32
ARCHITECTS REGISTRATION COUNCIL OF NIGERIA (ARCON) AND THE NIGERIAN INSTITUTE OF ARCHITECTS (NIA) ARCON Project Number CONDITIONS OF ENGAGEMENT AND REMUNERATION FOR ǯ 21ST SEPTEMBER 2011 Conditions of engagement and remuneration for the practice of Architecture, detailing the services offered by the Architect. The remuneration stipulated in this document represents the approved minimum for the corresponding professional service rendered by the Architect.

CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)    AND    

THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

 

 

 

 

 

 

 

ARCON  Project  Number    

 

 

 

 

 

   

 

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION      

FOR      

 21ST  SEPTEMBER  2011  

 

 

 

   

Conditions  of  engagement  and  remuneration  for  the  practice  of  Architecture,  detailing  the  services  offered  by  the  Architect.  The  remuneration  stipulated   in   this  document  represents   the  approved  minimum  for   the  corresponding  professional  service  rendered  by  the  Architect.  

Page 2: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

1  of  31  

 

PREFACE    .  .........................................................................................................................................................  3  CONTACT  ..........................................................................................................................................................  4  DEFINITIONS  .....................................................................................................................................................  5  1   APPOINTMENT  OF  ARCHITECT  ...........................................................................................................  8  2   SCOPE  OF  SERVICES  ...........................................................................................................................  8  3   OBLIGATIONS  AND  AUTHORITY  OF  THE  ARCHITECT  ...........................................................................  8  

3.1   Care  and  Diligence  ...................................................................................................................  8  3.2   Architect's  Obligation  ...............................................................................................................  8  3.3   Reports  .....................................................................................................................................  8  3.4   Limitation  of  Warranty  and  Insurances  ...................................................................................  8  

3.4.1   Limitation  of  Warranty.......................................................................................................................  8  3.4.2   Professional  Indemnity  Insurance  ......................................................................................................  9  3.4.3   Architectural  Standards  Compliance  Registration  .............................................................................  9  

3.5   Co-­‐operation  ............................................................................................................................  9  3.6   Alterations  to  Services  or  Design  .............................................................................................  9  

4   OBLIGATIONS  AND  AUTHORITY  OF  THE  CLIENT  .................................................................................  9  

4.1   Information,  Decisions,  Approvals  and  Instructions  ................................................................  9  4.2   Statutory  and  Other  Consents  Required  ..................................................................................  9  4.3   Appointment  of  Other  Consultants  .......................................................................................  10  4.4   Responsibilities  of  Others  ......................................................................................................  10  

5   ARCHITECTS  REMUNERATION  (AR)  ..................................................................................................  11  

5.1   Standard  Services  (Architectural  Design)  ...............................................................................  11  5.2   Standard  Services  (Supervision)  .............................................................................................  11  5.3   Additional  Supervision  and  Residency  ...................................................................................  11  5.4   Repetitive  Works  ....................................................................................................................  11  5.5   Renovation  Works  ..................................................................................................................  11  5.6   Partial  Services  .......................................................................................................................  11  5.7   Project  Management  .............................................................................................................  11  5.8   Other  Additional  and  Supplementary  Services  ......................................................................  11  5.9   Reimbursable  Expenses  .........................................................................................................  11  5.10   Value  Added  Tax  (VAT)  ..........................................................................................................  11  5.11   Remuneration  Milestones  .....................................................................................................  12  

6   SCHEDULE  OF  PROFESSIONAL  SERVICES  ...........................................................................................  13  

6.1   Architectural  Services  Delivery  Stages  (ASDS)  .......................................................................  13  6.2    ..................................................................................................  13  6.3   Client  Undertaking  to  Issue  Approvals  ...................................................................................  13  

7   INCAPACITY  OF  ARCHITECT  ..............................................................................................................  13  8   POSTPONEMENT  OR  ABANDONMENT  .............................................................................................  14  9   RESUMED  AGREEMENT  ....................................................................................................................  14  10   ALTERATIONS  AND  MODIFICATIONS  ................................................................................................  14  11   COPYRIGHT  AND  USE  OF  INFORMATION  .........................................................................................  14  

11.1   Copyright  ................................................................................................................................  14  

Page 3: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

2  of  31  

11.2   Use  of  information  .................................................................................................................  14  

12   TERMINATION  .................................................................................................................................  15  13   FORCE  MAJEURE  ..............................................................................................................................  15  14   LAWS  OF  THE  AGREEMENT  ..............................................................................................................  15  15   ARBITRATION  ..................................................................................................................................  15  16   ATTESTATION  I  .................................................................................................................................  16  17   SCHEDULES  ......................................................................................................................................  17  Schedule  1.   DETAILED  SCOPE  OF  ARCHITECTURAL  SERVICES.....................................................................  17  Schedule  2.   DETAILED  SCOPE  OF  SUPPLEMENTARY  SERVICES  AND  REIMBURSABLES  ...............................  20  Schedule  3.   DETAILED  SCOPE  OF  SERVICES  AND  RENUMERATIONS  FOR  PROJECT  MANAGEMENT  ...........  25  Schedule  4.   RATES  AND  CALCULATIONS  FOR  REMUNERATIONS  ...............................................................  27  18   AMENDMENT  TO  CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATIONS  ......................................  30  19   ATTESTATION  II  ................................................................................................................................  30  20   ADDENDUM    ARCON  PROJECT  REGISTRATION  FORMS  ..................................................................  31  

20.1   Project  Registration  Details  ...................................................................................................  31  20.2   Contract  Registration  Details  .................................................................................................  31  20.3   Contract  Completion  Details  ..................................................................................................  31  

 

   

Page 4: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

3  of  31  

 PREFACE  With   effect   from  21st   of   September   2011,   the   Architects   Registration   Council   of   Nigeria   (ARCON)   and   the  Nigerian   Institute  of  Architects   (NIA)  signed   into  use  this  Conditions  of  Engagement  and  Remuneration   for  

,  payable  by  both  the  public  and  the  private  sectors  to  architects.  

The   remuneration   stipulated   in   this   document   represents   the   approved  minimum   for   the   corresponding  professional  service  rendered  by  the  Architect.  With  this  remuneration,  an  Architect,  as  the  Prime  Consultant  on   building   projects,   is   expected   to   render   competent   services   to  meet   tprivate  sectors  as  well  as  the  general  public.  

In   addition   to   complying   with   these   mandatory   minimum   remunerations,   ARCON   and   NIA   issue   this  document  to  their  members  for  use  in  all  transactions  with  their  clients.  In  doing  so,  members  are  reminded  that  they  are  bound  by  the  professional  code  of  conduct  of  the  profession.    

           

     

Arc.  Umaru  Aliyu  fnia  ppnia  President  

Architects  Registration  Council  of  Nigeria    

Arc.  Ibrahim  A.  Haruna  fnia  pnia  President  

Nigerian  Institute  of  Architects      

Page 5: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

4  of  31  

CONTACT  

  is   issued   by   the  Nigeria  Institute  of  Architects  (NIA)  and  the  Architects  Registration  Council  of  Nigeria  (ARCON).  

 

2011  Edition.  

Joint  Publishers:   Architects  Registration  Council  of  Nigeria  (ARCON)       and       Nigerian  Institute  of  Architects  (NIA)    

 

 

Copies  of  this  document  may  be  obtained  from  the  following:  

 

1.   ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  26,  Ajose  Adeogun  Street,  (NULGE  Building)  0ff  Augustus  Aikhomu  Street,  Utako,  Abuja.  

  Tel:  +234  9-­‐8706525  Email:  [email protected]    

2.   ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  House  1A  &  1B  Dolphin  Scheme  II,  Behind  Federal  Secretariat  Phase  II.  P.  0.  Box  52895,  Falomo,  Ikoyi,  Lagos.  Tel:  +234  1-­‐8140499  Email:  [email protected]    

3.   NIGERIAN  INSTITUTE  OF  ARCHITECTS  Plot  215  Muazu  Magaji/Patrick  Yakowa  Crescent,  Off  Aminu  Sale  Street,  Katampe  Extension,  Abuja  Tel:  +234  9780  9702  Tel:  +234  8033  0472  17  Email:  [email protected]    

4.   All  State  Chapters  of  the  Nigerian  Institute  of  Architects    

   

Page 6: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

5  of  31  

DEFINITIONS  1.   Client  shall  mean  the  person  or  organisation  or  Government  obtaining  the  professional  services  

under  this  Agreement.  

2.     shall   mean   the   Federal,   State   and   Local   Government   of   the   Federal   Republic   of  Nigeria.  

3.   Architect  shall  mean  the  professional  architectural  firm,  organisation  or  person  commissioned  by  the  Client  to  carry  out  the  services  required  under  the  Agreement.  

4.   shall  mean  the  Architect,  who  is  the  Prime  Consultant  and  the  Team  Leader  on  building  projects.  He  initiates,  conceives  and  produces  the  Architectural  Design,  coordinates  the  input  of  other  consultants  and  manages  the  project.  

5.    shall  mean  professional  services.  .  

6.     shall   mean   the   building   and/or   other   construction   works   which   the   Client   wishes   to  undertake.  

7.    shall  mean  the  construction.  

8.   shall   mean   this   Conditions   of   Engagement   and   Remuneration   for   Professional    

9.   Force  Majeure   is  defined  as  war,  declared  or  undeclared,   revolution,  general   labour  strikes,  disease  epidemics,  extraordinary  floods  or  overflow  of  water,  fire  incidents  and  major  disasters  or  other  events  beyond  the  control  of  the  Architect.  

10.    shall  mean  consultant  in  Civil  Engineering,  Structural  Engineering,  Mechanical  &  Electrical  Engineering,  Quantity  Surveying,  Town  Planning,  and  any  other  professional  discipline  relevant  to  the  project  other  than  Architecture.  

11.   Landsca  shall  mean  specialist  Architect  in  Landscape  Design.  

12.    shall  mean  specialist  Architect  in  Interior  Design  

13.       shall  mean   that   the   building   or   other   construction   is   habitable   or   the  Works  otherwise  usable,  although  there  may  be  minor  items  unfinished  or  defective  workmanship,  all  of  which  are  listed  on  the  handover  inspection.  

14.     shall  mean  hourly   rates,   (and  daily   rates  or  man-­‐month   rates  derived   therefrom)   for  professional  and  sub-­‐professional   staff.   For   the  purposes  of  daily   rates,   the  number  of  working  hours  per  day  shall  be  8  hours.  

15.       shall   mean   a   fee   based   upon   time   spent   and   other   costs   including   all   the   relevant  factors  which  will  result  in  a  lump  sum  fee  being  inserted  in  the  Agreement.  

16.    shall  mean  unit(s)  of  the  same  design  types  and  specification  to  be  constructed  on  same  site  or  other  sites.  

17.     shall   mean   the   various   grades   of   Architects   and   technical   officers   hereunder  referred  to  in  Schedule  4.3.  

 

     

Page 7: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

6  of  31  

INTRODUCTION  

On  September  21st  2011,  the  Architects  Registration  Council  of  Nigeria  (ARCON)  approved  and  endorsed  the  Conditions  of  Engagement  and  Remuneration  for  Architectural  services  for  Architects  in  the  country.    

This  document  therefore  details  the  remuneration  for  services  offered  by  the  Professional  Architect  (PA).    

The   remuneration   stipulated   in   this   document   represents   the   approved  minimum   for   the   corresponding  professional  service  rendered  by  the  Architect.  With  this  remuneration,  an  Architect,  as  the  Prime  Consultant  on   building   projects,   is   expected   to   render   competent   services   to  meet   the   needs   in   public   and  private  sectors  as  well  as  the  general  public.  

    All  architects  are  required  to  adhere  to  the  provisions  of  this  document.     Non-­‐compliance  shall  attract  appropriate  sanctions  and  penalties.     Clients  are  advised  to  make  representations  on  any  unsatisfactory  services  by  any  registered  Architect.     The  architect   shall   exhibit  or   apply  best  practices   in   the  deliverance  of  his   services   as   contained   in   the  annexed  Milestone  schedule;  

  Non-­‐compliance   with   the   provisions   of   this   document   shall   be   a   breach   of   the   provisions   of   the  professional  code  of  conduct  and  ethics.  

  The  selection  and  appointment  of  an  architect  shall  be  based  on  these  Conditions  of  Engagement.  

Payment  for  services  rendered  shall  be  made  as  at  when  due  to  facilitate  prompt  and  successful  delivery  of  services  in  accordance  with  the  stipulated  payment  schedule  contained  herein.  

This  document  is  subdivided  into  eighteen  Clauses,  supported  by  four  Schedules  and  is  subject  to  review  by  The  Council  and  The  Institute  as  and  when  necessary.  

   

Page 8: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

7  of  31  

 

 

APPOINTMENT  OF  PROFESSIONAL  

ARCHITECT  

 

 

Firm/Name)  

 

 

For  

 

 

(Project  Name)  

 

At  

 

 

(Project  Location)  

 

 

By  

 

 

(Client)  

Page 9: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

8  of  31  

MEMORANDUM  OF  AGREEMENT  

ON  

THE  APPOINTMENT  OF  PROFESSIONAL  ARCHITECT  

 

Made   this   _____________________   between   ______________________   of  ___________________________,   (hereinafter   called   "the   Client"   which   expression   shall,   where   the  context   so   admits,   include   his   successors-­‐in-­‐title,   assigns   and   representative)   of   the   one   part   and  __________________     of   ________________________,expression   shall,   where   the   context   so   admits,   include   his   successors-­‐in-­‐title,   executors,   personal  representatives  and  assigns)  of  the  other  part.  

Whereas  the  Client  intends  to  ___________________________________________________________  

(Herein  after  called  "the  Services")  

Now,   Therefore,   The   Client   and   the   Architect,   for   the   consideration   hereinafter   named,   agreed   as  follows:-­‐  

1   APPOINTMENT  OF  ARCHITECT  1.1   The  Client  hereby  appoints  the  Architect  and  the  Architect  hereby  agrees  to  render  the  Services  on  the  

project  upon  the  terms  and  Conditions  of  Engagement  for  architectural  services  hereinafter  set  forth.  

2   SCOPE  OF  SERVICES  2.1   The   Architect,   as   Prime   Consultant   on   building   projects,   shall   undertake   the   responsibilities   and  

provide   the   Standard   Services   described   in   Schedule   1   and/or   the   Supplementary   and/or   Project  Management  Services  described  in  Schedule  2.  

3    OBLIGATIONS  AND  AUTHORITY  OF  THE  ARCHITECT  

3.1   Care  and  Diligence  The  Architect,   in  performing  the  Services  and  discharging  all   the  obligations  under  clause  2  of   these  Conditions,   shall   exercise   reasonable   care   and   diligence   in   conformity   with   the   expected   level   of  professionalism.  

3.2    Architect's  Obligation  The   Architect,   as   the   Prime   Consultant,   is   required   to   discharge   the   professional   responsibilities   as  provided  in  this  document  in  an  impartial  manner  for  the  success  of  the  project.  

3.3   Reports  The  Architect  shall  keep  the  Client  informed  of  progress  in  the  performance  of  the  Services  and  of  any  issue  that  may  affect  the  programme,  cost  or  quality  of  the  Project.  

3.4   Limitation  of  Warranty  and  Insurances  

3.4.1    Limitation  of  Warranty  

The  Architect  does  not  warrant  the  performance,  work  or  products  of  others  who  by  their  actions  or  inactions  affect  the  successful  delivery  of  the  Service.  

Page 10: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

9  of  31  

3.4.2   Professional  Indemnity  Insurance  

The  Client  shall  allow  for  the  provision  of  continuous  all-­‐risk  insurance  for  all  project  phases,  covering  professional  indemnity  and  contractors  all-­‐risk  insurance.  

3.4.3   Architectural  Standards  Compliance  Registration  

The  Client  shall  allow  for  the  registration  of  building  designs  with  the  Architects  Registration  Council  of  Nigeria  in  accordance  with  applicable  guidelines  and  standards.  

3.5   Co-­‐operation  The   Architect   in   performing   the   Services   shall,   when   reasonably   required   by   any   of   the   persons  identified  in  Clause  4.3  

i.   co-­‐operate  with  them  as  reasonably  necessary  for  the  carrying  out  of  their  services;  ii.   provide  them  with  information,  as  agreed  in  these  Conditions,  for  carrying  out  their  services;  iii.   consider  and  comment  on  their  work  when  necessary  or  as  requested  by  them;  iv.   integrate  into  the  Architect's  work  relevant  information  provided  by  them.  

3.6   Alterations  to  Services  or  Design  The  Architect  shall  not  effect  major  alterations  on  the  scope  of  Services  without  the  approval  of  the  client.    

4   OBLIGATIONS  AND  AUTHORITY  OF  THE  CLIENT  

4.1   Information,  Decisions,  Approvals  and  Instructions  4.1.1   The  Client   shall   provide   the  Architect  with   a   comprehensive   project   brief   and   shall   commission   the  

studies  required  to  arrive  at  the  budget  and  programme.  4.1.2   The  Client  shall  supply  accurate  information  as  necessary  for  the  proper  and  timely  performance  of  the  

Services.  4.1.3   The  client   shall  not  unnecessarily  withhold   information,  decisions  and  approvals  as  may  be   required  

for  the  timely  execution  of  the  Services.  4.1.4   The  Client  shall  notify  the  Architect  of  his  intention  to  make  alterations  and  or  amendments,  subject  to  

the  Architects  right  of  reasonable  objection.  4.1.5   All  notices/requests  for  approvals  or  decisions  from  the  Client  by  the  Architect  shall  be  responded  to  

within  the  agreed  period.  4.1.6   The  Client  shall  allow  for  the  provision  of  continuous  all-­‐risk  insurance  for  all  project  phases,  covering  

professional  indemnity  insurance.  4.1.7   The  Client  shall  allow  for  the  provision  of  Standards  Compliance  Registration  for  architectural  buildings  

and   other   projects  with   the   Architects   Registration  Council   of   Nigeria   (ARCON)   and   pay   the   related  statutory   fees   as   set   out   by   ARCON.   Projects   shall   be   issued   with   an   ARCON   Project   Registration  Number  to  certify  that  the  work  has  been  carried  out  by  a  duly  registered  Architect.  

4.1.8   The  client  shall  make  all  payments  due  to  the  Architect  in  accordance  with  Clause  5  of  this  agreement.  

4.2   Statutory  and  Other  Consents  Required  4.2.1   The   Client   shall   cause   the   making   of   applications   for   all   necessary   permits   under   the   appropriate  

legislation.    4.2.2   The   Client   shall   pay   all   statutory   charges,   fees,   expenses   and   disbursements   in   respect   of   such  

applications.  

Page 11: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

10  of  31  

4.3   Appointment  of  Other  Consultants  The  Architect,  as  Prime  Consultant,  shall  recommend  the  appointment  of  other  consultants  including  the  clerk  of  works  to  work  with  him  on  the  project.  The  appointed  consultants  as  listed  below  shall  be  remunerated  in  accordance  with  their  set  professional  remunerations;  the  architect  shall  co-­‐ordinate  all  deliverables  by  the  appointed  consultants  for  proper  project  delivery.  

Project   Manager,   Planning   Consultant,   Quantity   Surveyor,   Structural   Engineer,   Mechanical   Services  Engineer,  Electrical  Services  Engineer,  Surveyors,  Geo-­‐Technical  Engineers  etc.  

4.4   Responsibilities  of  Others    4.4.1   Service  providers  on  the  project  shall:  

a.   be  responsible  for  the  competent  performance  of  their  services;  b.   comply  with  the  directives  of  the  Architect  and  provide  all  information  needed  for  the  proper  and  

timely  performance  of  their  Services;  

Page 12: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

11  of  31  

5   ARCHITECTS  REMUNERATION  (AR)  

5.1   Standard  Services  (Architectural  Design)  The  initial  fee  payable  to  the  Architect  shall  be  a  percentage  of  the  estimated  project  cost,  while  the  final  fee  shall  be  based  on  the  adjusted  final  project  cost,  all  in  accordance  with  Schedule  4.1.  

5.2   Standard  Services  (Supervision)  The   total   remuneration  payable   to   the  Architect   for  standard  supervision  services   shall  be  based  on  time  charges  in  accordance  with  Schedule  4.3.  

Where  the  services  of  the  Architect  extend  beyond  the  estimated  contract  period,  the  Architect  shall  continue  to  receive  the  hourly  rate  remuneration  and  expenses  until  completion  of  the  project.  

5.3   Additional  Supervision  and  Residency  The  total  remuneration  payable  to  the  Architect  for  additional  supervision  and  residency  services  shall  be   based   on   time   charges   in   accordance   with   Schedule   4.3.   Additional   supervision   and   residency  services  are  detailed  in  Schedule  2.3.  

5.4   Repetitive  Works    The  total  remuneration  payable  to  the  Architect  for  repetitive  works  shall  be  based  on  the  number  and  nature  of  repeats  and  calculated  in  accordance  with  Schedule  2.4.  

5.5   Renovation  Works  The  fee  payable  to  the  architect  for  renovation,  rehabilitation,  refurbishing,  retrofitting,  restoration  or  remodelling  works  on  existing  premises  shall  be  in  accordance  with  Schedule  2.5.  

5.6   Partial  Services  The   remuneration   payable   to   the   Architect   for   Partial   Services   shall   be   charged   in   accordance  with  Schedule  2.6.  

5.7   Project  Management  The   remuneration   payable   to   the   Architect   for   Project   Management   Services   shall   be   charged   in  accordance  with  Schedule  4.3.  

5.8   Other  Additional  and  Supplementary  Services  The   total   remuneration   payable   to   the  Architects   for   supplementary   and   additional   services  will   be  calculated   in   accordance  with   the   applicable   detailed   service   descriptions   in   Schedule   2.8   and   time  charges  or  percentage  charges  in  Schedule  4.3.  

5.9   Reimbursable  Expenses  The  Architect  shall  be  reimbursed  by  the  Client  for  all  expenses  actually  and  properly  incurred  on  the  project  as  detailed  in  Schedule  2.9    

5.10   Value  Added  Tax  (VAT)    Remuneration   and   expenses   arising   under   the   Agreement   are   exclusive   of   Value   Added   Tax   (VAT)  which  shall  be  added  appropriately.  

Page 13: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

12  of  31  

5.11   Remuneration  Milestones  

DESIGN  STAGE  I    

(DS  I)  

Phase  1  15%  as  initial  payment  on  issuance  of  letter  of  Commission  and  instruction  to  proceed  with  the  appraisal,  programming  and  project  definition  (Commitment  Fee)  

Phase  2   20%  as  payment  for  Concept  Design.  

DESIGN  STAGE  II    

(DS  II)  

Phase  3   25%  as  payment  for  Co-­‐ordinated  Detail  Design.  

Phase  4   40%  as  payment  for  all  Construction  documents.  

TENDERING  AND  AWARD  (TA)   Phase  5  

Payment  based  on  minimum  hourly  rates  in  accordance  with  Schedule  4.3    -­‐  pre-­‐qualification  of  contractors,  invitation  to  tender,  analysis,  negotiation,  recommendation  and  award.  

CONSTRUCTION     Phase  6  Payment  based  on  minimum  hourly  rates  in  accordance  with  Schedule  4.3  -­‐      from  site  handover  to  contractor  through  to  completion.  

POST  CONSTRUCTION   Phase  7  

Payment  based  on  minimum  hourly  rates  in  accordance  with  Schedule  4.3:  

Architects  Post  Occupancy  Analysis  (APOA)  

Architects  Post  Occupancy  Evaluation  (APOE)  

Table  5.11  a  

NOTE:   Should  work  on  the  construction  extend  beyond  the  estimated  contract  period,  the  Architect  and  his  team  will  continue  to  receive  the  hourly  rate  remuneration  until  completion  of  the  project.  

Remuneration  and  expenses  are  to  be  paid  within  21  working  days  of  submission.  Any  remuneration  and   expenses   due   but   continued   to   remain   unpaid   shall   attract   interest   from   the   22nd  working   day  after  submission  to  the  date  of  payment  at   the  rate  of  2.5%  above  the  prevailing  bank   interest   rate  ruling  in  Nigeria  at  that  time.  

   

Page 14: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

13  of  31  

6   SCHEDULE  OF  PROFESSIONAL  SERVICES  

6.1   Architectural  Services  Delivery  Stages  (ASDS)  For   the   purpose   of   this   Agreement   the   Architect   as   the   Prime   Consultant,   shall   complete   the  Architectural    services  in  the  following  stages:-­‐  

 

S/N   STAGE   SCOPE  

1   Design  Stage  I  

(DS  I)  

From  the  date  of  receipt  of  instructions  to  proceed  until  the  submission  of  the  final  concept  design  including  the  preliminary  

programme.  

2   Design  Stage  II  

(DS  II)  

From  th Design  I  until  the  submission  of  

project  programme.  

3   Tendering  and  Award  

(T&A)  

From  commencement  of  tender  process  to  the  award  of  the  contract.  

4   Construction  Stage  

(CS)  

 

From  handing-­‐over  site  to  the  contractor,  issuing  of  Architects  Payment  Certificates,  completion  and  acceptance  of  the  Works  by  the  Client,  defects  Liability  Period,  issuing  of  the  Practical  Completion  Certificate  and  the  Final  Payment  Certificate.  

5   Post  Construction    

Period  (PCP)  

Project  hand  over  through  the  defects  liability  period  up  to  final  account.  

Table  6.1  a  

     

6.2    Where  there  is  a  delay  due  to  the   or  that  of  third  party  assigned  to  provide  decision  or  approval  within  an  agreed  period,  the  Architect  may  notify  the  Client  of  the  suspension  of  the  affected  services.  Any  costs  incurred  at  resumption  shall  be  borne  by  the  Client.  

6.3   Client  Undertaking  to  Issue  Approvals  The  Client  undertakes  to  process  and  issue  any  decisions  and  approvals  that  arise   in   line  with  clause  6.2.  

7   INCAPACITY  OF  ARCHITECT  In  the  event  of  the  Architect  incapacitation,  the  Client  may  make  full  use  of  all  documents  prepared  by  him  pursuant  to  and  for  use  under  this  Agreement  without  prejudice  to  the  lien  on  such  documents  against  unpaid  fees.  The  Client  shall  not  make  use  of  such  documents  except  for  the  purpose  of  the  building  Works  which  are  the  subject  of  this  Agreement.  

 

Page 15: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

14  of  31  

8   POSTPONEMENT  OR  ABANDONMENT  In  the  event  of  the  whole  or  any  part  of  the  Services  being  postponed,  abandoned  or  delayed  through  no  fault  of  the  Architect,  the  Parties  shall  proceed  as  follows:  

8.1   Instructions  to  postpone,  abandon  or  delay  work  shall  take  effect  after  such  instructions  are  received  from   the   Client.   The   remuneration   payable   in   this   event   shall   be   computed  on   a   'pro-­‐rata'   basis   to  match  the  services  delivered,  with  charges  to  cover  overheads.  

8.2   Notwithstanding   clause   9.1   if   instructions   necessary   for   the   Architect   to   continue   work   are   not  received   from   the  Client   six  months   after   such   instructions  were   requested,   the   services   under   this  Agreement  shall  be  deemed  to  have  been  abandoned.    

9   RESUMED  AGREEMENT    9.1   If   this   Agreement,  which  has   been   abandoned  pursuant   to  Clause   8   is   resumed  without   substantial  

alteration   within   one   year,   any   remuneration   paid   under   Clauses   8.1   and   8.2   shall   rank   solely   as  payments   on   account   towards   the   total   remuneration   on   the   execution   of   the   Services   herein   and  calculated  on  the  total  revised  estimated  costs  of  works.  

9.2   Where  this  Agreement  which  has  been  abandoned  pursuant  to  clause  8  is  resumed  at  any  time  with  substantial  alteration  or  is  resumed  after  one  year,  any  remuneration  paid  under  Clauses  8.1  and  9.1  shall  be  regarded  as  final  payment  for  the  Services  originally  rendered.  The  resumed  Agreement  shall  be   deemed   separate   and   remuneration   will   be   charged   in   accordance   with   Clause   5   of   these  conditions.  

9.3   All  additional  services  arising  out  of  Clause  9.1  shall  be  remunerated  on  hourly  rate  basis.  

10   ALTERATIONS  AND  MODIFICATIONS  All  alterations  and  modifications  to  approved  documents  by   the  Client   constitute  additional   services  and  shall  be  remunerated  in  accordance  with  schedule  4.3.  

11   COPYRIGHT  AND  USE  OF  INFORMATION  

11.1   Copyright    The  Architect  owns  the  copyright  of  the  work  produced  in  the  performance  of  the  services  and  asserts  the  rights  to  be  identified  as  the  author  of  the  artistic  work  and  or  work  of  architecture  comprising  the  Project.  

11.2   Use  of  information    The  Client,  with  the  express  permission  of  the  Architect,  is  allowed  the  use  of  documents  produced  by  the  Architect,  hereinafter  called  'the  Material',  only  for  purposes  related  to  the  Project  on  the  Site  or  part  thereof.    

Provided  that:  

1.   The  Architect  shall  not  be  liable   if  the  Material   is  modified  other  than  by  or  with  the  consent  of  the  Architect,   or   used   for   any   purpose   other   than   that   for   which   it   was   prepared,   or   used   for   any  unauthorised  purpose;  

2.  Where   the   Client   is   in   default   of   payment   of   any   amounts   due,   the   Architect   reserves   the   right   to  withdraw  his  permission  for  the  use  of  the  Material,  giving  7    of  the  intention  to  do  so.  

 

Page 16: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

15  of  31  

12   TERMINATION  This  Agreement  may  be  terminated  at  any  time  by  either  party  on  the  expiration  of  reasonable  notice  when  the  Architect  shall  be  entitled  to  remuneration  in  accordance  with  the  provisions  of  Clause  8.1.  

13   FORCE  MAJEURE  The  Architect  will  not  be  responsible  for  any  damage  or  delay  to  the  Works  or  delays  to  the  Services  attributable  to  Force  Majeure.  In  the  event  of  Force  Majeure,  the  Architect  shall  give  the  Client  written  notice.  Where  Force  Majeure  actually  results  in  such  delays  or  additional  service,  the  Architect  shall  be  entitled  to  reasonable  reimbursement  and  extension  of  time  where  applicable.  

14   LAWS  OF  THE  AGREEMENT  This  Agreement  shall  be  governed  by  the  laws  of  the  Federal  Republic  of  Nigeria.  

15   ARBITRATION  15.1   Any   disputes   arising   out   of   this   Agreement  which   cannot   be   settled   by  mutual   agreement   shall   be  

referred  to  an  arbitrator  to  be  agreed  between  the  parties  or,  failing  such  agreement  within  a  month,  to  an  arbitrator  appointed  by  the  President  of  the  Nigerian  Institute  of  Architects.  

15.2   Any   such   reference   shall   be   deemed   to   be   a   submission   to   arbitration   within   the   Arbitration   and  Conciliation  Act  Cap  A18  of  the  laws  of  the  Federation  of  Nigeria  2004  and  any  subsequent  revisions  thereto.  

15.3   The  findings  of  the  arbitrator  shall  be  binding  on  the  parties  hereto.  

 

   

Page 17: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

16  of  31  

AS  WITNESS  WHEREOF  the  Parties  hereto  have  hereunder  set  their  hands  the  day  and  year  first  above  written.  

16   ATTESTATION  I    

SIGNED  AND  DELIVERED  by:  

 

Signature:  

for  and  on  behalf  of  the  Client:         ______________________________________________  

 

 

in  the  presence  of:    

Witness  Signature:    

Name  in  block  letters       ______________________________________________  

Address             ______________________________________________  

 

 

SIGNED  AND  DELIVERED  by  :  

Signature:    

for  and  on  behalf  of  the  Architect      ______________________________________________  

 

 

in  the  presence  of:          

Witness  Signature:    

Name  in  Block  letters:          ______________________________________________  

Address:              ______________________________________________  

   

Page 18: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

17  of  31  

17   SCHEDULES  

Schedule  1.    DETAILED  SCOPE  OF  STANDARD  ARCHITECTURAL  SERVICES    

1.1   Preliminary  And  Final  Concept  Design  (Phases  1  &  2)    

1.1.1   Phase  1:  -­‐  Commitment  (15%  of  Percentage  Remuneration  as  calculated  in  Schedule  4)  Receive,  appraise  and   report  on  the  client's   requirements  with  particular   regard   to   site   information,  planning  and  statutory  regulations  and  budget  and  produce  site  analysis  and  report.  

Guide  and  advise  the  client  on:    

a.   Procedures  to  meet  his  requirements    b.   Constraints  and  challenges  in  meeting  his  requirements  c.   The  need  for  the  appointment  of  other  consultants    d.   Selection  of  procurement  methods  e.   Challenges,  opportunities  and  project  cost  implications  emanating  from  the  site  analysis  report  

1.1.2   Phase  2:  -­‐  Concept  Design  (20%  of  Percentage  Remuneration  in  accordance  with  Schedule  4)  Prepare   a   design   concept   in   broad   outline   showing   site   situation   and   planning,   space   provisions,  planning  relationships  and  materials  and  services  intended  to  be  used.    

Guide  and  advise  the  client  on:    

a.   The  technical  and  functional  characteristics  of  the  project  as  proposed    b.   The  estimated  costs  in  relation  to  the  budget    c.   The  anticipated  project  programme  d.   The  input  of  other  consultants  and  specialists.  

1.2   Detail  Design  &  Production  Drawings  (Phases  3  &  4)  

1.2.1   Phase  3:  -­‐  Coordinated  Detail  Design  (25%  of  Percentage  Remuneration  in  accordance  with  Schedule  )  

Develop  the  design  concept  in  sufficient  detail  to:  

a.   Detail  the  site  plan  and  the  location  of  all  site  structures  b.   Graphically  define  the  construction  of  the  building    c.   Spatially  coordinate  the  designs  by  other  consultants  and  specialists    d.   Review  the  design  with  the  relevant  authorities    e.   Submit  the  project  for  planning  approvals  (based  on  time  charges)  

1.2.2   Phase  4:  -­‐  Construction  Documentation  (40%  of  Percentage  Remuneration  in  accordance  with  Schedule  4)  

a.   Preparation  of  construction  documentation  and  coordination  of  construction  documentation  with  the  designs  by  other  consultants  and  specialists.    

b.   Selection  of  appropriate  Conditions  of  Contract  for  the  project.  

Page 19: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

18  of  31  

c.   Determination  of  appropriate  Preliminary  Items  to  suit  actual  site  conditions  and  project  nature.  d.   Provision  of  data  for  obtaining  estimates  and  other  information.  e.   Preparation  of  Schedules  and  Written  Specifications.  f.   Provision  of  data  for  the  preparation  of  information  for  the  Bills  of  Quantities  (BOQ),    g.   Coordination  and   reconciliation  of  all  drawings  with  the  Bill  of  Quantities   to  eliminate  discrepancies  

between  drawings  and  the  Bill  of  Quantities.  

1.3   Tendering  and  Award  -­‐    Phase  5    (Time  Charges)  a.   Guide   and   advise   the   Client   in   the   pre-­‐qualification   of   contractors,   sub-­‐contractors   and   invitation   of  

suitable  firms  to  tender  b.   Obtain,  analyse,  negotiate,  report  and  recommend  on  the  tenders.  

1.4   Construction  Stage  (CS)  -­‐  Phase  6:      (Time  Charges)  a.   Direct  and  co-­‐  b.   Supervise  and  co-­‐  c.   Co-­‐ordinate  and  preside  over  monthly  site  meetings,  technical  meetings  as  well  as  other  site  visits.  d.    (APC);    e.   Prepare  and  submit  Quarterly  Progress  Reports  (QPR).  f.   Issue  Architects  Site  Instructions  (ASI),  revised  designs  and  additional  drawings  and  details.  g.   Issue  Architects  Material  and  Component  Sample  Approvals  (AMCSA)  and  material  test  approvals.  h.   Inspect  off-­‐site  materials  intended  for  the  project  at  points  of  origin.    i.   Attend  special  meetings  and  consultations  with  the  client.  j.   Produce  special  reports  and  documentation.  k.   Oversee   and   supervise   the   testing   and   commissioning   of   equipment   and   collate   relevant   technical  

reports.  l.   Co-­‐ordinate  and  manage  the  handover  of  works  to  the  client.  m.   Prepare  schedule  of  defects  and  manage  the  defects  liability  period.  n.   Issue  Architects  Practical  Completion  Certificate  (APCC).  o.   Co-­‐ordinate   and   manage   the   preparation   of   final   account   and   its   acceptance   as   well   as   issue  

inal  Payment  Certificate  (AFPC).  p.   Prepare,  coordinate  and  collate  as-­‐built  drawings.  q.   Prepare,  coordinate  and  collate  maintenance  manuals.  r.   Receive,  direct,  review  and  recommend  on  claims.  s.   Prepare  project  performance  appraisals  t.   Prepare  building  performance  appraisals  

These  services  shall  be  charged  on  hourly  rate  basis  in  accordance  with  Schedule  4.3.  

1.5   Existing  Structures  The  scope  of  work  for  existing  structures  shall  include:  

a.   Surveys  and  inspections    b.   Production  of  Measured  drawings  

Page 20: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

19  of  31  

c.   Preparation   of   schedule   of   dilapidations,   schedule   of   conditions,   etc,     and   associated   drawings   and  documentation    

d.   Renovation,  Rehabilitation,  Refurbishing,  Restoration,  Retrofitting  and  Remodelling.    e.   Demolitions    

These  services  shall  be  charged  on  percentage  basis  in  accordance  with  Schedule  4.1  for  Design  Stages  I   &   II   and   on   an   hourly   rate   basis,   in   accordance   with   Schedule   4.3.   for   Construction   Stage   and  additional  services.  

   

Page 21: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

20  of  31  

Schedule  2.   DETAILED  SCOPE  OF  SUPPLEMENTARY  ARCHITECTURAL  SERVICES  The  following  services  are  not  included  in  the  standard  services  described  in  Schedule  1  and  constitute  additional  services  which  shall  attract  separate  remuneration.    

2.1   Standard  Services  (Architectural  Design)  See  Schedule  1  

2.2   Standard  Services  (Supervision)  See  Schedule  1  

2.3   Additional  Site  Visits  and  Residency  

2.3.1   Additional  Site  Visits:  

Where   a   project   requires   site   visits   over   and   above   the   standard   one   visit-­‐per-­‐month,   it   shall   be  regarded  as  additional  service  and  shall  attract  additional  remuneration   in  accordance  with  Schedule  4.3.  

2.3.2   Residency:    

Resident   Supervision     maintaining   professional   personnel   on   site   on   a   daily   basis.   The   cost   of  maintaining  resident  personnel  shall  be  charged  on  an  hourly  rate  basis  in  accordance  with  Schedule  4.3.   The   cost   of   accommodation,   transportation   and   other   expenses   shall   be   in   accordance   with  Schedule  2.9.  

2.4   Repetitive  Works    The   remuneration   for   pre-­‐contract   services   (Design   Stages   I   &   II)   for   repetitive   work   shall   be   full  remuneration  for  the  first  building,  while  subsequent  repeats  shall  attract  reduced  fees  in  accordance  with  the  table  2.4a  below:  

 

S/N   NUMBER  OF  REPEATS   %   REMARKS  

1   First  1  shall  be  charged  at   100%   Full  fees  for  first  building.  

2   Next  10  repeats  shall  be  charged  at   50%   the  remuneration  of  the  first  building  x  10.  

3   Next  20  repeats  shall  be  charged  at   30%   the  remuneration  of  the  first  building  x  20.  

4   Next  30  repeats    shall  be  charged  at   20%   the  remuneration  of  the  first  building  x  30.  

5   Over  60  repeats  shall  be  charged  at   10%   the  remuneration  of  the  first  building  x  60+.  

Table  2.4  a  

The   remuneration   for   post-­‐contract   services   (i.e.   construction   stage)   for   repetitive   works   shall   be  charged  on  hourly  rate  basis  in  accordance  with  Schedule  4.3.  The  remuneration  for  the  external  works  shall  be  charged  in  accordance  with  schedule  4.1.  

   

Page 22: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

21  of  31  

2.5    Renovation  Works  Renovation  works   shall   include   rehabilitation,   refurbishing,   retrofitting,   restoration   and   remodelling  and  shall  be  carried  out  in  the  following  stages:  

2.5.1   Conditional  Survey  

2.5.2   As-­‐built  Drawings  

2.5.3   Design  Stage  I  

2.5.4   Design  Stage  II  

2.5.5   Construction  Stage  

2.5.6   Post  Construction  The   fee   payable   to   the   architect   for   renovation   works   shall   be   in   accordance   with   the   applicable  sections  of  schedule  4.  

2.6   Partial  Services  The  total  remuneration  payable  to  the  Architect  appointed  to  render  partial  services  shall  be  charged  in  accordance  with  Schedule  4.2.  

2.7   Project  Management  Services:    The  Project  Manager  coordinates  the  logistics  of  the  Project  and  activities  of  other  Consultants  as  they  relate   to   the   Client.  He   does   not   take   professional   responsibility   for   the   performance  of   any  of   the  other  Consultants.  It  shall  constitute  an  additional  service  for  the  Architect.  

2.7.1   Architect  as    Project  Manager  The  Architect  as  the  Project  Manager  shall  be  the  Ccoordination  of  logistics  and  general  support  services  as  required  by  the  size  and  nature  of  the  project.  Remuneration  shall  be  in  accordance  with  Schedule  4.3.  

2.8   Other  Additional  and  Supplementary  Services  The  total   remuneration  payable  to  the  Architects   for  supplementary  and  additional  services   shall  be  charged  in  accordance  with  Schedule  2  and  Schedule  4.3.  

2.8.1   Pre-­‐design  Stage  2.8.1.1    Feasibility  Studies   -­‐  The  object  of   this  study   is   to   identify  the  parameters  of   the  project   in  terms  of  

facilities   and   functions,   space   use,   budget   inclusive   of   remuneration,   the   programme,   other  consultants  to  be  engaged  and  services  required;  shall  be  charged  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

2.8.1.4   The  preparation  of  the  client's  brief  shall  be  charged  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

Page 23: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

22  of  31  

2.8.1.5   Site   selection,   survey  and   location  services   shall  be  charged  on  hourly   rate  basis   in  accordance  with  Schedule  4.  

2.8.1.6   Environmental   Impact  Assessment   (EIA)   studies  and   reports   shall  be  charged  on  hourly   rate  basis   in  accordance  with  Schedule  4.  

2.8.2   Design  Stage  (DS)  2.8.2.1   The  production  of  Primary  Digital  Information  (PDI)  which  includes  digital  soft-­‐copy  of  CAD  (computer  

aided  design)  drawings  and  or  BIM  (building  information  modelling)  files  by  the  architect  shall  attract  additional   remuneration  charged  at  1%  of   the  Adjusted  Cost  of  Project  on  the  completion  of  Design  Stage  II  (DS  II).  

2.8.2.2   Design  Quality  Management  (DQM)  and  Architects  Value  Engineering  (AVE)  remuneration  shall  be  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

2.8.2.3   Processing  for  and  Obtaining  Building  Permit,  this  service  shall  be  on  hourly  rate  basis   in  accordance  with  Schedule  4.  

2.8.2.4   The   provision   of   supplementary   or   revised   documentation   due   to   the   exigencies   of   the   project   or  revised   requirements   of   the   client   arising   after   the   firm   has   received   the   client's   instructions   to  commence   his   work:   Provided   that   any   other   additional   remuneration   do   not   cover   such  documentation.  Remuneration  shall  be  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

2.8.2.5   Impressions,  Models  and  Illustrations:  remuneration  shall  be  charged  at  cost  plus  35%.  

2.8.2.6   Energy   conservation   services   shall   be   remunerated   based   on   hourly   rate   basis   in   accordance   with  Schedule  4.  

2.8.2.7   Human   and   vehicular   traffic   studies   and  design   shall   be   remunerated  based  on  hourly   rate   basis   in  accordance  with  Schedule  4.  

2.8.2.8   Urban   design:   this   service   shall   be   remunerated   based   on   hourly   rate   basis   in   accordance   with  Schedule  4.  

2.8.2.9   Master   site   planning/layout   planning   of   future   buildings   related   to   the   current   works;   shall   be  remunerated  based  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

2.8.2.10   Promotional  material  this  service  shall  be  remunerated  based  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

2.8.2.11   Graphics  and  signage;  this  service  shall  be  remunerated  based  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

2.8.2.12   Purpose-­‐made  items;  this  service  shall  be  remunerated  based  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

2.8.2.13   Schedule   of   furnishing   and   furniture   including   the   selection,   documentation   and   procurement   of  furniture  and   furnishings   and   special   finishes  or   fixtures;   this   shall   be   remunerated  based  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

2.8.2.14   Plant  procurement,  operational   and  production   layouts;   this   service   shall   be   remunerated  based  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

2.8.2.15   Acoustic   Design;   this   service   shall   be   remunerated   based   on   hourly   rate   basis   in   accordance   with  Schedule  4.  

2.8.2.16   Lighting   Design;   this   service   shall   be   remunerated   based   on   hourly   rate   basis   in   accordance   with  Schedule  4.  

Page 24: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

23  of  31  

2.8.2.17   Material   Selection   Procurement;   this   service   shall   be   remunerated   based   on   hourly   rate   basis   in  accordance  with  Schedule  4.  

2.8.2.18   Interior  Architecture:  shall  be  remunerated  based  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

2.8.2.19   Landscape  Architecture:  remuneration  shall  be  remunerated  based  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

2.8.3   Tendering  and  Award  (TA)  2.8.3.1   Procurement  remuneration  shall  be  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

2.8.3.2   Quality   control,   assurance   and   accreditation   of   service   providers   (contractors,   subcontractors,  specialists   etc);   this   service   shall   be   remunerated   based   on   hourly   rate   basis   in   accordance   with  Schedule  4.  

2.8.3.3   Negotiations  (Client  Management  Services)  remuneration  shall  be  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

2.8.4   Construction  2.8.4.1   Access/Hoist  way  for  Façade  Maintenance  this  service  shall  be  on  hourly  rate  basis  in  accordance  with  

Schedule  4.3  

2.8.4.2   Computation  of   variations  and  valuations;   remuneration   shall   be  on  hourly   rate  basis   in   accordance  with  Schedule  4.3  

2.8.4.2   Services   concerning   disputes   and   litigation   associated   with   the   project;   remuneration   shall   be   on  hourly  rate  basis  in  accordance  with  Schedule  4.3  

2.8.4.3   Services  concerning  work  arising  from  the   insolvency  or   liquidation  of  a  party  related  to  the  building  contract;  remuneration  shall  be  on  hourly  rate  basis  in  accordance  with  Schedule  4.3  

2.8.4.4   As  built  drawings;  remuneration  shall  be  on  hourly  rate  basis  in  accordance  with  Schedule  4.3  

2.8.4.5   Maintenance  and  operating  manuals.  This  service  shall  be  charged  on  hourly  rate  basis  in  accordance  with  Schedule  4.3  

2.8.4.6   Lessons   Learnt   (Building   Performance   Appraisal);   remuneration   shall   be   on   hourly   rate   basis   in  accordance  with  Schedule  4.3  

2.8.4.7   Lessons   Learnt   (Project   Performance   Appraisal);   remuneration   shall   be   on   hourly   rate   basis   in  accordance  with  Schedule  4.3  

2.8.5   Post  Construction  2.8.5.1   Architects  Post  Occupancy  Analysis  (APOA);  remuneration  shall  be  on  hourly  rate  basis  in  accordance  

with  Schedule  4.3  

2.8.5.2   Architects   Post   Occupancy   Evaluation   (APOE);   remuneration   shall   be   on   hourly   rate   basis   in  accordance  with  Schedule  4.3  

2.8.6   Others  2.8.6.1   Design  Audit:  remuneration  shall  be  on  hourly  rate  basis  in  accordance  with  Schedule  4.3  

2.8.6.2   Arbitration:  remuneration  shall  be  on  hourly  rate  basis  in  accordance  with  Schedule  4.3  

Page 25: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

24  of  31  

2.8.6.3   Schedules   of   dilapidations/condition   surveys:   remuneration   shall   be   on   hourly   rate   basis   in  accordance  with  Schedule  4.3  

2.8.6.4   Pre-­‐competition,   Jury,   post   adjudication   and  other   services   for   architectural   design   competitions  shall   be   in   accordance  with   the   ARCON/NIA   approved   Guidelines   for   Architectural   Competitions  published   by   the   Nigerian   Institute   of   Architects:   remuneration   shall   be   on   hourly   rate   basis   in  accordance  with  Schedule  4.3  

2.8.6.5   Green  building  rating:  remuneration  shall  be  on  hourly  rate  basis  in  accordance  with  Schedule  4.3  

2.8.6.6   Green   building   faculty   services:   remuneration   shall   be   on   hourly   rate   basis   in   accordance   with  Schedule  4.3  

2.8.6.7   Green  building   rating  assessment:   remuneration  shall  be  on  hourly   rate  basis   in  accordance  with  Schedule  4.  

2.8.6.8   Special  reports:  remuneration  shall  be  on  hourly  rate  basis  in  accordance  with  Schedule  4.3  

2.8.6.9   Monitoring   and   Evaluation   (M&E)   of   inputs,   outputs,   impacts   and   outcomes   of   projects   and  programmes.  Remuneration  shall  be  on  hourly  rate  basis  in  accordance  with  Schedule  4.3.  

2.9   Reimbursable  Expenses  

2.9.1   -­‐  The   Client   shall   pay   for   communications,   printing,   drawing   reproduction   and   local   travel     0.6%   of  project  cost  in  accordance  with  Schedule  4.    

2.9.2   -­‐of-­‐  The  Client  shall  pay  for  all  expenses  actually  and  properly  incurred  in  respect  of  travel,  transportation,  accommodation,   rentals,   printing  and   reproduction  and  other  project  expenses  which  occur  outside  the   town   of   residence   of   the   Architect,   denoted   -­‐of-­‐presentation  of  detailed  invoices  with  supporting  receipts.  Payment  shall  be  actual  cost  plus  15%.  This  payment  shall  be  in  addition  to  such  expenses  as  described  in  Schedule  2.9.1.  

2.10   Additional  services  not  contemplated  in  standard  services,  the  need  for  which  is  not  attributable  to  the  Architect,  shall  be  remunerated  based  on  hourly  rates  basis  in  accordance  with  Schedule  4.      

Page 26: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

25  of  31  

Schedule  3.   DETAILED  SCOPE  OF  SERVICES  AND  RENUMERATIONS  FOR  THE  ARCHITECT  AS  PROJECT  MANAGER  

3.1   Project  Management  Services  1.    

2.   Development  and  preparation  of  the  brief  

3.   Prepare  an  option  /  feasibility  report  

4.   Execute  a  risk  analysis  exercise  

5.   Establish  the  budget  and  the  total  project  programme  

6.   Advise  on  the  design  team  selection  

7.   Establish  and  manage  integrated  communication  and  information  systems  between  the  client  and  the  Design  Team  

8.   Advise  on  the  appropriate  procurement  strategy  

9.   Establish  the  pre-­‐contract  control  systems  and  execute  a  value  analysis  exercise  

10.   Monitor  planning  permission  and  other  statutory  consents  

11.   Facilitate  and  receive  tenders  evaluation  /  report  including  the  selection  of  contractor(s)  

12.   Establish  the  post  contract  time,  cost  and  quality  control  and  management  systems  

13.   Receive  from  Prime  Consultant,  Quarterly  Progress  Reports  (QPR),  through  to  the  project  completion  commissioning  and  occupation.  

These  services  shall  be  charged  in  accordance  with  Schedule  4.    

3.2   Additional  And  Supplementary  Project  Management  Services  Rendered  By  The  Architect      

3.2.1   Normal  Supervision  of  Works  (Construction);  remuneration  shall  be  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

3.2.2   Resident  supervision  remuneration  shall  be  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

3.2.3   Interior  decoration  remuneration  shall  be  on  percentage  basis  in  accordance  with  Schedule  4.  

3.2.4   Renovation,   Rehabilitation,   Refurbishing,   Restoration,   Remodelling,   Retrofitting   etc;   remuneration  shall  be  on  percentage  basis  in  accordance  with  Schedule  4.  

3.2.5   Landscaping  remuneration  shall  be  on  percentage  basis  in  accordance  with  Schedule  4.  

3.2.6   Negotiations  (Client  Management  Services)  remuneration  shall  be  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

3.2.7   Special  reports  remuneration  shall  be  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

3.2.8   Pre-­‐design  services  remuneration  shall  be  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

3.2.9   Computation   of   variations   and   valuations   remuneration   shall   be   on   hourly   rate   basis   in   accordance  with  Schedule  4.  

3.2.10   Analysis;  remuneration  shall  be  on  hourly  rate  basis  in  accordance  with  Schedule.  

3.2.11   As-­‐built  drawings  remuneration  shall  be  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

Page 27: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

26  of  31  

3.2.12   Schedules  of  dilapidations/condition  surveys;  remuneration  shall  be  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

3.2.13   Feasibility  studies;  remuneration  shall  be  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

3.2.14   Green  building  rating  remuneration  shall  be  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

3.2.15   Green  building   rating   faculty   services   remuneration  shall  be  on  hourly   rate  basis   in  accordance  with  Schedule  4.  

3.2.16   Green   building   rating   assessment   remuneration   shall   be   on   hourly   rate   basis   in   accordance   with  Schedule  4.  

3.2.17   Arbitration  remuneration  shall  be  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

3.2.18   Design  Audit  remuneration  shall  be  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

3.2.19   Lessons  Learnt  (including  Building  Performance  Appraisal)  remuneration  shall  be  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

3.2.20   Design   Quality  Management   (DQM)   remuneration   shall   be   on   hourly   rate   basis   in   accordance  with  Schedule  4.  

3.2.21   Procurement  remuneration  shall  be  on  hourly  rate  basis  in  accordance  with  Schedule  4.  

   

Page 28: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

27  of  31  

Schedule  4.   ARCHITECTS  REMUNERATIONS,  RATES  AND  CALCULATIONS    

4.1   Remuneration  for  Standard  Services    and  Reimbursables  4.1.1   Remuneration  for  standard  services  for  Design  Stages  I  and  II  shall  be  4.75%  of  the  Estimated  Project  

Cost   for   new   projects,   and   9.5%   for   services   on   existing   structures   all   of   which   shall   be   adjusted  appropriately  at  the  end  of  Design  Stage  II  for  the  final  fees  payable  to  the  Architect.    

4.1.2   All  remunerations  payable  to  the  Architect  shall  be  in  accordance  with  Table  5.11a.  

4.1.3   Remunerations  for  Tendering  and  Construction  Stages  shall  be  charged  on  the  minimum  hourly  rates  in  accordance  with  Schedule  4.3.  

4.2   Remuneration  for  Partial  Services  4.2.1     Where   the   Architect   is   appointed   to   render   a   partial   service,   the   remuneration   shall   be   charged   in  

accordance  with  Schedule  4  and  adjusted  for  the    scope   of   services   rendered   in   accordance   with  Schedule  1.  

Page 29: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

28  of  31  

4.3    Hourly  Rates  for  Architectural  Services  

4.3.1   Minimum  Hourly  rates  for  Architectural  Services  Rendered    The  following  minimum  hourly  rates  are  chargeable:  

 S/N   Professional  Cadre   Minimum   Years  

of  Experience  *Hourly  Rates  N  

1   Chief  Architect  Consultant  (CAC)  /Fellow   30  &  above   100,000  

2   Principal  Architect  Consultant  (PAC)  /Fellow   25    29   85,000  

3   Senior  Architect  Consultant  (SAC)  /Fellow   20    24   70,000  

4   Architect  Consultant  (AC)  I     15    19   45,000  

5   Architect  Consultant  (AC)  II   10  -­‐14   35,000  

6   Architect   5    9   30,000  

7   Associate  Architect   1-­‐  4   25,000  

8   Graduate  Architect   -­‐-­‐   20,000  

9   Architectural  impressionist   -­‐-­‐-­‐   20,000  

10   CAD  Technician   -­‐-­‐-­‐   15,000  

11   Architectural  Technologist   -­‐-­‐-­‐   15,000  

12   Secretarial  Services      

  Senior  Secretary     -­‐-­‐-­‐   10,000  

  Secretary   -­‐-­‐-­‐   7,500  

  Assistant  Secretary     -­‐-­‐-­‐   5,000  

13   Drivers      

  Senior  Driver   -­‐-­‐-­‐   10,000  

  Driver   -­‐-­‐-­‐   7,500  

14   Others        

Table  4.3.1  a  

*This   hourly   rate   is   subject   to   annual   adjustment   using   the   inflation   index   of   the   Central   Bank   of  Nigeria.  

   

Page 30: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

29  of  31  

4.4   Reimbursables  for  All  Services  Reimbursables  for  all  the  services  as  stated  above  shall  be  based  on  the  Adjusted  Cost  of  Project  with  the  exception  of  4.4.3  and  4.4.4.  

 

S/N   DESCRIPTION   CHARGE   REMARKS  

4.4.1   Reimbursables  (flat  rate)  -­‐  Architecture   0.6%  of  Adjusted  Cost  of  project   same  city  

4.4.2   Reimbursables  (flat  rate)    Project  Management  

0.2%  of  Adjusted  Cost  of  project   same  city  

4.4.3   Reimbursables  -­‐  Architecture   cost  plus  15%  administrative  charge  

outside  city  

4.4.4   Reimbursables    Project  Management   cost  plus  15%  administrative  charge.  

outside  city  

Table  4.4  a  

4.5   Payment  Time  Limit  All  remunerations  due  shall  be  honoured  within  21  working  days,  failing  which  it  shall  attract  interest  at  2.5%  above  prevailing  bank  rate  for  the  period  of  delay;  

 

 

Page 31: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

30  of  31  

18    AMENDMENT  TO  CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATIONS  i)   The   Remunerations   contained   in   this   agreement   are   as   currently   published   by   the   Architects  

Registration  Council   of  Nigeria   (ARCON)   and   The  Nigerian   Institute   of  Architects,   (NIA)   and   the   said  Remunerations  shall  be  subject  to  review  and  amendment  by  The  Council  and  The  Institute.  

ii)   The   Architect   shall   have   the   right   to   revise,   alter   or   amend   the   Remunerations   applicable   to   this  agreement   in   the  event  of   a   change  or   amendment  of   the   said   Remunerations   as   published  by   the  Architects  Registration  Council  of  Nigeria  (ARCON)  and  the  Nigerian  Institute  of  Architects  (NIA).  

iii)  A   change   or   alteration   in   the   Remunerations   applicable   to   this   Agreement   shall   become   effective  immediately  upon  the  expiration  of  30  days   from  the  delivery  of  notification  by  the  Architect   to   the  

CON  and  NIA).    

19   ATTESTATION  II  SIGNED  AND  DELIVERED  by:  

 

Signature:  

for  and  on  behalf  of  the  Client:         ______________________________________________  

 

 

in  the  presence  of:    

Witness  Signature:    

Name  in  block  letters       ______________________________________________  

Address             ______________________________________________  

 

 

SIGNED  AND  DELIVERED  by  :  

Signature:    

for  and  on  behalf  of  the  Architect      ______________________________________________  

 

 

in  the  presence  of:          

Witness  Signature:    

Name  in  Block  letters:          ______________________________________________  

Address:              ______________________________________________  

 

Page 32: CONDITIONSOFENGAGEMENTANDREMUNERATION ) FOR) · 3.! ^d Z Architect _!shall!mean!theprofessional! architectural!firm, organisation!orperson!commissionedby ! the Client!tocarry!outthes

 

 

ARCHITECTS  REGISTRATION  COUNCIL  OF  NIGERIA  (ARCON)  AND  THE  NIGERIAN  INSTITUTE  OF  ARCHITECTS  (NIA)  

CONDITIONS  OF  ENGAGEMENT  AND  REMUNERATION   SERVICES    21ST  SEPTEMBER  2011  

   

31  of  31  

20    ADDENDUM    ARCON  PROJECT  REGISTRATION  FORMS  ARCON  Project  Registration  No:     ...................................     ISSUE  DATE   ................................................  

20.1   Project  Registration  Details  

PROJECT  NAME:        

TYPE  OF  PROJECT(S):        

LOCATION  OF  PROJECT(S):        

ESTIMATED  PROJECT  COST:        

EMPLOYER/CLIENT:        

ADDRESS:        

CONSULTANT:        

ADDRESS:        

NOTES:        

20.2   Contract  Registration  Details  

DATE  OF  CONTRACT  AWARD:        

DATE  OF  CONTRACT  SIGNING:        

CONTRACTOR:        

ADDRESS:        

CONTRACT  SUM:        

NOTES:        

20.3   Contract  Completion  Details  

DATE  OF  POSSESION  OF  SITE:        

DATE  OF  FINAL  COMPLETION:        

DATE  OF  FINAL  HANDOVER:        

FINAL  CONTRACT  SUM:        

NOTES:        

END  OF  AGREEMENT