Conceptual Design Review
Design Requirements
The Systems PerspectiveRob Hubbard
Systems Engineering
The Flow-Down Process
ATST Science Requirements
Design Requirements
The Flow-Down Process
ATST Science Requirements
Design Requirements
StrawmanConcepts
Functional and Performance Requirements
Getting to a Concept – Input
Baseline Telescope Concept
Strawman Concepts
Experience with Similar Telescopes
Funded Studies
Trade StudiesEngineering Analysis
Obvious Constraints Work Shops
Getting to a Concept – Ideas
Testing the Concept
Science Requirements
Science Requirements Strawman
Concept
Strawman Concept
Error BudgetsError Budgets
Sub-System Specs, Design Requirements
Sub-System Specs, Design Requirements
Design and Development of
Systems and Subsystems
Design and Development of
Systems and Subsystems
Performance Evaluation
Performance Evaluation
Cost Evaluation
Cost Evaluation
PDR PhasePDR Phase
OK?
(CoDR)
Yes
Conceptual Design Review:
• What passes this test?
• What work remains?
No
Some Hard Constraints from the SRD
• Resolution, photon flux and sensitivity require a four-meter class telescope.
• Resolution requirement also leads to a high-order adaptive optics system.
• Wavelength coverage from 0.3 to 28 m leads to an all-reflecting telescope.
Some Challenging Requirements
• Resolution Requirement (Image Quality)– Even with a 4-meter
aperture, a world-class site, high-order AO system, this remains challenging.
• Stray Light Requirement (Coronal Observations)
• Polarization Requirement (Polarimetry)
Design Requirements Documents
• M1 Mirror Assembly– SPEC-0007 (Ron Price)
• M2 Mirror Assembly– SPEC-0008 (Ron Price)
• Enclosure– SPEC-0010 (Mark Warner)
• Telescope Mount Assembly– SPEC-0011 (Mark Warner)
The Systems Approach
The diverse and sometimes competing requirements placed on ATST forces a rigorous and aggressive systems approach during all phases of the project.
ATST Systems
ATST Systems
Orientation
Responsibilities of Systems Engineering
• Design Requirements Flow Down• Document and Drawing Control• Interface Control• Error Budgets• Standards• End-to-End Modeling• Quality Assurance Plan• Acceptance Test Plans• Integration Plan
Design Requirements Flow Down• Document and Drawing Control• Interface Control• Error Budgets• Standards• End-to-End Modeling• Quality Assurance Plan• Acceptance Test Plans• Integration Plan
Responsibilities of Systems Engineering – CoDR Emphasis
Systems Overview
• Telescope Systems and Subsystems Definition
• Interface Control and the N2 Diagram
• Documentation Control
• Error Budgets – Top Down
• Error Budgets – Bottom Up
Glossary and Acronym List
Document and Drawing Control
Interface Control and the N2 Diagram
N2 Diagram Detail
Top Level Systems
• 1.0 Telescope Assembly
• 2.0 Adaptive Optics• 3.0 Instrument
Systems• 4.0 High-Level
Controls and Software
• 5.0 Enclosure• 6.0 Support Facility
and Buildings
Telescope Assembly Subsystems
• 1.1 Telescope Mount Assembly
• 1.2 M1 Assembly• 1.3 M2 Assembly• 1.4 Feed Optics• 1.5 Thermal Systems• 1.6 Scattered Light Control
Probably specific to D&D Phase. Likely to be reabsorbed later.