12
Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section Sutton 2 Sandycove Cycle Route Interim Solution at Clontarf / Dollymount (Wooden Bridge to Causeway Road)

Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section

  • Upload
    minowa

  • View
    69

  • Download
    0

Embed Size (px)

DESCRIPTION

Sutton 2 Sandycove Cycle Route Interim Solution at Clontarf / Dollymount (Wooden Bridge to Causeway Road). Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section. S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD. S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD. Roads Traffic - PowerPoint PPT Presentation

Citation preview

Con Kehely BA, BAI, MUBC Chartered Engineer,

National Transport Authority Design Section

Sutton 2 Sandycove Cycle RouteInterim Solution at Clontarf / Dollymount

(Wooden Bridge to Causeway Road)

S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD

Roads• Traffic• Condition

Sea Defences• Erosion• Flooding

Ecology• SPA• SCA• pNHA

S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD

S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD

S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD

S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD

S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD

S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD

NEXT STEPS

•Planning Application / Public Display

•Cost

•Construction mid 2013

CONCLUSION

• Interim Solution

• Deliverable in Short Term

• Cycling

• Walking

• Additional flood defence

• Coastal erosion

• Trunk Water Main

QUESTIONS ?