan

findingsafe,

practicableand

environmentally

undueburden

onfuture

generations.”W

hileacceptable

solutionsfor

thelong-term

”Specifically,

forthe

1st

bullet,licensees

licenseesunderstand

theintent

ofthis

phrase,it

donot

havethe

authorityto

define

NK

21-CO

R-O

O531-15195

IN

K29-C

OR

R-00531-15981

IN

K37-C

OR

R-00531-03228

Pag

e3

of15

Page 26: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bruce

Pow

erco

mm

ents

ondraft

RE

GD

OC

-2.11.1,W

asteM

anag

emen

t,V

olume

I:M

anag

emen

tof

Radioactive

Waste

isa

policystatem

ent

inap

pro

priately

emb

edd

edin

aR

EG

DO

C.

This

requ

iremen

tis

notpart

ofth

efederal

policyon

radioactivew

astem

anag

emen

t.

Bullet

#3need

sto

berelated

tospecific

waste

types

solicensee

andth

eC

NSC

candem

onstrate

toth

epublic

that

waste

isbeing

safelym

anag

edin

am

ann

erco

mm

ensu

ratew

ithth

epoten

tialhazard

ofth

ew

aste.

Bullet

#4is

unclearas

tow

hat

aspects

arein

terdep

end

encies

tobe

taken

inaccount

for.N

oris

itclear

if“evaluation”

refersto

CN

SCin

spectio

ns

orinternal

self-assessmen

tsby

licensees.

Bullet

#5should

notplace

the

emphasis

onth

ed

ocu

men

tation

.T

helicensee

doesnot

“implem

ent

the

docu

men

tation”

—th

eyim

plem

ent

andd

ocu

men

tth

eprogram

,pro

cedures,

etc.T

hisstatem

ent

shouldalso

pointto

guidanceon

what

isconsidered

acceptab

leas

perth

egrad

edapproach.

Bullet

#6:W

henis

con

tamin

atedm

aterialheld

insto

rage

nolonger

“useful”and

isdesig

nated

asw

aste?

Bullet

#7:T

heuse

ofO

PEX,

lessonslearned

andad

van

cesin

scienceand

technologyshould

beco

mm

ensu

ratew

ithth

erisk

associatedw

ith

Bullet

#3:C

larifyth

especific

waste

types

thisbullet

relatesto.

Bullet

#4:C

larifyw

hatasp

ectsof

interd

epen

den

ciesneed

tod

ocu

men

tedand

who

isex

pected

to“evaluate”

andby

what

means.

Am

endto

saylicensees

shouldconsider

allknow

nstep

s,but

the

integ

ration

waste

man

agem

ent

system

sshould

detailhow

interd

epen

den

ciesw

illbe

addressed

.

Bullet

#5:A

mend

toread,

“develop,d

ocu

men

tand

implem

ent

programs,

pro

cedu

resand

instructionsto

ensu

reth

esafety

ofall

waste

man

agem

ent

activitiesfor

which

they

areresponsible

com

men

surate

with

the

scaleof

the

licensedfacility

oractivity

andth

einventory.”

Bullet

#6:C

learlystate

when

con

tamin

atedm

aterialis

desig

nated

asw

aste.A

pplyth

edefinition

of“w

aste.”

Bullet

#7:A

mend

toalign

with

the

5thbullet

andread:

“useoperatio

nal

experien

ce,lessons

learnedfrom

oth

ersim

ilarfacilities

oractivities,

andad

van

cesin

scienceand

technologyin

aneffort

tocontinuously

improve

the

safetyof

the

waste

man

agem

ent

facilityor

activityco

mm

ensu

ratew

iththe

scaleof

the

licensedactivity

andth

einventory.”

Bullet

#8:A

mend

toclearly

stateth

ereq

uirem

ent

toprovide

information

isupon

request/au

dit.

“undueburden”

onfu

ture

gen

erations.

That

responsibilityrests

with

gov

ernm

ent.

Regarding

the

bullet,industry

hashad

challengesin

the

pastw

ithapplying

grad

edap

pro

aches,

which

causes

uncertain

tyin

the

licensingprocess

when

the

regulato

rdoes

not

accom

mo

date

thisapproach

forlow

-risk

activities.

Regarding

the

bullet,th

etim

eand

resources

required

toidentify

trulyrelev

ant

OPEX

,lessons

learnedand

advan

cesin

scienceand

technologyfor

licenseesw

hogen

eratelow

-levelradioactive

waste,

andare

notW

asteM

anag

emen

tF

acilities,is

notalw

aysco

mm

ensu

ratew

ithth

eim

pacton

nuclearsafety.

Agraded

appro

achw

ouldim

provethis

requirem

ent.

waste.

Ifth

erisk

isvery

low,

itshould

notbe

areq

uirem

ent

touse

“advancesin

scienceand

NK

21-C

OR

R-00531

-15195/

NK

29-CO

RR

-00531-15981

/N

K37-C

OR

R-00531

-03228P

age

4of

15

Page 27: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bru

ce

Pow

er

com

ments

on

draft

RE

GD

OC

-2.11.1,

Waste

Managem

ent,

Volum

eI:

Man

agem

en

tof

Rad

ioactiv

eW

aste

technology”for

continuousim

provement.

BuIIet#8:

Reporting

requirements

arenot

well

defined!specified.

Mandatory

andperiodic

versusdiscretionary

andonly

uponrequest?

10.4

&5

Forclarity,

theG

eneralR

equirements

inS

ectionA

mend

the15tsentence

inS

ection4

toread,

“All

MA

JOR

The

managem

entof

radioactivew

aste

4and

requirements

inS

ection5

onthe

Waste

licenseesw

hom

anageradioactive

waste

theym

aybe

theresponsibility

ofm

ore

Managem

entP

rogramshould

includethe

gen

erateor

assume

ownership

forshall:”

thanone

licensee.R

einforcingthis

in

option/abilityof

alicensed

waste

gen

erator

tothe

REG

DO

Chelps

clarifythe

rolesand

contractually(com

mercially)

engagethe

servicesA

mend

the1

5tparagraph

ofS

ection5

toread,

“The

responsibilitiesfor

waste

gen

erators

ofoth

erlicensed

partiesto

transport,process,

licenseeshall

developand

implem

enta

waste

andw

asteow

ners.

storeand

disposeof

radioactivew

aste.T

hem

anagement

programto

controlthe

managem

ent

contractualarran

gem

ent

might,

insom

eof

radioactivew

astew

hereit

isgenerated,

handled,

instances,involve

thetransfer

ofcare

&custody,

processed,stored,

transp

orted

ordisposed

of.

orof

title,to

certainw

aste;i.e.

achange

waste

Licensees

may

contractuallyengage

anoth

erlicensed

ownership

&going

forward

responsibility,party

tocarry

outsom

eor

allof

theseactivities.”

11.5

Facilitiesth

atrequire

aw

astem

anag

emen

tR

emove

thefirst

3-bulletsas

theyare

alreadyC

larification

programcom

plyw

ithCSA

N286-12

aspart

ofaddressed

inlicensee’s

LCHs

forM

anagement

theirlicence.

As

such,this

REG

DO

Cshould

onlyS

ystems.

capturem

anagement

systemrequirem

entsth

atare

incremental

tothe

requirements

inN

286-12A

mend

thefinal

senten

cein

thesection

toread,

“For

tom

inimize

duplicationand

inconsistenciesw

ithm

oreinform

ationon

managing

programs

generalm

anagement

systemrequirem

ents.It

managem

entsystem

s,consult

RE

GD

OC

-2.1.1,

shouldalso

beclear

that

N286

doesnot

provideM

anagement

System

[6],and

CSAN

286,

information

onhow

tom

anageprogram

s,but

Managem

entsystem

requirements

fornuclear

howto

establishan

integratedm

anagement

facilities[7].”

system.

12.5

As

percom

ment

#1,clarity

issought

forseveral

Bullet

#5A

mend

toread,

“manage

addrcssall

waste

Clarification

ofthe

bulletpoints

inthis

section.stream

sassociated

with

orpotentially

contaminated

Bullet

#5:clarify

what

ism

eantby

“addressall

bynuclear

substances”w

astestream

s.”N

otall

waste

streams

needto

beaddressed,

butthey

shouldbe

identifiedso

Bullet#6:

The

requirements

regardingthe

waste

NK

21-CO

RR

-00531-15195/

NK

29-CO

RR

-00531-15981/

NK

37-CO

RR

-00531-03228

Pag

e5

of15

Page 28: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bruce

Po

wer

com

ments

on

draft

RE

GD

OC

-2.11.1,

Waste

Managem

ent,

Volum

eI:

Man

agem

ent

of

Radioactive

Waste

aninform

eddecision

canbe

made

toim

plement

managem

enthierarchy

needto

beclarified

eitherin

actionsw

henrequired.

thetext

orin

theglossary.

Ifthehierarchy

in7.1

isto

beaddressed

insection

5,B

ullet#6

requiresthe

licenseeto

considerthe

itshould

beclearly

stated.w

aste‘hierarchy’

butthis

isthe

firsttim

eit

ism

entionedand

theterm

isnot

defined.L

ater,S

ection7.1

listsfour

items

inthe

‘hierarchy’(prevent

generation,reduce

volume

andradioactivity

content,reuse

andrecycle,

dispose).13.

6.1A

sper

comm

ent#1,

thesection

onw

asteA

mend

the2nd

sentenceof

the1st

paragraphto

MA

JOR

Alack

ofclarity

caninadvertently

leadclassification

isnot

clearor

consistent.For

read,“W

hereappropriate,

Tthe

classificationsystem

tom

isunderstandingof

requirements

example:

shallbe

basedon

thespecific

safetycase

andsafety

andthe

reasonsfor

themby

licensees,assessm

entrequired

forthe

waste

managem

entthe

regulatorand

thepublic.

.H

istorically,not

allw

astem

anagement

facilityor

activity.facilities

haverequired

safetyassessm

ents.For

thissection,

itm

ayresult

inIs

thisphrase

beingused

generically?A

mend

4thbullet

toread,

“Due

toits

long-livedlicensee’s

developingunique

.T

he4’

bulletis

apotentially

misleading

orradionuclides,

LWgcncrally

may

requirea

higherclassifications

andunintended

biasingstatem

ent.

There

arecurrent

planslevel

ofcontainm

entand

isolationthan

canbe

confusionw

hendiscussing

waste.

Ifto

placeILW

inaboveground

mounds.

providedin

nearsurface

repositories.“

potentialm

anag

emen

tand

disposal.

Does

the5

thbullet

consideracid

rockapproaches

areto

becited,

thisdrainage

andthe

needfor

subaqueousA

mend

the5th

bulletto

read,“In

gen

crl,L

ong-termdocum

entshould

doso

forall

typesof

disposal?S

ubaqueousdisposal

hasbeen

managem

entin

near-surfacefacilities

adjacentto

waste.

Currently,

itonly

providesthis

employed

atE

lliottLake.

Also,

hasth

erem

inesand

mills

isthc

onlyone

ofthe

more

practicalinform

ationfor

some

ofthe

waste

beenno

backfillingof

undergrounduranium

optionsfor

thesew

astes,given

thelarge

volumes

oftypes.

mines

inC

anada?w

astegen

eratedin

mining

andm

illingoperations.

.T

hecurrent

wording

doesnot

providesufficient

guidanceas

tothe

rangeof

factorsIndustry

suggeststhis

sectionshould

listfactors

liketh

atshould

beconsidered

when

determining

waste

form(solid,

liquid,gas

etc.)th

atshould

becontainm

entand

isolationrequirem

ents,considered

when

determining

thedegree

ofw

hichm

aylead

toinappropriate

containment

andisolation.

requirements.

•T

hesection

doesnot

make

itclear

who

Itshould

alsoclarify

who

classifiesw

asteand

addto

classifiesthe

waste.

Canada

alreadyhas

fourthe

definitionof

ILWeg

>2m

Sv/hr

nearcontact.

NK

21-C

OR

R-00531

-15195/

NK

29-CO

RR

-00531-15981

/N

K37-C

OR

R-00531

-03228P

age

6of

15

Page 29: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bru

ce

Pow

er

com

ments

on

draft

RE

GD

OC

-2.11.1,

Waste

Man

agem

ent,

Volum

eI:

Managem

ent

of

Rad

io

activ

eW

aste

As

percom

ment

#1,there

isan

opportunityto

clarifythe

languageand

intentof

the15t

paragraph.

Am

endthe

15t

paragraphto

read,“T

helicensee

shall

performw

astecharacterization

atthe

variousap

pro

priate

step(s)for-4w

them

anagement

of

radioactivew

astethe

specificradioactive

waste.

Waste

characterizationshall

includeassessing

the

physical,m

echanical,chem

ical,biological,

thermal

and

/or

radiologicalproperties

ofthe

waste

material,

asapplicable.

Thc

licenseem

ustjustify

tothe

CNSC

theaspects

that

donot

apply.T

helicensee

shallm

aintaindetailed

recordsof

thecharacterization

performed.”

As

written,

thefirst

requirement

hasno

clearpurpose.

Clarity

isneeded

asto

why

thecharacterization

isperform

edand

atw

hatstage(s)

thecharacterization

shouldbe

performed.

As

written,

thism

ayresult

incharacterization

beingundertaken

when

notrequired

and/o

rcharacterization

notbeing

performed

when

required.In

the3”

sentence,by

default,aspects

that

donot

applyw

illbe

ruledout

duringthe

varioussteps

ofthe

characterizationsand

recordedin

detail.A

sw

ritten,licensees

arebeing

askedto

provea

negative,w

hichis

notclear

direction.T

hispassage

alsoraises

aseries

ofunintended

questions:A

tw

hatstage(s)

ofthe

fulllife

cyclew

astem

anagement

processis

documented

waste

characterizationapplicable?

Ifit

isprim

arilyfor

longterm

storageand

disposal,the

requirement

isim

posedupon

agen

erator

bythe

serviceprovider

ofw

astestorage

anddisposal

services.W

hatexactly

arethe

requirements

for

14.6.2

main

waste

classifications,but

theR

EGD

OC

indicateslicensees

shouldclassify

thew

aste.

.In

some

casespotential

“disposal”solutions

arepresented.

Inothers,

theyare

not.•

There

isno

referencefor

sourceof

radioactivew

asteclasses

anda

lackof

clarityon_the_definition_of_L

W.

MA

JOR

NK

21-C

OR

R-00531

-15195/

NK

29-CO

RR

-00531-15981

/N

K37-C

OR

R-00531

-03228P

age7

of15

Page 30: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bruce

Pow

er

com

ments

on

draft

RE

GD

OC

-2.11.1,

Waste

Man

agem

ent,

Volum

eI:

Man

ag

em

en

tof

Radio

active

Waste

satisfactory

characterizatio

nof

waste?

Are

the

requ

iremen

tsuniversal

andstan

dard

izedacross

the

industry,or

areth

eyvariable

bygen

erator

/

serviceprovider.

15.6.3

This

entire

sectionon

WA

Cis

onlyapplicable

toM

oveS

ection6.3

tonew

subsectio

ns

inS

ections9

Clarification

Waste

Storage

Facilities,

orW

asteD

isposaland

10.F

acilities.A

sper

Section

1.2(S

cope),th

een

tiretyof

Section

6is

applicableto

alllicensees

that

havea

waste

man

agem

ent

program.

16.6.3

The

l’paragraph

isin

com

plete

asw

rittenw

ithA

mend

toread,

“Forw

asteit

gen

eratesor

forw

hichM

AJO

RW

herea

licensee(w

asteg

enerato

r)regard

tow

asteow

nersh

ipand

gen

eration

.it

assum

esow

nership,th

elicensee

shalldevelop

engag

esth

eservice

ofan

oth

erw

asteaccep

tance

criteria,co

nsisten

tw

ithand

licenseeto

accept,

process,sto

reand

Also,

there

isno

needto

include“u

npack

aged

derivedfrom

the

safetycase

andsafety

assessmen

t.dispose

ofw

aste,th

eservice

providingw

aste.”T

hisis

coveredby

“waste.”

Unpackaged

The

waste

acceptan

cecriteria

shallspecify

the

licenseeprescribes

the

waste

waste

will

beaccep

tedfor

handling,processing,

chemical,

physical,radiological,

mechanical,

acceptan

cecriteria

forboth

Routine

storag

e,tran

spo

rtan

d/o

rdisposal

atth

efacility

biologicaland

oth

erch

aracteristicsof

waste,

waste

Waste

andN

on-Routine

Waste.

orplace

ofth

eactivity.

Clarity

isalso

sought

with

forms

unpck

agcd

wte

andpackages

that

will

respect

toex

pectatio

ns

forth

eterm

“placeof

be...”activity.”

17.7.1

As

perco

mm

ent

#1,th

e2”

parag

raph

does

notC

larifyth

eo

rder

ofpreferen

ceand

amen

dth

e2

nd

Clarification

clearlystate

that

wh

atis

listedis

ino

rder

ofparag

raph

toread,

“The

licenseeshould

&a44

preferen

ceand

inap

pro

priately

links“red

uce

considerw

here

practicableth

ew

astehierarchy

involum

eand

radioactivityco

nten

t.”T

hew

ordth

em

anag

emen

tof

radioactivew

aste,including

“some”

isnot

need

ed”

inth

e3rd

parag

raph.

Itprev

ent

gen

eration

,reduce

volume,

a.n4preclu

des

the

poten

tialfor

allw

asteto

beradioactivity

conten

tcleared

inthis

man

ner.

Delete

the

word

“some”

inth

e3

rdparagraph.

18.7.3

The

sectionon

processingis

notco

mplete.

Am

endto

stateth

atany

processingof

waste

isM

AJO

RA

licensee’soptio

nto

processw

astesubject

toth

ew

asteaccep

tance

criteriaof

theparty

may

beco

nstrain

edby

itscom

mercial

licensedto

receive,sto

reand

disposeof

waste.

agreem

ent

with

anoth

erlicensee.

Any

proposalor

initiativeto

processw

aste

NK

21-C

OR

R-00531

-15195/

NK

29-CO

RR

-00531-15981

/N

K37-C

OR

R-00531

-03228P

age

8o

f15

Page 31: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bru

ce

Pow

er

com

ments

on

draft

RE

GD

OC

-2

.1

1.1

,W

aste

Managem

ent,

Volum

eI:

Man

agem

ent

of

Radio

active

Waste

tochange

itsphysical

form,

characteristicsor

packagingis

subjectto

theo

ther

licensee’sreview

andapproval

tobe

compliant

with

prescribedw

asteacceptance

criteriafor

receipt,storage

anddisposal.

19.7.3

As

perC

omm

ent#1,

therequirem

entis

unclearD

eleteor

clarify.U

nclearhow

todem

onstrate

Clarification

inthe

firstparagraph.

What

demands?

compliance

20.7.5

As

percom

ment

#1,clarity

isneeded

forthis

Clarify.

Decay

may

notbe

until“final

disposal.”C

larification

section.L

icenseessuggest

using“disposition.”

Can

decaystorage

takeplace

atfinal

disposal,w

itha

viewof

limiting

thenum

berof

times

waste

ishandled?

Issegregation

arequirem

entor

recomm

endationw

hatis

theexpectation?

21.7.5

As

percom

ment

#2,the

sectionon

storageA

mend

toread,

“The

licenseeshall

store,or

make

Clarification

needsto

beclarified.

The

requirement

toarrangem

entsfor

thestorage

of,radioactive

waste

differentiate‘staging’

versus‘storing’

shouldbe

...“

broadened.A

san

example,

forR

outineLLW

andILW

,a

licenseecan

holdor

stagethe

waste

pendingout-of-facility

shipment.

22.7.6

The

licenseeshall

disposeof

radioactivew

asteA

mend

toread,

“The

licenseeshall

disposeof

Clarification

safely,in

am

annerth

atprovides

forthe

radioactivew

astesafely,

ina

manner

that

provides

protectionof

peopleand

theenvironm

ent,and

forthe

protectionof

peopleand

theenvironm

ent,in

accordancew

ithregulatory

requirements.

andin

accordancew

ithregulatory

requirements

atthe

time

ofthe

licenceapplication.”

23.7.6

As

percom

ment

#2,the

sectionon

disposalA

mend

toread,

“The

licenseeshall

disposeof,

orC

larification

needsto

beclarified,

make

arrangements

forthe

disposalof,

radioactivew

aste....“

NK

21-CO

RR

-00531-15195/

NK

29-CO

RR

-00531-15981/

NK

37-CO

RR

-00531-03228P

age

9of

15

Page 32: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bruce

Pow

er

com

ments

on

draft

RE

GD

OC

-2

.1

1.1

,W

aste

Man

agem

ent,

Volum

eI:

Man

agem

ent

of

Radio

active

Waste

24.8

Industryhas

concern

sw

ithth

eopening

senten

ceA

mend

the

senten

ceto

read,“T

helicensee

shallM

AJO

RN

otall

licenseesen

gin

eerth

eirow

nin

the

sectionon

Waste

Packages.

Not

alluse

engin

eeredw

astepackages

asrequired

topackages;

and

/or

notall

packagesare

contain

ersw

illbe

forsto

rage

anddisposal

asthis

containradioactive

waste

inacco

rdan

cew

ithrequired

tobe

engin

eered.

seems

toim

ply.applicable

regulations,both

duringnorm

alo

peratio

nand

inaccid

ent

conditionsof

itsin

tended

use.25.

9.1S

ayingsafety

caseand

safetyassessm

ent

isnot

Delete

“andsupporting

safetyassessm

ent”

Clarification

required

.By

maintaining

anup

todate

safetycase,

the

safetyassessm

ent

would

haveto

beup

todate.

Inaddition,

more

than

just

asafety

assessmen

tw

ouldgo

intoa

safetycase.

There

would

bem

ultiplesu

pportin

gdocu

men

tsth

atw

ouldhave

tobe

keptup

todate.

26.9.1,

10.1,10.2,

Draft

RE

GD

OC

sare

men

tioned

inth

esesections.

Cite

onlycurrently

publishedversions

ofR

EG

DO

Cs.

Clarification

10.5A

sa

matter

ofprinciple,

draft

RE

GD

OC

sshould

onlyreferen

ceo

ther

RE

GD

OC

sth

atare

currentlypublished

andnot

outfor

review.

Otherw

ise,ap

pro

ved

requ

iremen

tsm

aynot

befully

un

dersto

od

andinform

edco

mm

ents

cannot

beprovided.

27.9.3

As

perco

mm

ent

#2,this

sectionapplies

toA

mend

toread,

“The

licenseeshall

designth

enew

MA

JOR

The

executionof

additionalw

orkfor

facilitystates

that

may

notbe

applicableto

allsto

rage

facilitiesto

fulfillth

cfu

nd

amen

talapplicable

operatin

gstates

beyondth

ose

ofth

ew

astem

anag

emen

tsto

rage

facilities.T

hesafety

functionsfor

the

statesdefined

forth

efacility

analysisis

required

inth

elicenses

requ

iremen

tsshould

applyto

onlynew

facilities,during

normal

operatio

n,

anticip

atedop

erational

basis.occu

rrences,

designbasis

acciden

tsand

designextension

conditions,as

follows

28.9.4

This

shouldbe

focusedon

SSC“im

portan

tto

Specify

“SSCim

portan

tto

safety”M

AJO

RP

reventsin

creasedcom

missioning

safety.”O

ther

equ

ipm

ent

isan

operatio

nal

issuereq

uirem

ents

onsystem

sth

atare

notonly

andshould

notbe

anuclear

safetyconcern,

safetyrelated

.29.

9.4A

sper

com

men

t#1,

clarityis

soughton

the

3rd

Am

endto

read,“T

helicensee

shallverify

that

the

MA

JOR

The

phrase“conditions

ofparag

raph.

Com

missioning

requirem

ents

may

equ

ipm

ent

orSSC

sim

portan

tto

safetyperform

asau

thorizatio

n”

isnot

definedand

will

bem

etth

rough

oth

erm

eans

oth

erth

antestin

g.

perdesign

perfo

rman

cecriteria.

Upon

the

make

itdifficult

forlicensees

toW

hatare

“conditionsof

auth

orizatio

n”

andcom

pletionof

comm

issioning,th

elicensee

shallcom

plyand

CN

SCin

specto

rsto

aud

itw

here

arethey?

pro

duce

afinal

comm

issioningrep

ort.

The

repo

rtagainst.

shallprovide

assuran

ceth

atall

licenceconditions

NK

21-C

OR

R-00531

-15195/

NK

29-CO

RR

-00531-15981

/N

K37-C

OR

R-00531

-03228P

ag

e10

of

15

Page 33: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bru

ce

Pow

er

com

ments

on

draft

RE

GD

OC

-2.11.1,

Waste

Managem

ent,

Vo

lu

me

I:

Managem

ent

of

Radio

active

Waste

havebeen

satisfied.”docum

ent:the

asbuilt

statusof

thefacility;

thetesting

conductedw

ithevidence

tosupport

thesuccessful

completion

ofthe

testing;and,

anym

odificationsm

adeto

thefacility

orto

proceduresduring

construction.T

hereport

shallprovide

assuranceth

atall

theconditions

ofauthorization

havebeen

satisfied.

30.9.5

As

percom

ment

#1,licensees

haveconcerns

Am

endto

read,“T

helicensee

shouldm

aintain,test

Clarification

with

theclarity

ofthe

finalparagraph

onpage

8.and

inspectin

accordancew

iththe

designintent.”

thefacility

ata

frequencyth

atensures

that

thereliability

ofthe

equipment

remains

highand

that

theeffectiveness

ofthe

systems

remain

inaccordance

with

thedesign

intentfor

thefacility.

31.10

Agraded

approachcould

beapplied

tothe

Suggest

addingw

ordingto

clearlyenable

agraded

Clarification

waste

facilityin

considerationof

suchthings

asapproach

tobe

appliedbased

onw

astetype.

thew

astetype

tobe

managed

andhazards

orconsequences.

32.10.1

This

sectioncould

beclarified

ina

number

ofA

mend

to:C

larification

small

ways.

•M

akeit

clearthis

alsoincludes

Post

Closure

•A

sper

comm

ent#2,

thelicensee

shallS

afetyassessm

entsdevelop,

implem

ent,and

maintain

asafety

•C

hangefrom

“optionsfor

design”to

“design”case

andsupporting

safetyassessm

entfor

•C

hangefunction

to“barriers”

theentire

lifecycleof

aw

astem

anagement

•M

akerequirem

entm

orespecific:

SSCim

portantdisposal

facility.T

hisshould

includePost

tosafety

and“norm

al”SSC.

Closure

assessments.

•D

eletethe

4th

paragraph.•

Second

paragraph—

why

theoptions

fordesign

andnot

thedesign

itself?•

Safefacility

operationis

nota

function.•

As

percom

ment

#1,w

hatis

meant

by“classify

SSC”?

•T

he4th

paragraphis

aduplication

ofexisting

licensingprocesses

andoth

erregulatory

documents

NK

21-C

OR

R-00531

-15195/

NK

29-CO

RR

-00531-15981

/N

K37-C

OR

R-00531

-03228P

age

11of

15

Page 34: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bruce

Po

wer

com

men

tson

draft

RE

GD

OC

-2.11.1,W

asteM

anag

emen

t,V

olume

I:M

anag

emen

tof

Rad

ioactiv

eW

aste

33.10.1

&9.1

As

perco

mm

ent

#2,it

isunclear

ifth

ereis

aL

icenseessuggest

the

requ

iremen

tsfor

Long

Term

Clarification

differen

ceb

etween

Long

Term

Storage

anda

Waste

Man

agem

ent

beonly

specifiedin

one

place.D

isposalFacility.

Or,

additionalguidance

couldbe

added

tom

akeit

Confusingly,

bothsectio

ns

reference

draft

clearw

hat

the

differen

cesin

requ

iremen

tsfor

the

RE

GD

OC

-2.11.1W

asteM

anag

emen

tV

olume

Illtw

odifferen

tfacilities

Safety

Case

for

Long

Term

Radioactive

Waste

Man

agem

ent.

34.10.2

As

currentlyw

ritten,

thissection

inap

pro

priately

Forclarity

andto

avoidconfusion,

licenseessu

ggest

Clarification

suggeststh

atonly

DG

Rs

arean

acceptab

lerem

ovingth

esecond

parag

raph.

meth

od

ofw

astedisposal.

Licensees

would

liketo

seestatem

ents

herereferring

too

ther

Foradditional

clarity,industry

believesth

ephrase

meth

ods

ofw

astedisposal,

especiallyas

earlier“long-term

waste

man

agem

ent”

shouldbe

usedsectio

ns

men

tion

near

surfaceand

interm

ediate

insteadof

“disposal”w

here

appro

priate

thro

ughout

dep

thdisposal.

This

shouldalso

describeth

edocu

men

t.an

ticipated

levelsof

detailreq

uired

forvarious

types

ofw

asteand

disposalm

ethods.

35.10.3

As

perco

mm

ent

#1,licensees

believethis

Enhance

clarityin

futu

redrafts

by:C

larificationsection

andits

bulletsare

unclearand

itsreq

uirem

ents

arevague.

Forinstance,

•M

ovingparagraph

6&

7to

the

beginningof

thisparag

raphs

6and

7do

notseem

tobe

properlysection

sequen

ced.

•E

xplicitlystating

the

bulletsrelate

todifferen

tphases

ofth

efacility’s

lifecycleand

thisis

anA

sper

com

men

t#2,

licenseesalso

believeth

eiterativ

eprocess

that

takes

placeduring

the

bulletscan

berevised

tobetter

relateto

design.differen

tphases

ofa

facility’slifecycle.

•A

mending

Bullet

#1of

the

firstbullet

listto

read,“to

beem

placedin

accord

ance

with

the

Forth

esecond

listof

bullets,som

eSSC

sw

illbe

expected

perfo

rman

ceof

the

facility.”“closed”

priorto

DG

Rclosure

(asper

com

men

t•

Am

endingB

ullet#1

ofth

esecond

listto

read,#2).

Insom

ecases,

amo

un

tsof

water

couldbe

“allows

forth

em

easurem

ent

orcalculations

ofbounded

byoth

erev

iden

ceand

calculatedas

water

insafety-significant

SSCs

priorto

closureopposed

tom

easured

.of

the

specificSSC

”•

Updating

the

secondlist

ofbullets

toonly

NK

21-CO

RR

-00531-15195/

NK

29-CO

RR

-00531-15981/

NK

37-CO

RR

-00531-03228

Pag

e12

of15

Page 35: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bruce

Pow

erco

mm

ents

ond

raftR

EG

DO

C-2.11.1,

Waste

Man

agem

ent,

Volum

eI:

Man

agem

ent

ofR

adioactiveW

aste

Also,

thesecond

listof

bulletsis

am

ixtureof

high-levelrequirem

entsand

specificdesign

requirements,

which

canlead

toconfusion.

The

scopeof

thefinal

paragraphneeds

tobe

more

clearlydefined

toensure

engineeringrequirem

entsand

monitoring

programs

areappropriate

andcom

mensurate

with

potentialsrisks.

As

percom

ment

#1,the

1paragraph

isunclear

andshould

focuson

SSC’s

important

tosafety,

notequipm

entof

anoperational

natureand

nota

nuclearsafety

concern.T

he15tsentence

isself-

evidentand

notneeded.

The

2nd

paragraphis

notpractical.

Ifsitepreparation

isundertaken,

thelocal

environment

will

beim

pacted.T

heim

pactof

constructionneeds

tobe

consideredand

anygeological

features

creditedby

thefacility

designm

ustbe

shown

notto

beadversely

impacted

duringconstruction.

includehigh-level

requirements.

Exam

plesof

specificrequirem

entsfor

systems

important

tosafety

canbe

cited,but

theactual

requirements

relatedto

thehazards

(i.e.the

typeof

waste,

lowlevel,

intermediate,

fueletc.)

must

beclear.

•E

nsuringthe

bulletsrefer

toradioactive

waste,

notradioactive

material

•A

mend

thefinal

paragraphto

read,“T

helicensee

shalldesign

thedisposal

facilityto

facilitatethe

inspection,m

onitoring,testing,

andm

aintenanceof

thesystem

sim

portantto

safetyfacility

andthe

elements

ofthe

hostenvironm

entth

atare

creditedin

thesafety

case.,as

applicable.T

helicensee

must

justi’

tothe

CN

SCthe

vnrc

tcth

atdo

notapply.

Forclarity:

•Specify

“SSCim

portantto

safety”

•A

mend

the15t

paragraphto

read,“T

helicensee

shallconstruct

thedisposal

facilityin

accordance

with

itsdesign.

The

licenseeshall

havesufficient

evidenceth

atthe

closuredesign

will

functionas

intendedbefore

constructionactivities

comm

ence•

Am

endthe

2sen

tence

ofthe

2,d

paragraphto

read,“T

helicensee

shouldperform

allconstruction

activitiesso

that

containment

andisolation

features

ofthe

hostenvironm

entas

creditedin

thesafety

caseare

preserved.”

•T

helicensee

shallverify

that

theequipm

entm

eetsdesign

specificationsrequirem

entsand

performcom

missioning

validationactivities

todem

onstrate

that

theequipm

entand

SSC5perform

asexpected

insupport

ofoperations.”

36.10.4

Clarification

NK

21-C

OR

R-00531

-15195/

NK

29-CO

RR

-00531-15981

/N

K37-C

OR

R-00531

-03228P

age

13of

15

Page 36: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bruce

Pow

er

com

ments

on

draft

RE

GD

OC

-2.11.1,

Waste

Managem

ent,

Volu

me

I:

Man

agem

ent

of

Radio

active

Waste

37.10.6

The

titleis

misleading.

Disposal

facilitiesare

notC

hangethe

titleto

‘Closure

andD

ecomm

issioningof

Clarification

normally

decomm

issioned.A

ncillaryand

supporta

waste

managem

entdisposal

facility’stru

ctures

neededduring

operationsare

theelem

entsth

atare

decomm

issioned.A

mend

the1

sentenceof

the2d

paragraphto

read,“T

helicensee

shallclose

thedisposal

facilityin

aw

ayT

hesecond

paragraphcan

beclarified,

that

maintains

theintegrity

ofthose

SSC5th

atperform

safetyfunctions

that

havebeen

shown

tobe

important

tosafety

inthe

a4tefpost-closure

phases.38.

10.7A

sper

comm

ent#1,

thissection

couldbe

editedA

mend

thefinal

bulletto

read,“m

aintainrecords

ofC

larificationslightly

toenhance

clarity,the

information

onthe

disposalfacility,

thesite

andthe

environment

itssurroundings

Am

endthe

finalsentence

toread,

“After

closureand

untilrem

ovalfrom

CN

SClicensing

revocationof

thelicence,

thelicensee

shallrem

ainresponsible

forsurveillance

ofthe

disposalsystem

andfor

anyrem

edialaction

that

might

berequired.

39.10.8

The

lastparagraph

states“active

controlsm

ayA

mend

toclarify

which

statemen

tis

accuratein

theC

larificationbe

followed

eventuallyby

passivecontrols,”

lastparagraph

what

requirements

applyto

them

akingthe

implem

entationof

passivecontrols

“institutionalcontrol

period.”sound

optional.H

owever,

Section

10.1says,

“The

licenseeshall

site,design,

construct,A

mend

the2d

bulletto

read,“operation

andcom

mission,

operate

andclose

thedisposal

maintenance

ofa

monitoring

systemto

providefacility

insuch

aw

ayth

atsafety

isensured

byearly

warning

ofthe

releaseof

radionuclidesw

illbe

passivem

eansto

thefullest

extentpossible”

preparedand

acceptedin

supportof

theT

hesetw

ostatem

ents

seemat

oddsw

ithone

decomm

issionlicence

beforethey

leavethe

siteanother.

boundary”

The

phrase“institutional

controlperiod”

isused

Am

endthe

3”bullet

toread,

“Replace

thisfor

thefirst

time

insection

10.8,but

itsstatem

ent

with

“Implem

entationof

activecontrols,

requirement

isunclear.

The

phraseshould

alsow

hererequired,

toprevent

unauthorizedaccess

tobe

in10.6

and10.7.

thesite.”

NK

21-C

OR

R-00531

-15195/

NK

29-CO

RR

-00531-15981

/N

K37-C

OR

R-00531

-03228P

age

14of

15

Page 37: Confidentiality Notice: This e-mail and its …...the contents of this email and its attachment unless expressly authorized in writing by the sender or document author. If you have

Bruce

Pow

er

com

ments

on

draft

RE

GD

OC

-2

.1

1.1

,W

aste

Managem

ent,

Volum

eI:

Managem

ent

of

Radio

active

Waste

The

2bullet’s

expectationsfor

actionsto

beR

emove

thenote

onactive

controls.

takenduring

theinstitutional

controlperiod

shouldbe

clarified.S

urfaceand

groundwater

pathways

aresite-specific

andthe

“siteboundary”

isopen

tointerpretation

andunknow

nuntil

aspecific

siteand

thefinal

repositoryare

assessed.

Inthe

3”bullet,

theuse

ofactive

controlsis

contraryto

theP

rovinceof

Saskatchew

an’sIC

programth

atis

basedon

anexpectation

that

passivecontrols

will

beused

wherever

possibleto

reducefuture

maintenance

requirements

ofa

sitein

theprogram

.T

hegoal

ofm

anydecom

missioning

plansis

toallow

futureland

usersto

have“unrestricted

accessto

thesite”.

Regarding

thenote

inthe

finalsentence

-

controllingfuture

landuse

permitting

isnot

controlledaccess.

40.G

lossaryA

sper

comm

ent#1,

there

areoth

erterm

sthat

Define:

SSC5-

System

sIm

portantto

Safety

Clarification

arenot

definedin

RE

GD

OC

-3.6th

atw

ouldbe

usefulfor

thisglossary.

NK

21-C

OR

R-00531

-15195/

NK

29-CO

RR

-00531-15981

/N

K37-C

OR

R-00531

-03228P

age

15of

15