203
AD-A8584A ARY ENGINEER WATERWAYS EXPERIMENT STATION VICKSBURG-ETC F/B 13/13 CONCRETE AND ROCK TESTS. MAJOR REHABILITATION OF STARVED ROCK L-ETC(U) APR 80 R L STOWE, B A PAVLOV CLASSIFIED WES/P/SA.-0-6 W E OMOEEI I.EIIEEIIIIEEE IIIIIIIEEEEEEE IIIEEEEIIEEII -Eliiiiiii..

CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

AD-A8584A ARY ENGINEER WATERWAYS EXPERIMENT STATION VICKSBURG-ETC F/B 13/13CONCRETE AND ROCK TESTS. MAJOR REHABILITATION OF STARVED ROCK L-ETC(U)APR 80 R L STOWE, B A PAVLOV

CLASSIFIED WES/P/SA.-0-6 W

E OMOEEI

I.EIIEEIIIIEEEIIIIIIIEEEEEEEIIIEEEEIIEEII-Eliiiiiii..

Page 2: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

MISCELLANEOUS PAPER SL-80-

CONCRETE AND ROCK TESTS, MAJOR00 REHABILITATION OF STARVED ROCK LOCK AND

DAM, ILLINOIS WATERWAY, CHICAGO DISTRICTPHASE 11 COMPLIANCE, SCOUR DETECTION

C by

R. L Stow., B. A. Pavlov

Structures LaboratoryU. S. Array Engineer Waterways Experiment Station

P. 0. Box 63 1, Vicksburg, Miss. 39180

April 1980 D IFinal Report ELECTE

Approvd For Public Rlease; Distibution Unlinvited JUN I

emqinJPripets for U. S. Army Engineer District, ChicagoChicago, Illinois 60604

Im cp D1TAINEA080 6 is 19 43SIQUIFPICANT ?-7BnR OF PAGES WHIMH 1>0 "1

Page 3: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

Destroy this report when no longer needed. Do not returnit to the originator.f v

The findings in this report are not to be construed as an officialDepartment of the Army position unless so designated

by other authorized documents.

The contents of this report are not to be used foradvertising, publication, or promotional purposes.Citation of trade names does not constitute anofficial endorsement or approval of the use of

such commercial products.

Page 4: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

DISCLAIMER NOTICE

THIS DOCUMENT IS BEST QUALITYPRACTICABLE. THE COPY FURNISHEDTO DTIC CONTAINED A SIGNIFICANTNUMBER OF PAGES WHICH DO NOTREPRODUCE LEGIBLY.

Page 5: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

UnclannifiedSECURITY CLASSIFICATION OF THIS PAGE (Ma, 000 fhmto , ,

READ WlSTRUCTIKREPORT DOCUMEITATION PAGE XFORE COMPLMIG FOM

1. REPORT NUMBER I. GOVT ACCESSION NO. S. RECIPIENT'S CATALOG NUMBER

Miscellaneous Paper SL-80-6 __

.--.-. 5. TYPE OF REPORT A PERIOD COVERED

ONCRETE AND jOCK ESTS, AJOR EHABILTATION F Final Jeprt,' F TARVED 6K K.AND J AM, LINOIS WATERWAY,HI AGOISTRICT: PHSE D CO LIACE, 6. PERFOMINGOR ."EPORT NUMBER

COUR DETCTION, F.AUTHOR(& )- S. CONTRACT OR GRANT NUM8E4)4

JOR. L./Stowe '' i

B. A. Pavlov ~L9- PE IPORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT., PROJECT , TASK

U. S. Army Engineer Waterways Experiment Station A

Structures LaboratoryP. 0. Box 631, Vicksburg, Mississippi 39180I I. CONTROLLING OFFICE NAME AND ADDRESS /*U. S. Army Engineer District, Chicago AprO 801

219 South Dearborn Street .W.-o'mWVfWOF PAGES

Chicago, Illinois 60604 16514. MONITORING AGENCY NAME & ADDRESS(l/ dlffermt from Controlling Office) 15. SECURITY CLASS. (of this report)

Unclassified1So. DECL ASSI FICATION/DOWNGRADING

SCHEDULE

IS. DISTRIBUTION STATEMENT (of this RPort)

Approved for public release; distribution unlimited.

17. DISTRIBUTION STATEMENT (of the abstract etered In Block 20. If different from Report)

1. SUPPLEMENTARY NOTES

IS. KEY wOROS (Co tlinu on revere* side If necessy and idenify by block number)

Concrete cores Rock foundationsConcrete tests Rock tests (laboratory)Core drilling Starved Rock Lock and DamRock cores

lr -" ACT (CaiffWR -n revere oftl of neOcsary ad ldsaifiy by Weock member)

Drilling for laboratory testing of concrete and foundation rock wascarried out for the U. S. Army Engineer District, Chicago, as part of a majorrehabilitation program at the Starved Rock Lock and Dam. The structures are onthe Illinois Waterway. This report covers the work accomplished during thePhase II program entitled *Compliance and Scour Detection.* The compliance por-tion of the work was conducted for purposes of determining selected characteriza-tion and engineering design parameters on any foundation materials tht we -p-Con 'nue "-

OI i W3 SmTWM @9 I Novso s5 Ow"N.CTE Unclassified

SCUMT CLIFICATIOHW OF TIS PAME (81an Data EntetedO

Page 6: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

UnclassifiedSECURITY CLASSIPICATION OF THIS PAO@(Wbin Onto RMe1M

20. ABSTRACT (Continued)

different than previously detected. A secondary purpose of the compliance workwas to ascertain the base elevation of the head and taintor gate dams. Thescour detection portion of the work was accomplished to determine undercuttingof the dam (behind the dam) and the depth of possible scouring behind thetaintor gate dam. A loosely cemented sand was discovered under a portion ofthe head gates dam. Direct shear tests were performed on the material and acohesion of 0.22 tsf and an angle of internal friction of 27 deg were obtainedfrom the test results. The base of the head and taintor gate dam was foundwith borings to be significantly different than that shown on original workingdrawings. Of 26 borings through the head and taintor date dam, 20 showed thebase elevation of the dam to be deeper than that shown on the working drawings.Six borings through the head gate dam showed the base of the dam to be restingon the loosely cemented sand and as much as 5.3 ft above the base elevationshown on the original working drawings. Scour borings behind the dam showed noundercutting at selected locations. No Iovered scoured areas were detected atselected locations. A study of the foundotion condition was made.

UnclassifiedSECURITY CLASSIFICATION OF THIS PAGEWfIe Date Entered)

Page 7: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

PREFACE

This testing program entitled "Concrete and Rock Tests, Major

Rehabilitation of Starved Rock Lock and Dam, Illinois Waterway, Chicago

District, Phase II Compliance, Scour Detection" was conducted for the

U. S. Army Engineer District, Chicago. The compliance work was autho-

rized by DA Form 2544 No. NCC-IA-77-31, dated 5 April 1977; the scour

detection work was authorized by DA Form 2544 No. NCC-IA-78-57, dated

7 June 1978.

Drilling was conducted under the direction of Mr. M. A. Vispi

by members of the staff of the Geotechnical Laboratory (GL) of the

U. S. Army Engineer Waterways Experiment Station (WES) during the

period June 1977 through July 1977 for compliance holes and July 1978

through September 1978 for scour holes. Laboratory tests were performed

at the Structures Laboratory (SL) and the GL during the period September

1978 through November 1978 under the direction of Messrs. Bryant Mather,

Chief, Structures Laboratory, and J. M. Scanlon, Chief, Engineering

Mechanics Division. Mr. G. P. Hale supervised the laboratory testing

conducted in the GL; Mr. R. L. Stowe was Project Leader and was assisted

in performing laboratory work at the SL by Messrs. F. S. Stewart and

J. B. Eskridge and Ms. B. A. Pavlov. This report was prepared by

Mr. Stowe and Ms. Pavlov.

The Commanders and Directors of WES during the conduct of the in-

vestigation and the preparation and publication of this report wereCOL J. L. Cannon, CE, and COL N. P. Conover, CE. Mr. F. R. Brown was

Technical Director.

Aooession For

DDC TASlU:anowice dJustificktiCnf

Aval I e',d /or

27 s

Page 8: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

CONTE14TS

PREFACE. . .. . . . . . . . . . . . . . . . . . . . . 1

CONVERSION FACTORS, INCH-POUND TO METRIC (SI) UNITS OFMEASUREMENT ............. ........................... 4

PART I: INTRODUCTION ........... ....................... 5

Location of Study Area .......... ..................... 5Background ............. ........................... 5Objectives ............. ........................... 7Scope ............... .............................. 7

PART II: DRILLING AND EXPLORATION ........ ................ 9

Previous Explorations ........... ...................... 9Current Drilling ......... ........................ ... 10

PART III: SCOUR DETECTION RESULTS .... ............... ... 17

PART IV: GEOLOGICAL CHARACTERISTICS .... .............. ... 20

Backfill ........... ............................ .... 20Bedrock Stratigraphy ........ ...................... ... 20Geologic Cross Sections ....... ..................... .... 23Bedrock Structural Characteristics .... ............... ... 28Possible Weak Zones ........ ....................... .... 30

PART V: TEST SPECIMENS AND TEST PROCEDURES .............. ..... 33

Cores Received ......... ......................... ... 33Selection of Test Specimens ...... ................... .... 33Test Procedures ......... ......................... .... 34

PART VI: TEST RESULTS AND ANALYSIS ..... .............. ... 35

Characterization Properties. . ...... ............ 35Modulus of Elasticity and Poisson's Ratio, ............ 36Peak and Ultimate Shear Strength ..... ................ ... 37

PART VII: CONCRETE CONDITION ...... .................. ... 44

Concrete from Compliance Borings ..... ................ ... 44Concrete from Instrumentation Borings .... .............. ... 45Base Elevation Revealed in Borings .... ............... ... 46

PART VIII: SUMMARY OF FOUNDATION CONDITION, CONCRETE,

RECOMMENDED DESIGN VALUES. . ............... 53

Scour Detection. ......................... 53Foundation Condition ...................... 54Concrete Condition ........ ....................... ... 58Recommended Design Values ....... .................... ... 59Recommendations ......... ......................... .... 60

REFERENCES .............. ............................ 61

TABLES 1-3

2

.... .

Page 9: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

CONTENTS (Continued)

PLATES 1-35

APPENDIX A: SCOUR PROFILES FROM CHICAGO DISTRICT

APPENDIX B: PHOTOGRAPHS OF SCOUR DETECTION CORES

APPENDIX C: FIELD CORE LOGS, COMPLIANCE

APPENDIX D: FIELD CORE LOGS, SCOUR DETECTION

• Copies of Appendixes B, C, and D may be obtained from U. S. ArmyEngineer District, Chicago, 219 South Dearborn St., Chicago, Illinois60604.

3

Page 10: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

l-

CONVERSION FACTORS, INCH-POUND TO METRIC (SI)UNITS OF MEASUREMENT

Inch-pound units of measurement used in this report can be converted

to metric (SI) units as follows:

Multiply By To Obtain

cubic feet 0.02831685 cubic metres

degrees (angle) 0.0174533 radians

feet 0.3048 metres

feet per second 0.3048 metres per second

miles (US statute) 1.609344 kilometres

pounds (force) persquare inch 0.006894757 megapascals

pounds (mass) per

cubic foot 16.01846 kilograms per cubic metre

square feet 0.09290394 square metres

tons (force) persquare foot 0.09511274 megapascals

4

Page 11: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

CONCRETE AND ROCK CORE TESTS, MAJOR REHABILITATION OF

STARVED ROCK LOCK AND DAM

ILLINOIS WATERWAY, CHICAGO DISTRICT

PHASE II COMPLIANCE, SCOUR DETECTION

PART I: INTRODUCTION

Location of Study Area

1. The Starved Rock Lock and Dam site is located some 8 miles

west of Ottawa, Illinois, in LaSalle County, Illinois. The site is near

mile 231 on the Illinois River; the approximate driving distance is

about 85 miles southwest of Chicago.

Background

2. At a meeting held at the offices of the U. S. Army Corps of

Engineers Chicago District (NCC), on 11 February 1977, representatives

of the Structures Laboratory (SL) and the Geotechnical Laboratory (GL)

of the Waterways Experiment Station (WES) were requested to submit a

proposal for work to assist the Chicago District in connection with con-

crete and rock exploration and laboratory testing. The work was accom-

plished in two phases. Phase I work concerned concrete and rock explo-

ration and laboratory testing for a major rehabilitation of the Starved

Rock Lock and Dam (resurfacing, stabilizing lower approach wall with

grouted prestressed tendons, etc.). The Phase I work is completed and

results ofthe work are given in Reference 1. Phase II work concerned

drilling and laboratory testing to comply with certain Office, Chief of

A table of factors for converting inch-pound units of measurement to

* metric (SI) units is presented on page 4.The Chicago District is in the North Central Division, and the of-

fice symbol is NCC.

5

Page 12: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

.-. . . . . . . . . . . . . . .. . - f r... . . . . " - . . . : -- -.

Engineers (OCE), and North Central Division (NCD) comments as outlined

in Reference 2. A study of the foundation condition was also made.

3. The Phase II work involved drilling and then testing of con-

crete and bedrock for purposes of obtaining certain characterization

properties and engineering design properties as outlined on pages 53 and

54 in Reference 2. Bedrock would be tested if found to be significantly

different than bedrock tested and reported on in References I through 3.

The District will check previous structural stability analyses if cer-

tain rock properties differ significantly from those reported in Refer-

ence 2 or if new weaker materials are found and tested.

4. Subsequent to the February meeting, a scour detection study

was initiated by the District as part of its ongoing investigation at

Starved Rock Lock and Dam. A similar study was conducted at the Brandon

Road and Dresden Island Dams. In September 1977, WES was asked to

assist the NCC by drilling bedrock cores in scoured areas behind the

taintor gate dam. Careful examination, together with knowledge of the

local geology, could possibly indicate boulders within or covering

scoured-out holes. Soundings made in 1959, 1974, and those made in

1977 showed relatively deep scouring just downstream (D/S) of taintor

gate bays 8, 9, and 10.

5. At the completion of the Phase II and scour detection studies,

recommendations were made by the District to drill additional borings in

the head gate and taintor gate sections. These borings were necessary

to verify the base elevation of the dam and confirm the type of bedrock

beneath the dam. Borings were made and the information gathered from

them is incorporated in this report. This report presents the results

of the Phase II study and the results of the scour detection study de-

scribed in paragraph 4. Geological information obtained from these two

studies and the Phase I study was integrated with geological information

gathered from References 2 through 6 to make an evaluation of the

foundation condition. Attempts were made to gather additional informa-

tion on the foundation condition. The State of Illinois, the NCC, and

the Joliet Project Office (representatives of the operator, which is

the U. S. Government), and the Illinois Geological Survey were contacted.

6

Page 13: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

- -d

Little geological information was obtained dating back to the time of

the actual excavation for the lock and dam.

Objectives

6. The objectives of the Phase II study (complying with certain

OCE and NCD comments) were to:

a. Conduct limited drilling for laboratory testing of con-crete and foundation rock. The rock would be tested iffound to be different than rock previously observed atthe lock and dam site.

b. Make an analysis of tests conducted, a summary of the con-crete condition at specific locations, and an evaluationof the foundation using available geological information.

The objective of the scour detection study was to ascertain the top of

sound rock and the presence of boulders at specific locations behind

the taintor gate dam structure.

Scope

7. The compliance and scour detection drilling (4 and 18 borings,

respectively) was accomplished using a WES drilling crew, plant, and

supplies. NCC Construction and Operation Division supplied the floating

plant assistance for drilling on the river. A Bureau of Reclamation

geologist on contract to WES logged and preserved the core for testing

during the compliance drilling. A WES geologist performed similar duties

during the sar detection drilling. The core was transported to the

WES as soon feasible after drilling was completed for each job.

8. The objectives of the compliance study were accomplished by

drilling concrete and bedrock core and by conducting characterization

property tests (unit weight, compressional wave velocities, and compres-

sive strength tests) and engineering design tests (moduli, Poisson's

ratio, and direct shear tests). Direct shear tests were conducted on

intact core and core containing thin shale seams.

7

----- -- - ....... ilidiiA111608 im -

Page 14: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

-J -

9. The scour detection objective was accomplished by drilling

and then performing a detailed examination of the bedrock to determine

if the drilled rock had been recently disoriented. Information obtained

during drilling was used in determining if scoured holes were present

at selected drill locations.

10. A study was made to consolidate and evaluate engineering in-

formation, geologic and boring data, and laboratory test data as they

relate to the foundation conditions at the Starved Rock Lock and Dam.

Available construction and engineering data records were reviewed.

8

Page 15: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

PART II: DRILLING AND EXPLORATION

1Previous Exploration

11. From available information it was learned that 36 borings

were made by the State of Illinois in 1921 in connection with original

construction of the lock and dam. Forty percent of the borings were

drilled to a depth of about 25 ft, 30 percent to a depth of about 40,

and the remaining 30 percent up to depths of 65 ft. The boring logs do

not provide for an engineering evaluation of the bedrock or the over-

burden; detail is lacking from graphic representation of these borings.

The top of bedrock, the type of rock encountered, and the top of a sand-

stone bed in dolomite is in good agreement with the more recent informa-

tion gathered by the NCC and the WES drilling efforts.

12. In addition to the original exploration conducted by the

State of Illinois, drilling was performed by the NCC in 1971-1972 and

in 1974 through contract drilling by a private concern; the WES con-

ducted two separate drilling operations in 1977 and 1978.

13. The 1971-1972 drilling by the NCC was for purposes of:

a. Obtaining a foundation appraisal of the bedrock andbackfill.

b. Providing design parameters for use in a structuralstability analysis.

Thirteen borings were put down, 11 in the backfill adjacent to the lock

and 2 in front of the taintor gate dam section; 7 borings were in support

of the foundation appraisal and 6 for purposes of installing piezometers.

Six borings were drilled into bedrock while the others were put into

overburden. Nineteen borings were drilled on the land side of the lock3

in 1974 in connection with the proposed Duplicate Locks program.

Foundation core was sampled for purposes of conducting laboratory tests

appropriate for those bedrock conditions revealed in the core. A sum-

mary of the foundation condition was also made during the Duplicate

Locks investigation.

9

Page 16: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

14. The WES drilling was in support of the Phase I major rehabili-

tation (see paragraph 2) of this report. During the rehabilitation study

nine vertical borings were put into bedrock. Five borings were put

through and behind the lower approach wall; two went through the con-

crete wall into bedrock and three were put down in the backfill adja-

cent to the wall. Four borings were put down into bedrock behind (down-

stream) of the taintor gate dam section.

Current Drilling

15. Drilling equipment consisted of an Acker Toredo Mark II skid-

mounted rotary drill rig. A Diamond Core Drill Manufacturers Association

standard 6-in. by 7-3/4-in. double tube swivel tube core barrel was used

with diamond bits to obtain the concrete and bedrock core. Access to

the drill holes was by a marine floating plant and for holes on top of

structures by crane. Floating plant was supplied by NCC. Continuous

samples were obtained in all borings. Eight-inch casing was set in the

bedrock when necessary to keep a boring open.

16. Twenty borings were drilled during the compliance phase of

the study; 4 were scheduled originally and 17 added at the end of the

study to confirm base elevations. Of the four borings originally sched-

uled to be drilled during the compliance study, only three were completed,

as L-1 (through land lock wall) was drilled during the Phase I work (see

paragraph 21, Reference 1, for explanation). The remaining three borings,

D-11, D-12, and D-13, were drilled through the head gate dam structure,

the sixth taintor gate pier, and the fixed dam section, respectively.

Of the 17 borings added at the end of the compliance study (D-60 through

D-76), 1 was drilled in the ice chute bay area, 3 in taintor gate bays,

and 17 in the head gate dam section.

17. Boring locations for the scour detection study were assigned

within the scoured areas as indicated by profiles of soundings made by

the NCC. Appendix A contains the graphical representations cf the scour

soundings made by the NCC. Borings were assigned in areas where high

10

" = .. . - - H ll ...i: , -" i - ; , , - - ....,, ... " ...

Page 17: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

. .

peaks and low valleys were indicated on the profiles of soundings.

Generally, one boring per taintor gate bay was drilled.

18. The scour detection drilling consisted of 18 borings. Seven-

teen borings were put down behind the dam and one in front; the one in

front was drilled to provide geological information for an upstream-

downstream geologic cross section. Fourteen borings were located from

10 to 42 ft D/S from the vertical D/S face of the taintor gate piers;

one was drilled 2 ft U/S from this reference point; and two were located

100 ft D/S of this reference point. One boring was located 27 ft U/S of

the nose of pier No. 11 and about 15 ft to the north of pier No. 11.

Five of the 18 borings went through the concrete apron; the concrete

averaged 12 ft in thickness. A majority of the borings were drilled to

a depth of about 10 ft; eight borings ranged in depth from 21.5 to

70.1 ft. Most of these deeper borings were taken 25 ft into bedrock.

19. Borings for installing extensometers were drilled in the

summer 1978, and information from the borings is included in this report

for completeness. The instrumentation drilling consisted of seven

borings. Three horizontal borings were drilled through taintor gate

pier No. 11 (southernmost pier) continuing into the abutment. The con-

crete varied in thickness from 7.0 to 8.5 ft; these three borings were

taken to 50-ft depths.

20. Total footage drilled during the compliance study, the scour

study, and the instrumentation study was 1159.0 ft. Of this total foot-

age, 538 ft of concrete, 606 ft of bedrock, and 15 ft of silt were

drilled. Selected portions of the concrete and all the bedrock were

preserved for possible laboratory testing during the compliance drill-

ing. The concrete drilled during the scour study was not wrapped nor

was the badly broken bedrock; almost all intact bedrock was preserved.

21. Procedures for handling the field samples and preserving core

for testing were the same as presented in Reference 7. Color photographs

of all core recovered are included in a notebook as Exhibit A to this

report for the scour detection core. Photos for the core recovered during

the compliance drilling are contained in Exhibit A to the Phase I major

rehabilitation report for Starved Rock (see Reference 1). Exhibits B

11

Page 18: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

and C contain the field core logs for the compliance and scour detection

studies; the three exhibits are on file at the NCC.

22. Core recovery was good in the concrete and bedrock for the

borings in the lower approach wall, lock structure, ice chute, and

taintor gate structure. The average core recovery, using total footage

of concrete and bedrock, was 98.5 percent. Core recovery in the head

gate structure, using total footage of concrete and bedrock, was 94.8

percent. Relatively speaking, there is little difference between the

recovery in the head gates area and the rest of the lock and dam struc-

tures. However, when core recovery in the head gate area is based on

bedrock footage, a significant difference exists. Using only bedrock

footage from the head gate structure, core recovery is 85.2 percent. The

core loss occurred in a very friable, loosely cemented sandstone that is

fine-grained and varied in color from black, dark gray to light gray,

green, and white. A 2.9-ft loss in one boring in the head gates struc-

ture occurred at the concrete-bedrock interface. Two other borings show

core loss beginning at 0.7 and 0.9 ft from the interface. An average

loss of 2.2 ft occurred in 13 of the 15 borings in the head gate

structure.

23. Available information from seven projects at Starved Rock for

which borings were made, the number of borings, and the boring series

numbers are given in the following list:

No. ofProject (Agency) Year Borings Boring Series No.

Original Construction 1921 36 1-36(State Illinois)

Structural Stability 1971-1972 7 SACSR-l, through -7

Analysis (NCC)

Duplicate Locks (NCC) 1974 19 CSR-1-74 through -19-74

Phase I, Major 1977 9 SR WES GW-l, 2-77Rehabilitation (WES) SR WES GWB-I, through 3-77

SR WES D-14 through D-17-77

Phase II, Compliance (WES) 1977 4 SR WES L-1-77SR WES D-11 through D-13-77

12

Page 19: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

No. ofProject (Agency) Year Borings Boring Series No.

1979 17 SR WES D-60 through D-76-79

Scour Detection (WES) 1978 18 SR IES D-35 through D-52-78

Left Dam Abutment 1978 7 SR WES D-53 through D-59-78Instrumentation (WES)

24. Table I is a listing under each project of the above-listed

borings; the State of Illinois borings are not included due to lack of

information. The following information is presented for each boring:

the boring type symbol, the location by structure, the elevation of the

top of boring, the elevation top of rock, and the elevation bottom of

rock, and the date when the boring was started.

25. Figure I shows the relative location of every boring listed

in Table I plus the original construction borings. More precise locations

for the NCC and WES borings are shown in key plan views on the log of

borings. The logs of borings for the compliance and scour detection

studies are shown in profile in Plates I through 7g. The logs of

borings for selected holes drilled during the Phase I rehabilitation

study are also presented in Plates I through 4.

13

13

Page 20: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

CSR 6

00

CSR I COP

a a

0 74 D680 76 073

0672

D 071D69

4070

D11

01

ND6

00

240

*~ 046 0

0t 043

13 6 0

05

* Construction boring , 1921 ____________________

A NCC boring .1971 & 1972

* NCC boring, 1974* WES boring, 1977,1978 &1979 --

13i b~

Page 21: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

CSR 17

CSRI 4

CSeR 00

CSp 8 CSR 18

CSR 4 0CSR 12 4

49CSR 9 COR lS

CSRSCSR 0 7 CSRI s; 0

csp~CS 5 S01

cs 0

Io.. m mo.a 19 2sawn-Inf

22

33 FLOW

~~067

046060

7!0 D9

DTRf 61KLOKAN A

DLLNO4 WATRWA

BOIN LOCATION

JAUAY 5~

FIGRE

Page 22: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

PART III: SCOUR DETECTION RESULTS

26. The scour detection drilling supplied information about the

top of sound rock at specific locations behind the taintor gate dam.

Geological information obtained from the borings was used along with

similar information from other borings at the lock and dam site in making

an evaluation of the foundation. This part of the report deals with the

top of rock and the scouring. In response to inquiries made of the

Chicago District and the Joliet Project Office, it was learned that no

information was available concerning the possible filling of scoured

areas at the Starved Rock Dam. Corps personnel contacted did not know

whether the State of Illinois (original owners) or the Corps placed any

stone or other fill behind the dam to fill scoured areas.

27. No evidence of displaced or recently (post-dam construction)

disoriented rock blocks was found during the drilling of the scour detec-

tion borings. The scour borings showed that the top 4 ft of bedrock

consisted of friable sandstone, loose material or hard dolomite and

sandstone. Of the 17 borings drilled behind the dam, 5 contained fria-

ble sandstone, 4 contained loose material, 2 contained hard dolomite,

and 1 contained moderately hard sandstone. The remaining five borings

were drilled through concrete. The loose material includes sand, sand-

stone, dolomite, metal pieces, and metamorphic rocks. Some of the mate-

rial is local bedrock (the sandstone, sand, and dolomite). The remainder

is rock and debris presumably transported by the river. The loose mate-

rial is located downstream of the taintor gates 9 and 10. The thickest

accumulation (4 ft) of this material was found 17 ft downstream of the

apron of gate No. 10.

28. The NCC conducted scour soundings in 1959, 1974, and again in

1977. In comparing the results of the current scour detection study

and the 1977 sounding results, large discrepancies are seen. Depths of

scouring were compared whenever a WES drill site intersected a profile

traverse (taken perpendicular to the dam) made by the NCC. Of the 11

borings drilled directly into bedrock, only 2 top of rock elevations

matched the 1977 sounding elevations. Four borings are within 2 to 3 ft,

17

Page 23: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

four borings are within 7 to 9 ft, and one boring is within 13 ft of the

1977 sounding elevations. When the same WES data is compared to the 1974

soundings, the difference is considerably smaller for a number of compari-

sons; i.e., the largest difference (13 ft) becomes 1 ft. The NCC and

WES top of apron elevations are within several inches, which indicates

both parties used the same reference elevations. The discrepancies in

elevations between the previous soundings and the current WES work could

be attributed to the highly irregular surface of the bedrock just down-

stream of the dam section. This is somewhat reasonable due to the pres-

ence of the friable and sometimes highly fractured sandstone in this

area. Large discrepancies could easily occur with high narrow ridges

running perpendicular to the dam. For example, if one profile line was

run several feet to one side of a previous line, and one line was on a

high ridge while one line was in a trough, then large differences in

elevations would be observed.

29. Five borings were drilled through the concrete apron into

bedrock for purposes of detecting possible undercutting of the apron and

ascertaining apron thickness. The contact between concrete and bedrock

was tight in all five borings, i.e., borings D-38, D-41, D-42, D-43, and

D-48. Borings D-41, D-42, and D-48 showed the concrete to be resting

directly on competent dolomite. Boring D-38 contains a thin green clay

seam and D-43 contains a thin green shale seam at the contact.

30. No undercutting of the concrete apron was found in the five

borings drilled through the apron. The concrete apron thickness shown

on original working drawings is 5-ft minimum. The five current borings

through the apron show the concrete to be from 10.7 to 14.3 ft thick.

The thickest concrete was found in borings D-41 and D-42 located in gate

bays 8 and 7, respectively. By superimposing the original construction

drilling core record from boring No. 5 in gate 8 (see Plate 13), a 9-ft

thick clay seam or lens is shown from el 417 to 426 ft. It is evident

that the thick clay in this area was removed during construction, based

on the fact that the base of the apron was founded at el 415.5 and

416.0 ft as shown in D-41 and D-42, respectively. It is reasonable to

assume that the taintor gate pier 8 was founded at the same elevation

as the apron.

18

____________________

Page 24: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

31. Of concern during the Phase I work was the 1-ft thick clay

bed or lens found in the St. Peter sandstone in boring D-14-77 betweenIel 411 and 412 ft. The bed or lens is located 4-ft downstram of taintor

gate No. 8 (pier 8 was referred to as pier No. 4 in Reference 1). The

two borings D-41 and D-42 were drilled to investigate the possibility

that the 1-ft thick clay bed or lens extended upstream under the pier

and/or concrete apron. The St. Peter sandstone was missing just to the

north and just to the south of pier 8 in borings D-41 and D-42. It is,

therefore, assumed that the clay found in D-14-77 was either part of the

clay body that was removed during construction, or is a clay lens of

limited extent. A few thin (<0.1 ft) clay seams are present in the

dolomite recovered from borings D-41 and D-42. However, they occur

about 4 ft below the concrete-bedrock contact.

19

4

Page 25: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

PART IV: GEOLOGICAL CHARACTERISTICS

Backfill

32. The backfill behind the lower approach wall and the land lock

wall is described in References 1 and 2. The backfill is probably spoil

from the lock and dam excavations and consists of a mixture of clay, sand,

gravel, and boulders. Recommended design values for the backfill are

presented on page 18 in Reference 2.

Bedrock Stratigraphy

33. The bedrock beneath Starved Rock Lock and Dam consists of the

St. Peter sandstone and the Shakopee dolomite Formations of Ordovician

Age. The St. Peter Formation is represented at Starved Rock by two of

its members, the Tonti and Kress sandstones. The Tonti is a fine grained,

well sorted, friable or weakly cemented, porous sandstone; the Tonti

recovered in the head gate dam section varies in color from dark gray to

gray, green, and white. The sandstone has colored layers. The sandstone

in contact with the concrete in the head gate dam is dark gray to gray,

fine grained and moderately friable to friable; occasional lenses of

loose sand were found and zones of core loss were common. Beneath and

interbedded with this layer is a light green to green, fine-grained

sandstone with 5 to 10 percent clay mixed within the sandstone. Beneath

the green layer is a light gray to white, fine grained sandstone with

occasional interbedded thin black layers just above the underlying Shakopee

dolomite. The Tonti contains few or no impurities. It contains some

crossbeds. The Kress Member is a coarse rubble or conglomerate of chert

in a matrix of sand, clay, or shale, and is interpreted as a residue from

the solution of the underlying cherty dolomite and sandstone.

34. The Shakopee Formation is a thin to medium bedded, fine-

grained, argillaceous to pure, light brown to light gray dolomite. It

contains green to light gray clay and shale in seams that range from a

thin film to 1.5 ft in thickness. The term "filled parting," or just

20

Page 26: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

"parting," is used interchangeably with the term "seam." About 80 percent

of the filled partings range from a film to < 1/8 in. in thickness; about

10 percent of the filled partings range from 1/8 in. to < 1/2 in. in

thickness; and about 10 percent are > 1/2 in. in thickness. The surface

of the partings (host rock containing the filler material) is a natural

discontinuity, normally a bedding plane separation. The two surfaces

containing the filler are generally undulatory in nature, peak to valley

distance is about 1/2 in., and have periods of about 2 in. The peaks

are generally narrow, pointed asperities that are interlocked. About

80 percent of the film to < 1/8-in. thick partings are not uniformly

thick; rather, the filler coats about 60 to 70 percent of these parting

surfaces. The filled partings from 1/8 in. to < 1/2 in. in thickness

generally have parting surfaces that are 70 to 100 percent coated by the

filler. Observations of the thicker seams reveal that their parting

surfaces are coated 100 percent of the time. The thinner seams are con-

sidered to be discontinuous across the foundation. A few of the thicker

seams can be traced over several hundred feet.

35. The Shakopee also contains several beds of medium grained

sandstone and small quantities of buff-colored siltstone. The sandstone

beds are usually thin and discontinuous, with the exception of one con-

tinous 4-ft thick sandstone bed. The Shakopee also contains chert found

in discontinuous bands and isolated nodules. The chert is massive but

at times becomes oolitic or partly sandy. The Shakopee contains beds of

conglomerate and breccia. These appear to have formed essentially in

place. Algal reefs are found in the borings and range in thickness from

isolated fragments found in the conglomerate to 2 ft thick.

36. The contact of the St. Peter and the Shakopee Formations repre-

sents a major unconformity. This feature was examined in detail in the

resurfacing report. A general columnar section of the St. Peter sand-

stone and Shakopee dolomite found in the general vicinity of the lock

and dam is presented in Figure 2.

21

Page 27: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

NORTHERN ILLINOIS ______

Group Fm Member Feet

Ilarmony Hill 0-27 - -

Loughridge 0-22

C: a Daysville 0-75 ---

0 Kingdom 0-40

Starved Rock 0-235

C..)Tonti 30-300.

Ct)

________ Kress 0-170 Xex

A

0-2000

Figure 2. Columnar section typical of the Starved RockLock and Dam area

22

Page 28: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

Geologic Cross Sections

37. The cross sections were drawn with the intention of not show-

ing every lithologic and structural feature observed in the core. To do

so would unnecessarily clutter the cross sections. A detailed descrip-

tion of the core is given in the log of borings (Plates 1 through 7g).

38. The locations of the nine cross sections selected to illustrate

the foundation conditions at the lock and dam are shown in Figure 3.

The cross sections were drawn incorporating selected borings from the

seven projects listed in paragraph 23. The following tabulation gives

the cross sections, general location of section, borings in sections,

and plate number of sections.

Plate

Section General Location Borings in Sections No.

A-A' Dam axis SACSR-1, SACSR-4 through 6, 8

L-1, D-11 through 17*

B-B' Lock and lower guide wall SACSR-1 through 4, SACSR-7, 9

SACSR-4, SACSR-7, GWB-1, GW-I

and 2, L-1

C-C' Dam axis SACSR-1 and 4, L-1, D-11 10

through 13, D-35 through 43,

D-45, D-48 through 52, D-60

through 70, D-71 and 73

D-D' Taintor gate dam D-46 through 49, D-52, D-58 11

and 59

E-E' Taintor gate dam SACSR-5, D-16 and 17, D-51 12

F-F' Taintor gate dam 5, D-14 and 15, D-41 and 42 13

G-G' Taintor gate dam 6, D-50, D-52, D-56 and 57 14a

H-H' Head gate dam D-73 and 74, D-74 14b

I-I' Head gate dam D-71 and 72, D-76 14c

SACSR, Stability Analysis Civil Starved Rock; L, lock; D, dam; GW, guide

wall; B, backfill.

The first five letters and the last two numerals have been omitted

from the WES boring numbers for purposes of clarity.

It i23

Page 29: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

CSRR 4

CSR 2 CR rCCSR ICSR0

0 CSR

CSR F-

222

07 070s

60

II F 04

0354 D62

0 0

2

Page 30: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

CSR 170

CSR 14

CSR a1 CSi

CS 0 CSp 150

CR40 CSR 12

0rc CSR 9 0 CSR 19

CSR07CSR t0

crs 5 CSR 1300 F-A cp

Scw t A to 28 a- 33 WiO.F?22

22

FLOW33

3 31. 20 SCM 1 27

D6

D 7AD6RE RC OC N DM'070OI ATRA

urn' BRING LCATIO

0AUAY197

DI R 61

Page 31: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

T -7r - .- - - 4 -

The detailed location of the borings can be found in the plan view at

the top of each plate. Note that the profiles are nonlinear since they

incorporate borings placed near to as well as on the lock and dam struc-

tures. These sections give a good overview of the bedrock beneath the

installation. Detailed drawings of the borings are found on the log of

boring sheets.

39. The above cross sections show the major rock types and

include selected features such as reefs, fault zones, solution cavities,

beds and lenses of shale, clay, sandstone, dolomite, and chert greater

than 2 ft thick. It is difficult or impossible to trace most of these

potentially weak features across the foundation at Starved Rock Lock and

Dam. For example, thin clay and shale seams found in one or more borings

are not continuous in adjacent borings and are therefore considered as

discontinuous features local in extent.

40. A shale bed found in a number of boreholes may be continuous

over the area of study. Plate 12 illustrates one case where it was

reasonable to connect up a shale bed within the St. Peter sandstone.

The bed is traced over a distance of about 200 ft and is found at el

423 to el 429 within this 200-ft distance; the unit ranges in thickness

from 1.0 to 1.5 ft. Other shale units are found at elevations ranging

from 414 to 435 ft, but it is not reasonable to connect these units up.

A shale bed in the Shakopee could be continuous in the fixed dam and the

first one-half section of the head gate dam. The shale is found at

el 426 to 432 ft and ranges in thickness from 0.5 to 3.5 ft. It is not

connected between borings because it is not found in some of the borings

in this area.

41. There were three other features observable in the cross sec-

tions which may be continuous over the extent of the lock and dam.

The first feature is a small displacement fault zone in the Kress sand-

stone. The second is a line of solution cavities in the Shakopee, and

the third feature is the conglomerate and breccia found principally above

the 4-ft sandstone layer in the Shakopee. These features will be dis-

cussed in greater detail in paragraphs in the Bedrock Structural

27

Page 32: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

Characteristics Section. One feature that is traceable over the area of

study is a 4-ft sandstone layer in the Shakopee dolomite; the unit can

be seen in Plates 9 and 10.

Bedrock Structural Characteristics

42. Bedrock structural characteristics relevant to the foundation

are presented in Plates 15, 16, and 17 for the scour borings. Structure

sections were not drawn for compliance cores because structural charac-

teristics of these cores were similar to the structural features of the1

core described in the Phase I program and in the scour program.

43. The nearest major regional structure is the Sandwich Fault

Zone; it is described in Reference 1. As described in Reference 3, joint

traces and the orientation of the Sandwich Fault shows a subparallel re-

lationship. However, a study of surface joint exposures over a large

area would be necessary to conclusively relate the fault zone orientation

to the joint orientation. Such a relationship within the structural

fabric of the area is probable. This does not imply specific fault

activity at the site. Boring information from across the lock and dam

foundation does not show evidence of any major faulting. Small displace-

ment faulting is observed as discussed below.

44. Small displacement faulting and slickensides in the bedrock

are common occurrences. The longest measurable displacement along a

fault is 1.5 ft in D-16. The boring is located approximately 4 ft D/S

of gate No. 3. Slickensides occur in the clay and shale seams which are

abundant in the bedrock. Slickensides occur on both low and high angle

fracture surfaces. There exists in the Kress sandstone a zone of small

multiple faults which occur in the elevation interval 420 ft to 425 ft;

displacement is on the order of 0.5 ft. These small faults are present

in borings in front of and behind the dam sections. The small displace-

ment faulting observed in the core is considered not to be a problem in

terms of structural stability. The cause of the faulLing is not known.

Soft sediment deformation or unloading phenomenon of the valley after

glaciation could have caused the faulting.

28

Page 33: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

45. Dips in local bedding range from < I to 12 deg when measured

between boreholes at the St. Peter/Shakopee contact. A 0.5-deg dip to

the southwest was measured on the 4-ft sandstone bed in the Shakopee

dolomite. This dip is consistent with regional dips cited in the

literature. The 12-deg dip range in local bedding is explained by the

fact that the St. Peter/Shakopee contact marks a major unconformity, as

mentioned in the Bedrock Stratigraphy, where the St. Peter rests on an

irregular erosional surface caused by solution of the underlying cherty

dolomite.

46. The 4-ft sandstone layer in the Shakopee dips slightly to the

southeast. The elevation of the top of the layer is highest at the lock

(414 ft) and dips to 401 ft near the southern end of the dam. Within

the layer, as shown in the scour borings, is a disturbance in which sand-

stone was vertically injected into sandstone. This is most noticeable

where the original sandstone is finely layered or where shale seams are

present in either body of sandstone. There are also occurrences of

sandstone being injected into dolomite (D-51, el 402; D-42, el 400; D-41,

el 408; and D-49, el 407). There is one instance of shale injected into

dolomite (D-48). This type of structure is possibly related to the

same forces which caused the formation of conglomerates and breccias in

the dolomite directly above the sandstone layer; see paragraph 48.

47. The Shakopee dolomite is dense to porous in nature. It con-

tains vuggy areas and, in several locations, has developed solution

cavities up to 0.4 ft deep. These cavities occur primarily in a band

from el 408 ft to 412 ft. The majority of cavities were revealed in

core obtained from behind and within taintor gate bays 7, 8, 9, and 10.

Gate 10 is adjacent to the left dam abutment.

48. Borings behind the dam revealed that the Shakopee below the

base elevation of the dam contains much more conglomerate and breccia

than was previously believed. The majority of the conglomerate and

breccia occurs above the 4-ft sandstone layer in the Shakopee. The

conglomerate is usually a dolomite aggregate in a dolomite matrix but

may occur as a dolomite aggregate in a sandstone matrix. The conglomer-

ate (and breccia) probably formed in place as explained in the Phase I

29

Page 34: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

I 1report, and may have formed shortly after lithifaction. The conglomer-

ate and breccia and numerous fractural zones contain fragments that are

of such an angular nature that they should pose no problems in terms of

structural stability of the lock and dam.

49. In cross sections (Plates 8 and 10) taken parallel to the dam,

the 4-ft sandstone bed is a near planar bed. However, in two cross sec-

tions (Plates 11 and 14) taken perpendicular to the dam, there appears

a slight upward bulge in the bed (and probably in the rock above the bed)

in an area directly beneath the dam. The release of "locked in" stresses

due to the weight of ice during glaciation could have contributed to the

bulge. An unloading phenomenon caused by the lessening of pressure on

the bed which occurred when the overlying bedrock was removed during

excavation for the dam could have contributed to the bulge. The direct

cause of the slight bulge is not postulated.

50. Thirty-four joints were found in the 46 borings put down at

the lock and dam site during the last 3 drilling programs; all borings

were in the head and taintor gate dam sections. The 34 joint dips were

plotted on the frequency histogram presented in Reference 1, and a similar

histogram was obtained. It is reasonable to say that the more recently

observed joints fit into groupings similar to those groupings obtained

at other locations over the project site, namely the lock area. Possi-

ble wedge-shaped failures involving the joints detected at the lock and

dam are described in References 1 and 3.

Possible Weak Zones

51. The major lithologic units, shown in the geologic cross sec-

tions, do not contain all the features considered as possible weak zones.

For specific weak features (friable sandstone, shale beds, fractured

rock, and clay- or shale-filled partings) at a particular location be-

neath a concrete structure, consult Plates 1 through 7g. The logs of

the borings show each weak feature observed during field logging and

the detailed laboratory examination of the cores. Design values for the

weak zones or seams can be obtained from the tabulation "Recommended

30

Page 35: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

r

Design Values for Rock." As an example, the geologic cross section in

Plate 9 shows that the major lithologic unit directly under the upper

land lock wall is dolomite. Looking at Plate 9 under boring L-1-77, no

weak seam appears. Looking at the log of borings sheet, Plate 2, one9

sees that the dolomite directly beneath the concrete contains a shale-

filled parting in a thin friable sandstone seam; just below that is a

shale seam in the dolomite.

52. A few shale- and clay-filled partings can be traced between

some borings. The majority of the partings in the foundation rock can

not be traced between borings and therefore are not considered to be,

in themselves, continuous under the lock and dam. Borings show that

most all sections of the taintor gate dam rest on competent dolomite

while other sections rest on or near sandstone or clay- and shale-filled

partings. Borings D-12 and D-38 show concrete founded on or near a thin

green clay seam (Plates 4 and 5); D-43 (Plate 6) shows concrete founded

on a thin green shale seam; and D-63 (Plate 7d) shows concrete founded

on a seam of white clayey sandstone. As discussed under Bedrock Stratig-

raphy, the thin filled partings have less than 100 percent coating on

their parting surfaces, and the partings have interlocking asperities.

Shearing resistance along this type of parting is much higher than the

shearing resistance would be in the filler material itself. These thin

filled partings, < 1/8 in., would offer more shearing resistance than a

shale bed of several inches in thickness.

53. The extremely low strength of the intact shale parallel to

its bedding dictates that, for conservative design, any shale bed be

treated as a potential sliding plane parallel to its bedding. Boring D-11

(Plate 10) shows a shale bed underlying the concrete in the head gate dam

section. It is believed that the same shale bed (approximate el 430 ft)

is present behind taintor gate No. 3 and could exist under a portion

of the taintor gate dam (see Plate 12). However, the shale bed is within

the St. Peter sandstone, which in all borings through the taintor gate

dam, has been shown to be missing. It was likely removed during con-

struction at this location also.

31

Page 36: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

54. Borings through the head gate dam reveal an important finding.

The first 13 of 30 gate sections were apparently founded on a sandstone

ridge. The thickness of the sandstone averages 5.9 ft and ranges in

thickness from 3 to 11 ft. The sandstone is moderately friable to

friable; it is moderately to weakly cemented with some lenses or layers

consisting of loose sand. High core loss was obtained in the sandstone

unit. The weakly cemented friable sandstone and loose sand are considered

as possible weak zones.

55. The first 3 and 4-1/2 ft of bedrock beneath the lower approach

walls in borings GW-i and GW-2, respectively, is fractured. The fractured

rock in these two borings consists of shale, clayey shale, friable sand-

stone with shale-filled partings, and cherty dolomite (Kress Formation).

This fractured zone constitutes a weakness in the bedrock and should be

considered in a structural stability analysis. Similar amounts of frac-

turing in the same type of rock exist under the downstream portion of the

landside lock wall (see Plate 2, Reference 2). The bedrock under the

upper portion of the landside lock wall and under the riverside lock wall

consists of dolomite with shale-filled partings and thin sandstone layers.

About 5 ft beneath the base elevation of the lock is the nominal 4-ft-

thick sandstone layer that is continuous over the lock and dam site.

The lowest value of internal friction ($ = 13.7 deg) obtained on a shale-

filled parting was measured on a test specimen recovered from this sand-

stone layer.

56. Another possible weakness in the foundation is the joint

system. Reference 1 describes the possibility of individual and conju-

gate joints forming rock wedges in sections of bedrock where scouring

has occurred. Shear strength parameters for natural joints in the sand-

stone and shale are presented in the Part VIII.

32

Page 37: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

PART V: TEST SPECIMENS AND TEST PROCEDURES

Cores Received

t

57. Concrete and rock core from 4 and 18 borings, compliance and

scour detection studies, respectively, were received at the WES. Perti-

nent information concerning the core received for the compliance study

is presented in Table 2. Similar information is not presented for the

core received from the scour drilling operation because none of the core

was scheduled for testing. No significantly different materials, i.e.,

different than obtained during the "Duplicate Locks" and "Phase I Major

Rehabilitation" programs,1 ,3 were recovered during the compliance or

scour detection drilling programs.

Selection of Test Specimens

58. A detailed visual examination of all the core was made for

detailed logging purposes and to assist in the selection of representa-

tive test specimens of concrete and of the different foundation materials.

Concrete test specimens from the deep vertical borings were selected

from the top, middle, and bottom of the core. No concrete was tested

from the core recovered from the taintor gate apron section.

Test specimen depths shown in the tables of test results represent the

mid section of the test specimen;&i.e., el 466.1 is the midpoint of a

piece of core from el 466.6 to 465.6. Six-inch diameter by twelve-inch

long concrete and rock cores were used for testing, the exception being

the specimens for direct shear testing. Direct shear specimens were

nominal 6-in. diameter and about 6 in. in length.

59. For the characterization property tests (effective (wet) unit

weight (y m), compressional wave velocity (V p), and compressive strength

(UC)) and the engineering design tests (modulus of elasticity, Poisson's

ratio, triaxial and direct shear), an attempt was made to select test

specimens to be representative of the rock in close proximity to the base

of the structure. The test assignment locations can be obtained from

appropriate tables of test results.

33

Page 38: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

60. A weakly cemented sand was recovered from beneath the head

gate dam and was tested in direct shear. The sand was obtained from

about 4 ft below the base of head gate bay No. 6.

Test Procedures

61. The characterization properties tests and the engineering

design properties tests were conducted in accordance with the appropriate

test methods tabulated below:

Property Test Method

Characterization

Effective Unit Weight (As Received), ym RTM 109Dry Unit Weight, Yd RTM 109Water Content, w RTM 106

Compressional Wave Velocity, V RTM 110 (ASTM D 2845)Compressive Strength, UC RTM 111 (ASTM D 2938)

Engineering Design

Elastic Modulus, E, and Poisson's Ratio, v RTM 201 (ASTM D 2148)Direct Shear Strength RTM 203

Proposed Rock Test Method, Corps of Engineers, in review prior topublication.

3

, I,

p3

L .i

Page 39: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

PART VI: TEST RESULTS AND ANALYSIS

Characterization Properties

I

62. The results of the characterization property tests and the

engineering design tests are presented in Table 3. The average value,

the range and the number of tests for the concrete and the dolomite

bedrock are summarized below:

Summary of Characterization Properties

Effective Dry Water Comp Wave CompressiveUnit Weight Unit Weight Content Velocity StrengthYm, lb/ft3 Yd, lb/ft 3 w, % Vp, ft/sec UC, psi

ConcreteAverage 153.2 145.1 5.6 15,597 6640Range 6.2 8.6 2.7 2,805 4750No. of tests 8 8 8 8 8

DolomiteAverage 160.2 154.4 3.8 15,717 5080Range 5.6 3.8 2.4 277 5270No. of tests 3 3 3 3 3

Only one specimen of sandstone was tested and its properties can be found

in Table 3. An analysis of the characterization properties will be pre-

sented for the concrete and dolomite.

a. Concrete. The unit weights are reasonable and consistentwith the unit weights reported in Reference 1 for corestaken from the head gates and tainter gates structures.Previous average values of 153.8 and 151.1 lb/ft3 for con-crete beyond frost-damaged zones compare well with theaverage of 153.2 lb/ft 3 presented in the above tabulation.The average compressional wave velocity for the previously

tested core from vertically drilled holes is 15,088 ft/sec(core from boring L-l) and compares well with the averagevalue of 15,597 ft/sec presented in the above tabulation.The average compressive strength presented above, 6640 psi,

compares well with a similar value of 5300 psi for cores

from the head gate and tainter gate dam sections as reportedin Reference 1. With the exception of the compressivestrength values, the range in unit weight, velocities,

35

am -_

Page 40: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

I

and moistures indicates uniformity of the internal con-crete at the lock and dam. The range in strength is largebut is attributed to two specimens with relatively lowstrengths (4510 and 3900 psi) obtained from frost-damagedconcrete zones. These strengths are considered quite ac-ceptable in terms of the static compressive loading thestructures will actually receive.

b. Dolomite. A limited number (3) specimens of dolomite weretested in order to verify that the dolomite beneath thedam sections was similar in unit weight, velocity, andcompressive strength to the same rock under the lock andlower approach wall. Characterization properties fordolomite from beneath the lock and lower approach wallare presented in Reference 3. The average unit weight,velocity, and compressive strength from Reference 3 is164.5 lb/ft3, 14,140 ft/sec, and 6300 psi; these valuescompare very well with similar values for dolomite tabu-

lated above. The dolomite bedrock beneath the head gatesand taintor gates dam sections is considered to have nearlythe same characterization properties as does the dolomiteunder the lock and lower approach wall.

Modulus of Elasticity and Poisson's Ratio

63. Results of the modulus of elasticity and Poisson's ratio are

presented in Table 3. The stress-strain relation for the concrete, sand-

stone, and dolomite are presented in Plates 18 through 21. The modulus

was calculated as an incremental value between 1000 and 2000 psi on the

stress-strain curve; in all cases this stress increment corresponds to

the linear portion of the stress-strain curve for the concrete and both

the sandstone and dolomite. The stress-strain curves for both rocks have

a concave upwards initial portion which represents closure of the cracks

formed from stress relieving the core and closure of inherent microfrac-

tures. Poisson's ratio was calculated at a stress value of 2000 psi.

64. The average modulus for the near surface concrete (to about

2.5-ft depth) and deeper concrete is 1.37 x 106 and 5.44 x 106 psi, re-

spectively; Poisson's ratio is 0.15 and 0.21, respectively. Both the

modulus and Poisson's ratio compare well with similarly located concrete

specimens tested and reported in Reference 1. The average modulus and

Poisson's ratio for the sandstone and dolomite is 2.10 x 106 psi, 0.26

36

Page 41: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

and 3.97 x 106 psi, 0.15, respectively. The value for sandstone (mod-

erately hard) is in good agreement with the previously reported moduli

and Poisson's ratio. The current modulus value for the dolomite is1

about twice as great as the previously reported value. The dolomite

specimens tested during this study were not as vuggy as those previously

tested, which could account for some of the difference in moduli.

Peak and Ultimate Shear Strength

65. The Duplicate Locks 3 and the Phase I Major Rehabilitation

reports contain direct shear test results that define the shear strength

parameters for the rock types and different rock conditions found at the

Starved Rock Lock and Dam. These values are presented in Part VIII of

this report.

66. A new material, one that was not recovered and tested in pre-

vious drilling operation, was recovered from a depth of 4 ft below the

base of head gate bay No. 6 in boring D-67. The new material was a

weakly cemented sand.

67. The sample was classified as a silty sand (SM). A direct

shear box (I by 3 by 3 in.), used for testing soils~was used to run direct

shear tests on the sand. The normal loads used were 2, 4, and 8 tsf.

A plot of the normal load versus shearing load is presented in Plate 22.

The angle of friction for the sand is 27 deg with a cohesion is 0.22 tsf.

68. Almost al- of the clay seams found in the core were in or

adjacent to zones of fractured dolomite or friable sandstone. Specimens

from these zones could not be obtained for shear testing. Attempts were

made in the field to recover testable specimens, but with very little

success. One specimen of competent sandstone from D-75 was received

intact. The specimen contained a sandy clay parting 1/8 in. in thick-

ness at its thickest point. The parting surfaces had interlocking as-

perities about 1/2 in. from peak "o valley, and the filler covered about

60 percent of the parting surfaces. The asperities were semirounded.

The asperity configuration was typical of the majority of clay partings

observed in the core.

37

Page 42: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

4i

69. The specimen was tested using the multistage loading tech-

nique because other specimens were not available. The normal load

versus shear load is presented in Plate 23. The peak shear strength

value of phi (0) is 57.9 deg and cohesion (c) is 2.5 tsf. The * of

57.9 deg is a reasonable value when it is compared to the lowest peak

phi obtained for the intact competent sandstone (51.7 deg); see Part VII

under "Recommended Design Values for Rock." The relatively thin sandy

clay filler apparently did not affect the shear strength of the discon-

tinuity.

70. Examination of the specimen after testing revealed that the

asperities were not sheared off at their bases; instead, a small amount

of the peaks were ground away. Higher normal loads than used would be

required to shear the asperities along their bases. A residual value

could not be obtained using the low range of normal loads of 2 to 8 tsf.

The 2- to 8-tsf normal load range was used because it adequately covers

anticipated field loads. Plate 23 presents the residual shear strength

obtained from direct shear tests conducted on precut competent sandstone1

samples. The precut failure envelope is presented for comparison.

71. There were no clay-filled partings in the dolomite available

for testing as mentioned earlier. Clay material was removed from a

number of the broken filled parting surfaces. The material was classi-

fied as sandy clay (CL) with a maximum plastic index (PI) of 28, a liquid

limit (LL) of 48, and a plastic limit of 20. A correlation between the

Atterberg limits of the CL material and shear strength was made using10

ETL 1110-1-58, dated 17 February 1972. It is recognized that correla-

tions of this type should not be considered complete substitutes for

shear testing.

72. The vast majority of the thin (<1/8 in. thick) filled partings

have interlocking asperities as described under "Bedrock Stratigraphy."

However, for the few relatively smooth clay-filled partings (<1/8 in.

thick and asperities of low relief and long period), an attempt is made

to approach a reasonable lower bound shear strength. Figure 4 is taken

from the ETL. For a PI of 28, the 4 range of all values plotted is 20

38

Page 43: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

---40

z BASED ON 300 TESTS,

L I

RAG OFAL

--

z

< VALUES PLOT TEDW

/AVERAGE CURVE

20O-

0 10

z 10 20 30 40 50 rO 70 80

4F

zI-2Fi uez o r l t o e w en n l s i i y i d xf r m T 1 1 -1 5I0

z3

Page 44: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

to 26.5 deg. This range of phi values could be used in a stability

analysis where relatively smooth clay-filled partings in the dolomite

are considered.

73. Because the vast majority of the clay-filled partings observed

at the lock and dam have interlocking surfaces, it is expected that theshearing resistance along a parting would be much greater than the shear-

ing reistance through the filler itself. However, a very conservative

estimate of the shearing resistance would be obtained if a 4 = 20 deg

and c = 0 (from Figure 4) were considered for clay-filled partings.

74. The shear test data for shale-filled partings in dolomite is

presented in Figure 5. The data presented in this figure was obtained

from a number of the previous WES drilling and testing programs at

Starved Rock Lock and Dam. Both repetitive loading and direct shear

test results are plotted. Almost all the test results are from repeti-

tive tests. It was necessary to conduct repetitive tests because during

the different drilling and testing programs only a few shale-filled

partings were obtained at a time. Shear stress versus shear and normal

deformation curves are presented in Plates 24 through 32 for the repeti-

tive tests. The shear stress versus shear deformation curves for the

direct shear tests are presented in Plates 33 through 35.

75. In the repetitive tests the specimen is initially sheared

until failure is obtained. The shear and normal load is released, and

the shear block repositioned and resheared under an increased normal

load. Repetitive testing can be useful; however, the test results are

difficult to interpret, since after initial shearing the discontinuity

surface undergoes irreversible changes that affect the shear strength

values from succeeding tests. The failure envelopes obtained from

repetitive testing will usually define strengths intermediate between

the maximum and residual strength. In general, repetitive testing will

yield a conservative estimate of the maximum shear strength. It is

recognized that repetitive testing may be used to measure the residual

shear strength. Continued displacement ultimately reduces the strength

available along the discontinuity to its residual shear strength. After

a number of shearing cycles, the maximum stress is, in fact, the

residual stress.

40

Page 45: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

7

Upper Croup 1D D12 396.8GW 2 416.3D-15 409.6

0 CSR-2 401.630 12

- CSR-7 418.1

C3 D-12 409.1

F0 D11 415.2

DIRECT SHEAR

25 _____5_ 0-432.0427.3

202

CID

15

Residua ailure eveope

4 60 c =2ts

1001

NormalalStress, envelop

Figure 5. Direct shear results, shale-filled parting in dolomite,Starved Rock Lock and D~am

414

Page 46: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

76. In Figure 5 the lower grouping of repetitive test results

represent the residual shear strength (r) for shale-filled partings in

dolomite; the *r = 26 deg and c = 0. A series of direct shear tests

was conducted, and the peak and residual stress values are represented

in Figure 5 by the open and solid circles. The residual stress values

were obtained by repositioning the shear blocks after the initial shear

was recorded, reapplying the same normal stress, and reshearing the

specimens. Each specimen was resheared from two to four times. The

residual shear stress obtained from the specimens tested at 2- and 4-tcf

normal load plot well within the lower group of repetitive test results.

The residual stress value obtained from the specimen tested in direct

shear at 6n = 8 tsf is outside the lower group. However, this is not

surprising considering the different specimens available for testing.

77. The shale-filled parting surfaces varied in roughness;

asperity height was from <1/16 in. to 1/2 in. and had periods of one to

several inches. The filler thickness varied from a film coating to

>1/2 in. In addition, the parting surfaces varied in the amount of area

that the filler coated. Some partings had 60 percent of their surfaces

coated while others had varying coverage up to 100 percent. The test

specimens in the lower group generally had relatively smooth parting

surfaces and uniform filler thickness.

78. In Figure 5 the upper group of test data shows considerably

more scatter than the lower group. Examination of the specimen partings

from this group revealed that the parting surfaces were rougher and that

the filler was thinner than specimen partings from the lower group.

Because of the scatter and the lack of test data at >8-tsf normal load,

a conservative failure envelope was fitted through the lowest data point

in the upper group. A 49 deg and a c = 2 tsf are conservative maxi-

mum shear strength values for the shale-filled partings in dolomite.

79. No samples of the friable sandstone were obtained for cross-

bed shear testing. Intact specimens were tested parallel to bedding and

shear strength parameters are presented in the tabulation of "Recommended

Design Values for Rock." Because of the relative homogeneity of the

friable sandstone, it is believed that cross-bed shear strengths would

42

Page 47: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

!I

approach the intact shear strengths. The intact shear strengths are

recommended to be used in place of cross-bed shear strengths.

43

Page 48: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

PART VII: CONCRETE CONDITION

Concrete from Compliance Borings

80. The concrete core recovered from boring L-l was tested during

the Phase I Rehabilitation program. Results of tests conducted on the

core can be found in Table 6 of Reference 1. The concrete core recovered

from the four compliance borings (L-l, D-11, D-12, and D-13) is in very

much the same condition as the concrete core recovered during the Phase I

drilling program. See pages 29 through 31 in Reference 1 for a general

description. Boring L-1 was drilled in the land lock wall (monolith 11)

and the core revealed that the top 0.6 ft of cncrete was new. The new

concrete had been placed as an overlay during a previous resurfacing of

the top of the lock walls. The remaining 42.9 ft of concrete is considered

structurally sound and should serve its original intended purpose. The

interface between the concrete and a thin friable sandstone seam is poorly

bonded. The concrete core recovered from D-11 in pier 14 of the head

gate section was new in the top 0.9 ft, again the result of an overlay

of new concrete. The remaining concrete appears sound except for local

honeycombing at about 6 and 12 ft up from the base of the pier. These

two areas are 0.2 and 0.5 ft thick, respectively; concrete aggregates

with little or no cement were recovered from these two zones.

81. The concrete core from boring D-12, which was drilled through

the 56.2-ft height of taintor gate pier 6, was moderately deteriorated

to 0.3-ft depth. The boring was put through the central section (through

the wooden walkway atop the taintor gate dam section). The remaining

concrete appears sound with three natural cracks that caused separation

of the concrete within 4.6 ft of the top of the pier. A construction

joint at el 453.7 (19-ft depth) is stained and contains a small amount

of cracking to a depth of 0.1 ft; the joint was a "cold joint." Upper

pool el is 459, so that water from the upstream pool could have access

to the construction joint causing the staining. The cause of the crack-

ing is not postulated. The concrete-bedrock contact was tight with the

44

Page 49: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

concrete resting on dolomite at el 416.5 ft. The concrete core in D-13

is sound throughout the 31.1 ft depth. The contact is tight with dolo-

mite present as the bedrock material. See Reference I for a descrip-

tion of the surface concrete in the lock, head gates, and taintor gate

structures.

Concrete from Instrumentation Borings

82. During the drilling operation for the abutment instrumenta-

tion study, two vertical borings were drilled in each of taintor gate

piers 10 and 11. These two piers were referred to as piers 2 and 1,

respectively, in Reference 1. Two borings were located 6.5 ft in from

the upstream side and on the piers' centerline. Two were located on

centerline and at 6 ft and 9 ft in from the downstream vertical face of

piers 10 and 11, respectively. The concrete core from the upstream

boring in pier 10 (borings SR WES D-58-78) is severely deteriorated to

a depth of 4.0 ft. From 0 to 2.5 ft only concrete aggregate and a few

pieces of matrix were recovered. The core from 2.5 to 4.0 ft is cracked.

Evidence of frost damage is present at a depth of 5 ft. Prior Lo drill-

ing D-58 the deepest frost-damaged concrete in the taintor gate piers

was found in piers 3 and 6 (pier 3 is referred to as pier 9 in Refer-

ence 1); it was 3.1 ft deep in each pier and was located near the nose

of the piers. Boring D-59, located near the downstream face of pier 10,

contained obviously frost-damaged concrete to a depth of 3.5 ft. The

concrete from 3.5 to 5 ft has numerous natural breaks that are slightly

weathered; these breaks could be the result of deeper freezing and thaw-

ing action. The core from both borings showed evidence of alkali-silica

reaction just beneath the frost-damaged zones and minor amounts near the

bottom of the core. Serious alkali-silica reaction is reported in Refer-

ence 1 for concrete in the head gate and taintor gate sections of the

dam.

83. Concrete core from the two vertical borings in pier dm (D-56

and D-57, located upstream and downstream, respectively) showed frost

damage to depths of 2 ft with small amounts of alkali-silica reaction

45

Page 50: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

products present just below the damaged zones. The core appears sound

below these zones. The concrete core indicates that the bases of

piers 10 and 11 rest on dolomite. Core from the two borings in pier 10

show competent dolomite beneath the base of the pier. Core from the

9 two borings in pier 11 show shattered dolomite from 0.1 to 0.3 ft below

the base of the pier. The shattered rock is possibly due to blasting

during excavation for the dam. The shattered rock could have resulted

in settlement or tilting of pier 11 and contributed to jamming the con-

nected taintor gate. The taintor gate is supported between piers 10

and 11 and the gate has been difficult to operate for a number of years.

The concrete from pier 11 did not show unusual signs of distress. The

three horizontal borings through pier 11 show frost damage to an average

depth of 1.7 ft. The previous study showed frost damage at an average

depth of 1.4 ft in a number of other taintor gate piers.

Base Elevation Revealed in Borings

84. The following tabulation is presented to summarize the actual

base elevations of the lock and dam structures as revealed in borings.

The tabulation indicates the different elevations to which some sections

of the structures were taken, in some cases quite a bit below the base

elevazions shown on working drawings. Local bedrock conditions during

construction probably dictated additional excavation.

WorkingDrawing ActualBase Base

Boring Boring Elevation ElevationStructure No. Location of Concrete of Ccncrete

Lower Approach SR WES GW-1-77 430.0 428.1Wall

Lower Approach SR WES GW-2-'-' 430.0 431.5Wall

Lock SR WES L-1-77 Land wall, 421.0 415.5Monolith 11

Fixed Dam SR WES D-13-77 Center 438.0 432.9

Head Gates SR WES D-I1-77 Pier 17 435.0 427.8

46

Page 51: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

WorkingDrawing Actual

Base BaseBoring Boring Elevation Elevation

Structure No. Location of Concrete of Concrete

Head Gates SR WES D-60-79 Bay 7 435.0 439.7Head Gates SR WES D-61-79 Bay 21 435.0 427.2Head Gates SR WES D-66-79 Bay 8 435.0 439.8Head Gates SR WES B-67-79 Bay 6 435.0 440.3Head Gates SR WES D-68-79 Bay 2 435.0 439.9Head Gates SR WES D-69-79 Bay 11 435.0 439.2Head Gates SR WES D-70-79 Bay 14 435.0 434.0Head Gates SR WES D-71-79 Pier 11 440.0 435.5Head Gates SR WES D-72-79 Pier 11 435.0 438.0Head Gates SR WES D-73-79 Pier 4 440.0 434.5Head Gates SR WES D-74-79 Pier 4 435.0 438.5Ice Chute SR WES D-64-79 Apron 430.0 419.5Taintor Gate SR WES D-62-79 Bay 1 426.0 419.5Taintor Gate SR WES D-63-79 Bay 4 426.0 417.0Taintor Gate SR WES D-65-79 Bay 2 429.2 419.6Taintor Gate SR WES D-12-77 Pier No. 6, 426.0 416.5

Pier CenterTaintor Gate SR WES D-56-78 Pier No. 11, 426.0 416.7Pier U/S

Taintor Gate SR WES D-57-78 Pier No. 11, 426.0 419.6Pier D/S

Taintor Gate SR WES D-58-78 Pier No. 10, 426.0 417.0Pier U/S

Taintor Gate SR WES D-59-78 Pier No. 10, 426.0 422.7Pier D/S

Taintor Gate SR WES D-38-78 Apron 426.0 420.1Bay No. 5

Taintor Gate SR WES D-41-78 Apron 426.0 415.3Bay No. 8

Taintor Gate SR WES D-42-78 Overflow Sec- 426.0 416.5Bay No. 7 tion

Taintor Gate SR WES D-43-78 Apron 426.0 418.9Bay No. 8

Taintor Gate SR WES D-48-78 Apron 426.0 418.9Bay No. 9

Figure 6 shows the scouring at the face of the apron in the taintor gate

dam as plotted by NCC. Superimposed on this graph are the actual base

elevations of concrete at boring locations given in the above tabulation.Figures 7, 8, and 9 show the scouring at the apron face in the head gate

dam. These figures illustrate the base elevation of the concrete as

47

Page 52: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

-r - --

Ktt 4;

-,-. 47.

-4~

71

*~~4 Aj~ nH

'.4- j4-T

'--II

L~t L-

4~1 1E~...

Figtrc %~n~r~1 i f i of pro

Page 53: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

-~ F~ T7

41

I. L...

l< rj

rj~

4 2) c t o -4* qj o7

410

-' E ROC DAM

rLo STLHI WATRWA

.7-,' A// 'A1-Z6., -J

- t--717 .1,101

Page 54: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

I7

I -

I ,,.,* 1 . -... -i,'

* I

k2,J

_6) .. . ... . -. .,

0)0

L172jj' I] -,,I

,,L I ~S WATE-WAY.. . .... . S n " 0

I I lI.....

-% " i I 0

Figure. S , t, apron -hedgts t-0I

le

Page 55: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

U 43.

iiiE l. NJ

Figure 9. Scouring at face apron -head gates 21-30

Page 56: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

revealed in borings. Indications are that the 1977 scouring has not

undercut the apron for the full length of the two dam sections. The

base elevation of the taintor gate dam section is variable, and extrapo-

lation of these actual base elevations to other sections of the taintor

gate should be done with caution. The head gate dam appears to have been

built using two different design criteria. The first 16 gate bays are

founded on weakly cemented and friable sandstone, the 17th pier founded

on a shale seam, while the remaining gate bays appear to be founded on

competent dolomite. Because of the variable foundation elevations in

the head gate dam section, extrapolation of foundation elevations to

other sections of the head gates, notably bays 17 through 30, could be

misleading. It is suggested that an NX boring be put through the bays

already not drilled to determine actual base elevations. A figure for

the ice chute is not presented. The one boring in the ice chute over-

flow section shows the base of concrete at el 419.5 ft; working drawings

indicate the base of this structure to be el 430.0 ft.

52

Page 57: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

PART VIII: SUMMARY OF FOUNDATION CONDITION, CONCRETEAND RECOMMENDED DESIGN VALUES

Scour Detection

85. Inquiries were made into the possibility that riprap or armor

stone had been placed in scoured areas behind the taintor and head gate

dams. To our knowledge this has not been done at Starved Rock Lock and

Dam.

86. A total of 17 borings were drilled behind the dam. No

evidence of displaced or recently (post-dam construction) disoriented

rock was found during the drilling of the scour drilling. The top 4 ft

of bedrock consists of friable sandstone or hard dolomite and moderately

hard sandstone. The top of rock is highly irregular. Loose material to

4-ft depths including sand, sandstone, dolomite, concrete, and metamorphic

rock was found within 130 ft of the left dam abutment; local bedrock and

river deposits account for the loose materials. The scour data (top of

rock) did not agree with 1977 scour profiles compiled by the Chicago

District.

87. Eight borings (five for scour and three for compliance) were

carried through the concrete apron and overflow sections. The contact

between concrete and bedrock was tight, and the concrete was founded on

dolomite; thin shale- and clay-filled partings are at or near the contact

in two of the five borings. No undercutting of the apron was detected

in the borings. The eight borings through the apron and overflow section

show the concrete to be from 10.7 to 14.3 ft thick; minimum apron thick-

ness on working drawings is 5 ft.

88. During Phase I a I-ft thick clay seam or lens was found in

D-14-77 at el 411, 4 ft D/S of pier No. 8. Borings D-41 and D-42 through

the apron and overflow section on either side of pier 8 showed no trace Iof the clay. The clay remaining D/S is a portion of a clay lens that

was apparently removed during construction, or is just a small lens. 4I

53

Page 58: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

Foundation Condition

Backfill

89. The backfill behind the land lock wall and lower approach wall

is probably spoil from the lock and dam excavations. A mixture of sand,

clay, gravel, and boulders, the same as local bedrock, was recovered in

borings during the Phase I and Structural Stability 2 exploration. The

material did not appear to be stratified.

Bedrock stratigraphy

90. The Ordovician St. Peter sandstone and the Shakopee dolomite

were the two strata encountered at the lock and dam site. The Tonti and

Kress sandstones represent the St. Peter sandstone formation. The Tonti

member is a medium- to fine-grained, well sorted, noncalcareous, friable

sandstone. The Kress is a coarse rubble or conglomerate of angular chert

sometimes in a matrix of green shale, sand, or clay. One-foot thick

shale layers were found in the Kress.

91. The Shakopee dolomite formation is light brown to light gray,

fine-grained, argillaceous to pure and occurs in thin to medium beds.

It contains lenses and layers of sandstone up to 4 ft thick, shale seams

up to 0.3 ft thick, and shale- and clay-filled bedding planes throughout.

Algal reefs up to 1 ft thick are found in the Shakopee.

92. A major unconformity separates the St. Peter and the Shakopee

in the Starved Rock area. An interval of erosion and nondeposition H

created the irregular erosional surface that separates these two bodies

of bedrock. This irregular surface explains some of the differences in

elevation of the contact between the St. Peter and the Shakopee.

Geologic cross sections

93. Nine cross sections were drawn; one along the lock land wall

and the lower approach wall, two along the dam, and six perpendicular

to the dam structures. The sections clearly indicate the unconformable

contact between the St. Peter and Shakopee formations. The sections

delineates the 4-ft sandstone bed within the Shakopee; the bed is con-

tinous under the lock and dam. Reefs, fault zones, solution channels,

and occasional discontinuous seams and lenses of clay, shale, sandstone,

54

Page 59: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

dolomite and chert can be traced between some borings. Log of boring

sheets give the location of each of these and additional similar features

observed in the core.

94. In addition to the 4-ft sandstone bed, four other features

observable in the sections may be continuous over the lock and dam site.

They are the small displacement fault zone in the Kress sandstone, solu-

tion cavities in the Shakopee, conglomerate and breccia found above the

4-ft sandstone bed, the shale bed found within the Kress sandstone. No

clay seams were traceable across the lock and dam site.

Bedrock structural characteristics

95. Local bedding dips from <1 to 12 deg at the formational con-

tact, while in the 4-ft sandstone below this contact a 1-deg dip exists.

The St. Peter/Shakopee contact marks a major unconformity which is an

irregular erosional surface caused by solution weathering.

96. The Sandwich Fault Zone, 26 miles to the northeast, is the

only major regional structure. No major faulting was observed in the re-

covered bedrock core. Small displacement (<1.6 ft) faulting and slicken-

sides occur frequently in the core. A zone of small faults exists in

Kress sandstone within el 420 to 425. This faulted zone was not seen in

core recovered from beneath the dam sections. The faults detected in

the foundation are considered not to be a problem in terms of structural

stability.

97. A total of 22 borings were put through the concrete dam sec-

tions. The Kress, mostly friable, coarse rubble or conglomerate in a

matrix of shale, sand, or clay, was apparently removed prior to construct-

ing the taintor gate dam section. The Tonti, almost pure, friable sand-

stone, was found directly under at least the first 16 of the 30 head

gate bays. The 12 borings in the taintor gate dam showed the base of

the concrete to be founded on competent dolomite. However, in some of

the core shale- and clay-filled partings and clay seams were present at

or near the concrete/bedrock contact. The dolomite is dense to porous in

nature. It contains vuggy areas and in a few locations has developed

solution cavities up to 0.4-ft deep. The porous nature of the dolomite

should not cause problems in terms of the dam stability.

55

Page 60: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

98. There appears to be a slight upward bulge in the 4-ft sand-

stone bed (and probably in the rock above the bed) in an area directly

*beneath the dam. This is seen in the cross sections perpendicular to

the taintor gate dam section. The bulge could be due to a type of

* unlooding phenomenon caused when the overlying materials were removed

during excavation for the dam. The release of "locked in" stresses due

to the weight of ice during glaciation could also have contributed to

the bulge.

99. The joints observed during the compliance and scour programs

are considered to be within the same joint sets reported previously.1'3

Reference 1 discusses the possibility of joints participating in local

failures of the approach and lock walls and of the dam:

Individual joints could provide an inclined surface onwhich a horizontal shear failure could daylight. Andif the orientation of joint sets form possible rockwedges, then sliding along the joint surfaces could oc-cur. One potential sliding mass is a wedge bound on thetop by concrete, exposed face due to scouring and twointersecting cross-bed joints. The formation of poten-tial wedges is illustrated in Figure 5 of Reference 3.

Examples of possible slide wedges are presented in Reference 1. Figure 6

indicates that the face of the taintor gates apron is not undercut when

the base elevations, as indicated in borings, are considered. It would

be undercut at gate bays 7, 8, 9, and 10 if the base elevation was as

shown on the working drawings. The occurrence of slide wedges at the

taintor gate dam is less likely because scouring is not as severe as

once thought.

Lower approach wall,landside lock wall

100. Possible weak zones under the lower approach wall and the

downstream portion of the landside lock wall are the fractured and the

intact rock containing friable sandstone with shale-filled partings,

and shale. The bedrock under the upper portion of the landside lock

wall and under the riverside lock wall is dolomite containing shale-

filled partings and thin friable sandstone layers.

56

. ..... .... ..........

Page 61: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

101. The recommended design values for the fractured rock zones

are 19r = 19deg, c = 0.5 tsf. The precut shear strength for shale is

given for this zone, as it is the prominent rock type in the fractured

zone. The recommended design value for the friable sandstone within

the intact rock (dolomite) is 4 = 27.1 deg and c = 5.9 tsf. For the

shale-filled partings in dolomite, the recommended design values are

r = 26 deg and c = 0. For the portions of the walls where a shale unit

is considered in the stability analysis, a 4 = 11.9 deg and c = 3.7 tsf

is recommended to be used.

102. The fixed dam was apparently founded on dolomite that contains

shale-filled partings that are considered possible weak zones. One boring

through the head gate dam shows the concrete base resting on a shale seam

about 0.6 ft thick with dolomite beneath. Because of the low strength of

the intact shale parallel to its bedding, for conservative design, any

shale bed should be treated as a potential sliding plane parallel to its

bedding. The shear strength values for the shale are 4 = 11.9 deg and

c = 3.7 tsf.

103. One possible weak zone beneath the head gate dam is the weakly

cemented silty sand found directly below the concrete in bays 1 through

13. The shear strength values for the silty sand are 4 = 27 deg and

c = 0.22 tsf. A second possible weak zone is the shale seam found

directly beneath pier 16. A 4 = 11.9 deg and c = 3.7 tsf is recommended

when this zone is considered in the stability analysis.

104. The taintor gate dam appears to be founded on competent dolo-

mite. The dolomite contains thin shale and clay-filled partings, and

friable sandstone layers. The thin (<1/8 in.) shale and clay-filled

partings generally have less than 100 percent coating on their parting

surfaces, and the partings have interlocking asperities. Shearing re-

sistance along these types of partings is higher than the shearing re-

sistance along a thicker section of filler material itself. The shale

and clay-filled partings in the foundation are not continuous under the

lock and dam; i.e., continuous in the sense that a large-scale failure

might occur along them. The partings occur frequently and randomly

throughout the foundation. A 4r = 26 deg and c = 0 and a 4 = 29 deg

57

Page 62: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

and c 0 for shale and clay-filled partings, respectively, are recom-

mended for the stability analysis when these fractures are considered.

105. Neither the scour nor the instrumentation borings revealed

any weak bedrock layer that is believed to extend under the bluff that

serves as the left dam abutment. Such a feature might have somethingfto do with taintor gate 10 being extremely hard to operate. One feature

found in the bedrock that may have influenced the gate is the upward

bulge of the bedrock directly beneath and parallel to the dam. The

bulge is thought to be due to rebound when the overburden was removed

during excavation for the dam; also, locked-in stresses (caused during

glaciation) could have been released at this time. The upward thrust of

the bedrock near the bluff might have been restrained by the bluff.

After completion of the dam, the restraining forces of the bluff could

have been relieved somewhat, thus allowing further upward bedrock move-

ment. The movement could have caused, in part, the gate becoming hard

to operate. The ongoing instrumentation program is designed to study

any movement in the foundation as well as in the bluff. No data is

available from the program at this time. Reference 1 outlines the in-

strumentation program currently underway at Starved Rock Dam.

Concrete Condition

106. In general the condition of the concrete core recovered during

the compliance and scour detection drilling is the same as reported in

Reference i. Boring L-1 in monolith 11, landside lock wall, revealed

0.6 ft of air-entrained concrete, the result of recent resurfacing. The

remaining 42.9 ft is structurally sound and should serve its original

intended purpose. The top 0.9 ft of concrete in D-11 (head gate dam) is

new and is the result of recent resurfacing. The remaining concrete is

sound with small areas of honeycombing near the base. Such small areas

of honeycombing should not affect the structural integrity of the dam.

The top 0.3 ft of concrete in the central section of taintor gate pier 6

is deteriorated due to freezing and thawing action; the remaining concrete

in the central core of the pier appears sound with small amounts of

58

Page 63: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

if

cracking and staining occurring on and near a construction joint. The

entire length of core from the fixed dam is sound. Reference 1 gives

details on the condition of the exposed and the near surface concrete

over the lock and dam.

107. Taintor gate piers 10 and 11 were drilled during the instru-

mentation program for the left dam abutment. The average depth of dete-

riorated concrete in the top of the D/S and U/S portions of pier 10 is

4.3 ft. Evidence of frost damage was found at a depth of 5 ft. Core

from the two borings in pier 10 shows evidence of alkali-silica reaction

beneath the frost-damaged zones. Similar occurrences of alkali-silica

reaction are reported in Reference 1 for core from the head gate and

taintor gate dams. The average depth of deteriorated concrete in the

top of the D/S and U/S portions of pier 11 is 2 ft. Small amounts of

alkali-silica reaction products were found in the core just below the

damaged zones. The concrete below these damaged zones and in the central

sections of piers 10 and 11 is structurally sound. Three horizontal

borings in pier 11 showed frost-damaged concrete to an average depth of

1.7 ft.

108. Of the 30 vertical borings through concrete in the lower ap-

proach wall, lock, and dam, 22 borings showed the founding elevation to

be below that shown on the working drawings. Ten borings in the taintor

gate dam section show the concrete to be an average 7.8 ft below the base

elevation shown on the working drawings. Consult the log of boring sheets

for actual elevations at specific boring locations. Removal of weak bed-

rock is the likely reason for the deeper founding elevations.

Recommended Design Values for Rock

109. Design should consider rock and sand type and the various

bedrock structural characteristics described herein. Guidance is pre-

sented in the following tabulation as to proper choice of design param-

eters. The tabulation is taken from Reference 3 and was updated with

values obtained during the more recent studies:

59

Page 64: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

W - -

Friable Competent

Dolomite Sandstone Sandstone Shale

Characterization Properties 3Effective Unit Weight, 3 lb/ft 157.0* 127.7 138.3 110.4Wet Unit Weight, lb/ft 162.0 140.2 147.7 129.9

Compressive Strength, psi 4870 540 4440

Tensile Strength, psi 110 75 175

Shear StrengthIntact c=90 tsf c=5.9 tsf c=0.9 tsf c=3.7 tsf

=56 ° 0=27.1° 0 =51.70 0-1.9

°

Natural Joint .... c=1.45 tsf c=D

=30.5° *=38°

Shale-Filled Parting c=O c=0.1 tsf c=1.8 tsf --S=26

° 0 r=350 r=26.2°

Precut, Rock-on-Rock c=0.0 c=0.0 c=0.0 c=0.5 tsf

Or=31 ° Or=33,5 0 4r=31° r=19 0

Concrete on Rock c=1.6 tsf -- c=0.2 tsf --=63 °0 ** =73.90

Cross-Bed c=22.2 tsf c=i.1 tsf ....p=73.1 =38 °

Modulus of Elasticity 1.82 2.00x 106 psi

Poisson's Ratio 0.13 0.12

Shear Modulus 0.65x 106 psi

Silty Sand (SM) c = 0.22 tsf, p = 270

tsf, tons (force)/square foot

Newer lower value obtained during the Phase I investigation.

Values presented in Reference 2.

Recommendations

110. It is recommended that at least five NX borings be drilled

through head gate bays 17 through 30 to determine base elevations.

60

Page 65: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

REFERENCES

1. Stowe, R. L., Pavlov, B. A., and Wong, G. S., "Concrete and Rock CoreTests, Major Rehabilitation of Starved Rock Lock and Dam, IllinoisWaterway, Chicago District, Phase I Rehabilitation," MP C-78-12,U. S. Army Engineer Waterways Experiment Station, CE, Vicksburg, MS,Sep 1978.

2. Department of the Army, Corps of Engineers, Chicago District,"Appendix A, Soils and Geology for Structural Stability Analysis,

Starved Rock Lock and Dam, Illinois Waterway," Nov 1972, RevisedSep 1973.

3. Stowe, R. L., and Warriner, J. B., "Rock Core Tests, Proposed Dupli-cate Lock - Phase II, Starved Rock Lock and Dam, Illinois River,Illinois," MP C-75-9, U. S. Army Engineer Waterways Experiment Station,CE, Vicksburg, MS, Jun 1975.

4. Willman, H., Atherton, E., and Others, Handbook of Illinois Stratig-raphy, Bulletin 95, Illinois State Geological Survey.

5. Templeton, J., Willman, H., Champlanian Series (Middle Odovician) inIllinois Bulletin 89, Illinois State Geological Survey, 1963.

6. Krumbein, W. C. and Sloss, L. L., Stratigraphy and Sedimentation,2nd ed, Freeman, San Francisco, 1963, p 132.

7. Stowe, R. L., "Concrete and Rock Tests, Rehabilitation Work, BrandonRoad Dam, Illinois Waterway, Chicago District," Miscellaneous PaperC-78-4, May 1978, U. S. Army Engineer Waterways Experiment Station, CE,

Vicksburg, MS.

8. Stowe, R. L. and Pavlov, B. A., "Concrete and Rock Tests, MajorRehabilitation of Dresden Island Lock and Dam, Illinois Waterway,Chicago District, Phase II Compliance and Scour Detection," in Publi-cation as WES MP report.

9. Stagg, K. G. and Zienkiewicz, 0. C., Rock Mechanics in EngineeringPractice, John Wiley and Sons, London, 1968, p 49.

10. U. S. Army Office, Chief of Engineers, "Engineering and Design:Correlation of Atterberg Limits and Consolidated Drained DirectShear Strength," ETL 1110-1-58, 17 Feb 1972.

11. Deere, D. U., Hendron, A. J., Patton, F. D., and Cording, E. J.,(1967), "Design of Surface and Near Surface Construction in Rock,"Proceedings 8th Symposium on Rock Mechanics (AIME), p 237.

61

Page 66: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

.- N- - N- N- N- N- N- N- N- r- N- N- N- N- N- r, N- N- r,-l

M~4 1 :3 j Q :3 z0 J 0~ (1) 0 Q) QJW (1 0< << c In I I I <~ I < " r I < < U z ) I i I m~/ w

J.J'- u-caq -4a ' C4Cq C q-- 14

k". 0 NO . oc IC ;(; ;c z4 C c;C C

ao

0

4 C CUl ,-~NLr ~ 1 -4ra E-04 .w

M,-'- ri -T00oo 01' ) T1 o 1 In r- CtID 0m . 0O co00-4

ca 0 4'-4 T C 1 0 0 l c c "

-o 0'-4 41

'-4 Qal rf

-s C4 -4 -4 -. 1 -4 -4 14 4 Ir. 0

Q) w"a"-4Iipu1 0" a10l V"V" 0 10 -4

0 r4 r rd 4 rH.4 . 4 ,. r H H r.1 H q-4H H r4..Ir -4H 00 1 n ()W c ( l o0 nr )(n m w V o U ) c

*41h u U u U U U "0 "o "a- 0" 0a1 a a- 0 "M 0 00 00 0 00 Z ZZZZV

z u -4 1-4 -A - 14 m m m mm m0 m3 m0 0 .4 '41 -. - 4- 1 1.4 1

41~~~~- -4- ....m-4 -4 4 '4 -4 w m w w m m 0 w w

0 r- ~- H- r4-4 -,-1U-1*HHH 4wHt-4 4. .6

-0 0 M WW 4 4P -4P PP $-4 00P

--4

wOOOOOQOOOC2, LI4 4 4

J-40 ~ ~ ~ ~ ~ ~ ~ ~ N N0-1 1*4l 00 0000000

-- I N' -) t Lf 'o0 N-1 1 1 1 1 1 1 0 --1CN 1- T . O N - m0% rJ V)

4 fY & ~ C C4 W Cd 4Cf tj) 0r 0C - -411 1 -4 -4 11--4-4-1 -4 W

V) c U) V) c cn V) I I I I I I I I I I I I -i

Page 67: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

41

:3333333 :::33r=333333:::::::::

w n-rITa .0 ON'J'J' ~0 or-i " 4- - 4C 0a DrA0 m0C %

o

0 u 00 0 C14 0 'D CN Ln 0 nO N' 00 0I nL 10L

0 4..)_-180 40 6 90 ;C C C a C ,

m . - CJCN C - 4 -1rn r C) l n cn cn 1-i-1-4CN - -' 14C1-T IT IT IT It~~'- $-.1 I T 1 T - - - - .

0 o1 nL nCNC OC ~-r4 D a 10 00 D00N0L )0C4C .

414

.-I CMC'~4 MI N-I C4 a I I 1 1 1

po =c/c /)(imC)/ C I) CI) C) = H C Ci)I r:) CI) r:) mI C) mI cI) 4C CJ)CI CI) m I m m CI)U

Page 68: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

-- o ,--- -

c 4 (1)a) Q)W C~~ (1 u m.a c c 1 3: 0

-4 -4i --1 CO-i O CO4 1 0 H ON - c-4 COO <

4- 4- .. *)

ca)

0 Cur- C LI c

J r a% 0-c4a - %r-a ma rL)o T0 oa

Q)0; w

0 -H Lr)Lf Ln r)CD0 r- .N 0CON0 000 )C C Cn'0

LI-4 -4

-4-H

0 C)

a)) U-J 0

-4-40 w a)

4 :r J Ia)~C 0 0 0 .-. t

1. P) Wa -) a) N 0'~- 4.0 -,4 - -Hr-- r ~ C C ~ N--- c a M0 4 wo -H

4-J >1 a) Q) a) a)a

U 4 J4.J 4J = L,4J4-J 4. P---4p i

0 0 uu 0 0 OC 0 1-41-UU UUu 4 P'4.4J4J 4J 4.j4JU4.j 0 0

w -010 Q)

>1 0 0 *C0 ma-i aU).nN t

> > 0 ) --Wa) - 4 q

I Ia 1 - ) 0 G) 4

I I I I I 1 1- -H 4 0 ) I 1 )

u .u 0 10z it 11 1

Page 69: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

Ww W W W~ W WW4-4 WJ4 Q)Ww W W WO 4JW J JJ4~~ '4 . 4 4 4 . 4 4 4 4-4

u o 0a- 0C:r . za0 r £ 4r 4zr 20 0 r r

41

W0)(U -1 -111 -1 -1 - - -q - 4

0 0 m w m m m m m m m)

J4 4 4 4 4 4 J

0~ 0

00

1-4 \0 1 L ; 1 1 C 1 C 1a) cO c:- co 'Z2 )L, z , n c) , - , q " c4rq- ) = a c n Lz r

.14 C 2 , c-r-J ;2j :>L ;80 LP. lL ) :*- 1 "

4f. Ill liii 14 14 1 41 0 O 1o11111nn111m

aO -4C)C -: t-T-T- - - T- 1- T-T-T-T-T- : z z

0

4.j Ur ) ,L)C r " T T -1 - z - t) - q' 1 ) 0 a n C4 r

1,, 44-;;4 ;g C _ZC 4 C U (- u r-4 r- - n C)C n : -T U n O 4- '4C4 '

U) -- n r NMri C JCN J ;0 C 7

cu > * - - 4-1

-1 QZ 4 '4-4'4-40n 0 0

oco

W Eu0oH.H101 a1 0 oQ 0I 1 o o10 01 0 0 D o1

0U ) 0 -rf_

Ln U LtrU) 4f Lf') U4l Vt L11 LJ1 1J4 1 Lfl Ltn 4f4 L LI) LI) 44 LI) 0.ol 0 0' C all 0o-- - - - -

-4

,l 4 -1- -- - - - - - - - -4 4 4 4 4 444 -4 -4 -4 -4 -4 -4 111 . C n C) 0 C

AV )U nV nE nc )( n( l nL nI . nc nV nV )U

wn: -- :3: :

-41 4 NC4 W'. ;2'6 '21. " C' C1 C'.__ C'. C'. Ce C

-! -4--- '- -- -~ - 4-4-- -- 4 - '- -- - - - - -4- --Ir V) In Ir UI i) n Ir Ir in Ln I f I r Io Ic ID 10 Ic 10

a) (i (.) U. r- L. ci u Q) m cn n C U M I- UJ u u u

-- -- -- -4-4 -4 -

Page 70: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

0 0 0 0 00 0 --U- 4- 41 C. V (1 QU a) U ) r. a) U C) C) a) v 0) (3 U

o~ b 0 am m m flC o~ c~ o o o o 0 o b 0 0 C o o b a z -

4 4.

0 0

C-I 0" -Zr -TI 1-- ,-i C'4 -Zr 00 Lfr C'4 1--i4 0 C r fl- 14 -4 0 (71 CoC) - -, C-i C-. 0", -'1 C. C) 0 O"

> 4 tt c- m c4, c- cq c4 4- -- c) r- ,o r o n L)L r f n c) q - 4 -q

r ~ ad ~++ oC r- -I 0 M, N' NJ i 4 C', r- 1.-1 A r- 0 i r - -11 o

CY M0 4 -4 : 4r V) 4r Io -1 4-- 44 r-- r- C1 N 4 n T T I U) I r I o

NJ *-4 CN.

O-

0

0 0

1-. M~ C1

' . . . 0 . 0 '0'0'0 . . . . '0 ' 'o0 'D0 'D0 'D0 'D0 'D . 'D0 'D0 'D 'o '0 'o0 'D0 'H H

N.N.N r- r- C- N.N.C- r- r- r, N.N -N N -N - r- r- N. r- N.N C . N r-

N. ~ ~ ~ r r- N. r.C-N - -N - .N -N - -N. N r, - .N .N N. N.N C- N. N. N.

-4 - --4 -4 -I --1 -4 C14 N C 4 CJ CNI N4 CJ CIA C14 C14 -4 1,4 CJ CIA C4 C,4 C4 CN J-4 -4 i 4 4 4 4- - - - - -4 -1 -q A -1 -1_q-4--4 - -4-- -q-- -4 --

C4 0I 04 4 I 4 14 0 I C6 W I I o 4 0 a I4 n I I, w W aI n4Q

- - -C -o -~Li - -U - - -~ -~ -~ -

'I T I N C-4 (-I N'j '-4 C-3I T-, 4 1 -t-TZ- - , : I- t z -Zr 1 '1Z C-) C-

niC C C -C-C -C) mC fni C- C -' C u C u C u C u C u C u C u C L C- u C CC- CC- L) C-- uC 'C- zC

4 I 4 I I I I 4 4 4 4 I 4 4 1- I I 4 4 4A IA 1.4 4

Uu LJ u u u L; U u UUUUUUUUUUUUUUUUUuUUU

Page 71: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

44

0000uUU U C C) U f 4-1 0

4.

0 00

'-11

0~

0 o- - - L n-: NL nW 0-T

101 4.8C>4.J co 0 a Nu n Ln L )- : I : 1-

a) m4 > Tc qc T-T-I : -- T-T ' r' - - , :

-It IT1 M Me' .1~-~ -It t - j- - --.- r -It 'I -:T I - IT ITr -zr -11

4-4 .

0 0) o r -r 4 - 4r41- N C4C)c

C14oi- r- i N. r-4 NN C C Z -q -

40 0 00 00o x

r- r.r- - -. i.N r- N -N.N - r-. i.T-N N- 1

cl Q) -- - - -- - -----

m --------- NNNNNNNNNNt -- -- T- N- T- T-N-Nt-Nf.Np- r, r - N " - --

IU C1 CN 0I CI In C I In M M M M I M M M M M

Co 00 5O0 QO0O0wO0w x w

--- -4 - 4- 4 -

0- (:: 0sC sC sC C) Cs C) C) C) 4- Cs Us L) Usa) r: Z 2 .u U u u )u L lc1m C)c

t czU UUrn (n0 n UUQ () nU c m U mm mm c

Cn - - 4 -4 ,4 - 4 - - 4 4 - 1 - 4 - 4 -

UUUUUUUUUUUQQUU)U4UU- 1- -

Page 72: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

0 0

14-

4J 4440a) 4.4 0

414 ,-1444 U)U) (3) En tl (u0) 0. Cnp() 0O 4 4 H

E10 -0 0- 0 00 0 mE-4c' C% u r-IEn

-H U 0-H I V) 0Ui) U)- *H) . Ur, ~ CD U) U)- O 00 (nQ) H 0 4-1 C C 4 - - 1 - -1C MJ- 41 1-c ci

C 00c 0 0 m

p U) 1- U)(1) Q)) WU n .() U )c

U) C--4 0 r,-e-1 0 ( a-1 0 -.

(a r= r:r--, - - L I0C 0 4-,-4- ON P:: Ir v

r= 0 ) - -r4-T r N . .D .H 0 - CITO

co u 0

> 41 cn 10cn 0r- Lr L 1 ( 41U 41 r-0'r r-H - -LF)-Z Lf0 0oa oo 4O ,CJ- - ( , ,C)r

a C )D\Dr 14I )) C) -2 0 nL nOF~ W - U) ) r-4 )r-4 - r 1- --1 ) - r0L

-u 04-i 410 U) u > )u

E-4 .±e p) 4- 0wU,& a 1 41 r 0) -4 10

0 a1) W u- 00 ~0 m CLr C14 C4 a) Q)~ 4-1 r-0C) \D 'C4 041 41 . . . * 0 41~- -1

a 0 - r ILI)ULr) ZJ- \Lr - 0 ma 0- - C4L

C) 4-1 U 4-1 CJ 4> (o ca 0

14 N N(a -4 C) -4 c~

C) a) 4..) 4 4 4j -I0 r- C~0- C1) 41-4 - -

- j >,- fl - L -:C4 '0 C1 0' 4-1- > , -l

-4 (a 0- (a 0-

U) ) Q) L)

4- 41 -4 C) t r n Ln V r r 4-i rQ) .1 -4 1-4 1-10(~ Cr- - - 0) -H4

L64 C:4 CL" 4L64~ --D4

Q4) '1 44~ o-Tcir - \ I r- 1 H L 4C

ItIr I IT ~ ~~'T ITf I It-I 4 c.J

1- -- 4 -1C4 C1 CN C4~ -- I-4- 1

044--4 --- 4 -10--4-4 -- 1iC3 miim

000 w 00

Page 73: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SR WES GWO-1-774 55 3l5 .I 43 1 31 31 35

5935

SR WES GW-1 -77 SR WES GW-2-77

56 54 52

SR WES GW-1-77 0 50

(Concluded)465 425 - #1RLtY FAAC ZONE

CLAY SIAMREIFLObVA/GZE [RAL 15"

--RIA 1 55SR WES GW-1-77 PRo8 A4155/7 Z0Nf SR WES GW-2-77

4 -9 JUNE 1977 9 1,. 7t "9710EV OP OF,, 459O4DDING

46040 0 6"CO&0,/ E

- OSu[7ED a'SNNOG

,qIGH, ANGIF EfRWC J," .2L ILKEISIDE,.- OW ANCLE FRAC 35 5LN/IA'ENSIE

455 415 D15RAUPEO 8EOOi7G

. -L &,GLE "6PAC 'if*z 777- FRIAL $50

I- -H/Gy, Y FPRAC Z& VE-O A1LC FMC Z3O

4437 FRIABLE 55

450 . -44PROS M/.'J/AJ\ 7CVE

-Ft?1A8LE 5,5477.-

0 .0-445 45} -E40

Bgr w O , E:k - 4.- Z

440 400 -

435 .,

430

0% 1/E (A R/ 2ACS'--i

425 I

(Continued) LEGEND (Continued)

i SHALE SEAM CHERT NODULES PROPO

DOLOMITE "I. OOLITIC CHERT NODULES

DOL BRECCIA E BEDDED CHERT

0ISANDSTONE OOLITIC BEDDED CHERT

-" CLAY SEAM STYLOLITE

- GRAVEL CONCRETE

NOTE FIELD LOGS INDICATE NO WATER LOSS

Page 74: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

93 ~40 443 4 31292725 2 21SR WES L-1-77 IS3 1 49 43 41 39 3 351 3 131 2 1 7 25 23 1 9 1 17 Is 13 7

Sol 4=6 44 40138 31134 3 3038 26 24 22 0 18 116-- 12 = 8 2 2

SCALE

0 5 10I SR WES GW-2-77(Concluded)

zONE 425 465

ATAC 15* RF&WO5, D5, •PRIABLf 53

ZO/E SR WES GW-2-77 Z- E 2' VCRT fRAC

9 -14 J'2Ve 10OeL V TCW Of" hLt 6 45? 0 420 - A OOWiTE BRCCIA 40

Ak_ EOWAPCLE FRAC 20"ZOWA VLf FRAC Z3*

415F5,C ZONE IV 'FRr FRACr4G, 415 -OO4TZtCl 455

ARA C 0

4( 23 "IG/iL, FRAC ZVE

ZOV ' 410- 7" AZ,5r0V 6EC- 5

w-I-

405 40

807 rOmo0 IOLF 40= -

"CXff.CORLRtcovi§Ry 9927. Wj

400- 440

435

(Continued) SYMBOL .425

PROPOSED DESCRIPTION COMPLETED

ES COMBINATION DRIVESAMPLE AND CORED

6" CORE HOLE CO .PIANCE PHASE

STARVED ROCK LOCK AND DAM

ILLINOIS WATERWAY

LOG OF BORINGS

PLATE 1 %

Page 75: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SR WES L-1-77405 i~ov 7-30./i'L /977

465 R y I24 10C ol - f~0 42D

SR WES GWB-1 -77460 / 4 -20 IVIC /17 7 415

465 410

0

450 uJl 0

4454 40

LU 440 44

435

0-

425

4201SAESA

(Continued) DOLOMITE [j

SDOL BRECCIA

FJSANDSTONEECLAY SEAM'vGRAVEL

Page 76: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SR WES L-1-77 SR WES L-1-77Z7-30J7AY N77 (Concluded)

8 E v 7c,,o h a l - 46 # 'o 42 0 0 u -- 46 5_ /5,09( 8(1/95/MO

FRIABL 55

?5. FRIABLE 55

415 460

-FR/ABLE 55

7S6 S MALL FAUL!. L5 PLACEFEtW57

REEF

410 - 455

0I-

J -REff

LU405645

too? ?*

-ZONE 0F f¢ R 11144504000 "5

°396 8-- !014O~ 01 ! <. f 440 lU

4" 400 446f' ? 0

435

430

425

LEGEND70 R -,-di 55 SHALE SEAM CHERT NODULES 420

(Continued) F DOLOMITE OOLITIC CHERT NODULES

DOL BRECCIA BEDDED CHERT

m SANDSTONE OOLITIC BEDDED CHEAT

I CLAY SEAM STYLOLITE

, GRAVEL CONCRETE COMPLIANCE PHASE

STARVED ROCK LOCK AND DAM

ILLINOIS WATERWAY

LOG OF BORINGS

PLATE

Page 77: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SRWES SWS-I7D-13-77SRWSD1-7

SCALE

SRD-1

SR WES D-17-77 SR WES D-16-77 S E -57430 1?qZOJIAY '977i 2 ?JUL' V 977 RWS 57

971EV TOP ~' 109714282 [LI V 70p O[N#0 f42I9 ",'~ 'Iv , 'y

1I I T'OPM,1 4110

3- R6GNI IRA( ZONI" ' R/6- I IRA, ZO,1/

#f611 -4 AEp

* 1 V69 RA5 F-5A fAIl'' 1~ 11)~ 4 15/.1 -A. .I'A#.WR,4&

Y/11R AL6E A /619F1L0*A,.'4 4 , IrA 7/W

1-9ARY LEV5ES /lIA,2TI 0

No 0R8 .1", V11, "ONE1 DOOR41FPTL B100/AOG

Pf/lOA Af /141 ZONE ZONE I ir'A1116091) RA 167501-7 VI) 10/114YO 71 -O 4 A,.f I R*AE 29

415 6f FAIA&I 55 ZONE Of VfR 71 CA, FI4 1/

0 .- AOI-A 8 f14'4H16P flGO fRAn Z01N/ IR,48L1 SI,

S410 r"f sfAI',T bv, 9 12 NV/A/[Mt VT

1F48.97 5 ?k T

.0oS 7 MA'wl 4"

405WfF19 '0>

400

LEGEND SYMBOLElj SHALE SEAM M] CHERT NODULES PROPOSED DESCRIPTION COMPLETED

__5 E DOLOMITE ff OOLITIC CHERT NODULES 6' CORE HOLE

INDOL. BRECCIA EZ BEDDED CHERT

EL] SANDSTONE Pwm OOLITIC BEDDED CHERT

ECLAY SEAM STYLOLITESGRAVEL CONCRETE

Page 78: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SR WES D-12-77

FTSR WES 0-16-77w@ *SR WES D-14-77SR WES SR WESD-17-77 D-15-77

SR WES D-15-77432.3-15 JLY /9 77

ELEV 7opLYf qo~f! 428 0

PAAC 40. IY,y FRAY ZONE

I" //GIl 1C lVO'SRUPT.7 &EX/NOGMAC CLAY 5/ AM42

Y(05 L)/SPIA(&fMENT) Ca ' -'-AAMS. FRIA &ICI

JNAC 40* A01GHLY FRAY ZONE

FRWAC zo0 5a'rF sD DFORAF/oN,

5IlALE 5![Afl HIGA'LY [RA( ZIY~f SR WES D-14-77ZONE O'31/PFO AF0,~25-Z( JGYY /977

ws fe 1I CLAY /!V YIGHL6/C FRA -ah4E-CLAY WMA/

F AY !t ROD/~l FRAA f/ CR55

VRMAYTON 7 L OW AN1&I FRAY 25 ERIAt (,fZ415

rrA - FR 4C rRI'G/FAY lOP/I

CIA' LIPIS Y 1. RAC Y 70415

7 RA. -LYSRUPT!O) BEDING fIA~ Y FA/SYS 81, I fRA/ a0/iZOE R/A4a SS FRO8 AMI/M ZL04!

01SRI/P7rID BEy/IG -CL4Y SCA. RI/CH1'#Y MA ZE.9/581 -LAY~i ZL/I /LWAAIGI FoAY 25' 1,

-~21S~AYM~YFRIA&[ 55 410jP74 V ZK 4Y 0WIfrY FRAY IRA, ZO.N.

8 0 7 FOR X /SLY - 4057 1 t -- AA

CoR/WE OF~r YR FVA5

/J/S Ri/PI !It.N6

* -FRA Y N7 f

CROBSA!/5 e1,W ANY/I R41 Al'

SYMBOL

j WRO TIO COPLT IItE -~

Ir CORE HOLE 39

STARVED ROCK LOCK AND DAMILL11401S WATERWAY

LOG OF BORINGS

6(345241

PLATE 3

Page 79: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SIR WES D-12-77

(Concluded)475 SR WES D-12-77 40 ra~

SR WES D-1 1-77eju,* ., z-

2ZJV~ 2.Ar' ''' 1400,470 j.'P4E .. 3U

4-5 395 RECC

4W 390

455

450

4:35

430

425 tv

420

4151

415 :~-.,,,4ALEGEND

- ' A HAL SEAM '~CH-ERT NODULES

DOLMIT A.'oQ~ MOOLITIC CHERT W

410 . .. ' DOL BRECCIA '-~BEDDED CHERT

-. . ~ JSANDSTONE OOLITIC BEDDED

t-7 CLAY SEAM STYLOLITE

SGRAVEL ~4CONCRETE4051 (Continued)

Page 80: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SR WES D-12-77(Concluded)

D-12-77 405 F47

K&77'

r 400, 470

SR WES D-13-77

390- 460

455

450

445H

440 w

435

430

425 1

* 420

Q,. I~e415

3~.'2 ~LEGENDi;~ ~ SHALE SEAM "~CHERT NODULES

P'wDOLOMITE i~OOLITIC CHERT NODULES41V, DOL BRECCIA BEDDED CHERT CMLN~PAS

- SANDSTONE OOLITIC BEDDED CHERT S CRE OCLC ANDDA

CLAY SEAM STYLOLITEILNOSWTRA

{t~GRAVEL 4CNRT LIOSWTRA

0d) COCRETELOG OF BORINGS

PLATE 4

Page 81: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

'0090,SCALE

0 50 100 200F T

BORING LO

440-

435-

99 WES D-37-78/ A*6L~r, 1?78

Ei cV 'a6fiLE - 430 8

430 S ES -57 SR WES P-34-78 GEA 'R ~'1875/lJLY,(979 EV 70P OF HX E 4Z8

0 HIGH Q LLFRAL 1/GANGI FRAC, 45', OPEN VERT FRACRG ~ 15 JON H9SZIEALFD FRAc ,90

-JOINT 507Z : LLWAN Gzl #CA LED FRAC'VLR #16AH FRABE I/HALEFRAC 45*

_j ,Lh - REY ShIAZE SAN. HIC'HL, rRc *.t_: C/LERT M~ECC/A -* l/1/H AAIGI F FAC, SL/ICKFA/S/DESw 42 -CLAY SEAMfFi qIGY1FRAC GREY CLAY AND SHALE H/GA'PlY RAC FCK42 RIA8LE 55 SMALLEAULTS, 90, MAX LRtsPLACEMENT z5' -V GEY S#ALE SLAM, 10//ANGL FRACrLWES, 7V

OGf 1'CLAY SEAM, QG(HLYFAC SMALL PA L/TS, 0 .0S'LVPLACEMVVIVT IALUS20" i t//~ sL(CPENS16437* I /1E.4ZFZ) RAC ' 0",G*'CLAY SEA H/G W164GLHEA L EJ) IARAC

-YAEALEL)FRAC ./0 RC CLAY 5,EAM

- GREY CLAY SEAMf - fAuT5, 7S, i XS L AC AmENr40T. tHI111Y 1 1AC ,1011 40'AGRCN CLA YLOW AA'GLC FRA4C Z0

'RARLE 5 /1/GI/LYFRAC ''4bOArcf PRC)ABLE MISS/NOQ ZLOS/ 771- - REEN S,4AL E 5EAM,L A ES/ajjS420 - qL15,VGiEfRAC (3os GRff-tV~ RA GREEk WNALFEAMD CL AY, 50'C GA Y

BorrPOOFHOE- 4-185-1 80T T0/A OfSF OE - 4-7 7 ROThA OF I/OLE - 4('8 8LC(w cE ORE R ECVERY /100'7 COPE , COR op "rCOVER y 8 ( 7' ( c c , CaRE RECOVER'! 1o ? -

SYMBQL~415'

PROPOSED DESCRIPTION COMPLETED P;CLAY SEAM ST YL

©6' CORE HOLE M LOOSE MATERIAL CONC

W SILTSTONE VIIVUGS

IaL

Page 82: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

L D -52A A A A A A A A A

-44D-42

D -4\ -

D-3 ~D-38 ~ D -4 D-J45D-5D-36 D-37 D-39 D-40 *b- 4,# D

D-47

D-46D-51

LOCATION PLAN

SR WE 0 40- 785.4OUST /978

£LEV TOP OF r OVLE- 4"3'4'

-A'L i' 4

SR WES -3978 --- GREY?, , .

f-AUGU5 I, /? 78 N..J - SRup TEl 6i I'tD' ",

LELV 70P OF/.OLE- 432 8' '4S&uP , ISR# WE S 1 35 7 8 TFRIA&ZLE55V~q£9A 5 . , Y78 FA'I...-S

LE M 9CR558EDS 407- -EY .ELE VP o, 0~C , 4O C E KC€ ssC

GREY CLA ,/4 Vi

*' -N/N RA -~ A

0/T o- FRAE S ,

MAqdC MS80 CHERT -7711*GREY 7- A

#164/) INA; 9.7 A V- z~

S ~CRC5BO$ FR/A&F 5$- A>L~'FRIA 5 ,O f f5' SOLE A ,

frtES 75- CO aAc.ER E "9 & 4S CORE, CORE REC,? '- - ' '4 *' J

II* SC7DE; I A I 9 ROZ4 E AlS/A'G ZONE

T O7TTOM] HDLE 42 3 0'-_oRt CR 9ECOVERY 787-

7- ' T4,REEAUA,1SEAMY, 5# 9. QAC REF

LEGEND 1 '-,

SCOUR DETECTiONSTYLOLITE LSHALE SEAM CHERT NODULES STARVED ROCK LOCK AND DAW.

CONCRETE DOLOMITE P BEDDED CHERT LOG OF BORINGS

VUGS L--SANDSTONE OOLITIC BEDDED CHERT

PLATE 5

Page 83: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SR WES D -43 -78// AUGUST, 1q75

EL EV TOP CF HOLE - 4-30. 0'430 &

D.

425- ~~v ACIT

425- CcY MTA IECE

Y ~ ~ S WE DENSE 78L71?

_j~X 4716AI,9 TE OGLMRT

-j 4 5 P1OUS,-C O CK, DO -ILIKNGSES - - L COIGLMERATEP t6

-T O CAVTYIN ENSE4T- CLAL - -

IDOL~~9 COGOMRTW ~ ~ ~ ~ ~ l #/G/IL y FAACOC R EE CAYSEA REGFIAA'GLE FRAC

41 DaL CONGLOMREE RA AEN I 7-OSNDGL.AERA MOi/,'IG#LY, l(WLYFRAC. ROCA LCEIQbSIO CVGO(E'T

-EEFL COEALEO 01V AN4LE BOFR/ O Yc. /I41 - FOOU cO~oLR, t4CLY5rA X CEEA CLAY SEAM7JtYNFZIT 45 RT&-

7 - //IGII AN1GLE FAC., REEFC PoRO L)OLLZ)L CONGrL.,6REF'G NSW/ ESD LYSA

HIGPLPOOVS Il/GAIL ffRAC. ROCKAS~~

* AA COGLE RATELEE

PO TMOO-s fOLWH7'TECA EM BTOIO OE 140 'OE_ COE EF-UEy C0,ET7) C2' OERCVR 07~~~~7SH L SEA k/GA' ANLNiA. S/KN/E

EaO CO/VGL IAR TEBEDE

400-~GEE CLAYLA SEAMATYOL

SDLOEMTERA LFq -- EDDNC E

SILTSTONE jjVUGS

Page 84: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

,SR WEs D -*8 -75

acIv TOP OILE-'

R W[5 04 7- 78S-AUGusr, lq76

SR NES b- +5 -78 ELEV TOP OF/IOLE 4/9 9/4 AUGUS T /9 76 ROD - wDOL 8RECCIA Q

FLEVTO)P OF 9OLE = 418. 5' DSUTDB-)IC

ROD. *~ DOLC6qERT PIECES tSUTDBDIG- l

-~ XLC0YA1 ERA TE GREENV CLAY SEAMA%/HLYPFh4C RO(HL.O

~~OuS711 7IhL 3,4C 0~ A Da CONGLOAIERATE- LONOL£62 VRCCIALO

CJREEN C L AY SIM4M WRITE CLAY 7 717- FA tX5617--. -DOL COA61LOPERATE - .*4.'LY Fmc. ROCK~

- -DO( CQOAIMERATE, HEA4LED Low ANGLE FRAC. PO/?OUSbXL, .L VERT FRACTURES :GREEN C LA y SEA M 74HI6RLY FRAC' ROCA, UL CONGLC*ERATE 1q. IL

HE _ EL LOW C ALE- FRA CT QKESLUOL CONGLOM0AERATE CREENf-A CL AY S NAM7 S

-GkEEWN CLAY SAM DOL COhVGLOAIERA TE wrC~E(N D CNCLAY SEA A DLGREE CLAYT SRAC HIHY FMAC. ROCA; SL(KCKENSIXCSDO.

- /ILY Fk4C ,R- -- HIGHLY FrRAC ROCA'-X RE

BOTTOM bE ROLE= 40??' ql16yLY FRAC ReXK T

(.'CORE. CORE RECOVERY /007. 8O7TGCVf 9E 08,BOT-TOM 0FqOLE= 4077' cuR"vryt.-COE, COfRERE'COVERY IO/00'CR, aE EOVR

:RT NODULES

CED CHERT

.1T -BEDDED CHERT

L

Page 85: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SR WESIJ-*'8-78

EV TOP OFRhOL(- 430 2'

V. lu 430

425

~ CckVCA420

Vu

11.VR RCV

V 0

-L OWM RLVR EA RCWTFA. a vToc oF-450

WSFRAhCi~.. BRECCIA, SL/CNE-NSIJ2ES, £0 WANlb15HI 1ANGLE HFtEp~~f FRAc TLJRES WN&yWl 4154kW1 W ANG6L E 1A L E.D FX.,GC7REC'LA 4y SAA q M s L , CIER7?ME TAL /CCES

777- FAULT5; .8L)/SPLACEMEVATs - DoL. RECA c /4m qL VL!PT FA5 O REf. /'OS £OA

ES *7 VERTFRACA1JUCIZ E 4# iL VE7?T fR4C7TRE5P.L VERT FRAC'. - XL 8EC/4 PCROLJS

6I/HAMVGL(F)RAc., SLjCAENI?)ESDa~ -'A1&omERATC

LWANGLE E1A D f&4 L-T1RES H16R= /IG/9FR4C. FRC 41- 'REFA CL AY -';AM JOINT, go', CLAY OA TCFL S/Cf LNS DfES41

DL COA'GLOMERA TE, SOL&T/ CA'CAVI77ES .3' DE -/c - //6HLY [MC ROCXXLCA/GLOMEA TFo /9/6/iAMOLE IIEA LEb FR4CT6*LS aLc/(EMS/1)ES

GREE-Al CL-Ay -SEM D BRECCIA, PcROCAR 'EFECEL7TY GA'EENVSMIIAENJ7Ec TED /W-0 D9) - L BRECCIABOTF& O~a =REam CLAY sv4msBOTTiI cM9LC~ #0 2' 0£ &ECC/A Iw.SS AT9iX /MTEC TEl) (W W

6"CORE, CCRiE RECOVEY/O 100A (07 REEF61GREEN CLAY SEAM, 4. L VERT FRA'.

/1/GILY F/iAC- ROCK(Z HN O I VERT FRAC., CLAY FIL LED VUQS 40 5

- - () b$'LAYi-RS IN DOLGRE LAY SEAM. DOL BRECIA

BOTT0 OF 93 /L643.5'(Y15 RCOVERY /007

400SCOUR DETECTION

STARVED ROCK LOCK AND DAMLOG OF BORINGS

J PLATE 6)

Page 86: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

440

435

. ... 7 ....... ..

425 --

420 L

t -W0 '-'-N

475

405~':" IIng

Al,

M'

395'

rn ~ ~ ~ ~ ~ ~ 40 ; '.E<C V~ ' 'Ir

4~9 % '-

0 3 '< N .5 A NS

" 343 tM '-)C P FRi36 1)11' R l D OR

A9 Ii ',fAM j ,,

Wt K

Page 87: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

Imp - OW 14. - __ ____ __

440

D'C- 8 <A'~S'S430

'-Ifly 425

-'455

t410

45

46 4{ AA A0 4 .A A

A' 54 -

A'. 'A 15 ' 11-

MC'At1 .51 6. -8W A

*AA5 370

CH Q T' A "4 " .0' 1 - f, A

NOD"AI E S

E 3OED80HDrv)M!T F * " 11

7]SANC)STCOsE O.-L ( I TIC REDLAFO CRHEP RA - -1 A 365

ILAISI AM ~ SYt (OITL SCOUR DETECTIONA O ,T ATII~t ONCR TESTARVED ROCK LOCK AND DAM

CC'SMA~lPCI 5d1 ONCR yrLOo OF BORING$551 la~i [t}vuc.;s

PLATE 7

Page 88: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

47

40SR WESOD-56-76 SA WESD-57 -78 SR WESOD-58-79 SR WESD-5.12-14 SEPTEMBER. 17 4-16 SEPTEMBER. 1978 16-20 SEPTEMBER 1978 18.21 SEP EMBF

ElE TOP OF HOLE SELF,TOP OF HOLE El6, 1E, TOP 0' HOLE t-l $.E E_ I-O

465 .... .

45

440

435

430

425

420 Lp415 I

410 1

405 .

400 ...- f

395~.,

WIVF'IIO ,14 N(.,F(OE V~OVIl O

Page 89: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SR WESO D5778 '8Is 5 9 SRWESD 59-79 470

14-18 SEPTEMBER. 7978 62~56E.6 9781-,SPTME 7Ev T 1067078 , I

,.

I 455

450

44440

- j435

430

- -425

I .. . t -- '420

r -' 415

.. it. .410

- . 405

7777 j 395

LOG OF BORINGS

PLATE 7b

Page 90: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

opm - - _ __-7_

440

SR WES D-62-7921-23 MAY. 1979SR WES D-64-79 EL TOP OF HOLE 433.72'

25-27 MAY, 1979EL TOP OF HOLE 432A "

A 494

A4

:SR WES D-65-79

30MAY - 31 JUNE 1979430 EL TOP OF HOLE 4292

IL. 9

Z A

4 4U J = ..,

494

420 _

07- 4 ~ . E

BOTTOM OF HOLE 414 62'BOTTOM OF HOLE= 41Z9 4" CORE. CORE RECOVERY 100%

NX CORE. CORE RECOVERY 10D% LOST WATER ALONG ENTIRE LENGTH OF COREBOTTOM OF HOLE 412.8'

NX CORE CORE RECOVERY l9 I

410

LEGEND

Z PROBABLE MISSING ZONE

-~7 SHALE SEAM

S DOLOMITE

W SANDSTONE

EA CLAY SEAM

4 CONCRETE

BEDDED CHERT

Ni CHERT NODULES

U SAND, SILT. ORGANIC MATERIAL

11

Page 91: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

-440

07

SR WES D-65-79 SR WES D-63-7930 MAY - 3? JUNE. 1979 28 MAY, 1979

EL TOP OF HOLE =42Q2 EL TOP OF HOLE= 429.2 430

v 4VA 0 -

!,4% 44I-

4444 . 4 &:

.4 4--4 w L

VAj

Cl.U.= 4 '-420

4.,.. .............~rJ

OF CORE OP -BOTTOM OF HOLE 412.8' _.*" $., ,

NX CORE. CORE RECOVERY 100%BOTTOM OF HOLE 411.7

NX CORE, CORE RECOVERY 100% 410

MAJOR REHABILITATION. ADDITIONAL BORINGSSTARVED ROCK LOCK AND DAM

ILLINOIS WATERWAYLOG OF BORINGS

PLATE 7c

Page 92: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SR WES D-67-79 SR WES 0-60-79 SR WES 0-6-795-8 JUNE. 1979 16-18 MAY. 1979 1-5 JUNE, 1979

470- EL. TOP OF HOLE : 4800 EL TOP OF HOLE = 48.0' EL TOP OF HOLE =

4 4a4

a 4 4a

4 4

44604

opFl SAY O,. m

450

ILL

U.

41-

~BOTTOM OF HOLE =434 7' .NX CORE. CORE RECOVERY 100%40LOST WATER 465535'TO 4347'

430

OLEBOTTOM OF HOLE 422.r

0_ CORE CORE RECOVERY 9R6 9%S.COECREEOVY420

Page 93: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SR WES D-6679 SR WES D-61-79

1- JUNE. 1979 1-22 MAY, 1974EL TOP OF HOLE 460.0* EL TOP OF HOLE 4B.0" 470

444 A4

4 444

4 A 44

'44

-450

UL

4 1,1

4440

430

BOTTOM OF HOLE =422 7'6' CORE CORE RECOVERY 95%

BOTTOM OF HOLE =421 35'42

LOST WATER 442 45' to 421 35' •

MAJOR REHABILITATION, ADDITIONAL 13ORINGS I

STARVED ROCK LOCK AND DAMILLINOIS WATERWAY

LOG OF BORINGS

PL TE7

Page 94: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SR WES D-68-79 SR WES D-69-792 JUN 197912-14 JUNE, 1979

470- EL TOP OF HOLE 469 0EL

4600-SA

45(ft.MA

00

14

_J :

430 A

BOTTOM OF HOLE 422 66 CORE, CORE RECOVERY Be 5%

LOST WATER 440 0 TO 422 6 , , , ,•420..

BOTTOM Of HOLE - 420 0'a" CORE CORE RECOVER Y 90 7%

LOST WATER 443 1 tO 420 0

OPE -E

Page 95: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SR WES 0-69-79 SR WES 0-70-7912- 14 JUNE. 1979 18.20 JUNE. 1979

EL TOP OF HOLE 46990 EL TOP OF HOLE 4690O 470

-46

4 450

4440

4 430

42

#'OI 460RCOFFy 07

OILLIOIS WTERWAL G OFBORING

PLTE7

Page 96: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SR WES D-72-79 SR WES D-74-7924'28 JUNE 1979 29 JUNE-2 JUL'Y. 197

470 - EL TOP OF HOLE -49 0 EL TOP OF HOLE 0

/V 4

4,/ / '

1

v

V 4441

4V04

4/ .4

BOTTOM OF HL

'/4

RIF 74,1 l'

4404- /- 4

~BOTTOM OF HOLE = 4P36

BOTO C ORE OE: 23 BOTTOM OF HOLE 423_N C RECORE RECOVERY 88 3%

N CORE CORE RECOVERY

420

Page 97: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SR WES 0-74-79 SR WES 0-73-79 SR WES D-71-79

n JUNE-2 JULY. 1979 27-29 JUNE, 1979 21-24 JUNE. 1979

TOP OF HOLE 4990' EL TOP OF HOLE = 469 EL TOP OF HOLE 469 0 470

"-460

44450

v ' I--

=4. ...

/ V

440

-430

BOTTOM OF HOLE 4*; -q ,

• CORE CORE REC DVERY 94 1%iLOST WATER 431 1 TO0427 35

BOTTOM OF HO, E - 4, 1NX -ORE CORE RECOVERY 94 4%

-420

MAJOR REHASIL ITATION ADDITIONAL BORINGSSTARVED ROCK LOCK AND DAM

ILLINOIS WATERWAY

LOG OF BORINGS

PLATE 7f

•4

Page 98: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

A-O-ADO 5B'. ARMY ENGINEER WATERWAYS EXPERIMENT STATION VICKSBUIRG-ETC F/G 13/13CONCRETE AND ROCK TESTS. MAJOR REHABILITATION OF STARVED ROCK L--ETC(U)APR 80 R L STOWE, B A PAVLOV

UNCLASSIFIED WESPSLBB06 NHmhhhhhEEEIhhE-EEEE,7EEEEEE

mEmmmmEmmmm-mhhmhEEmhEEE-E1h0hEEE00hEEE

Page 99: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SR WES D-76-7910 JULY. 1097

450

EL TOP OF HOLE = 44&5

SR WES D-75-79-0 JULY. 1979

EL. TOP OF HOLE = 44 3.1

SAT mw, 4ffl 5 • 440

04

>r 4*-T Clo

.1..- 5545w WV~s 0

0._L -. i - a .0/4 , )/,L PA ( 0/

Lu u< i'

430 -- ...... ,---, 430

BOTTOM OF HOLE 430J

$OCORE. CORE RECOVERY 10D%

ANDSY TN

CLY SfAM

420 -0- .12BOTTOM OF HOLE - 420 5'

a CORE. CORE RECOVERY 6 0%

LEGEND

ED SHALE SEAM

0 DOLOMITE

ED SANDSTONE

CLAY SEAM

fJ CONCRETE

S BEDDED CHEAT

I CHEAT NODULES

SAND. SILT. ORGANIC MATERIAL ARV RLO LO AN RA

ILLINOIS WATERWAYPROBABLE MISSING ZONE LOG F BORINGS

PLATE 79

Page 100: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

r.A SR WES D-13-77 SR WES D-1 1-77

SR WES 1-1-77 PIERf I 4

SACSR-1 A SCALEio0 100 2U 18ASACSR-4 SR WES D-17-

470 SR WES D-1 1-77________

SR WES 1-1-77 AS-SACSR-1 RWS -37

480

450

z S0WSD1-

V..~C..

40

<U tECTION A-A

ku SAN SEM CAILL LEOO E PRPOH DECRPTO

IN~~~F UPPE POO , 6"CRE LIN~~~~"-RCI LOWE POOL . EFSYLUE .. CHR OUE

Page 101: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

**SACSR-5

I-7& SR WEB D-12-77 SACSR4A A'

tO tFT SRWESb-1-77q SR WES 0-1477 sWED-57SR WES 13-17-7A SR WES D-12-77_ SWED157

1-77 470

40

4W0

SACSR-5 ASR 440

SR WE$D-1 77SR WEB D-16-77~ 430'A SWESD15-7.

St.SEAW CL IENF PC-~~~!. -4 -- R .AC

-~cc 'PCS S' t

" I PA SR"H WES - rPn420" RACA..

H RAC I' rL~SEAM=

H FRAC FAE A MS 41

SECTIO A-A

C'IER~ F GEOOGI CROS SECTIO

BQFS CTIO A-A'. .

Page 102: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

......m-

SACSR-2SR WES A

BGWV-77 SR WES 16 S3 II-GW-2-77 47 1 5 43 41 30 17 3S XI

SR WESGW-1-77

so 54 w2

SAC%R-3100 0

470

SACS 2' SACSR 3*SR WES SR WES SR WES

GWB-1 -77 * GW-1-77 GW-2-77

LOWER 4

POOL

430 H. FRAC

420 RCC

:::.H FRAC

410 *X "5-HNFRAC

LEGEND

3 CL.AY DOLOMITE LIMESTONE SECTION B-B'(J SAND W4 ACKFILL WOOD

SILT 23GRAVEL SANDSTONE SMOSHALE SOULDERS CONCIIIETE YMO

REEF STYLOLITE .~.CHERT NODULES PROPOSED DESCRIPTION COMPLETED

IN SACNPILL. SAMPLE AND DORIE A6-r Coat HOLESONIN AND PIEZOMIEE iL

Page 103: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SACSR-2 SACSR-1A SACSR-7A

10 1 1 74 43_pl 13 37 135 133 1 112 1, 2 12 21 10 19 35 171 3 B'7

SR WES L-1-77

10 3 0 SAC R-3 CAESACAR-4 1

10 0 100 20Ff

SACSR-1 7

SACSRk-2 SACSR-3 3ASA SACSR-4* SR WES L-1 -77

POOL7~ ~ EL

450

1 440

4

42

410

-400

SECTION B-&B30

SYMBOL

DESCRIPTION COMPLETED COMPLIANCE P#"K

COMINNATIOt4 DRIVE *STARVED ROCK LOCK AND DAMSAMPLE AND CORED ILLINOIS WATERWAY

0 r CO HL GEOLOGIC CROSS SECTION21 @OAI AMD PIEZOMETER SECTIONBB

PLATE 9

Page 104: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

BORING LOCATION PLAND-68 D-73 D-60 D-72 D-70

C 'I R-6H2o i$1 -13 0-76 D-67 D-66 0- D-11 D-61 * l0655

SAC-i SCALEA0-35 D 36

SAC -4 0 50 100 200 FTD-73 D-60 D-71 D-70

470D69Q6,1D6 D6 D-1 D1

460

4 50

* j 4 40

2f

430 '

420

410

400 SECTION

LEGEND390

~CNCRETE ~ LOSE MATERIAL

D0OLOMITE ~ BEDDED CHERTSYMBOLS WDOLOMITE CONGLOMERATE ~OOLITIC BEDDED CHERT

PROPOSED DESCRIPTION COMPLETED E3 SHALE SEAM FAULTS

A COMBINATION DRIVE =SNSOEVG

SAMPLE ANDOCORED AL MREEF E~jCLAY SEIAM

0 6" CORE HOLE F~STYLOLITE OPRBABLE MISSING ZONE

0 NX CORE HOLE_

Page 105: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

BORING LOCATION PLAN 2

0-61 D-6D-52

D-1F -5 O-613j4 12 [j 04204 C,

D -35 D-36 D-37 D340 TD4 0-200 FT 0-39 0409 0404

D- 61 Z7C

*D 012D-51 -

460

450

D- 22

____D_____ 0-6

D-330

A .0

410

SECTION 40C0

~LOOSE MATERIAL

F; BEDDED CHER T

OMERATE EjjOOLITIC BETXJEDCHERT

E~jFAULTSI

EZ2 VUGS COPIICE AND SCOUR DETECTION

P;CLAY SEAM STARVED ROCK LOCK AND DAM~ PReABLE MISINGZONEGEOLOGIC CROSS SECTION

C PGBABE MISINGZONESECTION C-C'

PLATE 10

Page 106: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SCALE480 BORIG____T

0 50 100 200 FTBOIGLAT

470 -8D5

460 UPPER POOL El 2-VI EAHR

4550.

05

43 -GHAC LM-H. FRAA

- - - - - - - - -

410 6 a-~=;. RFRAC SMLYS. EGRSTA

3:CRR C.A SEAM.SAMO

IR~I

RA C CORE HOCTIE FT CL SHAEAEMJEA CON' OL SANDSTON01E

F* REEF r_ STYLCLITE

Page 107: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

D-58

SCALE 0-59lD-48 0-480

50 100 200 FT BORING LOCATION PLAN D4

le-447

L 0- 59 0D47W- wEATHERED .I4- FROST DAt/AGED)

-WEATHERED

:0.VOID WEATHERED 460

- 45 I- EATHERED BREAKR5

LOWER POOL EL ______LOERPOOE 440

0-48 430 u

1977 SCOUR PROFILE IOR

-. ACCERT V' YCL. SEM 01

-RY. CL. SEAM 101 D- BECI 420

TION A'0N C EM-46- .BRCRECCLA. SLIt(.ENSIDES D-49 WTCLSA

-H FRAC VtD IP2RECA-GRN CL SEAM l-SLENSIGES- H RAC . E,.RRECCIA RNC.EBRECCIA

3-H FRAC SHALT SS. - GRN. L. SEAM r RAC.. SLICKENSIDES - 410-SANDY GRNL RC L AMRtECCCNIE 3-H FRA 3 BRECCIA

-R.C -f AM A 3 HF-RkC AMr-lC&SEAMS rHFA

ERN A H. FRAC

-RNL.SAM. 400-RN.SH. SEA

. -GRN. S.SEAM

-J390SCONCRETE j LOOSE MATERIAL 9ORDTCIISDOLOMITE B EDDED CHERT STARVED ROCK LOCKc AND DAM

SCW DOLOMITE CONGLOMERATE OOULTIC BEDDED CHERT ILINOIS WATEWAY

0 SH4ALE SEAM ~ FAULTS GEOLOGIC CROSS SECTIONO10FT C3 SANDSTONE VUGS SECTION D-D

a REEF P;CLAY SEAM

FSTYLOLITE CPROABLE MISSING ZONE

PLATE 11%

Page 108: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SCALE480__ __

0 50 100 009 F BORING LOCATION PLAN

470

450

~440 ~SAC-SLOWER POOL EL

430-16 D-

L~~~~~~~ ~ ~ ~ ~ -- -- - - - - - - - - -SH.SEAM

4201 H. f RA.C.

SECTION, H. H FAC.WA

H1 0RC 1JAOL CLYE)S

400 SCALE

0 5 10 2O FT E N

39 E CONCRETE E LOOSE MATEREa DOLOMITE BEDDED CHERT

SYBOSW DOLOMITE CONGLOMERATE Eij OOLITIC BEDDED

PROPOSED DESCRIPTION- COMPLETED E3 SHALE SEAM Ea FAULTS

COMBINATION DRIVE [:3 SANDSTONE EZ]VUGS

SAMPLE AND CORED A REEF ~CLAY SEAM

0 6- CORE HOLE STYLOLITE PROBABLE MISS

Page 109: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SAC-

SCALE D-ti 00-63[

50 100 200 FT BORING LOA I PLAN D01740

DT 1 470

LE'

460

450

1977 SCOLD PROFILE 4R

LOWER POOL EL LOWER POOL EL ____

440S

D-51

D-16 D-17 430

!,AK AC (owC. OSRC. l

SH. EAMGRYCL SEAM

H. I RSAC. H2 F R. RA.G. L. IESS 420E

H-D CEA L, 420~" R CG

R C L . .A L K E I E SVRFRAC

GRN.CN SEAMDE41

SECTON RAC SIDS H I.AC.GAS. CL. SEAM,-

4- 7, AC. SLACK.S400

20~H FT LCEt

GAN. CL SEAM

SCONCRETE LOOSE MATERIAL -J390~DO OMITE ~BED E D CHERTSCU

DE CTO-DOLOMITE CONGLOMERATE OOLITIC BEDDED CHERT STARVE RCK LCK NDAESHALE SEAM " FAULTS ILLINOIS WATERWAY

SANDSTONE EZVUGS GEOLOGIC CROSS SECTIONREEF E CLAY SEAM SECTION Ere1

SSTYLOLITE C~ PROBABLE MISSING ZONE

PLATE 12

Page 110: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

400 " SCALE

0 50 100 200FT BORING LOCATION P

470

460 UPPER POOL EL

450

L440 LOWER POOL EL

wA4 3 0 D-2D4

420

= -C SF AM

-C. 'R AC.~~A41AGN CL SEA -- R , iA

cRcC :c AM FR

GNC, StAYS - RFAC

BRECC A -C CRS. $i S AM

400 HrA.-

RAC. -CGRNCL SL AN

LEGEND ',KSE AM GR SE A-

390 CONCRE TE LOOSE MATERIAL

EESDOLOMITE BEDDED CHERT

WDOLOMITE CONGLOMERATE EiOOLITIC BEDD)ED CHERT SCALE

Ej--SHALE SEAM ffFAULTS Re

M SANDSTONE EllV'JGS 0 5 10 20 FT0

MREEF FZCLAY SEAM 0~STYLOLITE C~PROBABLE MISSING ZONE

Page 111: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

IFSCALE 054148

50 100 200 OFT BORING LOCATION PLAN D-15 I

I,

470

460

450

LOWER POOL EL LOWER POOL EL______440

1977 SCOUR P~ROFILE OR 20

D-42 41430u'

0-14 -<~3- H. SF S N FAC

TAN CL SEAM -

CL SFAM.S410

GPH. SEAM H.AM -R 2DRC c- 1 -- QRN.CrNSFH.AAC

N1 -RAC I. -S ,,FRA

LRA~~..C.r V-GN ~SAM

SYMBOLfCE~ljS . S)S PETER SANDSTONESCAL. STARVE SHOCKE DOCLOMDIDA

TAN CL~BEIQ QQMELEE -LINI WATERWAY

0 5 0H.FR0COR 4OEGOOGCCOS0ETO0RN ORLINA BORIN CL SECIO F-

BRICCIALAT 13-HBRCl

Page 112: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SCALE

0 50 100 200 FT BORING LOCATION

470 I I AAE]

FOTD G

-- 5 S.WEMB~E

450

440D-52 wEATNERED-

430

' LOOSE CONTACT -

:/(.FA vi-H ANGLE FRAC. - C.LOOSE CONTACT = LSEAM. 0.1' . SLIC

ST. PETER SANDSTONIE SEAM 0.2 SLlSHAW(PEE DOLOMITE

3- RN.CL.EAM- SANDY SN. SEAM 05'H. FRC. H.FRAC.

410 H.F,:. - RN.

-S41CKENSIDES

H.FRAC. DOL.& SS.H.NGANl. CL. SEAM -N

.ALT. .03( DISPL.SLICKENSODES

-GRN.CL. SEAM

LEGENQ SECTIONSCONCRETE jl! LOOSE MATERIAL

Ea DOLOMITE E BEDDED CHERT

W DOLOMITE CONGLOMERATE Ejj OOLITIC BEDDED) CHERT SCALE

E3SHALE SEAM EFAULTS 0 5 10 2oFT a~JSANDSTONE EJ VUGSREEF P;CLAY SEAM0

ESTYLOLIYE CEPROABLE ISSING ZONE0

Page 113: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

D-56

SCAL0 8-57 4 0

50 1OO 200 FT BORING LOCATION PLAN G

Q~oz 470

.T].FROT DAMAGE

:.45 MR .WEATHSERED

1 460

3P SHATTERED-COST JT

450

LOWER POOL EL, LOWER POOL EL 40i

6 -*EATHFRED

1974 SCOUR PROFILE I01

430

.ANL RAC . CL ~.SIKNIE

-R CL E.SAC.S'- 420- . SNE 'A .

H. FRAC. .5S

H H NGE AUISI IUt

SECTIONSOOUP DETCTNM390

SYMBOLSSTARVED ROCK LOCK AND DAMSCALE ILLINOIS WATERWAY

O DE10RIPTION GEOLOGIC CROSS SECTION0o 0 ZF 6" CORE HOLE 0SECTIONG-G

o ORIGINAL BORING *0 3" CORE HOLE

PLATE 14a

Page 114: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SCALE, FT BORING

[ 00 50 0 too

470 0 5

460 UIPPER POOL EL 4

450

440 LOWER POOL EL

- -- ~ ST. PETER SANDSONE

430 M.SES SNAXOPEE DOLOMITE

423 J

LEGEND

400 O CONCRETE inSAND, SILT. AND ORGANIC MATERIAL

~DOLOMIE ~ BEDDED CHERT

WDOLOMITE CONGLOMERATE P;OOLITIC BEDDEDCHERTE] SHALE SEAM 9FRACTURED ROCK ----- OMDII ~ MPKOr7] SANDSTONE EVUGS A9MT MISC ON ACnW JM DATA

REEF P~CLAY SEAM~STLOLITE ~ PROBABLE MISSING ZONE

Page 115: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

BORING LOCATION PLAN

100

-470

4.-460

accum PROFA- D7-450

* LOWER POOL EL

-- 1 ___ -440

- ~ ST. PETER SANDSTONEw.FRAC-SH. sEAM SKNAKOPEE DOLOMTE

SM EFAM -430

-420

101

IC MATERIAL

NERTSTARVED ROCK LOCK ANDO DAM

OHM 0A*D UME ANM NUI ILLINOIS WATERWAY

A"WTWM N AAL 800 ATAGEOLOGIC CROSS SECTIONG ZONESECTION H-H'

PLAT E 14b

Page 116: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SCALE. FT BORING

100 00 0 10

470 2 5

460UPEPOLL

450

440

430 R.2.-

' F1 - ___ ST. PETIER SNSO

SAOEE DOILOMITIE

4")J

SCALE. FT410 -

10 0 0 10

400 LEGEND

SCONCRETE IMSAND, SILT, AND ORGANIC MATERIAL

SDOLOMITE P;; BEDDED CHERT

DOLOMITE CONGLOMERATE Eij QOLITIC BEDDED CHERT

[3jSHALE SEAM §FRACTURED ROCK

ElSANDSTONE Ez VUGSREEF PZCLAY SEAM

~ST LOLITE CPROBABLE MISSING ZONE

Page 117: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

On I I I 11 11 if m"I l !l l

BORING LOCATION PLAN

470

460

450

0-75 1,97 SOCUR PROFILE

LOWER POOL EL

-440

- mUmorr m

-430

L SEAM I - -.

- - I SH'AKOPEE DOLOMITE

-420

-410to

-400

NC MATERIAL

STARVED ROCK LOCK AND DAM

HERT ILLINOIS WATERWAY

GEOLOGIC CROSS SECTIONSECTION I-I'

G ZONE

PLATE 14c

Page 118: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SR WES D-35-78 SR WES D -36 -78

440

435

LL430

0 - 4Ls.sISAiDs TONtE

TN'ij' NE d 1. V~r fRcr., FR~IA 81.- SS BeItr 4?Z

425 ; SWJ

CLA zoCfs S 01A

Zd&Qs~o/cY-E~t;8P5J11PC

420 DOLOMITEE M.Ra b8PROM

& A-,

SPSH#LVETA

415

Page 119: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

F8SR WESD0-37 -78 SR WES D-38-78

4bwsro/vcE I CO~NCRETEp

50

Aw/~'z. 6

W,4 MOAWAf4)IMU SPI.AfE~f .2 51

TS, 73 20,' ./,5,D4 t A CEfE -N 7 70'BEt/A r,

CNERT r5ALT, 760,.P V PL. A c ENr

p wL AfISS/N6 Z'ONF sim-fSN S41rNIS14DEZ

~TAA0 hrWIZ FAC. WD

t DOI ON I E E jjAp L M ! C

REEF FRACTURED ROCK r PROBABLE MISSING

BEDDING PLANE BREAK .'CHERT NODULES STYLOLITE

Page 120: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SR WES D-39-78 SR WES D-40-78

$V1ALE --- FR.'&-"

, PsN

fA&E5E 6s C.

SWDS TONE 2R.LE 6S .

C1dS8(AcEr I B

--7 ' ,6P

a' CAIERT C

PPROBA LEC'SIBLE ON

I&

CAOSA8E~f c A-mlr C BPC

8" 807- SMALEBPRWsSaES t SANDS TOAIE £C EM /

POBABLE MISS/AMG WIVE

°AA( M.L. FMCTURs

SCOUR DETECTIONSTARVED ROCK LOCK AND DA

ISSING ZONE VUGS STRUCTURE SECTION

E SHALE SEAM

Page 121: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

-78 SR WES D -40 -7840

IIE T LVTFR- lTVA's

SNA LE435

FA'/A&ES430

)p ~80% 5#ALE ?5/IC/CAWDE/bS

RSA CRMISSNG DSf

- 415SCOUR DETECTION

STARVED ROCK LOCK AND DAMSTRUCTURE SECTION

Page 122: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SR WES D -43 -78 SR WES D-44-78

430 COMCRETrc

425

~420

+ OOMT PS -$V DO COAGLONNRAT -BP Sw, SLIC/AENSdli(s

0 1111 VOA F. t*L Fi,LL/A4 0O CVLMRTfS&JLUI)CD& CALV6)

D04L CCNGLOAIEMTE -C -O/iw~~~~E -B L,2'vs/

Wi OPPS !)SNicqrOOL. CCWV6WMERA~TE-(Sl LIICIIE

LW 415 - O .. I~As~e £- c~LM

_,gM~~~~~VL REEFCL OO~4XT

OL COWLOCRATE -- BVC

LOL~~~~~~M DOI-,N4ft TESPSIC'ES/

S4. aV-OKN ER -F -'8 BP SMi7 SLCKAS/E

405

8RP

L-BF worE cLS T

Page 123: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SR WES D45-78 SR WES D-47 -78 SR WES D-48-7

&WkLpTcb 4f~jo BpHi

$Psv SH

tApm N L CcArGL6MC1?AlTE &x BRECCI

X0 W CIA -- DL -CI ~ R

P-B.M.L COA4LOM(RAT-W -pSHIWL

S" STA( -- JMUApwloours. UA -

C~/GOIER~~OO CyI6OMArc8UI

-VCL

T FROU - 01 - ari LNE GEN-C&DSAD -O/

STYLLIT SHALE SEOAMCl5~---- BEDDIN PLANE. BRAu

Page 124: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

S R W E SD D-48 -78 SR WES D-49-78

OA'CRE rf 430

425

cL VER FRREAC 4 2 0 k

vaom/rE -HLL

a' S// 0 I8P 5Hl 25- 0

tv RECIA R7FRAc , S4 i cK ws-s -W1,u

PCLJLOP AVEE ALEb FMRIZRESM(11rS, -08' b/sPLA(Fm~Nrs LMTBP.W ML 8fcc/4

CMEF)V rtD# *1 VERT FRAC

c#- .0 PPOxL P8REclA Iz:4 DOL CcyI&L

C M0 rO >6P7Oc~/rE a__ LICRSD JrO/Ai 80' 410A % C O % 'G L AlW E M47 4FC D O I 13R E C C IA rer S

s~qt UA c I-

WL BFEC 1A Ak.MCECCOI I SS M47tx A(TCCTltb /ATO0IX'L

ZIWf- o# vcR77 fR4 C. _ 0

POL 4WCCIA US I-YW V

tDOLOMITE __

_ __ ______ ______400

SCOUR DETECTIONSFRACTURED ROCK STARVED ROCK LOCK AND DAM

BREAK CHERT NODULES STRUCTURE SECTION

PLATE 163

Page 125: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

SR WES D-51-78 SR WES 0 42 -78 SR WES D-41-78 SR WES D-46-78 SR WES D-50-78

440

435 t L -"

420

420

405 "A .-. 11 , : -

375 5"

370 t

415 L 85"-iL "tN

N.' CN'5Y5

''

t At.F [ ' Hn? S Aat- . Rttat iI7S-At RIt f M tc~ RA.U'.( R (

I . . .. --- ,, tt I

IA £ i ,. . . . . .. II I I I

t--_.&-'5 a

',',95-Bt5e 51#&n-a'

3SA - t j #t, ~ . - M t -

365-.-. -f --'SA, SEAM400 S[tv fr PAC- A NJ[ RC

Bf DDIN( P1 AN fl A"CLT OLOE

Page 126: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

WES D-42-78 SR WES D-41-78 SR WES D-46-78 SR WES D -50-78 SR WES 0-52-78

440

A,, tAAMA' ~ 435

rt ,~rut MK " ' A

t430

-- 425

if.1 '(ANA- tAA,, 420, :-,

I- Alt

M,~

-rs 40054 OtD

'I A,,

- 70t 40

' l C Lt~-~a ,45 , . ''nt : 'A 'a tr '~ 1

, 5-k A R-. M t1 w As)N V0' T

V.., ST 11 ON * r ' ,, ,Ar4 AM5, A 365

SCOUR DETECTIONOlt tf f fl" I RAt T P , R0( K1 S T AV R OC) LOCK AN DAMBf D[AN re PL 'NF BW AK F RT W)LAF fS PL':TEPLATEi17

t ,s'-. S, S WI INI.I .. .. r .... ..

Page 127: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

TI--

7 t ...k§7...z.

........ ....

............

.... ... .... ...

............................

.... .... ..

. . . . . . . . . . . . . . .

.... ............

PLATE 18

Page 128: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

L -4 1

4M4

itif

PLATE 19

Page 129: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

T 1 .~ . . ..

42 4

.,,4-4-

* 4 .. . . .4@ c.4.

. .4.

PLATE 20

Page 130: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

*~ t-

I 111 1 11,

-44::

IT-I

fit trt 1

-~~ ~~~41-~4V ''i n

v z ~ ~ '~ a ~ ~ t t p ~ t 44.~f[4

PLT 21

Page 131: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

%.D 4- -4

1-4-

_ _ _ _Z -:4,~

__ C

00

_: C.'J

Plate 22. Direct shear of sit ad(SM), head gate damn

PLATE 22

Page 132: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

* I4

14-

14 Clay Parting

-57.90

12c 2.5 tsf

D- 75

10 _____________El 425.4

6

01

2

0 2 4 6 8

'n)~ tsf

Plate 23. Multiload direct shear, clay parting competent sandstone

PLATE 23

Page 133: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

30 : 30

rr-

15 15

I . . . .. IL

0 . .. 2 .3 . .5 5 10 15 20 .5 30 35 40.m 10 - -10OMA TES

SHA STEGT AAMTR

S0 A DEOMAIN IN.. .4lD -5 0_ _ 5 1 1 2 2 3 3 4 4

oRA STRSS TSFMA STES 2.0 4.0.

TIM TO FAIUR. MIUTS..41 626ULTIMATE. SHEAR STRESS.H TPARA3.ME284T7.ERS

WECITO OF. MAEILMAT-TAEXTR;HL IE M UARTIMAT ECCA~

SHEAR DEFRECTON SHE4R TEST RE O T (R C

PLTE 24 2 3

Page 134: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

ju 7- -j-

25~ ~ -4 T2 ~ 1 ~, 2 4 :'20 20 .. .. . .. . .

-. ..... .

0 . ... 0 :: .... ...............

V, , LzILL'::: :: ::: :: :: ::: :: : - 5- - ,- , -.. .. ,,-

0 .1 .2 .3.4 .5 0 5 10 15 20 25 30 35 40 45

O NORMAL STRESS Or, TSF

2 .00 I-_0 f ~ It SHEAR STRENGTH PARAMETERS

5o' " MAXIMUM ULTIMATE

00 0 .1 .2 .3 .4 .5 TAN __

C TSFSHEAR DEFORMATION. IN1 - 10O

TEST NO. 1 2 3

WET DENSITY, PCF Y,, 162.3 162.3 162-3 __ __ ___WATER CONTENT 4.1 4.1 4.1

NORMAL STRESS, TSF r 2.0 4.0 8.0

MAXIMUM SHEAR STRESS. TSF r_ 16.8 6.1 4.20

TIME TO FAILURE. MINUTES 2f 26 14 27

ULTIMATE SHEAR STRESS. TSF T 5.4 6.4 4.2

INITIA AREAIN Do 27.95 27.88 27.88fINITIAL HEIGHTr Ho I

DESCRIPTION OF MATERIAL MJLTI-STAGE SHEAR OF SHALE FILLED PARTINGS IN DOLOMITE

REMARKS_ __ PROJECT STABVED LOCKANDDAM

AREA

. ..ORING NO. D-12 SAMPLE NO.

DEPTH DATE 1DEC77

ES DIRECT SHEAR TEST REPORT (ROCK)

PLATE 25

" • . .. 7, -'-

Page 135: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

30 6 T

25 F7 W 5 - -LLf

UI 4

i0 2' 0 1 2 1 5

15

150 NORMAL STRESS U., TSF

01400. SHEAR STRENGTH PARAMETERS

1M V MAXIMUM ULTIMATEa 2i50--

z 0 .1 .2 .3 .4 -5TA _ ___ ___

SHEAR DEFORMATION, IN, - 0O cTS

TEST NO. 1 2 3WET DENSITY, PCF Y-'-- 163.9 163.9 163.9WATER CONTENT ______ w 6.7 . 6.7% 6.7 ~RATE OF STRAIN INCREASED AT 0.155 0.156 -

NORMAL STRESS. TSF Uy 2.0 4.o 8.oMAXIMUM SHEAR STRESSTSF Tt 2.7 2.7 4.8TIME TO FAILURE. MINUTES t f 35 10

ULTIMATE SHEAR STRESS. TSF T

INITIAL DIAMETER, IN. Do 5.97 5.97 5.97INITIAL HEIGHT, IN. Ho

DESCRIPTION OF MATERIAL MULTI-STAGE SHEAR;SHALE FILLED PARTIN~GS IN BRECCIATED

DOLOMITE

REMARKS _____________PROJECT STARVED ROCK LOCK AND DAM

AREA

_____ B ORING NO. GW-2 SAMPLE NO.

DEPTHL____ __2_ E DATE 09SEP-77

FCH DIRECT SHEAR TEST REPORT (ROCK)

PLATE 26

Page 136: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

-7 7. -4 +4 4- -; _____

25 u r$ i .25

,,+ +

202 1 t 7 -

I1J

10 lo Il+" ~ ~ ~ H i -w S TU , + '

000 .1 .2 .3 .4 .5 0 5 10 15 2025 30 35h4 5

0 .. NORMAL STRESS ., TSF.. . . . .. . .. . .

00 SHEAR STRENGTH PARAMETERS

a i5; ... MAXIMUM ULTIMATE... .... . . . .

z 0 .1 .2 .3 .4 .5.... __ __ _:+- __

SHEAR DEFORMATION, IN. 10- -c T. .

TEST NO. 1 2 3WET DENSITY, PCF 147.1 _147.1 L47. 1

WATER CONTENT lwr 7.7" 7.7%7.7 '

RATE OF STR'AIN IN~CREASED AT 0.06 0.33 0.35

NORMAL STRESS, TSF Or 2.0 4.o 8.0MAXIMUM SHEAR STRESS. TSF Tf 6.3 12.8 25.6 ___

TIME TO FAILURE, MINUTES I f 69 61 5

ULTIMATE SHEAR STRESS, TSF .r 7.4 12.2 23.6

INITIAL DIAMETER. IN. Do 5.9 5.98 598 ____________

INITIAL HEIGHT. IN. Ho

DESCRIPTION OF MATERIAL MUJLTI-STAGE SHEAR;SHALE FILLED PARTINGS IN~ BECCIATED

REMARKS DOOIE PROJECT STARVED ROCK LOCK AN~D DAM

AREA

BORING NO. D-15 SAMPLE NO.DEPTH 18.4I

_____________ ______EL DATE

RCH DIRECT SHEAR TEST REPORT (ROCK)

WES .1490 EDITION O JUN 65 IS OBSOLETE

PLATE 27

laim

Page 137: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

12 6-- TT7 ~ ~ ** *

4,r

8 ... . ..

A LyAJ- - . " . . . ... . -

ILI z

4 2 . 6 8

20

00 20 TAN 1: 1 SHEAR STRENGTH PARAMtTERS

a 0MAXIMUM ULTIMATE

SHEAR DEFORMATION. IN. ,1- S

TEST NO. 1 2 3

WET DENSITY, PCF

WATER CONTENT wr. 2.6'. %.

NORMAL STRESS, TSF ar 2.37 4.75 7.20 1

MAXIMUM SHEAR STRESS, TSF 'r, 2.56 4.28 6.03

TIME TO FAILURE. MINUTES t 1 25 12 9

ULTIMATE SHEAR STRESS, TSF Tr

INITIAL Area, sq in. Do 23.87

INITIAL HEIGHT. IN, Ho

DESCRIPTION OF MATERIAL Shale parting in dolomite - multistage

REMARKS _______________PROJECT

Shape of AREA

Specimen BORING NO. CSR- SAMPLE NO.

DEPTH 401.6 1 Jan 17______________________EL "t DATE13 97

L DIRECT SHEAR TEST REPORT (ROCK)

PLATE 28

Page 138: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

6 6

1 I/ l . . . . . . , .. i ' . -- . , i , ±: . . .

cr~ 0 O

,!D,-+' " -" . 7:: - ------..

.2 0 268- Normal Str ss, r, ton/it

SHEAR STRENGTH PAgAMETEQSMaximum Residual

. - t _ _ _ 1-.

FD 1400 200Shear Deformation, 0.001 in. c: - - - tons/s ift

140'No. 1 2 3"_"_2

Wet densitj, lb/cu ft led

Water content Iw 4.9% 0/ 0 0/. /e

Normal stress, tons/slff T 2.37 4.75 7.20

Maximum shearstresstos/.. . f 1 2.83 3.69 1d5.22 _ _

Time to failure, minutes tf 5 5 5

Rasidwal shear sres, ion, .Is/sq rn. _____ _

Initial Diameter, Inches Do 6.00-

Initial Height, Inches Ho

Description of malarial INA L I oCL.N -

Remarks _____________ Project

Area

____ ___ ___ ___ ___ ___ Boring No. C5 ~ -& Sample No.

El -&.L Date 13 Jan. 1!75

DRQECT SHEAP TEST PEPOQT (POCK)

PLATE 29

Page 139: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

66

I 4 1

totm-I treST I r, tanas r

-o-

Norma Stress (m tonssqf

Tea5o 10 20 3a

Normal stress, tons/s~f4 T 2.37 4.75 7.20

Malmum shear streus, tans/s f 1- .61 2.56 3.72Time to failure, minutes tf

12uuiduai shear stress, tons/mft -r'. ____ __

Initial Diameter, Inches Do 5.98

Initial Height, Iches Ho I_______________________

Description of materia 15""O AkILcO IN bL.CaOAUO

Rdmriks ____________Project

____ ____ ____ ____ ___ Area

__________________boring No. C6 - I Sample No.

_________________ l 4 IF' Date 14 Jan. ij

DIRECT SHEAR TEST REPORT (12oci)

PLATE 30

Page 140: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

- -- 1

30 r F : 30

II-

.... .. . ,: /

15 5 .

ILI 15 15 -03

, - - ...... ,i

010

x HA DEOMTO, wx1-

Iii

0 0l ~ ~ ~ T'1 ~4 L

0 1 .2A3 . 5,0 3 .0 0 1 15 20 253035 4o

150--ONORMAL STRESSL SR r. TSF00XIMUMSHEAR STRENGTH PARAMETERS

U H AR TR T) "M AXIM UM ULTIM ATEO~50 -7-7 T 4I__

z 0 .1 .2 .3 .14 .sT-5 ____-

SHEAR DEFORMATION, IN4. x 03 S

TEST NO. 1. 2 3WET DENSITY, PCF 'm 162.8 162.8 162.8

WATER CONTENT w 5.0 % 5.0 % 5.0 %% %

NORMAL STRESS, TSF a 2.0 4j.o 8.0

MAXIMUM SHEAR STRESS. TSF I 6.3 7.8 18. 1

TIME TO FAILURE, MINUTES tj 19 11 25

ULTIMATE SHEAR STRESS, TSF 'r 4.9 8.4 18.1

INITIAL AREA, IN Do 27.90 27.88 27.88

INITIAL HEIGHT. IN. Ho - -

DESCRIPTION OF MATERIAL 4JI'TI-STAGE SHEAR OF SHALE FILLED PA.RTINGS IN DOLONTE

REMARKS PROJECT STARVED ROCK LOCK AND DAM

AREA

BORING NO. D-12 SAMPLE NO.DEP Tlt

EL T 63.2/409.5 DATE 30 NOV 77TES DIRECT SHEAR TEST REPORT (ROCK)

PLATE 31

Page 141: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

WI -

IJ

g c , ". . 4;- NORMA TT -. . .1,

-. .. . -r-r .-- -

- . . I I - - . ... . . . . 1, ._.-

O. ....

2z 0 3

0EST .2O.* * 1 5 101 20 530 5

W 15. 15

O .. JNORMAL STRESS TF " .0T.0S.

ic ii

4I- ~ ~ j77:t4' 114 I

0AXISM SARR STRENGTHF " PARAMET 37 RS

It ~0 MXMMULTIMATE SHA TES S ,1_00 8 __2L _

n; T T. E. n oo __?8__3 27._3 _ __.8 _ ... . .. .. TS

: HEAR E R I I- - T"-

TESTRO. 1 NO - _ ____MLENO

WETDESIY.PC2. 142. 145.6 ._______ E hNV7 _

TES

2NORMAL STRESS 0, TSFa2. 40 80

MAXIREAH STARET PRERTERO

LTMATE S S S328T

INTA HEIH IN. Ho 0 -

TEST__ NO.IN NO 2-1 SML O

WET DNSITY PCF142.6 142DE14TH

WATER__ CONTEN ___ DAE 1 %O __

MAXIMUM DSRECT STREAR TEST REPOR 2(RC83.

LTATE SHA32ES TF T 30 - .

Page 142: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

41 T411 t

~t

4J4

_ II

4-44

4, -44

-T f7?744 j* T ~~ .*.

m LII ,. j+Dietsha essal-atigi4dlmte- 2 f

PLTE3

Page 143: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

-A-T= 44

7 L.1 I J-4- --4-

4,+

I L --J L I

-L-1--1 LfT44 4, 14 4 4j4 tT

t I Afjj4 +

TT i- 44 4_44 t--; t

I W11 i I I I M1 1-4

L: 4

11-4

-14,

-4-

ft-4-4 4

4 tt -t TT

4+ -4t

t j f- -4- - 1 -4-t"O 4 T

4 , I"' tit -Hit- fill

t

-44-

T+Cf +

T T7 i ++t f ff

14

4 j I f

T

N+ + it

Direct shear test, shale parting in dolomite, 6n 4 tsf

PLATE 34

Page 144: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

Z

4M I A t

tf f-1 1 1 1-HT1-t t -4+4 t-fl-. f- fjl- t. j f 11 f-t t 1."I't t t t I 111- I i I T

t t

ljt" I

FT T-+

t

t 4

- 7 tt tf ri

t T 44

4

t

tt

tt +I it 4-Tt4 t

t'I it i i t 4 t i-4

J-1 +

+t +T' f

Er, 4t 1,i T I I I i

I t I t I I I I I f

-,I I f11

.' 1- lit 'lI I I I- rt1 1 4 1 4 1 ii

f,

411 1 t I + I 1 *1 1 f t , i t 1 4 1- 1 T 4 1

i t

I I t i T I f- 1, ct

I t t _I 4-1

. . . . . I . . . . 'T i t .t4 T t93 -4 +

- it 4 t L4

4LL:L] I

-717t t I(5 f I

rB 4-4 - 1"41 t -I

4 4t . 4

+ L -fit LL iLL

plate "3 5 . 1) i rec t shear test sha I v parting i n do I Om i t e 8 tsf

PLATE 35

LIM-

Page 145: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

APPENDIX A

SCOUR PROFILES FROM

CHICAGO DISTRICT

STARVED ROCK LOCK AND DAM

Ii

Page 146: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

7Z~///VtJ I

>4'4

4-4

F.. L,0 _ ihNt c

-%e

-u -fq

-~f~ '41

_QTRE ROK-A

__toO WATERWA

PLTEA

Page 147: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

7-

414Ut fu

Ij lb

tot zC

%J ick c?. 1

-, -fit4

-'AE ROC DAM

I I ~ hItWTEWY

PLATE A2

Page 148: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

k ID

NJN

11 Q

I It

I STARVED ROCK DAM

I:AfLL.LINOIS.WTRA

PLATE A3

Page 149: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

PI

40

1cot

in V)

Kill1-k•

~~LiZ

TT

~Ll

MII 9.

PLATE A4

2., I

Page 150: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

1>

Ilk

ra*A40 - 4

ZAA&-ly w=?0

PLAE A

Page 151: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

141

-- L ... K

w

.. LAT. A6 .3 .

. .... .. .. ..... .

I I , -_ _o_

71 --"- 4 ..- T I p. ,, ", i/ '

7i.I ~~+{ .2f .... j ___i__ __

PLATE A6

Page 152: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

-- IU- - -

qj~ 'Kcr40

NIL

A ~ ~ ~ I 0r ,fqPLAE A

Page 153: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

ILII

o4o

tIt

S, eI- f 7

PLATE A8

Page 154: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

74-,

I~ --

-N7J

Al 51LWHf3- 6PLAEJA

Page 155: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

-. ~. . ___

I' ni

*-. I.v .-

7--- i -~

I I '3

.1'I ~.. & ~4J

~1 ...-. -~

* ''2 I.

I. .- r-1---

Hs%%I H

- 'A(0

I&J

r 4

-4---,

r '.- v)

i-II ..- - .-. --

T '4V r'-i'

-- . -,-A

PLATE MO -1 ~ --~ A

a

A

Page 156: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

V . .

. .... . .. -- - W W

rip.a

IIt

-- - 4-.. . ....-- -.- w

OKK

I -

1 FS9 -A V 9

PLATE Al

12L

Page 157: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

t

tT

k~k-v

.1:o

... 2

I J -i '

!I,

~~PLATE A12

Page 158: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

-t

IPA

.t

4jI

PLAT A13

Page 159: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

a - -

Y77 --,

~- . 1~ -

- - .-± r , j . - - - -

. . . .: I _ . - .. i. . . : , -;- .. T__ _ . . .. _- _ _.. . ._ -.

... I, ..:_ : _. ... _.. ..I - * '. ' I I " ::. '.. . -4

I- .. -- --- -:- :: I-" i - : - - I " .

. - I . . .. , . . . . .

I .. .... .. :. I , t. :

*, - - - . . . ; l- - .4 ~ ~ : ] , _ . L :

'; b' '-h l ' :: : . l *.1 t ' ; -*- ... .. . 1 ', ' ! . * [ ' " Ft

- - '

I , " "! . . . : " L " , '*-" :. , ","H '4r - '- .. .. . . ' .. . ... -

. . . ... -_ _ _ .-

~~PLATE A14 ;

Page 160: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

-,-1

- : - - - . .. . . 1 : . . . - -

- - - ~ t~ ~ I

--- - .. .. . .

I " I -.' '-,-'

" 1 _ j ... R ..l< t4 j

I Vr ~~~11 Al "fi.u .. " "t

47 T

.. LAT1 APLATE A15 !

Page 161: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

- -4

ta

'4sI

I -- ~ O 9"U, Z;

PLATE A1

Page 162: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

~.. - -

7 ~ 1;- Lf

I-k-

7.7I

.PLAT A17I

.........

Page 163: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

______ K't--1

voj

-I-~ :~1-4 w-

TtI

PLATE A18

Page 164: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

244-

I-I

I.-, -___

Z07 %V 94) 0aA;

PLAT A-

Page 165: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

- 7 _T-- _ - -

_71 i --- --

44

:9-i.

* t:

PLAT A20

* Jw

Page 166: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

T-,-

.- ' I_ .-- -- _ .. ;- 7 . -- _ - - -- - - " 1

" . ' " . ; . .. T.

* .- -. ... ....

...._ _ - _ _ "_ _ . . .. . ._ _-_1

., ~. 7 !..--

*'. I - I ;. *- -. .

. .~44. .-

44

KPLjTE A2-

K * /PLATE A2_

Page 167: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

--

mu--44-

.21 -ff_

PLT A22

Page 168: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

- - -

---- ~ - - - - - - -- 771

t -

-~ -- - . 4-~ --

-- ..- - 1-'*--***-*-- -

-~ - -~ -z.~x -~

- - - is~.-I-, - s-i--

H- -~. . I- ~-

I. ....

_ .K \ . ...

.K -L -K -

N _ ___ __

-k .

U I Io L-N

N . .

__ N _

--- A- -- ~ __ __ _

I. -72-.. t.

*4 4-.

- r~. g~ T~TT

-~

. . I - - .:. ~

-- 4- 4-

- L~iPzij~it. 2 1*-I -~ 4.1 . I

~)il~ 71

~ij I -~

PLATE A23

Page 169: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

44-4.44- ~ - -

r4 - -4-

4 . - .

I 7u7- - _ ~T- -- -V T, ( -

~71

PLATE-' A2

Page 170: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

FRACT- 0-= ^-o R Lu

Ila

-.r -1 [I..7 F~

-T~l

3CK

IOL- -

PLATE A25

Page 171: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

4- -

E :1

14 4-4' .4

1+

r-

14 4

~17-

L 4i J T~i

I-

PLATE A26

Page 172: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

77 :ii7r i

r7 V .-. ., - 7

L 14

I~~~. I t' ' I_.

___ 1 I rt', 4

-. T.

F V

>- [1 47 J i> 4

1 14

41-~

v--4 t-

4-t.

Page 173: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

IT 77-,,.

TIPT

r~r

~4 - q±~ L* 4L.71

4-

H 44

T:7 i

rH

A -. rIr

-.T 1 IT -

It

PLAT IAT2

Page 174: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

-- f!

77t

T I I *

-- -i LL~ p u

El LL

I 3'

4I +

T~-

F I

II JZ iT I I

Page 175: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

V r~-_-,--T-7 TT ---

L "-i di 7i~zLL

f I- --_- Tt j T

11

Li T

LrH

v 44

-- - 4 1

a~ T -L4 -- C

Page 176: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

4 7 ~1~

-- 4~

1-T'-4~

4 j 7

7Tt-

77~r~- 4

T;t -T7

-7-PLATE A3f

Page 177: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

*111F 1 4-

II4Y

40 -r 1 -'

-- ~ ---

111 -4- 7-E

I EFiND

1 -4F.

rr~~ -7

-

T -7-

6 ~

1 7T

__ 7 4 I $ ' 1__-

PLATE A32* Ii77

L77

Page 178: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

F21 ~~ ~", !.-I~iTY EI

- Ir I

-41-

4-ri

~~ H-

--. .. -,4

ftTr

~ 4trt4t-__ _ _ _ T~ -

i-~-s-54jTt

LLL~T- 133 fS i43LJ O~ 4l E24PLT + Are

Page 179: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

Tr 7-T7

7 7! T 77f- --- L--- -T-T

T1 LiFT

I fi

ti I- -r. -- 1L7 S-i

-r

I tt

-H-I-1J13~ -H-HW.I AH

PLAT VA77

Page 180: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

-~~ ~ ---_ _ __

7f 44 j T~~~TIT~lttt~yI~r~~rITt F'L[uA'.7ILw ~ 74

-II,.,', ~~.71 L2iI ~ I I r-. Fi

f-[

7.~

-~~~-J- ~4 r 4t~ rr

V-4,

Est,1 IL

I-- LT7 .LT 14~

4 -t~ -~4 t±

J_ _ ---L -

* -4r- -

Page 181: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

J--

i7i

7- 1

17 Ii

L[ - rL iI

1- L

I T

LI 4-I 4 ---- T 1±JL4

IiU + 44.

' a T: J-rli4- - 4

Tt 4 4+T

T- 41 4-

Vl I 4-. I~~ t 41 _ --131 8-N1

PLT A3

Page 182: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

Pu-4

t7'17 7

tl -- wr

H- T--i

13] 4-r - vjj

v ix: *- ~ f +

I-~~ V- - -

a -T

1 7

.~L.

t- TIT A-~ 4 'i

4-' 4. 4_

-Vi tii-+;,

4i :_I- T 1 T 14f

L! I i

PLATE A37

Page 183: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

-iS I

T -ri4-I

4- +

.4~- J &r

I- 4-t T -

-~--7-,- -77-

r T -'-4;,

3-T. Ar 47-[

r +-I 'r

il-M31 K.4 T JA_F C.' 13

PLATE A38

Page 184: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

Fr I-H-tj j

1- 71

LEL 114t

4- 4_

-a 1

1-1

I~ 1 L1.VLrjrTill-

r-t- I-4-h -l~I-~ 1iJ~3344 1PLAT-4.

Page 185: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

r-rII~~~~iL jI~ L L L it1T

Eli r'H4V

1 h - -

*~~H 4t!] -~::4J 2~L

7-' 4HL~ V+VIT

4+L1

-77"-- ~ .7 r L i ±tR

flT -1

T-~31~ atB NLPLTE A40

Page 186: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

I 7 , -7

I L4L

_ 7- T L~ t~

titt

H4 ~ ~ ' !44T - L 1

_~ t j

z- I7-- T,~ f7 i .I-

:TT -7-7 1 ~ L

14-1- 4- p 4- F

131

L. L.

Page 187: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

71 r -T- F~

-4 -4-- ,

ITE JJ-

,r t

r j

7-'-

TAT ~ V14

- 1 -14 4~'

LjtI - 4-? -ttLL A

+33 N~-AiS OLA f-PLATE A42 *

Page 188: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

~~1. L_ _ _ __ _ I

- L- f4I

LI 71

,i A -- ,i

L.L7'rL Lj. =Lt

+. --F

r4 r

4-I 14___- L4J 7EAi1l WA~k O i3~1 5

-7 4 . - 7

-7PLATEp-43

Page 189: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

.74 11 2 4

4.jj -4 r

171

L L

L,4 UL,

t__ I -j T1 ~

±tf L 1It ttir 4

LT EIL

I i-

F-i- 4-~~ 7

_+ T_ --

__________ ~ Al~--O ~ J_

PLATE A-1

Page 190: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

54-.

i -i- FEJll t

T 7

r A.

44

M. LIIL

i- L l LN F-I

4-1 r

~T

-r:~+

141 4A S. N :

Lf~ MIUA 17 U

PLATE A45

Page 191: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

r [4

I-tit T

-7 IF - I.-1

:7 TII rT r 1 17T

IILLL -;-L

-i-:F--

JrV+a. tI HV f, ~F

C.L3i-3A3 j~ N i - SitWA~

PLATE A46

Page 192: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

I- -- ~ __ 7F--F,

Lh~ I MKI-1L

.71

L4F4-L L 1 %

I- I

~~~~4 -r -T-7

t7 ii I~ m I_

r * 1

UJ~jpA31 U35- N~7-73Ag - L-r PLATE A47

Page 193: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

- - T--

I L -4 z-L-

-T-7r T

L1 L -

L1~ L.L

I 1 1 7L T

I~ -f'-l- ' 4 zf13 t~4 i-tr+

1 rFI -4-

-4 j

L~

T- 4T-7

t t

ri N-J- T'-

1i 44-i

LT T ' 11ii Ill --- - - -. - It - -

, A- _ Tl -A-

-- 44 -4LU~LU JiT_

lit MJ 13 A F! -NI -- Ur gw-?wrn w

PLATE A48

Page 194: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

L L-,~ -

4 L' L -1 I

A -.-- ~~

,T-,

Ali t-

F 41

-T I

+ L-4~, r± -I -

4- __4 L

j4- - T-

I -T F

1~. 4

PLAT A49

Page 195: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

A-AO5 B8 ARMY ENGINEER WATERWAYS EXPERIMENT STATION VICKSBURG--ETC F/B 13/13CONCRETE AND) ROCK TESTS, MAJOR REHABILITATION OF STARVED ROCK L--ETC(U)APR 80 A L STOWE, B A PAVLOV

UNCLASSIFIED UES/MP/SL-80-6 N

_3 END

Page 196: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

-- 1

H- TI- iE-i 4±

711

PLATEiA44

Page 197: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

71. -. L., .

444

1- .4 7-L

4+-I

hili

J

p-U-- ~~~~~ ~ I,'---.L, j -~, i i LLI4+

I- Trn ,

PLATE A51

Page 198: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

- 44

4 r i

Page 199: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

4~F t . -

_ ~ ~ ~ ~ -- L4 .. 1 t-t~ r L - ,1 .4-- 1--777 t IiJy *I- H . . m.; '-, ~ jL

... t .. .±..7T.W rT

V-i **-t +-I-

PLTEf5

Page 200: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

'4Of 4UL'it

-H RE

42-

+t

T. r:: -.

+44 r : -4-WI.

i4 -14

i f t+i

A Ll -i.J

.. ........

I t I

sit,I f

wl: -t4-I t4-

44-

T-7-

+ I F

L!l I

4-4

-t L

4-1"Bn

PLATE AU

Page 201: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

I 7 -r

A4- L- 1 L.it

7-4 t 4-

-7- +a~

±;7'mc

PLTEA5

IfI

Page 202: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

* 4

E1- I_ ...r j -4 - 7 ' r£4 4 - -- -'- :

-4= t- tVfL 4--

-~ t~ {~2, h t r~iji ~14- *i4-Lc

PLATE +51

Page 203: CONCRETE AND ROCK WATERWAYS TESTS. EXPERIMENT … · oncrete and jock ests, ajor ehabiltation final f jeprt, ' tarved f 6k k.and j am, linois waterway, hi agoistrict: phse d co liace,

In accordance with letter from DAEN-EDC, DAEN-ASI dated22 July 1977, Subject: Pacsimile Catalog Cards forLaboratory Technical Publications, a facsimile catalogcard in Library of Congress MARC format is reproducedbelow.

Stove, Richard LRock Lock and Dan, Illinois Waterway, Chicago District,

Phase II compliance, scour detection / by R. L. Stove,B. A. Pavlov. Vicksburg, Miss. : U. S. Waterways ExperimentStation ; Springfield, Va. : available from NationalTechnical Information Service, 1980.

61, [7) p,,. [66) leaves of plates : ill. ; 27 ci. (Miscel-laneous paper - U. S. Army Engineer Waterways ExperimentStation ; SL-80-6)

Prepared for U. S. Army Engineer District, Chicago, Chicago,

Illinois.References: p. 61.

1. Concrete cores. 2. Concrete tests. 3. Core drilling.4. Rock cores. 5. Rock foundations. 6. Rock tests (Laboratory).7. Starved Rock Lock and Dam. I. Pavlov, Barbara A., jointauthor. II. United States. Army. Corps of Engineers. ChicagoDistrict. I1. Series: United States. Waterways ExperimentStation, Vicksburg, Miss. Miscellaneous paper ; SL-80-6.TA7.W34m no. SL-80-6

I