75
Road Section Linear Sketch Layout Long. Align Grade Faulting/Stepping Bump Blowup/Bulking/Sh attering Transverse Crack Diagonal Crack Longitudinal Crack Corner Break Multiple Cracks Ravelling Scaling Popout Potholes Joint Spalling Joint Damage Loss of Surface Texture Slab/Edge Punchout Pumping Rigid Shoulder (Y/N) Soft Shoulder (Y/N) Side Ditch (Y/N) Drainage Condition Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2 Chainage (km) Alignment Rigid Pavement……………………………. Condition Survey and Distress Rating…………………………………….. Cross Section Height (m), Crossfall(%) R i g i d  P a v e m e n t 247. 000 247. 050 247. 100 247.150 247. 200 247. 250 247.300 247. 350 247. 400 247. 450 247. 500 247. 550 247. 600 247. 650 247. 700 247. 750 247. 800 247. 850 247. 900 248. 000 247.950

Condition Survey Data

Embed Size (px)

Citation preview

Page 1: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 1/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Sh

attering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

Side Ditch (Y/N)

Drainage Condition

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2

Chainage

(km)

Alignment

Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

247.000 247.050 247.100 247.150 247.200 247.250 247.300 247.350 247.400 247.450 247.500 247.550 247.600 247.650 247.700 247.750 247.800 247.850 247.900 248.000247.950

Page 2: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 2/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

248.500 248.550 248.600 248.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)

248.050 248.100 248.150 248.200 248.250 248.300 248.350

Soft Shoulder (Y/N)

Side Ditch (Y/N)

Drainage Condition

249.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

en

t

Rigid Shoulder (Y/N)

248.700 248.750 248.800 248.850 248.900 248.950248.400 248.450

Page 3: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 3/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

249.500 249.550 249.600 249.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)249.050 249.100 249.150 249.200 249.250 249.300 249.350

Side Ditch (Y/N)

Drainage Condition

250.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

gi

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

249.700 249.750 249.800 249.850 249.900 249.950249.400 249.450

Page 4: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 4/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

250.500 250.550 250.600 250.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)

250.050 250.100 250.150 250.200 250.250 250.300 250.350

Side Ditch (Y/N)

Drainage Condition

251.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

en

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

250.700 250.750 250.800 250.850 250.900 250.950250.400 250.450

Page 5: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 5/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

251.500 251.550 251.600 251.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)

251.050 251.100 251.150 251.200 251.250 251.300 251.350

Side Ditch (Y/N)

Drainage Condition

252.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

en

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

251.700 251.750 251.800 251.850 251.900 251.950251.400 251.450

Page 6: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 6/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

252.500 252.550 252.600 252.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)

252.050 252.100 252.150 252.200 252.250 252.300 252.350

Side Ditch (Y/N)

Drainage Condition

253.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

en

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

252.700 252.750 252.800 252.850 252.900 252.950252.400 252.450

Page 7: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 7/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

253.500 253.550 253.600 253.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)

253.050 253.100 253.150 253.200 253.250 253.300 253.350

Side Ditch (Y/N)

Drainage Condition

254.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

en

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

253.700 253.750 253.800 253.850 253.900 253.950253.400 253.450

Page 8: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 8/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

254.500 254.550 254.600 254.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)

254.050 254.100 254.150 254.200 254.250 254.300 254.350

Side Ditch (Y/N)

Drainage Condition

255.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

en

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

254.700 254.750 254.800 254.850 254.900 254.950254.400 254.450

Page 9: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 9/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

255.500 255.550 255.600 255.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)

255.050 255.100 255.150 255.200 255.250 255.300 255.350

Side Ditch (Y/N)

Drainage Condition

256.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

en

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

255.700 255.750 255.800 255.850 255.900 255.950255.400 255.450

Page 10: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 10/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

256.500 256.550 256.600 256.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)256.050 256.100 256.150 256.200 256.250 256.300 256.350

Side Ditch (Y/N)

Drainage Condition

257.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

en

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

256.700 256.750 256.800 256.850 256.900 256.950256.400 256.450

Page 11: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 11/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

257.500 257.550 257.600 257.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)257.050 257.100 257.150 257.200 257.250 257.300 257.350

Side Ditch (Y/N)

Drainage Condition

258.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

en

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

257.700 257.750 257.800 257.850 257.900 257.950257.400 257.450

Page 12: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 12/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

258.500 258.550 258.600 258.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)258.050 258.100 258.150 258.200 258.250 258.300 258.350

Side Ditch (Y/N)

Drainage Condition

259.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

en

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

258.700 258.750 258.800 258.850 258.900 258.950258.400 258.450

Page 13: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 13/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

259.500 259.550 259.600 259.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)259.050 259.100 259.150 259.200 259.250 259.300 259.350

Side Ditch (Y/N)

Drainage Condition

260.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

259.700 259.750 259.800 259.850 259.900 259.950259.400 259.450

Page 14: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 14/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

260.500 260.550 260.600 260.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)260.050 260.100 260.150 260.200 260.250 260.300 260.350

Side Ditch (Y/N)

Drainage Condition

261.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

260.700 260.750 260.800 260.850 260.900 260.950260.400 260.450

Page 15: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 15/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

261.500 261.550 261.600 261.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)261.050 261.100 261.150 261.200 261.250 261.300 261.350

Side Ditch (Y/N)

Drainage Condition

262.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

261.700 261.750 261.800 261.850 261.900 261.950261.400 261.450

Page 16: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 16/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

262.500 262.550 262.600 262.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)262.050 262.100 262.150 262.200 262.250 262.300 262.350

Side Ditch (Y/N)

Drainage Condition

263.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

262.700 262.750 262.800 262.850 262.900 262.950262.400 262.450

Page 17: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 17/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

263.500 263.550 263.600 263.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)263.050 263.100 263.150 263.200 263.250 263.300 263.350

Side Ditch (Y/N)

Drainage Condition

264.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

263.700 263.750 263.800 263.850 263.900 263.950263.400 263.450

Page 18: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 18/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

264.500 264.550 264.600 264.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)264.050 264.100 264.150 264.200 264.250 264.300 264.350

Side Ditch (Y/N)

Drainage Condition

265.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

264.700 264.750 264.800 264.850 264.900 264.950264.400 264.450

Page 19: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 19/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

265.500 265.550 265.600 265.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)265.050 265.100 265.150 265.200 265.250 265.300 265.350

Side Ditch (Y/N)

Drainage Condition

266.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

265.700 265.750 265.800 265.850 265.900 265.950265.400 265.450

Page 20: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 20/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

266.500 266.550 266.600 266.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)266.050 266.100 266.150 266.200 266.250 266.300 266.350

Side Ditch (Y/N)

Drainage Condition

267.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

266.700 266.750 266.800 266.850 266.900 266.950266.400 266.450

Page 21: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 21/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

267.500 267.550 267.600 267.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)267.050 267.100 267.150 267.200 267.250 267.300 267.350

Side Ditch (Y/N)

Drainage Condition

268.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

267.700 267.750 267.800 267.850 267.900 267.950267.400 267.450

Page 22: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 22/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

268.500 268.550 268.600 268.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)268.050 268.100 268.150 268.200 268.250 268.300 268.350

Side Ditch (Y/N)

Drainage Condition

269.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

268.700 268.750 268.800 268.850 268.900 268.950268.400 268.450

Page 23: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 23/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

269.500 269.550 269.600 269.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)269.050 269.100 269.150 269.200 269.250 269.300 269.350

Side Ditch (Y/N)

Drainage Condition

270.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

269.700 269.750 269.800 269.850 269.900 269.950269.400 269.450

Page 24: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 24/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

270.500 270.550 270.600 270.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)270.050 270.100 270.150 270.200 270.250 270.300 270.350

Side Ditch (Y/N)

Drainage Condition

271.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

270.700 270.750 270.800 270.850 270.900 270.950270.400 270.450

Page 25: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 25/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

271.500 271.550 271.600 271.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)271.050 271.100 271.150 271.200 271.250 271.300 271.350

Side Ditch (Y/N)

Drainage Condition

272.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

271.700 271.750 271.800 271.850 271.900 271.950271.400 271.450

Page 26: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 26/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

272.500 272.550 272.600 272.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)272.050 272.100 272.150 272.200 272.250 272.300 272.350

Side Ditch (Y/N)

Drainage Condition

273.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

272.700 272.750 272.800 272.850 272.900 272.950272.400 272.450

Page 27: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 27/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

273.500 273.550 273.600 273.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)273.050 273.100 273.150 273.200 273.250 273.300 273.350

Side Ditch (Y/N)

Drainage Condition

274.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

273.700 273.750 273.800 273.850 273.900 273.950273.400 273.450

Page 28: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 28/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

274.500 274.550 274.600 274.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)274.050 274.100 274.150 274.200 274.250 274.300 274.350

Side Ditch (Y/N)

Drainage Condition

275.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

274.700 274.750 274.800 274.850 274.900 274.950274.400 274.450

Page 29: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 29/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

275.500 275.550 275.600 275.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)275.050 275.100 275.150 275.200 275.250 275.300 275.350

Side Ditch (Y/N)

Drainage Condition

276.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

275.700 275.750 275.800 275.850 275.900 275.950275.400 275.450

Page 30: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 30/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

276.500 276.550 276.600 276.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)276.050 276.100 276.150 276.200 276.250 276.300 276.350

Side Ditch (Y/N)

Drainage Condition

277.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

276.700 276.750 276.800 276.850 276.900 276.950276.400 276.450

Page 31: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 31/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

277.500 277.550 277.600 277.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)277.050 277.100 277.150 277.200 277.250 277.300 277.350

Side Ditch (Y/N)

Drainage Condition

278.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

277.700 277.750 277.800 277.850 277.900 277.950277.400 277.450

Page 32: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 32/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

278.500 278.550 278.600 278.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)278.050 278.100 278.150 278.200 278.250 278.300 278.350

Side Ditch (Y/N)

Drainage Condition

279.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

278.700 278.750 278.800 278.850 278.900 278.950278.400 278.450

Page 33: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 33/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

279.500 279.550 279.600 279.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)279.050 279.100 279.150 279.200 279.250 279.300 279.350

Side Ditch (Y/N)

Drainage Condition

280.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

279.700 279.750 279.800 279.850 279.900 279.950279.400 279.450

Page 34: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 34/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

280.500 280.550 280.600 280.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)280.050 280.100 280.150 280.200 280.250 280.300 280.350

Side Ditch (Y/N)

Drainage Condition

281.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

280.700 280.750 280.800 280.850 280.900 280.950280.400 280.450

Page 35: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 35/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

281.500 281.550 281.600 281.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)281.050 281.100 281.150 281.200 281.250 281.300 281.350

Side Ditch (Y/N)

Drainage Condition

282.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

281.700 281.750 281.800 281.850 281.900 281.950281.400 281.450

Page 36: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 36/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

282.500 282.550 282.600 282.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)282.050 282.100 282.150 282.200 282.250 282.300 282.350

Side Ditch (Y/N)

Drainage Condition

283.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

282.700 282.750 282.800 282.850 282.900 282.950282.400 282.450

Page 37: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 37/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

283.500 283.550 283.600 283.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)283.050 283.100 283.150 283.200 283.250 283.300 283.350

Side Ditch (Y/N)

Drainage Condition

284.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

283.700 283.750 283.800 283.850 283.900 283.950283.400 283.450

Page 38: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 38/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

284.500 284.550 284.600 284.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)284.050 284.100 284.150 284.200 284.250 284.300 284.350

Side Ditch (Y/N)

Drainage Condition

285.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

284.700 284.750 284.800 284.850 284.900 284.950284.400 284.450

Page 39: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 39/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

285.500 285.550 285.600 285.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)285.050 285.100 285.150 285.200 285.250 285.300 285.350

Side Ditch (Y/N)

Drainage Condition

286.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

285.700 285.750 285.800 285.850 285.900 285.950285.400 285.450

Page 40: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 40/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

286.500 286.550 286.600 286.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)286.050 286.100 286.150 286.200 286.250 286.300 286.350

Side Ditch (Y/N)

Drainage Condition

287.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

286.700 286.750 286.800 286.850 286.900 286.950286.400 286.450

Page 41: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 41/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

287.500 287.550 287.600 287.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)287.050 287.100 287.150 287.200 287.250 287.300 287.350

Side Ditch (Y/N)

Drainage Condition

288.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

287.700 287.750 287.800 287.850 287.900 287.950287.400 287.450

Page 42: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 42/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

288.500 288.550 288.600 288.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)288.050 288.100 288.150 288.200 288.250 288.300 288.350

Side Ditch (Y/N)

Drainage Condition

289.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

288.700 288.750 288.800 288.850 288.900 288.950288.400 288.450

Page 43: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 43/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

289.500 289.550 289.600 289.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)289.050 289.100 289.150 289.200 289.250 289.300 289.350

Side Ditch (Y/N)

Drainage Condition

290.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

289.700 289.750 289.800 289.850 289.900 289.950289.400 289.450

Page 44: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 44/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

290.500 290.550 290.600 290.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)290.050 290.100 290.150 290.200 290.250 290.300 290.350

Side Ditch (Y/N)

Drainage Condition

291.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

290.700 290.750 290.800 290.850 290.900 290.950290.400 290.450

Page 45: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 45/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

291.500 291.550 291.600 291.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)291.050 291.100 291.150 291.200 291.250 291.300 291.350

Side Ditch (Y/N)

Drainage Condition

292.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

291.700 291.750 291.800 291.850 291.900 291.950291.400 291.450

Page 46: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 46/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

292.500 292.550 292.600 292.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)292.050 292.100 292.150 292.200 292.250 292.300 292.350

Side Ditch (Y/N)

Drainage Condition

293.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

292.700 292.750 292.800 292.850 292.900 292.950292.400 292.450

Page 47: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 47/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

293.500 293.550 293.600 293.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)293.050 293.100 293.150 293.200 293.250 293.300 293.350

Side Ditch (Y/N)

Drainage Condition

294.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

293.700 293.750 293.800 293.850 293.900 293.950293.400 293.450

Page 48: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 48/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

294.500 294.550 294.600 294.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)294.050 294.100 294.150 294.200 294.250 294.300 294.350

Side Ditch (Y/N)

Drainage Condition

295.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

294.700 294.750 294.800 294.850 294.900 294.950294.400 294.450

Page 49: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 49/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

295.500 295.550 295.600 295.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)295.050 295.100 295.150 295.200 295.250 295.300 295.350

Side Ditch (Y/N)

Drainage Condition

296.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

295.700 295.750 295.800 295.850 295.900 295.950295.400 295.450

Page 50: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 50/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

296.500 296.550 296.600 296.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)296.050 296.100 296.150 296.200 296.250 296.300 296.350

Side Ditch (Y/N)

Drainage Condition

297.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

296.700 296.750 296.800 296.850 296.900 296.950296.400 296.450

Page 51: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 51/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

297.500 297.550 297.600 297.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)297.050 297.100 297.150 297.200 297.250 297.300 297.350

Side Ditch (Y/N)

Drainage Condition

298.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

297.700 297.750 297.800 297.850 297.900 297.950297.400 297.450

Page 52: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 52/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

298.500 298.550 298.600 298.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)298.050 298.100 298.150 298.200 298.250 298.300 298.350

Side Ditch (Y/N)

Drainage Condition

299.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

298.700 298.750 298.800 298.850 298.900 298.950298.400 298.450

Page 53: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 53/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

299.500 299.550 299.600 299.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)299.050 299.100 299.150 299.200 299.250 299.300 299.350

Side Ditch (Y/N)

Drainage Condition

300.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

299.700 299.750 299.800 299.850 299.900 299.950299.400 299.450

Page 54: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 54/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

300.500 300.550 300.600 300.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)300.050 300.100 300.150 300.200 300.250 300.300 300.350

Side Ditch (Y/N)

Drainage Condition

301.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

300.700 300.750 300.800 300.850 300.900 300.950300.400 300.450

Page 55: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 55/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

301.500 301.550 301.600 301.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)301.050 301.100 301.150 301.200 301.250 301.300 301.350

Side Ditch (Y/N)

Drainage Condition

302.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

301.700 301.750 301.800 301.850 301.900 301.950301.400 301.450

Page 56: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 56/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

302.500 302.550 302.600 302.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)302.050 302.100 302.150 302.200 302.250 302.300 302.350

Side Ditch (Y/N)

Drainage Condition

303.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

302.700 302.750 302.800 302.850 302.900 302.950302.400 302.450

Page 57: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 57/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

303.500 303.550 303.600 303.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)303.050 303.100 303.150 303.200 303.250 303.300 303.350

Side Ditch (Y/N)

Drainage Condition

304.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

303.700 303.750 303.800 303.850 303.900 303.950303.400 303.450

Page 58: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 58/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

304.500 304.550 304.600 304.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)304.050 304.100 304.150 304.200 304.250 304.300 304.350

Side Ditch (Y/N)

Drainage Condition

305.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

304.700 304.750 304.800 304.850 304.900 304.950304.400 304.450

Page 59: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 59/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

305.500 305.550 305.600 305.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)305.050 305.100 305.150 305.200 305.250 305.300 305.350

Side Ditch (Y/N)

Drainage Condition

306.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

305.700 305.750 305.800 305.850 305.900 305.950305.400 305.450

Page 60: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 60/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

306.500 306.550 306.600 306.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)306.050 306.100 306.150 306.200 306.250 306.300 306.350

Side Ditch (Y/N)

Drainage Condition

307.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

306.700 306.750 306.800 306.850 306.900 306.950306.400 306.450

Page 61: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 61/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

307.500 307.550 307.600 307.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)307.050 307.100 307.150 307.200 307.250 307.300 307.350

Side Ditch (Y/N)

Drainage Condition

308.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

307.700 307.750 307.800 307.850 307.900 307.950307.400 307.450

Page 62: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 62/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

308.500 308.550 308.600 308.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)308.050 308.100 308.150 308.200 308.250 308.300 308.350

Side Ditch (Y/N)

Drainage Condition

309.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

308.700 308.750 308.800 308.850 308.900 308.950308.400 308.450

Page 63: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 63/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

309.500 309.550 309.600 309.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)309.050 309.100 309.150 309.200 309.250 309.300 309.350

Side Ditch (Y/N)

Drainage Condition

310.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

309.700 309.750 309.800 309.850 309.900 309.950309.400 309.450

Page 64: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 64/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

310.500 310.550 310.600 310.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)310.050 310.100 310.150 310.200 310.250 310.300 310.350

Side Ditch (Y/N)

Drainage Condition

311.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

310.700 310.750 310.800 310.850 310.900 310.950310.400 310.450

Page 65: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 65/75

Road

Section

Linear Sketch

LayoutLong. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

311.500 311.550 311.600 311.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)311.050 311.100 311.150 311.200 311.250 311.300 311.350

Side Ditch (Y/N)

Drainage Condition

312.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

311.700 311.750 311.800 311.850 311.900 311.950311.400 311.450

Page 66: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 66/75

Road

Section

Linear Sketch

LayoutLong. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

312.500 312.550 312.600 312.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)312.050 312.100 312.150 312.200 312.250 312.300 312.350

Side Ditch (Y/N)

Drainage Condition

313.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

312.700 312.750 312.800 312.850 312.900 312.950312.400 312.450

Page 67: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 67/75

Road

Section

Linear Sketch

LayoutLong. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

313.500 313.550 313.600 313.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)313.050 313.100 313.150 313.200 313.250 313.300 313.350

Side Ditch (Y/N)

Drainage Condition

314.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

313.700 313.750 313.800 313.850 313.900 313.950313.400 313.450

Page 68: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 68/75

Road

Section

Linear Sketch

LayoutLong. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

314.500 314.550 314.600 314.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)314.050 314.100 314.150 314.200 314.250 314.300 314.350

Side Ditch (Y/N)

Drainage Condition

315.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

314.700 314.750 314.800 314.850 314.900 314.950314.400 314.450

Page 69: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 69/75

Road

Section

Linear Sketch

LayoutLong. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

315.500 315.550 315.600 315.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)315.050 315.100 315.150 315.200 315.250 315.300 315.350

Side Ditch (Y/N)

Drainage Condition

316.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

315.700 315.750 315.800 315.850 315.900 315.950315.400 315.450

Page 70: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 70/75

Road

Section

Linear Sketch

LayoutLong. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

316.500 316.550 316.600 316.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)316.050 316.100 316.150 316.200 316.250 316.300 316.350

Side Ditch (Y/N)

Drainage Condition

317.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

316.700 316.750 316.800 316.850 316.900 316.950316.400 316.450

Page 71: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 71/75

Road

Section

Linear Sketch

LayoutLong. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

317.500 317.550 317.600 317.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)317.050 317.100 317.150 317.200 317.250 317.300 317.350

Side Ditch (Y/N)

Drainage Condition

318.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

317.700 317.750 317.800 317.850 317.900 317.950317.400 317.450

Page 72: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 72/75

Road

Section

Linear Sketch

LayoutLong. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

318.500 318.550 318.600 318.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)318.050 318.100 318.150 318.200 318.250 318.300 318.350

Side Ditch (Y/N)

Drainage Condition

319.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

318.700 318.750 318.800 318.850 318.900 318.950318.400 318.450

Page 73: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 73/75

Road

Section

Linear Sketch

LayoutLong. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

319.500 319.550 319.600 319.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)319.050 319.100 319.150 319.200 319.250 319.300 319.350

Side Ditch (Y/N)

Drainage Condition

320.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

319.700 319.750 319.800 319.850 319.900 319.950319.400 319.450

Page 74: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 74/75

Road

Section

Linear Sketch

LayoutLong. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

320.500 320.550 320.600 320.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)320.050 320.100 320.150 320.200 320.250 320.300 320.350

Side Ditch (Y/N)

Drainage Condition

321.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

320.700 320.750 320.800 320.850 320.900 320.950320.400 320.450

Page 75: Condition Survey Data

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 75/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

321.500 321.550 321.600 321.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)321.050 321.100 321.150 321.200 321.250 321.300 321.350

Side Ditch (Y/N)

Drainage Condition

322.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

321.700 321.750 321.800 321.850 321.900 321.950321.400 321.450