6
X:\103\109 ENGDOC\109.3 CRIT_DC\CIVIL\C-DC-10-002\C-DC-10-002 GENSITECOND-REV0.DOC Sociedad Minera Cerro Verde S.A.A. Primary Sulfide Project Project No. PSP108 General Site Conditions Document No. C-DC-10-002 Rev. 0 16 December 2004

Condiciones de Sitio SMCV

Embed Size (px)

DESCRIPTION

Condiciones de sitio en mina de cobre peruana, Sociedad Minera Cerro Verde

Citation preview

  • X:\103\109 ENGDOC\109.3 CRIT_DC\CIVIL\C-DC-10-002\C-DC-10-002 GENSITECOND-REV0.DOC

    Sociedad Minera Cerro Verde S.A.A.

    Primary Sulfide Project Project No. PSP108

    General Site Conditions

    Document No. C-DC-10-002 Rev. 0

    16 December 2004

  • Client Name: Sociedad Minera Cerro Verde S.A.A. Specification C-DC-10-002 Project Name: Primary Sulfide Project Page 1 of 5 Project Number: PSP108 Rev. 0

    FLUOR Mining & Minerals

    GENERAL SITE CONDITIONS

    X:\103\109 ENGDOC\109.3 CRIT_DC\CIVIL\C-DC-10-002\C-DC-10-002 GENSITECOND-REV0.DOC) CIVIL

    This document has been revised as indicated below. Changes after revision 0 are identified by vertical bars at the right side of the page, with additions being underlined. Please replace all pages of this document and destroy the superceded copies.

    Rev No.

    Originator (name/initials)

    Rev Date

    Revision Description

    A P. Lo 25Sept03 Issued for Information (Feasibility Study) B P. Lo 15Oct03 Issued for Client Review (Feasibility Study) B1 P. Lo 27Oct03 Section 5 added (Feasibility Study) C P. Lo 16Nov04 Issue for Approval 0 P. Lo/PL 16Dec04 Issue for Construction

    New Issue ; Entire Document Re-issued

    APPROVALS ORIGINAL SIGNED BY FLUOR DATE CLIENT DATE

    Project Manager: Engineering Manager: Brad Matthews 15Dec04 Keith Richardson 16Dec04 Area Project Engineer: Janis Zeidaks 16Dec04 Lead Discipline Engineer: Patrick Lo 16Dec04 Process Approval:

  • Client Name: Sociedad Minera Cerro Verde S.A.A. Specification C-DC-10-002 Project Name: Primary Sulfide Project Page 2 of 5 Project Number: PSP108 Rev. 0

    FLUOR Mining & Minerals

    GENERAL SITE CONDITIONS

    X:\103\109 ENGDOC\109.3 CRIT_DC\CIVIL\C-DC-10-002\C-DC-10-002 GENSITECOND-REV0.DOC) CIVIL

    Table of Contents

    1. SCOPE OF SPECIFICATION .............................................................................................................................3 2. PROJECT LOCATION........................................................................................................................................3 3. SITE ACCESS.....................................................................................................................................................3 4. SITE CONDITIONS.............................................................................................................................................3

    4.1 Existing Conditions.......................................................................................................................................3 4.2 Environmental Requirements .......................................................................................................................3

    5. UTILITIES............................................................................................................................................................5

  • Client Name: Sociedad Minera Cerro Verde S.A.A. Specification C-DC-10-002 Project Name: Primary Sulfide Project Page 3 of 5 Project Number: PSP108 Rev. 0

    FLUOR Mining & Minerals

    GENERAL SITE CONDITIONS

    X:\103\109 ENGDOC\109.3 CRIT_DC\CIVIL\C-DC-10-002\C-DC-10-002 GENSITECOND-REV0.DOC) CIVIL

    1. SCOPE OF SPECIFICATION

    This specification includes the general information to be considered by a Bidder while preparing a proposal.

    2. PROJECT LOCATION

    The Cerro Verde mine is situated 16 km east-southeast of Arequipa, capital of the Province of Arequipa and second largest city in Peru.

    Project elevation: 2700 m above sea level (8860 ft) Project latitude: 16 32 south Project longitude: 71 37 west

    3. SITE ACCESS

    The mine is connected by paved roads to: Arequipa, a distance of 26 km, Pacific port of Matarani, a distance of 100 km Lima, the countrys capital, approximately a distance of 1100 km.

    The Southern Railway of Peru from Matarani to Arequipa passes within 12 km of the mine site.

    4. SITE CONDITIONS

    4.1 Existing Conditions

    A 40 000 t/d heap leach, SX/EW facility is presently operating at this site.

    4.2 Environmental Requirements

    A. Air Temperatures

    Average annual maximum temperature............. 24.7C Average annual minimum temperature.............. 3.7C Average daily variation ....................................... 16.6C

    Design maximum temperature...30C Design minimum temperature.0C (Short occurrences only)

    B. Humidity

    Maximum average monthly humidity 88.1% (rainy season) Minimum average monthly humidity 43.6% (rainy season)

    Maximum average monthly humidity.. 72.5% (dry season) Minimum average monthly humidity 34.9% (dry season)

    C. Barometric Pressure

    Average annual barometric pressure74.0 kPa (g)

  • Client Name: Sociedad Minera Cerro Verde S.A.A. Specification C-DC-10-002 Project Name: Primary Sulfide Project Page 4 of 5 Project Number: PSP108 Rev. 0

    FLUOR Mining & Minerals

    GENERAL SITE CONDITIONS

    X:\103\109 ENGDOC\109.3 CRIT_DC\CIVIL\C-DC-10-002\C-DC-10-002 GENSITECOND-REV0.DOC) CIVIL

    D. Solar Radiation

    Average annual solar radiation.. 6.27 kW/m2

    E. Wind

    Maximum gust.................................................... 100 km/h Prevailing winds ................................................. Southwesterly

    Winds are frequently laden with fine volcanic ash.

    F. Precipitation

    Average annual precipitation.............................. 40.7 mm 10 year, 24 hour rainfall...................................... 44.9 mm (from EIA) 100 year, 24 hour rainfall.................................... 81.5 mm (from EIA)

    G. Evaporation

    Average daily evaporation.................................. 6.1 mm

    H. Earthquake

    1. Earthquake loads are defined as the static horizontal and vertical forces equivalent in their design effect to the dynamic loads induced by ground motion during an earthquake.

    2. All buildings, structures, and components shall be designed for earthquake forces according to the International Building Code (IBC), 2003 Edition and the following factors:

    a) Ss = 0.8 g (Spectral acceleration for 0.2 sec. Period) b) S1 = 0.4 g (Spectral acceleration for 1.0 sec. Period) c) Fa = 1 (Site coefficient defined in Table 1615.1.2.(1) d) Fv = 1 (Site coefficient defined in Table 1615.1.2.(2) e) Site class = B (IBC Table 1615.1.1)

    3. Seismic design for circular storage tanks at grade shall be according to Appendix E of API Standard 650. The effect of slosh height on freeboard and tank roof shall be considered,

    4. Seismic load is the total dead or operating load, whichever is worse, and applicable portion of other loads as defined in IBC sections 1616 to 1622.

    5. Tall structures and structures having stiffness, weight, or geometric irregularities as defined in IBC Section 1616.5 shall be analyzed using dynamic lateral force procedures of Section 1618, including appropriate scaling of the results.

  • Client Name: Sociedad Minera Cerro Verde S.A.A. Specification C-DC-10-002 Project Name: Primary Sulfide Project Page 5 of 5 Project Number: PSP108 Rev. 0

    FLUOR Mining & Minerals

    GENERAL SITE CONDITIONS

    X:\103\109 ENGDOC\109.3 CRIT_DC\CIVIL\C-DC-10-002\C-DC-10-002 GENSITECOND-REV0.DOC) CIVIL

    5. UTILITIES

    Pressure (kPag)

    Temperature (Degrees Celsius) Plant Air (min/norm/max) 580 / 620 / 862 Ambient Instrument Air (min/norm/max) 580 / 620 / 862 Ambient Process Water (min/norm/max) 390 / 415 / 440 Ambient @ 2715 m plant elev.

    End of Specification