Conduit Mount- Composition Shingle PRODUCT GUIDE Exploded Product View/B.O.M. – 1 Installation Instructions – 2 Cut Sheets – 3 Specifications – 4 STEEP-SLOPE APPLICATIONS

Conduit Mount- Composition Shingle PRODUCT GUIDE STEEP … · 2014-07-16 · Remove ˚ ashing and cut “V” notch at marks where nail shafts engaged leading edge of ˚ ashing the

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Conduit Mount- Composition Shingle PRODUCT GUIDE STEEP … · 2014-07-16 · Remove ˚ ashing and cut “V” notch at marks where nail shafts engaged leading edge of ˚ ashing the

Conduit Mount- Composition Shingle PRODUCT GUIDE Exploded Product View/B.O.M. – 1

Installation Instructions – 2Cut Sheets – 3

Speci� cations – 4

STEE

P-SL

OPE

APP

LIC

ATIO

NS

Page 2: Conduit Mount- Composition Shingle PRODUCT GUIDE STEEP … · 2014-07-16 · Remove ˚ ashing and cut “V” notch at marks where nail shafts engaged leading edge of ˚ ashing the

Conduit Mount-Composition Shingle – Product Guide

Eco

Fast

en S

ola

r

877-859-3947 Committed to the Support of Renewable Energy © EcoFasten Solar® All content protected under copyright. All rights reserved. 04/8/14 1.1

Exploded Product View, Bill of Materials

Eco

Fast

en S

ola

r 4

3

2

1

Materials Needed for Assembly

Item No. Description of Material/Part Quantity

1 GF-1 Flashing 1

2 Conduit Mount- Comp Bracket 1

3 5/16” EPDM Bonded 304-18.8 SS Washer 1

4 Lag Bolt 5/16” 1

Required Tools

Page 3: Conduit Mount- Composition Shingle PRODUCT GUIDE STEEP … · 2014-07-16 · Remove ˚ ashing and cut “V” notch at marks where nail shafts engaged leading edge of ˚ ashing the

Conduit Mount-Composition Shingle – Product Guide

Eco

Fast

en S

ola

r

1

877-859-3947 Committed to the Support of Renewable Energy © EcoFasten Solar® All content protected under copyright. All rights reserved. 02/07/2014 2.1

Installation Instructions

1. Drill a pilot hole (1/4” diameter) for the lag bolt. Back� ll with sealant.*

2. Insert the � ashing so the top part is under the next row of shingles and pushed far enough up slope to prevent water in� ltration through vertical joint in shingles.

3. Line up pilot hole with GreenFasten hole.

4. Insert the lag bolt through the EPDM washer, the Conduit Mount- Comp. Bracket and the gasketed hole in the � ashing and into the roof deck.

5. The visual indicator for proper torque is when the EPDM on the underside of the bonded washer begins to push out the sides as the washer compresses. If using an impact wrench to install the fasteners be careful not to over torque the fastener. You may need to stop and use a ratchet to � nish the install.

Consult an engineer or go to www.ecofastensolar.com for engineering data.

*EcoFasten recommends an EPDM mastic.

5

2 3 4

Page 4: Conduit Mount- Composition Shingle PRODUCT GUIDE STEEP … · 2014-07-16 · Remove ˚ ashing and cut “V” notch at marks where nail shafts engaged leading edge of ˚ ashing the

Conduit Mount-Composition Shingle – Product Guide

877-859-3947 Committed to the Support of Renewable Energy © EcoFasten Solar® All content protected under copyright. All rights reserved. 02/07/2014

Eco

Fast

en S

ola

rInstallation Instructions

1. Slide � ashing up under shingles until leading edge engages nails. Measure remaining distance to adjust upslope.

Nails beneath shingleNails beneath shingle

3. Reinstall � ashing with notched area upslope.

Nails beneath shingle

4. Position notched leading edge underneath nail heads as shown.

Nails beneath shingle

2. Remove � ashing and cut “V” notch at marks where nail shafts engaged leading edge of � ashing the distance desired in Step 1. Notch depth not to exceed 2” length by 1/2” width.

Placement of “V” notch

2”

* Use for vertical adjustment when leading edge of � ashing hits nails in upper shingle courses

2.3

Page 5: Conduit Mount- Composition Shingle PRODUCT GUIDE STEEP … · 2014-07-16 · Remove ˚ ashing and cut “V” notch at marks where nail shafts engaged leading edge of ˚ ashing the

Conduit Mount-Composition Shingle – Product Guide

877-859-3947 Committed to the Support of Renewable Energy © EcoFasten Solar® All content protected under copyright. All rights reserved. 02/07/2014

Eco

Fast

en S

ola

r

.X = +/- .1

.XX = +/- .01

.XXX= +/- .005

8" 4X R 38 "

12"

78 "

516 "

3"

4"

1/32"

A 516 "

5/64

DETAIL ASCALE: 2:1

SHEET 1 OF 1SCALE: 1:5 1/23/2012

MATERIAL:

289 Harrel StreetMorrisville, VT 05661

Toll Free Phone 1.877.859.3947Toll Free Fax 1.888.766.9994web www.ecofastensolar.com

e-mail [email protected]

GF1-XXX-812

Assembly

3.2

Cut Sheets: GF1- L 812

Finish OptionsBLK = Matte Black

MLL = Mill Finish

Page 6: Conduit Mount- Composition Shingle PRODUCT GUIDE STEEP … · 2014-07-16 · Remove ˚ ashing and cut “V” notch at marks where nail shafts engaged leading edge of ˚ ashing the

Conduit Mount-Composition Shingle – Product Guide Cut Sheets: Conduit Mount- Comp Bracket

3.3877-859-3947 Committed to the Support of Renewable Energy © EcoFasten Solar® All content protected under copyright. All rights reserved. 02/07/2014

Eco

Fast

en S

ola

r

Page 7: Conduit Mount- Composition Shingle PRODUCT GUIDE STEEP … · 2014-07-16 · Remove ˚ ashing and cut “V” notch at marks where nail shafts engaged leading edge of ˚ ashing the

Conduit Mount-Composition Shingle – Product Guide

877-859-3947 Committed to the Support of Renewable Energy © EcoFasten Solar® All content protected under copyright. All rights reserved. 02/07/2014

Eco

Fast

en S

ola

rSpeci� cations

4.1

PART 1 – GENERAL

1.1 SUMMARYA. WORK INCLUDES

1. EcoFasten Comp Conduit Mount Backet thatattaches to the roof deck using GreenFasten-Flashing.

2. Provide appropriate conduit clamp for theapplication.

1.2 SYSTEM DESCRIPTIONA. COMPONENTS:

1. GreenFasten GF1 aluminum � ashing withintegral EPDM bushing and one bondedstainless steel and EPDM washer.

2. FastenersA. To be of metal compatible with aluminum

GreenFasten components.B. Fasteners should be selected for compat-

ibility with the roof deck.3. Sealant (if required by roof manufacturer):

to be roof manufacturer approved.4. Aluminum compression bracket

B. DESIGN REQUIREMENTS:1. Bracket spacing to be recommended by

project engineer.

1.3 SUBMITTAL A. Submit manufacturer’s written speci� cations.B. Submit standard product cut sheets.C. Submit installation instructions.

1.4 QUALITY ASSURANCE Installer to be experienced in the installation of speci� ed roo� ng material for no less than 5 years in the area of the project.

1.5 DELIVERY / STORAGE / HANDLING Inspect material upon delivery. Notify manufacturer within 24 hours of any missing or defective items. Keep material dry, covered, and o� the ground until installed.

PART 2 - PRODUCTS

2.1 MANUFACTUREREcoFasten Solar ®

289 Harrel Street, Morrisville, VT 05661(877) 859-3947 www.ecofastensolar.com

2.2 MATERIALSA. Comp Conduit Mount Bracket – 5000 Series

AluminumB. 5/16” x 2” Hex Head Lag Screw – 18.8 SSC.

C. Base � ashing is .032 gauge aluminum embossed to accept EPDM bushing.

D. Bushing is EPDM.

E. Stainless steel bonded washer is 304 18.8 stain-less and EPDM.

2.3 FINISH – Mill Finish

A. Bracket is mill � nish aluminum

B. Base � ashing (choose one)

1. Mill Finish

2. Black - kynar painted

PART 3 - EXECUTION

3.1 EXAMINATIONA. Substrate: Inspect roof on which brackets are

to be installed. Verify that roo� ng material has been installed correctly. Notify General Contractor of any de� ciencies before installing EcoFasten Solar Brackets.

3.2 INSTALLATIONA. Comply with architectural drawings and proj-

ect engineer’s recommendations for location of system. Comply with Manufacturer’s written installation instructions for installation and layout.