60
CONCISE MANUAL TOWER CRANE STT293 ! !

CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

Embed Size (px)

Citation preview

Page 1: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

CONCISE MANUAL

TOWER CRANE STT293

! !

Page 2: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

-7- EURC1.0ENG

TABLE OF CONTENTS CHAPTER 1. TECHNICAL DATA.......................................................................................9

1.1. SPECIFICATIONS ............................................................................................................................................... 10 1.1.1. CRANE 18 T .....................................................................................................................................................10 1.1.2. CRANE 12 T ....................................................................................................................................................14

1.2. PREPARING THE CONSTRUCTION SITE.................................................................................................... 18 1.2.1. SPACE REQUIREMENTS FOR ASSEMBLY.................................................................................................18

1.2.1.1. INTRODUCTION..................................................................................................................................... 18 1.2.2. DIMENSIONS ..................................................................................................................................................19

1.2.2.1. TOTAL CRANE DIMENSIONS .............................................................................................................. 19 1.2.2.2. DIMENSIONS EN WEIGHT PARTS....................................................................................................... 21

1.3. CONCRETE FOUNDATION FOR FOUNDATION ANCHORS..................................................................... 33 1.3.1. PREPARATION ................................................................................................................................................33 1.3.2. INSTALLATING THE CRANE FOUNDATION.............................................................................................34 1.3.3. GROUNDPRESSURE AND CHOICE OF THE FUNDATION.......................................................................35

1.3.3.1. STANDARD CONFIGURATION ............................................................................................................ 35 1.3.3.2. CONFIGURATION MAST LENGTH 5500MM-L69S MAST................................................................ 36

1.3.4. DIMENSIONAL FEATURES OF THE FOUNDATION ANCHORS..............................................................37

1.4. COUNTER-JIB BALLAST.................................................................................................................................. 38 1.4.1. INTRODUCTION.............................................................................................................................................38 1.4.2. COUNTER-JIB BALLAST DIMENSIONS.....................................................................................................39

1.5. REEVING (SEE 1.5.1-1) ....................................................................................................................................... 44 1.5.1. FROM DUAL REEVING TO SINGLE REEVING..........................................................................................44 1.5.2. FROM SINGLE REEFING TO DUAL REEFING...........................................................................................46

CHAPTER 2. WINCH UNIT .............................................................................................48

2.1. EXPLANATION OF THE SYMBOLS: .............................................................................................................. 49

2.2. COMPOSITION OF THE WINCH UNIT:......................................................................................................... 49

2.3. OPERATING PRINCIPLE .................................................................................................................................. 50

2.4. SPARE PARTS AND MAINTENANCE.............................................................................................................. 51 2.4.1. PROGRAMMABLE LOGIC CONTROLLER.................................................................................................51

CHAPTER 3. SLEWING MECHANISM ...........................................................................52

3.1. EXPLANATION OF THE SYMBOLS: .............................................................................................................. 53 3.1.1. DESCRIPTION:................................................................................................................................................53

3.2. SLEWING MECHANISM.................................................................................................................................... 54 3.2.1. DESCRIPTION.................................................................................................................................................54 3.2.2. OPERATION.....................................................................................................................................................55

3.3. RTC SCHEMATIC DIAGRAM........................................................................................................................... 57

3.4. MALFUNCTIONS ................................................................................................................................................ 59

! !

Page 3: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

-8- EURC1.0ENG

CHAPTER 4. TROLLEY WINCH .....................................................................................61

4.1. SYMBOLS ............................................................................................................................................................. 62

4.2. TROLLEY BRAKE(ZIE FIG. 6-4-1) .................................................................................................................. 63 4.2.1. DESCRIPTION:................................................................................................................................................63 4.2.2. PROGRAMMED MAINTENANCE ................................................................................................................65

! !

Page 4: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-9- EURC1.0ENG

CHAPTER 1. TECHNICAL DATA

! !

Page 5: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-10- EURC1.0ENG

1.1. SPECIFICATIONS

1.1.1. CRANE 18 t

Fig. 1.1.1-1 NOTE: The mast sections are also available in 5500-mm or standard

3000-mm lengths

30m

10.3t

3.0m

3.8m

16.2m

70m

54m

60m

64m

44m

40m

50m 4.6t

7.0t

8.0t

5.3t

4.0t

3.7t

3.0t

2.7t

35m

9.0t

20.2m

3.6m

18t

76.0m

74m

! !

Page 6: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-11- EURC1.0ENG

Table 1.1.1-1

R Fall R(max) m C(max) t 30 35 40 44 50 54 60 64 70 74

IV 14.3 18.00 7.02 6.23 5.05 4.48 3.80 3.43 2.98 2.72 2.39 2.20 74 II 25.9 9.00 7.66 6.73 5.55 4.98 4.30 3.93 3.48 3.22 2.89 2.70 IV 14.6 18.00 7.42 6.41 5.25 4.66 3.96 3.58 3.11 2.84 2.50 70 II 26.7 9.00 7.92 6.91 5.75 5.16 4.46 4.08 3.61 3.34 3.00 IV 15.7 18.00 8.30 7.03 5.83 5.19 4.42 4.01 3.49 3.20 64 II 29.1 9.00 8.80 7.53 6.33 5.69 4.92 4.51 3.99 3.70 IV 15.7 18.00 8.30 7.00 5.84 5.20 4.43 4.02 3.50 60 II 29.1 9.00 8.80 7.51 6.34 5.70 4.93 4.52 4.00 IV 15.7 18.00 8.40 7.08 5.95 5.30 4.52 4.10 54 II 29.6 9.00 8.90 7.57 6.45 5.80 5.02 4.60 IV 16.3 18.00 8.60 7.44 6.30 5.62 4.80 50 II 31.0 9.00 9.00 7.94 6.80 6.12 5.30 IV 18.2 18.00 10.10 8.53 7.28 6.50 44 II 35.0 9.00 9.00 9.00 7.78 7.00 IV 18.5 18.00 10.35 8.76 7.50 40 II 35.9 9.00 9.00 9.00 8.00 IV 18.5 18.00 10.35 8.80 35 II 35.0 9.00 9.00 9.00 IV 18.5 18.00 10.35 30 II 30.0 9.00 9.00

2. 702. 20

+0. 50t25. 9m

14. 3m

0

( t )

10 20 30 40 50 60 70

18

9

( m)

! !

Page 7: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-12- EURC1.0ENG

29.65926.6523.6520.65

14.6511.658.65

17.65

5.65

3m

1

2x2m

5

32

4

76

8

H(m)

32.6535.6538.6541.6544.6547.6550.6553.6556.65

16

13

1110

12

1415

1817

19 59.6520 62.65

37.1510

6x6m

21

2x2m

3m

6

43

5

87

9

13.1510.15

34.1531.15

25.15

19.1522.15

28.15

16.15

H(m)

1413

1112

1615

171819

52.1555.1558.15

40.1543.1546.1549.15

64.1561.15

L69B1

L69B1

F2 F3F1

YZ69H

1 7.62 10.63 13.64 16.65 19.66 22.67 25.68 28.69 31.6

10 34.611 37.612 40.613 43.6

46.614

6x6mYZ86X

H(m)

L69B1

3.0m

2.0x2.0m

2.1m

2019

64.661.658.61855.617

16 52.649.615

68

3333

404142434444

43424140

28 28 2828

32313029

32313029

32313029

2021

2021

2021

1818181817171717

L69B12.0x2.0m

67

6564

66

H206.65m

5556

5352

54

45

57

H

5655

525354

45

H

121.5m

170.65m

157.5m

85.5m

19

16

34

12

5

19

1616

49.5m

34

12

34

12

55

98.65mH

85.5m

49.5m

32

3029

31

2019

16

49.5m

21

34

12

5

134.65m

40

33

41424344

19

- Freestanding - Anchorage

Fig. 1.1.1-2

! !

Page 8: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-13- EURC1.0ENG

Table 1.1.1-2

F2 195 t 191 t F1 105 t 103 t F3 122 t 187 t

117 t

117 t

In service Out of service Crane weight without load or ballast with

longest jib and at maximum height

Crane mechanism specifications

Table 1.1.1-3

Name code m/min t m/min t kW

Hoisting 18 t

75LFV45 0—38 0—46 0—76

9.00 6.00 3.00

0—19 0—23 0—38

18.0 12.00 6.00

550 m >550 m* 75

Trolleying 7.5DFV08 0→69 7.5

RTC290 0—0.8 rpm 2 x 145 Nm Slewing

YMD100 0—0.8 rpm 2x10.5

Travelling RT 12.5-25 4x2.6/5.2 * Please consult us

! !

Page 9: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-14- EURC1.0ENG

1.1.2. CRANE 12 t

Fig. 1.1.2-1

ATTENTION: The mast sections can be supplied in 5500-mm or standard 3000-mm lengths.

30m

10.3t

3.0m

3.8m

16.2m

20.2m

3.6m

12t

76.0m

74m

70m

54m

60m

64m

44m

40m

50m 4.6t

6.5t

7.5t

5.3t

4.0t

3.7t

3.0t

2.7t

35m

8.8t

! !

Page 10: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-15- EURC1.0ENG

Table 1.1.2-1 R Fall R(max)

m C(max)

t 30 35 40 44 50 54 60 64 70 74

IV 20.2 12.0 7.50 6.21 5.05 4.48 3.80 3.43 2.98 2.72 2.39 2.20 74 II 37.3 6.0 6.00 6.00 5.55 4.98 4.30 3.93 3.48 3.22 2.89 2.70 IV 20.7 12.0 7.72 6.40 5.25 4.66 3.96 3.58 3.11 2.84 2.50 70 II 38.5 6.0 6.00 6.00 5.75 5.16 4.46 4.08 3.61 3.34 3.00 IV 22.3 12.0 8.43 7.03 5.83 5.19 4.42 4.01 3.49 3.20 64 II 41.9 6.0 6.00 6.00 6.00 5.69 4.92 4.51 3.99 3.70 IV 22.1 12.0 8.37 6.98 5.84 5.20 4.43 4.02 3.50 60 II 42.0 6.0 6.00 6.00 6.00 5.70 4.93 4.52 4.00 IV 22.3 12.0 8.46 7.06 5.95 5.30 4.02 4.10 54 II 42.7 6.0 6.00 6.00 6.00 5.80 5.02 4.60 IV 23.2 12.0 8.88 7.43 6.26 5.62 4.80 50 II 44.8 6.0 6.00 6.00 6.00 6.00 5.30 IV 25.9 12.0 10.10 8.50 7.17 6.50 44 II 44.0 6.0 6.00 6.00 6.00 6.00 IV 26.4 12.0 10.35 8.74 7.50 40 II 40.0 6.0 6.00 6.00 6.00 IV 26.4 12.0 10.35 8.80 35 II 30.0 6.0 6.00 6.00 IV 26.4 12.0 10.35 30 II 30.0 6.0 6.00

2. 702. 20

+0. 50t37. 3m

20. 2m

0

( t )

10 20 30 40 50 60 70

12

6

( m)

! !

Page 11: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-16- EURC1.0ENG

- Freestanding

- Anchorage

Fig. 1.1.2-2

3m

1

2x2m

5

32

4

76

8

H(m)

32.6535.6538.6541.6544.6547.6550.6553.6556.65

16

13

1110

12

1415

1817

19 59.6520 62.65

37.1510

6x6m

21

2x2m

3m

6

43

5

87

9

13.1510.15

34.1531.15

25.15

19.1522.15

28.15

16.15

H(m)

1413

1112

1615

171819

52.1555.1558.15

40.1543.1546.1549.15

64.1561.15

L69B1

L69B1

F2 F3F1

YZ69H

1 7.62 10.63 13.64 16.65 19.66 22.67 25.68 28.69 31.6

10 34.611 37.612 40.613 43.6

46.614

6x6mYZ86X

H(m)

L69B1

3.0m

2.0x2.0m

2.1m

2019

64.661.658.61855.617

16 52.649.615

29.65926.6523.6520.65

14.6511.658.65

17.65

5.65

2021

2021

2021

1818181817171717

L69B12.0x2.0m

67

6564

66

H206.65m

5556

5352

54

45

57

H

5655

525354

45

H

121.5m

170.65m

157.5m

85.5m

19

16

34

12

5

19

1616

49.5m

34

12

34

12

55

98.65mH

85.5m

49.5m

32

3029

31

2019

16

49.5m

21

34

12

5

134.65m

40

33

41424344

19

68

3333

404142434444

43424140

28 28 2828

32313029

32313029

32313029

! !

Page 12: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-17- EURC1.0ENG

Table 1.1.2-2

F2 195 t 191 t F1 105 t 103 t

F3 122 t 187 t 117 t

117 t In service Not in service Crane weight without load or ballast with

longest jib and at maximum height.

Crane mechanism specifications

Name Code m/min t m/min t kW

Hoisting

55LFV30 0—44

0—53 0—88

6.0 3.0 1.5

0—22 0—27 0—44

12.0 9.0 3.0

570 m >570 m* 55

Trolleying 7.5 DFV08 0→69 7.5 Nm

Slewing RTC290 0—0.8 rpm 2x 145 Nm

YMD100 0—0.8 rpm 2x10.5

Travelling RT 12.5-25 4x2.6/5.2

! !

Page 13: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-18- EURC1.0ENG

1.2. PREPARING THE CONSTRUCTION SITE 1.2.1. SPACE REQUIREMENTS FOR ASSEMBLY 1.2.1.1. INTRODUCTION This brochure provides the dimensions of the space requirements for the crane.

They consist of two sets:

- The entire crane with indication of the most important dimensions.

- The crane is shown in three parts:

− Foundation anchors and undercarriage

− Mast composition

− Range and jib length

Based on the provided dimensions, you can prepare the assembly of the crane. ATTENTION: The provided dimensions do not take account of sagging

under load or any manufacturing tolerances.

! !

Page 14: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-19- EURC1.0ENG

1.2.2. DIMENSIONS 1.2.2.1. TOTAL CRANE DIMENSIONS

Fig. 1.2.2.1-1

2.0 x 2.0 x 3.0m 1

18

7

5

4

3

2

14151312

68 9 10

11161719

6x6m

2.0 x 2.0 x 3.0m

74.0m19.1m 2.1m

! !

Page 15: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-20- EURC1.0ENG

No. Name No. Name

1 Foundation anchors 11 Cabin mast

2 Brace strut 12 Jib

3 Central ballast1 (undercarriage) 13 Trolley mechanism

4 Bogie 14 Trolley

5 Mast section 15 Hook assembly

6 Telescoping cage 16 Counter-jib

7 Climbing frame mechanism 17 Hoist mechanism

8 Fixed slewing ring section 18 Electric control system

9 Rotating slewing ring section 19 Counterweight1

NOTE: The mast sections are also available in 5500-mm lengths.

1 To be supplied by user

! !

Page 16: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-21- EURC1.0ENG

1.2.2.2. DIMENSIONS EN WEIGHT PARTS 1.2.2.2-1. Undercarriage

Fig: 1.2.2.3.1-1 . .Dimensions and weight 1.2.2.2-2. Foundation anchors

.

Fig. 1.2.2.2.2-1

7160

3190

3690

3690

3190

6000

6000

724843

40

400

400

2045

4x235kg

! !

Page 17: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-22- EURC1.0ENG

1150

1050

1170

1.2.2.2-3. Wheelbase complete Fig 1.2.2.2.3-1

4x610kg

! !

Page 18: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-23- EURC1.0ENG

1.2.2.2.4. Central ballast and foundation cross 1.2.2.2.4.1. Foundation cross composition - Standard type - YZ86X (refer to pg 59) - YZ69H (refer to pg 59) ATTENTION: Central ballast blocks and bogies are not included in the

weight.

7160

3190

3690

3690

3190

6000

6000

724843

40

! !

Page 19: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-24- EURC1.0ENG

1.2.2.2.4.2. Parts

Crossbeam for chassis

Side beam for chassis

Strut

Main mast

Diagonal support

Ladder

Fig. 1.2.2.2.4.2-1

NOTE: The mast sections (main mast) are also available in 5500-mm lengths

168kg

3600kg 518kg 40kg

640

6900

1150

2X1452kg

2480

710

7140

2402kg

2440

240240

25002500

3800

349 4445 370

3140

332

! !

Page 20: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-25- EURC1.0ENG

1.2.2.2.5. Mast

Mast section

Connecting anchor

Resting platform

Short ladder

Long ladder

Ladder support

Fig 1.2.2.2.5-1

NOTE: The ladder sections (main mast) must be modified if 5500-mm mast lengths are used.

1906kg

4x425kg 2x21kg 77kg

29kg 31kg 3kg

422

3300

1950

100

100

142072410

38

1950

3050

84971

6

3050

84971

6

2000

3305

2000

! !

Page 21: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-26- EURC1.0ENG

5kg 9kg172kg

110kg474kg

110kg80kg 85kg

3700

862 293 29

32710

830

2710

930 29

3

862

430029

32710

924 29

3

2520

400 249 1000

106

14kg

331

5100

1.2.2.2.6. Climbing cage

Front

Upper side platform

Rear upper platform

Climbing cage

Front lower platform

Lower side platform

Rear lower platform

Support

Connection

Safety connection

Ladder

Fig. 1.2.2.2.6-1

5170kg

80kg

2216

210

404472

60430

0

7260

2466

2550

3222kg

2861

2216

208

! !

Page 22: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-27- EURC1.0ENG

1.2.2.2.7. Slewing unit

Lower slewing unit

Upper slewing unit

Monorail

Trolley

Fig. 1.2.2.2.7-1

7154kg

2454kg 2884kg

131kg 129kg

2454 kg

2494

2500

2247

249410

45

2494 2500

805

2160

320

4425

351 84

6

2082

545

! !

Page 23: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-28- EURC1.0ENG

100kg 16kg

9kg

19kg12kg

8kg

1008

1254

9kg

1.2.2.2.8. Mast top

Fig. 1.2.2.2.8-1

Mast top

Cabin

Cabin platform

Platform

Upper ladder

Lower ladder

Housing

Connection

Handrail

Handrail

3223kg 240kg

4260kg

700kg

2887

2500

5369

43714

27

2942

300

1146

197092

1992

590

50

1361

335

658966

655

111

96

1113 1017

1454

2887

5369

3580

1300

! !

Page 24: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-29- EURC1.0ENG

1.2.2.2.9. Jib

Jib T2112-3

Jib T2112-4

Jib T2112-5

Jib T2112-6

Jib T2112-7

Jib T2112-8

22000kg

4059kg 3232kg

2101kg

1622kg 1240kg

1400

2480

10351

74885

2479 14

00

1400

10299

2430

1400

2395

10259 10231

2350

1770

1400

1400

10223

1750

1400

10168

1730

2496kg

! !

Page 25: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-30- EURC1.0ENG

Jib T2112-9

Jib T2112-10

Jib nose T2112-11

Pulley support

Strut

Pulley support

Trolley winch

Jib TP29312-5 Use when the jib length is 35m,it’s special configuration

958kg 315kg

110kg 163kg

30kg 30kg

10158

1715

1400 1400

1726

4118

724

603

1400

775

1180

383

1676

126

618

210230

3000kg1120kg

Fig. 1.2.2.2..9-1

5238

2350

1400

! !

Page 26: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-31- EURC1.0ENG

1.2.2.2.10. Trolley and hook

Front trolley support

Rear trolley support

Safety support

Tensioner

Front lock

Rear lock

Hook unit

Special applications hook

Fig. 1.2.2.2.10-1

369kg 342kg

45kg 9kg

5kg 5kg

555kg 10kg

18661596

1240

18661596

1240

600

1630

1173

80

620

135

93

500

9313

5

500

320

1767

1743

166140

1130

! !

Page 27: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-32- EURC1.0ENG

1.2.2.2.11. Counter-jib

Counter-jib T2116-2

Counter-jib ballast support T2116-3

Hoisting winch

Lifting device for service

Handrail

Handrail

Fig. 1.2.2.2.11-1

1700

8351

2430

3259kg

359028

7919596 16030kg

2551

2200 11516

3373kg

20kg 12kg

4700kg 770kg

231012

95

2510

620

3207

2647

1000

3852

1000

1674

! !

Page 28: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-33- EURC1.0ENG

1.3. CONCRETE FOUNDATION FOR FOUNDATION ANCHORS 1.3.1. PREPARATION TO BE PREPARED BY CLIENT:

The concrete foundation of the foundation anchors must be executed on basis of

the parameters in. Table 1.3.2-1

ATTENTION: The listed parameters are minimum values to be observed,

taking account of the stability requirements of the crane

Please contact us in case of deviating conditions.2

2 Jinlong Europe – Zandvoorstraat 10/6 – 2800 Mechelen – Belgium – Tel.:++32/15 28 54 54 – Fax: ++32/15 20 96 80. and Jinlong Europe UK & Ireland • 2nd Floor, Titan Court, 3 Bishop Square – Hatfield - AL10 9NA Hertfordshire - U.K. Tel: ++ 44/1707 226 522 – Fax: ++44/1707 226 001

! !

Page 29: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-34- EURC1.0ENG

1.3.2. INSTALLATING THE CRANE FOUNDATION The foundation anchors are mounted by means of:

− 4 foundation anchors and 8 associated pins − 1 foundation framework and 8 associated pins − 1 standard mast section − 1 plumb line or measuring device

- Check the framework for any deformation during transport. The difference between respectively the diagonals and the bearing surface heights may be at the most 2 mm.

- Install the foundation anchor on the reinforcement and adjust by means of filling plates.

- Check perpendicularity in both directions after assembly of the lower mast section on the framework. Adjust if necessary.

- Pour the concrete block and wait until it is completely hardened before removing the mast section and the framework

! !

Page 30: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-35- EURC1.0ENG

1.3.3. GROUNDPRESSURE AND CHOICE OF THE FUNDATION

1.3.3.1. STANDARD CONFIGURATION

Mt: Torque (kNm) Mv: Overturning moment (kNm)

Fv: Crane weight (kN) Fh: Horizontal forces (kN)

L: Jib length (m) n: Mast section number

YM: Type of concrete blocks Fg: Concrete block weight (kN)

ES: In service HS: Out of service

e: Offset (m) b: Concrete block dimensions (m)

pB: Soil pressure (kN/m2) [pB]: Admissible soil pressure (kN/m2)

H: Max free standing heigh (m)

Table 1.3.3.1-1 E s H s

L(m) L(m) H (m) n

74 70 64 60 54 50 44 40 35 30 74 70 64 60 54 50 44 40 35 30

Mv 4296 4370 4591 4522 4528 4576 4795 4773 4773 4773 5132 5033 4861 4846 4660 4544 4228 4118 4118 4118

Fh 42 42 42 42 42 41 41 41 41 41 152 151 150 150 148 148 147 146 146 14662.65 20

Fv 1207 1194 1178 1158 1125 1122 1085 1072 1072 1072 1027 1014 998 978 945 942 905 892 892 892

Mt 503 503 503 503 503 503 503 503 503 503 0 0 0 0 0 0 0 0 0 0

Table 1.3.3.1-2

H n YM 173N 206N 235N 270N 307N

Fg 1730 2060 2350 2700 3070

pB 3.0 2.1 1.7 1.5 1.3

b 6.0 6.5 7.0 7.5 8.0 62.65 20

h 2.0 2.0 2.0 2.0 2.0

3b

FFhFMe

gv

hv ≤+

⋅+=

[ ]Bgv

B pbl

FFp ≤

+=

3)(2

h

lb

eFg

FvFh

Mv

! !

Page 31: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-36- EURC1.0ENG

1.3.3.2. CONFIGURATION MAST LENGTH 5500MM-L69S MAST

t Torsional moment(kN.m) v Overturning moment(kN.m)

P Weight of crane(kN) Fh Horizontal reaction(kN) Q Mass of foundation concrete(kN) e excentricity(m) pB Pressure on ground(kN/m2) [pB] Permissible ground pressure(kN/m2) L Max.hook radius H Hook height n Number of section A number

IN SERVICE OUT OF SERVICE

L(m) L(m) H (m)

n

74 70 64 60 54 50 44 40 74 70 64 60 54 50 44 40 Mv 4193 4033 4042 3927 3866 3878 4132 4157 5958 5663 5255 5218 4934 4814 4474 4376

Fh 42 42 42 41 41 40 40 40 159 158 157 156 153 152 150 150 63.1

11

P 1067 1064 1050 1032 997 989 1001 988 947 944 930 912 877 869 881 868

Mv 3892 3736 3746 3635 3578 3591 3843 3869 4913 4626 4232 4200 3938 3824 3498 3406

Fh 39 39 39 39 38 38 37 37 147 146 145 144 141 140 139 138 57.6

10

P 1034 1031 1017 999 964 956 968 954 914 911 897 879 844 836 848 834

Mv 3620 3466 3478 3369 3317 3331 3582 3608 3970 3691 3309 3282 3041 2934 2621 2534

Fh 37 37 36 36 35 35 35 35 135 135 133 133 129 129 127 126 52.1

9

P 1001 998 984 965 931 923 934 921 881 878 864 845 811 803 814 801

Mv 3373 3222 3236 3129 3081 3097 3346 3373 3121 2850 2480 2458 2238 2136 1837 1786

Fh 34 34 34 33 33 33 32 32 124 123 121 121 118 117 115 115

46.6 8

P 968 965 951 932 898 889 901 888 848 845 831 812 778 769 781 768

Mv 3151 3002 3018 2913 2870 2886 3135 3163 2362 2098 1740 1722 1522 1533 1742 1786

Fh 31 31 31 31 30 30 29 29 112 111 110 109 106 105 104 103 41.1

7

P 934 931 917 899 864 856 868 855 814 811 797 779 744 736 748 735

Mv 2952 2805 2823 2719 2681 2698 2947 2975 1688 1430 1426 1413 1471 1533 1742 1786

Fh 29 29 28 28 27 27 27 27 100 99 98 97 94 93 92 91 35.6

6

P 901 898 884 866 831 823 835 821 781 778 764 746 711 703 715 701

Mv 2775 2631 2649 2548 2514 2532 2781 2809 1092 1139 1426 1413 1471 1533 1742 1786

Fh 26 26 26 25 25 25 24 24 88 88 85 86 83 82 80 79 30.1

5

P 868 865 851 832 798 790 801 788 748 745 731 712 678 670 681 668

Mv 2619 2477 2497 2397 2368 2368 2635 2665 914 1139 1426 1413 1471 1533 1742 1786

Fh 23 23 23 23 22 22 21 21 77 76 75 74 71 70 68 68 24.6

4

P 835 832 818 799 765 756 768 755 715 712 698 679 645 636 648 635

Mt 500 500 500 500 500 500 500 500 0 0 0 0 0 0 0 0

3b

FFhFMe

gv

hv ≤+

⋅+=

[ ]Bgv

B pbl

FFp ≤

+=

3)(2

h

lb

eFg

FvFh

Mv

! !

Page 32: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-37- EURC1.0ENG

1.3.4. DIMENSIONAL FEATURES OF THE FOUNDATION ANCHORS The foundation anchors are placed symmetrically in the foundation block and

are to form a 2-by-2 m square, based on the dimensions of the mast to be

erected (see Fig. 1.3.4-1).

The distance between the topside of the mounting plate and the topside of the

foundation block must be 150 mm.

Fig. 1.3.4-1

ATTENTION: Cutting or reducing the reinforcement in the foundation is

prohibited.

! !

Page 33: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-38- EURC1.0ENG

1.4. COUNTER-JIB BALLAST 1.4.1. INTRODUCTION

The counter-jib ballast consists of various reinforced concrete blocks A, B or

C. The counter-jib ballast is governed by the length of the jib. These blocks are

suspended one by one at the rear of the counter-jib.

The ballast is to be supplied by the client in accordance with Fig. 1.4.2-1.

During installation, care must be taken to ensure that they cannot be chipped or

become loose while operating the crane.

Composition and structural dimensions are dealt with in .1.4.2

The admissible tolerance is 500

+ kg per block. To allow for concrete density

changes, alter dimension X to bring the blocks within the indicated tolerance.

We recommend weighing the concrete blocks and marking their weight with

paint on a visible side of the block.

! !

Page 34: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-39- EURC1.0ENG

1.4.2. COUNTER-JIB BALLAST DIMENSIONS

Length of jib 30 35 40 44 50 54 60 64 70 74

Length of counter jib 16.2 16.2 20.2 20.2 20.2 20.2 20.2 20.2 20.2 20.2

Blocks 2A+C 2A+B+C 3A+C 3A+B 4A+C 4A+C 5A 5A+C 5A+B+C 6A During working

and telescoping

Weight (kg) 9000 11000 13000 14000 17000 17000 20000 21000 23000 24000

Block type Density (t/m3) Weight (kg) Tolerance

A 2.4 4000 ±1% B 2.4 2000 ±2% C 2.4 1000 ±2%

Fig. 1.4.2-1

! !

Page 35: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-40- EURC1.0ENG

Counterweight A 4000 kg (Figure T742719-1)

! !

Page 36: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-41- EURC1.0ENG

Counterweight B 2000 kg (Figure T742719-2)

! !

Page 37: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-42- EURC1.0ENG

Counterweight C 1000 kg (Figure T742719-3)

! !

Page 38: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-43- EURC1.0ENG

! !

Page 39: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-44- EURC1.0ENG

1.5. REEVING (SEE 1.5.1-1) 1.5.1. FROM DUAL REEVING TO SINGLE REEVING

- Bring the trolley against the jib foot and fasten it.

- Lower the hoist hook down the ground (vertical position).

- Remove the connecting pin (8), connecting arm (5) and single hook block (4).

- Reinstall the connecting pin (8) on the single hook block and secure it with cotter pins.

Fig. 1.5.1-1

8

9

4 3

5

! !

Page 40: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-45- EURC1.0ENG

- Hoist the single hook block (4) against the trolley (jib) (see Fig.).

- Remove the trolley connection pin (8) between both trolleys (1) and (2).

- When the trolley (2) is being run out, both trolleys become separated.

- Reinstall the connecting pin (8) and cotter pins (9) on the rear trolley.

This concludes the transition from dual (4-rope) reeving to single (2-rope) reeving.

Fig. 1.5.1-2

ATTENTION:

- If operating a significant amount of time with single reeving, the following periodic maintenance must be performed.

- Convert to dual reeving; let the trolley run a few times over the entire jib length while veering and hoisting the load hook over the entire hoisting height.

- Revert to single (2-rope) reeving

1 2

4

8

9

! !

Page 41: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-46- EURC1.0ENG

1.5.2. FROM SINGLE REEFING TO DUAL REEFING

- Bring the front trolley (2) against the rear trolley (1) (opposite the jib foot).

- Press the switch button on the operating panel.

- Connect both trolleys with the connecting pin (8) and secure it with the cotter pins (9).

- Lower the single hook block (4) down to the ground.

- Connect both hook blocks (4 and 3) by means of the fittings (8, 9 and 10) (see Fig. 1.5.2-1).

- This concludes the transition from single to dual reeving.

Fig. 1.5.2-1

9

8

1 2

4

3

6

! !

Page 42: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-47- EURC1.0ENG

ATTENTION:

- Working in single reeving configuration with cranes installed above freestanding mast height.

- The crane is designed to work with single reeving up to the maximum freestanding height.

- In case of higher heights, an imbalance can occur. Please contact us on this. In that case, the hook blocks must be ballasted, which will lead to diminished hoisting capacities.

! !

Page 43: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-48- EURC1.0ENG

CHAPTER 2. WINCH UNIT

! !

Page 44: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-49- EURC1.0ENG

2.1. EXPLANATION OF THE SYMBOLS: LFV (EX. 75LFV45) 2.2. COMPOSITION OF THE WINCH UNIT: The LFV winch unit consists of the following components: See Fig. 2.2-1.

- Frequency controlled motor (1) - Brake mechanism (2) - Gearbox (3) - Hoisting drum (4) - Limiter (5) - Motor ventilator (6) - Support base (7)

Fig. 2.2-1

Speed code, D for high speed motor Load capacity of single wire Frequency controlled Motor power in kW

! !

Page 45: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-50- EURC1.0ENG

2.3. OPERATING PRINCIPLE

The LFV frequency controlled system allows conversion of the 3-phase supply (through an AC transformer) to a frequency controlled supply voltage.

Schematic electric diagram:

XL Joystick PLC Programmable logic controller Lfa Brake PG Transformer LM Hoisting motor frequency converter

! !

Page 46: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

-51- EURC1.0ENG

2.4. SPARE PARTS AND MAINTENANCE 2.4.1. PROGRAMMABLE LOGIC CONTROLLER

The PLC must be checked regularly for proper working.

Part Description Parameter

Supply voltage PLC voltage L.N: AC 220V

Control panel Dust-free ambient temperature and humidity

0°C~55°C 30% ~ 85% RH

I/O voltage Operating voltage Input/output voltage DC24V

Connecting conditions Actual connecting parameters

Battery backup Replace the batteries regularly +/- 3 year

! !

Page 47: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

52- EURC1.0ENG

CHAPTER 3. SLEWING MECHANISM

! !

Page 48: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT 293 CONCISE TOWER CRANE MANUAL

53- EURC1.0ENG

3.1. EXPLANATION OF THE SYMBOLS:

R T C (EX. RTC290)

3.1.1. DESCRIPTION:

Select the slewing speed suitable for the required movement. Gradually increase or

decrease the slewing speed. Slow down gradually instead of stopping the load

abruptly with the slew brake.

The slew brake may only be used to position the jib during hoisting at wind speeds <

13 m/s (46 km/h).

Avoid simultaneous slewing and hoisting to prevent damage to the hoist rope (rope

twisting risk).

Couple (Nm) Eddy current Voltage timing Slewing mechanism

! !

Page 49: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

54- EURC1.0ENG

3.2. SLEWING MECHANISM

3.2.1. DESCRIPTION

The slewing mechanism RTC consists of:

- Motor with squirrel-cage armature turning at constant speed in the desired direction.

- Electrodynamics coupling/brake to perform the speed changes.

- A gearwheel in which the clutch engages directly on the slewing ring.

- Safety brakes mounted on the electrodynamics coupling/brake.

- Techno-dynamo, for speed control.

- Slewing limiter.

- The crane can be put in weathervaning both manually and electrically.

! !

Page 50: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

55- EURC1.0ENG

3.2.2. OPERATION

- Make the motor run in the desired direction.

- The brake releases.

- The electrodynamic brake inductor is supplied with direct current.

- An amperage change in the inductor produces a speed change. In that way, the desired speed can be obtained by means of the control box.

AT STANDSTILL:

- The power supply to the motor is switched off, power is supplied to the inductor of the electrodynamic brake and the jib is brought to a stop;

- The safety brake only locks when, in case of necessity, the operator presses the slewing brake button (XRFS).

ATTENTION: Stopping the jib by counter-slewing is prohibited.

At the end of the workday, the jib must be placed in weathervaning.

! !

Page 51: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

56- EURC1.0ENG

4

2

6

3

1

1. Motor

2. Gearbox

3. Weathervaing smechanism

4. Slewing ring

5. Limit switch

6. Eddy current brake

Fig. 3.2.2-1

5

! !

Page 52: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

57- EURC1.0ENG

3.3. RTC SCHEMATIC DIAGRAM

Functional diagram

Name

RP: Potentiometer

IC: Signal amplifier

Operation: The control signal of the potentiometer RP (slewing mechanism RTC) is

converted through the amplifier IC to a single and three-phase AC-

voltage that directly controls the driving motor.

The slewing direction is controlled through a separate signal.

IC

IC

IC

IC

-V

Contactor, counterclockwise direction

Contactor, clockwise direction

Adjustable 3-phase AC-

supply

Voltage feedback

RP

Eddy current voltage

output

! !

Page 53: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

58- EURC1.0ENG

Wiring diagram

RM

RD

RDi

A

B

C

AC48V RRa

RG

! !

Page 54: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

59- EURC1.0ENG

3.4. MALFUNCTIONS

- The slewing mechanism is provided with an electronic control device that: - Controls slewing acceleration and deceleration; - Prevents changing of the slewing direction by a control error;

- If a malfunction occurs, working with the crane must be stopped and its cause must be eliminated.

Table 3-4-1

Operation Normal Abnormal

Slewing movement from “0” position on joystick.

Slewing starts gradually up to its maximum speed.

Slewing starts abruptly. The tower deforms.

Slewing movement towards “0” position.

The slewing movement slows down and stops after 7-10 seconds.

Slewing stops instantly. The tower deforms.

Shunt bridging. Free slewing. Slewing stops suddenly.

! !

Page 55: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

60- EURC1.0ENG

NOTE: These malfunctions can have the following causes:

- Incorrect connection of the 380 VAC/48 VAC power supply; excessive voltage fluctuations;

- Potentiometer and joystick are not compatible or are incorrectly adjusted with reference to the resistance (O-R/2);

- Check if the inverter is intact and operates properly within the parameters;

- Check the connections of each part for damage and/or improper tightening;

- Check if the control box still works within the given parameters.

! !

Page 56: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

61- EURC1.0ENG

CHAPTER 4. TROLLEY WINCH

! !

Page 57: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

62- EURC1.0ENG

3

41

2 6

5

4.1. SYMBOLS

DFV (EX. 7.5DFV08) ATTENTION: The trolley speed must be selected according to the

distance to be run. Increase and decrease speeds gradually.

Composition of the trolley winch

Fig 4.1-1

1. Outside support board 2. Reductor 3. Drum 4. Motor 5. Limiter 6. Brake

1

Couple Frequency controlled Motor capacity (HP)

! !

Page 58: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

63- EURC1.0ENG

4.2. TROLLEY BRAKE(ZIE FIG. 6-4-1) 4.2.1. DESCRIPTION: The electromagnetic brake starts operating as soon as the power supply is cut. Brake clearance in the active range is automatically adjusted.

Fig. 4.2.1-1 1. Fixed brake disc 2. Two sided brake disc 3. Brake clearance 4. Spindle 5. Spring 6. Pressure disc 7. Electromagnet 8. Brake pressure spring 9. Spring pressure regulating cylinder 10. Brake cylinder joke 11-12-13. Fittings 14. Cover 15. Brake complete 16. Protection

! !

Page 59: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

64- EURC1.0ENG

Brakes:

When the current is cut, the electromagnetic attractive force disappears. The brake spring (8) pushes the pressure disc (6) back on the brake disc (1-2). This closes the brake.

Releasing the brake:

When the brake coil (7) is energized, the pressure disc (6) is attracted and the brake pressure spring (8) is pressed in. By this, the brake discs (1 and 2) open up.

Brake clearance:

Check the brake clearance for soiling (oil - grease). Normal brake clearance is 0.8 to 1.2 mm.

Brake moment adjustment:

Factory-set

Releasing the brake manually:

The brake can be released manually by loosening the brake yoke (9 and 10).

ATTENTION: Working with a manually released brake is not permitted.

! !

Page 60: CONCISE MANUAL TOWER CRANE STT293 - Bigge Crane and

STT293 CONCISE TOWER CRANE MANUAL

65- EURC1.0ENG

4.2.2. PROGRAMMED MAINTENANCE

- Every 200 hours or once a month:

- Check brake clearance and brake moment, as well as the condition of the brake discs. Normal brake clearance is normally 0.8 to 1.2 mm.

- Attention: replace brake discs before they are completely worn.

- Check if there is any foreign matter in the brake and if it is free from oil and grease.

ATTENTION: The brake must immediately be inspected if: - It does not work properly - It is overheating - Abnormal vibrations are noticed - Braking torque is insufficient

! !