Presented by:
Studio Laan715 G St. SE, 3rd FloorWashington, DC 20003
Concept Design forDuke Ellington Field1700 38th St. NW, Washington, DC 20007
September 29, 2021Project Description Upgrades to track, field, and field houses.
Presentation Index1. Existing Conditions Survey2. Existing Conditions Photos3. Minimum and Maximum Soccer Field Comparisons4. Layout Option 1 Existing 320m Track with Minimum
Soccer Field5. Layout Option 2 350m Track with Maximum Soccer
Field Achievable6. Historic Field House Elevations7. Historic Field House Plans8. South Field House Demolition Plan9. South Field House Proposed Plan10. South Field House Elevations11. North Field House Demolition Plan12. North Field House Proposed Plan13. North Field House Elevations14. Lighting Technology15. Lighting Field16. Lighting Track17. Lighting Edge of Property18. Transportation Plan
September 29, 2021Concept Design for Duke Ellington Field1700 38th St. NW
© 2021 studio laan, PLLC
Rules of the Road
• Please keep your microphone on mute during the presentation and your video off.
• Please use the chat feature to ask questions or provide comments which will be addressed after the prepared slides.
• The chat function is located at the bottom of your screen and looks like a “thought” cloud symbol. Please be sure to submit your question / comment to “Everyone” for documentation purposes.
• We’ll do the best we can to answer all questions / comments, but if your question is not answered, DPR is tracking all questions and will create a Q/A document that will be shared after the meeting.
September 29, 2021Concept Design for Duke Ellington Field1700 38th St. NW
1© 2021 studio laan, PLLC
Scale: 1/64” = 1’-0”
0 64’32’ N
Existing Conditions Survey
39th Street, NW
38th Street, NW
S St
reet
, NW
Rese
rvoi
r Roa
d, N
W
Field Houses
Existing Synthetic Surface Track
Main Entrance
Secondary Entrance
Secondary Entrance
Existing Bleachers
September 29, 2021Concept Design for Duke Ellington Field1700 38th St. NW
2© 2021 studio laan, PLLC
Existing Conditions Photos
South Field House, Field-Side Facade Main Entrance from 38th Street
North Field House Street-Side Facade Existing BleachersSecondary Entrance (Proposed Ramp)
North Slope
295'-0" (90m)
148'-
0" (4
5m)
295'-
0" (9
0m)
394'-0" (120m)
15'-0"
10'-0
"
15'-0"10
'-0"
September 29, 2021Concept Design for Duke Ellington Field1700 38th St. NW
3© 2021 studio laan, PLLC
Scale: 1/64” = 1’-0”
0 64’32’ N
Minimum and Maximum Soccer Field Comparisons
Minimum FIFA Regulation Soccer Field
Maximum FIFA Regulation Soccer Field
Minimum required buffer zone
295'-0"
148'-
0"
10'-0
"
15'-0"
September 29, 2021Concept Design for Duke Ellington Field1700 38th St. NW
4© 2021 studio laan, PLLC
Scale: 64” = 1’-0”
0 64’32’ N
Layout Option 1:Existing 320m Track with Minimum Soccer Field
39th Street, NW
38th Street, NW
S St
reet
, NW
Rese
rvoi
r Roa
d, N
W
315'-0"
190'-
0"
10'-0
"
15'-0"
Update curb ramps & crosswalks
September 29, 2021Concept Design for Duke Ellington Field1700 38th St. NW
5© 2021 studio laan, PLLC
N
Scale: 1” = 64’-0”
0 64’32’
Layout Option 2:350m Track with Largest Soccer Field Achievable
Optional Dog Park~8,500 SF
Soccer FieldVolleyball
Existing Entry:Repair Existing Curb Cut
Existing Entry:New Accessible Ramp
Update curb ramps & crosswalks
Update curb ramps & crosswalks
Bleachers Bleachers
Pickle ball
New Drinking Fountain
6 New Bike Racks
39th Street, NW
38th Street, NW
S St
reet
, NW
Rese
rvoi
r Roa
d, N
W
Relocated shot put & long jump sand pit
15 New Bike Racks
Repair/Replace Existing Drinking Fountain
Light Pole 1
Light Pole 2
Light Pole 3Light Pole 4
Repair & repaint existing guardrail
New Sidewalk
Abandon existing secondary entrance
Update curb ramps & crosswalks
September 29, 2021Concept Design for Duke Ellington Field1700 38th St. NW
6© 2021 studio laan, PLLC
Historic Field House Elevations
September 29, 2021Concept Design for Duke Ellington Field1700 38th St. NW
7© 2021 studio laan, PLLC
Historic Field House Plans
DN
Office Office Office Office
Common Space
Entry
Elect.
HallRR
Storage
September 29, 2021Concept Design for Duke Ellington Field1700 38th St. NW
8© 2021 studio laan, PLLC
South Field House Demolition Plan
Scale: 3/16” = 1’-0”
0 5’-4”2’-8” N
Demolish interior partitions
Demolish windows/doors & modify openings
Relocate existing condenser unit
DN
Office Office Office
Common Space
Entry
Elect.
HallRR
Women'sRestroom
Men'sRestroom
Vestibule
3'-6"
Janitor
9'-9"
7'-10
"
5'-0"
2'-0"
8'-3"
11'-9"
5'-0"
26'-612" (Exist.)
15'-1
" (Ex
ist.)
15'-0" (Exist.) 11'-8" (Exist.) 14'-112" (Exist.)9'-
91 2" (E
xist.)
ConcreteWalkway
Proposed Bicycle Parking
September 29, 2021Concept Design for Duke Ellington Field1700 38th St. NW
9© 2021 studio laan, PLLC
Scale: 3/16” = 1’-0”
0 5’-4”2’-8” N
South Field House Proposed Plan
New men’s & women’s restrooms
New concrete walkway
September 29, 2021Concept Design for Duke Ellington Field1700 38th St. NW
10© 2021 studio laan, PLLC
South Field House Elevations
Existing South Elevation Proposed South Elevation
Modify existing door/window openings to provide (2) 36” leaf doors
OfficeOfficeOffice
Office
Office Office Office
Hall
Common Space
RR
Elect.
Reception
September 29, 2021Concept Design for Duke Ellington Field1700 38th St. NW
11© 2021 studio laan, PLLC
North Field House Demolition Plan
Scale: 3/16” = 1’-0”
0 5’-4”2’-8” N
Demolish interior partitions
Demolish windows/doors & modify openings
Relocate existing condenser unit
OfficeOffice
Elect.
ReceptionDPR Meeting
AssignableStorage
AssignableStorage
Restroom #2
Restroom#1
Janitor
25'-1012" (Exist.)
15'-0
" (Ex
ist.)
8'-6"
8'-5"
8'-6"
12'-612"
8'-0"
7'-3"
4'-1"
4'-5"
AssignableStorage
12'-5" (Exist.) 11'-6" (Exist.)
9'-9"
(Exis
t.)
6'-11"
11'-3
"
ConcreteWalkway
September 29, 2021Concept Design for Duke Ellington Field1700 38th St. NW
12© 2021 studio laan, PLLC
Scale: 3/16” = 1’-0”
0 5’-4”2’-8” N
North Field House Proposed Plan
New all-gender restrooms
Infill missing brick to match existing
New concrete walkway
September 29, 2021Concept Design for Duke Ellington Field1700 38th St. NW
13© 2021 studio laan, PLLC
North Field House Elevations
Existing North Elevation Proposed North Elevation
Modify existing door/window openings to provide (3) 32” leaf doors
September 29, 2021Concept Design for Duke Ellington Field1700 38th St. NW
14© 2021 studio laan, PLLC
Lighting Technology
1Precast Concrete Base
5 Poletop Luminaire Assembly
4 Wire Harness
2 Galvanized Steel Pole
3Electrical Components Enclosure
Integrated Lightning
Ground System
Other Light Source Option
Metal Halide10 year warranty
“ LEDs must be carefully
integrated into lighting
fixtures. The efficiency of a
poorly designed fixture that
uses even the best LEDs will
be only a fraction of what
it would be if the fixture
were well-designed, and the
design can also affect lumen
maintenance.”
— U.S. Department of Energy
www.energy.gov/eere/ssl/led-basics
5
Luminaire
Use
Lose / Abuse
Off siteOn field
40 years of research, increasing efficiency and decreasing environmental impact.
TodayMusco LED
System
TodayOther Luminaire
ManufacturerLED
Equal parameters used for each pole including on-field light produced, wattage, height, and aiming angle.
What can beWhat often is
Other LED Manufacturer
Musco TLC for LED®
Light Energy: Use, Lose, Abuse
9
ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the written consent of MuscoSports Lighting, LLC. ©1981, 2021 Musco Sports Lighting, LLC.ENGINEERED DESIGN By: · File #213378B · 03-Aug-21
33
29
28
27
29
35
30
34
31
27
27
30
35
36
35
32
28
27
29
32
34
28
29
26
26
29
31
28
23
27
25
26
30
32
24
23
27
27
27
30
32
24
29
32
29
28
30
31
28
32
35
31
29
31
33
34
34
33
32
30
31
35
36
33
34
33
30
30
35
30
147'
82'
141'
177'
147'
82'
142'
165'
S2
S4
S1
S3
{\fC
alib
ri|b1
|i0|c
0; }
{\fC
alib
ri|b1
|i0|c
0; }
SCALE IN FEET 1 : 60
0' 60' 120'
EQUIPMENT LIST FOR AREAS SHOWNPole Luminaires
QTY LOCATION SIZE GRADEELEVATION
MOUNTINGHEIGHT
LUMINAIRETYPE
QTY /POLE
THISGRID
OTHERGRIDS
2 S1-S2 70' - 70'70'
TLC-LED-1500TLC-LED-1200
32
32
00
1 S3 80' - 80'80'80'
TLC-LED-900TLC-LED-1500TLC-LED-1200
222
222
000
1 S4 80' - 80'80'80'
TLC-LED-900TLC-LED-1500TLC-LED-1200
321
321
000
4 TOTALS 22 22 0
Pole loca�on(s) dimensions are rela�veto 0,0 reference point(s)
Duke Ellington College
GRID SUMMARYName: Soccer
Size: 315' x 190'Spacing: 30.0' x 30.0'
Height: 3.0' above grade
ILLUMINATION SUMMARYMAINTAINED HORIZONTAL FOOTCANDLES
En�re GridGuaranteed Average: 30
Scan Average: 30.10Maximum: 36Minimum: 23Avg / Min: 1.34
Guaranteed Max / Min: 2Max / Min: 1.59
UG (adjacent pts): 1.34CU: 0.66
No. of Points: 70LUMINAIRE INFORMATION
Applied Circuits: ANo. of Luminaires: 22
Total Load: 26.94 kW
Guaranteed Performance: The ILLUMINATION described aboveis guaranteed per your Musco Warranty document andincludes a 0.95 dirt deprecia�on factor.
Field Measurements: Individual �eld measurements may varyfrom computer-calculated predic�ons and should be takenin accordance with IESNA RP-6-15.
Electrical System Requirements: Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.Installa�on Requirements: Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design loca�ons.
September 29, 2021Concept Design for Duke Ellington Field1700 38th St. NW
15© 2021 studio laan, PLLC
Lighting Field
Calculated measurements in footcandles at grade
ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the written consent of MuscoSports Lighting, LLC. ©1981, 2021 Musco Sports Lighting, LLC.ENGINEERED DESIGN By: · File #213378B · 03-Aug-21
25 18 14 11 11 15 17 25 2520
7
3
2
2
2
3
5
8132322157918222211
7
4
3
2
2
2
4
14
2531
147'
82'
141'
177'
147'
82'
142'
165'
S2
S4
S1
S3
{\fC
alib
ri|b1
|i0|c
0; }
{\fC
alib
ri|b1
|i0|c
0; }
SCALE IN FEET 1 : 60
0' 60' 120'
EQUIPMENT LIST FOR AREAS SHOWNPole Luminaires
QTY LOCATION SIZE GRADEELEVATION
MOUNTINGHEIGHT
LUMINAIRETYPE
QTY /POLE
THISGRID
OTHERGRIDS
2 S1-S2 70' - 70'70'
TLC-LED-1500TLC-LED-1200
32
32
00
1 S3 80' - 80'80'80'
TLC-LED-900TLC-LED-1500TLC-LED-1200
222
222
000
1 S4 80' - 80'80'80'
TLC-LED-900TLC-LED-1500TLC-LED-1200
321
321
000
4 TOTALS 22 22 0
Pole loca�on(s) dimensions are rela�veto 0,0 reference point(s)
Duke Ellington College
GRID SUMMARYName: Track
Size: IrregularSpacing: 30.0' x 30.0'
Height: 3.0' above grade
ILLUMINATION SUMMARYMAINTAINED HORIZONTAL FOOTCANDLES
En�re GridScan Average: 12.35
Maximum: 31Minimum: 2Avg / Min: 8.06
Max / Min: 20.33UG (adjacent pts): 0.00
CU: 0.15No. of Points: 38
LUMINAIRE INFORMATIONApplied Circuits: A
No. of Luminaires: 22Total Load: 26.94 kW
Guaranteed Performance: The ILLUMINATION described aboveis guaranteed per your Musco Warranty document andincludes a 0.95 dirt deprecia�on factor.
Field Measurements: Individual �eld measurements may varyfrom computer-calculated predic�ons and should be takenin accordance with IESNA RP-6-15.
Electrical System Requirements: Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.
Installa�on Requirements: Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design loca�ons.
September 29, 2021Concept Design for Duke Ellington Field1700 38th St. NW
16© 2021 studio laan, PLLC
Lighting Track
Calculated measurements in footcandles at grade
ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the written consent of MuscoSports Lighting, LLC. ©1981, 2021 Musco Sports Lighting, LLC.ENGINEERED DESIGN By: · File #213378B · 03-Aug-21
S2
S4
S1
S3
{\fC
alib
ri|b1
|i0|c
0; }
{\fC
alib
ri|b1
|i0|c
0; }
0.00.10.10.10.20.20.10.00.10.10.30.20.10.00.00.10.10.00.00.00.00.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.00.0 0.0 0.0 0.0 0.4 1.1 1.3 0.9 0.7 0.6 0.8 1.1 1.5 1.6 1.1 0.4 0.1 0.0 0.0 0.0
0.0
0.1
0.1
0.2
0.2
0.2
0.2
0.2
0.1
0.1
0.0
0.0
0.0
SCALE IN FEET 1 : 60
0' 60' 120'
EQUIPMENT LIST FOR AREAS SHOWNPole Luminaires
QTY LOCATION SIZE GRADEELEVATION
MOUNTINGHEIGHT
LUMINAIRETYPE
QTY /POLE
THISGRID
OTHERGRIDS
2 S1-S2 70' - 70'70'
TLC-LED-1500TLC-LED-1200
32
32
00
1 S3 80' - 80'80'80'
TLC-LED-900TLC-LED-1500TLC-LED-1200
222
222
000
1 S4 80' - 80'80'80'
TLC-LED-900TLC-LED-1500TLC-LED-1200
321
321
000
4 TOTALS 22 22 0
Pole loca�on(s) dimensions are rela�veto 0,0 reference point(s)
Duke Ellington College
GRID SUMMARYName: Property Spill Line
Spacing: 30.0'Height: -17.0' above grade
ILLUMINATION SUMMARYHORIZONTAL FOOTCANDLES
En�re GridScan Average: 0.2268
Maximum: 1.57Minimum: 0.00
No. of Points: 67LUMINAIRE INFORMATION
Applied Circuits: ANo. of Luminaires: 22
Total Load: 26.94 kW
Guaranteed Performance: The ILLUMINATION describedabove is guaranteed per your Musco Warrantydocument.Field Measurements: Individual �eld measurements may varyfrom computer-calculated predic�ons and should be takenin accordance with IESNA RP-6-15.Electrical System Requirements: Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.Installa�on Requirements: Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design loca�ons.
September 29, 2021Concept Design for Duke Ellington Field1700 38th St. NW
17© 2021 studio laan, PLLC
Lighting Edge of Property
* ***
*
**
*
September 29, 2021Concept Design for Duke Ellington Field1700 38th St. NW
18© 2021 studio laan, PLLC
N
Scale: 1” = 64’-0”
0 64’32’
Transportation Plan
Residential Parking
Resid
entia
l Par
king
Legend Residential Parking
39th Street, NW
38th Street, NW
S St
reet
, NW
Rese
rvoi
r Roa
d, N
W
Metered Parking
Bicycle Circulation
WMATA Bus Stops
Pedestrian Access
Metered Parking(No Parking)
Proposed Bicycle Racks
Main Entrance
Secondary Entrance
Existing Capital Bikeshare Station
WMATA Bus StopD6 Sibley Hosp. to Stadium-Armory Metro
Proposed 37th St. Protected Bike Lanes, 1 block East
Proposed Bicycle RacksResid
entia
l Par
king
Metered Parking
Met
ered
Par
king
Met
ered
Par
king
Proposed Metered Handicap Parking
September 29, 2021Concept Design for Duke Ellington Field1700 38th St. NW
© 2021 studio laan, PLLC
Next Steps:
• Schedule an evening tour of Takoma Soccer Field in October• Release design package and consultant reports on the project website:
◦ Concept Design Package ◦ Traffic Study ◦ Archaeological Report ◦ Geotechnical Report ◦ Arborist’s Report
• Next community meeting in November• Design/builder on board winter 2022• Construction complete late 2022
Contacts: Peter Nohrden [email protected] Wayne Gore [email protected]