Concrete Bridge Approach Pavements: A Survey of State Practices Prepared for Wisconsin Highway Research Program Rigid Pavements Technical Oversight Committee Prepared by CTC & Associates LLC WisDOT Research & Library Unit January 15, 2010 Transportation Synthesis Reports are brief summaries of currently available information on topics of interest to WisDOT staff throughout the department. Online and print sources for TSRs include NCHRP and other TRB programs, AASHTO, the research and practices of other transportation agencies, and related academic and industry research. Internet hyperlinks in TSRs are active at the time of publication, but changes on the host server can make them obsolete. To request a TSR, e-mail [email protected] or call (608) 267-6977. Request for Report Many state DOTs use concrete slabs to connect the decks of bridges with adjoining roadways. These approaches are meant to provide a smooth transition from roadway to deck. However, the settlement of embankments supporting these slabs can lead to their cracking, as well as the failure of the expansion joints connecting them to roadway pavements. The Rigid Pavements Technical Oversight Committee of the Wisconsin Highway Research Program is interested in other states’ experiences with cracking and expansion joint failure in concrete bridge approach pavements. Summary We conducted a brief survey of state DOTs consisting of the following questions: 1. What problems has your state experienced with cracking of concrete approach slabs adjacent to skewed bridge decks? 2. Have you had instances of expansion joint failure at concrete approach slabs, and if so, to what extent? 3. Could you please attach or provide a link to your agency’s designs or specifications on concrete bridge approach pavements? 4. What is the name, phone number and e-mail address of the appropriate person in your agency to talk to about this topic? Eighteen state DOTs responded to the survey. See Survey Results beginning on page 2 of this report for the full text of these survey responses. State specifications provided by survey respondents are included in Appendices A through K.

Concrete Bridge Approach Pavements: A Survey of …sp.research.transportation.org/Documents/RAC Surveys of...Of 14 agencies reporting cracking, eight (57 percent) reported problems

  • Upload
    buidan

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

Concrete Bridge Approach Pavements: A Survey of State Practices

Prepared for

Wisconsin Highway Research Program Rigid Pavements Technical Oversight Committee

Prepared by

CTC & Associates LLC WisDOT Research & Library Unit

January 15, 2010

Transportation Synthesis Reports are brief summaries of currently available information on topics of interest to WisDOT staff throughout the department. Online and print sources for TSRs include NCHRP and other TRB programs, AASHTO, the research and practices of other transportation agencies, and related academic and industry research. Internet hyperlinks in TSRs are active at the time of publication, but changes on the host server can make them obsolete. To request a TSR, e-mail [email protected] or call (608) 267-6977. Request for Report Many state DOTs use concrete slabs to connect the decks of bridges with adjoining roadways. These approaches are meant to provide a smooth transition from roadway to deck. However, the settlement of embankments supporting these slabs can lead to their cracking, as well as the failure of the expansion joints connecting them to roadway pavements. The Rigid Pavements Technical Oversight Committee of the Wisconsin Highway Research Program is interested in other states’ experiences with cracking and expansion joint failure in concrete bridge approach pavements. Summary We conducted a brief survey of state DOTs consisting of the following questions:

1. What problems has your state experienced with cracking of concrete approach slabs adjacent to skewed bridge decks?

2. Have you had instances of expansion joint failure at concrete approach slabs, and if so, to what extent? 3. Could you please attach or provide a link to your agency’s designs or specifications on concrete bridge

approach pavements? 4. What is the name, phone number and e-mail address of the appropriate person in your agency to talk to

about this topic? Eighteen state DOTs responded to the survey. See Survey Results beginning on page 2 of this report for the full text of these survey responses. State specifications provided by survey respondents are included in Appendices A through K.

Key findings from the survey follow.

• Of 18 respondents, 17 use concrete approach slabs and one (Maryland) does not. • Of those agencies using approach slabs, 14 (82 percent) reported problems with cracking, two (12 percent)

had no problems, and one (6 percent) could not say because of difficulties with inspection. • Of 14 agencies reporting cracking, eight (57 percent) reported problems in the acute corners of skewed

approach slabs, and six (43 percent) said the cracking problem was the same for skewed and nonskewed bridges. Three of 14 agencies (21 percent) said that cracking was a minor problem, and five (36 percent) reported settling or erosion of underlying subgrade soils beneath slabs as a possible cause of cracking.

• Of 17 agencies using approach slabs, 13 (76 percent) use expansion joints. For those agencies using expansion joints, 12 (92 percent) had a problem with joint failure and one (8 percent) did not. For the 12 agencies with expansion joint problems, three (25 percent) reported this failure as uncommon and two (17 percent) as not attributable to approach slabs specifically.

Survey Results The full text of each survey response is provided below. For reference, we have included an abbreviated version of each question before the response; for the full question text, please see the Summary on page 1 of this report.

Alaska Contact: Design: Elmer Marx, Alaska Department of Transportation and Public Facilities, (907) 465-6941, [email protected]; Inspection: Drew Sielbach, Alaska Department of Transportation and Public Facilities, (907) 465-6942, [email protected]. 1. Problems with cracking: Alaska typically overlays the approach slabs with asphalt, making a direct

visual observation impossible. Cracking of asphalt in the acute areas has been observed at several locations.

2. Expansion joint failure: In-House Design Practices

o Alaska rigidly attaches the approach slab to the abutment backwall with no expansion joint present.

o Alaska uses flexible pavements on the approach roadway. No expansion joint is provided at the interface of the flexible pavement with the approach slab. The asphalt at this location typically cracks.

Contractor Design/Build Several bridges were designed attaching the approach slab to the abutment backwall with a dowel, which allowed ¾" movement. The compression seals installed at this location are loose, with some sections missing.

3. Designs or specifications: See Appendix A. Arkansas Contact: Glenn Cheatham, Arkansas State Highway and Transportation Department, (501) 569-2466, [email protected]. 1. Problems with cracking: The concrete approach slab used for transitioning from roadway to bridge has

always been a problem in AR. Whether from poor compaction at the bridge end or from material washing out from under the slab, our slabs are typically cracked or settled. Many have asphalt overlays placed to repair the bump at the end of the roadway. Similar problems occur whether square or skewed. I have not noticed skewed being any worse than square. See pictures of a typical problem in AR in Appendix B.

2. Expansion joint failure: Yes. The expansion joint material does not last very long. Incompressibles get in the joints, causing edge spalls and cracks in the approach slabs.

2

3. Designs or specifications: A List of Standard Bridge Drawings, including approach slabs and gutters, can be viewed at http://www.arkansashighways.com/bridge_division/list_standard_drawings.aspx.

Colorado Contact: Expansion Joints: Behrooz Far, Colorado DOT, (303) 757-9193; Concrete Approaches: Mohamed Zaina, Colorado DOT, (303) 757-9196; Abutment/Wingwall/Approach Slabs: Trever Wang, Colorado DOT, (303) 512-4072, or Steve Yip, Colorado DOT, (303) 512-4171. 1. Problems with cracking: We have experienced cracking with skewed and nonskewed bridge decks. This

may be caused by the materials, construction or approach slab design. The cracking of skewed concrete approach slabs is also caused by:

• Thermal load—the load will result in a gap at the corner having an obtuse angle with the approach slab and acute angle with the bridge deck. Water flowing through this gap causes settlement of the approach slab.

• The skew angle of the approach slab, which results in an uneven distribution of slab moment due to live load.

2. Expansion joint failure: Yes. There are many instances of failure for 0-4" expansion joints. The main cause is the lack of consolidation of concrete behind the expansion joints. We have also had failures due to snowplows catching the edge of expansion joints and ripping them out, because the contractor didn’t follow directions and recessed the expansion joint 1/8" below the deck surface. Failures have also been noted for 0-2" asphaltic plug joints when they have been used in curved bridges, steep inclines or poor installations.

3. Designs or specifications: See Appendix C. Florida Contact: Andre Pavlov, Florida DOT, (850) 921-7111, [email protected]. 1. Problems with cracking: No problems. 2. Expansion joint failure: No failures. 3. Designs or specifications: See Appendix D. Indiana Contact: David Andrewski, Indiana DOT, (317) 232-5452, [email protected]. 1. Problems with cracking: We have seen cracking in the corners of approach slabs. 2. Expansion joint failure: Occasionally we have seen expansion joint failure at the approach slabs but it

has not normally been attributed to the approach slab condition. 3. Designs or specifications: See Appendix E. Iowa Contact: Scott Neubauer, Iowa DOT, (515) 239-1290, [email protected]. 1. Problems with cracking: We have not documented approach issues with relation to skew. We do not see

obvious issues related to skew. We have cracking in the bridge approach slabs due to settlement. It is common for a dip to develop about 20' to 30' from the abutment. We have recently used flooding during placement of the granular fill behind abutments to try to reduce the settlement.

2. Expansion joint failure: We have approach slabs that have dropped because the abutment paving notch/corbel failed or there was fill material on the paving notch/corbel when the approach was placed and the fill washed away, allowing the slab to drop. We recently updated our approach standard to address these issues. I am unclear as to what you are calling joint failure.

3

3. Designs or specifications: Our standard approach details are at

http://www.iowadot.gov/design/stdrdpln.htm under the RK section “Bridge Approach Pavement,” Standard RK-20, “Double Reinforced 12" Approach.”

Kansas Contact: Andrew Gisi, Kansas DOT, (785) 291-3856, [email protected]. 1. Problems with cracking: We experience cracking in the bridge approach slabs regardless of the angle of

the bridge end to the roadway. The reason for the cracking is loss of support under the approach slab due either to erosion or settlement of subgrade soil. Our bridges are founded on rock or piles, which makes them a fixed object. Our pavements are founded on compressible soil, which makes them a movable object. The result is settlement in the embankment soils and a void created below the pavement. This causes the approach slab to crack.

2. Expansion joint failure: The 4" joint approximately 30' from the EWS will generally close up and maintenance forces will have to reconstruct.

3. Designs or specifications: http://kart.ksdot.org/; click on “KDOT Standard Drawings” and look at RD 711-715. [A free account is required to view the standards.]

Kentucky Contact: Jamie Bewley Byrd, State Highway Engineer’s Office, (502) 564-3730 ext. 3128, [email protected]. 1. Problems with cracking: We have gone to using buried approach slabs to allow for easier wedging of

pavements at bridge ends. Inspections for cracking would be difficult. 2. Expansion joint failure: We generally use integral end bents with buried approach slabs, and so

expansion joint devices are not used. 3. Designs or specifications: See Appendix F. Louisiana Contact: Jenan Nakhleh, Louisiana Department of Transportation & Development, (225) 379-1061, [email protected]. 1. Problems with cracking: Some problems we have had with skewed approach slabs would be cracking

near the sharp corners of the slab. 2. Expansion joint failure: We have had the usual joint failure due to pavement growth. That is a

continuous maintenance issue. 3. Designs or specifications: Our current detail for a skewed approach slab is to have the far end normal to

the center line of the bridge with the shorter side not less than 12 feet long. Maryland Contact: Jeff Robert, Maryland State Highway Administration, (410) 545-8327, [email protected]. 1. Problems with cracking: The Maryland State Highway Administration does not use concrete approach

slabs. 2. Expansion joint failure: N/A. 3. Designs or specifications: N/A.

4

Minnesota Contact: Paul Rowekamp, Minnesota DOT, (651) 366-4484, [email protected]. 1. Problems with cracking: Cracking in the acute corner of the adjoining approach slab. 2. Expansion joint failure: Yes, especially since we’ve built more integral abutment bridges. Our existing

joint sealers aren’t performing well with the wide openings we have at the end of integral abutment bridges with the approach panels tied to the bridge.

3. Designs or specifications: See Appendix G. Mississippi Contact: John Vance, Mississippi DOT, (601) 359-7111, [email protected]. 1. Problems with cracking: The problems that we are having include hard-to-get compaction and the slabs

tending to drop when the material underneath settles; we do have cracking in many approach slabs but not associated with skewed bridges (acute angle breaks).

2. Expansion joint failure: We have experienced joint failures causing undermining of the slab. This does not happen on what I would call a common basis. The approach slab joints (on paving brackets) are generally not a big problem. The approach slabs have on several occasions tended to migrate away from the end walls. We have a much bigger problem with the joints between the end walls and bridge decks.

3. Designs or specifications: See Appendix H. Missouri Contact: Gregory Sanders, Missouri DOT, (573) 526-0245, [email protected]. 1. Problems with cracking: Our reinforced bridge approach slabs are tied to the abutments with

reinforcement in the middle of our 12" min slab. We don’t see much cracking in the slabs except for slight cracking in the top at the end that is tied to our reinforcement detail where high steel permits movement.

2. Expansion joint failure: Our bridge approach is seated on an approach notch, poured flush with the abutment face on one end and tied, and rests on a sleeper slab on the other end where a 3/4" expansion (filled) joint is used. These joints are easily replaced. Additionally, there is a 2" filled expansion joint at the end of our 15' concrete approach pavement that abuts the bridge approach slab and sits on a concrete sill.

3. Designs or specifications: Standard Drawings: http://www.modot.mo.gov/business/consultant_resources/bridgestandards.htm Approach Slab Sheets: http://www.modot.mo.gov/business/standard_drawings2/approachslab_new_title_block.htm

New Mexico Contact: Ray M. Trujillo, New Mexico DOT, (505) 827-5448, [email protected]. 1. Problems with cracking: Have had cracking at acute corners of concrete approach slabs. This usually

occurs when skew angles are greater than 30°. 2. Expansion joint failure: Very few. Cause of failure for the few we have had was due to approaches

settling considerably. 3. Designs or specifications: See Appendix I.

5

6

New York Contact: Arthur P. Yannotti, New York State DOT, (518) 457-4453, [email protected]. 1. Problems with cracking: The approach slab frequently cracks perpendicular to the abutment on skewed

bridges. This occurs much more often when there is no expansion joint at the abutment. 2. Expansion joint failure: Yes. Almost all expansion joints leak in time. 3. Designs or specifications:

A3. Bridge Manual: https://www.nysdot.gov/divisions/engineering/structures/repository/manuals/brman-usc/Section_13_US_2008_1st.pdf BD Sheet: https://www.nysdot.gov/main/business-center/engineering/cadd-info/drawings/bridge-detail-sheets-usc/sa-approach-slabs-usc

North Dakota Contact: Tim Schwagler, North Dakota DOT, (701) 328-4421, [email protected]. 1. Problems with cracking: North Dakota has not experienced cracking of approach slabs adjacent to

skewed bridge decks. 2. Expansion joint failure: Expansion joints are not next to approach slabs. 3. Designs or specifications: See Appendix J. Texas Contact: Brian Merrill, Texas DOT, (512) 416-2232, [email protected]. 1. Problems with cracking: We do get cracks in concrete approach slabs that are perpendicular to the

expansion joint on skewed bridges. There seem to be few negative consequences from these cracks. 2. Expansion joint failure: Expansion joint failure occurs with and without the presence of a concrete

approach slab. We have seen no correlation between joint failures and approach slabs. 3. Designs or specifications: TxDOT’s standard drawings for approach slabs, BAS-A and BAS-C, can be

found at http://www.dot.state.tx.us/insdtdot/orgchart/cmd/cserve/standard/bridge-e.htm#Miscellaneous; or see Appendix K.

Washington Contact: Bruce Thill, Washington State DOT, (360) 705-7393, [email protected]. 1. Problems with cracking: Cracking of the approach slabs is generally the same in nature as that of the bridge

deck, but less frequent. 2. Expansion joint failure: Joint failure of the approach slabs is of the same nature, but less frequent due to

smaller joints. Large expansion movements are located at bridge joints. Generally, the smaller the joint gap, the less impact and the lower the risk of deterioration.

3. Designs or specifications: http://www.wsdot.wa.gov/eesc/bridge/drawings/index.cfm?fuseaction=drawings&section_nbr=8&type_id=34.

B

A

B

B

3" c

l.

2" C

L.

3" c

l.

3’-0"

1’-

0"

1’-

0"

1’-0"6"

2’-0"

1’-

0"

3"

8"

6"

Centerline of Roadway

Ò Brg. Abut.

#

4 @

1’-6"

Top o

f s

lab

1’-

0"

6 1/2 "

2’-4

"

#5 @ 1’-0"

Top of slab

Ro

ad

way

PLAN

A

B

BB

A

B

#5 @

1’-0"

#

6 @

6"

Bo

tt.

of s

lab

#5 @ 1’-0"

Bott. of slab

#4 @ 1’-6"

Detail "B"#5 @ 1’-0"

#6 @ 6" #5 @ 1’-0"

20 gauge galv. sheet metal

(To be included in the work)

#5 (6 Tot.)

SECTION

3" Hot Bituminous

Pavement over

waterproofing

membrane.

Slope for drainage

.02 ft/ft min.

1/2 Exp’n joint material

SECTION

2" deep poured

joint filler

1/2 " Exp’n joint mat’l

Contractor may use

1’-0"

7"

#4 @ 1’-6"

DETAIL "B"

Approach Slab

#5 project

1’-6" into approach

slab.

NOTES:

B-601-1

Concrete class d (Bridge) shall be used for

approach slabs.

Approach slab concrete shall be cured in

accordance with the Specifications for Bridge

Deck Concrete in Subsection 601.

The top surface of the post-tensioning block,

if any, shall be covered with 1" of low density

polystyrene foam. See Dwg. No. B______.

1/2 "expansion joint material shall meet AASHTO

Spec. M213.

Designer: Do not use this sheet when the bridge length

exceeds 250’ on bridges with integral abutments, nor

when the approach roadway is concrete.

14’-0" Sin

With ashphalt roadway

For type 3 guardrail,notch sleeper slab forguardrail post. Cutreinforcing at notch.For type 7 guardrail,place end of guardrailon sleeper slab.

Designer: Use #9 for approach slabs

greater than 20’and less than 31’ long

INIT

IAL

Desi

gn

Desi

gn

ed

By

Checked B

y

DA

TE

DA

TE

DA

TE

INIT

IAL

INIT

IAL

Deta

ilQ

uan

titi

es

Deta

iled

By

Checked B

yC

hecked B

y

Qu

an

titi

es

By

MM

/YY

MM

/YY

MM

/YY

MM

/YY

MM

/YY

MM

/YY

XX

X

XX

X

XX

X

XX

X

XX

X

XX

X

Phone: 303-757-9352 FAX: 303-757-9197

Colorado Department of Transportation

Denver, CO 80222-3400

Staff Bridge Branch

4201 East Arkansas Avenue

Room 303

Initials

14’-0" (minimum length)

Sleeper

Slab

X-XX-XX

X-XX-XX

Numbers

Structure

No Revisions:

Revised:

Void: Sheet Subset:

Detailer:

Designer:

Bridge

XXXXXXXX

XXXXXXXX

Sheet NumberSubset Sheets: B00 of

Init.CommentsDate:

Sheet Revisions As Constructed Project No./Code

APPROACH SLAB DETAILSDrawing File Name:

10/29/2007Print Date:

Horiz. Scale: 1:1

Unit Information Unit Leader Initials

Vert. Scale: As Noted

Sheet_B-601-1.dgn

#4 @ 1’-6"

3/07

6/04

4/02

5/00

11/9

93

/99

8/9

58/94

Rev

isio

n D

ate

s(P

reli

min

ary

Sta

ge O

nly

)

3"

1’-

0"

1’-

0"

1’-0"

3’-0"

15’-3 7/8 "

3" c

lr.

(ty

p.)

3" c

lr.

2’-0"

20’-0"

NOTES:

B-601-1BF

Centerline of Roadway

#

4 @

1’-6"

Top o

f s

lab

1’-

0"

2’-4

"

#5 @ 1’-0"

Top of slab

PLAN

A

B

A

B

Ro

ad

way

#5 @

1’-0"

Ò Abutment

B

B

C

B

6"

B

BSECTION

Approach slab

Bridge rail

Sleeper slab

Expansion joint

VIEW TYPE 7 RAIL

SECTIONB

C

#5

2’-9

"1’-

0"

1’-

0"

#4 @ 1’-0"

2 - #4’s x 2’-2" lg.

1’-8"

2’-2"

Construction Joint

#6 @ 6"

#4 @ 1’-6"

Contractor may use

1’-0"

6"

#5 @ 1’-0"

2’-6"

1’-

6"

2’-7"

7"

#5 @ 1’-0"

#5 @ 1’-0"

SECTIONB

A

Room 107

Phone:

Denver, CO 80222-3406

4201 East Arkansas Avenue

303-757-9352 FAX: 303-757-9197

Colorado Department of Transportation

Staff Bridge Branch Initials

INIT

IAL

Desi

gn

Desi

gn

ed

By

Checked B

y

DA

TE

DA

TE

DA

TE

INIT

IAL

INIT

IAL

Deta

ilQ

uan

titi

es

Deta

iled

By

Checked B

yC

hecked B

y

Qu

an

titi

es

By

MM

/YY

MM

/YY

MM

/YY

MM

/YY

MM

/YY

MM

/YY

XX

X

XX

X

XX

X

XX

X

XX

X

XX

X

Slope 4"ß trimmed

plastic pipe to

drain (2% min.)

Extend 4"ß trimmed plastic

pipe 4" (min.) beyond

outside face of wingwalls.

20 ga. galvanized sheet

metal (to be included in

the work)#5 (cont.)

(tot. 6)

Concrete Class D (Bridge) shall be used for

approach slabs.

1/2 " expansion joint material shall meet AASHTO

Spec. M213.

For expansion device details see Dwg. No. B___.

For curb and rail details see Dwg. No. B___.

Approach slab concrete shall be cured in accordance

with the Specifications for Bridge Deck Concrete in

Subsection 601.

The top surface of the post-tensioning block, if any,

shall be covered with 1" of low density polystyrene

foam. See Dwg. No. B___.

Slope for drainage0.02 ft/ft min.

1/2 " Exp’n.Joint Mat’l

#4 (tot. 3)

For transition seeM-606-13 sheet 2,

or M-606-1 sheet 10.

Slope for drainage

0.02 ft/ft min.

1/2 " Exp’n. Joint Mat’l.

Sleeper

Slab

#

6 @

6"

Bo

tto

m o

f s

lab

#5 @ 1’-0"

Bottom of slab

X-XX-XX

X-XX-XX

Numbers

Structure

No Revisions:

Revised:

Void: Sheet Subset:

Detailer:

Designer:

Bridge

XXXXXXXX

XXXXXXXX

Sheet NumberSubset Sheets: B00 of

Init.CommentsDate:

Sheet Revisions As Constructed Project No./Code

APPROACH SLAB DETAILSDrawing File Name:

10/29/2007Print Date:

Horiz. Scale: 1:1

Unit Information Unit Leader Initials

Vert. Scale: As Noted

Sheet_B-601-1BF.dgn

3/07

6/0

4

Rev

isio

n D

ate

s(P

reli

min

ary

Sta

ge O

nly

)

3"

"W"

Expansion joint

Expansion Joint

1’-

0"

20’-0" Sin

3" c

l.

2" c

l.

6"

3"

1’-

0"

1’-0"

4’-0"

1’-

3"

3" c

lr.

1’-

0"

1’-6"1’-0"1’-6"

20’-0" (minnimum length)

Centerline of Roadway

#

4 @

1’-6"

Top o

f s

lab

1’-

0"

2’-4

"

#5 @ 1’-0"

Top of slab

PLAN

A

B

A

B

Ro

ad

way

#5 @

1’-0"

B

B

C

B

6"

Ò Brg. Abut.

Wingwall

B

BSECTION

Approach slab

Bridge rail

Sleeper slab

SECTIONB

A

#4 @ 1’-6"

#6 @ 6"

#5 @ 1’-0"

#5 @ 1’-0"

With Hot Bituminous Pavement roadway

SECTIONB

C

#5

2’-9

"1’-

0"

1’-

0"

#4 (tot. 3)

#4 @ 1’-0"

2 - #4’s x 2’-2" LG.

1’-8"

2’-2"

Approach slab

Sleeper slab

Bridge curb

Approach Slab

DETAIL "B"

#4 @ 1’-6"

1’-0"

7"

2" deep poured joint filler.

SLEEPER SECTION

Taken normal to expansion device

#5 tot. 10

Expansion device

#5 tot. 2

8"

2’-2"

2’-8"

7"

1’-

9"#5 @ 1’=0"

(2 ea. place)

Hot Bituminous

Pavement over

Waterproofing

Membrane.

B-601-1EA

NOTES:

ISOMETRIC VIEW TYPE 7 RAIL

ISOMETRIC VIEW TYPE 3 OR 10 RAILS

Concrete Class D (Bridge) shall be used for

approach slabs.

1/2 " expansion joint material shall meet AASHTO

Spec. M213.

For expansion device details see Dwg. No. B___.

For curb and rail details see Dwg. No. B___.

Approach slab concrete shall be cured in accorcance

with the Specifications for Bridge Deck Concrete in

Subsection 601.

The top surface of the post-tensioning block, if any,

shall be covered with 1" of low density polystyrene

foam. See Dwg. No. B___.

#5 @ 1’-0"

Bott. of slab

#

6 @

6"

Bo

tt.

of s

lab

Sleeper

Slab

Designer: Use #9 for approach

slabs greater than 20’ and less

than 31’ long.

INIT

IAL

Desi

gn

Desi

gn

ed

By

Checked B

y

DA

TE

DA

TE

DA

TE

INIT

IAL

INIT

IAL

Deta

ilQ

uan

titi

es

Deta

iled

By

Checked B

yC

hecked B

y

Qu

an

titi

es

By

MM

/YY

MM

/YY

MM

/YY

MM

/YY

MM

/YY

MM

/YY

XX

X

XX

X

XX

X

XX

X

XX

X

XX

X

Detail "B"

Contractor may use .

#5 @ 1’-0"

(Proj. 1’-6"

into appr. slab)

1/2 " Expansion

Joint Mat’l.

Slope for drainage

0.02 ft/ft min.

1/2 " Exp’n. Joint Mat’l.

For transition see

M-606-13 sheet 2,

or M-606-1 sheet 10.

(Use with appropriate

exp’n device sheets)

Slope for drainage

0.02 ft/ft min.

1/2 " Exp’n.

Joint Mat’l

20 gage galvanized

sheet metal (to be

included in the work)

X-XX-XX

X-XX-XX

Numbers

Structure

No Revisions:

Revised:

Void: Sheet Subset:

Detailer:

Designer:

Bridge

XXXXXXXX

XXXXXXXX

Sheet NumberSubset Sheets: B00 of

Init.CommentsDate:

Sheet Revisions As Constructed Project No./Code

APPROACH SLAB DETAILSDrawing File Name:

10/29/2007Print Date:

Horiz. Scale: 1:1

Unit Information Unit Leader Initials

Vert. Scale: As Noted

Sheet_B-601-1EA.dgn

Room 107

Phone:

Denver, CO 80222-3406

4201 East Arkansas Avenue

303-757-9352 FAX: 303-757-9197

Colorado Department of Transportation

Staff Bridge Branch Initials

3/07

6/04

9/0

24/02

5/00

11/9

93

/99

1/9

7

Rev

isio

n D

ate

s(P

reli

min

ary

Sta

ge O

nly

)

3"

"W"

EXPANSION JOINT

6"

1’-

0"

Expansion Joint

6" 20’-0" Sin

3" c

l.

2’-0"

1’-

0"

1’-6"1’-0"1’-6"

4’-0"

1’-

0"

3" c

lr.

1’-

0"

3" c

l.

Centerline of Roadway

#

4 @

1’-6"

Top o

f s

lab

1’-

0"

2’-4

"

#5 @ 1’-0"

Top of slab

PLAN

A

B

A

B

Ro

ad

way

#5 @

1’-0"

B

B

C

B

6"

Ò Brg. Abut.

B

BSECTION

Approach slab

Bridge rail

Sleeper slab

VIEW TYPE 7 RAIL

SECTIONB

A

#4 @ 1’-6"

#6 @ 6"

With concrete roadway slab

Contractor may use

1’-0"

6"

#5 @ 1’-0"

#5 @ 1’-0"

SECTIONB

C

#5

2’-9

"1’-

0"

1’-

0"

#4 (tot .3)

#4 @ 1’-0"

2 - #4’s x 2’-2" lg.

1’-8"

2’-2"

VIEW TYPE 3 OR 10 RAILS

Approach Slab

DETAIL "B"

#4 @ 1’-6"SLEEPER SECTION

Taken normal to expansion device

#5 tot. 6

Expansion device

#5 tot. 2

8"

2’-2"

2’-8"

7"

1’-

9"#5 @ 1’=0"

(2 ea. place)

B-601-1EC

NOTES:

Room 107

Phone:

Denver, CO 80222-3406

4201 East Arkansas Avenue

303-757-9352 FAX: 303-757-9197

Colorado Department of Transportation

Staff Bridge Branch Initials

INIT

IAL

Desi

gn

Desi

gn

ed

By

Checked B

y

DA

TE

DA

TE

DA

TE

INIT

IAL

INIT

IAL

Deta

ilQ

uan

titi

es

Deta

iled

By

Checked B

yC

hecked B

y

Qu

an

titi

es

By

MM

/YY

MM

/YY

MM

/YY

MM

/YY

MM

/YY

MM

/YY

XX

X

XX

X

XX

X

XX

X

XX

X

XX

X

#5 @ 1’-0"

Bottom of slab

#

6 @

6"

Bo

tto

m o

f s

lab

Sleeper

Slab

Detail "B"

Polysulfide or silicone

sealant. Extend 6" up face

of curb or bridge rail.

#5 @ 1’-0"

(Proj. 1’-6"

into appr. slab)

1/2 " Expansion

Joint Mat’l.

Slope for drainage

0.02 ft/ft min.

1/2 " Exp’n. Joint Mat’l.

For transition see

M-606-13 sheet 2,

or M-606-1 sheet 10.

(Use with appropriate

exp’n device sheets)

Slope for drainage

0.02 ft/ft min.

1/2 " Exp’n.

Joint Mat’l

Sleeper slab

Bridge rail

Approach slab

20 gage galvanized

sheet metal (to be

included in the work)

Concrete Class D (Bridge) shall be used for

approach slabs.

1/2 " expansion joint material shall meet AASHTO

Spec. M213.

For expansion device details see Dwg. No. B___.

For curb and rail details see Dwg. No. B___.

Approach slab concrete shall be cured in

accordance with the Specifications for Bridge

Deck Concrete in Subsection 601.

The top surface of the post-tensioning block,

if any, shall be covered with 1" of low density

polystyrene foam. See Dwg. No. B___.

Designer: Use #9 for approach

slabs greater than 20’and less

than 31’ long.

X-XX-XX

X-XX-XX

Numbers

Structure

No Revisions:

Revised:

Void: Sheet Subset:

Detailer:

Designer:

Bridge

XXXXXXXX

XXXXXXXX

Sheet NumberSubset Sheets: B00 of

Init.CommentsDate:

Sheet Revisions As Constructed Project No./Code

APPROACH SLAB DETAILSDrawing File Name:

10/29/2007Print Date:

Horiz. Scale: 1:1

Unit Information Unit Leader Initials

Vert. Scale: As Noted

Sheet_B-601-1EC.dgn

20’-0" (minimum length)3/07

6/04

9/0

24/02

5/00

11/9

93

/99

1/9

7

Rev

isio

n D

ate

s(P

reli

min

ary

Sta

ge O

nly

)

Sheet No.

Index No.

2010 FDOT Design StandardsRevision

20900

07/01/07��� 1 of 2

Last

Sheet No.

Index No.

2010 FDOT Design StandardsRevision

20900

01/01/08��� 2 of 2

Last

Sheet No.

Index No.

2010 FDOT Design StandardsRevision

20910

07/01/07��� 1 of 2

Last

Sheet No.

Index No.

2010 FDOT Design StandardsRevision

20910

01/01/08��� 2 of 2

Last

BRIDGE

< ROADWAY

BRIDGE

1:6

APPROACH PANEL APPROACH PANEL

1:6

SHOULDER

SHOULDER SHOULDER

SHOULDER

20’-0" 20’-0"

STANDARD SHEET NO.

STANDARD APPROVED:

TITLE:

__

__

__

__

APPROACH PANEL PLAN

APPROACH PANEL PLAN

A

B

B

A

A A

A A

B

B

A A

(CONCRETE BARRIER ON WINGWALL)

B

B

BRIDGE NO. _____

STA. ________

EL. ______STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______ STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______

________

BRIDGE

1:6

< ROADWAY

1:6

BRIDGE

STA. ________

EL. ______

APPROACH PANEL

SHOULDER

SHOULDER

SHOULDER

APPROACH PANEL

STA. ________

EL. ______STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______STA. ________

EL. ______

STA. ________

EL. ______

________

10’-0"

SHOULDER

GUTTER LINE

GUTTER LINE

GUTTER LINE

______

______

GUTTER LINE

SQUARE TO 10^ SKEW, BARRIER ON WINGWALL

OVER 10^ SKEW, BARRIER ON WINGWALL

SHEET NO. OF SHEETS(TH )STATE PROJ. NO.

1

2

3

4

NOTES:

E8H

NONE

STRIP SEAL

3

4

GENERAL NOTES:

BRIDGE APPROACH PANELLAYOUT

5-297.222

CORNER DETAIL "D"

GUTTER LINE

_____

1’

1"

5’ 0" 2’ 0"

7’ 0"

CURB TRANSITION

4" CURB

END OF BRIDGE CONCRETE BARRIER

5-5/8

"

7-3/8

"

CONCRETE BARRIER

(PLAN VIEW)

SEE CORNER DETAIL "D"

AT RIGHT (TYP.)

C

C

E8H

NONE

STRIP SEAL

3

4EXPANSION JOINT TYPE -

(TYPICAL)

EXPANSION JOINT TYPE -

(TYPICAL)

C

C

______

(TYP.)

10’ 0" MIN.

(TYP.)

10’ 0" MIN.

BB

CERTIFIED BY

LIC. NO.

DATELICENSED PROFESSIONAL ENGINEER

EDGE OF WINGWALL

2

GU

TT

ER

LIN

E T

O G

UT

TE

RL

INE

GU

TT

ER

LIN

E T

O G

UT

TE

RL

INE

TYPICAL1

TYPICAL1

5’-0"

MIN.

(TYP.)3’-0" MIN.

(TYP.)

3’-0" MIN.

(TYP.)5’-0"

MIN.

(TYP.)

REFERENCE DATE

11-09-09

5

1’

0"

5

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

SEE CORNER DETAIL "D"

AT RIGHT (TYP.)

PRINTED NAME:

EDGE OF PANEL PERPENDICULAR TO GUTTER FOR SKEWS OVER 45^ (TYP).

MIN. (TYP.)

1

10’ 0" MIN.

(TYP.)

1

(TYP.) 1

SEE BRIDGE PLAN FOR PAY ITEM AND DETAILS.

SECTION A-A IS SHOWN ON STANDARD PLAN 5-297.227. SECTIONS B-B AND C-C

ARE SHOWN ON STANDARD 5-297.223 AND SHOW THE STATION AND ELEVATION

AT END LOCATIONS ON THE APPROACH PANEL.

A CONCRETE SILL IS REQUIRED BENEATH EXPANSION JOINT TYPES E8H AND STRIP

SEALS. EXTEND THE EXPANSION JOINT AND THE SILL ALONG THE FULL WIDTH OF

THE TRAFFIC LANES, SHOULDERS AND CURB. CONCRETE SILL AND CURBING, IF

REQUIRED, ARE INCLUDED IN THE APPROACH PANEL PAY ITEM.

SEE THE SPECIAL PROVISIONS FOR APPROACH PANEL PAYMENT INFORMATION.

AT THE END OF THE CONCRETE BARRIER, TRANSITION FACE OF 4 INCH CURB INTO

PROFILE OF CONCRETE BARRIER. SEE CURB TRANSITION DETAILS ON STANDARD

PLAN 5-297.227. IF THERE IS NO ROADWAY CURB AT THE END OF THE APPROACH

PANEL, TRANSITION THE APPROACH PANEL CURB HEIGHT FROM 4 INCH TO 0 INCH

IN THE LAST 3’-4" SECTION (1:10 OR FLATTER SLOPE).

PANEL SIZE AND REQUIREMENTS FOR TRANSVERSE AND LONGITUDINAL

JOINTS ARE SHOWN ON STANDARD PLANS 5-297.228 AND 5-297.229.

GENERAL DRAINAGE DETAILS ARE SHOWN ON BRIDGE APPROACH PANEL

DRAINAGE DETAILS, STANDARD PLAN 5-297.231. ADDITIONAL CATCH BASIN

DETAILS ARE SHOWN ON DRAINAGE PLAN SHEETS.

CONCRETE MIX SHALL BE 3A42 FOR APPROACH PANEL AND SILL.

E8H QUANTITY SHALL BE PAID FOR SEPARATELY, MEASURED FROM BACK OF

CURB TO BACK OF CURB.

4 INCH CURB DESIGN IS USED FOR ANY CURB OFF THE APPROACH PANELS.

SEE STANDARD PLATES FOR B4 CURB

SEE STANDARD PLAN 5-297.231 FOR DRAINAGE DETAILS AND ADDITIONAL

REQUIREMENTS.

STANDARD SHEET NO.

STANDARD APPROVED:

TITLE:

ROADWAY <

GUTTERLINE

4’’

GUTTERLINE

WINGWALL SEE

BRIDGE PLAN

BARRIER SEE

BRIDGE PLAN

12’’

APPROACH

PANEL 1

BAR LENGTH SHAPE LOCATIONNO.

’- BOTTOM LONGITUDINAL AP1901E

AP1302E ’-

BOTTOM TRANSVERSE AP1603E ’-

TOP LONGITUDINAL

AP1304E ’- TOP TRANSVERSE

’-

AP1605E

AP1306E

AP1307E

AP1608E

AP1609E ’-

TOP TRANSVERSE

BOTTOM TRANSVERSE

APPROACH PANEL

TRANSVERSE SECTION B-B

SEGM

ENT I

AP1312E

AP1611E

AP1310E

’- TOP TRANSVERSE

BOTTOM TRANSVERSE

BOTTOM TRANSVERSE

TOP TRANSVERSE

APPROACH PANEL

’-

’-

’-

’-

’- TO

’- TO

’- TO

’- TO

AP

PR

OA

CH

PA

NE

L W

IDT

H

AP

PR

OA

CH

PA

NE

L W

IDT

H

AP1314E

AP1913E

’-

’-

’- TO

’- TOTOP LONGITUDINAL

BOTTOM LONGITUDINAL

GENERAL NOTES:

2

1

CURB

SILL

7.0 FT. CURB TRANSITION

SILL (IF REQUIRED)

BRIDGE TO CONTRACTION JOINT

PANEL

(SQ. TO 10^)

BRIDGE TO END OF

APPROACH PANEL

CONTRACTION JOINT TO END

OF APPROACH PANEL

48.5 LB./SQ. YD.

PANEL SEGMENT I

(OVER 10^)

PANEL SEGMENT II

(OVER 10^)

48.5 LB./SQ. YD.

12’’

3’’

CL

R.

3’’

PERMISSIBLE LONGITUDINAL JOINT

1

3" CLR.

3 1/2 " CLEAR COVER

SEE PLAN VIEW FOR

BAR SIZE & SPACING

3"3"

12" MAX. SPACING4 3/8 "

6" MAX. SPACING4 SPS. @ 6" = 2’-0"

CURB DETAIL

(CONCRETE BARRIER ON WINGWALL)

ESTIMATED REINFORCEMENT QUANTITY FOR BRIDGE APPROACH PANELS

2’-7 3/8 "

B424 STANDARD

PLATE 7100H

SEE JOINT DETAIL ON

STANDARD 5-297.229

SPACING ONLY FOR B4 INTEGRANT CURB. SEE CURB DETAIL

FOR SPACING FOR USING B424 CURB AND GUTTER.

CURB DESIGN

B4 INTEGRAL

APPROACH PANEL REINFORCEMENT

APPROACH PANEL REINFORCEMENT

3’’ CLEAR COVER

6" 6"

4"

4"

4"

4"

AP

1901E

BO

TT

OM

AP

13

02

E T

OP

12" MAX. SPG.

AP1603E BOTTOM &

AP1304E TOP

POINT OF

STATION &

ELEVATION

POINT OF

STATION &

ELEVATION

4"

4"

4"

4"

AP

1901E

BO

TT

OM

AP

13

02

E T

OP

6"

SQUARE TO 10^ SKEWS

POINT OF

STATION &

ELEVATION

OVER 10^ SKEWS

SEGMENT II

12

" M

AX

. S

PG

. P

AR

AL

LE

L T

O R

OA

DW

AY

2

6"

2’-0" 12" MAX. SPG.

AP1611E (B)

AP1312E (T)AP1306E (T)

AP1605E (B)

2’-0"

12"

6"12"

6"

OF

SER.

OF

SER.

OF

SER.

OF

SER.

12" MAX. SPG.

12" MAX. SPG. 2’-0"

OF

SER.

OF

SER.

4"

4"

14.0 LBS/LIN FT.

19.0 LBS/EACH

TYPE LOCATION ESTIMATIED WEIGHT

3 1/2 " CLEAR COVER

12

" M

AX

. S

PG

. P

AR

AL

LE

L T

O R

OA

DW

AY

2

6" M

AX

. S

PG

. P

AR

AL

LE

L T

O R

OA

DW

AY

2

12

" M

AX

. S

PG

. P

AR

AL

LE

L T

O R

OA

DW

AY

2

6" M

AX

. S

PG

. P

AR

AL

LE

L T

O R

OA

DW

AY

2

(B424 MODIFIED CURB AND GUTTER)

4 3/8 "

CONTRACTION JOINT SEE

SHEET 5-297.229 FOR DETAILS

AND DOWEL BAR PLACEMENT

SHEET NO. OF SHEETS(TH )STATE PROJ. NO.

REINFORCEMENT DETAILS

BRIDGE APPROACH PANEL5-297.223

AP1302E BARS @ 12" MAX. O.C. PARALLEL TO ROADWAY (TOP) 2

AP1901E BARS @ 6" MAX. O.C. PARALLEL TO ROADWAY (BOTTOM) 2

AP1315E ’-

12"

6"

NOTES:

II

I

ROADWAY < GUTTERLINE

GUTTERLINE

TRANSVERSE SECTION C-C

CURB DESIGN

B4 INTEGRALCURB TRANSITION

SEE 5-297.227 FOR BAR

SPACING AND SIZE

AP1310E BARS @ 12’’ O.C.

AP1609E BARS @ 12’’ O.C.

3’’ CLEAR COVER

POINT OF

STATION &

ELEVATION

POINT OF

STATION &

ELEVATION

POINT OF

STATION &

ELEVATION

VAR.

3-1/2" CLEAR COVER

12’’

APPROACH

PANEL 1

FROM STANDARD PLAN 5-297.222

AP1314E BARS @ 12" MAX. O.C. PARALLEL TO ROADWAY (TOP)

AP1913E BARS @ 12" MAX. O.C. PARALLEL TO ROADWAY (BOTTOM)

AP1603E (BOT.)

AP1304E (TOP)

AP1605E (BOT.)

AP1306E (TOP)

AP1609E (BOT.)

AP1310E (TOP)

FOR AP1302E (TOP),

AP1314E (TOP),

AP1913E (BOTTOM)

FOR AP1302E (TOP),

AP1314E (TOP),

AP1913E (BOTTOM)

FOR AP1901E (BOTTOM) FOR AP1901E (BOTTOM)

2 SPS. @

1’0" = 2’0"

AP

19

13

E B

OT

TO

M &

AP

13

14

E T

OP

4 3/8 "

(4 3/8 " MIN. 10" MAX.)

3 EXTEND REINFORCEMENT INTO CURB AS SHOWN IN TRANSVERSE

SECTION B-B AND C-C.

TOP & BOTTOM EDGE

8’-0

TOP & BOTTOM EDGE

AP1608E

DETAIL "E"

AP1315E

(TOP & BOT.)

AP1307E

(TOP & BOT.)

3

SEE

DETAIL "E"

SEE

DETAIL "E"TYP.

3 TYP.

AP1304E BARS @ 12’’ MAX. O.C.

PARALLEL TO SKEW

AP1603E BARS @ 12’’ MAX. O.C.

PARALLEL TO SKEW

FROM STANDARD PLAN 5-297.222

REFERENCE DATE

11-09-09

FAN 4-AP1608E BARS AS SHOWN

IN ACUTE CORNERS FOR SKEWS OVER 30^.

TOP CORNER - FAN

BACKFILL TO THE

TOP OF CURB

(INCIDENTAL) (TYPICAL).

DOWEL BAR

SEE BRIDGE PLAN

APPROACH SLAB THICKNESS SHOWN INCLUDES 2 INCH CONCRETE WEARING

COURSE THAT MAY BE REQUIRED. CHECK BRIDGE PLANS FOR CONCRETE

WEARING COURSE. CONCRETE WEARING COURSE IS BE INCLUDED IN

BRIDGE PLAN QUANTITIES.

AS PER MNDOT SPEC. 3301, USE EPOXY COATED GRADE 60 REINFORCEMENT BARS

IN APPROACH PANEL, CONCRETE SILL AND CURB TRANSITION.

THE FIRST TWO DIGITS OF EACH BAR MARK INDICATE THE BAR NUMBER WHICH

APPROXIMATES THE NOMINAL DIAMETER OF THE BAR IN MILLIMETERS (mm).

BARS MARKED WITH THE SUFFIX "E" SHALL BE EPOXY COATED IN ACCORDANCE

WITH Mn/DOT SPEC. 3301.

FOR VARIABLE ROADWAY WIDTHS, VARY THE LAP LENGTH OF THE

REINFORCEMENT.

MINIMUM REINFORCEMENT LAP LENGTHS ARE AS FOLLOWS; NO. 13 BAR = 1’-8",

NO. 16 BAR = 2’-1", NO. 19 BAR = 2’-6".

BILL OF REINFORCEMENT FOR

BRIDGE APPROACH PANELS

CONTRACTOR IS REQUIRED TO COMPLETE THE BILL OF

REINFORCEMENT TABLE AND PREPARE SHOP DRAWINGS

AND SUBMIT THEM TO THE PROJECT ENGINEER AT

LEAST 3 WEEKS BEFORE REBAR FABRICATION.

35.0 LBS/SQ. YD.

CLR. (TYP.)

3" CLR. (TYP.)3" CLR. (TYP.)

4

3" CLR. (TYP.) 3" CLR. (TYP.)

4

4

TRANSVERSE BARS IN BOTH PANEL SEGMENTS

ARE PERPENDICULAR TO ROADWAY CENTERLINE

EXCEPT AP1307E ARE PARALLEL TO SKEW IN

SEGMENT AND AP1315E ARE PARRALLEL TO

SKEW IN SEGMENT .

LONGITUDINAL BARS IN BOTH PANEL SEGMENTS

ARE PARALLEL TO ROADWAY CENTERLINE.

AP1916E 5’-0 C2H-D JOINT

IF THE APPROACH PANEL IS TIED TO THE BRIDGE ABUTMENT WITH REINFORCEMENT

BARS, PLACE 12 MIL POLYETHYLENE SHEETING (OR 2 LAYERS OF 6 MIL) UNDER THE

LIMITS OF THE APPROACH PANEL TO ALLOW THE PANEL TO MOVE LONGITUDINALLY

ON THE GRADE. SHEETING IS INCLUDED IN THE APPROACH PANEL PAY ITEM.

BRIDGEBRIDGE

1:6

APPROACH PANEL APPROACH PANEL

1:6

SHOULDER

SHOULDER SHOULDER

SHOULDER

20’-0" 20’-0"

STANDARD SHEET NO.

STANDARD APPROVED:

TITLE:

GENERAL NOTES:

__

__

__

__

CORNER DETAIL "D"

APPROACH PANEL PLAN

APPROACH PANEL PLAN

C

C

B

A

C C

A A

B

C

B

B

C

C

AA

AA

A

2

1

1

3

< ROADWAY ___

_______________

STA. ________

EL. ______STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______ STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______

________

BRIDGE

1:61:6

BRIDGE

STA. ________

EL. ______

APPROACH PANEL

SHOULDER

SHOULDER

SHOULDER

APPROACH PANEL

STA. ________

EL. ______

STA. ________

EL. ______STA. ________

EL. ______

STA. ________

EL. ______STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______

STA. ________

EL. ______STA. ________

EL. ______

STA. ________

EL. ______

________

10’ 0"

SHOULDER

GUTTER LINE

GUTTER LINE

GUTTER LINE

GUTTER LINE

GUTTER LINE

_____

1’

1"

SEE CORNER DETAIL "D"

AT RIGHT (TYP.)

AP

PR

OA

CH

PA

NE

L W

IDT

H

AP

PR

OA

CH

PA

NE

L W

IDT

H

____________

5’ 0" 2’ 0"

7’ 0"

CURB TRANSITION

4" CURB

SQUARE TO 10^ SKEW, BARRIER ON APPROACH PANEL

OVER 10^ SKEW, BARRIER ON APPROACH PANEL

(TYP.)

1

2

3

4 SEE BRIDGE PLAN FOR PAY ITEM AND DETAILS.

(TYP.)

BRIDGE NO. _____

STA. ________

EL. ______

5-5/8

"

7-3/8

"

SHEET NO. OF SHEETS(TH )STATE PROJ. NO.

NOTES:

3 (TYP.)

2(TYP.)

5-297.224

CONCRETE BARRIER

(PLAN VIEW)

EXPANSION JOINT TYPE -

(TYPICAL)

E8H

NONE

STRIP SEAL

3

4EXPANSION JOINT TYPE -

(TYPICAL)

E8H

NONE

STRIP SEAL

3

4

APPROACH PANELAPPROACH PANELAPPROACH PANEL

______

(TYP.)

< ROADWAY ___

_______________

10’ 0" MIN.

(TYP.)

10’ 0" MIN.

(TYP.)

5’-0"

MIN.

(TYP.)3’-0" MIN.

(TYP.)

3’-0" MIN.

(TYP.)5’-0"

MIN.

(TYP.)

BRIDGE APPROACH PANELLAYOUT

(CONCRETE BARRIER ON APPROACH PANEL)

2

4 INCH CURB DESIGN IS USED FOR ANY CURB OFF THE APPROACH PANELS.

SEE STANDARD PLATES FOR B4 CURB.

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

C

END OF BRIDGE CONCRETE BARRIERSEE BRIDGE PLAN.

5

5 (TYP.)

(TYP.)5

CERTIFIED BY

LIC. NO.

DATELICENSED PROFESSIONAL ENGINEER

REFERENCE DATE

11-09-09

PRINTED NAME:

SEE STANDARD PLAN 5-297.231 FOR DRAINAGE DETAILS AND ADDITIONAL

REQUIREMENTS.

FOR PARALLEL WINGWALLS THE BARRIER MUST EXTEND OUT TO AT LEAST

THE END OF THE WINGWALL. REFER TO BRIDGE PLAN FOR BARRIER

REINFORCEMENT AND PAYMENT.

MIN. (TYP.)

1

1

10’ 0" MIN.

(TYP.)

1

1

SECTION A-A IS SHOWN ON STANDARD PLAN 5-297.227.

SECTIONS B-B AND C-C ARE SHOWN ON STANDARD PLAN 5-297.225

AND SHOW THE STATION AND ELEVATION AT END LOCATIONS ON THE

APPROACH PANEL.

A CONCRETE SILL IS REQUIRED BENEATH EXPANSION JOINT TYPES E8H AND

STRIP SEALS. EXTEND THE EXPANSION JOINT AND THE SILL ALONG THE FULL

WIDTH OF THE TRAFFIC LANES, SHOULDERS AND CURB. CONCRETE SILL

AND CURBING, IF REQUIRED, ARE INCLUDED IN THE APPROACH

PANEL PAY ITEM.

SEE THE SPECIAL PROVISIONS FOR APPROACH PANEL PAYMENT INFORMATION.

AT THE END OF THE CONCRETE BARRIER, TRANSITION FACE OF 4 INCH CURB

INTO PROFILE OF CONCRETE BARRIER. SEE CURB TRANSITION DETAILS ON

STANDARD PLAN 5-297.227 IF THERE IS NO ROADWAY CURB AT THE END OF

THE APPROACH PANEL, APPROACH PANEL CURB HEIGHT FROM 4 INCH TO 0 INCH

IN THE LAST 3’-4" SECTION (1:10 OR FLATTER SLOPE).

PANEL SIZE AND REQUIREMENTS FOR TRANSVERSE AND LONGITUDINAL

JOINTS ARE SHOWN ON STANDARD PLANS 5-297.228 AND 5-297.229.

GENERAL DRAINAGE DETAILS ARE SHOWN ON BRIDGE APPROACH PANEL

DRAINAGE DETAILS, STANDARD PLAN 5-297.231. ADDITIONAL CATCH BASIN

DETAILS ARE SHOWN ON DRAINAGE PLAN SHEETS.

CONCRETE MIX SHALL BE 3A42 FOR APPROACH PANEL AND SILL.

E8H QUANTITY SHALL BE PAID FOR SEPARATELY, MEASURED FROM BACK OF

CURB TO BACK OF CURB.

EDGE OF DECK OR APPROACH PANEL

STANDARD SHEET NO.

STANDARD APPROVED:

TITLE:

ROADWAY < GUTTERLINE

4’’ 4’’

GUTTERLINE

WINGWALL SEE

BRIDGE PLAN

BARRIER SEE

BRIDGE PLAN

BARRIER SEE

BRIDGE PLAN

12’’

APPROACH

PANEL 1

GENERAL NOTES:

BAR LENGTH SHAPE LOCATIONNO.

’- BOTTOM LONGITUDINAL AP1901E

AP1302E ’-

BOTTOM TRANSVERSE AP1603E ’-

TOP LONGITUDINAL

AP1304E ’- TOP TRANSVERSE

’-

BILL OF REINFORCEMENT FOR

BRIDGE APPROACH PANELS

AP1605E

AP1306E

AP1307E

AP1608E

AP1609E ’-

TOP TRANSVERSE

BOTTOM TRANSVERSE

APPROACH PANEL

TRANSVERSE SECTION B-B

CURB

SILL

7.0 FT. CURB TRANSITION

SILL (IF REQUIRED)

BRIDGE TO CONTRACTION JOINT

SEGM

ENT I

PANEL

(SQ. TO 10^)

BRIDGE TO END OF

APPROACH PANEL

CONTRACTION JOINT TO END

OF APPROACH PANEL

48.5 LB./SQ. YD.

PANEL SEGMENT I

(OVER 10^)

PANEL SEGMENT II

(OVER 10^)

1

AP1312E

AP1611E

AP1310E

’- TOP TRANSVERSE

BOTTOM TRANSVERSE

BOTTOM TRANSVERSE

TOP TRANSVERSE

APPROACH PANEL

’-

’-

’-

’-

’- TO

’- TO

’- TO

’- TO

AP

PR

OA

CH

PA

NE

L W

IDT

H

AP

PR

OA

CH

PA

NE

L W

IDT

H

AP1314E

AP1913E

’-

’-

’- TO

’- TOTOP LONGITUDINAL

BOTTOM LONGITUDINAL

48.5 LB./SQ. YD.

ROADWAY < GUTTERLINE

GUTTERLINE

TRANSVERSE SECTION C-C (CONCRETE BARRIER ON APPROACH PANEL)

ESTIMATED REINFORCEMENT QUANTITY FOR BRIDGE APPROACH PANELS

APPROACH PANEL REINFORCEMENT

APPROACH PANEL REINFORCEMENT

CURB DESIGN

B4 INTEGRALCURB TRANSITION

SEE 5-297.227 FOR BAR

SPACING AND SIZE

CONTRACTOR IS REQUIRED TO COMPLETE THE BILL OF

REINFORCEMENT TABLE AND PREPARE SHOP DRAWINGS

AND SUBMIT THEM TO THE PROJECT ENGINEER AT

LEAST 3 WEEKS BEFORE REBAR FABRICATION.

3’’ CLEAR COVER

6" 6"

4"

4"

4"

4"

6" M

AX

. S

PG

. P

AR

AL

LE

L T

O R

OA

DW

AY

12

" M

AX

. S

PG

. P

AR

AL

LE

L T

O R

OA

DW

AY

AP

19

01

E B

OT

TO

M

AP

13

02

E T

OP

12" MAX. SPG.

AP1603E BOTTOM &

AP1304E TOP

POINT OF

STATION &

ELEVATION

POINT OF

STATION &

ELEVATION

4"

6" M

AX

. S

PG

. P

AR

AL

LE

L T

O R

OA

DW

AY

4"

4"

4"

12

" M

AX

. S

PG

. P

AR

AL

LE

L T

O R

OA

DW

AY

AP

19

01

E B

OT

TO

M

AP

13

02

E T

OP

6"

AP

19

13

E B

OT

RT

OM

& A

P1

31

4E

TO

P

SQUARE TO 10^ SKEWS

14.0 LBS/LIN FT.

19.0 LBS/EACH

POINT OF

STATION &

ELEVATION

1’

5"

1’-

5"

OVER 10^ SKEWS

SEGMENT II

TYPE LOCATION ESTIMATIED WEIGHT

6"

2’-0" 12" MAX. SPG.

AP1611E (B)

AP1312E (T)AP1306E (T)

AP1605E (B)

2’-0"

12"

6"

12"

6"

OF

SER.

OF

SER.

OF

SER.

OF

SER.

12" MAX. SPG.

12" MAX. SPG. 2’ 0"

OF

SER.

OF

SER.

APPROACH PANEL WIDTH

12

" M

AX

. S

PG

. P

AR

AL

LE

L T

O R

OA

DW

AY

3’’ CLEAR COVER

POINT OF

STATION &

ELEVATION

POINT OF

STATION &

ELEVATION

POINT OF

STATION &

ELEVATION

APPROACH PANEL WIDTH

VAR.

CONTRACTION JOINT SEE

SHEET 5-297.229 FOR DETAILS

AND DOWEL BAR PLACEMENT

35.0 LBS/SQ. YD

3-1/2 " CLEAR COVER

3-1/2" CLEAR COVER

SHEET NO. OF SHEETS(TH )STATE PROJ. NO.

BRIDGE APPROACH PANELREINFORCEMENT DETAILS

5-297.225

12’’

APPROACH

PANEL 1

2

2

FROM STANDARD PLAN 5-297.224

AP1314E BARS @ 12" MAX. O.C. PARALLEL TO ROADWAY (TOP)

AP1913E BARS @ 12" MAX. O.C. PARALLEL TO ROADWAY (BOTTOM)

AP1302E BARS @ 12" MAX. O.C. PARALLEL TO ROADWAY (TOP)

AP1901E BARS @ 6" MAX. O.C. PARALLEL TO ROADWAY (BOTTOM)

FROM STANDARD PLAN 5-297.224

2 2

2 2

12"

6"

12’’

3’’

CL

R.

3’’

PERMISSIBLE LONGITUDINAL JOINT

1

3" CLR.

3 1/2 " CLEAR COVER

SEE PLAN VIEW FOR

BAR SIZE & SPACING

3"3"

12" MAX. SPACING4 3/8 "

2 SPS. @

1’-0" = 2’-0"

6" MAX. SPACING4 SPS. @ 6" = 2’-0"

CURB DETAIL

2’-7 3/8 "

B424 STANDARD

PLATE 7100H

(B424 MODIFIED CURB AND GUTTER)

AP1315E ’- TOP & BOTTOM EDGE

2

AP1603E (BOT.)

AP1304E (TOP)

AP1605E (BOT.)

AP1306E (TOP)

AP1609E (BOT.)

AP1310E (TOP)

FOR AP1302E (TOP),

AP1314E (TOP),

AP1913E (BOTTOM)

FOR AP1302E (TOP),

AP1314E (TOP),

AP1913E (BOTTOM)

4 3/8 "

(4 3/8 " MIN. 10" MAX.)

FOR AP1901E (BOTTOM) FOR AP1901E (BOTTOM)

SEE

DETAIL "E"SEE

DETAIL "E"

AP1307E

(TOP & BOT.)

AP1315E

(TOP & BOT.)

3TYP.

8’-0

TOP & BOTTOM EDGE

3 EXTEND REINFORCEMENT INTO CURB AS SHOWN IN TRANSVERSE

SECTION B-B AND C-C.

AP1608E

DETAIL "E"

FAN 4-AP1608E BARS AS SHOWN

IN ACUTE CORNERS FOR SKEWS OVER 30^.

AP1609E BARS @ 12’’ MAX. O.C.

AP1310E BARS @ 12’’ MAX. O.C.

MATCH PROJECTION ON BRIDGE

REFERENCE DATE

11-09-09

AP1304E BARS @ 12’’ MAX. O.C.

AP1603E BARS @ 12’’ MAX. O.C.

TOP CORNER - FAN

DOWEL BAR

SEE BRIDGE PLAN

BACKFILL TO THE

TOP OF CURB

(INCIDENTAL) (TYPICAL).

DOWEL BAR

SEE BRIDGE PLAN

APPROACH SLAB THICKNESS SHOWN INCLUDES 2 INCH CONCRETE WEARING

COURSE THAT MAY BE REQUIRED. CHECK BRIDGE PLANS FOR CONCRETE

WEARING COURSE. CONCRETE WEARING COURSE IS INCLUDED IN

BRIDGE PLAN QUANTITIES.

THE FIRST TWO DIGITS OF EACH BAR MARK INDICATE THE BAR NUMBER WHICH

APPROXIMATES THE NOMINAL DIAMETER OF THE BAR IN MILLIMETERS (mm).

BARS MARKED WITH THE SUFFIX "E" SHALL BE EPOXY COATED IN ACCORDANCE

WITH Mn/DOT SPEC. 3301.

4

AS PER MNDOT SPEC. 3301, USE EPOXY COATED GRADE 60 REINFORCEMENT

BARS IN APPROACH PANEL, CONCRETE SILL AND CURB TRANSITION.

FOR VARIABLE ROADWAY WIDTHS, VARY THE LAP LENGTH OF THE REINFORCEMENT.

MINIMUM REINFORCEMENT LAP LENGTHS ARE AS FOLLOWS; NO. 13 BAR = 1’-8",

NO. 16 BAR = 2’-1", NO. 19 BAR = 2’-6".

SPACING ONLY FOR B4 INTEGRANT CURB. SEE CURB DETAIL FOR SPACING

FOR USING B424 CURB AND GUTTER.

CLR. (TYP.)

3" CLR. (TYP.) 3" CLR. (TYP.)

3" CLR. (TYP.) 3" CLR. (TYP.)

4

4

NOTES:

II

I

TRANSVERSE BARS IN BOTH PANEL SEGMENTS

ARE PERPENDICULAR TO ROADWAY CENTERLINE

EXCEPT AP1307E ARE PARALLEL TO SKEW IN

SEGMENT AND AP1315E ARE PARRALLEL TO

SKEW IN SEGMENT .

LONGITUDINAL BARS IN BOTH PANEL SEGMENTS

ARE PARALLEL TO ROADWAY CENTERLINE.

AP1916E 5’-0 C2H-D JOINT

IF THE APPROACH PANEL IS TIED TO THE BRIDGE ABUTMENT WITH REINFORCEMENT

BARS, PLACE 12 MIL POLYETHYLENE SHEETING (OR 2 LAYERS OF 6 MIL) UNDER THE

LIMITS OF THE APPROACH PANEL TO ALLOW THE PANEL TO MOVE LONGITUDINALLY

ON THE GRADE. SHEETING IS INCLUDED IN THE APPROACH PANEL PAY ITEM.

BAR LENGTH SHAPE LOCATIONNO.

3’ 6" CURB VERTICAL C1301E

BAR NO. LENGTH SHAPE LOCATION

S1301E 3’ 2" SILL VERTICAL

S1302E 5’ 6" SILL TIE

S1603E ’- SILL HORIZONTAL

C1302E 3’ 9"

C1303E

C1304E

C1305E 4’ 5"

C1306E 6’ 9" CURB LONGITUDINAL

CURB VERTICAL

CURB VERTICAL

CURB VERTICAL

CURB VERTICAL

4’ 3"

*

ROADWAY <CONCRETE ROADWAY

SHOULDER SHOULDER

GUTTERLINE GUTTERLINE

4’’

C1301EC1302EC1303EC1304EC1305E

CL

R.

1’ 1’’

7’ 0’’

1’

0’’

4’’

B4 CURB

2’’

C1301E-C1305E

10

’’

10

’’SECTION D-DINSIDE ELEVATION

(FOR F - SHAPE SAFETY RAIL)

BRIDGE

LONGITUDINAL SECTION A-A

12

1

LEVEL, SMOOTH TROWELED SURFACE3

4’’

S1302E @

1’-6’’ SPG.

4’’

4’-0’’ SILL

S1301E @ 1’ 6’’ SPG.

112

APPROACH

PANEL

4’’

6’’

13

’’

CL

R.

2

2’ 0’’ 2’ 0’’

3’’

3’’

1’’

3’’

3’’

1’-

6’’

SILL DETAILS(CONCRETE MAINLINE SHOWN)

(BITUMINOUS MAINLINE SIMILAR)

2

3 REQUIRED CONSTRUCTION JOINT.

4

1

NOTES:

12

’’

12’’

1’

8’’

3’ 6’’

S1301E

S1302E

4

12

6’’

C1

30

1E

C1

30

2E

C1

30

3E

C1

30

4E

C1

30

5E

2’’ RAD.

12’’

C1301E - C1305E

1’

2’’

8’’

PERMISSIBLE

CONSTRUCTION

JOINT

D

D

C1306E BAR,

6’ 9’’ LG.

7’ 0’’

2’-0’’

6’’

TO

P

3’’ 3’’

1’

1’’

PLAN VIEW

SEE STD. PLATE FOR

B4 INTEGRANT CURB OR

B424 CURB & GUTTER

GUTTER LINE

BITUMINOUS ROADWAY

SEE ROADWAY PLANS

FOR DETAILS

END OF APPROACH PANEL

CURB TRANSITION DETAILS

SILL ELEVATION

(REINFORCEMENT IN PAVEMENT NOT SHOWN)

1’ 4

-1/2

’’

1’ 3

-1/2

’’

1’ 0

-1

/2 ’

4’ 0"

7-3/8’’

1-1/2 ’’ CLR.

C1306E BAR,

6’ 9’’ LG.

THREE S1603E

TWO SPS. @ 1’ 8" = 3’ 4’’

FOUR SPS. AT 1’ 7-1/2 ’’ =

6’ 6’’ C1305E - C1301E

CONCRETE ROADWAY

SEE ROADWAY PLANS

FOR DETAILS

BITUMINOUS ROADWAY SEE ROADWAY

PLANS FOR DETAILSSTANDARD SHEET NO.

STANDARD APPROVED:

5-297.227

TITLE:

LANES LANES

12" 1

END OF APPROACH PANEL

SILL & CONCRETE MAINLINE

3" CLEAR COVER

END OF APPROACH PANEL

SILL & BITUMINOUS MAINLINE

SEE SILL DETAILS

BITUMINOUS MAINLINE WITHOUT SILL

3-1/2" CLEAR COVER

END OF APPROACH PANEL

SEE SILL DETAILS

SHEET NO. OF SHEETS(TH )STATE PROJ. NO.

END OF APPROACH PANEL

EXPANSION JOINT TYPE NONE

NO. 19 BARS IN BRIDGE

DESIGN PLANS (FOR

JOINTLESS ABUTMENT ONLY)

CONTRACTOR IS REQUIRED TO COMPLETE THE BILL OF

REINFORCEMENT TABLE AND PREPARE SHOP DRAWINGS

AND SUBMIT THEM TO THE PROJECT ENGINEER AT

LEAST 3 WEEKS BEFORE REBAR FABRICATION.

CONTRACTOR IS REQUIRED TO COMPLETE THE BILL OF

REINFORCEMENT TABLE AND PREPARE SHOP DRAWINGS

AND SUBMIT THEM TO THE PROJECT ENGINEER AT

LEAST 3 WEEKS BEFORE REBAR FABRICATION.

BRIDGE APPROACH PANEL

MISCELLANEOUS DETAILS

EXPANSION JOINT

TYPE E8H/STRIP SEAL

4EXPANSION JOINT

TYPE E8H/STRIP SEAL 4

FROM SHEET 5-297.222

& SHEET 5-297.224

SEE STANDARD 5-297.231

FOR DRAINAGE DETAIL (TYP).

THREE S1603E BARS

(TOP & BOTTOM)

ROADWAY

CONSTRUCTION JOINT IF

BITUMINOUS ROADWAY.

CONCRETE END BLOCK

(PLACED PARALLEL TO < ROADWAY)

TWO S1301E & TWO S1302E @ 1’ 6" MAX. SPACING

11’’

RO

AD

WA

YS

ILL

5 FROM BACK SIDE OF CURB TO GUTTERLINE.

5

APPROACH PANEL

2

REFERENCE DATE

7-15-09

CURB TRANSITION

CURBISOMETRIC VIEW

END POST

FOR W-BEAM GUARDRAIL TO

F-SHAPE SAFETY BARRIER OPTION

PROVIDE 2’ 1" MINIMUM LAP IF TWO BARS REQUIRED*

SEE DETAIL "A"

6" 6"

1/2" X 12" BIT. FELT

FULL WIDTH OF

APPROACH PANEL

SILL

DETAIL "A"

CONCRETE AND S1301E BARS

INCLUDED WITH THE SILL.

AS PER MNDOT 3301, USE EPOXY COATED GRADE 60 REINFORCEMENT

BARS.

APPROACH SLAB THICKNESS SHOWN INCLUDES 2 INCH CONCRETE

WEARING COURSE THAT MAY BE REQUIRED. CHECK BRIDGE PLANS

FOR CONCRETE WEARING COURSE. CONCRETE WEARING COURSE

IS INCLUDED IN BRIDGE PLAN QUANTITIES.

SEE STANDARD PLANS 5-297.222 & 5-297.224 FOR TYPE OF

EXPANSION JOINT. DETAILS OF EXPANSION JOINT TYPE E8H,

ARE SHOWN ON STANDARD PLAN 5-297.229. DETAILS OF

EXPANSION JOINT TYPE STRIP SEAL ARE SHOWN ON BRIDGE PLAN.

PLACE PLASTIC SHEETING (MNDOT 3756) AS APPROVED BY THE

ENGINEER TO BREAK BOND. COVER AREA SHOWN IN DETAIL.

(INCIDENTAL TO THE APPROACH PANEL PAY ITEM).

BILL OF REINFORCEMENT

FOR CURB TRANSITION

BILL OF REINFORCEMENT

FOR CONCRETE SILL

3" (TYP.) 3" (TYP.)

CLR.

(TYP.)

CONTRACTION

JOINT

3" CLR. (TYP.)

BACKER ROD

1’’ POLYSTYRENE

TYPE B

SEE NOTES A-F

TOP OF CURB

TOP OF

APPROACH

PANEL

REINFORCING BARS

APPROACH PANEL CONCRETE ROADWAY

L1TH

JOINT DETAILEXPANSION JOINT NOTES:

REINFORCING BARS

SEE DETAILS ON

SHEET 5-297.231

ELEVATION

E8H JOINT AT CURB

SEE DETAIL

ABOVE

SEE DETAIL

ABOVE

SEE DETAIL

ABOVE

E8H JOINT DETAIL AT PAVEMENT

SECTION THRU CURB

E8H PRESSURE RELIEF JOINT MATERIAL

INSTALLATION INSTRUCTIONS:

STANDARD SHEET NO.

STANDARD APPROVED:

TITLE:

PREFORMED JOINT FILLER MATERIAL, SPEC. 3702.

EXPANSION JOINTS

THE JOINT FACES SHALL BE CLEANED AND DRIED BY SANDBLASTING AND AIR BLASTING

PRIOR TO SEALING THE JOINT.

4"

4"

4

1"

4" 1

4

1

1"

1"

1

2

3

4

INSTALL JOINT MATERIAL IN ACCORDANCE WITH THE MANUFACTURER’S

RECOMMENDATIONS AND THE FOLLOWING:

A)

B)

C)

D)

E)

5

6

7

3"

12"

12"

3"

12"

6"

3"3"

MIN. MIN.CL

R.

CL

R.

CL

R.

CL

R.

(CONCRETE BARRIER ON WINGWALL)

3"

CL

R.

CL

R.

LO

W S

LU

MP

AP

PR

OA

CH

FU

LL

DE

PT

H

AP

PR

OA

CH

PA

NE

L

PA

NE

L

5-297.229

(SAWED & SEALED PER SPEC. 3725)(SAWED & SEALED PER SPEC. 3725)

1/8"

5/8"

CO

NC

RE

TE

WE

AR

ING

CO

UR

SE

1/8"

3-1/2

"

3-1/2

"

3-1/2

"

SHEET NO. OF SHEETS(TH )STATE PROJ. NO. REFERENCE DATE

BRIDGE APPROACH PANEL

JOINT DETAILS

CONCRETE SILL

HOT POUR SEALANT

HOT POUR JOINT SEALER SPEC. 3725. TOP OF SEALER FLUSH TO 1/8 INCH BELOW TOP OF

PAVEMENT SURFACE. MAKE TOP OF SEALER FOR CURB SECTION E8H JOINTS FLUSH

WITH SURFACE (+ 1/8 INCH OR - 1/8 INCH).

2 1

/2" D

EP

TH

OF

CU

T

2"

1/2"

2 1

/2" D

EP

TH

OF

CU

T

JOINT NOTES:

3

2

(TYP.)

JOINT DETAIL

(CONCRETE BARRIER ON APPROACH PANEL)

1 1/2 ’’ POLYSTYRENE

TYPE B

SAW OR FORM THE JOINTS 4 INCHES WIDE BY THE FULL-DEPTH OF THE PANEL.

INSPECT TO ASSURE THAT THE INSIDE WALLS OF THE JOINT HAVE BEEN

SANDBLASTED, ARE DRY, SMOOTH AND FREE OF DEBRIS AND LOOSE PARTICLES.

APPLY TAPE TO THE TOP 1 INCH OF THE INSIDE WALLS TO PREVENT THE

LUBRICANT ADHESIVE FROM CONTAMINATING THE CONCRETE BONDING

SURFACES OF THE SUBSEQUENTLY PLACED HOT POUR JOINT SEALER.

PAINT THE INSIDE WALLS OF THE JOINT WITH LUBRICANT ADHESIVE AT THE

RATE OF 1 GALLON PER 50 LINEAL FEET OF JOINT.

PINCH THE BOTTOM OF THE MATERIAL TOGETHER AND PUSH IT DOWN INTO

THE JOINT. WALK THE MATERIAL DOWN INTO THE JOINT; USE A SLEDGEHAMMER

AND A 2 X 4 IF NECESSARY. APPLY LUBRICANT ADHESIVE TO THE ENDS OF

THE PREFORMED FOAM MATERIAL WHEN BUTTING TWO PIECES TOGETHER.

INSTALL THE FOAM RELIEF JOINT MATERIAL TO A DEPTH OF APPROXIMATELY

7/8 INCH BELOW THE FINISHED CONCRETE SURFACE. AFTER INSTALLATION,

REMOVE THE TAPE AND FILL THE VOID ON TOP OF THE FOAM MATERIAL WITH

APPROXIMATELY 1/2 INCH OF HOT POUR JOINT SEALER (MNDOT 3723 OR 3725)

TO A LEVEL OF 3/8 INCH +/- 1/4 INCH BELOW THE FINISHED CONCRETE

SURFACE. THE HOT POUR JOINT SEALER SHOULD ONLY SLIGHTLY MELT INTO

THE FOAM JOINT MATERIAL (TO PREVENT EXCESSIVE MELTING OF THE JOINT

MATERIAL, PLACE THE HOT POUR SEALER AT THE LOWER END OF THE

TEMPERATURE SPECIFICATION). CHECK FOR CORRECT TEMPERATURE BY PLACING

HOT POUR SEALER ON A SAMPLE OF WASTE FOAM MATERIAL.

http://www.dot.state.mn.us/productsSEE APPROVED/QUALIFIED PRODUCTS LIST AT

FOR ALL PRODUCTS USED.

EXPANSION JOINT FILLER MATERIALS USED FOR A 4 INCH PRESSURE RELIEF JOINT

CONSISTS OF A PREFORMED FOAM PRODUCT HAVING MINIMUM DIMENSIONS OF

4.5 INCHES IN WIDTH (MAY BE LAMINATED) AND 8 INCHES IN DEPTH, AND A

MINIMUM LENGTH OF 10 FEET. WHEN THE CONCRETE DEPTH IS GREATER THAN THE

DEPTH OF THE PRESSURE RELIEF MATERIAL, FILL THE VOID BELOW THE MATERIAL

WITH POLYSTYRENE. INSTALL THE JOINT MATERIAL UNDER COMPRESSION WITH A

LUBRICANT ADHESIVE APPLIED TO THE CONCRETE CONTACT SURFACES.

CLEAN AND DRY JOINT FACES BY SANDBLASTING PRIOR TO SEALING THE JOINT.

PLACE PLASTIC SHEETING SPEC. 3756 AS APPROVED BY THE ENGINEER TO BREAK BOND.

COVER AREA SHOWN IN DETAIL. SEE SILL DETAILS ON STANDARD PLAN 5-297.227.

SLOPE UP

AT JOINT

6 6

66

7

5

11-09-09

L1TH

(AT CONSTRUCTION JOINT)

WHEN CONSTRUCTING A L1TH JOINT UNDER STAGED CONSTRUCTION EXTEND NO. 13 BARS

1’-8" AND NO. 16 BARS 2’-1" PAST THE EDGE OF THE FIRST CONCRETE POUR. CONSTRUCT

L1TH JOINT ACCORDING TO DETAIL SHOWN AFTER ADJACENT POUR IS COMPLETE.

1 1/2 "

PERMISSIBLE CONSTRUCTION JOINT. AP1916E BARS AT 12 INCH SPACING AT MID DEPTH

OF SLAB, PARALLEL TO THE CENTERLINE OF THE ROADWAY. AP1916E BARS ARE 5’-0" LONG.

PLACE THE BAR WITH 2’-0" ON ONE SIDE OF THE JOINT AND 3’-0" ON THE OPPOSITE SIDE

OF THE JOINT. ALTERNATE THE 2’-0" AND 3’-0" DIMENSION AS SHOWN ON THE PLAN.

AP1916E 5

5

2’-0" 3’-0"

ALTERNATE DIMENSIONS EVERY OTHER BAR

PERMISSIBLE CONSTRUCTION JOINT

C2H & L1TH WITH

CONCRETE WEARING COURSEC2H & L1TH WITHOUT

CONCRETE WEARING COURSE

SECTION AT DOWELED JOINT

APPROACH PANEL JOINT LAYOUT NOTES:

STANDARD SHEET NO.

STANDARD APPROVED:

TITLE:

C2H CONTRACTION JOINT.3

2

1

5-297.228

SHEET NO. OF SHEETS(TH )STATE PROJ. NO.

BRIDGE APPROACH PANEL

JOINT LAYOUT

BRIDGE NO. _____

4 MAXIMUM PANEL LENGTH OF 20’-0" FOR UP TO 40^ SKEWS,

15’-0" FOR SKEWS OVER 40^.

6

1

3

BRIDGE

< ROADWAY

SILL

6

6

1:6

SHOULDER

SHOULDER

SHOULDER

SHOULDER

1:6

BRIDGE

3

6

6

< ROADWAY

SILL

1

APPROACH PANELS - SQUARE TO 10^ SKEWS 5

APPROACH PANELS - OVER 10^ SKEWS 5

1:6

SHOULDER

SHOULDER

SILL

6

1

1

2

BRIDGE

3

3

BRIDGE

1

12

SILL

1:6

SHOULDER

SHOULDER

20’-0"

20’-0"

7 TYPICAL

7 TYPICAL

44

66

6

7 SEE STANDARD PLANS 5-297.222 OR 5-297.224 FOR TYPE

OF EXPANSION JOINT.

_____

_____

_____

_____

_____

_____

REFERENCE DATE

11-09-09

8

LIMITS OF JOINT DETAIL 8 (TYP.)

_____

_____

_____

_____

_____

_____

_____

L1TH

L1TH

C2H

C2H

C2H

C2H

L1TH

L1TH

E8H

E8HE8H

E8H

E8H

E8H E8H

E8H

L1TH

L1TH

_____ _____

_____ _____

3 C2H 4

3 C2H 4

CERTIFIED BY

LIC. NO.

DATELICENSED PROFESSIONAL ENGINEER

PRINTED NAME:

SEE STANDARD PLANS 5-297.229 OR 5-297.231

FOR JOINT DETAIL FOR CONCRETE BARRIER ON WINGWALL.

L1TH LONGITUDINAL JOINT. SEE STANDARD PLAN 5-297.229 FOR

REINFORCEMENT LAP LENGTH REQUIREMENTS FOR STAGED

CONSTRUCTION.

2’-O"

3’-0"

C2HD JOINT

AP1916E STAGGER

AS SHOWN (TYP.)

STAGGER DIAGRAM

SEE STAGGER DIAGRAM

SEE STAGGER DIAGRAM

5 ALL JOINTS SHALL BE SAWCUT. SAWCUTS SHALL BE MADE WHILE

THE CONCRETE IS STILL GREEN. WHEN A CONCRETE WEARING

COURSE IS SPECIFIED, THE JOINTS SHALL BE SAWN THROUGH BOTH

THE WEARING COURSE AND THE UNDERLYING APPROACH SLAB IN A

SINGLE OPERATION.

C2H

C2H

PERMISSIBLE CONSTRUCTION JOINT. USE JOINT TYPE C2H WITH

AP1916E BARS AT 12 INCH SPACING AT MID DEPTH OF THE SLAB,

PARALLEL TO THE CENTERLINE OF THE ROADWAY. AP1916E BARS

ARE 5’-0" LONG. PLACE THE BAR WITH 2’-0" ON ONE SIDE OF

THE JOINT AND 3’-0" ON THE OPPOSITE SIDE OF THE JOINT.

ALTERNATE THE 2’-0" AND 3’-0" DIMENSIONS AS SHOWN ON THE

PLAN. THE C2H JOINT AND AP1916E BARS ARE REQUIRED ON ALL

PANELS WITH A SKEW OVER 10 DEGREES.

E8H JOINT REQUIRED IN CURB ADJACENT TO E8H JOINT, E8H

QUANTITY SHALL BE PAID FOR SEPARATELY, MEASURED FROM BACK

OF CURB TO BACK OF CURB.

BRIDGE

< ROADWAY

1:6

DIVIDED-URBAN ROADWAY PLAN

SHOULDER

SHOULDER

STANDARD SHEET NO.

STANDARD APPROVED:

TITLE:

DIVIDED-URBAN ROADWAY PLAN

2’’ THICK STYROFOAM TO SEPARATE CONCRETE

ADJUSTING RINGS FROM APPROACH SLAB, TO

PREVENT MOVEMENT OF MANHOLE.

2’’ STYROFOAM TYPE B

SECTION C-C

PLAN VIEW OF C.B. CASTING

CC

112

MIN

.

APPROACH

PANEL

12’’

6’’

1’’

5-297.231

APPROACH PANEL

EXPANSION JOINT

6’’

MORTAR BETWEEN CASTING, RINGS AND

STRUCTURE EXCEPT AS SHOWN. SEE

SPEC. 2506.2B FOR MORTAR MIX REQUIREMENT.

3’’

3’’

6

2

DRAINAGE AT PANEL EDGE OF JOINT

A A

AA

NOTES:

1- 1

/2 "

LOCATE BETWEEN GUARDRAIL POST OR AS DETERMINED BY THE DESIGNER.

1:6

BRIDGE

SHOULDER

SHOULDER

SQUARE TO 10^ SKEWS

COUPLING

NON-PERFORATED PIPE

CATCH BASIN

PERFORATED

PIPE

CATCH

BASIN

PERFORATED

PIPE

CATCH BASIN

NON-PERFORATED PIPE

COUPLING

( GRATE NOT SHOWN )

3

3

1

1

3

5’-0’’ MIN.

5’ 0’’ MIN.

3’-0’’ MIN.

3’-0’’

3’ 0’’

APPROACH PANEL

4

5’ 0’’ MIN.

5’-0’’ MIN.

CATCH BASIN 3

SEE ROADWAY PLAN FOR ADDITIONAL CATCH BASIN DETAILS.

4

4

1

4

1

5

5

5

1

2

4

5

6

3’ 0’’

5

3

SHEET NO. OF SHEETS(TH )STATE PROJ. NO. REFERENCE DATE

7-15-09

BRIDGE APPROACH PANEL

DRAINAGE DETAILS

1

2

F

F

1

6’’

SILL

MIN

.

6’’

1- 1

/2 "2

DRAINAGE AT EXPANSION JOINT DETAIL

SECTION A-ASECTION F-F

OVER 10^ - SKEWS

BACKFILL WITH FINE AGGREGATE (MNDOT 3149) MODIFIED TO 0-3% PASSING A

NO. 200 SIEVE (INCIDENTAL TO THE APPROACH PANEL PAY ITEM).

ENCASE CASTING AND RINGS WITH A CONCRETE

COLLAR. USE THE SAME MIX AS USED IN CONCRETE

CURB AND GUTTER OR USE MORTAR MIX

(MNDOT 2506.2B) FOR THE CONCRETE COLLAR.

2 INCH OR 4 INCH NOMINAL DIAMETER THERMOPLASTIC PIPE, AS PER ASTM

D1785M, SCHEDULE 40. SLOPE PIPE TO DITCH. WRAP PERFORATED PIPE

WITH GEOTEXTILE AS PER SPEC. 3733. 1/8 INCH PER 12 INCH MINIMUM

SLOPE (INCIDENTALTO THE APPROACH PANEL PAY ITEM).PRECAST CONCRETE HEADWALL

(SEE STANDARD PLATE 3131)

OR DRAIN INTO CATCH BASIN.

PRECAST CONCRETE HEADWALL

(SEE STANDARD PLATE 3131)

OR DRAIN INTO CATCH BASIN.

(THIS DETAIL IS USED IF THE CONCRETE BARRIER

IS MOUNTED ON THE WINGWALL. DO NOT USE THIS DETAIL

IF THE BARRIER IS MOUNTED ON THE APPROACH PANEL).

2 INCH NOMINAL DIAMETER THERMOPLASTIC PIPE, AS PER ASTM D1785M, SCHEDULE

40. SLOPE PIPE TO DITCH. WRAP PERFORATED PIPE WITH GEOTEXTILE AS PER

SPEC. 3733. 1/8 INCH PER 12 INCH MINIMUM SLOPE. FURNISHING AND INSTALLING

THE DRAIN SYSTEM IS INCIDENTAL TO THE APPROACH PANEL.

REFER TO THE DRAINAGE PLAN TO DETERMINE WHETHER A FLUME OR A

CATCH BASIN REQUIRED.

SECTION 502 - PORTLAND CEMENT CONCRETE BRIDGE END PAVEMENT

502.01--Description. This work consists of bridge end pavement of portland cement concrete with reinforcement as shown on the plans, constructed in one course on a prepared base in accordance with these specifications, and in reasonably close conformity with the lines, grades, thickness, and cross section shown on the plans or as directed. 502.02--Materials. On bituminous paving contracts, concrete for this work may be Class "B" Structural Concrete meeting the applicable requirements of Subsection 804.02. Sampling and testing of concrete for acceptance and control purposes shall be in accordance with Subsection 804.02.3. Reinforcing steel shall meet the requirements of Subsection 711.02. 502.03--Construction Requirements. 502.03.1--General. The requirements specified for concrete pavement in Section 501, shall apply in all respects to bridge end pavement except where otherwise indicated in the specific requirements below, or on the plans. When the plans specify a certain thickness of hot mix asphalt under the bridge end pavement, the Contractor may substitute Class "B" Structural Concrete base in lieu of the hot mix asphalt. The concrete base shall be constructed in one course on a prepared base in accordance with these specifications, and in reasonably close conformity with the lines, grades, thickness, and typical cross-sections as shown on the plans or as directed. The concrete base will be allowed to cure 24 hours prior to placement of the bridge end pavement. A one-inch premolded expansion joint will be required along the face of the paving bracket. See Section 403 for measurement and payment of substituted concrete base material. 502.03.2--Specific Requirements. 502.03.2.1--Final Screeding and Finishing. The final screeding shall be performed by hand methods. The concrete shall be screeded longitudinally using the bridge floor for a gauge on one end, and a temporary bulkhead cut and securely installed true to crown and grade on the other end. In the event the concrete pavement, adjacent to the bridge end pavement, has been previously poured, the end of the pavement shall be used as a gauge in lieu of the temporary bulkhead. The final finish of the bridge end pavement shall be that designated on the plans. If a finish is not designed, the finish shall be transverse tined finish. 502.03.2.2--Joints. Concrete bridge end pavement shall be constructed monolithically, unless construction joints are specifically indicated on the plans. 502.04--Method of Measurement. Portland cement concrete bridge end pavement, complete in place and accepted, will be measured as specified in Subsection 501.04.

502.05--Basis of Payment. Portland cement concrete bridge end pavement will be paid for at the contract unit price per square yard in accordance with the methods as provided in Subsection 501.05. The prices thus paid shall be full compensation for completing the work. Payment will be made under: 502-A: Reinforced Cement Concrete Bridge End Pavement- per square yard

#4TA2 (TYP.)

#4TA1 (TYP.)

#7BA1

#5BA2

#6AD12 DOWELS (TYP.)

14'-0"

PLAN

ABUTMENT NO. 2

N

ABUTMENT NO. 1

N

| BRG.ABUTMENT

| CONSTRUCTION

#4AS2

#4AS3

#4AS5 #4AS1

B

A

A

3"

18 SPACES @ 9" = 13'-6"

19-#4TA2 TOP MAT

19-#5BA2 BOTTOM MAT

3"

A

B

A

B

ABUTMENT DIAPHRAGM

APPROACH SLAB

SLEEPER FOOTER REINFORCEMENT SEE SECTION B-B &SLEEPER FOOTER DETAIL

EVAZOTE 380 SEAL (SEE DETAIL 1)THIS SHEET.

B

1'-0" EXTENSION OF BRIDGE JOINT STRIP SEAL (TYP.)

1'-0"

2-#4AS4 AT END OFSLEEPER

2-#4AS4 AT END OF SLEEPER

SPACE EQUAL TO #4TA1 BARS

*

*

*

*

*

*

518"

ABUTMENT DIAPHRAGM

#7BA1

#4AS2

#4TA2 (TYP.)#4TA1

A-1-a MATERIAL

#5BA2 (TYP.)

16 GAGE GALVANIZED SHEET METAL TO RUN FULL LENGTH & WIDTH OF SLEEPER

FOOTER (INCIDENTAL TO COST OF SUPERSTRUCTURE CONCRETE).

312"

2'-0"

312"

212"

1'-0"

2"(± )14'-0"

SECTION B-B

114" x 2" EVAZOTE 380

SEAL (SEE DETAIL 1)THIS SHEET.

TRANSITION SLABJOINT SEAL ASSEMBLYSEE DETAIL NEXT SHEET

#4AS3

#4AS1 (4 REQ'D)

| BRG. ABUT.

1'-0"

1'-0"

#4AS5 (8 REQ'D)

1" NORMAL TO DECK

#6AD12

1'-6"MIN.

NOTESCONCRETE FOR APPROACH SLABS AND SLEEPER FOOTERS SHALL

BE SUPERSTRUCTURE CONCRETE CLASS "AA".

DIMENSIONS ARE TO THE CENTERLINE OF BARS. ALL BARS ARE EPOXY COATED REINFORCING BARS GRADE 60.

THE EVAZOTE 380 SEALS BETWEEN APPROACH SLABS AND DECK

SLAB (SEE DETAIL 1), AND SLEEPER SLAB AND TRANSITION SLAB SHALL BE INCLUDED IN THE UNIT BID PRICE FOR SUPERSTRUCTURE

CONCRETE, CLASS "AA".

TOP SURFACES OF THE APPROACH SLABS SHALL BE MACHINEGROOVED IN CONFORMANCE WITH SUBSECTION 512.3.10.3 OF THESTANDARD SPECIFICATIONS.

TOP SURFACE OF THE TRANSITION SLAB SHALL MATCH APPROACHSLAB FINISHED GRADE.

1.

2.

3.

4.

5.

1" NOMINAL

8"

2"

RECESS EVAZOTE 18"BELOW ROADWAY SURFACE

PRIMER OR ADHESIVE

AS REQ'D BY MFG'R

114" X 2" EVAZOTE SEAL

DECK SLAB

ABUTMENT CAP

DETAIL 1

1" PREFORMED BITUMINOUSJOINT FILLER BELOW EVAZOTE

APPROACH SLAB

1'-0"

3"CLR.

6"

3" EXTRUDED POLYSTYRENE 3"

3"

2"

3"

6"

DRIP-GROOVE FORM

W/34" HALF-ROUND.

DETAIL 2

APPROACH SLAB

WINGWALL

#4BA3 @ 1'-2"(9 TOTAL ON EACH SIDE)

EXTRUDED POLYSTYRENE

(TO BE REMOVED BEFORE BRIDGE IS

OPENED TO TRAFFIC)

EXTEND FROM ABUTMENT DIAPHRAGM TO END OF WINGWALLS.

312"

4'-9"

212"

312"

1'-6"

312" 2'-0"

11" 1'-4"2 EQUAL SPA.= 1'-7"

512"512"

SLEEPER FOOTER DETAILSECTION TAKEN PERPENDICULAR TO SLEEPER FOOTER

#4AS3

#4AS2

#4AS1(4 REQ'D)

#4AS5(8 REQ'D)

1'-9" 1'-6"

2% 2%

#4TA1 (TYP.)

3"

#7BA1 (TYP.)

WINGWALL (TYP.)

#6AD12 @ 1'-0" (TYP.)

#5BA2 (TYP.)

3"

#4TA2 (TYP.)

SECTION A-A77 SPACES @ 6" = 38'-6" (78-#7BA1)

| CONSTRUCTI0N

NOT TO SCALE

PROFILE GRADE

3"3"

39'-0"

37 SPACES @ 1'-0" = 37'-0" (38-#4TA1, 40 TOTAL IN SLAB)

#4BA3(TYP.)

SEE DETAIL 2THIS SHEET.

9" 9"

FOR CLARITY SOME REBAR NOT SHOWN

APPROACH SLAB ELEVATION TABLE

A

LOCATION

NOTE: LOCATION A IS NEAR EDGE OF BRIDGE DECK

LOCATION B IS NEAR SLEEPER FOOTER

ABUT. NO. 1

ABUT. NO. 2

POINT LEFT RIGHT

6448.394 6448.386

6448.3896448.397

6448.313

6448.316

6448.321

6448.324

B

A

B

6448.709

6448.706

6448.783

6448.780

| CONSTRUCTION

REVISIONS

NO. DESCRIPTION DATE BY

1

2

3

CHECKED BY:DESIGNED BY: APPROVED FOR CONSTRUCTION: DATE:

OF TRANSPORTATIONNEW MEXICO DEPARTMENT

NEW MEXICO PROJECT NO.

SHEET NO.

CN

SHEET NO.

DRAWN BY: PLOT DATE: DRAWING PATH: 5/28/08RMTTNC BRCOMMON\US 64-LA JARA\24-APPROACH SLAB.dwgTJB

G2735

BR-GRIP-064-4(24)106 5-24

5-24STA. 1722+62.22

DETAILSAPPROACH SLAB

BRIDGE NO. 9424

LA JARA ARROYO

US 64 OVER

4" 4"

8"

10"

10"

14’-0"

4’-8�"

9’-3�"

14’-0"

42’-8"

3’-4"

12’-0"

12’-0"

3’-4"

4"

4"

3’-7�"

1’-0" 3"

3 Sp @ 14’-0" ~ HP10 x 42 Piling

3"

3’-7�"

4 @ 8�" 1’-0"1’-0"1’-0"

1’-0"1’-0" 1’-0"1’-0" 15 Equal Spaces15 Equal Spaces15 Equal Spaces

3’-4"3’-4"

4 @ 7�"4 @ 7�" 3"3"

‘ Roadway

‘ Roadway

42’-8"

Road

way 4’-0"

4’-1"

3

@

7"

4

@

7"

1’-6"

1’-6"

3" 3"

4A802

7A800

7A800

4SN800 or

4SN801

9SA800

8SA801

2-4A8022-7A800

2-8A803

4-7A800

2’-0" 2’-0"

9SA8008SA801

8A803

8A803

4A805

7A801 8A804

7A800

7A801 (typ)

Between Piling

20’-0"

20’-9�" ~ Barrier Length

2-4A805 2-8A804 ~ (typ)

Between Piling

2-7A801 ~ (typ)

Between Piling

8"4"

8"

5�" ~ SB

3�" ~ LB

4"

1’-4"

3"

Cl

3"

Cl

5SN802 or

5SN803

4XA807 ~ SB

4XA808 ~ LB

8’-0"

4’-0"

23’-4" 19’-4"

49’-3�"

4’-8�

"

4’-1�

"

4-8A803

4’-5�"

16 Equal Spaces

4’-8�

"

28 Sp @ 10" ~ 5SA803 ~ Top

3"

Cl

5"

5"

8SA801

(Not Shown)

5XL800, 5XMK800

(Not Shown)

7A800

8A803

8A903

(Sho

win

g Top

Reinforcin

g)

(Sho

win

g

Botto

m

Reinforcin

g)

16 Equal Spaces 16 Equal Spaces

3 Sp @ 12’-0" ~ HP10 x 42 Piling

65 Sp @ 8" ~ 5XK800 & 5XL800 (Not Shown)

5XL800, 5XMK800

(Not Shown)

29 Sp @ 8" ~ 5XK800 & 5XL800 ~ SB

65 Sp @ 8" ~ 5XK800 & 5XL800 ~ LB

1’-2�"

44’-7�" ~ Barrier Length

20 Sp @ 10" ~ 5A806 ~ Top

84 Spaces

@

6"

~ 8S

A801 ~ Top

84 Spaces

@

6"

~ 9S

A800 ~

Bot

8A804 (typ)

Between Piling

29 Sp @ 8" ~ 5A806 ~ Bot

29 Sp @ 8" ~ 5XK800 & 5XL800

35 Sp @ 8" ~ 5SA802 ~ Bot

5XL800 &

5XMK800

9SA800

5SN802 5SN803

4 @ 8�"

5C800

8SA801

9SA800

4SN8014SN800

STATENO.

ND

PROJECT NUMBERSHEET

NO.

SECTION

12/2/2009 R:\project\40002144.058\BRIDGE\2-144.205L\170BR_026_BEGAPPRBR.dgn

170

JRT

BRN-4-002(058)144

08LCS088

AA B

B

B-B

C

C

D

D

C-C D-D

This document

was originally issued and

on and the original

document is stored at the North

Dakota Department of

Transportation

sealed by

Registration Number PE

23 U.S.C. 409

NDDOT Reserves All Objections

BNSF RAILROAD OVERHEAD

SECTION @ ‘ ROADWAY

SECTION @ GUTTER LINE

PLAN

SB = Short Barrier

LB = Long Barrier

26

5048,

Jason R Thorenson,

2-144.205L-26

QUANTITIES

SEE DWG 2-144.205L-27

WARD COUNTY

WEST MINOT

A-A

BEGIN APPROACH SLAB

1/26/09

SIZE MARK NO. LENGTH

7

7

4

SKEW ANGLE = 30^

5 5’-11"

5 5’-0"

REINFORCING STEEL

(LBS)

CONCRETE

(CY)

4 9

5 4 3’-10"

5

1

8 1

5 1

5 1

4

1

5 1

11’-8"8"2.5" R

1.25

12 2’-2"

2’-2"

3"

1’-10"

2’-0"

Vertical

1’-8"

8"

8.5

12

1’-2"

2.5" R

11"

1’-10"

8"

1’-0"

8"

a

b

e = No.

Eq. Sp.

SA BARS

6

6

(ONE SLAB)

a

b

6"

(typ) 6"

(typ)

1’-8" 1’-8"e = No.

Eq. Sp.

SN BARS

3"

1’-7"

10"

7" 2"

*

* 10" R

(Optional)

1�" x 5�"

Keyway

2’-8�

"

Top of Slab

1" Polystyrene

Polyethylene

Membrane

BRIDGE

10"

8"

1" Sawed or Hand

Tool Formed

Tie

Bar 4"

APPROACH SLAB

�" x 4"

Pref Exp

Jt Filler

�"Silicone Sealant (Type 5)

Leave joint sealer 0" to

�" below finished surface.

É 1" | Std Pipe (A 501)

Welded to ˝ 11� x

� x 1’-2�" behind

each hole (typ).

5"

1’-4"2’-2"

4"

2"

(typ)

3�" 3�"

7�"

É ˝ 11� x

� x 1’-2�"

(M270 Grade 36)

É �" | Std

Pipe (A 501)

4"

‘ �" | Std

Pipe (A 501)

É Galvanize after

fabrication.

a b e

SA BAR TABLE

19’-10"

SN BAR TABLE

a b e

3’-5"

Surface Finish "D" shall be required on the inside

and top surfaces of the approach slab barriers

and curbs. See note 602 SURFACE FINISH "D"

for colors.

6"

1’-3"

8.5

12

8"

4"

MK800

1�"

Cl

5XMK800

4XA807 or

4XA808 (typ)

5 4’-1"

2.5 R

2.5 R

5.5"

6.5"

10"

11"

2XMK800

98

SN803

SN802

3’-11"

3’-11"3’-6"

31

25

33

21

4’-1"

4’-1"

3’-11"

19’-10" 44’-1"

44’-1" 84

3541’-7"1’-2"

1’-7" 42’-0" 28

42’-4"

8 42’-4"

8

8

4 10 48’-11"

42’-4"515

4 20’-5"9XA807

44’-3"

9 2748’-5"

2748’-5"

769’-6"

632’-0"

5 6’-9"

96

5 1

1 373’-4"

305’-6"

419’-4"

262’-2"SN803

13’-6"

3’-6"

25,328

XA808

1�"

Cl

4XA807 or

4XA808 (typ)

The estimated material quantities shown are for

information purposes only. All materials including

concrete, reinforcing bars, polyethylene membrane,

preformed joint filler, polystyrene, silicone sealant,

connection plates and pipes, and all labor required

to build the approach slab and barriers shall be

included in the pay item "Pile Supported Approach

Slab." The concrete shall be Class AE-3 and the

reinforcing steel shall be Grade 60. The polyethylene

membrane shall meet the requirements of AASHTO

M 171.

The bar marks beginning with an "X" indicate an

epoxy coated bar.

6

6

48’-11"

3’-5"

4

102.9

SA800

SA801

SA802

SA803

SN800

SN801

5XL800

5XK800

5XL800

5XB800

XB800 C800

XL800 XK800

A800

A804

A805

A801

A802

A803

A806

SA800

SA801

SA802

SA803

XB800

C800

XK800

XL800

SN800

SN801

SN80284

1" Bevel

BAR LIST - ONE SLAB

ESTIMATED MATERIAL QUANTITIES

BENT BAR DETAILS

NOTES:

BNSF RAILROAD OVERHEAD

APPROACH SLAB JOINT DETAIL

CONNECTION PLATE DETAILS

STATENO.

ND

PROJECT NUMBERSHEET

NO.

SECTION

12/2/2009 R:\project\40002144.058\BRIDGE\2-144.205L\170BR_027_BEGAPPRBR1.dgn

170

JRT

BRN-4-002(058)144

08LCS089

This document

was originally issued and

on and the original

document is stored at the North

Dakota Department of

Transportation

sealed by

Registration Number PE

23 U.S.C. 409

NDDOT Reserves All Objections

27

5048,

Jason R Thorenson,

2-144.205L-27

WEST MINOT

BEGIN APPROACH SLAB

(SHOWING DIMENSIONS) (SHOWING REINFORCING)

(SHOWING FRONT FACE) (SHOWING REINFORCING)

(DIMENSIONS SHOWN ARE OUT TO OUT)

BARRIER DETAILS

QUANTITIES

153.2 SYPILE SUPPORTED APPROACH SLAB

1/26/09