Conceptual Design Report Trail Lake Dewatering Alternative
26
CONCEPTUAL DESIGN REPORT TRAIL LAKE DEWATERING ALTERNATIVE Trail Lake Section of the Main Canal Columbia Basin Project, Washington U.S. Department of the Interior Bureau of Reclamation Pacific Northwest Region Design Group Boise, ID July 2014
Conceptual Design Report Trail Lake Dewatering Alternative
Conceptual Design Report Trail Lake Dewatering Alternative
CONCEPTUAL DESIGN REPORT TRAIL LAKE DEWATERING ALTERNATIVE
Trail Lake Section of the Main Canal Columbia Basin Project,
Washington
U.S. Department of the Interior Bureau of Reclamation Pacific
Northwest Region Design Group Boise, ID July 2014
U.S. DEPARTMENT OF THE INTERIOR
PROTECTING AMERICA’S GREAT OUTDOORS AND POWERING OUR FUTURE
The U.S. Department of the Interior protects America’s natural
resources and heritage, honors our cultures and tribal communities,
and supplies the energy to
power our future.
BUREAU OF RECLAMATION
The mission of the Bureau of Reclamation is to manage, develop, and
protect water and related resources in an environmentally and
economically sound
manner in the interest of the American public.
i
TABLE OF CONTENTS 1.0 Introduction
....................................................................................................................
1 2.0 Existing Facilities
...........................................................................................................
1 3.0 Problems and Needs
.......................................................................................................
2 4.0 Dewatering Alternative
..................................................................................................
3
Box Culvert
.......................................................................................................................
3 Pump Station
.....................................................................................................................
4 Power
................................................................................................................................
5 Pipeline
.............................................................................................................................
5 Downstream Control Weir
................................................................................................
5 Access Roadway
...............................................................................................................
6
5.0 Conclusions and Recommendations
..............................................................................
6
Appendix A – Drawings
1. G-1 Location Map & Sheet Index 2. C-1 Site Overview 3. PP-1
Culvert – Plan & Profile 4. PP-2 Pump Station – Plan &
Profile 5. PP-3 Pipeline – Plan & Profile 6. PP-4 Pipeline –
Plan & Profile 7. D-1 Pump Station Detail Sheet 8. D-2 Culvert
Detail Sheet 9. D-3 Weir Detail Sheet
Reference Drawings
10. 222-116-20476 Main Canal – Profile and Sections – Sta.
255+85.56 to Sta. 326+90.0
11. 222-D-15597 Main Canal – S ta. 318+80 – Transition 12.
222-D-15598 Main Canal – S ta. 325+61.08 – Transition
Appendix B – Cost Estimates
1.0 Introduction
The purpose of this conceptual design report is to document an
alternative that will eliminate the continual maintenance issues
involved with the repair of the concrete lining of the Columbia
Basin Project’s Main Canal adjacent to Trail Lake. The Main Canal
conveys all the flow for the over 630,000 acres of land irrigated
within the Columbia Basin Project.
A draft conceptual design report titled Trail Lake Modifications
was produced in December 2005 by the PN Regional Office.
Alternatives investigated were: Canal Breach, Corrugated Metal Pipe
Culverts, and Concrete Box Culvert. These alternatives all
addressed and attempted to solve the problem of excessive
hydrostatic pressure on the canal lining by allowing the lake to
drain into the canal during canal draw-down. A clear, best solution
to addressing the maintenance issues did not emerge from that
report.
The issue of Trail Lake Modifications was reinvestigated in 2014. A
collaboration of engineers (two from the Ephrata Field Office and
two from the PN Regional Office) met in Ephrata to discuss the full
range of possible modifications. It was determined that the
previously examined alternatives did not fully eliminate the
continual maintenance issues. Completely dewatering the Main Canal
to allow for repairing the Main Canal over successive maintenance
seasons would address those issues. Thus, this report documents a
way to dewater the Main Canal at the end of each irrigation
season.
2.0 Existing Facilities
The Main Canal commences at the headworks at Dry Falls Dam at the
southern end of Banks Lake. It flows for approximately 1.8 miles to
the Bacon Siphon and Tunnel structures which consist of two siphons
and two tunnels. At the outlet of the tunnels, the canal extends
for approximately one mile as an unlined canal section and then
transitions to a lined canal as it extends adjacent to Trail Lake.
The lined canal section was designed for a maximum flow of 13,200
cfs. The section has a 20-foot base width and 1.5:1 side slopes.
The lining is 5-inches thick, unreinforced concrete.
Trail Lake is a small lake formed in Trail Lake Coulee which
approximately parallels the Main Canal. During the planning stages
of the Columbia Basin Project, there was a proposal to discharge
the Main Canal into the upstream end of Trail Lake and then
continue the canal at the downstream end of the lake, thereby
saving the cost of approximately 2.5 miles of canal construction.
However, there was a concern about possible seepage losses from the
lake. The evaluation of this concern is found in the report Trail
Lake Seepage, March 27, 1941. The report contained the following
conclusion “Sufficient information has been presented in this
report to conclude that Trail Lake will not serve as a reservoir in
its present condition.” The report was concerned with seepage
through pervious gravel deposits and a talus slope within the lake
area. As remedies to the seepage concerns it states “Possibly the
gravel bar and talus might be sealed off by a silt blanket”.
3.0 Problems and Needs
The problem at this site is displacement and damage to the canal’s
concrete lining panels. The concrete lining panels are forced out
due to hydrostatic pressure in the embankment fill. This is
explained by the following sequence of events: The canal is filled
at the start of the irrigation season. It is observed that Trail
Lake water surface elevation begins to rise after the canal surface
rises, when the canal is at the peak water surface elevation the
lake rises to about the same elevation. At the end of the
irrigation season the canal flow is gradually reduced and the canal
water surface elevation lowers. The lake water surface elevation
does not lower as quickly. The saturated embankment fill material
exerts a force on the lining that is not counter-balanced by the
hydrostatic pressure in the canal, resulting in a “blow-out” in the
lining.
Shown in Figure 1 are water surface elevation measurements in Trail
Lake for the years 2002 through 2005. The lake elevation rises at
the start of the irrigation season and then recedes at the end of
the irrigation season and has a maximum water surface elevation of
about El. 1502.0. The canal and the lake are in some way
hydraulically connected.
FIGURE 1 – Trail Lake Elevation
Past studies haven't looked at the need to pump out the last
several feet of the canal and lake in order to obtain a dewatered
condition. Past study emphasis was on balancing the hydrostatic
pressure during draining of the Main Canal. Pumping is necessary
because of a high point in the canal floor at El. 1491.75 at Sta.
328+25 as shown in Appendix A on Reclamation Reference Drawing
222-116-20476. The result of this high point creates a pocket of
water in the Main
2
3
Box Culvert
One gated concrete box culvert with an interior opening of 8 feet
by 8 feet and 130 feet long was selected. This was sized to be able
to drain Trail Lake by 1,170 AF from El. 1502 feet to El. 1493 feet
as the Main Canal is drained at the end of the season.
Canal. A drain was later installed at the low point to drain back
to Trail Lake at a point in time that Trail Lake wasn’t filling up
as it is today. The volumes of water amount to about 50 AF in the
canal and about 1,000 AF from the lake. Shown in Figure 2 is the
Trail Lake Area/Capacity expressed as Area in acres and Capacity in
acre-feet compared to the lake elevation in feet.
FIGURE 2 – Trail Lake Area/Capacity
4.0 Dewatering Alternative
The intent of this alternative is to develop infrastructure that
will allow the dewatering of Trail Lake and the Trail Lake Section
of the Main Canal. Doing so will allow maintenance and
rehabilitation of the Main Canal free from the adverse impacts of a
lake water-surface elevation higher than the canal invert. The
items included in the infrastructure are: box culvert, pump
station, power, pipeline, weir, and access roadway. Drawings of the
Dewatering Alternative are shown in Appendix A and costs are shown
in Appendix B.
4
Our initial assumptions were to expect the canal to drain at 2 feet
per day and to size the culvert to drain the lake at 1.5 feet per
day with the ability to reach elevation 1493 within 6 days. The 6
days was set based on the need to dewater fairly quickly (within 28
days), with a reasonably sized culvert, so maintenance on the
concrete lined canal banks could be started before the weather
turned cold in the fall that would freeze the water that needs to
be drained. The culvert is gated because we expect the maintenance
of the Main Canal to take several years and will want to control
the flow of water between the lake and the canal. In particular, we
will want to keep from filling the lake as the canal fills in the
spring by closing the gate and keeping the gate closed until the
end of the irrigation season when it is time to drain the
canal.
Pump Station
The pump station is needed to drain the additional 50 AF from the
Main Canal and the additional 1,000 AF from Trail Lake between El.
1493 and El. 1483.
The pump was sized with similar consideration as the culvert being
the approximate 28 day window from the start of draining the canal
until freezing temperatures that would preclude further draining. A
drainage time for the pump station was set at 10 days. In order to
meet this 10 day window the pumps were sized as two 200 hp pumps
operating at 12,500 gpm from a maximum water surface elevation of
1493 feet to a minimum water surface elevation of 1483 feet.
The American National Standard for Pump Intake Design was used in
sizing the pump station:
• Dividing walls for pumps w/Q > 5000 gpm are required
• Limit approach velocity (to pump) to 1.5 fps
• Minimum submergence (page 3) S=D(1+2.3*FD) FD= V/(g*D)0.5
• Bay width of 2*D
• Floor clearance of 0.3*D - 0.5*D
• Wall clearance of 0.25*D </= 4”
• Approach velocity of conduit </= 4 fps
• Install vanes below pump volute
• See page 20 for wet well configuration
• See page 31 for inlet bell design diameter
Solutions:
• Bell Diameter: Q=12,500 gpm, v = 5.7 fps D = 30” inside
diameter
• Clearances: Wall = 7.5” Floor = 15” Bay width = 60”
• Submergence: FD = 0.635 SD = 8 ft. min. submergence
5
Associated with the pump station are two intakes: one from Trail
Lake and one from the Main Canal. An open channel ditch sized for
60 cfs is need from Trail Lake and a pipeline sized for 1,000 gpm
into the wetwell with a maximum head differential of 1 foot for the
Main Canal.
Power
Rough guideline power line costs were obtained from an engineer at
Grant County Public Utility District (PUD) who works in power line
construction, installation, and new services.
Single phase power, run about 2 miles, would run around $50,000 to
$100,000 for just the power line, not considering any easement or
Right of Way costs. Single phase is available at the farmstead on
Rd 31 NE, about a 1.9 mile run to the east that will provide 240 V
power sufficient to run a 10 hp pump (typically).
There is three phase power available about 2.5 miles away to the
south from the line that serves the Summer Falls Power Plant. This
would be able to run much larger pumps at a higher voltage and
would probably cost around $150,000 to $200,000. There is also a
possibility that a line could just run right up the county road
(Pinto Ridge Rd) utility Right of Way for about the same
cost.
Neither of these rough cost figures appears to be prohibitive to
the design concept.
The PUD has an application that we can submit that give more exact
cost estimates.
Pipeline
The pipelines from the pump station will be two 30-inch-diameter
HDPE pipes about 1,225 ft. long. They will be buried with 3’ of
cover under the access road of the Main Canal and exit into the
Main Canal at Sta. 11+38 just downstream of the new downstream
control weir.
Downstream Control Weir
A weir will be placed into solid rock on the Main Canal at Sta.
326+90 across the bottom width of the canal 120 feet wide and 1
foot high. The purpose of the weir is to prevent discharged water
from the pump station from flowing back into the low spot in the
canal at the pump station. The weir was designed to have a low
profile so it would not impact the capacity of the canal but be
high enough to provide a water depth for normal flow down the canal
at rates equivalent to the pumping rate of the pump station.
6
Access Roadway
The existing Main Canal access will be improved from Pinto Ridge
Road into the pumping plant. It will be a 20 foot wide surface with
6 inches of gravel about 1350 feet long.
5.0 Conclusions and Recommendations
This alternative will reduce the hydro-static pressure on the canal
lining as well as fully drain the canal so that maintenance can be
performed during the non-irrigation season. As designed it is quite
expensive compared to previous studies that only addressed the
hydrostatic pressure but well suited for the intended use of also
draining the Main Canal. There may be ways to reduce cost by making
it more of a temporary facility rather than a permanent one. A case
can be made that the pumping station will no longer be needed when
the Main Canal is completely repaired. The main contribution to the
rise in the lake is from the seepage through the damaged
lining.
APPENDIX A – Drawings
1. G-1 Location Map & Sheet Index 2. C-1 Site Overview 3. PP-1
Culvert – Plan & Profile 4. PP-2 Pump Station – Plan &
Profile 5. PP-3 Pipeline – Plan & Profile 6. PP-4 Pipeline –
Plan & Profile 7. D-1 Pump Station Detail Sheet 8. D-2 Culvert
Detail Sheet 9. D-3 Weir Detail Sheet
Reference Drawings
10. 222-116-20476 Main Canal – Profile and Sections – Sta.
255+85.56 to Sta. 326+90.0
11. 222-D-15597 Main Canal – S ta. 318+80 – Transition 12.
222-D-15598 Main Canal – S ta. 325+61.08 – Transition
TRAIL LAKE CANAL MODIFICATIONS 30% DRAFT DESIGN DRAWINGS
SITE SUMMARY T24N, R2BE. E. W.M.
GRANT COUNTY COULEE CITY. WASHINGTON
J,RAND COULEE Project Vicinity COULEE C/rY'\ - SPO!Wlf Cl
DATUM
PROJECT SITE (SCALE IS APROXIMATE)
·~I ! I I I ! ! ! ? •cpo 2or SCALE OF FEET
Horizontal Dotum is NADBJ Woshinglon Slate Planes, North Zone, US
Survey Foot
)(
...)
No.
5000 10000
SIT£ O\lfR'1EW
CULVERT - PLAN & PROAL[
D
B
D
B
A
t"""' ,y
Pinto Ridge Rd.
Station Change Sia/ion Back: 328+12.27 Sia/ion Ahead: 326+ 19. 1
I
Canal Access Raad
10 20 I I
Profile Wew Concrete Box Culvert
2p! ' I ' I ' ' ' I y 2,0 SCAu: OF FEET
40 I
D
B
A
2 3 4 5
--------
= =---~ - -
---
Sia. 2+07.21
-----~------------------------------------------------
Drained by Cano!
-----~-~ws--:. 1493· I ----..!.F - - - - - - - - - -Drained by
Pumps Invert of Dredged Ditch
WSE 1483' ~---
J.O
OF FEET Vories1 L::::::::: ~1 2 2
B
PP-2 5>££1 I or I
-- --
I~ -----1- 1~
'" o.1 ~ -----1- HBO
~ 1470 -t------------------ ----t- H~
0+00 5+00
\ \ .. ~\
1----'----.i
..JL
~,
Pump Station Layout 00'f,I' I I ' I ' I y 2/> ':> I
SCALE OF FEET
2 4 5
_ _ _ _ ____ --__ _ --~------~--~~~~~~----~~~-----
B
1520~----;:=:-T~----- 1515 ~ up Roadway Elev. . . ""'""' """''r~lb
~Build Lwam Mm1mum J' af caver:\ t {_E
IZZ/.207L77~~,o:z--= - - - - - -
1505
I 1500
-0+50 0+00 1+00 2+00 J+OO HOO 5+00 6+00 7+00
STATION
4P' ' I I ? HORIZONTAL SCALEI I I
SCAU: OF FEET •jO • o L SCALC
2~_....._..._._..._J__soii:f"'"i'P~~-1~~-
VERnCA~.._,_...._...J_~SiCCALAi:E°E~~~f.FCCEETC'T_:aL__ I
2 3 4 5
!o I
------- '515
-o.~
PROFI
E11isting Grade FinIJin
r4 1£=1504.2STA 11+JS.".· · Outlet (2) JO" Dram Pipe
1515
1510
1505
LE
//I, /
/ / 6"
PIPEUNE.;; STA ll+JSTA 7+00
HORIZONTAL sCALE ao ,r t . , , , , .f, I y I ! 1 I 40 I 1 1
5Cf\l..E OF FEET
"° llO
BB ---7
3 4 5
SECTION A-A (NTS)
• h flush Pipe drsc arge See sheet I w/cana/ bank.
-,12+oo ~-,--L____ Roadway Bridge
4
rs
ss
x
D
B
A
Cliltklb
-1 E-=J.
Pump Control BoxI I I I
~~1---L----., ... '
Trashrack Acce
Safety Railing
:: ;.. ~ ..:· ··~··; .; .. .• .....
' ·~
SECnON A-A Pump Station Layout
?IP II J II II y t 1p SCALE or FEET
,, , .. r
·' r. .. .,
Floor 0 1505'
SECnON 8-8 Pump Station Layout
?I I I 1 I 1 ! I\ y ? 1p SCALE OF FEET
15 I
llOIS£,l()IH)
8'x8' Reinforced Concrete 14·-o· (12" Thick walls) Box Culve
Culvert Invert 1492'
Intake Invert 1491'
', .·
no/ Bonk (1.5:1 Bonk Slope)
12· -11 .--------.....
Steel Trasnrack Concrete Curb
DETAIL Concrete Box Culvert Concrete Box Culvert loke lntoke Pion
View lake Intake
10 20 10 15 I I I I,? ~ I I f,,,,1,,,.? I I
SCALE OF FEET SCALE OF FEET
I I I I I I I I I I I I I I 1 ~ I I / Top of Main Canal Concrete
lining
I I I I -+-1-------1-+------'I I I I
-' .. ',
-----~
SCALE OF FEET
'------------------
Cano/ Discharge
SCALE Of FEET
-< A
i
D
._j_· --~·'V . i: 0
D
c
CUf:IVE. lWTA .0 • 28' ' 7'15.' 0 ·16: R · JS8.10 · T·9190. L•/79.
77 l'C. Sia :us •:Jl.09 Pl SI.> J27•e299 r T. s~a :JelJ •
10.116
PLAN 'LU
.$€.ALl or 'LrT
£STIMATED OUANT I TtiSI (Sta :J2S +,61.09 lo Sta Ji!6 • 901 ·
Concrete• ••.. ___ •• _ .••• _....es&~"~·
NOTES
Tro.n.sv~r.J~ dtm•nstof'l~ and .side .slop~sior;. l'ilt:i01.
Slt:tt/ons and longih~d1nol dimen '"'u \Ort.of · on { Mo1n Co'1a/.
·
Longdud,nol ~roo~e os 3hown Tl"ansverJe 9rooVI!$ or.: fD D• p/o(.~d
rodlol · at fS"• anlers °" f. Mom Conol . ·I .I :.
l ·'.
I
50.ll OF F££T
L::JNGITUDINAL SECTION {!JEVf."L OPrDJ
OETAIL OF LINING I 0 I L....ul__J SCAL £ 01 F£Fr
H YORAL/LtC PROPERTIES
B
Existing solid rock.
El. 1492.75 NOTE: I. Rt1ft1r to drawing 222- 0- 15598 for tJxisling
information
1·-0· -- A
D-3 SH£C1 I or I
2 3 4 5
I
\
260 - 270 280 2 SO 300 3 10 3 20 '
11.30 .00061 12.21 00055 13
/ ' see ladder rung deroilj l , j , j -.f O-t-····30· ••• • •
5£CTICN No.l·B
U N.Itta STATES OP'AR'TM iHT ~ THC INTC~IOflt
llUREAU OF REC\.AMATION COLUMBIA BASIN PROJECT· WASHI NGTON
MAIN CANAL
<D "'~ + ... N~+ ,__ - ..--.., "' <i++N "' "' ,._
NC\!~ N - - t-ci ci
- <i .... .... ..n: .... en:-;; "' en en I 0
~~- ·· Transition 0... I +I I ,~.; I - "'I <D: ' (~ I \ I l N -
I r\<iI !1 r A I.... I.. I ,1 I \ \ I V> ru
""" lI "' I
11•, \ • ' 1 , µ ~
I \ lJ/"' f\ISi :l.49,,.! 11 " u I_.. I ,___ WATER
SURFACEC>
:1soe 1
I I I... I 11 I 1V I
"' I II I I
'O I I ,_I I,_..., 1488.1 3. BOT: TOM OF CANAL 0
,,., .JUOI
I I I
I 0 0 0 0;o +.., 0 -,.., ,.., <i <i ,....._ .... .... en en I
I I A II I J\ trrrn$ilion. I
I " \ l ' I II I
...l\ I I ~, I
1 L/iI II i
g ~ '? ~""o ++ + "' r~~ ~~- N ~ N ~ ,..,,.., ,.., rt') 0 .
ii~- <t<-t ~-~ .... .... 0 ti) tl) en V> ti) ' • 1 1 Io
I
I I / 11 I,, r ·/ : I I'" I I 'l."i r··., 1 I
I I I • ronsltion1 I 1' - !II< I 1'.1so .89 I'"''
'Ii 1 1rl5 Pf- N I
II,_ , 1 1I I 11•14R ih1
ci
! I '"
: : L..o,
-:i. .. II
~ ~ <D
~: ~~~Q + CD
~ ~ "' I I
z ~ ~~ ~ o en V> ;:::: I I <t I I :> ri
.til..:.j *I
I II
H I I
N I N I I "!1 I :!1 ! <l>I
I
I ...c ------ ------------- -- ----- ---------- ----- -CANAL
SECT'ON No. I -A ------ - -----------_____ ..,.___-·--- ----- 1
\ ->t< - ... ::?___
PROFILE AND SECTIONS STA . 255 • 85.56 TO STA . 32 + 90.0
r
f i_ ,
II
' I ('.).
I I I I I I I I
,I \I). ~.
I I
"' I
~ I I I. '* ' ~ I
HYDRAU LIC P ROPER Tl ES
d A r s V Q n ZO.O el.O 1081. 5'0 11. 30 .0006/ It? .i!/ 13 i!OO
.014 40.0 el O Vorioblt .00055 H.aoo .OllS/twt.
°' ii I I I I I I
. '
' . .
,,
11 :·:o Q II 1· ' I)
:: · ~ ~ :: :: ~ I t I : II I I -c.. II~ \ :1 fl . .. ....... IJ:
I
•I : 11 ' , 1 I
....!,.., . ·~
11 I
~,
'<> ~
-<Jc -~J£
J ;I
"''"'O t''t ~·"', .~ tol o 4o 1"?.....,... <0 1... Ol l... - 1 ~
,;;I~ ~:~':t ·1 01...,. ~1-= ~1...; ~1lcJ Vlll,J ,,.,1...,
' I I I I 'o"''°' g•-.t ~"!"'lo .•-:~1.J. :..~"''...(;\)~ ;T,l~
.... ~
o•-:: 2:~ ~::::-·,,,,... Vl1W V)1b.J
'in .,
I I I I I ~~ o: "':m o:'° V\:t... vc~ o'o ~~ ~~ ~~ ~:~ '<tit
.... ~ ~I~~I\) N'... ':t~ \Olo:it:• . ~~~ c:::~ ;: ~ ~: ~ .,,...
~;:~.ct! •..t .,.,.-t +a • + I• ~,~ "' ... .,.,,¢ ;n;~
~~ - 10l iii: ~ iV\I~ .;:;. ~iii•~ ,;;,~ (;;1~ c::! ~:~(\"'11~ "'•
~ ·1
O• .1- ·t - ·• i :: : :: '"a1 "' . 21::; .e1...: ~:~ ~!~
....,..; .e.1~ ~,...;
~rJ ~w .....,-.:.
Vl1"" "''"' <ll'"' "'1w vnW "'•"' V'l1 V'\1IU
' "For detai l s a( ea>-H' fill see Section 8-B-'
SECTION A-A 10 10 zo
SCALt or FEET
. - ·- '"· SECTTON B·B
End lon91fud i nal groov< at' tro.~svnJe/ groove near est S~o.
318 •80.~-1
'-For d<fo i I~ of l inin9 o:n l•f ~ l>ank 5« Dw9. u~-o
·t5S98.
SECTION C-C
FOR SIDE SLOPE)·
NOTES
Longitudinal groov<is as shown . Tronsv1rsc q rooves arQ 1'o be
p loud at Z5' Ct!nhrs Oil
~ ol Main Canal.
MAIN CAN AL - STA. 318~80 . TRANSIT I ON
~.~ OAAWN . ..Ut.P. ___ svBMtTTEO ---
., . :~-
1 -Cv·ml Jr,· fton 1-8
":.;,,roove.s not shown._,
~·;t-Locote berm os dtrecfed -- -.~-._,
...--·-- -------·----:>~ M 1n1mum bank i?O'O /
CURVE DATA LI • 28~ 4 7:15; D ·/6; R<J58.t0' T · 9190, L •
/79.77 P.C. Sia. 3Z6 ~:Jl.09 Pl 51.:J J27•Z2 99 f'T s-:o 328 •
1a&6
PLAN :LU
No. 4 (/n/lned lcO.O
~---~ v " -~~ - f
SCALC or f"££T
' -~-
Ccmcrefe___ __ - -- _ _____ _--·?SC cu.~.
'-EXCAVATED TO SOLID ROCK.
HYDRAULIC P ROP£PTt£S
d A r s v e1.o Von;,bk .oooss
Io~ ·n
11.r.zoo O'zi-jr,...,. 14. l:J f995.09 1167 ()006S 6./ZS !1~too I
.osq_
llttllORl!.I~ 10J lb,, KEYPUNCHEll
Sfofions and lonoifudinol dimen ions ' or~ · on ~ Mein Canal.
.
L on9tfvdlnol ?rco ve os :Jhown iron:;verJ grooves or" ro tie
placed rod/al · of f 5'. cenfers on ~ Mom Conol. . j :I ·:.
T I .. , :
o.!'"/'.l</. ,..,~. IJN•T ' O ~T•TE3
OL PAl17N£NT' ()I" rHL tNTCRtOt'I avt:1r.-v o, Rl'ct.
A.twAru>N
COLu"'B'-" BAS,.,, PPoJrcr - wASffrN~ roN .
APPENDIX B – Cost Estimates
QUANTITIES PRICES BY NS CHECKED RW BY SW CHECKED NS
DATE PREPARED
PROJECT: Trial Lake Canal Modification
WOID: ESTIMATE LEVEL: Draft
FILE: N:\CAD\Columbia_Basin\Trail Lakes\[Cost
Estimation.xlsx]Formal Cost Estimate
DESCRIPTION QUANTITY Unit UNIT PRICE AMOUNT
Culvert
Excavation 7,000 CY $ 27.00 $189,000.00 Embankment Backfill 335 CY
$ 36.00 $12,060.00 Concrete Reinforced 78 CY $ 1,500.00 $117,000.00
Headgate 8' x 8' Metal Slide Gate, Hydraulically Controlled 1 Ea. $
106,000.00 $106,000.00 Trashrack 15' x 10' Steel Trashrack 1 Ea. $
7,500.00 $7,500.00 Demolition Concrete Canal Lining 233 SY $ 21.00
$4,893.00 Metal Grating 5' x 8' Steel Walkway Grating 77 SF $ 32.00
$2,464.00 Culvert 8' x 8' x 100' Reinforced Concrete Box Culvert 1
LS $ 76,000.00 $76,000.00
Pump Station
Excavation 7,000 CY $ 27.00 $189,000.00 Embankment 170 CY $ 36.00
$6,120.00 Demolition Concrete Canal Lining 4 SY $ 21.00 $73.50
Dredging Channel Dredging 3,000 CY $ 32.00 $96,000.00 Concrete
Reinforced 304 CY $ 1,500.00 $456,000.00 Pipe 30" dia. HDPE 2,400
LF $ 3.50 $8,400.00 Trashrack 17' x 15' Steel Trashrack 1 Ea. $
12,750.00 $12,750.00 Headgate 7' x 7', Steel Slide Gate,
Hydraulically Controlled 2 Ea. $ 101,000.00 $202,000.00 Headgate
18" Dia., Steel Slide Gate 1 Ea. $ 2,600.00 $2,600.00 Valve 30"
dia. Butterfly 2 Ea. $ 10,000.00 $20,000.00 Valve 30" dia. Check 2
Ea. $ 21,000.00 $42,000.00 Fittings 30" dia. Flexible Coupling 2
Ea. $ 5,940.00 $11,880.00 Pumps Vertical Turbine Pump -200hp, 12500
GPM 2 Ea. $ 91,500.00 $183,000.00 Power 3 Phase 1 LS N/A
$200,000.00
Pipeline
Excavation 910 CY $ 27.00 $24,570.00 Embankment 95 CY $ 36.00
$3,420.00 Surfacing 3/4" Subbase Gravel 1,040 SY $ 11.15 $11,596.00
Fittings 30" dia. Flexible Coupling 4 Ea. $ 5,940.00
$23,760.00
Weir
Excavation 20 CY $ 27.00 $540.00 Concrete Reinforced 43 CY $
1,500.00 $64,500.00
Access Roadway
Surfacing 3/4" Subbase Gravel 3,000 SY $ 11.15 $33,450.00 SUBTOTAL
$2,106,577
8 4 3
5 3 2
CONTINGENCIES - 10% $231,7 FIELD COST $2,548,958
TOTAL COST $2,549,000
The U.S. Department of the Interior protects America’s natural
resources and heritage, honors our cultures and tribal communities,
and supplies the energy to power our future.
Bureau of Reclamation