CONCEPTUAL DESIGN FOR WILLIAMS ROAD BIKE AND PEDESTRIAN IMPROVEMENTS BRENT ADDISON, P.E. End Project Sta. 88+15 Begin Project Sta. 13+25 Three Oaks Parkway Williams Road Estero High School Hertz DAVID WILLEMS, P.E.

CONCEPTUAL DESIGN FOR WILLIAMS ROAD BIKE AND …

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CONCEPTUAL DESIGN FOR WILLIAMS ROAD BIKE AND …

CONCEPTUAL DESIGN FOR WILLIAMS ROAD BIKE AND PEDESTRIAN IMPROVEMENTS

BRENT ADDISON, P.E.

End ProjectSta. 88+15

Begin ProjectSta. 13+25

Thre

e O

aks P

arkw

ay

Williams Road

Estero High School

Hertz

DAVID WILLEMS, P.E.

Page 2: CONCEPTUAL DESIGN FOR WILLIAMS ROAD BIKE AND …

OBJECTIVE

The goal of this project is to improve the bicycle andpedestrian facilities for Williams Road from US 41 toThree Oaks Parkway.

Page 3: CONCEPTUAL DESIGN FOR WILLIAMS ROAD BIKE AND …

DISCUSSION TOPICS

•Conceptual Plan Views

•Conceptual Section Views

•Enhancements

•Preliminary Cost Analysis

Page 4: CONCEPTUAL DESIGN FOR WILLIAMS ROAD BIKE AND …

CONCEPTUAL PLAN VIEWS

Page 5: CONCEPTUAL DESIGN FOR WILLIAMS ROAD BIKE AND …

Proposed 12’ Multi-use Path

Proposed 7’ Bike Lane

Existing 5’ Sidewalk

Future 4 Lane Expansion

US 41 TO VIA COCONUT

Page 6: CONCEPTUAL DESIGN FOR WILLIAMS ROAD BIKE AND …

Proposed 7’ Bike Lane

Proposed 7’ Bike Lane

Proposed 12’ Multi-use Path

Proposed 8’ Concrete Sidewalk

Proposed 7’ Bike Lane

Proposed 8’ Concrete Sidewalk

RAILROAD TO ESTERO HIGH SCHOOL

Page 7: CONCEPTUAL DESIGN FOR WILLIAMS ROAD BIKE AND …

Proposed 8’ Concrete Sidewalk

Proposed 12’ Multi-use Path

Proposed 7’ Bike Lane

Proposed 12’ Multi-use Path

RoundaboutPer River Ranch Road Project

Proposed 8’ Concrete Sidewalk

ESTERO HIGH SCHOOL TO RIVER RANCH

Page 8: CONCEPTUAL DESIGN FOR WILLIAMS ROAD BIKE AND …

Proposed 8’ Concrete Sidewalk

Proposed 12’ Multi-use Path

Proposed 7’ Bike Lane

Proposed 8’ Concrete Sidewalk

RIVER RANCH TO THREE OAKS PARKWAY

Page 9: CONCEPTUAL DESIGN FOR WILLIAMS ROAD BIKE AND …

CONCEPTUAL SECTION VIEWS

Page 10: CONCEPTUAL DESIGN FOR WILLIAMS ROAD BIKE AND …

US 41 TO VIA COCONUT

Page 11: CONCEPTUAL DESIGN FOR WILLIAMS ROAD BIKE AND …

VIA COCONUT TO SEMINOLE GULF RAILWAY

Page 12: CONCEPTUAL DESIGN FOR WILLIAMS ROAD BIKE AND …

SEMINOLE GULF RAILWAY TO ESTERO HIGH SCHOOL

Page 13: CONCEPTUAL DESIGN FOR WILLIAMS ROAD BIKE AND …

ESTERO HIGH SCHOOL TO RIVER RANCH ROAD

Page 14: CONCEPTUAL DESIGN FOR WILLIAMS ROAD BIKE AND …

RIVER RANCH ROAD TO THREE OAKS PARKWAY

Page 15: CONCEPTUAL DESIGN FOR WILLIAMS ROAD BIKE AND …

ENHANCEMENTS

• Decorative lighting to allow safe nighttime use of bicycle and pedestrian facilities

• Landscaping to improve aesthetics, comfort and safety

Page 16: CONCEPTUAL DESIGN FOR WILLIAMS ROAD BIKE AND …

PRELIMINARY COST ANALYSIS(For Via Coconut to Three Oaks Parkway Only)

Bike Lanes $249,952.00

North Side (Sidewalk and Asphalt Path) $564,420.00

South Side Multi-Use Path $742,812.00

Irrigation and Landscaping $1,272,000.00

Lighting $622,272.00

Misc. (Mobilization, Survey, Design, MOT, Inspection) $663,000.00

Total Estimated Costs $4,114,456.00