Computer System

Validation:- HPRA

Expectations

Wholesale Distribution Conference

11th November 2014

Alfred Hunt, Inspector

What is validation

2

“Action of proving that any procedure, process,equipment, material, activity or system actually leadsto the expected results”

1. Did we pick the correct software/hardware?

2. Was it installed correctly?

3. Do we have a working system?

4. Is the system still working?

5. Is it compliant with GDP/Regulations?

6. Is it fit for the intended use?

11th November 2014

3

•Background to CSV

•Basic GDP requirements relating to CS

11th November 2014

4

PIC/S – Good Practices for Computerised Systems in Regulated ‘GxP’ Environments (PI 011)

11th November 2014

Category Validation Approach

1

Infrastructure Software

Record version (include service pack).

Verify Correct Installation

3

Non – Configured

User Requirements Specification

Record version (and configuration of environment) and verify

installation

Risk based tests against requirements

Procedures put in place for maintaining compliance

Consider auditing supplier for critical and complex applications

4

Configured

As above, plus…

Life cycle approach (FS/DS)

Supplier questionnaire – Adequate QMS

Risk based tests against requirements in a test environment

Risk based tests against requirements within the business process

5

Custom

As above, plus…

Full life cycle documentation

Design and source code review GAMP 5 Appendix M4

5

A document which specifies the

system requirements

A document which defines the

system to meet the user’s needs

described in the URS

A document provides a detailed

technical expansion of the FS

11th November 2014

Hardware Validation

6

• Hardware Category 1 - Standard Hardware

– Installation and connection

– Record model, version number, serial number

– Change Control

• Hardware Category 2 - Custom Built Hardware

– As above plus..

– Design Specification and Acceptance Testing

– Verification of compatibility of interconnected hardware

– Supplier audit

11th November 2014

Validation Plan

• User Requirement Specification

• Functional & Configuration Specification (separate or together)

• Testing

• SOPs / Manuals / Drawings / Vendor Documentation

• Change Control

• Revalidation?

• System withdrawal, data migration

7

– Life Cycle

11th November 2014

Warehouse Management System

9

A warehouse management system (WMS)

controls the movement and storage of

materials within a warehouse and processes

the associated transactions, including

shipping, receiving, put-away and picking.

11th November 2014

Validation Plan

• User Requirement Specification

• Functional & Configuration Specification (separate or together)

• Testing

• SOPs / Manuals / Drawings / Vendor Documentation

• Change Control

• Revalidation?

• System withdrawal, data migration

10

– Life Cycle

11th November 2014

11

Identify:

1. What the system does – understand it. Involve

the supplier, map it

2. How the system works (Hardware & Software)?

3. What are the critical pieces of equipment?

4. How is data maintained, secured, retrieved?

5. What are the future expectations, challenges?

6. What controls are in place to ensure compliance?

7. SOPs, manuals, drawings

8. Maintenance, calibration, training

First Steps

11th November 2014

1. Describe the entire system (Use vendor info)

Server, workstations, RF scanners, forklift terminals, printers, back-up & archival storage...

2. What are the system requirements

Manage stock & record transactions...

3. Testing of requirements, functions, configuration

• Define the tests which you will perform

• Perform tests

4. Report

• Results of validation exercise

• Deviations & resolution

• Further actions

12

Testing Stage - Protocol

11th November 2014

Some key (GDP) actions of WMS

• Traceability of product (supplied / received)

• Batch number tracking

• Picking correct product

• FEFO

• Quarantine

• Approved customers for category

• Alarms / error messages

• Returns

• Archiving

• Authorised users (and number of)

• Audit trail (key actions)

• Data Transfer between systems

• Recovery following power failure

• Recovery following system failure

13

Non-exhaustive list

Know your own system /requirements

11th November 2014

14

Action FEFO

(First Expired First Out)

Risk Expired / short dated product dispatched

Control WMS configured to pick all stock based on FEFO

Test 1) Ensure FEFO is assigned in configuration options

2) In test environment enter various expiry dates and

verify picked as per FEFO

3) Enter a returned product back into inventory &

ensure picked by FEFO

Expected

Result

All pick lists assign products based on FEFO

Actual Result 1)&2) – FEFO

3) Not FEFO [Reference Deviation #1]

Initial/ Date AH 11/11/14

11th November 2014

15

Dev’n

No.

Description Action Result

1 Returned products ,

once placed back

into inventory are

not picked based

on FEFO but on

FIFO basis

Contact system supplier

& request returned

products to be

assigned on FEFO basis

Supplier has verified

that configuration for

returned products has

altered so that picked

(returned) products are

based on FEFO as per

non-returned products

11th November 2014

HPRA Expectations

• CS are maintained in compliance with 3.3.1 of GDP

Guidelines

• Know both your requirements and GDP

requirements and verify that they have been met

• Validation documentation available for review for

entire system (incl. data storage and retrieval)

• Systems revalidated where required (changes to

system or processes)

1611th November 2014

11th November 2014 17