17
COMPRES 2008 Annual COMPRES 2008 Annual Meeting Meeting GSECARS Update Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13-BMD (bending magnet end station), 13-BMC (bending magnet side station, commissioning) Techniques available to the scientific community Diamond Anvil Cell: energy-dispersive and monochromatic diffraction and spectroscopy Multi-anvil Press: energy-dispersive and monochromatic diffraction and imaging (250 ton and 1000 ton press; acoustics, tomography) Microprobe: XRF, XAFS, CMT, XRD Microtomography: absorption and edge CMT Surface scattering and spectroscopy: CTR, XSW, reflectivity, GIXAFS. Extended X-ray Absorption Fine Structure (EXAFS) Microcrystal and powder diffraction Inelastic scattering in the DAC Brillouin spectroscopy in the DAC

COMPRES 2008 Annual Meeting GSECARS Update Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13- BMD (bending magnet end station),

Embed Size (px)

Citation preview

Page 1: COMPRES 2008 Annual Meeting GSECARS Update  Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13- BMD (bending magnet end station),

COMPRES 2008 Annual MeetingCOMPRES 2008 Annual Meeting

GSECARS Update Now have 3 beamlines running 100% of the time: 13-ID-D (undulator),

13-BMD (bending magnet end station), 13-BMC (bending magnet side station, commissioning)

Techniques available to the scientific community

Diamond Anvil Cell: energy-dispersive and monochromatic diffraction and spectroscopy

Multi-anvil Press: energy-dispersive and monochromatic diffraction and imaging (250 ton and 1000 ton press; acoustics, tomography)

Microprobe: XRF, XAFS, CMT, XRD Microtomography: absorption and edge CMT Surface scattering and spectroscopy: CTR, XSW, reflectivity, GIXAFS. Extended X-ray Absorption Fine Structure (EXAFS) Microcrystal and powder diffraction Inelastic scattering in the DAC Brillouin spectroscopy in the DAC

Page 2: COMPRES 2008 Annual Meeting GSECARS Update  Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13- BMD (bending magnet end station),

COMPRES 2008 Annual MeetingCOMPRES 2008 Annual Meeting

GSECARS allocates 100% of available beam time on the basis of reviewed proposals through web-based forms (both GSECARS and APS ratings).

• All GSECARS proposals are submitted through the APS General User Program.

Productivity Summary Most Recent 12 months

ID Experiments 88 BM Experiments 92 Total Experiments 180 Beam Time Proposals Received

247

Oversubscription rate (ID) 2.5 Oversubscription rate (BM) 2.1 Outside Users (unique) 228 (2007) User visits 414 (2007) Publications: 2007 59 Publications 2008 to date 26 Publications total 567

GSECARS User Program

Page 3: COMPRES 2008 Annual Meeting GSECARS Update  Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13- BMD (bending magnet end station),

COMPRES 2008 Annual MeetingCOMPRES 2008 Annual Meeting

GSECARS Funding NSF-EAR

In Year 2 of 5 year operations. Flat budget for third year in a row. No money for equipment in FY2008

Year Approved Funding (Notice of Grant Award) $M

Actual Funding

$M

Shortfall

$M

FY 2005 (Previous award)

$1.800 $1.700 $0.100

FY 2006 (Current award)

$1.810 $1.810 0

FY 2007 $2.147 $1.811 $0.336

FY 2008 $2.141 $1.815 $0.326

Cumulative Shortfall $0.762

Page 4: COMPRES 2008 Annual Meeting GSECARS Update  Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13- BMD (bending magnet end station),

COMPRES 2008 Annual MeetingCOMPRES 2008 Annual Meeting

GSECARS Funding (cont) DOE-BES

Operations funding for GSECARS, $740K /year NSF-Geophysics

Rheology Grand Challenge project contains $270K for post-doc and supplies for GSECARS.

High-pressure tomography project. Funds ½ post-doc with Yanbin Wang.

NSF-EAR Nanoscale Research (NIRT) Award to U. Alaska (T. Trainor, PI; $1.3M, 2004-2008;

$310K subcontract to UofC (P. Eng, PI) supports postdoc

Page 5: COMPRES 2008 Annual Meeting GSECARS Update  Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13- BMD (bending magnet end station),

COMPRES 2008 Annual MeetingCOMPRES 2008 Annual Meeting

GSECARS Funding

NSF-Major Research Instrumentation (Complete, no funds remaining)

X-ray optics to complete the 13-BM-C side station ($550K; $88K match; 2004 – 2007)

Another MRI grant to UNLV for single-crystal diffraction in DAC has $225 for CCD detector for GSECARS, received.

COMPRES Infrastructure Projects (All complete, no funds remaining)

CO2 Laser Heating: Postdoc and laser system support Gas Loading Facility: $118K equipment Multi-anvil Module Project: $68K equipment Johnson Noise Thermometry Project: $36K

Page 6: COMPRES 2008 Annual Meeting GSECARS Update  Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13- BMD (bending magnet end station),

13ID-C13ID-D13ID-B 13ID-A

13BM-D

13BM-C13BM-B

13ID-C213ID-D13ID-B 13ID-A

13BM-D

13BM-C13BM-B13ID-C1

LVP Laser Heated DAC

Microprobe

Horz. Focusing Mirror

Existing Mono. ID-C2 / DDiffractometer

Vert. Focusing Mirror

New Mono. ID-C1

New Horz. Deflecting Mirrors

ID Mono.

New Wall

Horz. Focusing Mirror

A.

B. Vert. Focusing Mirror

New Door

New Beam Center Line

New Shutters:C2/D& C1Shielded Beam Pipe

13ID-C13ID-D13ID-B 13ID-A

13BM-D

13BM-C13BM-B

13ID-C13ID-D13ID-B 13ID-A

13BM-D

13BM-C13BM-B

13ID-C213ID-D13ID-B 13ID-A

13BM-D

13BM-C13BM-B13ID-C1

13ID-C213ID-D13ID-B 13ID-A

13BM-D

13BM-C13BM-B13ID-C1

LVP Laser Heated DAC

Microprobe

Horz. Focusing Mirror

Existing Mono. ID-C2 / DDiffractometer

Vert. Focusing Mirror

New Mono. ID-C1

New Horz. Deflecting Mirrors

ID Mono.

New Wall

Horz. Focusing Mirror

A.

B. Vert. Focusing Mirror

New Door

New Beam Center Line

New Shutters:C2/D& C1Shielded Beam Pipe

Canted Undulator UpgradeCanted Undulator Upgrade

• Proposal submitted to APS SAC Dec. 2006, very positive response. APS will contribute $1.5M for undulators and front-end components

• Greatly increases time for high-pressure, microprobe is separated and runs 100% of time

• Allows new undulators optimized for high-energy (high-pressure) and low-energy (spectroscopy, microprobe)

• Unsuccessful in getting Univ. of Chicago MRI slot for Jan 2008.• Now submitting split funding proposals to NASA, NSF, and DOE (~$700K each)

Page 7: COMPRES 2008 Annual Meeting GSECARS Update  Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13- BMD (bending magnet end station),

COMPRES 2008 Annual MeetingCOMPRES 2008 Annual Meeting

Hardware Development Highlights

(COMPRES Infrastructure Projects)

ID-D CO2 heating laser• Now commissioned in 13-ID-D. Tom Duffy talk at this meeting.

Gas loading facility for DAC• Gas loading system built by GSECARS with COMPRES

funds, now available to all high-pressure users at the APS.• Over 40 cells now loaded• Progress report at this meeting.

• D-DIA30• Being fabricated by Rockland Research. Progress report at

this meeting.

Page 8: COMPRES 2008 Annual Meeting GSECARS Update  Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13- BMD (bending magnet end station),

COMPRES 2008 Annual MeetingCOMPRES 2008 Annual Meeting

GSECARS Personnel News• Takeshi Sanehira, post-doc for Johnson noise thermometry

project and GSECARS LVP, COMPRES and GSECARS funding. Will remain till end of 2008.

• Barbara Lavina. Post-doc for single-crystal DAC studies.

• Innokenty Kantor. Post-doc for DAC. His wife Anastasia is supported by Bayreuth but is also stationed at GSECARS

• Nadege Hilairet. Post-doc for rheology grand challenge

• Currently looking for post-doc for high-pressure tomography

• Alexei Kuznetsov, post-doc for CO2 laser heating development; COMPRES and GSECARS funding has returned to Brazil

• Atsushi Kubo, post-doc for DAC has returned to Japan

Page 9: COMPRES 2008 Annual Meeting GSECARS Update  Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13- BMD (bending magnet end station),

COMPRES 2008 Annual MeetingCOMPRES 2008 Annual Meeting

LVP progress: Technical development

Modified Drickamer anvil cell for high T deformation above 30 GPa

6-6 multi-anvil cell for flexible D-DIA applications, Nishiyama et al., 2008

DDIA-30, a COMPRES - GSECARS joint megabar multi-anvil development project

Radiospectrometry and pressure effect on thermocouple e.m.f., a COMPRES - GSECARS joint project

Page 10: COMPRES 2008 Annual Meeting GSECARS Update  Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13- BMD (bending magnet end station),

COMPRES 2008 Annual MeetingCOMPRES 2008 Annual Meeting

6-6 MA cell test

“second-stage” anvils in cubic cell,vary from run to run

Perm-anent“first-stage” anvils on edges

DDIA_Extender1.wmv

Page 11: COMPRES 2008 Annual Meeting GSECARS Update  Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13- BMD (bending magnet end station),

COMPRES 2008 Annual MeetingCOMPRES 2008 Annual Meeting

LVP Program progress: Science Rheology in D-DIA:

Serpentine and subduction zone dynamics, Hilairet et al., Science, 2007 hcp iron and rheology of the inner core, Nishiyama et al., GRL, 2007 Preferred orientation slip systems of post-perovskite CaIrO3, Miyagi et al., EPSL,

2008 High-P tomography:

Equation of state of silicate glasses at high P and T, Lesher et al., PEPI, 2008 Surface tension of Fe-S, Fe-P, and Ni-S melts at high pressure, Terasaki et al.,

PEPI, HPR, 2008 High P-T crystallography:

Symmetry of CaSiO3 perovskite to 18 GPa and 2000 K, Uchida et al., 2008, EPSL, in press

High P melting: Allende meteorite: solidus and liquidus phases at high P, Danielson et al., 2007 Fe-S, B. Chen et al., HPR, 2008 Si melting curve, Kubo et al., Phys. Chem. Solids, 2008

Ultrasonic elasticity and self-consistent equation of state: MgSiO3 enstatites, Kung et al., GRL, 2005 Mg2SiO4 ringwoodite, Li et al., 2005 (Mg,Fe)2SiO4 wadsleyite, Liu et al., PEPI, 2008

Page 12: COMPRES 2008 Annual Meeting GSECARS Update  Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13- BMD (bending magnet end station),

COMPRES 2008 Annual MeetingCOMPRES 2008 Annual Meeting

Ø 5 μm X-ray

Ø 20 μm flat top laser beam

30 μm

Prakapenka et al., High Pressure Research, 2008 (in press)

Page 13: COMPRES 2008 Annual Meeting GSECARS Update  Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13- BMD (bending magnet end station),

COMPRES 2008 Annual MeetingCOMPRES 2008 Annual Meeting

Page 14: COMPRES 2008 Annual Meeting GSECARS Update  Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13- BMD (bending magnet end station),

COMPRES 2008 Annual MeetingCOMPRES 2008 Annual Meeting

A gradual spin transition of iron occurs over a pressure-temperature range extending from about 1000 kilometers in depth and 1900 kelvin to 2200 kilometers and 2300 kelvin in the lower mantle

Jung-Fu Lin, et al., Science 317, 1740 (2007)

Page 15: COMPRES 2008 Annual Meeting GSECARS Update  Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13- BMD (bending magnet end station),

COMPRES 2008 Annual MeetingCOMPRES 2008 Annual Meeting

•Brillouin spectroscopy

•Raman spectroscopy

•Fluorescent spectroscopy (ruby)

•Optical spectroscopy (500-1600 nm)

Remarkable combination of in-situ high resolution microdiffraction at HP/HT in DAC with optical

spectroscopy:

13-BM-D (GSECARS)

Page 16: COMPRES 2008 Annual Meeting GSECARS Update  Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13- BMD (bending magnet end station),

COMPRES 2008 Annual MeetingCOMPRES 2008 Annual Meeting

573K_b

0

5E-23

1E-22

1.5E-22

2E-22

2.5E-22

3E-22

3.5E-22

4E-22

1033 1133 1233 1333 1433 1533

wavelength (nm)

inte

nsi

ty

obs

Series2

Fit: 577K

Page 17: COMPRES 2008 Annual Meeting GSECARS Update  Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13- BMD (bending magnet end station),

COMPRES 2008 Annual MeetingCOMPRES 2008 Annual Meeting

GSECARS Near Term Goals Pursue funding and (hopefully) design and

construction of canted undulators. Bring the 13-BM-C station fully online with

scientific programs in interface diffraction and single-crystal diffraction at high pressure

Complete D-DIA30 project Bring CO2 laser heating for the DAC in 13-

ID-D into full user program