Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Concord Street I -494 TO ANNAPOLIS STREET
PROJECT STATUS UPDATEThe City of South St. Paul completed a visioning study in 2016 and scoping study in 2018 to plan for the future of Concord Street from Annapolis Street to I-494. The process included partner agencies and public engagement to build consensus towards the shared vision of Concord Street and develop a funding plan for the project. The project is now in the final design stages and construction is anticipated to begin in 2021.
ISSUES ▶ Neglected Infrastructure – No rehabilitation since MnDOT
construction in 1954
▶ Traffic Safety – Elevated crash rates in North Concord business area
▶ Pedestrian Safety – Lack of consistent ADA compliant sidewalk and pedestrian crossings
▶ Bicycle Safety and Connectivity – Lack of consistent bike facility on commuter bike route
WHAT ARE THE IMPROVEMENTS? ▶ Roadway rehabilitation and reconstruction
▶ Evaluation of existing roadway geometrics
▶ Upgrades to City utilities
▶ Pedestrian and bicycle accommodations including sidewalks, trails, and shoulders
What is the Concord Street Project?The Concord Street Improvements project includes the roadway reconstruction of 3.5 miles of Concord Street from I-494 to Annapolis Street. Other project improvements include new sidewalks and trails, retaining wall improvements, storm sewer replacement, and public utility replacement. The project will provide better multi-modal connectivity, increase traffic safety and efficiency, and replace infrastructure that has reached the end of its useful life. The City is also coordinating with MnDOT and St. Paul on improvements to Concord Street from Annapolis Street to Hwy 52.
FLIP OVER FOR DETAILS!
What are your concerns about the project and what should the city be mindful of during this final design stage? What excites you the most about the project moving forward? Watch the Project Video and visit the Concord Street Feedback Map on the project website (www.concordstreetssp.com) to tell us your thoughts on:
▶ Access to Concord Street ▶ Bicycle/Pedestrian Facilities ▶ Parking ▶ Landscaping ▶ Traffic Signal Placement ▶ Other
WE WANT YOUR INPUT!
💻 www.concordstreetssp.com
SCHEDULE:
Project Development 2019-2020
Construction Start 2021
Concord Street I -494 TO ANNAPOLIS STREET
Proposed Visualization of Concord Street
IMPROVED SAFETY ▶ New sidewalks and dedicated
roadway crossings for pedestrians
▶ Bikable shoulders to reduce commuter bicycle and vehicle conflicts
▶ Left turn lanes to access local street and businesses and keep turn traffic separated
REVITALIZATION ▶ Remove and replace deteriorating
roadway, curbs, walkways, and retaining walls
▶ Remove barriers for bike and pedestrian access
▶ Provide momentum to private redevelopment opportunities with public investment increasing the tax base in the area
INCREASED MOBILITY ▶ Reduce delay of through traffic by
providing left turn lanes
▶ Provide connectivity to commuter bike lanes in St Paul and recreational Mississippi River Trail at Simon’s Ravine
▶ ADA compliant sidewalks, trails, roadway crossings, and business access
Lee Elfering [email protected] 651-554-3210
City of South St. Paul 125 3rd Avenue North South St. Paul, MN 55075
CONTACT
We are interested in hearing your suggestions, concerns, and questions about the project’s design! Visit the project website to watch a video of the proposed road design and share your input with the project team through an interactive map of the proposed layout.
HOW CAN I PARTICIPATE IN THIS PROJECT?
💻 www.concordstreetssp.com