2
INECO DNA COMPREHENSIVE SERVICE OFFER KEY PROJECTS 2% of our TURNOVER we collaborate with universities technological centres AUTOMATISATION of engineering PROCESSES NEW METHODS and approaches to SUSTAINABILITY PREDICTIVE MAINTENANCE & MANAGEMENT IMPROVEMENT TOOLS advanced concepts in MODELLING and organisation of MOBILITY TECHNOLOGICAL VANGUARD in infraestructure ENGINEERING to INNOVATION more than spain high speed network 3,100 km in service 20 years of experience World leader in ERTMS deployment 350 km/h speed airport network modernisation and reorganisation of airspace >20 years of collaboraon with the airport authories >1,900,000 operaons Close to 700 million tonnes of cargo SACTA updates in 5 centers and 48 control towers european commission ertms deployment Deployment in more than 65,000 km of European rail network 9 priority corridors 6 year term Horizon 2030 united kingdom hs2 high speed Parcipaon in Phase 1 and Phase 2 531 km of tracks 400 million journeys in 2020 Be Inspired Award 2013 turkey istambul – Ankara high speed 250 km/h speed 3h journey 50,000 passengers daily Consultancy and works supervision uae orat at abu dhabi airport New terminal for 30 millon passengers x2 current volume of passenger traffic 700,000 m² surface Capacity for 19,000 suitcases/hour kuwait project management of the international airport expansion New terminal with more than 700,000 m 2 of built surface 3 runways for 4F class flights Two control towers 5 km of tunnel under the runways for air cargo management peru lima airport extension Airport surface extension from 3 to 7 millon m 2 New passenger terminal in 2016 Second runway of 3,500 metres 23 millon passengers in 2023 brazil cptm lines in são paulo 6 metro lines 25 minutes average duraon journey 3 minute intervals Standard gauge saudi arabia makkah-madinah high speed 166,000 passengers daily 444 km 320 km/h speed <3 hours of journey mexico roads: concessions and signalling 148 km 10,000 vehicles daily 28% heavy transport Extension to 4 lanes construction supervision of the new international airport in ciudad de mexico 6 runways of triple simultaneous operaon >170 operaons / hour 1 mul-level terminal of 743,000 m 2 2 satellite buildings Line 12 of ciudad de Mexico metro Line of 4 km 3 new staons Management, coordinaon and control of the extension projects Will relieve congeson of metro lines 1, 2 & 3 ecuador national strategic mobility and transport plan Analysis of more than 800 km of road 4 internaonal traffic ports and 20 fishing ports 25 airports Duraon of the plan: 2012-2037 Consultancy and planning Strategic planning Preliminary studies and reports Formulaon of legal regulaon Structuring, financing and concessions Preliminary design P RO J E C T MA N A G E M E N T > > > > > > > > > > > P RO J E C T M A N A G E M E N T > > > > > > > > > >> > Drawing up projects Funconal / conceptual design Detailed design / construcon project Project supervision Works Supervision & monitoring Health & safety coordinaon Environmental management Works management Commissioning Operaon tests Operaonal readiness Launch of fully operang service Training Operation and maintenance Safety inspecons Supervision and monitoring Pre maintenance Procurement consulting horizon 2020 participation in European programmes: framework programme 7 th we dedicate THE WHOLE LIFECYCLE OF THE PROJECT

COMPREHENSIVE INECO DNA KEY PROJECTS SERVICE OFFERptico... · KEY PROJECTS 2% of our TURNOVER we collaborate with universities technological centres AUTOMATISATION of engineering

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: COMPREHENSIVE INECO DNA KEY PROJECTS SERVICE OFFERptico... · KEY PROJECTS 2% of our TURNOVER we collaborate with universities technological centres AUTOMATISATION of engineering

INECO DNACOMPREHENSIVE SERVICE OFFER

KEY PROJECTS

2% of our

TURNOVER

we collaborate with

universities technological centres

AUTOMATISATION of engineering PROCESSES

NEW METHODS and approaches to SUSTAINABILITY

PREDICTIVEMAINTENANCE & MANAGEMENTIMPROVEMENT TOOLS

advanced concepts in

MODELLING and organisation of

MOBILITY

TECHNOLOGICAL VANGUARD in infraestructureENGINEERING

to INNOVATIONmore than

spainhigh speed network

3,100 km in service20 years of experienceWorld leader in ERTMS deployment350 km/h speed

airport network modernisation and reorganisation of airspace

>20 years of collaboration with the airport authorities

>1,900,000 operationsClose to 700 million tonnes of cargoSACTA updates in 5 centers and 48 control towers

european commissionertms deployment

Deployment in more than 65,000 km of European rail network9 priority corridors6 year termHorizon 2030

united kingdomhs2 high speed

Participation in Phase 1 and Phase 2531 km of tracks400 million journeys in 2020Be Inspired Award 2013

turkeyistambul – Ankara high speed

250 km/h speed3h journey50,000 passengers dailyConsultancy and works supervision

uaeorat at abu dhabi airport

New terminal for 30 millon passengersx2 current volume of passenger traffic700,000 m² surfaceCapacity for 19,000 suitcases/hour

kuwaitproject management of the international airport expansion

New terminal with more than 700,000 m2 of built surface3 runways for 4F class flightsTwo control towers5 km of tunnel under the runways for air cargo management

perulima airport extension

Airport surface extension from 3 to 7 millon m2

New passenger terminal in 2016Second runway of 3,500 metres23 millon passengers in 2023

brazilcptm lines in são paulo

6 metro lines25 minutes average duration journey3 minute intervalsStandard gauge

saudi arabiamakkah-madinah high speed

166,000 passengers daily444 km320 km/h speed<3 hours of journey

mexicoroads: concessions and signalling

148 km10,000 vehicles daily28% heavy transportExtension to 4 lanes

construction supervision of the new international airport in ciudad de mexico

6 runways of triple simultaneous operation>170 operations / hour1 multi-level terminal of 743,000 m2

2 satellite buildings

Line 12 of ciudad de Mexico metroLine of 4 km3 new stationsManagement, coordination and control of the extension projectsWill relieve congestion of metro lines 1, 2 & 3

ecuadornational strategic mobility and transport plan

Analysis of more than 800 km of road4 international traffic ports and 20 fishing ports25 airportsDuration of the plan: 2012-2037

Consultancy and planningStrategic planning

Preliminary studies and reportsFormulation of legal regulation

Structuring, financing and concessionsPreliminary design

PROJECT MANAGEMENT >

>>

>>

>>>>>> PROJECT MANAGEM

ENT

>>

>>

>>

>>>>>>

Drawing up projectsFunctional / conceptual design

Detailed design / construction projectProject supervision

WorksSupervision & monitoringHealth & safety coordinationEnvironmental managementWorks management

CommissioningOperation testsOperational readinessLaunch of fully operating serviceTraining

Operation and maintenanceSafety inspectionsSupervision and monitoringPre maintenance

Procurement consulting

horizon2 0 2 0

participation in European programmes:

framework

programme7th

we dedicate

THE WHOLE LIFECYCLE

OF THE PROJECT

Page 2: COMPREHENSIVE INECO DNA KEY PROJECTS SERVICE OFFERptico... · KEY PROJECTS 2% of our TURNOVER we collaborate with universities technological centres AUTOMATISATION of engineering

ENGINEERING AND CONSULTANCY FOR INFRASTRUCTURE AND TRANSPORT

engineering and consultancy around the world

MARKETSSOLUTIONS

www.ineco.com

TRANSPORT PLANNING AIRPORTS RAILWAYS

ROADS URBAN TRANSPORT PORTS

ENVIRONMENT ARCHITECTUREICT

!

AIR NAVIGATION

more than

6,000projects

more than

45yearsof experience

more than

50countries

R+D

WASTE MANAGEMENT

PROJECTS

ERTMS

ROLLING STOCK

MAINTENANCE

CONSULTANCY WORKS

ORAT

OPERATION

PROJECT MANAGEMENT

SMART PRODUCTSPLANNING

AND WATER MANAGEMENT

around

2,500professionals

in the last 10 years